04.

27 38 mm thick artificial patent stone (1:2:4) flooring with


cement, best quality coarse sand (50% quantity of Sylhet
sand or coarse sand of equivalent F.M. 2.2 and 50% best
local sand of FM 1.2) and 12 mm down well graded brick
chips including breaking chips, screening, laying the
concrete in alternate panels, compacting and finishing the
top with neat cement and curing at least 7 days in all floors
including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer. (Cement: CEM-
II/A-M) In ground floor. sqm. @Tk.423/-
04.28 25 mm thick artificial patent stone (1:2:4) flooring with
cement, best quality coarse sand (50% quantity of Sylhet
sand or coarse sand of equivalent F.M. 2.2 and 50% best
local sand of FM 1.2) and 12 mm down well graded stone
chips, laying the concrete in alternate panels, compacting
and finishing the top with neat cement and curing at least 7
days in all floors including cost of water, electricity and other
charges etc. all complete and accepted by the Engineer.
(Cement: CEM-II/A-M) In ground floor. sqm. @Tk.390/-
04.29 38 mm thick artificial patent stone (1:2:4) flooring with
cement, best quality coarse sand (50% quantity of Sylhet
sand or coarse sand of equivalent F.M. 2.2 and 50% best
local sand of FM 1.2) and 12 mm down well graded stone
chips, laying the concrete in alternate panels, compacting
and finishing the top with neat cement and curing at least 7
days in all floors including cost of water, electricity and other
charges etc. all complete and accepted by the Engineer.
Cement: (CEM-II/A-M) In ground floor. sqm. @Tk.510/-
04.30 25 mm thick artificial patent stone (1:1.5:3) flooring with
cement, best quality coarse sand (50% quantity of Sylhet
sand or coarse sand of equivalent F.M. 2.2 and 50% best
local sand of FM 1.2) and 12 mm down well graded stone
chips, laying the concrete in alternate panels, compacting
and finishing the top with neat cement and curing at least 7
days in all floors including cost of water, electricity and other
charges etc. all complete and accepted by the Engineer.
(Cement: CEM-II/A-M) In ground floor sqm. @Tk.409/-
04.31 38 mm thick artificial patent stone (1:1.5:3) flooring with
cement, best quality coarse sand (50% quantity of Sylhet
sand or coarse sand of equivalent F.M. 2.2 and 50% best
local sand of FM 1.2) and 12 mm down well graded stone
chips, laying the concrete in alternate panels, compacting
and finishing the top with neat cement and curing at least 7
days in all floors including cost of water, electricity and other
charges etc. all complete and accepted by the
Engineer.(Cement: CEM-II/A-M)In ground floor. sqm. @Tk.539/-
04.32 Extra cost shall be incorporated in the estimate for each
additional floor for patent stone works.
04.32.1 Add for each additional floor up to 5th floor sqm. @Tk. 24/-
04.32.2 Add for each additional floor from 6th floor to 9th floor sqm. @Tk. 32/-
04.32.3 Add for each additional floor for 10th floor and above sqm. @Tk. 40/-