3D-4D-5D BIM &

Project Delivery
Presenter:
Peter Cholakis
Chief Marketing Officer
4Clicks Solutions, LLC

Webcast| March , 2011


2011 Copyright 4Clicks Solutions, LLC
Change on the AEC horizon ….

PROCESS Drives Efficient


Construction Delivery …
Key Drivers for Change

 Altered World Economic Landscape


– AEC Productivity has DELINED over the past 40
years !

 Global Climate Change


– Buildings are a major contributor!
BIM
Strategy
“Traditional” Project Delivery vs. IPD

 Design-Bid-Build (DBB)  Integrated Project Delivery (IPD)


 Design-Build (DB)  Job Order Contracting (JOC)
 CM-at-Risk (CMAR)  …
 …
“Traditional” Project Delivery vs. IPD
“Traditional” Project Delivery vs. IPD
Benefits of IPD for Existing Buildings -
JOC / SABER
Job Order Contracting* proven, process-driven,
Integrated Project Delivery methods for facility repair,
renovation, & minor new construction.

 Collaboration
 Shorter Project Timelines
 Transparency
 Higher Productivity
 Quality
 Longer Term Relationships

* JOC is also knows as SABER in the Air Force –Initially developed within the DOD, this form of IPD for
existing buildings has a successful track record encompassing more than two (2) decades.
JOC / SABER = Shorter Timelines!
Technology Enabled JOC

Integration of Proven Construction Delivery Methods / Project


Management

Standardized Cost Data Architectures / Taxonomies (i.e.


RSMeansTM – 400,000 line items)

Comprehensive Document Management

Electronic Visualization / QTO (i.e. eTakeoffTM)


Manage Multiple Project Types

Integration of Proven Construction Delivery Methods


Integrated, Standardized Cost Data

Example – RSMeansTM - 400,000 line item extension


Electronic Visualization

Example - eTakeoffTM Electronic Visualization / QTO!


How OWNERS Use JOC & Technology

 Track & Manage each project from


inception to completion.
Programming Estimate
 Manage a single project, your
entire contract, or multiple
contracts. Estimates from Each Design Stage
 All project milestones, thru
warranty period. Final Detailed Cost Estimate
 Display status of each project.
Initial Contractor Proposals
 Maintain a complete cost history
Technically Evaluated Proposals
 Record all estimates associated
with a project.
Final Revised Contractor Proposals
 Review value of all projects
awarded on a specific contract, or
to a specific contractor. Modifications & Changes Orders
 Reports show pre-negotiation
strategies and post-negotiation
summaries.
PROJECTS – Share Quick Access with Teams

 Document and Manage Projects

 Link Estimates to Specifications

 Project Reporting Tools

 From Planning thru Warranty!


ESTIMATES – Create Detailed Estimates

 Paperless estimating — direct access to pricing


guides, references, drawings, and more.

 Copy and paste estimates or estimate line items.

 Create and maintain multiple estimates in a


project, or across multiple projects/contracts/years
coefficients.

 Update estimates in seconds to reflect pricing


guide changes.
ESTIMATE LINE ITEMS – RSMeans, IDIQ, Custom

 Display complete descriptions of line items:


crew, output, material, labor, & equipment costs.

 View source data at a glance

 Sort and filter estimates

 Include unlimited detailed notes and engineering


calculations at the line item level.
THE COST DATABASE
– Extended 400,000 line items
COMPLETE City Cost Index
ELECTRONIC TECHNICAL EVALUATIONS
– Compare, Evaluate, Negotiate, Award

 Streamlined/Automated Technical Evaluation process.

 Focus technical evaluations on areas of difference.

 Changes are easily summarized in estimate report for both


contracting officials and the contractor - creating a pre-
negotiation strategy.

 Multiple contractor proposals can be compared side-by-side.


Construction Specifications
– Integrate your contract specifications
REPORTS
– Print, PDF, Export to Forms
eTakeoffTM – Electronic Visualization / QTO

 Trace electronic drawings to determine quantities.

 Increase estimating efficiency and accuracy.

 Takeoff directly from the screen using digital plans - DWG,


PDF, TIFF …

 Dynamically linked to your RSMeans or IDIQ estimate data.


Who Uses JOC/SABER, IDIQ ….

70%+ of the United States Air Force


12th AF, Andrews AFB, Arnold AFB, Avon Park, Bolling AFB, Buckley AFB, Cannon AFB, Charleston AFB,
Cheyenne Mountain AFS, Columbus AFB, Davis Monthan AFB, Dobbins ARB, Dyess AFB, Eglin AFB,
Elmendorf AFB, Fairchild AFB, Grand Forks AFB, Hickam AFB, Hill AFB, Holloman AFB, Hurlburt Field,
Lackland AFB, Lajes Field, Langley AFB, Laughlin AFB, Little Rock AFB, Los Angeles AFB, Luke AFB, March
ARB, McConnell AFB, Moody AFB, Nellis AFB, New Boston AFS, Offutt AFB, Peterson AFB, Pittsburgh ARS,
Randolph AFB, Robins AFB, Schriever AFB, Seymour Johnson AFB, Shaw AFB, Scott AFB, Travis AFB,
Tyndall AFB, USAFA, Westover ARB, Whiteman AFB, Wright Patterson AFB, Youngstown ARS

Numerous Army, Navy, and other Government Agencies


Anniston Army Depot, Fort Benning, Fort Carson, Fort Hood, Fort Huachuca, Fort Hunter Liggett, Fort
Leonard Wood, Fort Irwin, Fort Jackson, Fort Polk, Fort Sill, McAlester Army Depot, USACE Albuquerque
District and USACE Fort Worth District, Charleston NWS, NSA Panama City, Defense Intelligence Agency,
NASA, National Park Service, Army Corps of Engineers

Thousands of Contractors, Subcontractors, A/Es

Higher Education, County/State/Local Government,


Healthcare …
“Standards”

MasterFormat2010, Uniformat II – Reference Cost Databases


(aka RSMeans)

COBIE, OMNICLASS

IFC

Metrics: FCI, SCI, Cost/GSF, Cost/NSF, Utilization Rates, ….


Comprehensive Solution