工作界面说明:
1、勘察设计Survey & Design统一由“网络部署BU”的站点设计及实施管理部负责完成。
2、
1.6 Design of cables outside containers and pipe routing, cable trays preparation R
1.7 Preparation of equipment room conditions and ground system design construction R
3 Construction preparation
Preparing and providing temporary water supply, power supply, and office area
3.4 R
4 Installing device
4.11 Connecting, keeping warm, and fixing water supply pipes and drainpipe for AC R
4.13 Connecting refrigerant pipes, leak checking, charging refrigerant or water for AC R
Installing monitoring system hardware (server, switch, NVR, and camera) and
4.16 connecting monitoring cable R
5 Project acceptance
*Customer: including final users in direct sales and channel resellers, not final users
*Loading and unloading of devices in the receiving address: According to the logistics contract, devices transported by Huawei ar
Huawei, and those transported by customers are loaded and unloaded by customers.
0Installation
Advanced directed commissioning
service Comments
Custome Huawei
R S
R S
R S
R
R S
R S
R S
R S
R S
R S
R S
R S
R S
R S
R S
R S
R S
S R
S R
R S
R S
R S