Professional Documents
Culture Documents
0 Exam Outline
Exam Overview
Certification Exam Code Exam Name Language Duration Pass Score/Total Score
Exam Outline
The HCIA-Data Center Facility V1.0 exam includes the following: data center facility,
electrical EHS, power distribution system, cooling system, monitoring system, fresh air
10. Functions of fresh air system, cabling system and gas fire
6%
extinguishing system
Note:
The content mentioned in this article is just a general exam guide; the exam may
Reference
Recommended Training