WORK ORDER
Reporting Sheet
Ord.Type: PREV
‘Order No: 13016017
[Functional Location: REF2/F86/1S4-3U1
\Fun.Loe.Dese: UPS 110V 50HZ F/SERS
[Eqpt. & Desc: 10189337 - UNINTERRUPTED POWER SUPPLY,0KVA
UPS INSPECTION.ELEC, 6M
BATTERY BANK.ELEC,6M
CHARGER BATTERY. ELEC, 6M
‘UPS FISERS,184.3U1,ELEC
‘Awaiting contractor" Gulf Energy *
Material No.& Desc: ‘SizerDim.
Seria! No: Catalog Profile: UPSU
IManuf: CHLORIDE INDUSTRIAL SYSTEM (O&M Manual Doc. No:
[ABC Ind: 2 Location: SERS ‘Scheduling Grp: 1S43U1A Haz Area: NH
[Peiority:c- C-Med Potential Loss ‘Seheduled Start Date: 04.07.2027
Main Wk Ctr/Plant:ELTC/2500 ‘Scheduled End Date : 04.07.2024
Werk Requested By:
Work Description
Job reportin
Date [OperNo [WkCtr |ActTyp [St [End Time _[No-Men
[Remarks/Reasons for Variance:
Technical Analysis Summary:
Om cowplect- as Pek Bp Checu lst by Os?
SS 3 F PHY
Executed By: ‘Signature:
Page 1 ofWORK ORDER
Maintenance routine Ord.Type: PREV
‘Order No: 13016017
‘Oper No: 0110- UPS INSPECTION,ELEC.6
StText Key: REUPAGM CCnfn.No:7396771 ‘ActType:INTPM, No.Mo
‘Start Date: 04.07.2024 WectriPtt: ELTC 12500, Burrs: 1.0
UPS INSPECTION.ELEC,6M
UPS INSPECTION, PROPER OPERATION & CLEANING,6M
Crew: 1 Duration: 2H. Man-Hour:2
PLEASE FILL IN THE BLANKS WITH YES.NO,READINGS
4. COLD PERMIT NO —
°
2, tsolation permit No. - 11S
WorK:
1. Clean and rernave dust fom the UPS unt. «~~
2. Isolate one of the UPS and transfer the iad fo the redundant one and inspect intemal components and PCB for signs of
Somage, evra or oe ble a then epee he sare he redundant UPS
repack vt’ and recta suber bred of roken wes.
Verify that all fans are operational. wor <
‘hes a ters and veilaten gis fo cleanness and amps, lace anode
hast vernon apertures ere clean and arf cbstcton cen I ecassay.
Cheek he OC nk satin caoacrs for reg
Choc ne rar and reverse votage vate fh He wheeling odes,
Ghectnerensurson capac ver sib nut ero
{o.__ Hace UBS tock on ne an partrm operational iat ofthe atom and rete proper peaion dn et
Swit sees, dey, mete, an oad love an repeat ese forthe redundant UPS
sre efeac ana caltatemeies erenomal and eco het exdgs, alma sored dtc avaiable fm UPS dare, }
Completion:
1. HOUSEKEEPING AFTER JOB COMPLETION. —
2. CLOSECOLDWORK PERMIT. a4
3. _ RAISE NOTIFICATION FOR ANY ABNORMALITIES,
‘Oper.No: 0140- BATTERY BANK.ELEC OM
‘StText Key: REBBAGM (Chfr.No:7395772 ‘Act-Type:INTPM
‘Start Dato: 04.07.2021 Wk.CtePIt: ELTC 12500 Durlirs: 2.0
BATTERY BANK ELEC,6M
BATTERY BANK VISUAL INSPECTION AND CHECKING PROPER OPERATION,6M
Crew: Duration: 2 Hr. ‘Man Hour 2
‘SAFETY:
“OBTAIN ISOLATION PERMIT NO: ~
2.OBTAIN COLD WORK PERMIT NO: —-=—.
11>
WORK:
1. CHECK INTEGRITY OF BATTERY BANKIRACK
2. VISUAL INSPECTION INCLUDING THE FOLLOWING: (~~
21 CHECK FOR No-OX GREASE OR ACCEPTABLE COMPOUND ON ALL CONNECTION“
32 CHECK BATTERY CELLS FOR PROPER ELECTROLYTE LEVELONHERE APPLICABLE) 4)
3 Giiecx Fox CORROSION ON ALL TERMINALS AND CABLES, REMOVE AND NEUTRALZE AS NEEDED, |
2a Ghiecx FOR OVERALL CLEANLINESS OF THE BATTERY ROOMAND CELLS,
4
3, RECORED THE VOLTAGE OF EACH CELL —-
Page 2of4WORK ORDER
‘Maintenance routine Ord.Type: PREV
‘Order No: 13016017
4, MEASURE RECORD TOTAL BATTERY FLOAT CHARGING VOLTAGE & CURRENT.
om
5. VERIFY THAT ALL REQUIRED SAFETY DEVICES ARE PRESENT AND OPERATIONAL”
Completion:
4, HOUSE KEEPING AFTER JOB COMPLETION.
2 CLOSE COLD WORK PERMIT.
3. _ RAISE NOTIFICATION FOR ANY ABNORMALITIES.
(Oper.No? 0170 - CHARGER, BATTERY,ELEC 6M
StToxt Key: REBCAGM ‘Cnfn.No:7398773, Act Type: INTPM No.Men:t
Start Date: 04.07.2021, We.cteiPit: ELTC /2500 Durlirs: 20
CHARGER BATTERY,ELECOM
BATTERY CHARGER VISUAL INSPECTION, PROPER OPERATION & CLEANING 6M
Crew: Duration: 2 Hr Man-Hour.2
SAFETY:
Obtain isolation permit No. 11682
Isolate, lock out, tag rout
(Obtain cold work permit No.
CLEAN THE PANEL FROM DIRT AND OUST. ao
‘ieual nection of batery charger components and PCB for any signs of damage, overheating or other problems,
Check the rectifier anubbers for burned or broken wes.
(Check the OC tink smoothing capactors for itering
‘Check te foward and reverse vatage valve of he Fee wheeling codes,
{Gheck the resistors and capacitors valves of he input Mle.
heck gnd calibrate meters are normal and record a meter Tadings, alas, stored data.et availabe fom battery charger
8. Petform operations test ofthe system and note proper operation including circuit breakers, onfoff switches, cispiay, meters
lamps and load level
9. Verity that all fans are operational. ~~
10. Check airfiters and ventilaton grils for eanliness and lamps, replace as needed.
$1, Check ventiation aperatures are clean and clear of obstruction, lean if necessary, —~
Comeletion
4. HOUSE KEEPING AFTER JOB COMPLETION.
2, GLOSECOLDWORK PERMIT. 4
3, RAISE NOTIFICATION FOR ANY ABNORMALITIES.
Page 3 of 4WORK ORDER
Object List
Ord.Type: PREV
Order No: 13016017
Object list for order:
Process Functional Location & Description:
Ind:
Equipment & Description:
Serial No: Material:
REF2/F/86/1S4-3U1A-BB
BAT BANK F/1S4-3U1A
10315021
BATTERY BANK
REFUF/6/1S4-3U1A-CA
BAT CHRGR F/1S4-3U1A
10315022
BATTERY CHARGER,57.4 KVA
REF2/F/86/1S4-3U1A-INVTR
INVTR F/1S4-3U1A
10315023
INVERTER, 110 V,30 KVA
REF2/F/86/2301-CB-1S43U1-1
MCCB F/1S4-3U1 FRM 1522
10315064
CIRCUIT BREAKER,MOULDED CASE, 160 A
REF2/F/86/2301-CB-1843U1-3
MCCB F/1S4-3U1A UPS BYPASS FRM 1824
10315066
CIRCUIT BREAKER,MOULDED CASE,415 V
Page 4 of 4- cs QP REFINERY
dakar tron some te ET common o_oureencr
SEO GRE Rate mo eceron Peoria ema
Eis [oooras
ha Sea eouPver pe
seq, [rowan Go arESTTELES an DOVER OO GURGERGATENY
fa haarameoemr SATE SSS
Fane ave Caen aS ress ceseacame a
= he merece 2
6 Coca ea ee eA UNE LEAS Ie "
a aT
seonona) fp escowecteo fix | sorrow xo
See ae (ea .
RY TST SES CLAN OF COMDUSTINES lan fe counsronce ne wane vor We VALDIY oF
MACE SEVERE ARE COVE wasunscione (ts | ust WORE ME PERTORUNG AITHORTY 210 TOP THE WOR
ee ee ea is
pare eta aericioe
Beer mum arm acon meer
Ee minaret merce
ers ieeaae SS wenn ire oo 0,70 ten
Bisre sea cia ttatecear sei SET soy
vahechas gen Sahel 1 creer sunogY oL TE ATONN 719 PRCUED FPR AION
SEE BENE SOR iS eG
Te VALDY Tae tT Tae 1
Fea ee eee TRS weATIONED IN SECTION 2 & 3 APQVE AND ACCEPT TO.PLEMENT THEM PRIOR START WORKING, SHALL INFORM THE OPERATING
an
serene Ra ra rome mnseesvccanieeD "wa The woncnsseayscmtoreomosTrren
ORIGINAL COPY TO BE DISPLAYED ON THE EQUIPMENT AT SITE
General Shift ONLY _(Su-Th: 06:30 ~ 14:30 hrs) - All ther times, wrtton HSE approval required
IMPORTANT: ia WORK TE SUPERVSOR fy etre ow al presets nt prt a wt ipipementin sate way.
sue Heo Porton snc, octane Sere: PAP spar: Go oar: 18/2177
Paes sora 828e1ozz:Aa
Tospuedng suSHOM,
ins
Tae, ToRweL Ten
supuog wou 4 fa
‘una /Baysng~ ing feqweup- | usamoe
‘Sumi - ‘son | 9pun-
‘Suypuer auanxy eumesaduroy. u
renuew, aunsodya | _ 34802)
=
som seye Buidaayasnoy CO]
‘1940 Jo Ayayes Uo 10M Jo ed
+ suojssnasip 19430
ony
uaaig/Uuety Jo 9se2