Input/Output Sheet: Process Ouputs/Features Process Inputs(s)

The document outlines the input and output specifications for various process steps in glass manufacturing, including cutting glass receiving, inspection, loading glass on a table, glass cleaning, and table movement for printing. It specifies inputs like trolleys, gloves, paper, and operators along with features and specifications they must meet. Output quality checks are also defined at each step to ensure the glass meets standards for attributes such as dust, scratches, water marks, and positioning before progressing to the next process.

Uploaded by

Abhishek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
167 views1 page

Input/Output Sheet: Process Ouputs/Features Process Inputs(s)

The document outlines the input and output specifications for various process steps in glass manufacturing, including cutting glass receiving, inspection, loading glass on a table, glass cleaning, and table movement for printing. It specifies inputs like trolleys, gloves, paper, and operators along with features and specifications they must meet. Output quality checks are also defined at each step to ensure the glass meets standards for attributes such as dust, scratches, water marks, and positioning before progressing to the next process.

Uploaded by

Abhishek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

INPUT/OUTPUT SHEET

Process Ouputs/Features Process Inputs(s)


VA/
Process Step SOP Equipment Output Feature (Y) Specification MSA Capability Input(X) C/N Feature Specification Test(s) / Analysis
NVA

Trolly C dust no dust


Cut glass receiving NVA Cut glass received Packing condition Fully covered as per std.
IPY
Trolly wheel C dust No dust
Qty as per process card 100.0 %

Hand gloves C dust / dirt No dust / dirt


Colour as per plan / process card
QA/T1/JS -04
Paper C paper mark no mark
Inspection NVA QA/T1/JS -06 Appearance set up Ok cut glass Dust No dust

Paper C dust no dust

Operator C Competent level Skilled


Scratch As per appearance std.
IPY
Mark on glass C water mark no mark
Water mark No water mark 95.2 %

C
Powder mark No powder mark Mark on glass moisture moisture free

C
Paper mark No paper mark Dusty glass dust no dust

C
Thumb mark No thumb mark powder mark on glass Powder mark no mark

Hand gloves C dust / dirt No dust / dirt


Loading on Table NVA Table Glass loaded on table Position Fitted in the template
IPY
Table C level ok level
Play NO Play 100 %

Template C edge finish No sharp edge

PD/PN/JS-63
Operator C Competent level Skilled
Glass cleaning NVA PD/PN/JS-127 Hand glooves Clean glass Dust No dust
IPY
Hand glooves c dust / dirt No dust / dirt
PD/PN/JS-02 100 %

Vaccume cleaner C working condition Should be in working condition

Limit switch should be in


Limit switch C position As per setting / 1st glass
Table move inside NVA Transfering system Glass transfer for printing Position w.r.t screen working condition
IPY
Limit switch C condition Should be in working condition
Jerking No jerking 100 %

Gear assy. C play No play

40000±5000 stoke MYB RQ


Ink N dust No dust
Ink Preparation NVA PD/PN/JS-07 Ink mixing machine Mixed ink Viscosity 30000±5000 stoke TK4 FV

Ink C Expiry date not expired


Dust No dust
IPY
Ink C Viscosity 30000±5000
100 %

M 900 oil C Expiry date not expired

Oil mixing C ratio 1:10

PD/PN/JS-3
Print screen C screen pattern Clear screen pattern
PRINTING VA PD/PN/JS-5 Printing m/c Printed glass Dust No dust
PD/PN/JS-6
Print screen C Mesh As per std. x y
PD/PN/JS-7 Misprint No misprint
PD/PN/JS-25 x = 9± 1 mm
Print screen C Gap with table
PD/PN/JS-62 Pin holes as per std. Y = 12 ±1 2mm
PD/PN/JS-64
Print screen C Tension As per std.
PD/PN/JS-104 Printing waviness As per limit sample
PD/PN/JS-106
Print screen C Dust No dust
PD/PN/JS-111 Wet film thickness as per std.

Print screen C Level variation No variation

PD/PN/JS-125
Ink C Viscosity 30000±5000 stoke TK4 FV
PD/PN/JS-126

Scrapper C surface condition as per limit sample

Scrapper C Speed 90±10 mm/s


IPY
100 % Pressure
Scrapper C 1 to 3.0 mm
(gap on screen)
dist mm
Squeeze C surface condition as per limit sample

Squeeze C Hardness 75±15 Sh.

Pressure
Squeeze C 0.5 to 1.0 mm
(gap on screen)

Squeeze C Speed 40±10

Squeeze C Dust No dust

Cut glass C Position w.r.t screen As per limit switch

Temp 23± 5°C


Room condition C Temp & R Humudity
RH = 60 ±10

Room condition C Cleanliness ok level

Printed glass outside from


Gear assy. C Play No play
Table move outside NVA Transfering system printing m/c table position As per setting IPY
100 %
Jerking No jerking

Pick up by shuttle NVA Shuttle Printed glass in picked Position as per setting Vaccume cup C position As per model

IPY Vaccume cup C Dust No dust


100%
Vaccume cup C condition No wear & tear

Vaccume cup C Vaccume Mini 350 GH


Printed glass placed on
Place on conveyor NVA Transfering system conveyor Breakage No bkg. Conveyor C Dust no dust

Scratch No scratch IPY Transfering system C speed 1540 rpm


100 %
position in the center Transfering system C Vibration No vibration

gear box C Play no play


Drying chamber with
Drying VA heaters Dry printed glass dryness ok dry Heaters C Temperature 200±15°C

IPY Conveyor C speed 3±1 M/MIN.


100 %
Heating zone C Dusty No dust

Conveyor C Dust No dust


QA/T1/JS -04 All should be in working
Inspection NVA QA/T1/JS -2A Inspection set up Ok printed glass Light printing as per limit sample Inspection lights C working condition condition

Inspector C Competent level Skilled


Misprint No misprint

Pin hole As per std


IPY
Printing waviness As per limit sample 99.75 %

Packing Competent level Skilled


NVA PD/PN/JS-10 Trolly , green strip Packed glass Packing condition As per job std. Operator C

Packing qty As per job std. Spacer C Edge finish No sharp edges

glass handling C safely handled no touching

IPY Spacer C Dust No dust


100%
Spacer C Location As per std.

packing condition C covered as per std.

packing condition C Loose No loose packing

pallet C Type As per insp. Std.

Transfer to tempering as per std.


NVA Forklift Transferred glass Breakage No breakage Forklift C speed
IPY packing condition during
Misprint No misprint 100 % transfering C Proper packing as per standard

scratch No scratch Glass C touching no touching


as per standard (>40,< 400 )
Tempering
VA Furnace Tempered glass Fragmentation QA/T1/JS 59 ,12A Glass heating C Temperature As per SOP PD/T3/ FM -27
IPY
100 % Quenching air C Pressure As per SOP PD/T3/ FM -27

Highlite distortion as per limit sample Quenching air C Purity No dust / dirt

Inspection & Packing Final Inspector C Competent level Skilled


QA/T1/JS 04 Appearance set up ok glass defect free as per appearance std.
IPY
VA Pallet Ok packed glass Packing condition as per job std. 95.5 % packing condition C covered as per std.

Packing qty. as per insp. Std. Pallet C type as per std.