Crate&Barrel
Founded in 1962
Headquartered in Northbrook, IL
168 Stores in US, Canada, And UAE
7,000 Employees
Retailers of Housewares & Furniture
Emphasis on People, Product and Presentation
Crate&Barrel
We don’t use prototypes
Each store is a unique design. No efficiency
Complex articulation in plan and elevation
Neo-Modernist approach to design and detailing
Difficult materials to source
High sensitivity to delivered facility. Building as
Brand
1
2/14/2011
2
2/14/2011
3
2/14/2011
Survival Mandate
Reduce Capital Investment 30%-50%
Reduce Facility Opening Cycles 45%
Maintain or Improve the Brand
Survival Strategies
Challenge Design-Bid-Build
Find our Bottlenecks and Constraints
Eliminate Non-Value Added Steps
10
11
12
4
2/14/2011
13
14
15
5
2/14/2011
16
20.0
18.0
16.0
14.0
12.0
MH / Ton
10.0
8.0
6.0
4.0
2.0
0.0
0 1 2 3 4 5 6 7 8 9 10
Store
17
$500.00
$450.00
$400.00
$350.00
$300.00
Cost (thousands)
$250.00
$200.00
$150.00
$100.00
$50.00
$-
0 1 2 3 4 5 6 7 8 9 10
Store
18
6
2/14/2011
19
20
21
7
2/14/2011
22
23
24
8
2/14/2011
25
26
27
9
2/14/2011
28
29
30
10
2/14/2011
31
32
33
11
2/14/2011
$500.00
$450.00
$400.00
$350.00
$300.00
$250.00
$200.00
$150.00
$100.00
Cost per Selling Square Foot
$50.00
34
35
36
12
2/14/2011
37
38
39
13
2/14/2011
40
STRATEGIC
OPERATIONAL
TACTICAL
14
2/14/2011
JM9
STRATEGIC
OPERATIONAL
TACTICAL
Where is BIM headed in the next five years ?
Greater Adoption among Architects, Engineers, Contractors,
Manufacturers, Owners
For Architects
Replacement (but not elimination of) 2D CAD as the main production platform for graphic
Instruments of Service.
For Engineers
Combined graphic, analytical, and modeling capabilities.
For Contractors
Combined 4D and 5D operations within the BIM.
For Sub‐Contractors
Coordinated Layout of Dimension Control from the BIM
For Manufacturers
Completion of Product Catalogs and Specification Interface within BIM
For Owners
At the MINIMUM, understanding the benefits and availability of BIM from the AEC
industry so as to change basic expectations with respect to the STANDARD OF
CARE.
How will BIM software change in five years?
Massive integration and expansion of “out of the box”
functionality of the two major platforms
Visualization
The majority of project renderings and animations done with the BIM platform instead of
CG software (3D Studio MAX). And anyone can render and animate.
Coordination
Clash detection and coordination done within the platform and automated.
Code Analysis
Standard ICC, ADA, NEC, and ASHREA code conformance checking .. perhaps certification
Sustainability
USGBC (LEED) compliance checking
Communication
BIMs will talk with RFIDs, Bar Codes, Total Stations, Scanners, and GPS
Ease and Speed of Use
Cloud computing will make BIM software faster without the IT infrastructure.
15
Slide 43
JM9 hierarchy
overlap
bottom up reinforcing
John Moebes, 2/2/2011