PROCUREMENT PLAN
NATIONAL URBAN DEVELOPMENT PROJECT
(NUDP)
I. General
1. Project information:
Public Disclosure Authorized
Country : INDONESIA
Borrower : Republic of Indonesia
Project Name : National Urban Development Project (NUDP)
Loan/Credit No. : IBRD Loan No. P163896
Project Implementing
Units (PIUs) : 1. Ministry of Home Affairs (MoHA)
2. National Development and Planning Agency
(Bappenas)
3. Ministry of Public Works and Housing (MPWH)
Preamble
This textual part along with the Procurement Plan tables in STEP constitute the
Procurement Plan for the Project. The following conditions apply to all
procurement activities in the Procurement Plan. The other elements of the
Public Disclosure Authorized
Consultants: individuals
Competitive Selection All ≥ US$ 300k or as
stated in the
procurement plan
Direct Selection Subject to conditions as ≥ US$ 300k
per paragraph 7.39 of
the Procurement
Regulations
The Procurement Plan table below are only for the first 18 months of
implementation. The Procurement Plan is a living document and will be revised
if there are any changes during the implementation of the project.
1 2 3 4 5 6 7
Expected
Procurem Review
Estimate Proposal
Ref ent by
Description of d s
. Approach/ Bank
Assignment Cost Submissi PIU
No. Selection (Prior /
($ ‘000) on
Method Post)
Date
1 City Positioning and 1,000 Internation Prior 2019 MoHA
Economic Development al
Study Open/QCBS
2 National Urban 1,000 Internation Prior 2019 MPWH
Infrastructure Strategy al
Plan 2020-2024 Open/QCBS
3 City Spatial Planning, 4,9002 UN Prior 2019 MPWH
Data Collection, Agency/
2 For 3 cities.
3 1 USD = Rp. 14.062 – Kurs BI 28/02/2019
1 2 3 4 5 6 7
Expected
Procurem Review
Estimate Proposal
Ref ent by
Description of d s
. Approach/ Bank
Assignment Cost Submissi PIU
No. Selection (Prior /
($ ‘000) on
Method Post)
Date
Benchmarking, Data Direct
Management, Capacity Selection
Building and
Institutionalization1for
Phase 1 cities
4 Integrated Data Platform 1,000 Internation Prior 2020 MPWH
(IDP)3for 3 cities (Phase al
1) Open/QCBS
5 Development of CIP 12,000 Internation Prior 2019 MoHA
framework and al
implementation in 10 Open/QCBS
cities
6 National Project 4,000 Internation Prior 2019 MPWH
Management al
Consultants/PMS Open/QCBS
1 Bank’s Procurement Framework 1 day for each 2019 The training will
and Regulations PIU be conducted 2 –
3 times per year
or based on
requirement by
PIUs
2 Systemic Tracking Exchange in 0.5 day for 2019 Will be
Procurement (STEP) each PIU conducted 2
times per year or
based on
requirement by
PIUs
1 Key activities include: 1) City-level input analytics, models and studies and development of spatial
development framework and strategic area framework (includes data production, economic strategy
study, environment zoning and land suitability study, strategic integrated transport and land use
planning study) 2) Capacity Building + Development of Municipal Spatial Data Infrastructure (MSDI) 3)
Development control studies and pilots and 4) Institutionalization of 1), 2) and 3). For 3 cities.
3Phased package for 10 cities – within same contract, contract continuation from initial 3 cities
dependent on performance measured against KPIs.
NOTE:
- All TORs of consulting services shall be reviewed by the Bank.
PROCUREMENT
Indonesia : National Urban Development Project (NUDP)
PLAN
General Information
Country: Indonesia 2021-02-22
Bank’s Approval Date of the Original Procurement Plan:
2023-03-08
Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID: P163896 GPN Date:
Project Name: National Urban Development Project (NUDP)
Loan / Credit No: IBRD / 89760
Regional Infrastructure Development Agency, MPWH
Executing Agency(ies):
WORKS
Activity Reference No. / Estimated Actual Am Bid Evaluation Report
Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet
Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract
o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion
S$) ) for Award
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned
GOODS
Activity Reference No. / Bid Evaluation Report
Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission /
Description Component Review Type Method and Recommendation Signed Contract Contract Completion
o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes
for Award
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
CONSULTING FIRMS
Activity Reference No. / Combined Evaluation
Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic
Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion
o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal
otiated Contract
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
ID-RIDA-241352-CS-QCBS / Component 1: National Urba Quality And Cost- Open - Internationa Under Implement
IBRD / 89760 Post 958,650.00 0.00 2021-06-25 2021-06-29 2021-06-30 2021-07-08 2021-08-17 2021-09-28 2021-09-28 2021-11-07 2021-12-27 2023-06-22
National Urban Infrastructure n Institutional and Policy De Based Selection l ation
Strategy velopment
ID-RIDA-197783-CS-QCBS / P
roject Management Support (
Component 4: Project Imple Quality And Cost- Open - Internationa
PMS) For The Government of IBRD / 89760 Post 2,656,550.96 0.00 Canceled 2021-02-22 2021-02-23 2021-02-25 2021-03-10 2021-04-23 2021-06-29 2021-06-03 2021-06-03 2021-08-05 2021-09-19 2024-03-28
mentation Support Based Selection l
Indonesia-World Bank Nation
al Urban Development Projec
t (NUDP)
ID-RIDA-342638-CS-QCBS / P
Component 4: Project Imple Quality And Cost- Open - Internationa Under Implement
roject Management Support f IBRD / 89760 Prior 3,114,139.00 0.00 2023-02-15 2023-02-21 2023-03-08 2023-03-02 2023-04-21 2023-05-19 2023-06-18 2023-07-23 2023-08-27 2024-11-19
mentation Support Based Selection l ation
or National Urban Developme
nt Project
ID-RIDA-346873-CS-QCBS /
Component 1: National Urba
National Urban Development Quality And Cost- Open - Internationa
IBRD / 89760 n Institutional and Policy De Prior 4,157,044.00 0.00 Under Review 2023-03-03 2023-03-24 2023-05-07 2023-06-04 2023-07-04 2023-08-08 2023-09-12 2024-12-30
Strategy for National Urban Based Selection l
velopment
Development Project
INDIVIDUAL CONSULTANTS
Activity Reference No. /
Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont
Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion
o. h unt (US$) (US$) d/Selected Consultant ract
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
ID-RIDA-347653-CS-INDV / T
he Regional Planning Expert
Component 1: National Urba
will provide an initial work w Individual Consult Pending Impleme
IBRD / 89760 n Institutional and Policy De Post Open - National 64,770.00 0.00 2023-03-08 2023-04-01 2023-04-06 2023-04-16 2023-12-12
hich will be part of the greate ant Selection ntation
velopment
r NUDS package that will be
delivered in full by the incom
ing NUDS consultancy firm.
ID-RIDA-347655-CS-INDV / T
he Urban Infrastructure Plann
ing Expert will provide an init Component 1: National Urba
Individual Consult Pending Impleme
ial work which will be part of IBRD / 89760 n Institutional and Policy De Post Open - National 64,770.00 0.00 2023-03-08 2023-04-01 2023-04-06 2023-04-16 2023-12-12
ant Selection ntation
the greater NUDS package th velopment
at will be delivered in full by
the incoming NUDS consulta
ncy firm.
ID-RIDA-347657-CS-INDV / T
he Institutional/Urban Policy
Component 1: National Urba
Expert will provide an initial Individual Consult Pending Impleme
IBRD / 89760 n Institutional and Policy De Post Open - National 64,770.00 0.00 2023-03-08 2023-04-01 2023-04-06 2023-04-16 2023-12-12
work which will be part of the ant Selection ntation
velopment
greater NUDS package that
will be delivered in full by the
incoming NUDS consultancy f
irm.