Customer Requirement Planning Vendor

Customer Business Plan Designing


▪ Complete Building Network Improvement ▪ 3D Modelling
▪ To offload Macro traffic ▪ Model walls horizontal and inclined surfaces
▪ Technology (2G/3G/4G/5G/ combinations) ▪ Import floor plans CAD/ PDF
▪ Frequency bands with allocated bandwidths ▪ Geocoding
▪ Floor plans and survey permissions ▪ Export 3D images to image files
▪ Zone layer per wireless services/ Sectors

Technical Data
▪ Solution type (Active DAS/ Passive DAS/ Small Planning
Cells)/ (SISO/ MIMO) Wi-Fi/ Public safety ▪ Define propagation model/ model tuning
▪ RAN type (CRAN/ DRAN) ▪ Antenna / small cell count to plan to provide
▪ OEM (Nokia/ Ericsson/ Spider cloud/ enough coverage and capacity
Samsung/ Airspan etc) ▪ Body loss modelling for dense venues
▪ Design and Planning tool (iBwave/ Ranplan) ▪ Antenna plan and cable connectivity plan
▪ Power sharing criteria ▪ PIM calculation and EMF calculations
▪ Design Criteria (RSRP >-95 dBm and SINR >
10 dB @ 95% coverage area)

Deliverables and Performance Thresholds


▪ iBwave design file with prediction plots Performance Check
▪ EMF report/ Compliance ▪ Survey measurement and prediction (CW
▪ Link Budget testing) vs. measured reports
▪ BOM/ Equipment list ▪ Generating prediction plots for coverage and
▪ Coverage (SS-RSRP, CS-RSRP, RSCP, Rx-Level) capacity to meet the KPI.
▪ Quality (SS-RSRQ, RSRQ, Ec/No, SINR) ▪ Walk test
▪ Capacity (Avg. DL Data Throughput)
▪ SHO (Soft Handover Ratio)/ Overlapping zones
Indoor Solution Floor Plan Customer network Final Survey/ BTS
requirement confirmation requirements discussion
Pre Survey location/
with survey schedule with RNP Distribution box
from customer end

Detailed RF Design & Planning using


Tool iBwave/ Ranplan
Report Submission 1. 3D modelling using building
Discuss
1. Ibwave report material
Discuss solution installation issues
2. CAD Drawings 2. System Diagram
with customers with system design
3. Installation proposal 3. Antenna location on floors
RNP with installation
4. Material list 4. Output KPI’s Criteria
planner
5. Coverage predictions
6. Link budget calculation
Backhaul Planning
Transmission Team
Acquisition Implementation/
Integration
Proposal Installation Site Acceptance
submission Test/ HOTO/
Handover

RF Optimization Site Acceptance


RF Acceptance
(if required) Test/ HOTO/
Handover
1. Input Data

5. Implementation

7. Acceptance Test 6. Integration and


Commissioning

2. Preliminary Design
3. Site survey and 4. Design proposal
test measurements
4