Sample Procurement Plan

I. General

1. Bank’s approval Date of the procurement Plan Original: February 24, 2017
2. Date of General Procurement Notice: To Be Published
3. Period covered by this procurement plan: August 2017 to February 2019
Public Disclosure Authorized

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as
stated in Appendix 1 to the Guidelines for Procurement:

Type of Procurement Prior Review


Threshold (>=US
million)
Works (including turnkey, supply and 5
installation of plant and equipment, and Public
Public Disclosure Authorized

Private Partnership (PPP)


Goods, information technology and non- 1.5
consulting services

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with


the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the
Guidelines: Not Applicable.

4. Reference to (if any) Project Operational/Procurement Manual: Project


Implementation Manual Issued by the Ministry of Water, Irrigation and Electricity,
Public Disclosure Authorized

August 2017.

5. Any Other Special Procurement Arrangements: Not Applicable.

Summary of the Procurement Packages planned during the first 18 months after project
effectiveness

1 2 3 4 5 6 7

Ref. Description Estimated Packages Domestic Review Com


No. Cost Preference by Bank ments
US$ million (yes/no) (Prior /
Post)

July 9, 2010
1 Summary of 32 2 To be Prior
the ICB Determined
(Works)
2 Summary of 10.2 6 To be Prior
the ICB Determined
(Goods)
3 Summary of 19.4 5 No Post
the NCB
(Works)
4 Summary of 0.28 1 No Post
the NCB
(Goods)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated
in Appendix 1 to the Guidelines Selection and Employment of Consultants:

2.
Type of Procurement Prior Review
Threshold (>=US
million)
Consultants: firms 0.5
Consultants: Individuals 0.2

2. Short list comprising entirely of national consultants: Short list of consultants for
services, estimated to cost less than $_300,000_equivalent per contract, may comprise
entirely of national consultants in accordance with the provisions of paragraph 2.7 of the
Consultant Guidelines.
3. Any Other Special Selection Arrangements: Not Applicable.

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. Description of Estimated Packages Review Comments


No. Assignment Cost by Bank
US$ (Prior /
million Post)
1 Summary of 3.5 3 Prior
number of contracts
that will be let
under QCBS
2 Summary of 11.8 14 Post
number of contracts
that will be let
under QCBS
3 Summary of 10.1 31 Post CQS/IC
number of contracts

July 9, 2010
that will be let
under other
methods

July 9, 2010
PROCUREMENT
Ethiopia : Second Ethiopia Urban Water Supply and Sanitation Project
PLAN
General Information
Country: Ethiopia Banks Approval Date of the Original Procurement Plan: 2017-08-20
Revised Plan Date(s): (comma delineated, leave blank if none) 2018-04-30
Project ID: P156433 GPN Date: 2018-02-02
Project Name: Second Ethiopia Urban Water Supply and Sanitation Project
Loan / Credit No: IDA / 60070
Executing Agency(ies): Addis Ababa Water and Sanitation Development and Rehabilitation Project Office, Ministry of Water Irrigation and Electricity, WSS Program Management Unit

WORKS
Activity Reference No. / Bid Evaluation Report
Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission /
Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion
Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes
for Award
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
ET-AAWSA-43105-CW-DIR /
Component 1: Sanitation and
Procurement of kality sanitary Under
IDA / 60070 water supply services Prior Direct Selection Direct 24,528,903.54 0.00 2018-03-01 2018-03-06 2018-05-01 2019-05-01
sewer trunk mains for remaining Implementation
improvements in Addis Ababa
work

ET-AAWSA-42142-CW-RFB /
Procurement of specialized
Component 1: Sanitation and
contractor or operator on Single Stage - One Pending
IDA / 60070 water supply services Prior Request for Bids Open - International 11,000,000.00 0.00 2018-05-11 2018-05-25 2018-07-09 2018-08-08 2018-09-12 2023-07-07
operation and maintenance of 12 Envelope Implementation
improvements in Addis Ababa
MBR decentralized wastewater
treatment plants # lot 2

ET-AAWSA-42871-CW-RFB /
Procurement of specialized
contractor or operator on Component 1: Sanitation and
Single Stage - One Pending
operation and maintenance of IDA / 60070 water supply services Prior Request for Bids Open - International 14,000,000.00 0.00 2018-05-18 2018-06-01 2018-07-13 2018-08-12 2018-09-16 2023-07-07
Envelope Implementation
koye feche (3 sites) and chefe improvements in Addis Ababa
phase one and two wastewater
treatment # lot 3

ET-AAWSA-45501-CW-DIR /
Procurement of Kality Component 1: Sanitation and
Under
wastewater treatment plant IDA / 60070 water supply services Prior Direct Selection Direct 10,336,166.03 0.00 2018-02-28 2018-03-14 2018-04-25 2019-04-25
Implementation
rehabilitation and expansion for improvements in Addis Ababa
remaining works

ET-AAWSA-57113-CW-RFB /
Procurement of Data center
facilities construction ,supply Component 1: Sanitation and
Single Stage - One Pending
and installation of hardware IDA / 60070 water supply services Post Request for Bids Open - International 279,050.00 0.00 2018-05-30 2018-06-04 2018-07-16 2018-08-15 2018-09-19 2019-08-30
Envelope Implementation
equipment and software for improvements in Addis Ababa
disaster recovery (DRS) for
AAWSA main data center

ET-AAWSA-42850-CW-RFB /
Procurement of specialized
contractor or operator for Component 1: Sanitation and
Pending
operation and maintenance of IDA / 60070 water supply services Prior Direct Selection Direct 6,000,000.00 0.00 2018-04-15 2018-04-29 2018-05-30 2020-05-30
Implementation
kality 100,000 m^3/day improvements in Addis Ababa
wastewater treatment plants # lot
1

ET-AAWSA-42875-CW-RFB /
NRW management through
performance based
contract(PBC). (Assessment of
Component 1: Sanitation and
existing water supply network Single Stage - Two Pending
IDA / 60070 water supply services Prior Request for Bids Open - International 18,700,979.00 0.00 2018-05-15 2018-05-20 2018-07-01 2018-10-20 2018-11-24 2022-12-30
and verification of NRW base Envelope Implementation
improvements in Addis Ababa
line, DMA zone establishment,
identification ,supply and
installation of pipes fittings and
water meters (replacement)

ET-AAWSA-42884-CW-RFB /
Procurement of Construction of
Component 1: Sanitation and
20 communal latrines and Single Stage - One Pending
IDA / 60070 water supply services Post Request for Bids Open - National 1,000,000.00 0.00 2018-09-20 2018-09-25 2018-11-06 2018-12-06 2019-01-10 2020-01-10
Construction of5 Public latrines Envelope Implementation
improvements in Addis Ababa
in low income and commercial
area of the city Addis Ababa

GOODS
Activity Reference No. / Bid Evaluation Report
Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission /
Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion
Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes
for Award
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
ET-MOWIE-43004-GO-DIR /
Supply of pipes and fittings for Component 2: Sanitation and
Under
the remaining work of Dire Dewa IDA / 60070 water supply services Prior Direct Selection Direct 1,897,466.00 0.00 2018-01-12 2018-01-17 2018-02-24 2018-05-25
Implementation
City Water Supply and Sanitation improvement in secondary cities
Project

ET-MOWIE-43329-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-17 2018-06-16
Quotations Envelope Implementation
and lap top computers) for strengthening
Gambella City Water Supply and
Sewerage Service

ET-MOWIE-43286-GO-RFQ /
procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-22 2018-05-03 2018-06-02
Quotations Envelope Implementation
and lap top computers)for strengthening
Deghabur Town Water Supply
and Sewerage Service

ET-MOWIE-43289-GO-RFQ /
procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-22 2018-05-03 2018-06-02
Quotations Envelope Implementation
and lap top computers) for strengthening
Arbaminch Town Water Supply
and Sewerage Service

Page 1
ET-MOWIE-43291-GO-RFQ /
procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-22 2018-05-03 2018-06-02
Quotations Envelope Implementation
and lap top computers) for Harar strengthening
Town Water Supply and
Sewerage Service

ET-MOWIE-43294-GO-RFQ /
procurement of office
equipment(printers, desk top
Component 3: Project
computers, scanners, photo Request for Single Stage - One Pending
IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
copy machines and lap top Quotations Envelope Implementation
strengthening
computers) for Bishoftu Town
Water Supply and Sewerage
Service

ET-MOWIE-43297-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-17 2018-06-16
Quotations Envelope Implementation
and lap top computers) for strengthening
Shashemane City Water Supply
and Sewerage Service

ET-MOWIE-43299-GO-RFQ /
procurement of office
equipment(printers, desk top Component 3: Project
Request for Single Stage - One Pending
computers, scanners, photo IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-17 2018-06-16
Quotations Envelope Implementation
copy machines and lap top strengthening
computers) for Jigjiga City Water
Supply and Sewerage Service

ET-MOWIE-43300-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for strengthening
Hawassa City Water Supply and
Sewerage Service

ET-MOWIE-43035-GO-RFQ /
Procurement of IT equipment
Component 3: Project
(printers, desk top computers, Request for Single Stage - One Pending
IDA / 60070 management & institutional Post Limited 50,000.00 0.00 2018-04-14 2018-06-09 2018-07-09
scanners, photo copy machines Quotations Envelope Implementation
strengthening
and lap top computers) for
Ministry PIU

ET-MOWIE-43317-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-17 2018-06-16
Quotations Envelope Implementation
and lap top computers) for strengthening
Assosa City Water Supply and
Sewerage Service

ET-MOWIE-43319-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for Asella strengthening
City Water Supply and Sewerage
Service

ET-MOWIE-43322-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for Sodo strengthening
City Water Supply and Sewerage
Service

ET-MOWIE-43324-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for Debre strengthening
Berhan City Water Supply and
Sewerage Service

ET-MOWIE-43326-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for strengthening
Dessie City Water Supply and
Sewerage Service

ET-MOWIE-43328-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for strengthening
Gonder City Water Supply and
Sewerage Service

ET-MOWIE-43331-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for strengthening
Nekmte City Water Supply and
Sewerage Service

ET-MOWIE-43333-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for Jimma strengthening
City Water Supply and Sewerage
Service

Page 2
ET-MOWIE-43303-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for strengthening
Adama City Water Supply and
Sewerage Service

ET-MOWIE-43304-GO-RFQ /
Procurement of office equipment
(printers, desk top computers, Component 3: Project
Request for Single Stage - One Pending
scanners, photo copy machines IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
and lap top computers) for strengthening
Mekelle City Water Supply and
Sewerage Service

ET-MOWIE-43307-GO-RFQ /
Procurement of office
equipment(printers, desk top
Component 3: Project
computers, scanners, photo Request for Single Stage - One Pending
IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
copy machines and lap top Quotations Envelope Implementation
strengthening
computers) for Bahir Dar City
Water Supply and Sewerage
Service

ET-MOWIE-43310-GO-RFQ /
Procurement of office equipment
for Dire Dawa City Water Supply Component 3: Project
Request for Single Stage - One Pending
and Sewerage Service(Printers, IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
desk top computers, scanners, strengthening
photo copy machines and lap top
computers)

ET-MOWIE-43311-GO-RFQ /
Procurement of office equipment
for Semera City Water Supply Component 3: Project
Request for Single Stage - One Pending
and Sewerage Service(Printers, IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
desk top computers, scanners, strengthening
photo copy machines and lap top
computers)

ET-MOWIE-43313-GO-RFQ /
Procurement of office equipment
for Adegrat City Water Supply Component 3: Project
Request for Single Stage - One Pending
and Sewerage Service (printers, IDA / 60070 management & institutional Post Limited 10,000.00 0.00 2018-03-29 2018-05-10 2018-06-09
Quotations Envelope Implementation
desk top computers, scanners, strengthening
photo copy machines and lap top
computers)

ET-MOWIE-50407-GO-DIR /
Procurement of Bulk Flow meter Component 2: Sanitation and
Under
for Mekelle Town Water Supply IDA / 60070 water supply services Prior Direct Selection Direct 433,013.00 0.00 2018-02-28 2018-04-05 2018-03-05 2018-04-06 2018-07-05
Implementation
and Sewerage Service by improvement in secondary cities
Mekelle town WSSS

ET-AAWSA-43126-GO-RFB /
Procurement of GPS, surveying Component 3: Project
Single Stage - One Pending
equipment, laptop , computers, IDA / 60070 management & institutional Post Request for Bids Open - National 200,000.00 0.00 2018-09-03 2018-09-08 2018-10-20 2018-11-19 2018-12-24 2019-12-24
Envelope Implementation
printers and copy machines and strengthening
office furniture's.

ET-AAWSA-42879-GO-RFB /
Component 1: Sanitation and
Procurement of 90 Vacuum Single Stage - One Under
IDA / 60070 water supply services Prior Request for Bids Open - International 10,227,272.73 0.00 2018-06-08 2018-06-22 2018-08-06 2018-09-20 2018-11-01 2019-11-01
Trucks and 22 Double Cabin Envelope Implementation
improvements in Addis Ababa
Pick Up Vehicles.

NON CONSULTING SERVICES


Activity Reference No. / Bid Evaluation Report
Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission /
Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion
Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes
for Award
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS
Activity Reference No. / Combined Evaluation
Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical
Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion
Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal
Negotiated Contract
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
UWSSP-
II/AAWSA/CON/01/2017 /
Component 1: Sanitation and
feasibilty study ,deatil design and Quality And Cost-
IDA / 60070 water supply services Prior Open - International 4,656,175.00 0.00 Under Review 2017-08-18 2017-08-18 2017-08-31 2017-10-16 2017-11-15 2018-01-15 2018-02-19 2023-02-09
construction supervision for Based Selection
improvements in Addis Ababa
eastern addis Ababa waste water
treatment plant

ET-AAWSA-42833-CS-QCBS /
Supervision Consultancy service
for operation and maintenance of
existing waste water treatment Component 1: Sanitation and
Quality And Cost-
plants (chefe, koye fache, kaliti IDA / 60070 water supply services Prior Open - International 5,000,000.00 0.00 Under Review 2018-02-28 2018-03-21 2018-05-04 2018-06-15 2018-07-15 2018-08-19 2018-09-23 2023-09-22
Based Selection
and decenteralized package improvements in Addis Ababa
waste water treatment plants)
found in different location of addis
city.

ET-AAWSA-42834-CS-QCBS /
Consultancy service for ESIA of Component 1: Sanitation and
Quality And Cost- Pending
Eastern Catchment Waster IDA / 60070 water supply services Prior Open - International 1,000,000.00 0.00 2019-01-05 2019-01-26 2019-03-11 2019-04-08 2019-05-08 2019-06-12 2019-07-17 2020-07-16
Based Selection Implementation
Water Treatment plant and improvements in Addis Ababa
Swere line

ET-AAWSA-42881-CS-CQS /
Consultancy service for updating
of AAWSA Business Plan and Component 1: Sanitation and Consultant
Pending
Hiring of individual consultant for IDA / 60070 water supply services Post Qualification Open - National 100,000.00 0.00 2019-02-28 2019-03-21 2019-05-04 2019-06-03 2019-07-08 2020-07-07
Implementation
support in the preparation of improvements in Addis Ababa Selection
branch level AAWSA Business
Plan

Page 3
ET-MOWIE-43218-CS-QCBS /
Consultancy service for
Development of an integrated Component 2: Sanitation and
Quality And Cost- Pending
Town Sanitation plan for Dire IDA / 60070 water supply services Post Open - National 200,000.00 0.00 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-08-27 2018-10-08 2018-11-19 2019-08-16
Based Selection Implementation
Dewa town by Dire Dawa Town improvement in secondary cities
water supply and sewerage
service

ET-MOWIE-43227-CS-QCBS /
Consultancy service for
Component 2: Sanitation and
Development of an integrated Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 200,000.00 0.00 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-08-27 2018-10-08 2018-11-19 2019-08-16
Town Sanitation plan for Mekelle Based Selection Implementation
improvement in secondary cities
town by Mekelle Town water
supply and sewerage service

ET-MOWIE-43231-CS-QCBS /
Consultancy service for
Component 2: Sanitation and
Development of an integrated Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 200,000.00 0.00 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-08-27 2018-10-01 2018-11-12 2019-08-09
Town Sanitation plan for Adama Based Selection Implementation
improvement in secondary cities
town by Adama Town water
supply and sewerage service

ET-MOWIE-43234-CS-QCBS /
Consultancy service for
Development of an integrated Component 2: Sanitation and
Quality And Cost- Pending
Town Sanitation plan for IDA / 60070 water supply services Post Open - National 200,000.00 0.00 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-08-27 2018-10-01 2018-11-12 2019-08-09
Based Selection Implementation
Hawassa town by Hawassa Town improvement in secondary cities
water supply and sewerage
service

ET-AAWSA-43920-CS-QBS /
procurement of Consultancy
Service on the Assessment on
Component 1: Sanitation and
the Quality Based Pending
IDA / 60070 water supply services Post Open - National 200,000.00 0.00 2018-09-17 2018-10-08 2018-11-21 2018-12-19 2019-01-18 2019-02-17 2019-03-24 2020-03-23
Impacts of Industrial Waste Selection Implementation
improvements in Addis Ababa
Water discharge on municipal
wastewater treatment plants and
associated structures

ET-MOWIE-43222-CS-QCBS /
Consultancy service for
Development of an integrated Component 2: Sanitation and
Quality And Cost- Pending
City Wide Sanitation plan for IDA / 60070 water supply services Post Open - National 200,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-08-28 2018-10-09 2018-11-20 2019-08-17
Based Selection Implementation
Bahir Dar town by Bahir Dar improvement in secondary cities
Town water supply and sewerage
service

ET-MOWIE-43214-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and Component 2: Sanitation and
Quality And Cost- Pending
Feasibility Study and Detail IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Based Selection Implementation
Design of Waste Water improvement in secondary cities
Management System for Adegrat
town by AdegratTown water
supply and sewerage service

ET-MOWIE-43213-CS-QCBS /
Consultancy Service for
Development of an Integrated
Component 2: Sanitation and
City Wide Sanitation plan and Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Feasibility Study and Detail Based Selection Implementation
improvement in secondary cities
Design for Aossosa Town WSSS
by Assosa Town water supply
and sewerage service

ET-MOWIE-43212-CS-QCBS /
Consultancy Service for
Development of an Integrated
Component 2: Sanitation and
City Wide Sanitation plan and Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Feasibility Study and Detail Based Selection Implementation
improvement in secondary cities
Design for Asella Town WSSS
by Asella Town water supply and
sewerage service

ET-MOWIE-43209-CS-QCBS /
Consultancy Service for
Development of an Integrated
Component 2: Sanitation and
City Wide Sanitation plan and Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-08-27 2018-10-08 2018-11-19 2019-08-16
Feasibility Study and Detail Based Selection Implementation
improvement in secondary cities
Design for Sodo Town WSSS by
Sodo Town water supply and
sewerage service

ET-MOWIE-43208-CS-QCBS /
Consultancy Service for
Development of an Integrated
Component 2: Sanitation and
City Wide Sanitation plan and Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-08-27 2018-10-01 2018-11-12 2019-08-09
Feasibility Study and Detail Based Selection Implementation
improvement in secondary cities
Design for Sodo Town WSSS by
Sodo Town water supply and
sewerage service

ET-MOWIE-43206-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and Component 2: Sanitation and
Quality And Cost- Pending
Feasibility Study and Detail IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Based Selection Implementation
Design of Waste Water improvement in secondary cities
Management System for Dessie
town by Dessie Town water
supply and sewerage service

ET-MOWIE-43200-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and
Component 2: Sanitation and
Feasibility Study and Detail Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Design of Waste Water Based Selection Implementation
improvement in secondary cities
Management System for
Gambella town by Gambella
Town water supply and sewerage
service

Page 4
ET-MOWIE-43198-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and
Component 2: Sanitation and
Feasibility Study and Detail Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-06-24 2018-07-22 2018-09-20 2018-11-01 2018-12-13 2019-09-09
Design of Waste Water Based Selection Implementation
improvement in secondary cities
Management System for
Nekemet town by Nekemet
Town water supply and sewerage
service

ET-MOWIE-43237-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and Component 2: Sanitation and
Quality And Cost- Pending
Feasibility Study and Detail IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Based Selection Implementation
Design of Waste Water improvement in secondary cities
Management System for Jigjiga
town by Jigijiga Town water
supply and sewerage service

ET-MOWIE-43239-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and
Component 2: Sanitation and
Feasibility Study and Detail Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Design of Waste Water Based Selection Implementation
improvement in secondary cities
Management System for
Shashemene town by
Shashemene Town water supply
and sewerage service

ET-MOWIE-43216-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and Component 2: Sanitation and
Quality And Cost- Pending
Feasibility Study and Detail IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Based Selection Implementation
Design of Waste Water improvement in secondary cities
Management System for Semera
town by Semera Town water
supply and sewerage service

ET-MOWIE-43241-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and Component 2: Sanitation and
Quality And Cost- Pending
Feasibility Study and Detail IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Based Selection Implementation
Design of Waste Water improvement in secondary cities
Management System for Bishoftu
town by Bishoftu Town water
supply and sewerage service

ET-MOWIE-43244-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and Component 2: Sanitation and
Quality And Cost- Pending
Feasibility Study and Detail IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Based Selection Implementation
Design of Waste Water improvement in secondary cities
Management System for Harari
town by Harari Town water
supply and sewerage service

ET-MOWIE-43059-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and
Component 2: Sanitation and
Feasibility Study and Detail Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Design of Waste Water Based Selection Implementation
improvement in secondary cities
Management System for
Deghabur town by Deghabur
Town water supply and sewerage
service

ET-MOWIE-43248-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and
Component 2: Sanitation and
Feasibility Study and Detail Quality And Cost- Pending
IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Design of Waste Water Based Selection Implementation
improvement in secondary cities
Management System for
Arbaminch town by Arbaminch
Town water supply and sewerage
service

ET-MOWIE-43203-CS-QCBS /
Consultancy service for
Development of an integrated
City Wide Sanitation plan and Component 2: Sanitation and
Quality And Cost- Pending
Feasibility Study and Detail IDA / 60070 water supply services Post Open - National 250,000.00 0.00 2018-04-20 2018-05-11 2018-07-01 2018-07-29 2018-09-27 2018-11-08 2018-12-20 2019-09-16
Based Selection Implementation
Design of Waste Water improvement in secondary cities
Management System for Gonder
town by Gonder Town water
supply and sewerage service

ET-AAWSA-42137-CS-QCBS /
A Comprehensive Groundwater
Component 2: Sanitation and
Sustainable Management Quality And Cost-
IDA / 60070 water supply services Prior Open - International 6,456,740.00 0.00 Under Review 2018-02-28 2018-03-21 2018-05-19 2018-07-03 2018-08-17 2018-10-06 2018-11-10 2020-11-09
System establishment , water Based Selection
improvement in secondary cities
extraction management and
ground water modeling

ET-AAWSA-42832-CS-QCBS /
Consultancy service for
Component 1: Sanitation and
Development of an integrated Quality And Cost- Pending
IDA / 60070 water supply services Prior Open - International 6,000,000.00 0.00 2018-02-28 2018-03-21 2018-06-19 2018-08-03 2018-09-17 2018-11-22 2019-01-05 2020-06-28
Town Sanitation plan and city Based Selection Implementation
improvements in Addis Ababa
sewerage master plan and
feasibility study

INDIVIDUAL CONSULTANTS
Activity Reference No. / Invitation to
Contract Type Estimated Actual Amount Draft Negotiated
Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion
Amount (US$) (US$) Contract
Consultant
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Page 5
ET-AAWSA-45503-CS-CDS /
Procurement of supervision
Component 1: Sanitation and
consultancy service Kaliti
IDA / 60070 water supply services Prior Direct Selection Direct 1,180,528.92 0.00 Under Review 2018-03-01 2018-03-29 2018-05-10 2019-05-08
sanitary sewer trunk mains &
improvements in Addis Ababa
treatment plant rehabilitation and
expansion for remaining work

ET-AAWSA-46275-CS-CDS /
Individual consultancy service for
Component 2: Sanitation and
groundwater flow and solute Pending
IDA / 60070 water supply services Post Direct Selection Direct 18,000.00 0.00 2018-02-28 2018-03-10 2018-05-14 2018-11-10
transport modeling of addis Implementation
improvement in secondary cities
ababa area and its suburbs for
the remaining works

ET-AAWSA-47575-CS-INDV /
Component 3: Project
Procurement of individual Individual Consultant Pending
IDA / 60070 management & institutional Prior Open 200,000.00 0.00 2018-03-30 2018-05-18 2018-06-08 2018-07-13 2023-07-07
procurement specialist Selection Implementation
strengthening
consultant

ET-AAWSA-47564-CS-INDV / Component 3: Project


Individual Consultant Pending
Procurement of individual law IDA / 60070 management & institutional Prior Open 200,000.00 0.00 2018-04-11 2018-05-30 2018-06-20 2018-07-25 2023-07-07
Selection Implementation
specialist consultant strengthening