Accelerating Infrastructure Delivery through Better Engineering Services Project

Format for Expression of Interest (EOI) for Panel

Expression of Interest (EOI) Consulting Firms for Constitution of a Panel of Consultants under
Accelerating Infrastructure Delivery through Better Engineering Services Project

Project Number 49141-001


Accelerating Infrastructure Delivery through Better Engineering Services
Project Name
Project
Project Country Republic of Indonesia

I. Consulting Firm Information

CMS No.1 / date: Country of Incorporation:2


000576/06 March, 2008 India
Consultant Name: Acronym:
WAPCOS Limited WAPCOS Lim
EOI Submission Authorized by: Position:
Rohit Mishra Sr. Engineer

Associations (Joint Venture or Sub-consultancy)

Joint EOI
CMS Country of Venture (JV) Submission
Consultant Acronym Position
No.1 Incorporation2 or Sub- Authorized
consultant By
DOLSAR
012791 Engineering Inc. DOLSAR Turkey JV Cem Aker International
Co. Projects
Coordinator

007099 PT. Indra Karya IKA Indonesia JV Hari General Manager


(Persero) Sampurno
025289 PT Bina Karya BIKA Indonesia JV Swingly President Director
(Persero) Parubak
026082 PT. Multi Phi Beta MPB Indonesia JV Denny Director
Donobagyo
026083 PT. Pola Agung PA Indonesia JV Metta President Director
Sutrisno

Present the rationale for and benefits of working in association (JV or Sub-consultant) with
others rather than undertaking the assignment independently (as appropriate). Describe the
proposed management and coordination approach of the association and the role of each
firm.

WAPCOS Limited, an ISO: 9001:2008 certified company, a Government of India undertaking


under the Ministry of Water Resources, River Development and Ganga Rejuvenation, is a well-knit
organization with specialized functional core groups fully equipped to provide comprehensive inter-

1
If already registered on ADB’s Consultant Management System (CMS). CMS registration under EA-administered selection
is mandatory prior to contract award.
2
The lead consultant must submit a copy of the Certificate of Incorporation of itself and of each JV member and sub-
consultant through VII. EOI Attachments.

1
Accelerating Infrastructure Delivery through Better Engineering Services Project

disciplinary coverage of all aspects of consultancy in roads and highways, infrastructure


development, water resources and power sector ranging from planning, feasibility studies, detailed
investigations, detailed design engineering, tender engineering, project management and
construction supervision, operation and maintenance. WAPCOS has been providing to various
domestic and overseas clients, consultancy services in a diverse range of Engineering. WAPCOS
have been instrumental in providing consultancy services in various engineering fields from
concept to commissioning in more than 50 countries in Asia and Africa. Many of these projects
have been funded by International Agencies like the United Nations, the World Bank, the Asian
Development Bank, and the Kuwait Fund for Arab Economic Development and from local funds of
respective countries. WAPCOS has major strengths in managing and execution of large value
projects in India and abroad. WAPCOS possesses state- of-the-art expertise in the various areas of
its operation and has successfully completed a large number of assignments in Asia, Africa and
Middle East countries in various engineering disciplines.

For this project, WAPCOS Limited associates with DOLSAR Engineering Inc. Co. to enhance the
technical capacity by providing wider expertise, and experience which would benefit the project.
WAPCOS Limited acknowledges the role of local partners that understand the localities of the
project. The localities include but not limited to the provision of local experts, geographical
orientation, as well as communication and coordination with the executing/implementing agency
and local communities. Therefore, WAPCOS Limited associates with PT. Indra Karya (Persero),
PT. Bina Karya (Persero), PT. Multi Phi Beta and PT. Pola Agung.

Founded in 1961 PT Indra Karya (Persero) concentrated its field of business in undertaking
electric power and water resources development projects. Since then PT Indra Karya has
succeeded in completing all the assignments which had been undertaken from feasibility studies,
planning and detailed designing to construction, supervision and project management in various
fields. To enhance the knowledge and skill of its personnel, associations with leading foreign
companies have been carried out, especially in undertaking large scale engineering projects with
latest and advanced technology. PT Indra Karya has been registered in the IBRD, ADB, OECF/
JBIC.

PT. Bina Karya (Persero) was established in 13 November 1962 based on Government regulation
No. 31/1962, in the form of Government-owned Corporation enacted in the republic of Indonesia
National Statute No. 85 year 1962. It was changed into a State-owned liability company by the
Government regulation No. 41 year 1970, and changes in company financial equity from Idr
75,000,000.00 into Idr 10,912,000,000.00 through the shareholders declaration and changes in
charter authorized in 21 May 2003 by notary Abdul Hamid. At its beginning the company only
handled architectural and buildings project, but with the development of the business environment
that is increasingly expanding and the services provided also experiencing growth, today it has
become a company that is capable of handling extensive multi-disciplinary engineering consultancy
and management.

Starting from the establishment of the company in 1979 up until now PT Multi Phi Beta is
entrusted by his Clients to carry out various type of services ranging from study works, field survey
and investigations, up until engineering design and construction supervision of projects located in
all parts of Indonesia. PT MULTI PHI BETA in association with KAMPSAX International A/S carried
out transmigration studies, planning, and design of transmigration settlements financed by the
World Bank in Central Kalimantan for 10 years. Study, planning, and design of Kabupaten roads in
all provinces in Indonesia is carried out in association with Hoff & Overgaard and Carl Bro for more
than 10 years. The project also developed guidelines and methods for planning & design for
Kabupaten roads, which are widely used up until now. Nucleus Estate and Smallholder (NES)
project in Ophir was studied, planned and designed together with DIWI from Germany. The project
was financed by KfW and undertaking also in 10 years. The work consist of planning of oil palm
plantation, network of harvesting, collector, and access road, design of housings, and construction
supervision of all construction works

2
Accelerating Infrastructure Delivery through Better Engineering Services Project

PT. Pola Agung Consulting is an Indonesian private company who provides services in the field of
engineering and management consultancy. The company was founded in 1978 in Jakarta. The
Company was initially involved in the Government program in transmigration and public works
sectors. Within the time span of 25 years, the company has grown. To adjust with new situation the
company’s board of management changed in May 2003. At present, we are supported by a group
of dedicated experienced professionals, to carry out our company’s vision. Our professionals have
experiences in consultation work in the field of Infrastructure: Road, Bridges, Water Supply,
Regional Planning, Waste Water Treatment, Solid Waste, Water Resources, Finance and
Community Empowerment.

WAPCOS is confident that the consortium will form a synergy for the benefit of the Project.
Through the association, WAPCOS identifies there are at least, seven significant benefits, among
others: (i) Wider field/expertise coverage; (ii) More professional human resources available, both
international and national; (iii) Vast experience and know-how; (iv) Extensive lessons-learned and
best practices; (v) Familiarity with local/regional conditions; (vi) Easier management for two project
locations; and (vii) Smooth communication and coordination with the executing agency,
implementing agency, as well as local communities.

The role of each firm could be described as below:


1. WAPCOS will assign international experts, lead overall project management, and act as
consortium's authorized representative towards the Client/ADB for all matters associated with
this Project;
2. DOLSAR will assign international experts, support WAPCOS in technical issues;
3. PT Indra Karya and PT Bina Karya will provide significant contribution in the provision of
national experts, technical and local support;
4. PT Multi Phi Beta and PT. Pola Agung will provide national experts and also strengthen the
consortium in the project communication and coordination;

I confirm that:
Documentation regarding our corporate structure including beneficial ownership has been
attached.

Documentation regarding our Board of Directors has been attached.

A written agreement to associate for the purpose of this Expression of Interest has been
signed between the consortium partners and has been attached.

Once a consultant in the Panel is invited to submit Proposal for any call-down assignment, it is not
permissible to transfer the invitation to any other firm, such as Consultant’s parent companies,
subsidiaries and affiliates. The Client will reject a Proposal if the Consultant drops a JV member
without following the procedure prescribed in the REOI/RFP in this regard.

II. Assignment Specific Qualifications and Experience


Your EOI shall demonstrate technical competence and geographical experience based on project
references in the format prescribed in Section E below.

A. Technical Competence
Cross-referencing from your profile projects in Section E, highlight the technical qualifications of
your entity/consortium in undertaking similar assignments. Provide details of past experiences
working with similar project authorities.

In term of experience with financing authorities, our Consortium is experienced in the


implementation of loan financed projects (Word Bank/IBRD, JBIC/OECF, ADB). By 2016, we have
involved in implementation of numerous international financed projects.
3
Accelerating Infrastructure Delivery through Better Engineering Services Project

Our Consortium has proven a long track record in undertaking water resources assignment,
including projects under the same project authorities in the Ministry of Public Works.

WAPCOS

In term of the project scope, WAPCOS’s experiences include:

(a) Highways:

1. Design Review, Pre-Contract Services and Project Management of Civil Works Contract
for: Multinational Nacala Road (Lot-B: Ribaue- Malema road)- (103 kms) (African
Development Bank funded), Mozambique, Duration: March 2011 to Sep 2015; Client:
National Roads Administration(ANE), Republic of Mozambique Country: Mozambique, Scope
of Work: Review of the Engineering design and detailed drawings for the Construction works,
construction supervision.

2. Consultancy Services for Design & Construction Supervision of Rehabilitation of road


N280/281 between Tica, Buzi & Nova Sofala in Sofala Province (131.2 KM) in
Mozambique, Duration: Nov 2006 to Nov 2008; Client: National Roads Administration
“ANE”, Mozambique, Country: Mozambique, Scope of Work: Detailed engineering design,
Supervision of civil works contract.

3. Construction Supervision for Rehabilitation and Reconstruction of Regional Roads in


Hadramout Governorate, Yemen (Contract No. FPERP-RR3 & RR4) - Funded by World
Bank; Duration: Oct 2010 to July 2013; Client: Ministry of Public works and Highway,
Country: Republic of Yemen, Scope of Work: Design review, construction supervision for
Contract No. FPERP-RR3: includes the rehabilitation and reconstruction of priority damaged
segments along (1) BIN AIFAN – AL ABR ROAD (127+000 km) (2 ) AL KHASHAA – RAKHI
ROAD (61+000 km) (3) SEIYUN – BIN AIFAN ROAD (61+000 km) Contract No. FPERP-
RR4: includes the rehabilitation and reconstruction of priority damaged segments along (1)
SEIYUN – TARIM ROAD (33+600 km) (2) TARIM – ASOUM ROAD (40+950 km) (3) ASOUM –
PROPHET HOOD ROAD (27+200 km) (4) GHARF – SAH ROAD (55+450 km) of the regional
roads.

4. Construction Supervision of Abdulla Gharib Road Contract No. FPERP-RR5, Yemen


(World Bank Funded); Duration: Jan 2013 to Jan 2015; Client: Ministry of Public works and
Highway, Country: Republic of Yemen, Scope of Work: Design review, construction
supervision Contract No. FPERP-RR5 -Abdullah Gharib section of Rayyan Bin Aifan Road (7.0
km), Culvert – 28 Nos. of varying cells and sizes, bridges – 2 Nos. of 120m length and 1 of
75m length, Retaining Wall – at various locations.

5. Project Management Consultant (PMC) for Development of Ring Road No. 4, Road
Network System, Water Supply System, Sewerage, Electrical Networks, Storm Water
Drains and Reuse System including Defect Liability for Kamal Vihar, Raipur; Duration:
Jan 2012 to Jan 2014; Client: Raipur Development Authority, Country: India, Scope of Work:
Design review and checking of construction drawings, project management consultancy
services.

6. Design & Engineering Consultancy for the Main Civil, electro-Mechanical & Hydro-
Mechanical works, Infrastructural works including Roads, Bridges and Technical
Assistance during construction for Punatsangchhu-I Hydro Electric Project, PHPA,
Lobesa, Bhutan Duration: January, 2004 to August 2007; Client: Department of Energy
4
Accelerating Infrastructure Delivery through Better Engineering Services Project

(DoE), Royal Govt. of Bhutan, Country: Bhutan, Scope of Work: Detailed engineering
design, EIA studies for all project components including National Highway (Town Wangdue
to Tsirang-Realignment) of length 4.83 km of formation width 10.50m, roads to various
project components & residential colony of length 23.12 km of formation width 6.10 m,
Bailey Bridges class 40R loading at 3 locations, Plate Girder bridges of 33 m span, Internal
colony road of length 5.12 km of formation width 6.10 m permanent pre-stressed concrete
bridge at Powerhouse complex of span 110m of class 70R loading.

7. Design & Engineering Consultancy for the Main Civil, electro-Mechanical & Hydro-
Mechanical works, Infrastructural works including Roads, Bridges and Technical
Assistance during construction for Punatsangchhu-II Hydro Electric Project, PHPA,
Lobesa, Bhutan Duration: Nov 2006 to Nov 2008; Client: Department of Energy (DoE),
Royal Govt. of Bhutan, Country: Bhutan, Scope of Work: Detailed engineering design, EIA
studies.

8. Design & Engineering Consultancy for the Main Civil, electro-Mechanical & Hydro-
Mechanical works, Infrastructural works including Roads, Bridges and technical
Assistance for Tala Hydro Electric Project, Bhutan Duration: 1996 to July 2007; Client:
Royal Govt. of Bhutan, Country: Bhutan, Scope of Work: Detailed engineering design, EIA
studies for all project components including Road to Powerhouse of length 26.5 km,
Roads to various project components & residential colony of length 74.7 km, Steel truss
bridges of 8 Nos of class 70R loading & 6 Nos of 40R loading within the project area,
Rehabilitation of Gedu-Mirching road of length 7 km, Upgradation of Jumja-Tala road of
length 7 km.

9. Reconstruction / Rehabilitation and completion of Salma dam project, Govt. of


Afghanistan (including infrastructure works) Duration: Nov 2004 to Nov 2011; Client:
Govt. of Afghanistan, Country: Afghanistan, Scope of Work: Detailed engineering design, EIA
studies, Land Acquisition, Resettlement and Rehabilitation (R&R) Plan and construction
supervision for Civil construction works, infrastructure works, Buildings, roads and maintenance
during construction

10. Preparation of Detailed Project Report for Urban Transport system in Dhanbad under
JNNURM; Duration: May 2008 to August 2009; Client: Dhanbad Municipal Corporation,
Govt. of Jharkhand, Country: India, Scope of Work: Feasibility Studies, Detailed Engineering
Design and Drawing, Detailed Estimates and Technical specifications

11. Detailed Project Report including PPR for State Highways/ Major District Roads in the
National Capital Region of Haryana (Total length - 331.45 km); Duration: June 2006 to
March 2009; Client: PWD, B&R, Haryana, Country: India, Scope of Work: Feasibility
Studies including preparation of a proposal for up-gradation of existing roads on the basis of
traffic census, preparation of Detailed Project Report, Detailed design for SH 20 Murthal –
Sonepat 6.75km, Sonepat –Kharkhoda 14.25 km, KharkhodaSampla Road 18.9 km, SH 22
Rohtak-Kharkhoda-Delhi Border 32.80 km, Bahadurgarh to Jhajjar Road 28 km, SH 15 A
Jhajjar to Farrukh Nagar Gurgaon Road 40.03 km, SH 13 Gurgaon SohnaNuh Road 39.85 km,
SH 20 SamplaJhajjar Road 21.2 km, MDR 132 Hodal - Nuh- Tauru – Pataudi – Patauda
38.67 km, MDR 138 Rai – Nahra – Kundal – Sohti – Bahadurgar 39 km.

12. Detailed Project Reports preparation and supervision and quality control consultancy
services for construction of rural roads under Gram Sampark Sadak Yojana for the
consultancy package no. CS2602 (Rajgarh District), Gujarat India; Duration: April 2011 to
May 2016; Client: M.P. Rural Engineering Service, Rajgarh, India; Country: India Scope of
Work: Feasibility Studies and preparation of Detailed Project Reports (DPRs) of identified rural

5
Accelerating Infrastructure Delivery through Better Engineering Services Project

roads after conducting detailed survey and investigation, testing of field soil and material(s),
construction material survey, supervision and quality control.

13. Preparation of Detailed Project Report for Urban Transport system in Jamshedpur
under JNNURM; Duration: May 2008 to August 2009; Client: Jamshedpur Urban
Agglomeration, Govt. of Jharkhand Govt. of Jharkhand, Country: India, Scope of Work:
Feasibility Studies, Detailed Engineering Design and Drawing, Detailed Estimates and
Technical specifications

14. Detailed Project Reports preparation and supervision and quality control consultancy
services for construction of rural roads under Gram Sampark Sadak Yojana for the
consultancy package no. CS2002 (Dewas District), Gujarat India Duration: April 2011 to
June 2012; Client: M.P. Rural Engineering Service, Dewas, Country: India, Scope of Work:
Feasibility Studies and preparation of Detailed Project Reports of identified rural roads,
supervision and quality control.

15. Preparation of Detailed Project Report for Border Road in the state of Uttaranchal-
Package-III -Sela to Tedang- (22 K.M. Hill Terrain Road) Duration: May 2007 to April 2008;
Client: Central Public Works Department, Country: India, Scope of Work: Feasibility Studies,
detailed engineering design.

16. Preparation of Detailed Project Report for Border Road in the state of Uttaranchal-
Package –II: Niti to Geldung (46 Km Hilly Terrain Road), Uttaranchal, India Duration:
Nov.,2006 to June, 2007; Client: Central Public Works Department, Country: India, Scope of
Work: Feasibility Studies, detailed engineering design.

17. Kerala Sustainable Urban Development Project “Detail Design and Supervision
Consultancy for package 2 (Kochi, Thrissur and Kozhikode) – DSC 2” (Asia
Development Bank Funded), India; Duration: May 2007 to June 2010; Client: Kerala
Sustainable Urban Development Project, Local Self Government Department, Government of
Kerala; Country: India Scope of Work: Detailed design engineering, construction supervision.

18. Detailed Project Reports preparation and supervision and quality control consultancy
services for construction of rural roads under Gram Sampark Sadak Yojana for the
consultancy package no. CS4902 (Alirajpur, Jhabua, Barwani District, M.P., India
Duration: April 2011 to June 2012; Client: M.P. Rural Engineering Service, Alirajpur,
Country: India, Scope of Work: Feasibility Studies and preparation of Detailed Project
Reports of identified rural roads, supervision and quality control.

19. Preparation of Detailed Project Report for Santalpur-Gadhuli Road, Patan and Kachchh
District., Gujarat India (125 km) Duration: April 2011 to March 2013; Client: The Executive
Engineer, Bhuj, Kutch Country: India, Scope of Work: Feasibility Studies, preparation of
Detailed Project Report for selected 125 km of missing link.

20. Preparation of Detailed Project Report of roads from Ambedkar Chowk to Railway
Station for Nagar Palika Parishad Nepanagar Distt. Burhanpur, India Duration: Oct 2012
to Nov 2012; Client: Nagar Palika Parishad Nepanagar Country: India, Scope of Work:
Feasibility studies and preparation of DPR, Detailed designs, estimates, specifications and
other related information.

21. Consultancy Services for Design, drawing and cost estimate & Construction supervision
for Bridge across Rangmati river near Vora Hazira Causeway at Jamnagar, Duration:
Jan 2009 to July 2009; Client: Jamnagar Municipal Corporation Country: India Scope of
Work: Preparation of project report, preparation of detailed design incuding formation level as
per IRC and MORTH guidelines
6
Accelerating Infrastructure Delivery through Better Engineering Services Project

22. Preparation of plan design, cost estimate, leveling and tender document for Fire station,
housing works & other development work, Morbi (Gujarat), India; Duration: Nov 2009 to
April 2010; Client: Morbi Nagar Palika, Gujarat; Country: India Scope of Work: Detailed
design engineering.

23. Environmental Impact Assessment for construction/ widening/ strengthening/


upgradation of 255 km long Gaduli-Santhalpur Road through Rann of Kachchh;
Duration: Feb 2010 to Feb 2011 Client: Road & Building Department, Bhuj, Gujarat; Country:
India Scope of Work: EIA Studies.

DOLSAR

DOLSAR, established in 1971, is a multi-disciplinary engineering firm which performs engineering,


architectural, consultancy and supervision services for large-scale projects in a wide range of
fields. DOLSAR has successfully performed services in the fields of energy, water, land resources
development, regional planning, environment, transportation and buildings. DOLSAR is completely
independent of any contractor or manufacturer and exclusively represents the interests of its
clients. As a leading engineering and consultancy company in Turkey, DOLSAR has undersigned
various significant projects, which are financed by various financing institutions such as World
Bank (WB), European Union (EU), European Investment Bank (EIB), European Bank for
Reconstruction and Development (EBRD) and Kreditanstalt für Wiederaufbau (KfW) and has
substantial experience in the application of international standards as well as FIDIC and EU
Conditions of Contracts and Regulations. DOLSAR is committed to excellence through the
implementation of the Quality Management System certified by the ISO 9001:2008, ISO 14001 and
OHSAS 18001 certificates.

DOLSAR provides engineering and consultancy services for transportation structures and mass
transit systems including the preparation of master plans, feasibility reports, final/detailed designs,
application drawings, technical specifications, tender documents as well as construction
supervision.

DOLSAR Engineering has vast experience in planning, design and construction supervision of
transportation projects. DOLSAR has performed the engineering and consultancy services for
several roads, highways, railways and ports projects and their appurtenant structures including
tunnels and bridges. The total length of roads, highways and railways projects for which
engineering and consultancy services have been performed sums up to more than 1000 km.

DOLSAR recent experience includes;


 GEBZE – ORHANGAZI– İZMİR (Including İzmit Bay Bridge) Motorway: 428 km motorway,
3.1 km suspension bridge, various tunnels, bridges and viaducts. Services provided are design
review and construction supervision.
 KARAKORAM Highway: 62 km highway Services provided are detailed design and
construction supervision.
 BALIKESİR Northern Ring Road Consultancy Services for Survey and Design:
Preparation of all design aspects of the 17 km long 2 way 2 lane state road including Corridor
studies, Alignment studies, Hydraulic and Hydrological studies, At-grade and grade separated
junctions, Final design drawings, Drainage designs, Bridge, small engineering structures and
retaining wall designs, Traffic designs, Geological investigations and reports, Tunnel designs

7
Accelerating Infrastructure Delivery through Better Engineering Services Project

and Superstructure designs. Client: General Directorate of State Highways (KGM).


 KEMER-KUMLUCA State Highway: Geological investigations, topographical surveys and
detailed design engineering and consultancy services (38 km), Client: General Directorate of
State Highways (KGM).
 ARTVİN-ERZURUM State Highway: Geological investigations, topographical surveys and
detailed design engineering and consultancy services (28 km state highway including 13
tunnels, 8 bridges, 4 balanced cantilever bridges, 3 viaducts, culverts, 6.5 km concrete
retaining walls), Client: General Directorate of State Hydraulic Works (DSİ) and General
Directorate of State Highways (KGM).
 TOPÇAM-MESUDİYE State Highway: Geological investigations, topographical surveys and
detailed design engineering and consultancy services (20 km), client: General Directorate of
State Highways (KGM).

INDRA KARYA

In term of experience with financing authorities, Indra Karya is experienced in the implementation
of loan financed projects (Word Bank/IBRD, JBIC/OECF, ADB). By 2016, they have involved in
implementation of numerous international financed projects.

Indra Karya has proven a long track record in feasibility study, detailed engineering design,
environmental impact, construction supervision of dams, including projects under the same project
authorities in the Ministry of Public Works and Housing.

In term of the project scope, INDRA KARYA experiences include:

1. Road Rehabilitation (Sector) Project Design and Field Team Consultants Under ADB
Loan No. 1798-IND; Duration : November 2003 to January 2004; Client : PT. Jasa Marga
(Persero); Country : Center Java, Indonesia; Scope of Work : Detail engineering design and
master plan
2. Regional Design and Supervision consultants-2 (RDSC-2) for Second Eastern Indonesia
Region Transport Project (EIRTP-2) Under IBRD Loan No. 4744-IND; Duration : November
2006 to October 2010; Client : Directorate General of Highways (Bina Marga), Technical
Guidance Unit for Roads and Bridges; Country : Center Sulawesi, Indonesia; Scope of Work
: Detailed engineering design and supervision
3. Toll Road Technical Planning Cikampek - South Purwakarta - Pleret Segment's;
Duration : October 2003 to September 2004; Client : PT. Jasa Marga (Persero); Country :
West Java, Indonesia; Scope of Work : Planning, desain, and masterplan
4. Design Engineering Design of Road Improvment Exs. Kertas Kraft Aceh, PT Takengon
Cross -North Aceh; Duration : November 2006 to May 2007; Client : Public Planning Works
Unit, Technical Planning and Supply Chain Management BRR NAD – Nias; Country : North
Aceh, Indonesia; Scope of Work : Detail engineering design and master plan
5. Road Engineering Planning North Sulawesi Cross Center; Duration : March 2010 to July
2010; Client : Directorate General of Highways, SNVT Planning and Supervision of Road and
Bridge North Sulawesi; Country : North Sulawesi, Indonesia; Scope of Work : Detail
engineering design, master plan
6. Landslide Monitoring and Analysis System on Strategic Paths in Java and Sumatra;
Duration : June 2007 to November 2007; Client : Ministry of Public Works, Directorate
General of Highways, Technical Road and Bridge Engineering Working Unit; Country :
Indonesia; Scope of Work : Study, LARAP, environmental impact
7. Road Engineering Planning of Kapitu - Tumpaan Kapitu Tumpaan Location, Minahasa
District South Minahasa; Duration : September 2006 to January 2007; Client : South

8
Accelerating Infrastructure Delivery through Better Engineering Services Project

Minahasa District Department of Public Works; Scope of Work : Detail engineering design,
master plan
8. Road Engineering Planning North Sulawesi Cross West (84,54 Km); Duration :
September 2007 to March 2008; Client : SNVT Planning and Supervision of Roads and
Bridges of North Sulawesi; Scope of Work : Detail engineering design, master plan
9. Road Engineering Planning in Kupang City, Kupang District and TTS District - PR 01 –
Package; Duration : August 2010 to January 2011; Client : Directorate General of Highways,
SNVT Planning and Supervision Roads and Bridges NTT; Scope of Work : Detail engineering
design, master plan
10. Road Engineering Planning in Manggarai District and West Manggarai; Duration : March
2006 – June 2007; Client : SNVT P2JJ Prov. NTT; Scope of Work : Planning, engineering,
and design
11. Road Engineering Planning (Package 3); Duration : April 2004 – November 2004; Client :
Road & Bridge Planning & Supervision Project Prop. Central Java; Scope of Work : design,
master plan
12. Road Engineering Planning in Kupang District and TTS (PR-02 Package); Duration :
August 2010 – December 2010; Client : Directorate General of Highways, SNVT Planning and
Supervision of Roads and Bridges of NTT; Scope of Work : planning, design
13. Road Engineering Planning in Flores Island (West Slide) PR 02 – Package; Duration :
March 2013 – December 2013; Client : Ministry of Public Works, Directorate General of
Highways, Sattet NVTPP National Road Prov NTT; Scope of Work : design, planning
14. DED of National Leger Road’s; Duration : June 2005 – January 2006; Client : Directorate
General of Road, Ministry of Public Works; Scope of Work : detail engineering design
15. Bridge Engineering Planning (Package-3); Duration : April 2004 – November 2005; Client :
Project Planning and Supervision of Road and Bridge Prop. Central Java; Scope of Work :
planning, design
16. DED of Kulon Progo Fly Over (2), Kulon Progo District; Duration : October 2004 –
December 2004; Client : Public Works Department Kulon Progo; Scope of Work : detail
engineering design, master plan
17. DED of Road and Bridge – Package 1; Duration : May 2004 – December 2004; Client :
General Directorate of Roads, Public Works Department; Scope of Work : planning, design
18. Package of Road Planning Spreads North Sulawesi; Duration : March 2010 – July 2010;
Client : Directorate General of Highways, SNVT Planning and Supervision of Roads and
Bridges of North Sulawesi; Scope of Work : planning, design
19. Bridge Engineering Planning in Timor Island (PR-03 Package); Duration : November 2007
– December 2007; Client : Satker. NVT Planning and Supervision of Roads and Bridges of
NTT Province; Scope of Work : planning, design
20. Road Engineering Planning in Alor Island (PR-02 Package); Duration : September 2007 –
March 2008; Client : SNVT Planning and Supervision of Roads and Bridges of NTT Province;
Scope of Work : design, master plan
21. Information System in Sekayu and Lubuk Linggau; Duration : July 2005 – September
2005; Client : Directorate General of Road, Ministry of Public Works; Scope of Work : design
22. Feasibility study and Bridge Cross Design; Duration : December 2006 – July 2007; Client
: PT. Kalimantan Prima Persada Contractor & Mining Developer; Scope of Work : study and
design
23. DED of Bridge - Pakckage 7; Duration : January 2005 – June 2005; Client : Directorate
General of Road, Ministry of Public Work; Scope of Work : detail engineering design
24. Road Engineering Planning Package, Kenjeran, Surabaya; Duration : May 2009 – August
2009; Client : SNVT P2JJ Metro Surabaya; Scope of Work : planning, design
25. Road Engineering Planning in Urban Areas (package 01); Duration : March 2004 – May
2004; Client : Project for Planning and Controlling Roads and Urban Bridges of East Java
Province; Scope of Works : design, planning
26. Sangkariang's Bridge Engineering Planning, Suguh River, Kalianyar (Malang District)
and Bedadung River's Bridge Review Design (Jember District); Duration : January 2009
– March 2009; Client : Welfare Core Cooperative (KOPINKAN); Scope of Works : master
plan, design
9
Accelerating Infrastructure Delivery through Better Engineering Services Project

27. Road Engineering Planning in 124 KM's Denpasar - Packages 12 (Bon Dalem/Tembok
Village) – Amlapura; Duration : March 2013 – April 2013; Client : P2JN Bali; Scope of
Works : design, master plan
28. Road and Bridge Enginnering Planning in Lubuk Linggau; Duration : September 2005 –
December 2005; Client : Directorate General of Road, Ministry of Public Works; Duration of
Works : design, master plan
29. Road Engineering Planning at 9,50 Km's, Cekikik Gilimanuk, Pekutatan - Negara-
Tabanan Antasari; Duration : June 2004 – December 2005; Client : Directorate General of
Road, Ministry of Public Works; Scope of Works : planning, design
30. Bridge Engineering Planning Spread in East Java South Cross (Paket-2); Duration : June
2006 – October 2006; Client : Public Works Office of Bina Marga East Java; Scope of Works
: master plan, design
31. DED of Kulonprogo Fly Over (1), Kulonprogo District; Duration : January 2004 – August
2004; Client : Directorate General of Road, Ministry of Public Works; Scope of Works : detail
engineering design
32. DED of Retaining Wall Avalanche in all Road segments in Southeast Sulawesi and South
Sulawesi (Package 5); Duration : January 2004 – May 2004; Clients : Directorate General of
Road, Ministry of Public Works; Scope of Works : detail engineering design
33. Technical Assistance For Second Road Rehabilitation Project, UNDER ADB LOAN NO.
3989 – IND; Duration : April 2003 – January 2004; Clients : PT. Jasa Marga (Persero);
Scope of Works : engineering
34. DED of Gunung Putri Toll Gate's; Duration : August 2002 – October 2002; Clients :
Directorate General of Highways (Bina Marga), Technical Guidance Unit for Roads and
Bridges; Scope of Works : Detail engineering design

BINA KARYA

In term of the project scope, Bina Karya experiences include:

1. Feasibility Study and Preliminary Design of Papua's Central Cross Road, May 2014 – Nov
2014, Ministry of Public Works of the Directorate General of Highways of the Work Unit of the
Dire. Scope of work : Survey, Investigation, and prepared Preliminary Design
2. Project Consultancy Services Project Management Manual Project Mass Rapid Transit
Jakarta Phase -1, Sept 2012 - Dec 2012, PT. MRT Jakarta. Scope of work : Prepared the
Manual for MRT or Guideline for MRT Consultant
3. Preparation of Feasibility Study and Initial Design of Trans Sumatera Toll Road, 2012 -
2013, Directorate General of Highways, Ministry of Public Works. Scope of work : Survey and
data colection, driling for taking the sample, prepared the Feasibiity study for the toll road and
the impact to the community.
4. Design and Supervision Construction of Medan - Kualanamu Toll Road, Jan 2016 - Dec
2016, Directorate General of Highways, Ministry of Public Works. Scope of work : Evaluation of
study results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
5. Detail Engineering Design Crossing, Aug 2015 – Dec 2015, Department of Public Works of
DKI Jakarta Province. Scope of work : Surveys and Topographic Analysis, Design Drill, Sondir,
Utilities, Hydrology, Traffic, Road Network,
6. Detail Engineering Design (DED) Toll Road Development Soreang-Pasir Koja, Aug 2005 –
Feb 2016, PT.Wijaya Karya & PT.Citra Marga Lintas Jabar. Scope of work : Evaluation of study
results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation

10
Accelerating Infrastructure Delivery through Better Engineering Services Project

7. Review Review and Basic Design of Elevated Busway Corridor 15 Pasar Minggu -
Manggarai, July 2014 – Dec 2014, Department of Public Works of DKI Jakarta Province Scope
of work : Survey for the field data, review for the Basic Design
8. Preparation of Technical Document of Road Development Palu - Parigi By Pass, Apr 2014
– Dec 2014, Ministry of Highways Regional Office Central Sulawesi Province. Scope of work :
Secondary and Primary Data Collection, Technical Analysis (Topography, geotechnical,
hydrology and environment), Identification and assessment of alternative routes Initial Design
and ROW PlanEconomic Cost and Feasibility Analysis Financial Feasibility Analysis (FIRR,
Feasibility Sensitivity) The concept of TOR Preparation of DED Preparation of EIA
9. Detail Engineering Design IC design Cibitung - Railway (Sta -0 + 440 s / d Sta 3 + 000) Toll
Road Cibitung - Cilincing, Apr 2013 - Oct 2013, PT. CTP - MTD Malaysia. Scope of work :
DeD Works Cibitung Toll Road Plan Included design of : Interchange Cibitung,
Telaga Asih Main Toll Elevated, Surveys : Surveys and Topographic Analysis, Design Drill,
Sondir, Utilities, Hydrology, Traffic, Road Network, and Design : IC Cibitung, Lanscape
IC Telaga Asih - Mechanical Elevated Toll + 1,400 m - Drainage
- Toll Road - Toll Gate
10. Technical Design and Supervision of Kualanamu Toll Road Construction, Aug 2012 - Aug
2014, Directorate General of Highways, Ministry of Public Works. Scope of work : : Evaluation
of study results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
11. Consulting Services Re-Computation of Existing Structure in Kebon Jeruk Interchange I,
Mar 2012 - Apr 2012, PT. Marga Lingkar Jakarta, Scope of work : Conducting Structure
Checking on Structures that have been built for IC Kebon Jeruk included with Structure
reinforcement proposal
12. Detail Engineering Design (DED) Alternative Alinyement Sta. 2 + 800 s / d 8 + 000 Toll
Road Cibitung Cilincing, Mar 2012 - July 2012, PT. MTD CTP Expresway, Malaysia. Scope of
work : Conducting a Field Survey consists of a 6 km topographic survey, drilling in 10 points and
12 point sondir and conduct Hydrology and Utilities survey, Doing Technical Analysis (Plan
Profile Structure, Geotechnical and Drainage), Creating Technical Analysis Report, Creating a
DED Image, Create a Specific Document in English Calculate Cost and Plan Working Methods
13. Coastal Road and EIA Planning for East Bolaang Mongondow Distric, Aug 2011 - Dec
2011, East Bolaang Mongondow District Public Works Department. Scope of work : Conduct
primary data survey (topography, soil, hydrology, environment) for the inner ring plan
Bolaang Mongondow East Creating detailed engineering design of the road along 13.3 km
and 2 bridges with road criteria freeway, Prepare Tender & Budgeting Documents Prepare EIA
Documents, doing calculating and solution to minimalize impact from work on field, prepare
reporting and conduct presentations.
14. Technical Planning for Improving Ciawi - Benda Road, Jun 2011 - Nov 2011, Directorate
General of Highways, Ministry of Public Works. Scope of work : Obtain an upgraded road
technical assessment and detailed technical plan for road improvement
Ciawi - A 9 km long object in West Java, This work includes field data surveys (road inventory,
topographic surveys, soils & materials, then Cross, pavement, hydrology and utilities) Followed
by technical planning and quantity calculation and price estimates, methods and
Implementation schedule, and tender documents
15. Bridge Design from Limunjan - Mantaritif Port (5 Units), Jun 2011 - Dec 2011, Public Works
Department of Berau District. Scope of work : Preparing technical work design for 5 bridges
along Limunjan road - Mantaritif Port, from survey, survey analysis, DED, Budgeting, and
Tender Documents for 5 bridges with spans between 25 s / d 80 meters, These DED bridge is a
superstructure of composite steel
16. DED Sambaliung - Mantaritif Road, Apr 2010 - Nov 2010, Public Works Department of Berau
District. Scope of work : Conducting topographic survey, soil investigation, hydrological, and
environmental surveys to perform technical planning of Detail Engineering Design for the road ±
41 km from Sambaliung to Mantaritif, Berau District, East Kalimantan Province with the criteria
of expressway prepare the Tender Document and Budget Plan (RAB) as well as the Plan
Drawings of the route in A3 size
11
Accelerating Infrastructure Delivery through Better Engineering Services Project

17. Final Engineering Design for Government Support Toll Road, Jun 2009 - Dec 2009,
Directorate General of Highways, Ministry of Public Works. Scope of work : Compiled the final
engineering plan document for Cileunyi - Sumedang - Dawuan toll road for ± 60 km
Scope of activities carried out include: evaluate the results of previous studies and preliminary
designs preparation of design criteria conduct Surveys and field investigations, technical
analysis and planning and prepared the Tender Document
18. Technical Assistance Consulting Services Financial Management, Legal, Technical and
Toll Road Concession Management (PMU), Apr 2009 - Dec 2009, Toll Road Regulatory
Agency, Ministry of Public Works. Scope of work : Services related to the development of BPJT
governance, preparing BPJT decision concept on SOP; NSPM and other rules based on results
Has been made by the previous consultant, assist the client in the preparation of the concept of
perfection of laws and regulations on the Toll roads organization (BUJT), BPJT institutions,
construction and operation of toll roads, services directly related to BUJT performance
Early identification of various problems that occur in the implementation of toll roads,
Including the collection of primary and field data related to the work to be performed.
19. Final Engineering Design (FED) Toll Road Development Ciawi - Sukabumi Section 1 + 2
Ciawi - Cibadak (Sta. 0 + 750 - Sta. 26 + 250), Aug 2008 - Jun 2009, PT. Trans Jabar Toll
Road. Scope of work : The length of this toll road is 26 + 250, divided into 2 sections namely
Section 1: Ciawi - Cigombong from Sta. -0 + 750 s / d Sta. 13 + 875 with 3 interchange pieces,
namely IC Ciawi, IC Caringin, and IC Lido; Section 2: Cigombong - Cibadak from Sta. 13 + 875
s / d Sta. 26 + 250 with 1 interchange of IC Cibadak, the main work consists of Survai
(topography, hydrology, land investigation, traffic, road network, and utilities), Analysis and
Planning (main roads, interchange, access, shelter, structures, toll gates, mechanical electrical,
landscape, Utilities, and toll facilities)
20. Final Engineering Design Waru (Aloha) - Wonokromo - Tanjung Perak Toll Road
(Advanced Stage), Jun 2008 - Sep 2009, PT. Margajaya Toll Road. Scope of work :
Conducting a review of previous work of the field conditions as well as costs to the bussiness
Plan, Scope of activities carried out include:- Evaluate the results of previous studies and
preliminary designs, preparation of design criteria, surveys and field investigations technical
analysis and planning and Complete Tender Document
21. Review Design of Outer Ring Toll Road Jakarta W2 North (Kebon Jeruk - Ulujami), Jun
2008 - Dec 2008, PT. Jasa Marga (Persero) Tbk. Scope of work : Conducting a design review
of a project designed in 1996 by PT. Citra Mataram Satria Persada includes:
review of main road plan and profile, interchanges of Ulujami and Kebon Jeruk, overpass and
underpass as built condition, review the needs of Toll Facility, toll gates, utilities and drainage
22. Preparation of Manual of Detailed Engineering Design and Landscape of Toll Road, Apr
2008 - Nov 2008, Directorate General of Highways, Ministry of Public Works. Scope of work :
Preparation of Manual Detail Engineering Design and Landscape Toll Road as the basis /
guidance for further implementation by publishing guidebook manuals for each - Each discipline
23. Detailed Engineering Design of Solo - Ngawi and Ngawi - Kertosono Toll Road, Dec 2007 -
Oct 2008, Directorate General of Highways, Ministry of Public Works. Scope of work : Detailed
Engineering Design of Solo - Ngawi Toll Road and Ruas Ngawi - Kertosono along 68.04 Km
Consists of segments: Solo - Ngawi, Ngawi - Nganjuk and Nganjuk - Kertosono and the
activities are : Evaluate the results of previous studies and preliminary designs, preparation of
criteria design, surveys and field investigations, Technical analysis and planning
and preparation of Tender document
24. Feasibility Study & Detail Engineering Design Flyover Harapan Mulya Bekasi, Aug 2007 -
Jan 2008, PT. Summarecon Agung, Tbk.. Scope of work : A. Making Feasibility Study and
Preliminary Design: Survey work: topography, land investigation, utilities, traffic
Conducting studies: traffic, topography, soil, geometric, structure, cost estimates, and feasibility
of the project, Preparation of the Final Engineering Plan, covering the work:
Stake out design: center line, cross section, Detailed planning: geometric, intersection,
structure, utility, sign and mark, PJU, Cost estimates, working methods
Preparation of Tender and Budgeting Plan Documents and prepare the Tender document
25. Detailed Engineering Design of Cibitung - Cilincing Toll Road Project, Mar 2007 - Apr
2008, PT. MTD CTP Expressway - Malaysia, Scope of work : Planning started from IC Cibitung
12
Accelerating Infrastructure Delivery through Better Engineering Services Project

meeting with Cawang - Cikampek toll road heading east until ended in IC Cilincing meeting with
access road Tanjung Priok through Bekasi and DKI area about ± 34 km
Construction work area Bekasi pile and pile slab with 17 bridges, 9 overpasses, and 4 locations
Ramp on / off with a length of ± 29.8 KmJakarta area with pile slab construction with 2 bridges,
1 overpass, and 1 ramp location on / off with Length ± 4.2 Km.

PT MULTI PHI BETA

In relation with project scope, PT Multi Phi Beta experiences includes:

1. Technical Assistant For Core Team Consultant (CTC) For Regional Roads Development
Project (RRDP) under ADB loan NO.2817-INO, duration: February 2014 – December 2017,
Client: Directorate General of Bina Marga Scope of work: Prepare Final Engineering Design
and bidding documents for all projects and Provide construction supervision of all civil works.
2. Detail Engineering Design Kayu Agung - Palembang - Betung Toll Road Sta.00+000 -
Sta.111+694, Part of Trans Sumatera Toll Road, duration : August 2013 – June 2014, Client
: PT Sriwijaya Markmore Persada, Scope of work: Topographical mapping, Soil Investigations
and field sampling for Final Engineering design of toll road and its structures including
preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP) for bidding
purpose and conducting traffic analysist for forecast of revenue in financial proposal.
3. Supervision Consultancy Services For The Cikampek - Palimanan Toll Road In West
Java, duration: February 2013 – June 2016, Client: PT Lintas Marga Sedaya, Scope of work:
Reviewed Engineering Design, Assist Client in building and contract negotiation, Construction
supervision of Toll road and all civil works and carried out environment Management and
Monitoring Plan.
4. Road and Bridge Construction Supervision, West Java Road (PW-12/2013, West Java
Province, duration: March 2013 – December 2013, Client: P2JN West Java Province, Scope
of work: Reviewed Engineering Design, Assist Client in building and contract negotiation,
Construction supervision of National Roads and all civil works and carried out Environment
Management and Monitoring Plan.
5. Engineering Supervision for Reconstruction / Road Structure Improvement, Sei Rampah
Road CS (Package 01) North Sumatra Province, duration: March 2013 – December 2013,
Client: P2JN North Sumatera Province, Scope of work: Reviewed Engineering Design, Assist
Client in building and contract negotiation, Construction supervision of National Roads and all
civil works and carried out Environment Management and Monitoring Plan.
6. Detail Engineering Design Of Highway Cross East Aceh-1 (PR-JLJB/11/2012), duration:
June 2012 – December 2012, Client: Directorate General of Bina Marga NAD, Scope of work:
Topographical mapping, Soil Investigations and field sampling for Final Engineering design of
National road and its structures including preparation of Bill of Quantities (BoQ) and
Compilation of tender document (RFP) for bidding purpose.
7. Package 24 - East Line Supervision (MYC) - North Sumatra, duration: June 2012 –
December 2013, Client: Directorate General of Bina Marga North Sumatra, Scope of work:
Reviewed Engineering Design, Assist Client in building and contract negotiation, Construction
supervision of National Roads and all civil works and carried out Environment Management
and Monitoring Plan.
8. Advance DED Bridge Bintan Island - Dompak Island And Review Design, duration:
August 2012 – December 2012, Client: P2JN Kepulauan Riau Province, Scope of work:

13
Accelerating Infrastructure Delivery through Better Engineering Services Project

Topographical mapping, Soil Investigations and field sampling for Final Engineering design and
review of previous design of Bridges including tender document for bidding purpose.
9. Design And Build Work, For Package 4 Sta.6+092 - Sta.8+122 (Main Road), Benoa
Interchange of Nusa Dua-Ngurah Rai-Benoa Toll Road, Port Access Widening Sta.0+000 -
Sta.2+200 And Pesanggrahan Intersection At Ngurah Rai Bypass, duration : February 2012 –
April 2013, Client : PT Jasa Marga Bali Tol, Scope of work: Topographical mapping, Soil
Investigations and field sampling for Final Engineering design of toll road and its structures
including preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP) and
conducting traffic analysist for forecast traffic volume on each Interchanges, finally Carry out
Environment Management and Monitoring Plan as long as project runs.
10. Design And Build Work, For Nusa Dua - Benoa - Ngurah Rai Toll Road, Package 2,
Sta.2+790 - Sta.5+308 (Main Road) of Nusa Dua-Ngurah Rai-Benoa Toll Road, duration :
February 2012 – April 2013, Client : PT Jasa Marga Bali Tol, Scope of work: Topographical
mapping, Soil Investigations and field sampling for Final Engineering design of toll road and its
structures including preparation of Bill of Quantities (BoQ) and Compilation of tender document
(RFP) and conducting traffic analysist for forecast traffic volume on each Interchanges, finally
Carry out Environment Management and Monitoring Plan as long as project runs.
11. Construction Supervision Services for Construction of Gempol – Pasuruan Toll Road
Section 1, 2 & 3, Part of Trans Java Toll Road, duration : November 2011 – October 2014,
Client: Trans Marga Jatim Pasuruan, Scope of work: Reviewed Engineering Design, Assist
Client in building and contract negotiation, Construction supervision of Toll Roads and all civil
works and carried out Environment Management and Monitoring Plan.
12. Construction Supervision Services for Construction of Gempol – Pandaan Toll Road
Section 1, 2 & 3, Part of Trans Java Toll Road, duration : November 2011 – April 2013,
Client: PT Marga Bumi Adhikaraya, Scope of work: Reviewed Engineering Design, Assist
Client in building and contract negotiation, Construction supervision of Toll Roads and all civil
works and carried out Environment Management and Monitoring Plan.
13. Construction Supervision of Jakarta Outer Ring Road (JORR) Section W2 Segment
Kebon Jeruk – Ulujami Package 1 Sta.8+330 – Sta.10+282, duration : December 2011 –
April 2013, Client: PT Marga Lingkar Jakarta, Scope of work: Reviewed Engineering Design,
Assist Client in building and contract negotiation, Construction supervision of Toll Roads and all
civil works and carried out Environment Management and Monitoring Plan.
14. Consulting Services for Construction Management of Toll Road (At Grade & Fly Over)
and Jakarta Outer Ring Road Section W1 Segment Kebon Jeruk - Penjaringan Package
1 and Package 3 (included Fly Over Rawa Buaya and Fly Over Daan Mogot), duration :
June 2009 - January 2010, Client: PT Jakarta Lingkar Baratsatu (JLB), Scope of work:
Reviewed Engineering Design, Assist Client in building and contract negotiation, Construction
supervision of Toll Roads and all civil works and carried out Environment Management and
Monitoring Plan.
15. Pre Design Of Bakauheni - Terbanggi Besar Toll Road Section 1 (Bakauheni - Babatan)
and Section 3 (Tegineneng - Terbanggi Besar) – Part of Trans Sumatera Toll Road,
duration : May 2009 - November 2009, Client : Directorate General of Bina Marga Lampung
Province, Scope of work: Carry out Topographical mapping, Soil Investigations and field
sampling in numbers of project spots for Pre Engineering Design of toll road including
preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP) and
conducting traffic analysist for forecast traffic volume on each Interchanges.
16. Consulting Services For The Final Engineering Design (Fed) Toll Road Ciawi -
Sukabumi, Section 3 And 4 : Cibadak - Sukabumi Sta.26+250 - Sta.53+600 (27,35 Km),
14
Accelerating Infrastructure Delivery through Better Engineering Services Project

duration : October 2008 - June 2010, Client : PT Semesta Marga Raya, Scope of work:
Topographical mapping, Soil Investigations and field sampling for Final Engineering design of
toll road and its structures including preparation of Bill of Quantities (BoQ) and Compilation of
tender document (RFP) and conducting traffic analysist for forecast traffic volume on each
Interchanges.
17. Construction Supervision Sevices of Kanci-Pejagan Toll Road Sta.233+000-Sta.268+000,
duration : June 2008 - December 2010, Client: PT Semesta Marga Raya, Scope of work:
Reviewed Engineering Design, Assist Client in building and contract negotiation, Construction
supervision of Toll Roads and all civil works and carried out Environment Management and
Monitoring Plan.
18. Construction Supervision Services Of Bogor Ring Road Section I Sentul Selatan -
Kedung Halang (Sta.0+000 - Sta.3+850), duration : March 2008 - November 2008, Client:
Indonesia Highway Corporation, Scope of work: Reviewed Engineering Design, Assist Client in
building and contract negotiation, Construction supervision of Toll Roads and all civil works and
carried out Environment Management and Monitoring Plan.
19. Consulting Services For The Row Plan Preparation And Detailed Engineering Design of
Semarang - Solo Toll Road Phase II Link : Salatiga-Boyolali (Sta.40+200-Sta.63+100),
Part of Semarang-Solo Toll Road, duration : March 2008 - October 2008, Client : Indonesian
Highway Corporation, Scope of work: Topographical mapping, Soil Investigations and field
sampling for Final Engineering design of toll road and its structures including preparation of Bill
of Quantities (BoQ) and Compilation of tender document (RFP) for bidding purpose and
conducting traffic analysist to determined Traffic Loads of each vehicles across Arterial roads.
20. Construction Supervision Services Of Toll Prof. DR.IR Sedyatmo Toll Road Package 4
Link : Penjaringan – Kapuk Lane B (Sta. 7+456 – Sta. 11+337), duration : June 2008 -
December 2008, Client: Indonesia Highway Corporation, Scope of work: Reviewed
Engineering Design, Assist Client in building and contract negotiation, Construction supervision
of Toll Roads and all civil works.
21. Consulting Services For Construction Supervision For Technical National Road Project,
Package BRR-PW JN 01, duration : August 2007 - December 2007, Client: BRR Aceh-Nias,
Scope of work: Reviewed Engineering Design, Assist Client in building and contract
negotiation, Construction supervision of Toll Roads and all civil works.
22. Consulting Services for The Detailed Engineering Design and Construction Supervision
of Tanjung Priok Access Road Construction Project Phase I Under JBIC Loan, duration :
September 2007 - February 2011, Client : Directorate General of Highway, Scope of work:
Topographical mapping, Soil Investigations and field sampling for Final Engineering design of
toll road and its structures including tender document for bidding purpose.
23. Basic Design and FED Penjaringan – Kebon Jeruk Toll Road Project Under Jakarta
Outer Ring Road (JORR) Section W-1, duration : May 2006 - December 2006, Client : PT
Jakarta Lingkar Baratsatu (JLB), Scope of work: Topographical mapping, Soil Investigations
and field sampling for Final Engineering design of toll road and its structures including
preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP) for bidding
purpose, Beside engineering works, The Company has also carried out The Review of
Environmental Study for the project in form of Environmental Impact Assessment.
24. Detailed Engineering Design of Depok - Antasari Toll Road, duration : August 2006 - July
2007, Client PT Citra Waspphutowa, Scope of work: Topographical mapping, Soil
Investigations and field sampling for Final Engineering design of toll road and its structures
including preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP)for
bidding purpose.
15
Accelerating Infrastructure Delivery through Better Engineering Services Project

25. Consulting Services for Regional Design and Supervision Consultant (RDSC) Team I
Second Eastern Indonesia Region Transportation Project (EIRTP-2), duration : January
2007 - June 2009, Client : Directorate General of Highway, Scope of work: Prepare Final
Engineering Design and bidding documents for all projects to be implemented in Annual Work
Programmed and Provide construction supervision of all civil works implemented under Annual
Work Programmed, including establishing and operating testing laboratories at specified
locations, provide general support in overall project management to all implementing agencies
at all level of government.
26. Technical Supervision Works for Kabupaten Roads Package PW-03C BRR Aceh, duration
: August 2006 - January 2007, Client : BRR Aceh & Nias, Scope of work: carry out the review
design and construction supervision including assistance to the project officer for tendering and
contracting of the successful implementation of technique supervision of road construction.
27. Technical Advisory Services Road Rehabilitation (Sector) Project – Core Team
Consultant Under ADB Loan No. 1798-INO, duration : November 2002 - July 2006, Client :
KIMPRASWIL (DGRI), Scope of work: Monitoring the progress of the Action Plan and
reformulating and implementing road sector policies and strategies, Quality and quantity control
to support and enforce the law on vehicle overloading, road safety and road planning and
programming, Monitoring progress evaluated the proposal AWP each year by using latest
IIRMS 2000 program and Certification of monthly payment review engineering design, cost
estimates, pre qualification document and bidding documents for first batch (AWP).
28. Consultancy Services for The Road Rehabilitation (Sector) Project (RRSP) under ADB
Loan No.1798-INO (Design and Field Team), duration : November 2003 - January 2006,
Client : Ditjen Bina Marga, Scope of work: carry out the review design and construction
supervision including assistance to the project officer for tendering and contracting of the
successful implementation of technique supervision of road construction.

PT. POLA AGUNG

PT. Pola Agung has proven a long track record in feasibility study, detailed engineering design,
environmental impact, construction supervision of dams, including projects under the same project
authorities in the Ministry of Public Works and Housing.

In term of the project scope, PT. Pola Agung experiences include:

1. Technical Assistence for Traffic Environment Impact (ANDALALIN) Segment Padang


- Pekanbaru, Sumatera Province , Duration : July 06, 2017 - September 03, 2017
Client : PT. Hutama Karya (Persero) Toll road development divisionIndonesian , Scope
of Work : Feasibility Study

2. Feasibility Study And Basic Desain For Toll Road Trans Sumatera Province Link
Medan - Aceh. Package F3. Duration : April 2012 - July 2013 Client :Direktorat General
Of Highways Ministry Of Public Work Indonesian PT. Pola Agung Scope of Work :
Feasibility Study

3. Guide Line for Design Of Specsification Bridge Project (Package A-7) Duration
: July 08, 2015 - December 2015 Client : Direktorat General Of Highways Ministry Of
Public Work, Working Group on Coaching Activities of Directorate of Bridge Indonesian,
Scope of Work : Feasibility Study

4. Technical Guideline / Managemen for Bridge Rehabilitation (Package B-4/2014) ,


Duration : May 02, 2014 - December 2014 Client :Direktorat General Of Highways

16
Accelerating Infrastructure Delivery through Better Engineering Services Project

Ministry Of Public WorkWork Unit of Directorate of Technical Engineering of Bridge


Engineering Development Indonesian ,Scope of Work : Feasibility Study

5. Pra Feasibility Development Of Road at jayapura sentani City and Keerom City Of
Papua Province Duration : November 12, 2007 - May 2008 Client : DPU
Jayapura Indonesian , Scope of Work : Feasibility Study

6. Package 20 : Detail Engineering Desain Bridge Of West Nusa Tenggara Province 02


Duration : January 08, 2016 - December 2016 Client : Direktorat General Of Highways
Ministry Of Public Work National West Nusa Tenggara Province Indonesian , Scope
of Work : Design

7. Detail Engineering Desain Bridge Of West Nusa Tenggara Province 01 (Package 10)
Duration : April 01, 2015 - September 2015 Client : Direktorat General Of
Highways Ministry Of Public Work, nationalWest Nusa Tenggara Province
Indonesian , Scope of Work : Design

8. Desain Checker / Management Contruction I Infrastructure Bidge Suramadu


National, Duration : August 01, 2005 - March 2006 Client : Direktorat General Of
Highways Ministry Of Public Work, Temporary Working Unit of Suramadu National Bridge
Construction Indonesian , Scope of Work : Design

9. Detail Engineering Design Road, Fly Over and Bridge East Java Province, Duration
: July 28, 2005 - December 18, 2005 Client : Direktorat General Of Highways Ministry
Of Public Work, Temporary Work Unit of East Java P2JJ Indonesian , Scope of Work :
Design

10. Detail Engineering Design Last Toll Road Semarang - Bawen City Duration : July,
28 2005 - January 18, 2006 Client : PT Jasa Marga (Persero) Indonesian ,
Scope of Work : Design

11. Consulting Services For Construction Supervision Consultant (CSC) for


Reconstruction of Calang - Meulaboh National Road Duration : January 9, 2012 -
December 31, 2012 Client : Direktorat General Of Highways Ministry Of Public Work,
Satker of Central Implementation of National Road I Activities Implementation Indonesian ,
Scope of Work : EIA

12. Management Consulting For Direktorat Bina Marga East Regional, Duration :
February 25, 2010 - December 2010 Client : Direktorat General Of Highways Ministry
Of Public Work, Satker of East Road and Bridge Directorate Indonesian Scope of
Work : EIA

13. Management Consulting For Direktorat Bina Marga East Regional , Duration :
January 14, 2008 - December 2009 Direktorat General Of Highways Ministry Of Public
Work, Unit Dir. Eastern Roads and Bridges Indonesian Scope of Work : EIA

14. Management Consulting For Phase II Construction Bidge Suramadu (Continue ) ,


Duration : June 03 2008 - July 2009 Direktorat General Of Highways Ministry
Of Public Work, Temporary Working Unit for Development of Suramadu National Bridge
Construction Technique Indonesian , Scope of Work : EIA

15. Consulting Services For Construction Supervision of The Tanjung Priok Access
Road Construction Project, Phase Duration : 2 November 23, 2010 - July 03,
2015 Client : Direktorat General Of Highways Ministry Of Public Work Akses Tanjung

17
Accelerating Infrastructure Delivery through Better Engineering Services Project

Priok PPK Planning and Supervision of Tanjung Priok Access Road


ConstructionIndonesian , Scope of Work : Supervision

16. Management Consulting Construction Toll Outer Ring Road Jakarta Seksi W1
Segment Kebon Jeruk - Penjaringan Duration : October 04, 2007 - June 2009 Client :
PT. Jakarta Lingkar Barat Satu Indonesian Scope of Work : Supervision

17. Construction Supervision For Bridge to Satker Road And Bridge National Region II
(Package 04) Duration : April 01, 2015 - December 2015 Client : Direktorat
General Of Highways Ministry Of Public Work, National Road Planning and Monitoring Unit
of West Nusa Tenggara Province Indonesian Scope of Work : Supervision

18. Construction Supervision For Bridge Merah-Putih In Maluku Province Duration


: July 26, 2011 - December 2014, Client : SNVT Planner and Supervision National Road
Province Maluku Indonesian, Scope of Work : Supervision

19. Construction Supervision And Management Construction Phase II Bridge


Construction Suramadu May 27, 2006 - April 2009 Direktorat General Of
Highways Ministry Of Public Work, Suramadu Indonesian Scope of Work :
Supervision

B. Geographical Experience
Cross-referencing from your profile projects in Section E, present experiences in similar geographic
areas (Indonesia or the Asian and the Pacific).

Since its inception in 1969, WAPCOS has been actively providing consultancy services in more
than 50 countries all over the world. WAPCOS has till date provided consultancy for more than
2000 projects in India as well abroad. WAPCOS has undertaken numerous projects in Asia Pacific
region as well. For carrying-out various project activities, WAPCOS has established its offices at
different project locations in the region. The countries of operation in Asia and Pacific region have
been Indonesia, Lao PDR, Philippines, Malaysia, Singapore, Cambodia, Myanmar,Vietnam,
Mangolia, India, Bhutan, Bangladesh, Afghanistan, Sri Lanka, Nepal etc.
DOLSAR’s experience covers projects in several other countries such as Azerbaijan, Bosnia-
Herzegovina, Cyprus, India, Iraq, Libya, Pakistan, Georgia, Saudi Arabia, Turkmenistan and
Uzbekistan.
PT. Indra Karya (Persero) is seemly the most experienced Indonesian Consulting Company in
Road and Bridge Projects. The company has been actively providing consultancy services in Detail
Design and of almost all major road and bridge engineering planning and study in Indonesia, such
as Road Rehabilitation (Sector) Project Design Under ADB, Second Eastern Indonesia Region
Transport Project (EIRTP-2) Under IBRD, Landslide Monitoring and Analysis System, and
Feasibility Study and Bridge Cross Design. The company also has been actively providing
consultancy services in Study, Detail Design, LARAP, and EIA project of almost all major Irrigation,
River improvement, and bulk water in Indonesia, such as Ciliwung – Cisadane river, Brantas river,
Cimanuk-Cisanggarung river, Bili-Bili, Pengga, and Batutegi.

WAPCOS

WAPCOS has been engaged in a number of water sector and infrastructure projects in Asia and
the Pacific as follows :

18
Accelerating Infrastructure Delivery through Better Engineering Services Project

Lao PDR
1. Development of Six Lift Irrigation Schemes in Champassack Province (under Line of
Credit, Government of India); Duration: May, 2009 to Sept. 2015; Client: Department of
Irrigation, Ministry of Agricultural and Forestry, Government of Lao PDR; Location: Lao PDR
2. Project Management Consultancy for Nam Song Hydropower Project (3x2 MW) (Under
Line of Credit of Govt. of India); Duration: Oct 2008 to Ongoing; Client: Electricite Du LAOS
(EDL); Location: LAOS PDR
3. Construction of Nam song Hydropower project & 115 Kv Transmission line project and
purchase of equipment for rural electrification Phase-2; Duration: 2008; Client: Electricile
du Laos; Location: Lao PDR
4. Engineering Procurement and construction for development of 6 large Irrigation
Schemes in Champassak province Lao PDR; Duration: 2015; Client: Department of
Irrigation, Ministry of Agricultural and Forestry, Government of Lao PDR; Location: Lao PDR

Cambodia
1. Project Implementation Consultant for Construction of 230kV DC Transmission Line from
Stung Treng to Kratie and associated 230/22 KV Substation at Kratie, Kingdom of
Cambodia.; Duration: January 2012 to January 2014; Client: Electricite Du Cambodia (EDC);
Location: Cambodia
2. Siem Reap River Basin-Development of Master Plan, Cambodia, Kingdom of Cambodia.;
Duration: December, 2014 to Nov, 2016; Client: Ministry of External Affairs, Government of
India; Location: Cambodia
3. Rehabilitation of West Baray Irrigation Project – Project Management, Kingdom of
Cambodia.; Duration: April, 2005 to June, 2009; Client: Ministry of Water Resources and
Meteorology, Royal Government of Cambodia; Location: Cambodia
4. Engineering Procurement and Construction of Stung Tasal Dam Project, Kingdom of
Cambodia; Duration: Dec,2007 to September, 2015; Client: Ministry of Water Resources and
Meteorology, Royal Government of Cambodia; Location: Cambodia

Bhutan
1. Punatsagchhu-I Hydro Electric Project (1200 MW, 343m Design head) Investigations,
Engineering Consultancy for Main Civil Works and Infrastructure Development, Wangdue
Phodrang, Western Bhutan; Duration: Jan 2004 to August, 2010; Client: PHPA Royal
Government of Bhutan; Location: Bhutan
2. Punatsagchhu-II Hydro Electric Project Investigations, Engineering Consultancy for Main
Civil Works and Infrastructure Development (6x170 MW), 256 m Gross Head, Wangdue
Phodrang, Western Bhutan; Duration: November, 2006 to Ongoing; Client: PHPA Royal
Government of Bhutan; Location: Bhutan
3. Detailed design engineering for Tala Hydro Electric Project (1020 MW, 860 m Gross
Head), Tala, Western Bhutan; Duration: December, 1997 to July, 2007; Client: Royal
Government of Bhutan; Location: Bhutan
4. Technical services on Design & construction of 400 kV Transmission lines for
Mangdechhu Hydro electric Project, Bhutan; Duration: September 2011 to Ongoing; Client:
Bhutan Power Corporation, Bhutan; Location: Bhutan
5. EIA study for additional generation of power from chukha H.E. Project; Duration: May,
1976 to August, 1988; Client: Royal Government of Bhutan; Location: Bhutan
6. Development of Financial Information System For Tala Hydro Elect. Project; Duration:
December, 1997 to July, 2007; Client: Royal Government of Bhutan; Location: Bhutan

Bangladesh
1. Sustainable Rural Infrastructure Improvement Project (Asian Development Bank – TA
7371-BAN), Dhaka, Bangladesh; Duration: April, 2010 to August, 2010; Client: Asian
Development Bank; Location: Bangladesh

19
Accelerating Infrastructure Delivery through Better Engineering Services Project

Nepal
1. Draft Feasibility Study Report of Arun-III H.E. Project; Duration: August 2008 to ongoing;
Client: Satluj Jal Vidyut Nigam Ltd.(SJVNL), Shimla; Location: Nepal
2. Preparation of DPR for Irrigation Studies of Command area lying in Indian Territory under
Sapta Kosi High Dam Multi-Purpose Project and Sun Kosi Storage-cum-Diversion
Scheme; Duration: March 2009 to Feb 2014; Client: Sapta Kosi Sun Kosi Investigation (JPO-
SKSKI), Nepal

DOLSAR

DOLSAR has been involved in and successfully delivered services, ranging from feasibility studies
to construction supervision in various Asian countries. This experience includes some notable
projects
 HAVELIAN-THAKOT Motorway: Located in Pakistan, 130 km motorway. Services provided
are design review and construction supervision.
 KARAKORAM Highway: Located in Pakistan 62 km highway. Services provided are detailed
design and construction supervision.
 Consultant’s Services including Design and Construction Supervision of Water Supply
and Sewerage Projects for 10 PROVINCES IN AZERBAIJAN: Preparation of detailed
design, tender documents and provision of construction supervision services for Shirvan,
Salyan, Neftchala, Khacmaz, Yevlakh, Barda, Khizi, Quzar, Gobustan and Naftalan Provinces.
Client: AZERSU Joint Stock Company, Azarbaijan
 Dasu Dam and Hydroelectric Power Plant: Located in Pakistan, Dasu Dam and HEPP is a
roller compacted concrete dam with a height of 240 m and an installed capacity of 4320 MW.
Services provided are review of the feasibility study, preparation of detailed design, bill of
quantities, cost estimate, environmental impact assessment report, social impact assessment
report, RAP, preparation of bidding documents, tendering and contracting, construction design,
contract management and construction supervision services.

 Pakal Dul Dam and Hydroelectric Power Plant: Located in India, Pakal Dul Dam and HEPP
is a concrete faced rockfill dam with a height of 167 m and an installed capacity of 1000 MW.
Services provided are tender design and tender drawings.

 Rupsiabagar Khasiyabara Dam and Hydroelectric Power Plant: Located in India,


Rupsiabagar Khasiyabara Dam and HEPP is a concrete gravity dam with a height of 62 m and
an installed capacity of 261 MW. Services provided are tender design and tender drawings.

 Lata Tapovan Dam and Hydroelectric Power Plant: Located in India, Lata Tapovan Dam
and HEPP is a concrete dam with a height of 20 m and an installed capacity of 171 MW.
Services provided are tender design and tender drawings.

 Kishanganga Dam and Hydroelectric Power Plant: Located in India, Kishanganga Dam and
HEPP is a concrete faced rockfill dam with a height of 37 m and an installed capacity of 330
MW. Services provided are tender design and tender drawings.

 Ramman Stage III Dam and Hydroelectric Power Plant: Located in India, Ramman Stage III
Dam and HEPP is a concrete faced rockfill dam with a height of 32 m and an installed capacity
of 120 MW. Services provided are tender design and tender drawings.
20
Accelerating Infrastructure Delivery through Better Engineering Services Project

INDRA KARYA

Relevant to this project, INDRA KARYA has engaged in the preparation of a number of projects in
the region, as follows:

I. CENTRAL JAVA

1. Road Rehabilitation (Sector) Project Design and Field Team Consultants Under ADB
Loan No. 1798-IND; Duration : November 2003 to January 2004; Client : PT. Jasa
Marga (Persero); Country : Central Java, Indonesia; Scope of Work : Detail engineering
design and master plan

2. Road Engineering Planning (Package 3); Duration : April 2004 – November 2004;
Client : Road & Bridge Planning & Supervision Project Prop. Central Java; Scope of Work
: design, master plan

3. Bridge Engineering Planning (Package-3); Duration : April 2004 – November 2005;


Client : Project Planning and Supervision of Road and Bridge Prop. Central Java; Scope
of Work : planning, design

4. DED of Road and Bridge – Package 1; Duration : May 2004 – December 2004; Client :
General Directorate of Roads, Public Works Department; Scope of Work : planning,
design

5. Road Engineering Planning in Urban Areas (package 01); Duration : March 2004 –
May 2004; Client : Project for Planning and Controlling Roads and Urban Bridges of East
Java Province; Scope of Works : design, planning

II. WEST JAVA

1. Toll Road Technical Planning Cikampek - South Purwakarta - Pleret Segment's;


Duration : October 2003 to September 2004; Client : PT. Jasa Marga (Persero); Country
: West Java, Indonesia; Scope of Work : Planning, desain, and masterplan

2. Landslide Monitoring and Analysis System on Strategic Paths in Java and Sumatra;
Duration : June 2007 to November 2007; Client : Ministry of Public Works, Directorate
General of Highways, Technical Road and Bridge Engineering Working Unit; Country :
Indonesia; Scope of Work : Study, LARAP, environmental impact

3. Technical Assistance For Second Road Rehabilitation Project, UNDER ADB LOAN
NO. 3989 – IND; Duration : April 2003 – January 2004; Clients : PT. Jasa Marga
(Persero); Scope of Works : engineering

4. DED of Gunung Putri Toll Gate's; Duration : August 2002 – October 2002; Clients :
Directorate General of Highways (Bina Marga), Technical Guidance Unit for Roads and
Bridges; Scope of Works : detail engineering design

III. NORTH SULAWESI

1. Road Engineering Planning North Sulawesi Cross Center; Duration : March 2010 to
July 2010; Client : Directorate General of Highways, SNVT Planning and Supervision of
Road and Bridge North Sulawesi; Country : North Sulawesi, Indonesia; Scope of Work :
Detail engineering design, master plan

21
Accelerating Infrastructure Delivery through Better Engineering Services Project

2. Road Engineering Planning of Kapitu - Tumpaan Kapitu Tumpaan Location,


Minahasa District South Minahasa; Duration : September 2006 to January 2007;
Client : South Minahasa District Department of Public Works; Scope of Work : Detail
engineering design, master plan

3. Road Engineering Planning North Sulawesi Cross West (84,54 Km); Duration :
September 2007 to March 2008; Client : SNVT Planning and Supervision of Roads and
Bridges of North Sulawesi; Scope of Work : Detail engineering design, master plan

4. Package of Road Planning Spreads North Sulawesi; Duration : March 2010 – July
2010; Client : Directorate General of Highways, SNVT Planning and Supervision of
Roads and Bridges of North Sulawesi; Scope of Work : planning, design

IV. SOUTH KALIMANTAN

1. Feasibility study and Bridge Cross Design; Duration : December 2006 – July 2007;
Client : PT. Kalimantan Prima Persada Contractor & Mining Developer; Scope of Work :
study and design

V. EAST NUSA TENGGARA

1. Road Engineering Planning in Kupang City, Kupang District and TTS District - PR 01
– Package; Duration : August 2010 to January 2011; Client : Directorate General of
Highways, SNVT Planning and Supervision Roads and Bridges NTT; Scope of Work :
Detail engineering design, master plan

2. Road Engineering Planning in Manggarai District and West Manggarai; Duration :


March 2006 – June 2007; Client : SNVT P2JJ Prov. NTT; Scope of Work : Planning,
engineering, and design

3. Road Engineering Planning in Kupang District and TTS (PR-02 Package); Duration :
August 2010 – December 2010; Client : Directorate General of Highways, SNVT Planning
and Supervision of Roads and Bridges of NTT; Scope of Work : planning, design

4. Road Engineering Planning in Flores Island (West Slide) PR 02 – Package; Duration :


March 2013 – December 2013; Client : Ministry of Public Works, Directorate General of
Highways, Sattet NVTPP National Road Prov NTT; Scope of Work : design, planning

5. Bridge Engineering Planning in Timor Island (PR-03 Package); Duration : November


2007 – December 2007; Client : Satker. NVT Planning and Supervision of Roads and
Bridges of NTT Province; Scope of Work : planning, design

6. Road Engineering Planning in Alor Island (PR-02 Package); Duration : September


2007 – March 2008; Client : SNVT Planning and Supervision of Roads and Bridges of
NTT Province; Scope of Work : design, master plan

VI. SOUTH SUMATERA

1. DED of National Leger Road’s; Duration : June 2005 – January 2006; Client :
Directorate General of Road, Ministry of Public Works; Scope of Work : detail
engineering design

2. Information System in Sekayu and Lubuk Linggau; Duration : July 2005 – September
2005; Client : Directorate General of Road, Ministry of Public Works; Scope of Work :
design
22
Accelerating Infrastructure Delivery through Better Engineering Services Project

3. DED of Bridge - Pakckage 7; Duration : January 2005 – June 2005; Client : Directorate
General of Road, Ministry of Public Work; Scope of Work : detail engineering design

4. Road and Bridge Enginnering Planning in Lubuk Linggau; Duration : September 2005
– December 2005; Client : Directorate General of Road, Ministry of Public Works;
Duration of Works : design, master plan

VII. CENTRAL SULAWESI

1. Regional Design and Supervision consultants-2 (RDSC-2) for Second Eastern


Indonesia Region Transport Project (EIRTP-2) Under IBRD Loan No. 4744-IND;
Duration : November 2006 to October 2010; Client : Directorate General of Highways
(Bina Marga), Technical Guidance Unit for Roads and Bridges; Country : Center
Sulawesi, Indonesia; Scope of Work : Detailed engineering design and supervision

VIII. ACEH

1. Design Engineering Design of Road Improvment Exs. Kertas Kraft Aceh, PT


Takengon Cross -North Aceh; Duration : November 2006 to May 2007; Client : Public
Planning Works Unit, Technical Planning and Supply Chain Management BRR NAD –
Nias; Country : North Aceh, Indonesia; Scope of Work : Detail engineering design and
master plan - NAD

IX. YOGYAKARTA

1. DED of Kulon Progo Fly Over (2), Kulon Progo District; Duration : October 2004 –
December 2004; Client : Public Works Department Kulon Progo; Scope of Work : detail
engineering design, master plan

2. DED of Kulonprogo Fly Over (1), Kulonprogo District; Duration : January 2004 –
August 2004; Client : Directorate General of Road, Ministry of Public Works; Scope of
Works : detail engineering design

X. EAST JAVA

1. Road Engineering Planning Package, Kenjeran, Surabaya; Duration : May 2009 –


August 2009; Client : SNVT P2JJ Metro Surabaya; Scope of Work : planning, design

2. Sangkariang's Bridge Engineering Planning, Suguh River, Kalianyar (Malang


District) and Bedadung River's Bridge Review Design (Jember District); Duration :
January 2009 – March 2009; Client : Welfare Core Cooperative (KOPINKAN); Scope of
Works : master plan, design

3. Bridge Engineering Planning Spread in East Java South Cross (Paket-2); Duration :
June 2006 – October 2006; Client : Public Works Office of Bina Marga East Java; Scope
of Works : master plan, design

XI. BALI

1. Road Engineering Planning in 124 KM's Denpasar - Packages 12 (Bon


Dalem/Tembok Village) – Amlapura; Duration : March 2013 – April 2013; Client : P2JN
Bali; Scope of Works : design, master plan

23
Accelerating Infrastructure Delivery through Better Engineering Services Project

2. Road Engineering Planning at 9,50 Km's, Cekikik Gilimanuk, Pekutatan - Negara-


Tabanan Antasari; Duration : June 2004 – December 2005; Client : Directorate General
of Road, Ministry of Public Works; Scope of Works : planning, design

XII. SOUTH SULAWESI

1. DED of Retaining Wall Avalanche in all Road segments in Southeast Sulawesi and
South Sulawesi (Package 5); Duration : January 2004 – May 2004; Clients :
Directorate General of Road, Ministry of Public Works; Scope of Works : detail
engineering design

BINA KARYA

PT. Bina Karya (Persero) have Branch Offices in all Regions. Relevant to this project, BIKA has
engaged in projects in the region, as follows:

A. SUMATERA
1. Preparation of Feasibility Study and Initial Design of Trans Sumatera Toll Road, 2012 -
2013, Directorate General of Highways, Ministry of Public Works. Scope of work : Survey and
data colection, driling for taking the sample, prepared the Feasibiity study for the toll road and
the impact to the community.
2. Design and Supervision Construction of Medan - Kualanamu Toll Road, Jan 2016 - Dec
2016, Directorate General of Highways, Ministry of Public Works. Scope of work : Evaluation
of study results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
3. Technical Design and Supervision of Kualanamu Toll Road Construction, Aug 2012 -
Aug 2014, Directorate General of Highways, Ministry of Public Works. Scope of work :
Evaluation of study results and preliminary design, Evaluation of planning criteria and
standards Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation

B. JAVA
1. Project Consultancy Services Project Management Manual Project Mass Rapid Transit
Jakarta Phase -1, Sept 2012 - Dec 2012, PT. MRT Jakarta. Scope of work : Prepared the
Manual for MRT or Guideline for MRT Consultant
2. Detail Engineering Design Crossing, Aug 2015 – Dec 2015, Department of Public Works of
DKI Jakarta Province. Scope of work : Surveys and Topographic Analysis, Design Drill,
Sondir, Utilities, Hydrology, Traffic, Road Network,
3. Detail Engineering Design (DED) Toll Road Development Soreang-Pasir Koja, Aug 2005
– Feb 2016, PT.Wijaya Karya & PT.Citra Marga Lintas Jabar. Scope of work : Evaluation of
study results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
4. Review Review and Basic Design of Elevated Busway Corridor 15 Pasar Minggu -
Manggarai, July 2014 – Dec 2014, Department of Public Works of DKI Jakarta Province
Scope of work : Survey for the field data, review for the Basic Design
5. Detail Engineering Design IC design Cibitung - Railway (Sta -0 + 440 s / d Sta 3 + 000)
Toll Road Cibitung - Cilincing, Apr 2013 - Oct 2013, PT. CTP - MTD Malaysia. Scope of
work : DeD Works Cibitung Toll Road Plan Included design of : Interchange Cibitung,
Telaga Asih Main Toll Elevated, Surveys : Surveys and Topographic Analysis, Design Drill,
Sondir, Utilities, Hydrology, Traffic, Road Network, and Design : IC Cibitung, Lanscape
IC Telaga Asih - Mechanical Elevated Toll + 1,400 m - Drainage
- Toll Road - Toll Gate
24
Accelerating Infrastructure Delivery through Better Engineering Services Project

6. Consulting Services Re-Computation of Existing Structure in Kebon Jeruk Interchange


I, Mar 2012 - Apr 2012, PT. Marga Lingkar Jakarta, Scope of work : Conducting Structure
Checking on Structures that have been built for IC Kebon Jeruk included with Structure
reinforcement proposal
7. Detail Engineering Design (DED) Alternative Alinyement Sta. 2 + 800 s / d 8 + 000 Toll
Road Cibitung Cilincing, Mar 2012 - July 2012, PT. MTD CTP Expresway, Malaysia. Scope
of work : Conducting a Field Survey consists of a 6 km topographic survey, drilling in 10 points
and 12 point sondir and conduct Hydrology and Utilities survey, Doing Technical Analysis
(Plan Profile Structure, Geotechnical and Drainage), Creating Technical Analysis Report,
Creating a DED Image, Create a Specific Document in English Calculate Cost and Plan
Working Methods
8. Technical Planning for Improving Ciawi - Benda Road, Jun 2011 - Nov 2011, Directorate
General of Highways, Ministry of Public Works. Scope of work : Obtain an upgraded road
technical assessment and detailed technical plan for road improvement
Ciawi - A 9 km long object in West Java, This work includes field data surveys (road inventory,
topographic surveys, soils & materials, then Cross, pavement, hydrology and utilities)
Followed by technical planning and quantity calculation and price estimates, methods and
Implementation schedule, and tender documents
9. Final Engineering Design for Government Support Toll Road, Jun 2009 - Dec 2009,
Directorate General of Highways, Ministry of Public Works. Scope of work : Compiled the final
engineering plan document for Cileunyi - Sumedang - Dawuan toll road for ± 60 km
Scope of activities carried out include: evaluate the results of previous studies and preliminary
designs preparation of design criteria conduct Surveys and field investigations, technical
analysis and planning and prepared the Tender Document
10. Technical Assistance Consulting Services Financial Management, Legal, Technical and
Toll Road Concession Management (PMU), Apr 2009 - Dec 2009, Toll Road Regulatory
Agency, Ministry of Public Works. Scope of work : Services related to the development of
BPJT governance, preparing BPJT decision concept on SOP; NSPM and other rules based on
results
Has been made by the previous consultant, assist the client in the preparation of the concept
of perfection of laws and regulations on the Toll roads organization (BUJT), BPJT institutions,
construction and operation of toll roads, services directly related to BUJT performance
Early identification of various problems that occur in the implementation of toll roads,
Including the collection of primary and field data related to the work to be performed.
11. Final Engineering Design (FED) Toll Road Development Ciawi - Sukabumi Section 1 + 2
Ciawi - Cibadak (Sta. 0 + 750 - Sta. 26 + 250), Aug 2008 - Jun 2009, PT. Trans Jabar Toll
Road. Scope of work : The length of this toll road is 26 + 250, divided into 2 sections namely
Section 1: Ciawi - Cigombong from Sta. -0 + 750 s / d Sta. 13 + 875 with 3 interchange pieces,
namely IC Ciawi, IC Caringin, and IC Lido; Section 2: Cigombong - Cibadak from Sta. 13 +
875 s / d Sta. 26 + 250 with 1 interchange of IC Cibadak, the main work consists of Survai
(topography, hydrology, land investigation, traffic, road network, and utilities), Analysis and
Planning (main roads, interchange, access, shelter, structures, toll gates, mechanical
electrical, landscape, Utilities, and toll facilities)
12. Final Engineering Design Waru (Aloha) - Wonokromo - Tanjung Perak Toll Road
(Advanced Stage), Jun 2008 - Sep 2009, PT. Margajaya Toll Road. Scope of work :
Conducting a review of previous work of the field conditions as well as costs to the bussiness
Plan
Scope of activities carried out include:- Evaluate the results of previous studies and
preliminary designs, preparation of design criteria, surveys and field investigations technical
analysis and planning and Complete Tender Document
13. Review Design of Outer Ring Toll Road Jakarta W2 North (Kebon Jeruk - Ulujami), Jun
2008 - Dec 2008, PT. Jasa Marga (Persero) Tbk. Scope of work : Conducting a design review
of a project designed in 1996 by PT. Citra Mataram Satria Persada includes:
review of main road plan and profile, interchanges of Ulujami and Kebon Jeruk, overpass and
underpass as built condition, review the needs of Toll Facility, toll gates, utilities and drainage

25
Accelerating Infrastructure Delivery through Better Engineering Services Project

14. Preparation of Manual of Detailed Engineering Design and Landscape of Toll Road, Apr
2008 - Nov 2008, Directorate General of Highways, Ministry of Public Works. Scope of work :
Preparation of Manual Detail Engineering Design and Landscape Toll Road as the basis /
guidance for further implementation by publishing guidebook manuals for each - Each
discipline
15. Detailed Engineering Design of Solo - Ngawi and Ngawi - Kertosono Toll Road, Dec
2007 - Oct 2008, Directorate General of Highways, Ministry of Public Works. Scope of work :
Detailed Engineering Design of Solo - Ngawi Toll Road and Ruas Ngawi - Kertosono along
68.04 Km
Consists of segments: Solo - Ngawi, Ngawi - Nganjuk and Nganjuk - Kertosono and the
activities are : Evaluate the results of previous studies and preliminary designs, preparation of
criteria design, surveys and field investigations, Technical analysis and planning
and preparation of Tender document
16. Feasibility Study & Detail Engineering Design Flyover Harapan Mulya Bekasi, Aug 2007 -
Jan 2008, PT. Summarecon Agung, Tbk.. Scope of work : A. Making Feasibility Study and
Preliminary Design: Survey work: topography, land investigation, utilities, traffic
Conducting studies: traffic, topography, soil, geometric, structure, cost estimates, and
feasibility of the project, Preparation of the Final Engineering Plan, covering the work:
Stake out design: center line, cross section, Detailed planning: geometric, intersection,
structure, utility, sign and mark, PJU, Cost estimates, working methods
Preparation of Tender and Budgeting Plan Documents and prepare the Tender document
17. Detailed Engineering Design of Cibitung - Cilincing Toll Road Project, Mar 2007 - Apr
2008, PT. MTD CTP Expressway - Malaysia, Scope of work : Planning started from IC
Cibitung meeting with Cawang - Cikampek toll road heading east until ended in IC Cilincing
meeting with access road Tanjung Priok through Bekasi and DKI area about ± 34 km
Construction work area Bekasi pile and pile slab with 17 bridges, 9 overpasses, and 4
locations
Ramp on / off with a length of ± 29.8 KmJakarta area with pile slab construction with 2 bridges,
1 overpass, and 1 ramp location on / off with Length ± 4.2 Km...

C. SULAWESI
1. Preparation of Technical Document of Road Development Palu - Parigi By Pass, Apr
2014 – Dec 2014, Ministry of Highways Regional Office Central Sulawesi Province. Scope of
work : Secondary and Primary Data Collection, Technical Analysis (Topography, geotechnical,
hydrology and environment), Identification and assessment of alternative routes Initial Design
and ROW PlanEconomic Cost and Feasibility Analysis Financial Feasibility Analysis (FIRR,
Feasibility Sensitivity) The concept of TOR Preparation of DED Preparation of EIA
2. Coastal Road and EIA Planning for East Bolaang Mongondow Distric, Aug 2011 - Dec
2011, East Bolaang Mongondow District Public Works Department. Scope of work : Conduct
primary data survey (topography, soil, hydrology, environment) for the inner ring plan
Bolaang Mongondow East Creating detailed engineering design of the road along 13.3 km
and 2 bridges with road criteria freeway, Prepare Tender & Budgeting Documents Prepare EIA
Documents, doing calculating and solution to minimalize impact from work on field, prepare
reporting and conduct presentations.

D. KALIMANTAN
a. Bridge Design from Limunjan - Mantaritif Port (5 Units), Jun 2011 - Dec 2011, Public
Works Department of Berau District. Scope of work : Preparing technical work design for 5
bridges along Limunjan road - Mantaritif Port, from survey, survey analysis, DED, Budgeting,
and Tender Documents for 5 bridges with spans between 25 s / d 80 meters, These DED
bridge is a superstructure of composite steel
b. DED Sambaliung - Mantaritif Road, Apr 2010 - Nov 2010, Public Works Department of
Berau District. Scope of work : Conducting topographic survey, soil investigation, hydrological,
and environmental surveys to perform technical planning of Detail Engineering Design for the
road ± 41 km from Sambaliung to Mantaritif, Berau District, East Kalimantan Province with the
criteria of expressway prepare the Tender Document and Budget Plan (RAB) as well as the
26
Accelerating Infrastructure Delivery through Better Engineering Services Project

Plan Drawings of the route in A3 size

E. PAPUA
1. Feasibility Study and Preliminary Design of Papua's Central Cross Road, May 2014 –
Nov 2014, Ministry of Public Works of the Directorate General of Highways of the Work Unit of
the Dire. Scope of work : Survey, Investigation, and prepared Preliminary Design

PT POLA AGUNG

Relevant to this project, PT. POLA AGUNG has engaged in the preparation of a number of projects
in the region, as follows:

III. SUMATERA
1. Technical Assistence for Traffic Environment Impact (ANDALALIN) Segment
Padang - Pekanbaru, Sumatera Province , Duration : July 06, 2017 -
September 03, 2017 Client : PT. Hutama Karya (Persero) Toll road development
division Indonesian , Scope of Work : Feasibility Study
2. Feasibility Study And Basic Desain For Toll Road Trans Sumatera Province
Link Medan - Aceh. Package F3. Duration : April 2012 - July 2013 Client
:Direktorat General Of Highways Ministry Of Public Work Indonesian PT. Pola
Agung Scope of Work : Feasibility Study
3. Guide Line for Design Of Specsification Bridge Project (Package A-7)
Duration : July 08, 2015 - December 2015 Client : Direktorat General Of
Highways Ministry Of Public Work, Working Group on Coaching Activities of
Directorate of Bridge Indonesian, Scope of Work : Feasibility Study
4. Consulting Services For Construction Supervision Consultant (CSC) for
Reconstruction of Calang - Meulaboh National Road Duration : January 9,
2012 - December 31, 2012 Client : Direktorat General Of Highways Ministry
Of Public Work, Satker of Central Implementation of National Road I Activities
Implementation Indonesian , Scope of Work : EIA
IV. KALIMANTAN
1) Technical Guideline / Managemen for Bridge Rehabilitation (Package B-
4/2014) , Duration : May 02, 2014 - December 2014 Client :Direktorat General
Of Highways Ministry Of Public WorkWork Unit of Directorate of Technical
Engineering of Bridge Engineering Development Indonesian ,Scope of Work :
Feasibility Study
III. PAPUA
1) Pra Feasibility Development Of Road at jayapura sentani City and Keerom
City Of Papua Province , Duration : November 12, 2007 - May 2008 Client :
DPU Jayapura Indonesian , Scope of Work : Feasibility Study
IV. WEST NUSA TENGGARA
1) Package 20 : Detail Engineering Desain Bridge Of West Nusa Tenggara
Province 02 Duration : January 08, 2016 - December 2016 Client : Direktorat
General Of Highways Ministry Of Public Work National West Nusa Tenggara
Province Indonesian , Scope of Work : Design
2) Detail Engineering Desain Bridge Of West Nusa Tenggara Province 01
(Package 10) Duration : April 01, 2015 - September 2015 Client : Direktorat
General Of Highways Ministry Of Public Work, nationalWest Nusa Tenggara
Province Indonesian , Scope of Work : Design

27
Accelerating Infrastructure Delivery through Better Engineering Services Project

3) Construction Supervision For Bridge to Satker Road And Bridge National


Region II (Package 04) Duration : April 01, 2015 - December 2015 Client :
Direktorat General Of Highways Ministry Of Public Work, National Road Planning
and Monitoring Unit of West Nusa Tenggara Province Indonesian Scope of
Work : Supervision
V. EAST JAVA
1) Desain Checker / Management Contruction I Infrastructure Bidge Suramadu
National, Duration : August 01, 2005 - March 2006 Client : Direktorat
General Of Highways Ministry Of Public Work, Temporary Working Unit of
Suramadu National Bridge Construction Indonesian , Scope of Work : Design
2) Detail Engineering Design Road, Fly Over and Bridge East Java Province,
Duration : July 28, 2005 - December 18, 2005 Client : Direktorat General Of
Highways Ministry Of Public Work, Temporary Work Unit of East Java P2JJ
Indonesian , Scope of Work : Design
3) Management Consulting For Direktorat Bina Marga East Regional, Duration
: February 25, 2010 - December 2010 Client : Direktorat General Of Highways
Ministry Of Public Work, Satker of East Road and Bridge Directorate
Indonesian Scope of Work : EIA
4) Management Consulting For Direktorat Bina Marga East Regional , Duration
: January 14, 2008 - December 2009 Direktorat General Of Highways Ministry
Of Public Work, Unit Dir. Eastern Roads and Bridges Indonesian Scope of
Work : EIA
5) Management Consulting For Phase II Construction Bidge Suramadu
(Continue ) , Duration : June 03 2008 - July 2009 Direktorat
General Of Highways Ministry Of Public Work, Temporary Working Unit for
Development of Suramadu National Bridge Construction Technique
Indonesian , Scope of Work : EIA
6) Construction Supervision And Management Construction Phase II Bridge
Construction Suramadu May 27, 2006 - April 2009 Direktorat
General Of Highways Ministry Of Public Work, Suramadu Indonesian
Scope of Work : Supervision
VI. JAKARTA
1) Consulting Services For Construction Supervision of The Tanjung Priok
Access Road Construction Project, Phase Duration : 2 November 23,
2010 - July 03, 2015 Client : Direktorat General Of Highways Ministry Of Public
Work Akses Tanjung Priok PPK Planning and Supervision of Tanjung Priok Access
Road ConstructionIndonesian , Scope of Work : Supervision
2) Management Consulting Construction Toll Outer Ring Road Jakarta Seksi W1
Segment Kebon Jeruk - Penjaringan Duration : October 04, 2007 - June 2009
Client : PT. Jakarta Lingkar Barat Satu Indonesian Scope of Work :
Supervision
VII. CENTRAL JAVA
1. Detail Engineering Design Last Toll Road Semarang - Bawen City Duration
: July, 28 2005 - January 18, 2006 Client : PT Jasa Marga (Persero)
Indonesian , Scope of Work : Design
IX. MALUKU
1) Construction Supervision For Bridge Merah-Putih In Maluku Province
Duration : July 26, 2011 - December 2014, Client : SNVT Planner and

28
Accelerating Infrastructure Delivery through Better Engineering Services Project

Supervision National Road Province Maluku, Indonesian , Scope of Work :


Supervision

C. Management Competence (Please answer each question in one paragraph of 3-5


sentences)
1. Describe standard policies, procedures, and practices that your entity has to assure quality
interaction with clients and outputs. Please state if your company is ISO certified.

WAPCOS is an ISO-9001:2008 certified company since 2008; DOLSAR is committed to


excellence through the implementation of the Quality Management System and holds ISO
9001:2008 certificate since 2003, PT. Indra Karya (Persero) has been awarded for ISO 9001
Quality Management System by IKRCS since 2011 and OHSAS 18001 by CCMS since 2015;
PT. Bina Karya (Persero) has been awarded ISO 9001 Quality Management System by KAN
since 2012 and OHSAS 18001 by KAN since 2012. PT. Multi Phi Beta has been registered
with ISO 9001:2008 since 2011 and OHSAS 18001:2007 since March, 17. PT. Pola Agung
has been awarded for ISO 9001:2015 Quality Management System by Global SAI since 2016
and OHSAS 18001 by IMS Indonesia since 2016. Based on ISO system, all project activities
are to follow the relevant standard operating procedures which have set up a SOP and
mechanism for check and review of the outputs of engineering design, construction
supervision, and quality control. In practice this means that Consultant undertakes the tasks
agreed upon with the client on a timely basis and to the appropriate quality standards. With its
basis of many years of experience and through the establishment of the processes defined by
the quality system, the company can minimize the required time and the cost for providing its
services. The management actively supports all potential quality improvements and assists the
employees in their implementation where appropriate.

The consulting team works in close co-ordination with client to establish rapport within the
project implementation units and identify optimal frameworks to achieve project objectives.
Effective management of resources is the priority and key professionals identified for the job
are highly experienced working in team contexts towards establishing efficient synergies in
applying their knowledge to implement best solutions. We lay emphasis on continuous
interaction with our clients, timely submission of reports, continuous monitoring of project
activities, and timely completion of project activities & completion of milestones as per
envisaged work schedule to promote quality output.

2. How will your firm/consortium handle complaints concerning the performance of experts or
quality of the reports submitted for this assignment? What internal controls are in place to
address and resolve complaints?

To avoid any complain is our first priority. We will assign our permanent and experienced
engineers to the Team, and try to avoid any possible complain through close interaction and
coordination with all parties concerned, especially the client and the Bank. Our strategies are:
1) to ensure our quality and professionalism at all time via good Team management; 2) to
resolve minor complains without delay before it got serious; 3) always seek for improvement
within our Team, including innovation and creativity. With regard to complaints on the quality
of the reports submitted, we will make sure all outputs will be reviewed by senior professionals
and checked for accuracy and completeness before submission. In addition, thorough analysis
of client’s requests will be made to ensure that the services exactly match with the
requirements of the clients, so that Client satisfaction is ascertained during and after
completion of the projects.

3. How will you ensure the quality of your firm’s/consortium’s performance over the life of this
assignment?

Our Team will perform all tasks based on the relevant standard operating procedures, i.e. ISO
29
Accelerating Infrastructure Delivery through Better Engineering Services Project

and OHSAS. Following these procedures, we are sure that the quality of our deliverables and
all activities will meet the requirements stipulated in the TOR. To better ensure our
performance quality, the management home suppport team from each company will act as
strong backup support for the Team, including all the required assistance in relation to
technical, project administration, legal, procurement, and financial aspects. In addition, if the
need arises, we are in a position to form a special, case by case, Task Unit to support the
Team. Through extensive teamwork, the Task Unit(s) and fellow experts will offer
comprehensive solutions and technical recommendations to overcome any urgent outreach
support requested by the Client or consultant Team. We measure our performance using the
Critical Success Criteria related to the project by means of key performance indicators based
on Time, Cost and Scope of the project. We exercise constant vigil and alertness in
forecasting, preventing and mitigating project risks in time and ensuring communication
between the client and the consultant’s team. We follow systematic procedures for quality
control with no compromise to quality and standards and strict adherence to work schedule
and completion of proposed services within stipulated time and budget. In-depth knowledge of
financial and management information systems are maintained at all times by keeping a
record system of all activities, and all services are executed in accordance with professional
standards by effective use of applicable reports, standards, maps/drawings, specifications and
other information. Regular briefings to the client/ authorities are undertaken to discuss on the
progress, performance variance, risk assessment and any problems of the project with
measures to be taken.

4. Describe standard policies, procedures and practices that your firm has put in place to avoid
changes/replacements of personnel and to ensure the continuity of professional services once
contracted.

In order to avoid changes/replacements of personnel, our consortium will implement standard


policies, procedures and practices. We will assign highly qualified personnel refer to project
requirement who are not only loyal to the company but fully committed to the project. An
availability confirmation letter, as well as CV, will be signed by each individual engineer who is
going to be proposed for the project as a commitment declaration. During project
implementation, except for medical or any other reasons specified in the main contract, we will
avoid any changes of personnel, through the internal human resource management and
dialogs with adequate care and support to our engineers.

5. Describe what social protection practices you have in place to safeguard the well-being of your
proposed experts? Specifically describe arrangements you have in place for medical, accident,
and life insurance coverage during the assignment.

WAPCOS Limited provides social benefits like Earned Leave, Leave Travel Concession, and
contribution to Provident Fund, life and medical insurances to all its permanent staff and
experts It also provides medical, accidental insurance to all its permanent/ contract as well as
resource personnel. During the course of assignment, experts would be given medical and
accidental insurance cover. Each of the Indonesian companies provide social protection such
as BPJS Ketenaga-kerjaan and BPJS Kesehatan, which cover medical, accident and life
insurance during the assignment for the project.

DOLSAR has a clean HSSE history and all related protection measures are being taken for all
projects with different requirements. All medical and social insurances of DOLSAR are covered
as per the requirement of the Turkish Government under the Act of Labor. Therefore, all
personnel employed by DOLSAR have medical, accident and life insurance policies defined
and acquired.

30
Accelerating Infrastructure Delivery through Better Engineering Services Project

D. Other Information (maximum of 500 words)

WAPCOS was set up in 1969 to promote though consultancy services, the sharing of expertise
built up in the country through massive water resources development over the years. Being a
Government of India Undertaking, it has the unique facility to draw upon the vast reserve of experts
from specialised Government Departments, Semi Government Agencies, Autonomous Bodies and
Academic/Research and Development Institutions working at Union and State levels which are its
constituents and associates. Besides, it has its own contingent of specialists in multifarious
disciplines. WAPCOS is registered with funding agencies like World Bank, Asian Development
Bank, African Development Bank, besides other international agencies and possesses the requisite
competence to deliver the goods to the entire satisfaction of the client and is reckoned as one of
the top international consultancy organisations of repute the world over in the water resources
sector. WAPCOS possesses state-of-the-art expertise in the various areas of its operation and has
successfully completed a large number of assignments in Asia and the Pacific namely, India,
Bangladesh, Bhutan, Afghanistan, Myanmar, Sri Lanka, Nepal, Cambodia, Philippines, Singapore,
Malaysia, Lao PDR ; African countries namely Ghana, Burkina Faso, Benin, Senegal, Sierra
Leone, Central African Republic, Chad, DR Congo, Ethiopia, Kenya, Mali, Mozambique, Nigeria,
Rwanda, Tanzania, Uganda, Zimbabwe, Swaziland, Malawi, Madagascar, Mauritius, Niger, Togo,
Guinea Conakry, Burundi, South Sudan, & Middle East countries namely Iraq, Iran, Republic of
Yemen, Syria, Oman etc in various disciplines of water resources, power and infrastructure
development.

INDRA KARYA
Founded in 1961 as PN Indra Karya and in 1972 became PT Indra Karya (Persero) was at the
beginning, engaged in general contracting activities. In the year 1978 the company was
reorganized and changed its line of business to engineering and management consulting services.
As its preliminary step which become the basis fundament for further development, PT Indra Karya
concentrated its field of business in undertaking electric power and water resources development
projects. Since then PT Indra Karya has been succeeded in completing all the assignments which
had been undertaken from feasibility studies, detailed design to construction, supervision and
project management. To enhance the knowledge and skill of its personnel, associations with
leading foreign companies have been carried out, especially in undertaking large scale engineering
projects with high technology. PT Indra Karya has been registered in the IBRD, ADB, OECF/ JBIC.

BINA KARYA
PT. Bina Karya (Persero) is a State Owned Enterprise consultant based in Jakarta founded in
1962. More than fifty years since our establishment, BIKA has successfully and completed many
projects for goverment dan private sector client and also for national and international funding
agencies, as well as for private sector clients. Major International agencies with which BIKA is
registered as a consultant include the World Bank (WB), the Asian Development Bank (ADB),
Japan Bank International Corporation (JBIC) and Islamic Development Bank (IDB). BIKA is also
registered as Indonesian Consultant Association member. For Quality Since 2012 the firm has
been certified with ISO 9001:2008 and OHSAS 18001:2007.

PT. POLA AGUNG


PT Pola Agung Consulting is an Indonesian private company who provides services in the field of
engineering and management consultancy. The company was founded in 1978 in Jakarta. The
Company was initially involved in the Government program in transmigration and public works
sectors. Within the time span of 25 years, the company has grown. To adjust with new situation the
company’s board of management changed in May 2003. At present, we are supported by a group
of dedicated experienced professionals, to carry out our company’s vision. Our professionals have
experiences in consultation work in the field of Infrastructure: Road, Bridges, Water Supply,
Regional Planning, Waste Water Treatment, Solid Waste, Water Resources, Finance and
Community Empowerment. We have worked with organizations such as non-government

31
Accelerating Infrastructure Delivery through Better Engineering Services Project

organization, universities, research, institution or local and international consultants. In partnering


with regional consultant at local cities or regencies, we work together, mutually support and
complete, and also improve the regional consultant capability and jointly developed their own
region. For Quality Since 2013 the firm has been certified with ISO 9001:2015 and OHSAS
18001:2007.

E. Project References
Please select ALL relevant projects to demonstrate the firm’s technical qualifications and
geographical experience.

SN Project Period Client Country Firm


A HIGHWAYS
Feasibility Studies

Detailed Project Reports April 2011 to M.P. Rural Engineering India WAPCOS
preparation and May 2016 Service, Rajgarh Lim
supervision and quality
control consultancy
services for construction
1 of rural roads under Gram
Sampark Sadak Yojana
for the consultancy
package no. CS2602
(Rajgarh District), Gujarat
India
Preparation of Detailed WAPCOS
Dhanbad Municipal
Project Report for Urban May 2008 to Lim
2 Corporation, Govt. of India
Transport system in August 2009
Jharkhand
Dhanbad under JNNURM

Detailed Project Report WAPCOS


including PPR for Sate Lim
Highways/ Major District June 2006 to
3 PWD, B&R, Haryana India
Roads in the National March 2009
Capital Region of
Haryana.

Preparation of Detailed WAPCOS


Project Report for Urban Jamshedpur Urban Lim
May 2008 to
4 Transport system in Agglomeration, Govt. of India
August 2009
Jamshedpur under Jharkhand
JNNURM

Detailed Project Reports April 2011 to M.P. Rural Engineering India WAPCOS
preparation and June 2012 Service, Dewas Lim
supervision and quality
control consultancy
services for construction
5
of rural roads under Gram
Sampark Sadak Yojana
for the consultancy
package no. CS2002
(Dewas District), Gujarat
32
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


India

Preparation of Detailed WAPCOS


Project Report for Border Lim
May 2007 to Central Public Works
6 Road in the state of India
April 2008 Department
Uttaranchal- Package-III –
Sela to Tedang- (22 K.M.)

Preparation of Detailed WAPCOS


Project Report for Border Lim
Road in the state of Nov.,2006 to Central Public Works
7 India
Uttaranchal-Package –II: June, 2007 Department
Niti to Geldung (46 Km),
Uttaranchal, India

Detailed Project Reports April 2011 to M.P. Rural Engineering India WAPCOS
preparation and June 2012 Service, Alirajpur Lim
supervision and quality
control consultancy
services for construction
of rural roads under Gram
8 Sampark Sadak Yojana
for the consultancy
package no. CS4902
(Alirajpur, Jhabua,
Barwani District, M.P.,
India

Preparation of Detailed WAPCOS


Project Report for Lim
April 2011 to The Executive
9 Santalpur-Gadhuli Road, India
March 2013 Engineer,Bhuj, Kutch
Patan and Kachchh
District., Gujarat India

Preparation of Detailed WAPCOS


Project Report of roads Lim
from Ambedkar Chowk to
Oct 2012 to Nagar Palika Parishad
10 Railway Station for Nagar India
Nov 2012 Nepanagar
Palika Parishad
Nepanagar Distt.
Burhanpur.

Ministry of Public Works,


Landslide Monitoring and Directorate General of
Analysis System on 08 June 2007 Highways, Technical
11 Indoensia IKA
Strategic Paths in Java – 8 Nov 2007 Road and Bridge
and Sumatra Engineering Working
Unit

Feasibility Study and 14 Dec 2006 – PT. Kalimantan Prima


12 Indonesia IKA
Bridge Cross Design 14 July 2007 Persada Contractor &
33
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Mining Developer

13 Feasibility Study and May 2014 – Ministry of Public Works Indonesia BIKA
Preliminary Design of Nov 2014 of the Directorate
Papua’s Central Cross General of Highways of
Road the Work Unit of the
Directorate of Planning

14 Project Consultancy Sept 2012 – PT. MRT Jakarta Indonesia BIKA


Services Project Dec 2012
Management Manual
Project Mass Rapid
Transit Jakarta Phase -1

15 Preparation of Feasibility 2012 – 2013 Directorate General of Indonesia BIKA


Study and Initial Design of Highways, Ministry of
Trans Sumatera Toll Public Works
Road

16 Technical Assistence for July 06, PT. Hutama Karya Indonesia PA


Traffic Environment 2017 - (Persero)
Impact Segment Padang September
- Pekanbaru, Sumatera 03, 2017
Province

17 Study Of Road Network March 29, Direktorat General Of Indonesia PA


at Serang Banten 2016 - Highways Ministry Of
Province December Public Work, Jalan
2016 Bebas Hambatan,
Perkotaan Dan
Fasilitasi Jalan Daerah

18 Feasibility Study And April 2012 - Direktorat General Of Indonesia PA


Basic Desain For Toll July 2013 Highways Ministry Of
Road Trans Sumatera Public Work, Bina
Province Link Medan - Program Direktorat
Aceh. Package F3. Jenderal Bina Marga

19 Assistance for Indonesia August 09, Indonesia PA


Road Management 2012 -
System (IRMS) Brigde January 6, SMEC International Pty
Management System 2013 Ltd.
(BMS) Development
Support

20 Guide Line for Design Of July 08, Direktorat General Of Indonesia PA


Specsification Bridge 2015 - Highways Ministry Of
Project (Package A-7) December Public Work, Pokja
2015 Kegiatan Pembinaan
Direktorat Jembatan

34
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


21 Feasibility Study And May 02, Direktorat General Of Indonesia PA
Basic Desain Road 2014 - Highways Ministry Of
Middle Cross Papua November Public Work, Satuan
Island (Package F1) 2014 Kerja Direktorat Bina
Program Direktorat
Jenderal Bina

22 Technical Guideline / May 02, Direktorat General Of Indonesia PA


Managemen for Bridge 2014 - Highways Ministry Of
Rehabilitation (Package December Public Work, Satuan
B-4/2014) 2014 Kerja Direktorat Bina
Teknik Kegiatan
Pembinaan Teknik
Jembatan

23 Monitoring And Evalution April 30, 2013 Direktorat General Of Indonesia PA


Handling Of Daerah - November Highways Ministry Of
Rawan Bencana Road 05, 2013 Public Work, Bina
National in Java Island Pelaksanaan Wilayah II
(Package 7) Direktorat Jenderal Bina
Marga

24 Feasibility Study And June 27, Badan Pengembangan Indonesia PA


Selection Of Allighment, 2012 - Wilayah Surabaya
Of Access Road To December Madura
Container Port At Madura 28, 2012

25 Preparation Of Guide line April 19, Direktorat General Of Indonesia PA


Technic For Inspection Of 2012 - Highways Ministry Of
Surabaya Bridge (B- November Public Work, PPK
3/2012) 2012 Kegiatan Pembinaan
Teknik Jembatan
Satuan Kerja Direktorat
Bina Teknik

26 Preparation Of Concept July 22, PPK Pengendalian Indonesia PA


Manual Of Suramadu 2011 - Pengembangan
Bridge For Maintenance December Wilayah Suramadu
2011

27 Preparation The Concep March 11, Direktorat General Of Indonesia PA


of Fungtion and Status Of 2009 - Highways Ministry Of
Regional Roads in The August Public Work, Satuan
Road Network 2009 Kerja Direktorat Bina
Program Kegiatan
Fasilitas

28 Preparation Of Guidelines May 04, 2009 Direktorat General Of Indonesia PA


and Determind of Road – Oktober Highways Ministry Of
Status, Province, Region 2009 Public Work, PPK
Or Nasional Road Kebijakan dan Strategi
Pengembangan

35
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Jaringan Jalan dan

29 Preparation Of Guidelines October 03, Direktorat General Of Indonesia PA


Practic of determination 2007 - Highways Ministry Of
Condition Road December Public Work, Satuan
(Package-B) 2007 Kerja Direktorat Jalan
dan Jembatan Wilayah
Barat

30 Pre-Feasibility November 12, DPU Jayapura Indonesia PA


Development Of Road at 2007 - May
jayapura sentani City and 2008
Keerom City Of Papua
Province

31 Feasibility Study And May 01, Pemerintah Indonesia PA


Ring Road Amdal, Distric 2002 - Kabupaten Magetan-
Magetan, Goverment Of November Jawa Timur
Distric Magetan 01, 2002
Detailed Engineering Design
Design Review, Pre- WAPCOS
Contract Services and Lim
Project Management of National Roads
Civil Works Contract for : March 2011 to Administration(ANE),
1 Multinational Nacala Road Mozambique
Sep 2015 Republic of
(Lot-B: Ribaue- Malema Mozambique
road)- (103 kms) (African
Development Bank
funded), Mozambique
Consultancy Services for WAPCOS
Design & Construction Lim
Supervision of National Roads
Nov 2006 to
Rehabilitation of road Administration “ANE”, Mozambique
2 Nov 2008
N280/281 between Tica, Mozambique
Buzi & Nova Sofala in
Sofala Province (131.2
KM) in Mozambique
Construction Supervision WAPCOS
for Rehabilitation and Lim
Reconstruction of
Regional Roads in Oct 2010 to Ministry of Public works Republic of
3 July 2013 and Highway Yemen
Hadramout Governorate,
Yemen (Contract No.
FPERP-RR3 & RR4) -
Funded by World Bank
Construction Supervision WAPCOS
of Abdulla Gharib Road Lim
Jan 2013 to Ministry of Public works Republic of
4 Contract No. FPERP-
Jan 2015 and Highway Yemen
RR5, Yemen (World Bank
Funded)

36
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Consultancy Services for Jamnagar Municipal WAPCOS
Design, drawing and cost Corporation Lim
estimate & Construction Jan 2009 to
5 supervision for Bridge India
July 2009
across Rangmati river
near Vora Hazira
Causeway at Jamnagar.
Kerala Sustainable Urban WAPCOS
Development Project Lim
Kerala Sustainable
“Detail Design and
Urban Development
Supervision Consultancy
May 2007 to Project, Local Self
6 for package 2 (Kochi, India
June 2010 Government
Thrissur and Kozhikode) –
Department,
DSC 2” (Asia
Government of Kerala
Development Bank
Funded), India

Preparation of plan WAPCOS


design, cost estimate, Lim
leveling and tender
Nov 2009 to
7 document for Fire station, Morbi Nagar Palika India
April 2010
housing works & other
development work, Morbi
(Gujarat), India

Gebze – Orhangazi – October, 2012 Otoyol Yatırım A.Ş. DOLSAR


8 İzmir Motorway Project to March, Turkey
(Phase I + Phase II A) 2017

Construction Supervision
Services of Adapazarı
City Center - New December, Republic of Turkey DOLSAR
9 Settlement Areas and 2006 to July, Greater Municipality of Turkey
Karaman and Camili 2009 Adapazarı
Regions Connection
Roads

WAPDA
Karakoram Highway (as a September, Kashmir Road, Sunny DOLSAR
10 part of the Dasu Dam and 2011 to View Estate, Lahore, Pakistan
HEPP Contract) August, 2014
Pakistan

General Directorate of
Balıkesir Northern Ring June, 2015 to Highways
11 Road Survey and Design Turkey
May, 2017 Karayolları Genel DOLSAR
Consultancy Services
Müdürlüğü Ankara

Kemer-Kumluca Road General Directorate of


Survey and Detailed January, 2011 Highways
12 to March, Turkey DOLSAR
Design Engineering Karayolları Genel
2017
Services Müdürlüğü, Ankara
Artvin-Erzurum State May 2005 to General Directorate of
13 Highway: Engineering and Turkey
March, 2013 State Hydraulic Works
Consultancy Services DOLSAR
37
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


(DSİ), Çankaya / Ankara
Emirdağ-Çifteler General Directorate of
(Emirdağ-4.Rg.Brdr.) July, 2008 to Highways
14 Road Survey and Detailed December, Turkey DOLSAR
Design Engineering 2009 Karayolları Genel
Services Müdürlüğü, Ankara
Fethiye-Dalaman- December, General Directorate of
2.Rg.Brdr. Road Survey 2006 to Highways DOLSAR
15 Turkey
and Detailed Design December, Karayolları Genel
Engineering Services 2008 Müdürlüğü, Ankara
Western Black Sea General Directorate of
Coastal Road Between April, 1998 to Highways
16 (İnebolu-Çatalzeytin) Turkey DOLSAR
May, 2005 Karayolları Genel
Survey, Detailed Design
and Engineering Services Müdürlüğü, Ankara
Kale-(Denizli- General Directorate of
December,
Serinhisar)Junct. Road Highways
2006 to DOLSAR
17 Survey and Detailed December, Turkey
Design Engineering Karayolları Genel
2008 Müdürlüğü, Ankara
Services
Kayseri-Niğde State Road General Directorate of
(km 78+500-95+820) Highways
May, 2003 to DOLSAR
18 Survey and Detailed July, 2015 Turkey
Design Engineering Karayolları Genel
Services Müdürlüğü, Ankara
General Directorate of
Silifke-Mut Road Survey December, Highways
19 and Detailed Design 2006 to July, Turkey DOLSAR
Engineering Services 2009 Karayolları Genel
Müdürlüğü, Ankara

Topcam-Mesudiye Road General Directorate of


Survey and Detailed May, 2010 to Highways DOLSAR
20 Turkey
Design Consultancy October, 2013 Karayolları Genel
Services Müdürlüğü, Ankara
Road Rehabiltation
(Sector) Project Design
and Field Team 12 Nov 2003 - PT Jasa Marga
21 Indonesia IKA
Consultants Under ADB 11 Jan 2004 (Persero)
LOAN NO.1798-IND

Regional Design and


Supervision consultants-2
(RDSC-2) for Second Directorate General of
Eastern Indonesia Region 22 Nov 2006 - Highways (Bina Marga),
22 Indonesia IKA
Transport Project (EIRTP- 30 Oct 2010 Technical Guidance Unit
2) Under IBRD Loan No. for Roads and Bridges
4744-IND

Toll Road Technical


Planning Cikampek - 14 Oct 2003 - PT Jasa Marga
23 Indonesia IKA
South Purwakarta - Pleret 8 Sept 2004 (Persero)
Segment's
Design Engineering Public Planning Works
Design of Road 17 Nov 2006 - Unit, Technical Planning
24 Indonesia IKA
Improvment Exs. Kertas 15 May 2007 and Supply Chain
Kraft Aceh, PT Takengon Management BRR NAD
38
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Cross -North Aceh - Nias
Directorate General of
Highways, SNVT
Road Engineering 17 March
25 Planning North Sulawesi 2010 - 16 Jul Planning and Indonesia IKA
Supervision of Road and
Cross Center 2010
Bridge North Sulawesi

Road Engineering
Planning of Kapitu -
South Minahasa District
Tumpaan Kapitu 1 Sept 2006 -
26 Department of Public Indonesia IKA
Tumpaan Location, 12 Jan 2007
Minahasa District South Works
Minahasa
SNVT Planning and
Road Engineering 26 Sept 2007 -
Supervision of Roads
27 Planning North Sulawesi 26 March Indonesia IKA
and Bridges of North
Cross West (84,54 Km) 2008 Sulawesi
Road Engineering Directorate General of
Highways, SNVT
Planning in Kupang City, 31 Augst 2010
28 Planning and Indonesia IKA
Kupang District and TTS - 12 Jan 2011
District - PR 01 - Package Supervision Roads and
Bridges NTT
Road Engineering
Planning in Manggarai 12 Mart 2006
29 SNVT P2JJ Prov. NTT Indonesia IKA
District and West – 12 Jun 2007
Manggarai
Road & Bridge Planning
30 Road Engineering 23 Apr 2004 – & Supervision Project Indonesia IKA
Planning (Package 3) 15 Nov 2004
Prop. Central Java
Directorate General of
Road Engineering
Highways, SNVT
Planning in Kupang 31 Augst 2010
31 Planning and Indonesia IKA
District and TTS (PR-02 - 31 Dec 2010 Supervision of Roads
Package)
and Bridges of NTT
Ministry of Public Works,
Road Engineering 06 March
Directorate General of
Planning in Flores Island 2013 – 05
32 (West Side) PR-02 December Highways, Sattet Indonesia IKA
NVTPP National Road
Package 2013
Prov NTT
Directorate General of
DED of National Leger 01 June 2005
33 Road, Ministry of Public Indonesia IKA
Road's – 12 Jan 2006
Works
Project Planning and
Bridge Engineering 23 April 2004 - Supervision of Road and
34 Indonesia IKA
Planning (Package - 3) 15 Nov 2005 Bridge Prop. Central
Java
DED of Kulonprogo Fly Public Works
09 Oct 2004 -
35 Over (2), Kulonprogo Department Kulon Indonesia IKA
District 17 Dec 2004 Progo
07 May 2004 General Directorate of
DED of Road And Bridge - 17
36 Roads, Public Works Indonesia IKA
- Package 01 December
Department
2004

Directorate General of
Package of Road 17 March Highways, SNVT
37 Planning Spreads North 2010 – 16 July Planning and Indonesia IKA
Sulawesi 2010 Supervision of Roads
and Bridges of North
Sulawesi
38 Bridge Engineering 02 Nov 2007 - Satker. NVT Planning Indonesia IKA

39
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Planning in Timor Island 17 Dec 2007 and Supervision of
(PR-03 Package) Roads and Bridges of
NTT Province
SNVT Planning and
Road Engineering 17 Sep 2007 -
Supervision of Roads
39 Planning in Alor Island 27 March Indonesia IKA
(PR-02 Package) 2008 and Bridges of NTT
Province
Information System in Directorate General of
07 July 2005 -
40 Sekayu and Lubuk 11 Sept 2005 Road, Ministry of Public Indonesia IKA
Linggau Works
Directorate General of
DED of Bridge - Pakckage 11 Jan 2005 -
41 Road, Ministry of Public Indonesia IKA
7 01 Jun 2005 Works
Road Engineering 19 May 2009 -
SNVT P2JJ Metro
42 Planning Package, 19 August Indonesia IKA
Kenjeran, Surabaya 2009 Surabaya
Project for Planning and
Road Engineering 09 March
Controlling Roads and
43 Planning in Urban Areas 2004 - 07 May Indonesia IKA
(package 01) 2004 Urban Bridges of East
Java Province
Sangkariang's Bridge
Engineering Planning,
Suguh River, Kalianyar 09 Jan 2009 - Welfare Core
44 (Malang District) and 17 March Cooperative Indonesia IKA
Bedadung River's Bridge 2009 (KOPINKAN)
Review Design (Jember
District)
Road Engineering
Planning in 124 KM's
04 Mar 2013 -
45 Denpasar - Packages 12 P2JN Bali Indonesia IKA
27 Apr 2013
(Bon Dalem/Tembok
Village) - Amlapura
Road and Bridge Directorate General of
12 Sept 2005 -
46 Enginnering Planning in Road, Ministry of Public Indonesia IKA
Lubuk Linggau 12 Dec 2005 Works
Road Engineering
Planning at 9,50 Km's, Directorate General of
07 June 2004
47 Cekikik Gilimanuk, - 15 Dec 2005 Road, Ministry of Public Indonesia IKA
Pekutatan - Negara- Works
Tabanan Antasari
Bridge Engineering
Planning Spread in East 05 June 2006 Public Works Office of
48 Indonesia IKA
Java South Cross (Paket- - 22 Oct 2006 Bina Marga East Java
2)
DED of Kulonprogo Fly Directorate General of
12 Jan 2004 -
49 Over (1), Kulonprogo Road, Ministry of Public Indonesia IKA
4 Aug 2004
District Works
DED of Retaining Wall
Avalanche in all Road Directorate General of
12 Jan 2004 -
50 segments in Southeast Road, Ministry of Public Indonesia IKA
Sulawesi and South 15 May 2004 Works
Sulawesi (Package 5)
Technical Assistance For
Second Road 02 April 2003 - PT. Jasa Marga
51 Rehabilitation Project, Indonesia IKA
05 Jan 2004 (Persero)
UNDER ADB LOAN NO.
3989 - IND
Directorate General of
DED of Gunung Putri Toll 28 Aug 2002 - Highways (Bina Marga),
52 Indonesia IKA
Gate's 31 Oct 2002 Technical Guidance Unit
for Roads and Bridges

40
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Design and Supervision Jan 2016 - Directorate General of Indonesia BIKA
Construction of Medan - Dec 2016 Highways, Ministry of
53 Kualanamu Toll Road Public Works

Detail Engineering Aug 2015 – Department of Public Indonesia BIKA


Design Crossing Dec 2015 Works of DKI Jakarta
54
Province

Detail Engineering Design Aug 2005 – PT.Wijaya Karya & Indonesia BIKA
(DED) Toll Road Feb 2016 PT.Citra Marga Lintas
55
Development Soreang- Jabar
Pasir Koja
Review Review and July 2014 – Department of Public Indonesia BIKA
Basic Design of Elevated Dec 2014 Works of DKI Jakarta
56 Busway Corridor 15 Province
Pasar Minggu -
Manggarai

Preparation of Technical Apr 2014 – Ministry of Highways Indonesia BIKA


Document of Palu Road Dec 2014 Regional Office Central
57 Development - Parigi By Sulawesi Province
Pass

Detail Engineering Design Apr 2013 - Oct PT. CTP - MTD Mala Indonesia BIKA
IC design Cibitung - 2013
58 Railway (Sta -0 + 440 s /
d Sta 3 + 000) Toll Road
Cibitung - Cilincing
Technical Desig and Aug 2012 - Directorate General of Indonesia BIKA
Supervision of Aug 2014 Highways, Ministry of
59 Kualanamu Toll Road Public Works
Construction

Consulting Services Re- Mar 2012 - PT. Marga Lingkar Indonesia BIKA
Computation of Existing Apr 2012 Jakarta
60
Structure in Kebon Jeruk
Interchange
Detail Engineering Mar 2012 - PT. MTD CTP Indonesia BIKA
Design (DED) Alternative July 2012 Expresway, Malaysia
61 Alinyement Sta. 2 + 800
s / d 8 + 000 Toll Road
Cibitung Cilincing

Coastal Road and UKL / Aug 2011 - East Bolaang Indonesia BIKA
UPL Planning for East Dec 2011 Mongondow District
62 Bolaang Mongondow Public Works
Distric Department

Technical Planning for Jun 2011 - Directorate General of Indonesia BIKA


63 Improving Ciawi - Benda Nov 2011 Highways, Ministry of
Road Public Works
64 Bridge Design from Jun 2011 - Public Works Indonesia BIKA

41
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Limunjan - Mantaritif Port Dec 2011 Department of Berau
(5 Units) District

DED Sambaliung - Apr 2010 - Public Works Indonesia BIKA


Mantaritif Road Nov 2010 Department of Berau
65
District

Final Engineering Design Jun 2009 - Directorate General of Indonesia BIKA


for Government Support Dec 2009 Highways, Ministry of
66
Toll Road Public Works

Technical Assistance Apr 2009 - Toll Road Regulatory Indonesia BIKA


Consulting Services Dec 2009 Agency, Ministry of
Financial Management, Public Works
67
Legal, Technical and Toll
Road Concession
Management (PMU)
Final Engieering Design Aug 2008 - PT. Trans Jabar Toll Indonesia BIKA
(FED) Toll Road Jun 2009 Road
Development Ciawi -
68
Sukabumi Section 1 + 2
Ciawi - Cibadak (Sta. 0 +
750 - Sta. 26 + 250)
Final Engineering Design Jun 2008 - PT. Margajaya Toll Indonesia BIKA
Waru (Aloha) - Sep 2009 Road
69 Wonokromo - Tanjung
Perak Toll Road
(Advanced Stage)

Review Design of Outer Jun 2008 - PT. Jasa Marga Indonesia BIKA
Ring Toll Road Jakarta Dec 2008 (Persero) Tbk
70
W2 North (Kebon Jeruk -
Ulujami)
Preparation of Manual of Apr 2008 - Directorate General of Indonesia BIKA
Detailed Engineering Nov 2008 Highways, Ministry of
71
Design and Landscape of Public Works
Toll Road
Detailed Engineering Dec 2007 - Directorate General of Indonesia BIKA
Design of Solo - Ngawi Oct 200 Highways, Ministry of
72
and Ngawi - Kertosono Public Works
Toll Road
Feasibility Study & Detail Aug 2007 - PT. Summarecon Indonesia BIKA
Engineering Design Jan 2008 Agung, Tbk.
73
Flyover Harapan Mulya
Bekasi
Detailed Engineering Mar 2007 - PT. MTD CTP Indonesia BIKA
Design of Cibitung - Apr 2008 Expressway - Malaysia
74
Cilincing Toll Road
Project
Technical Assistant For February 2014 Directorate General of Indonesia MPB
Core Team Consultant – December Bina Marga
75 (CTC) For Regional 2017
Roads Development
Project (RRDP) under
42
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


ADB loan NO.2817-INO
Detail Engineering Design August 2013 – PT Sriwijaya Markmore Indonesia MPB
Kayu Agung - Palembang June 2014 Persada
- Betung Toll Road
76 Sta.00+000 -
Sta.111+694, Part of
Trans Sumatera Toll
Road
Supervision Consultancy February 2013 PT Lintas Marga Indonesia MPB
Services For The – June 2016 Sedaya
77
Cikampek - Palimanan
Toll Road In West Java
Road and Bridge March 2013 – P2JN West Java Indonesia MPB
Construction Supervision, December Province
78 West Java Road (PW- 2013
12/2013, West Java
Province
Engineering Supervision March 2013 – P2JN North Sumatera Indonesia MPB
for Reconstruction / Road December Province
Structure Improvement, 2013
79
Sei Rampah Road CS
(Package 01) North
Sumatra Province
Detail Engineering Design June 2012 – Directorate General of Indonesia MPB
Of Highway Cross East December Bina Marga NAD
80
Aceh-1 (PR- 2012
JLJB/11/2012)
Package 24 - East Line June 2012 – Directorate General of Indonesia MPB
81 Supervision (MYC) - December Bina Marga North
North Sumatra 2013 Sumatra
Advance DED Bridge August 2012 – P2JN Kepulauan Riau Indonesia MPB
82 Bintan Island - Dompak December Province
Island And Review Design 2012
Design And Build Work, February 2012 PT Jasa Marga Bali Tol Indonesia MPB
For Package 4 Sta.6+092 – April 2013
- Sta.8+122 (Main Road),
83
Benoa Interchange of
Nusa Dua-Ngurah Rai-
Benoa Toll Road
Design And Build Work, February 2012 PT Jasa Marga Bali Tol Indonesia MPB
For Nusa Dua - Benoa - – April 2013
Ngurah Rai Toll Road,
84 Package 2, Sta.2+790 -
Sta.5+308 (Main Road) of
Nusa Dua-Ngurah Rai-
Benoa Toll Road
Construction Supervision November Trans Marga Jatim Indonesia MPB
Services for Construction 2011 – Pasuruan
of Gempol – Pasuruan October 2014
85
Toll Road Section 1, 2 &
3, Part of Trans Java Toll
Road
Construction Supervision November PT Marga Bumi Indonesia MPB
86
Services for Construction 2011 – April Adhikaraya
43
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


of Gempol – Pandaan Toll 2013
Road Section 1, 2 & 3,
Part of Trans Java Toll
Road
Construction Supervision December PT Marga Lingkar Indonesia MPB
of Jakarta Outer Ring 2011 – April Jakarta
Road (JORR) Section W2 2013
87
Segment Kebon Jeruk –
Ulujami Package 1
Sta.8+330 – Sta.10+282
Consulting Services for June 2009 - PT Jakarta Lingkar Indonesia MPB
Construction January 2010 Baratsatu (JLB)
Management of Toll Road
(At Grade & Fly Over) and
Jakarta Outer Ring Road
88 Section W1 Segment
Kebon Jeruk -
Penjaringan Package 1
and Package 3 (included
Fly Over Rawa Buaya and
Fly Over Daan Mogot)
Pre Design Of Bakauheni May 2009 - Directorate General of Indonesia MPB
- Terbanggi Besar Toll November Bina Marga Lampung
Road Section 1 2009 Province
(Bakauheni - Babatan)
89
and Section 3
(Tegineneng - Terbanggi
Besar) – Part of Trans
Sumatera Toll Road
Consulting Services For October 2008 PT Semesta Marga Indonesia MPB
The Final Engineering - June 2010 Raya
Design (Fed) Toll Road
90 Ciawi - Sukabumi, Section
3 And 4 : Cibadak -
Sukabumi Sta.26+250 -
Sta.53+600 (27,35 Km)
Construction Supervision June 2008 - PT Semesta Marga Indonesia MPB
Sevices of Kanci-Pejagan December Raya
91
Toll Road Sta.233+000- 2010
Sta.268+000
Construction Supervision March 2008 - Indonesia Highway Indonesia MPB
Services Of Bogor Ring November Corporation
92 Road Section I Sentul 2008
Selatan - Kedung Halang
(Sta.0+000 - Sta.3+850)
Consulting Services For March 2008 - Indonesian Highway Indonesia MPB
The Row Plan October 2008 Corporation
Preparation And Detailed
Engineering Design of
93 Semarang - Solo Toll
Road Phase II Link :
Salatiga-Boyolali
(Sta.40+200-Sta.63+100),
Part of Semarang-Solo
44
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Toll Road
Construction Supervision June 2008 - Indonesia Highway Indonesia MPB
Services Of Toll Prof. December Corporation
DR.IR Sedyatmo Toll 2008
94 Road Package 4 Link :
Penjaringan – Kapuk
Lane B (Sta. 7+456 – Sta.
11+337)
Consulting Services For August 2007 - BRR Aceh-Nias Indonesia MPB
Construction Supervision December
95 For Technical National 2007
Road Project, Package
BRR-PW JN 01
Consulting Services for September Directorate General of Indonesia MPB
The Detailed Engineering 2007 - Highway
Design and Construction February 2011
96 Supervision of Tanjung
Priok Access Road
Construction Project
Phase I Under JBIC Loan
Detailed Engineering August 2006 - PT Citra Waspphutowa Indonesia MPB
97 Design of Depok - July 2007
Antasari Toll Road
Consulting Services for January 2007 Directorate General of Indonesia MPB
Regional Design and - June 2009 Highway
Supervision Consultant
98 (RDSC) Team I Second
Eastern Indonesia Region
Transportation Project
(EIRTP-2)
Technical Supervision August 2006 - BRR Aceh & Nias Indonesia MPB
Works for Kabupaten January 2007
99
Roads Package PW-03C
BRR Aceh
Technical Advisory November KIMPRASWIL (DGRI) Indonesia MPB
Services Road 2002 - July
Rehabilitation (Sector) 2006
100
Project – Core Team
Consultant Under ADB
Loan No. 1798-INO
Consultancy Services for November Ditjen Bina Marga Indonesia MPB
The Road Rehabilitation 2003 -
(Sector) Project (RRSP) January 2006
101 under ADB Loan
No.1798-INO (Design and
Field Team)

Regional Roads November Direktorat General Of Indonesia PA


Development Project 21, 2013 - Highways Ministry Of
(RRDP) Design And June 15, Public Works
102 Supervision Consultant 2017 Government Of The
(DSC-1) Kalimantan Republic Of Indonesia
Region

45
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Package 19 : Detail January 08, Direktorat General Of Indonesia PA
Engineering Desain 2016- Highways Ministry Of
103 Bridge West Nusa December Public Work Nasional
Tenggara Province 01 2016 Provinsi Nusa
Tenggara Barat
Package 20 : Detail January 08, Direktorat General Of Indonesia PA
Engineering Desain 2016- Highways Ministry Of
104 Bridge Of West Nusa December Public Work Nasional
Tenggara Province 02 2016 Provinsi Nusa
Tenggara Barat
Detail Engineering Design March 22, The Government of Indonesia PA
Road Metropolitan North 2016 - The Republic Of
Sumatera Package-26 November Indonesia, Ministry
105
2016 Ministry Of Public
Works, SNVT P2JN
North Sumatera
Detail Engineering Design March 10, Direktorat General Of Indonesia PA
Nasional Road Jambi 2016 - Highways Ministry Of
106
Provinsi Package 17. December Public Work Nasional
2016 Provinsi Jambi
Detail Engineering Desain April 01, Direktorat General Of Indonesia PA
Bridge Of West Nusa 2015 - Highways Ministry Of
Tenggara Province 01 September Public Work, Nasional
107
(Package 10) 2015 Provinsi Nusa
Tenggara West
Province
Detail Engineering Desain 7 April 2011 - Direktorat General Of Indonesia PA
Of Bridge National West September Highways Ministry Of
Cross I 2011 Public Work, SNVT
108 Perencanaan dan
Pengawasan Jalan
Nasional Provinsi Aceh

Detailed Engineering June 01, 2010 PT. Summarecon TBK. Indonesia PA


Design Fly Over Achmad – August 2010
109 Yani, Sumarecon -
Bekasi.

Development and May 15, Direktorat General Of Indonesia PA


Application of Informatics 2009 - Highways Ministry Of
System for December Public Work, Satker
110 Bina Marga West Region 2009 Direktorat Jalan dan
Jembatan Wilayah
Barat

Determination Strategic June 02, Direktorat General Of Indonesia PA


Road Distric and Province 2008 - Highways Ministry Of
November Public Work, Satuan
2008 Kerja Pembinaan dan
111
Pengembangan
Program Jalan dan
Jembatan, Dep. PU.

46
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Detail Engineering Desain March 26, Direktorat General Of Indonesia PA
For Bridge South 2007 - Highways Ministry
112 Sumatera August
Province (P-6) 2007
Review Design Road May 19, 2006 Direktorat General Of Indonesia PA
(Bridge Include) Segment – August Highways Ministry Of
Betung 2006 Public Work, Satuan
113
Sei Lilin - South Kerja Pembinaan
Sumatera Province Pelaksanaan Jalan &
Jembatan Wil. Barat
Design Checker / August 01, Direktorat General Of Indonesia PA
Management Construction 2005 - Highways Ministry Of
Suramadu International March 2006 Public Work, Satuan
114 Kerja Sementara
Pembangunan
Jembatan Nasional

Detail Engineering Design July 28, Direktorat General Of Indonesia PA


Road, Fly Over and 2005 - Highways Ministry Of
115 Bridge December Public Work, Satuan
East Java Province 18, 2005 Kerja Sementara P2JJ
Jawa Timur
Detail Engineering July, 28 2005 PT Jasa Marga Indonesia PA
116 Design Last Toll Road – January 18, (Persero)
Semarang - Bawen City 2006
EIA
Environment Impact WAPCOS
Assessment for Lim
construction/ widening/ Road & Building
strengthening Feb 2010 to India
1 Department, Bhuj
/upgradation of 255 km Feb 2011
long Gaduli Santhalpur
Road through Rann of
Kachh
Design & Engineering WAPCOS
Consultancy for the Main Lim
Civil, electro-Mechanical
& Hydro-Mechanical
works, Infrastructural January, 2004
works including Roads, to August
2 Bhutan
Bridges and Technical 2007
Assistance during
construction for Department of Energy
Punatsangchhu-I Hydro (DoE), Royal Govt. of
Electric Project, PHPA, Bhutan
Lobesa, Bhutan
Design & Engineering WAPCOS
Consultancy for the Main Lim
Civil, electro-Mechanical
& Hydro-Mechanical Nov 2006 to
3 Nov 2008 Bhutan
works, Infrastructural Department of Energy
works including Roads, (DoE), Royal Govt. of
Bridges and technical Bhutan
Assistance during
47
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


construction for
Punatsangchhu-II Hydro
Electric Project, Lobesa,
Bhutan

Basic Design and FED May 2006 - PT Jakarta Lingkar MPB


Penjaringan – Kebon December Baratsatu (JLB)
Jeruk Toll Road Project 2006
4 Indonesia
Under Jakarta Outer Ring
Road (JORR) Section W-
1

Independent Consulting December 22, PT. Jasa Marga Indonesia PA


Work for Toll Road at 2016 - April (Persero)
Surabaya-Gempol 2018
5 Segment Porong-Gempol
Package 1 and 2 Porong-
Kejapanan (Include Ramp
4)

Consulting Services For January 9, Direktorat General Of Indonesia PA


Construction Supervision 2012 - Highways Ministry Of
Consultant (CSC) for December 31, Public Work, Satker
6 Reconstruction of Calang 2012 Balai Besar
- Meulaboh National Road Pelaksanaan Jalan
Nasional I Kegiatan

Monitoring And Evalution April 05, 2013 Direktorat General Of Indonesia PA


Pavement Design at - December Highways Ministry Of
Structure to Effective 2013 Public Work, Bina
7 National Road in Pelaksanaan Wilayah I
Directorat Bina Pelaksana Direktorat Jenderal Bina
Wilayah I (Package 3) Marga

Management Consulting February 25, Direktorat General Of Indonesia PA


For Direktorat Bina Marga 2010 - Highways Ministry Of
East Regional December Public Work, Satker
8 2010 Direktorat Jalan dan
Jembatan Wilayah
Timur

Management Consulting January 14, Direktorat General Of Indonesia PA


For Direktorat Bina Marga 2008 - Highways Ministry Of
East Regional December Public Work, Satuan
9 2009 Kerja Dir. Jalan dan
Jembatan Wilayah
Timur

Management Consulting June 03 Direktorat General Of Indonesia PA


For Phase II Construction 2008 – July Highways Ministry Of
Bidge Suramadu 2009 Public Work, Satuan
10 (Continue ) Kerja Sementara
Pembinaan Teknik
Pembangunan
Jembatan Nasional

48
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Suramadu

Feasibility Of Problematic Novermber Direktorat General Of Indonesia PA


Handling Land In Cross 10, 2006 - Highways Ministry Of
Sulawesi Province December Public Work, Satuan
11 2006 Kerja Pembinaan dan
Pengembangan Teknik
Jalan Dan

LARP
Design & Engineering
Consultancy for the Main
Civil, electro-Mechanical
& Hydro-Mechanical 1996 to July WAPCOS
1 works, Infrastructural Royal Govt. of Bhutan Bhutan
2007 Lim
works including Roads,
Bridges and technical
Assistance for Tala Hydro
Electric Project, Bhutan
Reconstruction /
Rehabilitation and
completion of Salma dam Nov 2004 to WAPCOS
2 Govt. of Afghanistan Afghanistan Lim
project, Govt. of Nov 2011
Afghanistan (including
infrastructure works)

Consulting Services For November Direktorat General Of Indonesia PA


Construction Supervision 23, 2010 - Highways Ministry Of
of The Tanjung Priok July 03, 2015 Public Work Akses
Access Road Tanjung Priok PPK
3 Construction Project, Perencanaan dan
Phase 2 Pengawasan
Pembangunan Jalan
Akses Tanjung Priok

Identification / Preparation 05 April Direktorat General Of Indonesia PA


Of Land Acquisition At 2013 Until Highways Ministry Of
Road Directorat Bina December Public Work, Bina
4 Pelaksanaan Wilayah I 2013 Pelaksanaan Wilayah I
(Package 9) Direktorat Jenderal Bina
Marga

Assessment / Strengthing Direktorat General Of Indonesia PA


the Management of Highways Ministry Of
Aofficials to Support the May 21, 2010 Public Work, Satuan
5 performance of roads at - December Kerja Direktorat Jalan
West Region 2010 dan Jembatan Wilayah
Barat

Management Consulting October 04, PT. Jakarta Lingkar Indonesia PA


Construction Toll Outer 2007 – June Barat Satu
6 Ring Road Jakarta Seksi 2009
W1 Segment Kebon Jeruk
- Penjaringan

49
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Addendum Management June 22, 2009 PT. Jakarta Lingkar Indonesia PA
Consulting Construction - February Barat Satu
Toll Outer Ring Road 2010
7 Jakarta Seksi W1
Segment Kebon Jeruk -
Penjaringan

Consultancy services for December Kegiatan Pembinaan Indonesia PA


the construction 29, 2006 - Teknik Jalan dan
supervision of north March 2011 Jembatan Wilayah
8 Java corridor fly over Barat
project, Under JBIC
Loan No. IP-528.

Consulting Services For January 23, PT. Jasa Marga Indonesia PA


Construction Supervision 2017 - (Persero)
Consultant at October 2017
9 Rehabilitation of Periodic
(SFO) And
Reconstruction to Toll
Road Palimanan-Kanci

Consulting Services For October 23 Direktorat General Of Indonesia PA


Construction Supervision 2016 - Highways Ministry Of
10 Samota Bridge (MYC) Pebruary Public Work, Satuan
Package : 22 2018 Kerja Perencanaan dan
Pengawasan Jalan

Construction Supervision January 06, Satuan Kerja Non Indonesia PA


For Preservation 2016 - Vertikal Tertentu
Rehabilitation Major Road December Perencanaan dan
Segment Aceh Province 2016 Pengawasan Jalan
11 Link Tanjung Pura And Nasional (P2JN) Prov.
Perbaungan - Tebing Sumatera Utara
Tinggi Town - District
Segment Batubara
Package : 01

Construction Supervision January 06, Direktorat General Of Indonesia PA


Package Contruction 2016 - Highways Ministry Of
Regency Popoh - Prigi - November Public Work, Satuan
12 Panggula East Java 2016 Kerja Perencanaan
Province Package : 01. Dan Pengawasan
Jalan Nasional Provinsi
Jawa Timur

Construction Supervision January 28, Direktorat General Of Indonesia PA


For Road Puruk Cahu - 2016 - Highways Ministry Of
Km. 50 (Pasar Punjung) - November Public Work, Satuan
13 Segment Muara Teweh 2016 Kerja Perencanaan Dan
Town+Muara Teweh Pengawasan Jalan
Road In The City Nasional Provinsi
(Package PW-13) Kalimantan Tengah

Construction Supervision April 08, Direktorat General Of Indonesia PA


14
For Road Link. Line West 2015 - Highways Ministry Of
50
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Kalimantan Province - November Public Work, Satuan
Kujan City (Package - 01) 2015 Kerja Perencanaan dan
Pengawasan Jalan
Nasional Provinsi
Kalimantan Tengah

Construction Supervision April 08, 2015 Satuan Kerja Indonesia PA


For Road Link Asam Baru - November Perencanaan dan
15 - Segment Sampit Town 2015 Pengawasan Jalan
And Sudirman Road Nasional Provinsi
(Sampit) (Package - 05) Kalimantan Tengah

Construction Supervision March 16, Direktorat General Of Indonesia PA


For Road and Bridge of 2015 - Highways Ministry Of
Kertosono - Kediri - November Public Work, SNVT
16 Tulungagung - District 2015 Perencanaan dan
Segment Trenggalek Pengawasan Jalan
Package : PW-13 Nasional Provinsi Jawa

Construction Supervision April 01, Direktorat General Of Indonesia PA


For Bridge to Satker Road 2015 - Highways Ministry Of
And Bridge National December Public Work, Satuan
17 Region II (Package 04) 2015 Kerja Perencanaan dan
Pengawasan Jalan
Nasional Provinsi Nusa
Tenggara Barat

Construction Supervision February 16, Direktorat General Of Indonesia PA


For Road Middle cross 2 2015 - Highways Ministry Of
Package 21/2015 December Public Work, Satuan
18 2015 Kerja Non Vertikal
Tertentu Perencanaan
dan

Construction Supervision February 17, Direktorat General Of Indonesia PA


For Road Construction 2015 - Highways Ministry Of
Siantar (Lubuk Pakam) November Public Work, SNVT
Package 25 2015 Perencanaan dan
19 Pengawasan Jalan
Nasional Prop.
Sumatera Utara
Metropolitan Sumatera

Construction Supervision February 21, Direktorat General Of Indonesia PA


For Road Construction 2014 - Highways Ministry Of
Sempasai - Parado September Public Work, Satuan
20 (Package 12) 2014 Kerja Perencanaan dan
Pengawasan Jalan
Nasional Provinsi Nusa
Tenggara Barat

Construction Supervision February 21, Direktorat General Of Indonesia PA


For Road Construction 2014 - Highways Ministry Of
21 Talabiu - Simpasai September Public Work, Satuan
(Package 13) 2014 Kerja Perencanaan dan
Pengawasan Jalan
51
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Nasional Provinsi Nusa
Tenggara Barat

Construction Supervision February 21, Direktorat General Of Indonesia PA


For Road Contruction 2014 - Highways Ministry Of
Tetar - Lunyuk 1 and 2 September Public Work, Satuan
22 (Package 14) 2014 Kerja Perencanaan dan
Pengawasan Jalan
Nasional Provinsi Nusa
Tenggara Barat

Construction February 17, Direktorat General Of Indonesia PA


Supervision For Road 2014 - Highways Ministry Of
periodic Rehabilitation September Public Work, Satuan
Wonorejo - District 2014 Kerja SNVT
23 Segment Jember - Perencanaan dan
Genteng Kulon Pengawasan Jalan
(Package : 24) Nasional Provinsi Jawa
Timur

Construction Supervision February 27, Direktorat General Of Indonesia PA


For Road and Bridge 2014 - Highways Ministry Of
Segment East Kalimantan November Public Work, Planner
24 Province Kudangan - 2014 and Supervision
Penopa (Package 01) National Road Province
Central

Construction March 04, Direktorat General Of Indonesia PA


Supervision For 2014 - Highways Ministry Of
Betterment Structure December Public Work, Unit
25 Road Line Medan Town 2014 SNVT SNVT Planner
- Tembung - Lubuk and Supervision
Pakam (Section 1) Cs. National Road (P2JN)
North Sumatera

Construction Supervision February 14, Direktorat General Of Indonesia PA


For East Cross Road 2 2013 - Highways Ministry Of
December Public Work, Planner
2013 and Supervision
National Road
Provinsce Aceh

Construction Supervision March 28, Direktorat General Of Indonesia PA


For Bridge In Ambon 2013 - Highways Ministry Of
Island December Public Work, SNVT
26 2013 Planner and
Supervision National
Road Province

Construction Supervision February 28, Direktorat General Of Indonesia PA


For Road And Bridge 2013 - Highways Ministry Of
Segment Penopa - December Public Work, Planner
27 Kudangan - Limit East 2013 and Supervision
Kalimantan (Package 02) National Road Central
Kalimantan

52
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Construction Supervision February 22, Direktorat General Of Indonesia PA
For Road And Bridge 2013 - Highways Ministry Of
Reguler VIII December Public Work, Unit
28 2013 SNVT SNVT Planner
and Supervision
National Road East
Java

Construction Supervision August 10, Direktorat General Of Indonesia PA


For Road And Bridge in 2012 - Highways Ministry Of
Seram 2 Island December Public Work, Unit
29 31, 2012 SNVT SNVT Planner
and Supervision
National Road Maluku

Construction Supervision March 20, Unit SNVT SNVT Indonesia PA


For Road And Bridge 2012 - Planner and
30 SEP.335,64 M December Supervision National
Package.07 2012 Road(P2JN) North
Sumatera

Construction Supervision March 16, Unit Planner and Indonesia PA


For Road And Bridge In 2012 - Supervision National
31 East Maluku Tenggara November Road Maluku
Province 2012

Construction Supervision March 30, Unit SNVT Planner Indonesia PA


For Road Reguler 11 2011 - and Supervision
32 December National Road East
2011 Java

Construction Supervision March 23, Direktorat General Of Indonesia PA


For Road Benangin - 2011 - Highways Ministry Of
33 Lampeong - Limit. West November Public Work, SUnit
Kalimantan 2 2011 SNVT SNVT

Construction Supervision March 23, SNVT Planner and Indonesia PA


For Road And Bridge In 2011 - Supervision National,
34 Buru II Island. Maluku December Road Province Maluku
Province 2011

Construction Supervision March 02, SNVT Planner and Indonesia PA


For Road And Bridge 2011 - Supervision National
35 Region V. Fak-Fak 5. December Road Province Papua
Papua Province 2011

Construction Supervision July 26, SNVT Planner and Indonesia PA


For Bridge Merah-Putih In 2011 - Supervision National
36 Maluku Province December Road Province Maluku
2014

Construction Supervision February 02, SNVTP2JJ Jawa Timur Indonesia PA


For Road And Bridge / 2010 - Direktorat Bina
37 Core Team (Package - 8) December
2010 Marga

53
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


B OTHER SECTORS
Irrigation
EIA
EIA Study for proposed WAPCOS
Sept 2012 to Water Resources Dept.,
1 Kalisindh Major Irrigation India Lim
Dec. 2013 Govt. of M.P.
Project
EIA Study For Bina Water Resources Dept., WAPCOS
May 2015 to
2 Complex Multipurpose Govt. of Madhya India Lim
Aug 2016
Irrigation Project Pradesh
EIA Study for proposed Sept 2012 to Water Resources Dept., WAPCOS
3 India Lim
Ghogra Irrigation Project Dec. 2013 Govt. of M.P.

EIA Study for proposed Sept. 2012 to Water Resources Dept., WAPCOS
4 India Lim
Mahuar Irrigation Project Dec 2013 Govt. of M.P.

EIA Study for Ganeshpura Oct 2012 to Water Resources Dept., WAPCOS
5 India Lim
Irrigation Project Jan 2014 Govt. of M.P.
EIA Study for proposed WAPCOS
Sept. 2012 to Water Resources Dept.,
6 Chetikheda Irrigation India Lim
Dec 2013 Govt. of M.P.
Project
EIA Study for proposed NWDA, Min. of Water WAPCOS
Aug 2013 to
7 Lower Orr Major Dam Resources, Govt. of India Lim
April 2016
Project India
LARP
Preparation of Estimate, WAPCOS
Feasibility Report, DPR Lim
Superintending
for the Linking of
Feb, 2006 to Engineer,I&CAD
1 Pranahitha River to India
Mar, 2012 Department,SripadaRao
SripadaSagar Project for
Project Circle, A.P, India
utilization of 160 TMC of
Pranahitha
Design Engineering and WAPCOS
preparation of Feasibility Lim
and DPR for Pumping Superintending
Scheme with Link Canal Jul., 2006 to Engineer,
2 India
for Diversion of About 165 Mar 2011 Dummugudem Project
TMC of Water from Circle, A.P, India
Dummugudem Project to
Nagarjuna Sagar Project
Office of Chief Engineer, WAPCOS
Consultancy for
Project Planning and Lim
Preparation of DPR for
June 2008 to Formulation
3 Upper Vansadhara India
April 2012 Sechasadan,
Irrigation Project with EIA
Kharvelnagar,
and EMP and R&R Plan
Bhubaneswar, Orissa
EIA Study for proposed WAPCOS
Sept 2012 to Water Resources Dept.,
4 Datuni Major Irrigation India Lim
Dec. 2013 Govt. of M.P.
Project.
Environmental Impact WAPCOS
Assessment of Upper Narmada Valley Lim
5 Narmada Irrigation Project 2004-2009 Development Authority, India
in Dindori and Annupur Govt. of M.P.
Districts

54
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


EIA Study for proposed WAPCOS
Oct 2012 to Water Resources Dept.,
6 Bansujara Irrigation India Lim
Jan. 2014 Govt. of M.P.
Project
River and Coastal
EIA
Preparation of Integrated WAPCOS
Irrigation Master Plan for 01 Sept., 2006 Water Resources Lim
1 various river basin of the to Department , Govt. of India
State of Chattisgarh, 30 Sept., 2008 Chhattisgarh, India
India
Environmental study of October 2009 WAPCOS
2 minimum flows for Dibang to August NHPC Ltd. India Lim
Multipurpose Project 2010
March 2012 to Ministry of Environment WAPCOS
Basin Study for Bichom
3 September & Forests (MoEF), India Lim
Basin
2009 Government of India.
Ministry of Environment WAPCOS
Basin Study for Lohit Sept 2009 to
4 & Forests (MoEF), India Lim
Basin March 2011
Government of India.
Detail Engineering Design IKA
and Environmental Impact January 2007 Bina Marga and
5 Indonedia
Assessment of Dredging to July 2007 Irrigation Samarinda
Works in Mahakam River
EIA Works for Jambo Aye Jul – Dec Satker Balai Wilayah Indonesia BIKA
Dams North Aceh 2010 Sungai Sumatera I -
6
Prop. Aceh Dirjen SDA,
Kementerian PU.
LARP
Consultancy Services for WAPCOS
the Preparation of Lim
Detailed Project Report
for improvement of Irrigation and
May 2009 to
1 embankment and Waterways Directorate, India
Feb 2012
ancialliary work in Kandi Govt. of West Bengal
and adjoiing area in the
District of Murshidabad in
West Bengal
Environment Impact WAPCOS
Assessment and Lim
September,
Environment Water Resources
2012 to
2 Management Plan for Department, Govt. of India
December,
Mohanpura, Major M.P.
2013
Multipurpose Project,
Madhya Pradesh
EIA Study for proposed WAPCOS
Apr 2014 to Water Resources Dept.,
3 Arpa-Baisajhar Barrage India Lim
January 2015 Govt. of Jharkhand
Project
WAPCOS
Lim
EIA Study for Kundaliya Sept. 2012 to Water Resources Dept.,
4 India
Major Multipurpose Dec 2013 Govt. of M.P.
Project

55
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm

Water Supply
EIA
Consultancy services for WAPCOS
The Municipal
formulation of detailed Lim
Commissioner
project report of water
Jamnagar Municipal
supply master plan of Feb 2009 to
1 Corporation India
Jamnagar city of ward no. October 2009
Jubilee Gardens, Lal
18 & 19 for posing to
Banglow, Jamnagar,
national agencies for
India
financial assistance.
Environmental Impact IKA
June 2010 to
Assessment Study of
2 December BBWS NTT 1 Indonesia
Tanju and Mila Dam for
2010
Rababaka Complex
Feasibility Study and IKA
April 2007 to
3 Environmental Baseline of BWS Kalimantan II Indonesia
October 2007
Muara Juloi Dam
Environmental Impact IKA
Assessment Study and May 2008 to
4 Hydraulic Model of Lolak December BWS Sulawesi I Indonesia
Dam in Bolaang 2008
Mongondow District
DED Bulk Water Rural IKA
May 2007 to Serayu Opak Regional
5 Networks on 20 Locations Indonesia
January 2008 Hall
WS Serayu Bogowonto
LARP
Consultancy Services for WAPCOS
Detail Design Review for Lim
Water and Sanitation
Gerbi Dam Reservoir,
July, 2012 Development &
Transmission and
1 to Rehabilitation Project Ethiopia
Treatment Plant Study,
June, 2014 Office, Addis Ababa,
Design and Tender
Ethiopia
Document Preparation
Project, Ethiopia
Environmental and Social WAPCOS
Assessment (ESIA) and Lim
Development of
Resettlement Policy
Nile Basin Initiative/ Nile
Framework (RPF) for
November Equatorial Lakes
Proposed Borenga and Kenya &
2 2011 to July Subsidiary Action
Norera Small Dams, Tanzania
2012 Program (NELSAP)
Irrigation, Hydropower
and Water Supply
Infrastructure in Mara
River Basin, Kenya and
Tanzania
Consultancy Services for WAPCOS
the Detailed Design and Lim
Lake Victoria South
Supervision of Bondo & Oct 2011 to
3 Water Services Board, Kenya
Siaya Water supply and Oct 2014
Kisumu, Kenya
Sanitation Projects,
Bondo & Siaya, Kenya –
56
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


Tender
No.LVSWSB/T/07/2010-
11 (African Development
Bank Funded)
Design and construction WAPCOS
of the Water Network at Fundo de Investment e Lim
Nacala, Mozambique, Patrimonio do
Nov, 2011
Africa Abastecimento (FIPAG) Mozambique,
4 To
(FIPAG/WASIS/CON-21 under Ministry of Works Africa
Sep, 2015
A/10 and and Housing
FIPAG/WASIS/CON-21 Mozambique, Africa
B/10)
LARAP Study of Mujur March 2015 to IKA
5 Dam in Central Lombok November BBWS NTT 1 Indonesia
District 2015
LARAP Study and IKA
May to
Dambreak Analysis of
6 December BWS Sulawesi 1 Indonesia
Kuwil Kanangkoan Dam
2013
in North Minahasa District
Land Acquisition IKA
Resettlement and Action
Plan and Updating of February to DPU East Kalimantan
7 Indonesia
Environmental Impact October 2009 Province
Assessment of Lambakan
Dam
Medan Flood Control IKA
Project – Special
Assistance for Project October to CTI Engineering
8 Indonesia
Implementation (SAPI), March 2008 International.Co.Ltd
Solid Waste Management
Study
9 LARAP Dam Lolak in November, Directorate General of Indonesia IKA
Bolaang Mongondow 2011 Water Resources,
Satker Hall Sulawesi
River Region I
Waste Water
EIA
Assistance In Handling October 2007
1 Techniques Combined to December
(3R) in Bangli 2007 Cipta Karya Bali Indonesia IKA

SKNVT Performance
Assistance In Handling September Development of
Techniques Combined 2007 to Environmental IKA
2
(3R) in Mataram October 2007 Sanitation Management
NTB Indonesia

Assistance In Handling
Techniques Combined SKNVT Performance
(3R) in Kupang IKA
April 2007 to Development of
3 October 2007 Environmental Indonesia
Sanitation Management
NTT

57
Accelerating Infrastructure Delivery through Better Engineering Services Project

SN Project Period Client Country Firm


LARP
Survey & investigation,
planning preparation of
DPR, carrying out EIA
and implementation / Himachal Pradesh
commissioning support for March, 07 to Irrigation and Public WAPCOS
1 India
renewal and Rejuvenation April 2010 health Department, Lim
of water supply & Shimla
sewerage capacities for
Shimla City under
JNNURM, India
Conducting Feasibility
studies and preparation of
Detailed Project Report
for Water Supply, Waste
Water Treatment and WAPCOS
2010 to Support Programme for
2 Development of Ghats India Lim
2012 Urban Reform in Bihar
and Sarovar in Gaya
Municipal Area under the
Support Program for
Urban Reform in Bihar
(SPUR), India
Preparation of DPR for
Underground Sewerage
Scheme Consultancy
Services for Preparation
of City Sanitation Plan,
Feasibility Reports and WAPCOS
Detailed Project Reports June 2011 to Lim
3 for Sewerage and Related June 2015 Executive Officer,
schemes for Rajmahal Rajmahal Nagar
Nagar Panchayat of Pachayat
Sahibganj district in Urban Development
Jharkhand under National Department,
Ganga River Basin Government of
Authority Jharkhand India

Hydro-power
EIA
Comprehensive
Environment Impact WAPCOS
Assesment Studies of L&T Power Lim
1 Mar-15 India
Sach-Khas (267 MW) Development Limited
Hydro Power project,
Himachal Pradesh

For each of the projects listed above, provide a Project Summary using the following template to be
annexed to EOI Attachments.

III. Comments on Terms of Reference


Not Applicable for Empanelment.
IV. Comments on Budget Adequacy
Not Applicable for Empanelment.

58
Accelerating Infrastructure Delivery through Better Engineering Services Project

V. Key Considerations in approaching this assignment (no more than 9,000 characters
summarizing approach and methodology)
Not Applicable for Empanelment.

VI. Key Experts


Details of experts3 available with the consortium with experience relevant to the assignments at
call-down stage, and who shall be proposed as key-personnel for a specific assignment at the call-
down stage. At this stage, CVs of the experts are not required to be submitted by the consulting
firms.

3
Refers to experts who (i) are employees of the consulting firm, or (ii) have fixed-term consultant contract with the
consulting firm covering the term of the Indefinite Delivery Contract.
59
Accelerating Infrastructure Delivery through Better Engineering Services Project

Table 1: List of Experts with Experience relevant to the Assignment at Call-down Stage

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

1. Motilal Team WAPCOS  B.Sc. Engg. 44  Worked in Mozambique as Team Leader cum International Full time
Choudhary Leader (Civil), R.I.T Resident Engineer for the Project : Design Review,
Jamshedpur,I Pre-Contract Services and Project Management of
Indian ndia, 1967 Civil Works Contract for : Multinational Nacala Road
 M. Tech. (Lot-B: Ribaue- Malema road)- (103 kms),
iwrm@wapcos. (Design Eng) Mozambique (African Development Bank funded),
co.in
I.I.T Delhi, Year: 2011-2015, Client: National Roads
India, 1970 Administration(ANE), Republic of Mozambique
 Worked in Yemen as a Team Leader for the project,
:Construction Supervision for Rehabilitation and
Reconstruction of Regional Roads in Hadramout
Governorate, Yemen (World Bank Funded) Year:
2010-2013, Client: Ministry of Public works and
Highway, Republic of Yemen
 Construction of Sahebganj-Dumka Road,
Jharkhand, Govt of Bihar, India, Two lane
highway 13 km length, hilly terrains of
hazardous and inhospitable areas, consisting of
one major bridge and two RCC & more than ten
H.P. culverts.
 Repair & maintenance of State highways at
Jharkhand, Govt of Bihar, India, Two lane 335 km
existing highways consisting of 7 major, more
than 20 minor bridges and more than 150
culverts
 Widening, repair & maintenance of state highways
at Bihar, India for Four lane and two lane
highways of Patna, capital of Bihar in Governor’s
60
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

& Chief-Minister’s residential area.

2. Serdar Team DOLSAR B.Sc. Civil 3 Mr.Erler has more than 30 years of experience in the International Full Time
Erler Leader Engineering supervision of motorway and highway projects
Middle East including bridges, viaducts, cut&cover structures,
Turkish Technical culverts, retaining structures. He has many years of
University experience on site, as a site engineer, resident civil
Email : engineer, chief resident engineer and project
serdar.erler manager. He also has extent knowledge on computer
@ software related to above subjects and computer
dolsar.com. aided design. His experience also includes, various
tr supervision services of motorways including, Gebze –
Orhangazi – İzmir Motorway (428 km, Turkey), Al
Koufra-Abouzareg Motorway (470 km, Libya) and
Karakoram Highway (62 km, Pakistan). In all projects
he has been involved in he has reviewed detailed
engineering design documents for the road section,
including design drawings, specifications, sectional
plans, bill of quantities, cost estimates and
construction plans. He has more than 20 years of
experience working as a Team Leader in Motorway
and Highway Projects. He also has knowledge and
experience on operation and maintenance of
motorways and highways.

He has experience in earthworks, drainage structures,


pavement –both Asphalt Concrete and Cement
Concrete- and material production as well as office
studies such as preparing method of works, work
schedules, publishing reports, cost control, price
61
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

analyzing etc. He has significant experience working


under FIDIC conditions.

 He has experience in Pakistan, Tajikistan, Libya


and Turkish Republic of Northern Cyprus.

3. G. Venkata Pavement WAPCOS  B.Tech. 14  Road Construction Supervision for Rehabilitation International Full time
Ramana Engineer (Civil) and Reconstruction of Regional Roads in
Indian  M.Tech. Hydramout Governorate, Yemen.
(Transportati  Engineering and Design Consultancy for Main
iwrm@wapcos. on Civil Work & Electromechanical Works and
co.in
Engineering) Infrastructure including the works on items like
Bridges, Culverts and roads for Punatsangchhu-I
Hydro Electric Project (PHEP-I) (6x200 MW),
Bhutan
 Consultancy services for Kerala sustainable urban
Development project “Design and Supervision
Consultancy for package 2 (Kochi, Thrissur and
Kozhikode) – DSC 2”(ADB Funded)
 Surveying, investigation and preparation of Detailed
Project Report for Roads and Bridges for Mandi
District in Himachal Pradesh, India
 Engineering and Design Consultancy for Main Civil
Work & Electromechanical Works and Infrastructure
including the works on items like Bridges, Culverts
and roads for TALA Hydro Electric Project
(THEP)(6x170 MW) Bhutan
 Detailed Project Report including PPR for Murthal
to Sonepat road at NCR Haryana.

62
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

4. Nilüfer Senior DOLSAR B.Sc. Civil 20 Mrs. Yaşar has more than 20 years of experience as a International Full Time
Yaşar Pavement Engineering design engineer and a senior pavement design
Design Middle East specialist. He has held this position for various
Turkish Engineer Technical national and international projects, including -Anamur
University 3. District. State Road Survey and Project Engineering
nyasar@ Services and - Balıkesir North Ring Road State
dolsar.com. Highway Survey and Project Engineering Services.
tr
5. Ali Onur Senior DOLSAR B.Sc. Civil 20 Mr. Ali Onur Kuyucak has more than 20 years of International Full-time
Kuyucak Bridge / Engineering experience in the bridge design of motorway and
Structure Middle East highway projects. He also has extent knowledge on
Turkish Engineer Technical computer software related to above subjects including
University MS Windows and MS Office applications, Computer
aokuyucak Aided Design Softwares (Microstation, AutoCAD),
@ M.Sc. Civil Numerical Map Aided Roadway Design Softwares,
dosar.com. Engineering (Inroads, Inrail for hıghway and railway design) and 3-
tr Middle East D Building Structural Design and Analysis Software
Technical (Probina). In all projects he has been involved in he
University has prepared detailed engineering design documents
for the bridge section, including design drawings,
specifications, sectional plans, bill of quantities, cost
estimates, permanent supports and construction
plans.

6. Manish Traffic WAPCOS  B .E. (Civil 10  Construction Supervision for Rehabilitation and International Full time
Kumar Engineer Engg.), from Reconstruction of the Regional Road (FPERP-
Nagpur RR3,RR4) in Hadramout Governorate, Yemen
Indian University  Construction Supervision of Reconstruction of
(2002). Hanad Weir and Hanad Left Main Canal (HLMC)
iwrm@wapcos.  M.Tech (Soil and Associated Works in Wadi Ahwar, Yemen.
co.in
63
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Mechanics
and
Foundation)
from NIT
Kurukshetra
(2007).

7. Shambhu Hydrology WAPCOS  M.Tech 27  Construction Supervision for Rehabilitation and International Full time
Azad Engineer( (Water Reconstruction of Regional Roads in Hadramout
1) Resource Governorate, Yemen (Contract No. FPERP-RR3 &
Indian Engineering), RR4) (World Bank Funded)
I.I.T Delhi  Consultancy services for Kerala sustainable urban
iwrm@wapcos.  B.Tech (Civil Development project “Design and Supervision
co.in
Engineering), Consultancy for package 2 (Kochi, Thrissur and
I.I.T Kanpur Kozhikode) – DSC 2”(ADB Funded)
 Consultancy Service for Detail Design, Tender
Document Preparation and Construction
Supervision and Project management services of
Bondo&Siaya Water Supply and Sanitation Projects,
Kenya (African Development Bank Funded)
 Kurnool-Cuddapah Canal Modernization Project,
Andhra Pradesh, India (Japan International
Coorporation Agency Funded)
 Construction Supervision and Quality Control of
Rural Roads for APMGSY for PIU-Rewa, Madhya
Pradesh, India
 Tala Hydro Electric Project – Infrastructrual works
including Roads, Bridges and Technical Assistance
during Construction, Bhutan
 Rohtang Pass, Manali Highway Roads and
64
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Bridges, Manali, Himachal Pradesh, India


 Preparation of Feasibility and Detailed Project
Report for Rehabilitation and Upgrading of
Existing 2 Lane Road to 4/6 Lane Divided
Carriageway Configuration of National Highway
Under Phase-II Programme of North-South Project
in India – 4 Laning of Km 24 to Km 41 of Agra-
Dholpur Section of NH-3 in the State of U.P. /
Rajasthan, India
 Preparation of Detailed Project Report for Border
Road in the state of Uttaranchal-Package –II: Niti to
Geldung (46 Km), Uttaranchal, India.

8. Ali Osman Senior DOLSAR M.Sc. in 40 Mr. Erdem has 41 years of experience on planning International Full-time
Erdem Hydrologi Meterology/Hy and designing the development of transportation and
st drology water resources projects. He has vast experience in
Turkish Engineering water resources and flood hydrology especially
Istanbul hydrometrics, hydrometeorology, snow and ice
aoerdem@ Technical hydrology and climate. He has provided services for
dolsar.com. University many master plan, feasibility reports, detailed designs
tr in regards to hydrology, engineering hydrology studies
of roads, highways and motorways.

9. Abhijit Geodetic WAPCOS  B.E. Civil 16  Design and Fabrication drawings for Foot Over National Full time
Patki Engineer Colleg Bridges for Pune Municipal Corporation.
e of  Design and Fabrication drawings for Foot Over
Indian Engineering, Bridges for Kolhapur Municipal Corporation.
Pune 1997  Approach Road for various Wind Farm sites in
iwrm@wapcos.  M.Tech. Satara Dist., Maharashtra.
co.in
(Structures),  Approach Road for Wind Farm at Sakri, Dist. Dhule
65
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Visvesvaraya – Maharashtra.
Regional  Approach Road for Wind Farm at Kas Lake, Dist.
College of Satara – Maharashtra.
Engineering,  Topographical / Contour Survey, Cadastral Survey,
Nagpur 2000 Approach & Internal Roads and micrositing survey
for Wind Farm site at various Districts in Karnataka
State – 16 Nos.

10. R N Gupta Geotech WAPCO  Ph.D. (Rock 31 Over 3 decades experience in the field of geotechnical International Full Time
nical S Mechanics) investigation in a number of projects pertaining to
Indian, Engineer University of various sectors.
New Castle
Email : Upon Tyne.
iwrm@wap England –
cos.co.in 1982.
 M. Tech (Mine
Planning and
System
Design) -
Indian School
of Mines India
– 1975.
 BE (Mining
Engg.) -
Indian School
of Mines India
– 1964.

11. Kağan Senior DOLSAR B. Sc. in Civil 27 Mr. Solmaz has more than 15 years of experience in International Full-time
Solmaz Geotechni Engineering the tender design, detailed design and construction
66
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

cal Middle East supervision of transportation and water resources


Turkish Engineer Technical projects.
University He has in depth experience in suitability of
ksomaz@ construction materials, foundation design and
dolsar.com. seepage control.
tr
12. Mehmet Senior DOLSAR B.Sc. in 38 Mr. Budak has more than 35 years of experience as a International Full-time
Budak Geotechni Geological material engineer in the supervision of motorway and
cal Engineer highway projects including bridges, viaducts,
Turkish Engineer Istanbul cut&cover structures, culverts, retaining structures. He
University has many years of experience on site, as a site
mbudak@ engineer and materials engineer. His experience also
dolsar.com. M.Sc. includes, various supervision services of motorways
tr Geological including, Gebze – Orhangazi – İzmir Motorway (428
Engineering km, Turkey) and Ankara-İstanbul Motorway (440 km,
Istanbul Turkey). He has more than 30 years of experience
University working as a Material Engineer in Motorway and
Highway Projects. His experience also covers tunnels,
where during his services as a material engineer in
various motorway projects, he has provided advice on
the excavation, support and lining systems of
motorway tunnels.
Mr. Budak specializes in the review of pavement
structure and testing of relevant materials. During his
experience with large motorway projects, he has
worked together with QA/QC Engineers, thus allowing
him to understand and perform field and lab testing.

13. A.K.M. Cost and WAPCOS  B.E. (Civil), 30  Road Construction Supervision for Abdulla Gharib International Full time
Govil Quantity from Birla Road Section (FPERP-RR5) of Rayyan Bin Aifan
67
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Engineer Vishwakarma Road in Hadramout Governorate, Yemen


Indian Mahavidalya  Road Construction Supervision for Rehabilitation
Engg. and Reconstruction of the Regional Road (FPERP-
iwrm@wapcos. College, RR3,RR4) in Hadramout Governorate, Yemen
co.in
Vallabh  Third Party Quality Assurance and Quality Control
Vidyanagar, Services for water supply and sewerage projects of
Sardar Patel HMWSSB under JNNURM, India
University,
Gujarat –
1974
 M.Tech. with
specialization
in Rock
Mechanics
from IIT, Delhi
,– 1978-81
14. B.P. Acharya WAPCO  Ph.D. 47  Preparation of Pre-Feasibility and Feasibility/ International Full time
S (Economics Detailed Project Report for Purulia Pumped Storage
Indian ), Utkal Extension Project on Turga Nala (Dam Height :
University 72m, 4x250 MW)
iwrm@wapcos. (Orissa),  Preparation of Feasibility Report and Detailed
co.in
Economic 1996 Project Report for Arun-3 Hydro Electric Project
and  M.A. (303.8 m Gross Head) (Dam Height : 70m, 900 MW)
Financial (Economics  Preparation of Feasibility/ Detailed Project Report
Expert ), Utkal for Punatsangchhu-II Hydro Electric Project (Dam
University Height : 86m, 6x165 MW)
(Orissa),  Preparation of Feasibility /Detailed Project Report of
India,1969 VishnugadPipalkoti H.E Project (4x111MW, 237m
Gross Head)-(Dam Height : 65m, 4x111 MW)
 Feasibility Study, Detail Design and Construction of
68
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Salma Dam Project (Dam Height : 107.5m, 3x14


MW)
 Preparation of Feasibility/ Detailed Project Report
for Tapovan Vishnugad (494 m rated head, Dam
Height : 22m, 3x120MW)
 Preparation of Pre Feasibility Report and
Feasibility/Detailed Project Report for Lohari Nag
Pala Project (437.96 m Gross Head), Uttarakhand
(Dam Height : 15m, 4x130 MW)
 Feasibility/ Detailed Project Report, Detailed Design
for Kol Dam H.E Project, Bilaspur, Himachal
Pradesh, India (Dam Height : 163m, 4 x 200 MW)
 Preparation of Feasibility / DPR for Gairezi Dam
Hydro Electric Project (30 MW - 50 m high)
 Feasibility study and Detailed Design of 15 MW
peat to power project, Rwanda
 Feasibility, Detailed Design and Construction
Supervision for Kabu-16 Hydro Electric Project (20
MW - 20 m high)) in Burundi (gross head of 193 m;
Concrete Gravity Type Diversion Dam).

15. Sanjay Procurem WAPCOS  MTech-IIT 19  Consultancy Services for Design Engineering and International Full time
Sharma ent Delhi 1998, Construction Supervision for Stung Tasal Dam
Specialist  BTech. Project, Cambodia (Under Line of Credit of Govt. of
Civil- REC India and Govt. of Cambodia – Procurement Expert
Hamirpur- – (Client: Ministry of Water Resources and
1996 Meteorology, Royal Government of Cambodia) –
(2012-2014)
 Project Management Consultancy Services for
increasing height of existing weir constructed at
69
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Mahuta Ghat across Betwa River for BORL, Bina,


India – Procurement Expert – (Client: Bharat Oman
Refinery Limited, Bina, India) – (2012-2013)

16. Pushpendra Contract WAPCOS  M. Tech. 25  Supervision for Rehabilitation and Reconstruction of International Freelancer
Srivastava document (Civil), from Regional Roads (FPERP-RR3/RR4) in Hadramout
specialist Manav Governorate, Yemen
Indian Bharti  Construction of Various new and up gradation of
University, existing roads Project funded by World Bank
iwrm@wapcos. Solan, 2013  Construction Supervision of Four Laning of National
co.in
 B.E. (Civil), Highway No. 2 from km 317+100 to km 65+000
from M.S. GTRIP/5, Package IV-A, National Highways
University of Authority of India, World Bank Funded
Baroda,  Project Engineering Services for Ahmedabad
Gujarat, Mehsana Toll Road Project, Length-51.6 Km. (4
1992 laning), Cost of Project: 150 crores, Ahmedabad
Mehsana Toll Road Company Limited (An SPV of
Govt. of Gujarat and IL & FS)
 Four Laning of SAMAKHIYALI TO Bhachau, Section
of National Highways - 8A. (Ch. 306.00 – Ch.
324.00)

17. Som Dutta Institution WAPCOS  LLB/Civil 49  Preparation of Detailed Project Reports for International Full time
Gupta al and Engineering Integrated Municipal Solid Waste Management in
legal 18 ULB’s of Bihar Under NGRBA through SPUR-
Indian specialist Group 2 towns.
 Preparation of DPR and Construction Supervision
iwrm@wapcos. of Water supply, Drainage, Sewerage, Solid Waste
co.in
Management, Roads & slum improvement for 8
ULB’s in the state of Karnataka
70
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

 Preparation of Detailed Project Report on Solid


waste management (SWM) for Dhanbad
 Consultancy services for Kerala Sustainable Urban
Development Project “Project Management
Consultancy” for Package-2 (Kochi, Thrissur and
Kozhikode) (Asia Development Bank Funded)
 Consultancy Services for Detailed Design, Tender
Document Preparation and Supervision of Bondo &
Siaya Water Supply and Sanitation Projects
(African Development Bank Funded)
 Consultancy services for development of
awareness and hygiene education, development of
dry PIT Latrines. Designs for local conditions for
households and schools and development study for
flood areas and solid water waste management for
the four municipalities. ( in Xai-Xai, Chokwe,
Inhambane
 Consultancy Services for World Bank funded 5
ULB Project under Karnataka Municipal Reforms
Project (KMRP) – Package – 2
 Consultancy Services for Survey, Investigation,
Planning, Preparation of DPR, carrying out EIA and
Implementation/ Commissioning Support for
Renewal and Rejuvenations of Water Supply and
Sewerage capacities for Shimla city (JNNURM
Funded, GoI)
 Consultancy Services for Project Monitoring ,
Construction Supervision & Quality Control for
Sewerage Project of Jabalpur city under JNNURM
 Preparation of DPR for Underground Sewerage

71
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Scheme for Moti Daman area of Daman Town


under Daman Municipal Council.

18. K.K. Gaur Social WAPCOS  Ph.D., 14  Survey for block contouring, planning, design & International Full time
safeguard Sociology, preparation of plans estimates of distributary down
Indian s Agra to 8 ha. sub chak and drainage of chak for the
specialist University, command area under various canals of Sardar
iwrm@wapcos. 1990-91 Sarovar Project.
co.in
 M.A.,  Kurnool-Cuddapah Canal Modernization Project,
Sociology, Andhra Pradesh
Institute of  Detailed Project Report of Godavari Lift Irrigation
Advanced Schemes Preparation of DPR and Construction
Studies, Supervision of Water supply, Drainage, Sewerage,
Meerut Solid Waste Management, Roads & slum
University, improvement for 8 ULB’s in the state of Karnataka
1975 (World Bank Funded)
 B.A., Meerut  Consultancy Services for Project Monitoring ,
University, Construction Supervision & Quality Control for
1973 Sewerage Project of Jabalpur city (JNNURM
Funded, GoI)
 Consultancy Services for Survey, Investigation,
Planning, Preparation of DPR, carrying out EIA and
Implementation/ Commissioning Support for
Renewal and Rejuvenations of Water Supply and
Sewerage capacities for Shimla city (JNNURM
Funded, GoI)
 Preparation of Detailed Project Report for Providing
Water Supply, Sewerage, Sewerage Treatment
Plant for Ludhiana town (JNNURM Funded, GoI)
 Support Agency for Project Gram Panchayats- “Jal
72
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Nirman Project”

19. A. Stephen Environm WAPCOS  M.Sc. 24  Construction of Salma Dam Project (3X14MW); International Full time
Leo ental (Environment (Under Line of Credit of Govt. of India) (107 m ;
expert al Sciences) earth and rock fill dam)- Detailed Design and
Indian Bharthidasan Construction supervision
University,  Gerbi Dam Reservoir, Transmission and Treatment
iwrm@wapcos. Tiruchirapalli, Plant Study, Design And Tender Document
co.in
Tamil Nadu, Preparation Project, Ethiopia ( 22m High Rock Fill
India (1987, Dam) - Detailed Design and Construction
First Class) supervision
 Nam Song Hydropower Project (3x2 MW)- Detailed
Design and Construction supervision(Gravity Dam
with 70 Height) )
 Preparation of Detailed Project Report for
Punatsangchhu-I Hydro Electric Project (Under
Line of Credit of Govt. of India) (A concrete gravity
type about 137 m in height)- Detailed Design and
Construction supervision
 EIA Study for Tala Hydro Electric Project
(1020MW) (92m high concrete gravity dam)-
Detailed Design and Construction supervision
 EIA Study for Teesta-III H.E Project, Sikkim
(1200MW) (rock fill dam at 60 m height)- Detailed
Design and Construction supervision
 Detailed Project Report, Detailed Design
Engineering Services, Construction Supervision,
Testing and Commission of Purulia Pumped
Storage Project (4 X 225 MW) West Bengal (72 m
high rockfill dam)- Detailed Design and
73
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Construction Supervision
 Kurichhu H.E. Project (Straight gravity concrete
Dam, 55 m height, 4 X 15 MW)- Project
Management and Construction Supervision

20. Sevgi Senior DOLSAR B. Sc. in 29 Ms. Arslan has experience in the preparation of International Full-time
Arslan Environm Environmental Environmental Impact Assessment (EIA),
ental Engineering Environmental and Social Impact Assessment (ESIA),
Turkish Specialist Environmental and Social Due Diligence (ESDD)
Middle East Reports, environmental consultancy and monitoring
sarslan@ Technical issues according to Turkish regulation and/or
dolsar.com. University according to International requirements. She has over
tr 29 years of experience in preparation of
Environmental Impact Assessment Reports (EIA) as
well as in infrastructure projects including
transportation projects.
In her most recent experience she is working as the
Environmental Expert for Gebze – Orhangazi – İzmir
Motorway, a 428 km Motorway which is being built
under an EPC Basis.

21. Prasetijo Highway Indra Master of 30 Has vast experince in the field of planning, design, National Full Time
Adi Engineer Karya Highway execution of road and bridge projects. Worked as a
Engineering team leader for following projects:
System, 1991,  Supervision Consultancy Service on The
ITB Bandung, Construction of Light Rail Transit (LRT) in South
Indonesia Sumatera Province, 31 Oct 2016 - 14 Juli 2017
 Review Study of Toll Road Develompent Medan-
Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015
74
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

 KPML's Road Infrastructure Development


Technical Supervision Package 1 (stage 1), 16
Dec 2013 - 19 Sept 2014
 Traffic Analysis of Nusa Dua-Ngurah Rai-Benoa
Highway Planning (Package-04), Jul 2012 - Des
2012
 Study of Traffic Engineering Planning Simpang
Cikande, Tangerang-Merak Toll Road, Feb 2011 -
Juni 2011
 Sea Transportation Planning Riau Island
Province, Maret 2010 - Oct 2010
 Basid Design of Toll Road Bakauheni - Terbanggi
Besar, Aug 2009 - Feb 2010
 Evaluation Traffic Study of JORR Toll Road, W1,
Maret 2009 - Juli 2009
 Final Engineering Design Ciawi - Sukabumi Toll
Road, Mei 2008 - Des 2008
 Toll Road Engineering Planning Kertosono -
Mojokerto, Feb 2007 - Nov 2007
 DED of Serang Ring Road, Sept 2006 - Des 2006
 DED of Toll Road Gempol - Pasuruan 34 Km's,
Feb 2005 - Aug 2005
 Final Engineering Desain Rest Area and On/Off
Toll Road Jakarta – Cikampek – Sadang, Sept
2003 - Aug 2004
 Engineering Planning of Fly Over KiaraCondong
and Soekarno Hatta, Bandung, Juni 2002 - Oct
2002
 Road Planning at West Java Province, Cirebon -

75
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Kuningan Segment, Jul 2001 - Des 2001


 Design and Construction Supervision of The
Sumatra East Coast Highways Project, Feb 1999
- March 2000.

22. Apriyanto Pavement Indra Master of 10 Has vast experince in the field of planning, design, National Full Time
Engineer Karya Transportation execution of road and bridge projects. Worked as a
Engineering, pavement engineer for following projects:
ITB, 2007,  Study and Analysis Traffic at Ciawi - Sukabumi
Bandung, Toll Road, Client: Trans Jabar Tol, Sep 2015 - Juli
Indonesia 2016
 Road Engineering Planning, Bintuni - Wondama,
Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
 Road Engineering Planning Leger Data's for
National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
 Road Engineering Planning in Kupang District and
TTS (PR-02 Package), Client : Directorate General
of Highways, SNVT Planning and Supervision of
Roads and Bridges of NTT, August 2010 -
December 2010
 Road Engineering Planning Package, Kenjeran,
Surabaya, Client : SNVT P2JJ Metro Surabaya,
May 2009 - August 2009

23. Magdalena Bridge Indra Bachelor of 23 Has vast experince in the field of planning, design, National Full Time
Idrus Engineer Karya Civil execution of road and bridge projects. Worked as a
Engineering, bridge engineer for following projects:
Palembang  Review Study of Toll Road Development Medan-
76
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Tridinanti Kualanamu-Tebing Tinggi Segments, 7 Jan 2015 -


University, 19 Aug 2015
1994  Technical Assistance Sub Directorate of Highways
and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client:
Bina Marga, Juli 2013 - Des 2013
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
 Sangkariang's Bridge Engineering Planning, Suguh
River, Kalianyar (Malang District) and Bedadung
River's Bridge Review Design (Jember District),
Client : Welfare Core Cooperative (KOPINKAN),
January 2009 - March 2009
 Bridge Engineering Planning Spread in East Java
South Cross (Paket-2), Client : Public Works Office
of Bina Marga East Java, June 2006 - October
2006
 Road and Bridge Engineering Planning Sayati -
Palasari, Client : Bina Marga Bandung, June 2004 -
October 2004
 Road Planning at West Java Province, Cirebon -
Kuningan Segment, Jul 2001 - Des 2001
 Planning Access Road Ramp Ciawi, Jagorawi Toll
Road, Client : PT. Jasa Marga (Persero), August
2000 - October 2000
 Feasibility Study and EIA Jatiasih Toll Road -
Cileungsi and Spur Spur Jagorawi, Client : PT.
Jasa Marga (Persero), December 1997 - April 1999
 Supervision of Road and Bridge in Inderalaya
77
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Segment - Kayu Agung, Client : P3TNAS South


Sumatera, August 1995 - May 1996

24. Luthfy Aziz Traffic Indra Master of 25 Has vast experince in the field of planning, design, National Full Time
Lubis Engineer Karya Transportation execution of road and bridge projects. Worked as a
Engineering, road engineer for following projects:
University of  Review Study of Toll Road Development Medan-
Indonesia, Kualanamu-Tebing Tinggi Segments, 7 Jan 2015 -
2008 19 Aug 2015,Client: PT. Cipta Strada
 FS of Bridge at Sambas Besar River - Kalimantan,
Client: PT. Wiraguna Tani West Kalimantan
Branch, Oct 2014 - Des 2014
 Road Engineering Palnning Bofuer-Bomberay,
Client: PT. Laksana Desain Daya Cipta, Jul 2014 -
Oct 2014
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, March 2014 - Juni 2014
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sep 2013 - Des 2013
 Road Engineering Planning, Bintuni - Wondama,
Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
 FS Access Road North Kalibaru Port (Tanjung
Priok New Port), Client: Cipta Strada, Maret 2013 -
Mei 2013
 Traffic Survey for Indi II Sumatera and Java
Project, Client: Dacrea Konsultan, Jan 2013 - Maret
2013
78
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

 Road Engineering Planning National Road on


Jayapura 1 Region, Abepura-Arso-Waris
Segments, Client: Kogas Driyap Konsultan, Aug
2014 - Des 2014
 Road Engineering Planning Leger Data's for
National Road of Gatentiri - Tanah Merah, Client:
Pillar Pusaka Inti, Apr - Aug 2014
 Road Engineering Planning Leger Data's for
National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
 Special Handling of Road Avalanches in Nabire -
Bedudipa Segment , Client: Kogas Driyap
Konsultan, April 2011 - Aug 2011
 Special Handling of Road Avalanches in Nabire -
Bedudipa Segment , Client: Kogas Driyap
Konsultan, Jan 2011 - Apr 2011
 Road Engineering Planning Leger Data's for
National Road of Jayapura, Client: Kogas Driyap
Konsultan, Aug 2010 - Des 2010
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Review Study of Toll Road Kunciran - Serpong -
Bandar Soekarno Hatta, Client: Cipta Strada, Jan -
March 2010

79
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

25. Fatchi Hydrology Indra Bachelor of 19 Has vast experience in the field of planning, design, National Full Time
Handoyo Engineer Karya Civil execution of road and bridge projects. Worked as a
Engineering, hydrology engineer for following projects:
Malang
Muhammadiya  Review Study of Toll Road Development Medan-
h University, Kualanamu-Tebing Tinggi Segments, 7 Jan 2015 -
1998 19 Aug 2015
 Technical Assistance Sub Directorate of Highways
and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client:
Bina Marga, Juli 2013 - Des 2013
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
 Regional Design and Supervision consultants-2
(RDSC-2) for Second Eastern Indonesia Region
Transport Project (EIRTP-2) Under IBRD Loan No.
4744-IND, Client : Directorate General of Highways
(Bina Marga), Technical Guidance Unit for Roads
and Bridges, November 2006 - October 2010
 Road and Bridge Engineering Planning in Lubuk
Linggau, Client : Directorate General of Road,
Ministry of Public Works, September 2005 -
December 2005
 Road Rehabilitation (Sector) Project Design and
Field Team Consultants Under ADB LOAN
NO.1798-IND, Client : PT Jasa Marga (Persero),
November 2003 - January 2004
 Road Planning at West Java Province, Cirebon -
Kuningan Segment, Jul 2001 - Des 2001
80
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

26. Lubab Transport Indra Master of Civil 26 Has vast experince in the field of planning, design, National Full Time
Planner Karya Engineering, execution of road and bridge projects. Worked as a
Surakarta transport planner for following projects:
Muhammadiya  Consultancy Service of Financing Scheme of
h University, Semarang-Batang Toll Road, Pandaan-Malang,
2009 Balikpapan-Samarinda, and Manado-Bitung, Client:
Mandiri Sekuritas, Aug 2016 - April 2017
 Study and Analysis Traffic at Ciawi - Sukabumi Toll
Road, Client: Trans Jabar Tol, Sep 2015 - Juli 2016
 Review Traffic Study Kanci - Pejagan - East
Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
 Study Bali Mandara Toll Road Networking, Client:
Jasa Marga Bali Tol, Oct 2014 - Desember 2014
 Technical Assistance Sub Directorate of Highways
and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client:
Bina Marga, Juli 2013 - Des 2013
 Traffic Study and Basic Design Toll Road Bogor
Ring Road Sekci II B, Client: Marga Sarana Jabar -
Multhiphibeta, Jan 2013 - Juli 2013
 Traffic Study of Road Engineering Planning, Nusa
Dua-Ngurah Rai-Benoa Toll Road (Paket-04),
Client: Waskita Karya, Jul 2012 - Des 2012
 Preparation of Masterplan of Marine
Transportation of Kepulauan Riau Province
Riau Islands Province, Client: Bappeda Riau
Island Province, Jul 2011 - Des 2011
 Engineering Consulting Service For Jakarta Mass
Rapid Transit System Project Jakarta, Client:
81
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

JMEC-Wiratman, March 2010 - Jan 2011


 Basic Design Toll Road Bakauheni - Terbanggi
Besar, Client: PU Bina Marga, Sept 2009 - Feb
2010
 Final Engineering Design Ciawi - Sukabumi Toll
Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
 Intercodal Transportation Planning Study and
Pedestrian System of Banda Aceh City, Client:
Qorina-BRR NAD Nias, Sep 2007 - Des 2007
 Detail Design Urip Soemaharjo Fly Over,
Makasar, South Sulawesi, Client: Bina Marga, Aug
2006 - Des 2006
 Final Engineering Desain Rest Area and On/Off
Toll Road Jakarta – Cikampek – Sadang, Sept
2003 - Aug 2004
 Road Planning at West Java Province, Cirebon -
Kuningan Segment, Jul 2001 - Des 2001
 Design and Construction Supervision of The
Sumatra East Coast Highways Project, Feb 1999 -
March 2000

27. Eko Geodetic Indra Bachelor of 25 Has vast experince in the field of planning, design, National Full Time
Prihriyadi Engineer Karya Geodetic execution of road and bridge projects. Worked as a
Subagyo Engineer, geodetic engineer for following projects:
Gadjah Mada  Technical Planning of Bojonegoro Regional Road,
University, Client : Bina Marga and Irrigation Bandung, March
1992 2015 - September 2015
 Road Engineering Planning in 124 KM's Denpasar
- Packages 12 (Bon Dalem/Tembok Village) -
82
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Amlapura, Client : P2JN Bali, March 2013 - April


2013
 Review Study of Toll Road Kunciran - Serpong -
Bandar Soekarno Hatta, Client: Cipta Strada, Jan
- March 2010
 Road Engineering Planning in Alor Island (PR-02
Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT
Province, September 2007 - March 2008
 Road and Bridge Engineering Planning in Lubuk
Linggau; Client : Directorate General of Road,
Ministry of Public Works, September 2005 -
December 2005
 DED of Kulonprogo Fly Over (2), Kulonprogo
District, Client : Directorate General of Road,
Ministry of Public Works, January 2004 - August
2004
 Road Planning at West Java Province, Cirebon -
Kuningan Segment, Jul 2001 - Des 2001
 Design and Construction Supervision of The
Sumatra East Coast Highways Project, Feb 1999 -
March 2000
 Engineering Design of Urban Bridge, Kupang and
Manado, Binkot - Directorate General of
Highways, Sept 1996 - Mar 1997

28. Eko Cost and Indra Bachelor of Has vast experience in the field of planning, design, National Full Time
Suliyanto Quantity Karya Civil 20 execution of road and bridge projects. Worked as a
Engineer Engineering, cost and quantity engineer for following projects:
Udayana
83
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

University,  Review Traffic Study Kanci - Pejagan - East


1997 Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
 Traffic Study and Basic Design Toll Road Bogor
Ring Road Sekci II B, Client: Marga Sarana Jabar
- Multhiphibeta, Jan 2013 - Juli 2013
 Road Engineering Planning Leger Data's for
National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
 Intercodal Transportation Planning Study and
Pedestrian System of Banda Aceh City, Client:
Qorina-BRR NAD Nias, Sep 2007 - Des 2007
 Detail Engineering Design Special Bridge Busung
and Kangboi, Client : Bina Marga Riau, July 2005
- February 2006
 Toll Road Technical Planning Cikampek - South
Purwakarta - Pleret Segment's, Client : PT Jasa
Marga (Persero), October 2003 - September
2004
 Road Planning at West Java Province, Cirebon -
Kuningan Segment, Jul 2001 - Des 2001
 Planning Access Road Ramp Ciawi, Jagorawi
Toll Road, Client : PT. Jasa Marga (Persero),
August 2000 - October 2000

84
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

29. Wisnu Geotech Indra Master of 30 Has vast experience in the field of planning, design, National Full Time
Wibowo nical Karya Geology execution of road and bridge projects. Worked as a
Engineer Engineering, geotechnical engineer for following projects:
University of
New South  Technical Planning of Bojonegoro Regional Road,
Wales, 1987 Client : Bina Marga and Irrigation Bandung, March
2015 - September 2015
 Periodical Road and Bridge Technical Planning in
Timika, Client : SKNVT Road Planning and
Supervision Province Papua, April 2014 -
September 2014
 Bridge Technical Preparation, Client : SKNVT
Road Planning and Supervision, July 2013 -
November 2013
 Road Engineering Planning Segment Maruni -
Warmare - Prafi, Client : SKNVT Road Supervision
and Planning West Papua, August 2012 -
December 2012
 Detail Engineering Design Cross Island I (Package
23/2011), Client : SNVT Road Supervision and
Planning Province Aceh, April 2011 - September
2011
 Bridge Engineering Planning Tirasai River, Client :
SKNVT Road Supervision and Planning West
Papua, August 2010 - December 2010
 Road and Bridge Geitechnical Planning, Client :
Publics Works Service, June 2009 - October 2009
 Bridge Engineering Planning Fly Over Jomin,
Client : DPU Bina Marga, September 2007 -
December 2007
85
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

 Detail Engineering Design Special Bridge Busung


and Kangboi, Client : Bina Marga Riau, July 2005 -
February 2006
 Road and Bridge Engineering Planning Sayati -
Palasari, Client : Bina Marga Bandung, June 2004
- October 2004
 Road Planning in East Kalimantan Province
Package - 11 Road Sections Mensalong - Tau
Lumbis and Tau Lumbis - Long Bawan, Client :
Directorate General of Regional Infrastructure of
the Department of Settlements and Regional
Infrastructure, April 2003 - December 2003
 Road and Bridge Engineering Planning in
Segment Jatibarang - Palimanan Stage I, Client :
Department of Settlement and Regional
Infrastructure, January 2001 - November 2001

30. Dedi Contract Indra Bachelor of 11 Has vast experience in the field of planning, design, National Full Time
Tarmedi Documen Karya Civil execution of road and bridge projects. Worked as a
t Engineering, contract document specialist for following projects:
Specialist Surabaya  Review Study of Toll Road Develompent Medan-
Sunan Giri Kualanamu-Tebing Tinggi Segments, 7 Jan 2015 -
University, 19 Aug 2015
2006  Technical Assistance Sub Directorate of Highways
and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client:
Bina Marga, Juli 2013 - Des 2013
 Engineering Consulting Service For Jakarta Mass
Rapid Transit System Project Jakarta, Client:
JMEC-Wiratman, March 2010 - Jan 2011
86
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

 Road and Bridge Geotechnical Planning, Client :


Publics Works Service, June 2009 - October 2009
 Road Engineering Planning in Alor Island (PR-02
Package); Client : SNVT Planning and Supervision
of Roads and Bridges of NTT Province,
September 2007 - March 2008.

31. Tri Wanto Road Indra Bachelor of 14 Has vast experience in the field of planning, design, National Full Time
Ardi Safety Karya Civil execution of road and bridge projects. Worked as a
Wibawa Specialist Engineering, road safety specialist for following projects:
Semarang 17  Review Traffic Study Kanci - Pejagan - East
August 1945 Brebes, Client: Multhiphibeta - Waskita Toll Road,
University, Jan - March 2015
2003  Road Engineering Planning Leger Data's for
National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
 FS Access Road North Kalibaru Port (Tanjung
Priok New Port), Client: Cipta Strada, Maret 2013 -
Mei 2013
 Special Handling of Road Avalanches in Nabire -
Bedudipa Segment , Client: Kogas Driyap
Konsultan, April 2011 - Aug 2011
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Final Engineering Design Ciawi - Sukabumi Toll
Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
 Road Engineering Planning of Kapitu - Tumpaan
Kapitu Tumpaan Location, Minahasa District South
87
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Minahasa, Client : South Minahasa District


Department of Public Works, September 2006 -
January 2007
 DED of Bridge - Pakckage 7, Client : Directorate
General of Road, Ministry of Public Works, January
2005 - June 2005.

32. Maryoni Economi Indra Master of 31 Has vast experience in the field of planning, design, National Full Time
c and Karya Economic, execution of road and bridge projects. Worked as a
Financial Jakarta economic and financial analysis expert for following
Analysis Nusantara projects:
Expert Economic
Sciences  Review Traffic Study Kanci - Pejagan - East
University, Brebes, Client: Multhiphibeta - Waskita Toll
2004 Road, Jan - March 2015
 Road Engineering Planning, Bintuni - Wondama,
Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
 Traffic Study of Road Engineering Planning,
Nusa Dua-Ngurah Rai-Benoa Toll Road (Paket-
04), Client: Waskita Karya, Jul 2012 - Des 2012
 Engineering Consulting Service For Jakarta
Mass Rapid Transit System Project Jakarta,
Client: JMEC-Wiratman, March 2010 - Jan 2011
 Review Study of Toll Road Kunciran - Serpong -
Bandar Soekarno Hatta, Client: Cipta Strada,
Jan - March 2010
 Road Engineering Planning in Alor Island (PR-02
Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT
88
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Province, September 2007 - March 2008


 Bridge Engineering Planning Fly Over Jomin,
Client : DPU Bina Marga, September 2007 -
December 2007
 Information System in Sekayu and Lubuk
Linggau, Client: Directorate General of Road,
Ministry of Public Works, July 2005 - September
2005.

33. Sugih Jaya Procurem Indra Bachelor of 28 Has vast experience in the field of planning, design, National Full Time
ent Karya Management execution of road and bridge projects. Worked as a
Specialist Economic, procurement specialist for following projects:
Jakarta
Krisnadwipayana  Review Study of Toll Road Development Medan-
University, 1989 Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015,Client: PT. Cipta Strada
 Technical Assistance Sub Directorate of
Highways and Urban Roads, Dit. Bina Teknik,
Ditjen. Bina Marga, Ministry of Public Works
Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
 Traffic Study of Road Engineering Planning,
Nusa Dua-Ngurah Rai-Benoa Toll Road (Paket-
04), Client: Waskita Karya, Jul 2012 - Des 2012
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Final Engineering Design Ciawi - Sukabumi Toll
Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
 Road Engineering Planning of Kapitu - Tumpaan
89
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Kapitu Tumpaan Location, Minahasa District


South Minahasa, Client : South Minahasa District
Department of Public Works, September 2006 -
January 2007
 Toll Road Technical Planning Cikampek - South
Purwakarta - Pleret Segment's, Client : PT Jasa
Marga (Persero), October 2003 - September
2004
 Design and Construction Supervision of The
Sumatra East Coast Highways Project, Feb 1999
- March 2000
 Engineering Design of Bridge Package 1,
Semarang, Binkot-Directorate General of
Highways, Aug 1995 - Mar 1996
 Engineering Design of Road and Bridge,
P3TNas-Directorate General of Highways,
Lampung, May 1993- Feb 1994
 Engineering Design of Bridge Package XI, West
Kalimantan, P3TNas Kalbar - Directorate
General of Highways, Jul 1991- Nov 1991

34. Utari Institution Indra Bachelor of Civil 29 Has vast experience in the field of planning, design, National Full Time
Dewi al and Karya Law, Jakarta execution of road and bridge projects. Worked as a
Legal Pancasila institutional and legal specialist for following projects:
Specialist University, 1988
 Review Traffic Study Kanci - Pejagan - East
Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
 Road Engineering Planning Leger Data's for
National Road of Serui, Client: Kogas Driyap
90
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Konsultan, Feb 2012 - Apr 2012


 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Detail Engineering Design Special Bridge Busung
and Kangboi, Client : Bina Marga Riau, July 2005
- February 2006
 Toll Road Technical Planning Cikampek - South
Purwakarta - Pleret Segment's, Client : PT Jasa
Marga (Persero), October 2003 - September 2004
 Planning Access Road Ramp Ciawi, Jagorawi Toll
Road, Client : PT. Jasa Marga (Persero), August
2000 - October 2000
 Engineering Preparation Design of Road at the
Location of Landslide and Preparation of Tender
Document Package 1, Jambi, Bintek - Directorate
General of Highways, May 1998 - Mar 1999
 Engineering Design of Urban Bridge, Kupang and
Manado, Binkot - Directorate General of
Highways, Sept 1996 - Mar 1997.

35. Syakti Social Indra Bachelor of 34 Has vast experience in the field of planning, design, National Full Time
Kirana Eka Safeguar Karya Social and execution of road and bridge projects. Worked as a
Sidharta ds Politic, Jember social safeguards specialist for following projects:
Specialist University, 1983  Review Study of Toll Road Development Medan-
Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015
 Traffic Study and Basic Design Toll Road Bogor
Ring Road Sekci II B, Client: Marga Sarana Jabar
- Multhiphibeta, Jan 2013 - Juli 2013
91
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

 Road Engineering Planning, National Road on


Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Road Engineering Planning in Alor Island (PR-02
Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT
Province, September 2007 - March 2008
 Road Rehabiltation (Sector) Project Design and
Field Team Consultants Under ADB LOAN
NO.1798-IND, Client : PT Jasa Marga (Persero),
November 2003 - January 2004
 Design and Construction Supervision of The
Sumatra East Coast Highways Project, Feb 1999
- March 2000
 Engineering Design Package II, Engineering
Design of Road / Pulo Gadung Fly Over, Jakarta,
P3Tprop DKI - Public Works Jabotabek, Sept
1997 - Mar 1998
 Engineering Design of Urban Bridge, Kupang and
Manado, Binkot - Directorate General of
Highways, Sept 1996 - Mar 1997
 Engineering Design of Bridge Package 1,
Semarang, Binkot-Directorate General of
Highways, Aug 1995 - Mar 1996
 Engineering Design of Bridge in West Regional
Package 1, DI Aceh, North Sumatera, Riau and
Jambi, Binkot - Directorate General of Highways,
Aug 1994 - Jan 1995
 Engineering Design of Road and Bridge, P3TNas-
Directorate General of Highways, Lampung, May
92
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

1993- Feb 1994


 Engineering Design of Bridge Package IV, West
Kalimantan, P3TNas Kalbar - Directorate General
of Highways, Nov 1992- Mar 1993
 Engineering Design of Bridge Package IV, West
Kalimantan, P3TNas Kalbar - Directorate General
of Highways, May 1992 - Okt 1992
 Engineering Design of Bridge Total Length 350m,
East Nusa Tenggara, P3TNas NTT - Directorate
General of Highways, Dec 1991 - Mar 1992
 Engineering Design of Bridge Package XI, West
Kalimantan, P3TNas Kalbar - Directorate General
of Highways, Jul 1991- Nov 1991
 ADB 7 Supervision Project Link Dompu - Sila and
Talabiu - Parado, in Dompu West Nusa Tenggara,
Directorate General of Highways, Apr 1990- Feb
1991.

36. Achmad Environm Indra Master of 26 Has vast experince in the field of planning, design, National Full Time
Widarto ental Karya Environmental execution of road and bridge projects. Worked as a
Expert Engineering, environmental expert for following projects:
Surabaya  Review Traffic Study Kanci - Pejagan - East
Sepuluh Brebes, Client: Multhiphibeta - Waskita Toll Road,
November Jan - March 2015
Technology  Road Engineering Planning in 124 KM's Denpasar
University, 2011 - Packages 12 (Bon Dalem/Tembok Village) -
Amlapura, Client : P2JN Bali, March 2013 - April
2013
 Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
93
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Konsultan, Apr 2010 - Aug 2010


 Road Engineering Planning in Alor Island (PR-02
Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT
Province, September 2007 - March 2008
 Bridge Engineering Planning Spread in East Java
South Cross (Paket-2), Client : Public Works
Office of Bina Marga East Java, June 2006 -
October 2006
 DED of Bridge - Pakckage 7, Client : Directorate
General of Road, Ministry of Public Works,
January 2005 - June 2005
 Technical Assistance For Second Road
Rehabilitation Project, UNDER ADB LOAN NO.
3989 - IND, Client : PT. Jasa Marga (Persero),
April 2003 - January 2004
 Design and Construction Supervision of The
Sumatra East Coast Highways Project, Feb 1999
- March 2000.

37. Graduate in
Civil
Engineering,
Ir. Team Univ. He has experience in, planning, design,programming,
PT. Bina
Muhammad Leader/Hi Hasanuddin, managing, monitoring, and supervising construction of National
Karya 28 Full Time
Ridwan, ghway 1984 roads, flyovers and bridges Expert
(Persero)
MSc Engineer Master of
Engineering
Civil, Ins.
Teknologi
94
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Bandung, 1988

38. Graduate in
Civil
PT. Bina He has responsible for carrying out all types of
Ir. Sukris Pavement Engineering, National
Karya 32 structural design especially fly over, bridge and Full Time
Santoso Engineer Univ. Expert
(Persero) highway design related to road works
Brawijaya,
1984
39. Graduate in He has experience in the design, construction and National Full Time
Civil supervision of highways, fly over and bridges Expert
Ir. Ganda PT. Bina
Bridge Engineering,
Sumekarjay Karya 22
Engineer Institut
a (Persero)
Teknologi
Nasional, 1994
40. Graduate in He has experience in the design, construction and National Full Time
Civil supervision of highways, fly over and bridges Expert
Ir. Ganda PT. Bina
Bridge Engineering,
Sumekarjay Karya 22
Engineer Institut
a (Persero)
Teknologi
Nasional, 1994
41. Graduate in
Civil
PT. Bina He has Experience for carrying out all types of traffic
Traffic Engineering, National
Ir. Bunedi Karya 18 analysis especially fly over, bridge and highway Full Time
Engineer Univ. Expert
(Persero) design related to road works
Borobudur,
1998
42. PT. Bina Graduate in
Ir. Hendra Hydrology National
Karya Civil 20 He has experience for carrying out all types Full Time
Ananda, ME Engineer Expert
(Persero) Engineering, ofhidrology and drainage works especially for fly over,
95
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

Univ Brawijaya bridge and highway designrelated to road works


Malang, 1986
Post Graduate
in Water
Resources
Engineering of
Roorkie
University,
1996
43. Graduate in
Civil
PT. Bina He has experience for carrying out all types of
Ir. Kharis Transport Engineering, National
Karya 12 transport planning element especially related with fly Full Time
Subarkah Engineer Univ. Islam Expert
(Persero) over, bridge and highway works
Indonesia,
2004
44.
Graduate in
PT. Bina Civil He has experience in the
Ir. Geodetic National
Karya Engineering, 31 planning, design and implementation of road, flyover Full Time
Yahmanto Engineer Expert
(Persero) Univ. Gadjah and bridge projects
Mada, 1985

45.
Graduate in
He has experiences in estimation of roads, flyovers
Elon Cost and PT. Bina Civil
and bridges projects with qualification in civil National
Ahmadi Quantity Karya Engineering, 12 Full Time
engineering and relevant project Expert
Wiranta Engineer (Persero) STT - YPKP,
experience in Indonesia.
2005

96
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

46. Graduate in
Geotechni PT. Bina Geotechnical He has experiences in undertaking geotechnical
Ir. Herold National
cal Karya Engineering, 28 surveys and investigations for road projects Full Time
Hutagalung Expert
Engineer (Persero) Universitas that comply with the DGH requirements
Indonesi, 1988
47. Contract PT. Bina Graduate in He has experience in contract procurement
Widiyagung, National
Document Karya Bachelor , 30 philosophy and procedures currently used for civil Full Time
SH Expert
Specialist (Persero) 1986 works in Indonesia
48. Graduate in
Civil
Eko Broto Road PT. Bina Engineering, He has experience in roadsafety issues in Indonesia
National
Budiarto, Safety Karya Univ 12 and must have project experience with a wide range Full Time
Expert
ST Specialist (Persero) Krisnadwipaya ofsafety-related projects of government agencies
na, Jakarta,
2004
49. Graduate in He has many experiences as economist and/or
Economic
Economic financial analyst in developing infrastructure projects.
and PT. Bina
Ateng Faculty He also has experience and understanding of National
Financial Karya 30 Full Time
Sunarya Pancasila economic and financial analyses of infrastructure Expert
Analysis (Persero)
University, projects per government requirement and ADB
Expert
Jakarta, 1986 standards.
50. Graduate from
Economic
Faculty of He has experiences in procurement of goods, works
Procurem PT. Bina
Kusuma and services as well as contract management of National
Maryana ent Karya 20 Full Time
Negara infrastructure projects in accordance with Indonesian Expert
Specialist (Persero)
Institute of public procurement regulations.
Economic
Science, 1996
97
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

51. Graduate from


Institution
PT. Bina Law Faculty He has more than 10 years of experiences in drafting
Irmani al and National
Karya Sebelas Maret 28 contract agreements and in resolving legal issues in Full Time
Indroyono Legal Expert
(Persero) University, public procurements in Indonesia.
Specialist
1988
52. Graduate in
Social
PT. Bina Civil He has 7 years working experience on project related
Ir. Andi Safeguard National
Karya Engineering, 27 social safeguards. He’s has experience on the project Full Time
Yulianto s Expert
(Persero) Univ. Trisakti, social impacts consistent with the country’s
Specialist
Jakarta, 1989
53. Graduate from She has many experiences in environmental science,
Ir. Environm PT. Bina Invironmental engineering, and related field with experience in
National
Muhwinardi ental Karya Faculty Sahid 19 overseeing environmental management plans of Full Time
Expert
ni Expert (Persero) University, infrastructure projects, including Indonesia’s
1997 regulatory framework
54. Mamik
Radyantono Resident PT Multi
S2 23 Ahli Teknik Jalan - Utama National full-time
, Ir, MT, Engineer Phi Beta
Indonesia
55. Dadan
Rusli, ST , Team PT Multi
S2 18 Ahli Teknik Jalan - Madya National full-time
MT, Leader Phi Beta
Indonesia
56. Houdman
Resident/
Tambunan, PT Multi
Highway S2 19 Ahli Teknik Jalan - Utama National freelance
Ir, MT, Phi Beta
Engineer
Indonesia

98
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

57.
Agus Budi Resident/
PT Multi
Satriawan, Highway S1 20 Ahli Teknik Jalan - Utama National freelance
Phi Beta
Ir, Indonesia Engineer
58. Abdurahma
Team PT Multi
n, Ir, S1 20 Ahli Teknik Jalan - Utama National freelance
Leader Phi Beta
Indonesia
59. Resident/
Sabaruddin, PT Multi
Highway S1 20 Ahli Teknik Jalan - Madya National freelance
Ir, Indonesia Phi Beta
Engineer
60.
Resident/
Asiano, Ir, PT Multi
Highway S1 25 Ahli Teknik Jalan-Utama National freelance
Indonesia Phi Beta
Engineer
61.
Houdman
Tambunan, Resident PT Multi
S2 21 Ahli Madya Pengawas National freelance
Ir, MT, Engineer Phi Beta
Indonesia
62.
Edi
Susanto,Ir, Resident PT Multi Ahli Teknik Jalan - Utama, Ahli Teknik Jembatan -
S2 19 National full-time
MT, Engineer Phi Beta Madya
Indonesia
63. M. Daud
Nasution, Resident PT Multi
S1 15 Ahli Teknik Jalan - Madya National freelance
ST, Engineer Phi Beta
Indonesia

99
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

64. Bontor
Resident PT Multi
Rumahorbo, S1 20 Ahli Teknik Jalan - Madya National freelance
Engineer Phi Beta
Ir, Indonesia
65. Quality /
Limin, Ir, Pavement PT Multi
S1 22 Ahli Teknik Jalan - Madya National full-time
Indonesia & Mat. Phi Beta
Eng
66. Quality /
Yandri
Pavement PT Multi
Yalmi, Ir, S1 19 Ahli Madya Pengawas National freelance
& Mat. Phi Beta
Indonesia
Eng
67.
Abdul
Structure PT Multi
Mutholib, Ir, S1 16 Ahli Teknik Jembatan - Madya National freelance
Engineer Phi Beta
Indonesia
68.
AS.
Structure PT Multi
Sulistyo, Ir, S1 20 Ahli Teknik Jembatan - Madya National freelance
Engineer Phi Beta
Indonesia
69.
M. Yazied, Structure PT Multi
S1 20 Ahli Teknik Jembatan - Madya National freelance
Ir, Indonesia Engineer Phi Beta

70.
Haryanto, Ir,
Drainage PT Multi
MT, S2 19 Ahli Teknik Irigasi - Muda National freelance
Engineer Phi Beta
Indonesia

100
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

71.
Rachman
HIghwaY PT Multi
Syarief, Ir, S1 18 Ahli Teknik Jalan-Madya National freelance
Engineer Phi Beta
Indonesia
72.
Mardijati, Ir, Architect PT Multi
S1 20 Arsitek - muda National freelance
Indonesia Engineer Phi Beta

73.
Irwin Bahar
Quantity
Rasyid, Ir, PT Multi
Engineer/ S2 19 Ahli Teknik Jalan - Utama National full-time
MT, Phi Beta
K3
Indonesia

74.
Bambang
Quantity PT Multi
Gustiarso, S1 20 Ahli Teknik Jalan - Madya National freelance
Engineer Phi Beta
Ir, Indonesia

75. Quality /
Jafar
Pavement PT Multi
Rasyid, Ir, S1 19 Ahli Teknik Jalan - Madya National freelance
& Mat. Phi Beta
Indonesia
Eng
76. Quality /
Sugeng
Pavement PT Multi
Bintoro, ST, S1 16 Ahli Teknik Jalan - Madya National freelance
& Mat. Phi Beta
Indonesia
Eng
77. Gentur J,
Chief PT Multi
ST, S1 18 Ahli Teknik Jalan - Madya National freelance
Inspector Phi Beta
Indonesia
101
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

78. Tjarli, Ir, Chief PT Multi


S1 20 Ahli Teknik Jalan - Madya National full-time
Indonesia Inspector Phi Beta
79. Adi Paria
Chief PT Multi
Bardam, Ir, S1 19 Ahli Madya Pengawas National freelance
Inspector Phi Beta
Indonesia
80. Achmad
Mudawari, Ahli PT Multi
S2 29 Ahli Teknik Tenaga Listrik-Madya National freelance
Ir, MT., Elektrikal Phi Beta
Indonesia
81. Dr.-
Ing.Josia
Irwan Visiting PT Multi
S3 13 Ahli Teknik Bangunan Gedung - Utama National
Rastandi, Structur Phi Beta
ST., MT,
Indonesia freelance
82. Ikyha
Visiting
Bavadal, Ir, PT Multi
Geoteknik S2 13 Ahli Geoteknik Madya National
MT, Phi Beta
al
Indonesia freelance
83. Djoko Budi
Environm
Pramono, PT Multi
ental S1 15 Ahli Teknik Lingkungan-Madya National
ST, Phi Beta
Specialist
Indonesia freelance
84. Nurul
Environm
Fadhlya H. PT Multi
ental S2 15 Ahli Teknik Lingkungan-Muda National
S.Si, Phi Beta
Specialist
Indonesia freelance

102
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

85. Utilitas/
Zaidadin Mechanic
PT Multi
Razmel, Ir, al & S1 31 Ahli Teknik Mekanikal - Madya National
Phi Beta
Indonesia Elektrikal
Engineer freelance
86. Ir.
Yohannes
Haryanto Highway PT. Pola S1 / 1988 Civil
26 Feasibility Study / DED National Full time
Indonesia Engineer Agung Engineering
polajkt@hot
mail.com
87. S2 / 1995 /
Ir.
Civil
Sumarsono,
Engineering - Feasibility Study / DED National Associate
MBA Highway PT. Pola
S1 / 19
Indonesia Engineer Agung
1988 / Master
polajkt@hot
Of Business
mail.com
Administration
88. Ir.
Yohannes
Haryanto Highway PT. Pola S1 / 1988 Civil
26 Feasibility Study / DED National Full time
Indonesia, Engineer Agung Engineering
polajkt@hot
mail.com
89. Ir. S2 / 1995 / Civil
Sumarsono, Engineering -
MBA Highway PT. Pola S1 / 1988 /
19 Feasibility Study / DED National Assosiate
Indonesia, Engineer Agung Master Of
polajkt@hot Business
mail.com Administration
103
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

90. Ir. Berton


Siahaan S1 / 1987 /
Quality PT. Pola
Indonesia, Civil 27 Feasibility Study / DED National Full time
Surveyor Agung
polajkt@hot Enginnering
mail.com
91. Ir. Drs.
Sukarni
S1 / 1990 /
Ginting Highway PT. Pola
Civil 27 Feasibility Study / DED National Full time
Indonesia, Engineer Agung
Enginnering
polajkt@hot
mail.com
92. Muhammad
Arifin, ST S1 / 1994 /
Highway PT. Pola
Indonesia, Civil 23 Feasibility Study / DED National Full time
Engineer Agung
polajkt@hot Enginnering
mail.com
93.
Ir. Pramono
S1 / 1988 /
Indonesia, Highway PT. Pola
Civil 28 Feasibility Study / DED National Full time
polajkt@hot Engineer Agung
Enginnering
mail.com
94. Ir. Lanny
Hidayat Bridge S1 / 1992 /
PT. Pola Assosiate
Indonesia, engineeri Civil 35 Environment National
Agung
polajkt@hot ng Enginnering
mail.com

104
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

95. Dr. Ir.


Fauzri
S3 / 2001 - S2
Fahimmudin
Bridge PT. Pola / 1994 - S1 /
M.Eng 13 Feasibility Study / DED National Full time
Structure Agung 1987 / Civil
Indonesia,
Engineering
polajkt@hot
mail.com
96. Ir. M.
Zaenuri
S1 / 1990- S2 /
Arifin, MT Traffic PT. Pola
2008 / Civil 25 Feasibility Study / DED National Assosiate
Indonesia, Engineer Agung
Engineer
polajkt@hot
mail.com
97. Sukma National
Rahardian,
S1/2002 -
ST. MT Traffic PT. Pola
S2/2006 / Civil 15 Feasibility Study / DED Full time
Indonesia, Engineer Agung
Engineer
polajkt@hot
mail.com
98. Muhammad National
Isnaeni, ST,
S1 / 1997 - S2
MT. Traffic PT. Pola
/ 2001 / Civil 20 Feasibility Study / DED Full time
Indonesia, Engineer Agung
Engineer
polajkt@hot
mail.com
99. Heru S1 / 1995-S2 /
Kunadi PT. Pola 2000 -S3 /
Structure 19 Feasibility Study / DED National Full time
Indonesia, Agung 2004 Civil
polajkt@hot Engineer

105
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

mail.com

100. Ir. Eko


Buyung
Rahmad
PT. Pola S1 / 1996 /
Santoso Geodetic 18 Feasibility Study / DED National Full time
Agung Geodetic
Indonesia,
polajkt@hot
mail.com
101. Ir. Supono
Indonesia, Geotecnic PT. Pola S1 / 1984 /
30 Environment National Full time
polajkt@hot al Agung Geology
mail.com
102. Ir. Yom-yom
Hadiyanty
PT. Pola S1 / 1994 /
Indonesia, Planner 20 Feasibility Study / Environment National Full time
Agung Planology
polajkt@hot
mail.com
103. Prihadi Health
Utomo, ST Safety S1 / 1996 /
PT. Pola
Indonesia, and Civil 18 Feasibility Study / Environment National Full time
Agung
polajkt@hot Environm Enginnering
mail.com ent (HSE)
104. Ir. Agus Health
Subekti Safety S1 / 1993 /
PT. Pola
Indonesia, and Civil 21 Feasibility Study / DED National Full time
Agung
polajkt@hot Environm Enginnering
mail.com ent (HSE)

106
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

105. Drs. Marsidi


State
Indonesia, PT. Pola S1 / 1991 /
Administr 21 Feasibility Study / DED National Full time
polajkt@hot Agung Administration
ation
mail.com
106. Susana
Rahmi Yeni,
Financial/
SE PT. Pola S1 / 2004 /
Economis 23 Feasibility Study National Full time
Indonesia, Agung Economy
t
polajkt@hot
mail.com
107. Ir. Agus
Satimo S1 / 1996 /
Quality PT. Pola
Indonesia, Civil 18 Feasibility Study / Environment National Full time
Engineer Agung
polajkt@hot Engineering
mail.com
108. Ir. Djayadi
S1 / 1992 /
Indonesia, Quality PT. Pola
Civil 22 Feasibility Study National Full time
polajkt@hot Engineer Agung
Engineering
mail.com
109. Ali Imron,
Quality
ST S1 / 1996 /
Engineer / PT. Pola
Indonesia, Civil 18 Feasibility Study National Full time
Material Agung
polajkt@hot Engineering
Engineer
mail.com
110. Abdul
Wachid, ST S1 / 2007 /
Material PT. Pola
Indonesia, Civil 7 Feasibility Study National Full time
Spesialist Agung
polajkt@hot Engineering
mail.com
107
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Position Firm Educational No. of Details of Internationa Employment


Expert, likely to Qualifications years of Expertise/ Experience l or National Status with
Citizenshi be relevant Expert Firm (full-
p, Email, assigned/ experience time, or
Expertise other)

111. Pasrah
Pamuji, ST S1 / 2007 /
PT. Pola
Indonesia, Surveyor Civil 7 Environment National Full time
Agung
polajkt@hot Engineering
mail.com
112. Sylvia
Yuniar, ST S1 / 2009 /
PT. Pola
Indonesia, Surveyor Civil 5 Feasibility Study National Full time
Agung
polajkt@hot Engineering
mail.com
113. Rima
Ekawati,ST
Traffic PT. Pola S1 / 2016 /
Indonesia, 1 Feasibility Study National Full time
Engineer Agung Civil Engineer
polajkt@hot
mail.com

108
Accelerating Infrastructure Delivery through Better Engineering Services Project

Table 2: List of Experts in Table 1 with Experience in Indonesia


(Please provide the details of experience of the experts in Indonesia)

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

1. Prasetijo Adi 30 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a team leader for following projects:
 Supervision Consultancy Service on The Construction of Light Rail Transit (LRT) in South
Sumatera Province, 31 Oct 2016 - 14 Juli 2017
 Review Study of Toll Road Develompent Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan
2015 - 19 Aug 2015
 KPML's Road Infrastructure Development Technical Supervision Package 1 (stage 1), 16 Dec
2013 - 19 Sept 2014
 Traffic Analysis of Nusa Dua-Ngurah Rai-Benoa Highway Planning (Package-04), Jul 2012 - Des
2012
 Study of Traffic Engineering Planning Simpang Cikande, Tangerang-Merak Toll Road, Feb 2011
- Juni 2011
 Sea Transportation Planning Riau Island Province, Maret 2010 - Oct 2010
 Basid Design of Toll Road Bakauheni - Terbanggi Besar, Aug 2009 - Feb 2010
 Evaluation Traffic Study of JORR Toll Road, W1, Maret 2009 - Juli 2009
 Final Engineering Design Ciawi - Sukabumi Toll Road, Mei 2008 - Des 2008
 Toll Road Engineering Planning Kertosono - Mojokerto, Feb 2007 - Nov 2007
 DED of Serang Ring Road, Sept 2006 - Des 2006
 DED of Toll Road Gempol - Pasuruan 34 Km's, Feb 2005 - Aug 2005
 Final Engineering Desain Rest Area and On/Off Toll Road Jakarta – Cikampek – Sadang, Sept
2003 - Aug 2004
 Engineering Planning of Fly Over KiaraCondong and Soekarno Hatta, Bandung, Juni 2002 - Oct
2002
 Road Planning at West Java Province, Cirebon - Kuningan Segment, Jul 2001 - Des 2001
 Design and Construction Supervision of The Sumatra East Coast Highways Project, Feb 1999 -
March 2000
109
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

2. Apriyanto 10 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a pavement engineer for following projects:
 Study and Analysis Traffic at Ciawi - Sukabumi Toll Road, Client: Trans Jabar Tol, Sep 2015 - Juli
2016
 Road Engineering Planning, Bintuni - Wondama, Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
 Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
 Road Engineering Planning in Kupang District and TTS (PR-02 Package), Client : Directorate
General of Highways, SNVT Planning and Supervision of Roads and Bridges of NTT, August 2010
- December 2010
 Road Engineering Planning Package, Kenjeran, Surabaya, Client : SNVT P2JJ Metro Surabaya,
May 2009 - August 2009

3. Magdalena Idrus 23 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a bridge engineer for following projects:
 Review Study of Toll Road Development Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015
 Technical Assistance Sub Directorate of Highways and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
 Sangkariang's Bridge Engineering Planning, Suguh River, Kalianyar (Malang District) and
Bedadung River's Bridge Review Design (Jember District), Client : Welfare Core Cooperative
(KOPINKAN), January 2009 - March 2009
 Bridge Engineering Planning Spread in East Java South Cross (Paket-2), Client : Public Works
Office of Bina Marga East Java, June 2006 - October 2006
 Road and Bridge Engineering Planning Sayati - Palasari, Client : Bina Marga Bandung, June 2004
- October 2004

110
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

 Road Planning at West Java Province, Cirebon - Kuningan Segment, Jul 2001 - Des 2001
 Planning Access Road Ramp Ciawi, Jagorawi Toll Road, Client : PT. Jasa Marga (Persero),
August 2000 - October 2000
 Feasibility Study and EIA Jatiasih Toll Road - Cileungsi and Spur Spur Jagorawi, Client : PT. Jasa
Marga (Persero), December 1997 - April 1999
 Supervision of Road and Bridge in Inderalaya Segment - Kayu Agung, Client : P3TNAS South
Sumatera, August 1995 - May 1996
4. Luthfy Aziz Lubis 25 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a road engineer for following projects:
 Review Study of Toll Road Development Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015,Client: PT. Cipta Strada
 FS of Bridge at Sambas Besar River - Kalimantan, Client: PT. Wiraguna Tani West Kalimantan
Branch, Oct 2014 - Des 2014
 Road Engineering Palnning Bofuer-Bomberay, Client: PT. Laksana Desain Daya Cipta, Jul 2014 -
Oct 2014
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, March 2014 - Juni 2014
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sep 2013 - Des 2013
 Road Engineering Planning, Bintuni - Wondama, Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
 FS Access Road North Kalibaru Port (Tanjung Priok New Port), Client: Cipta Strada, Maret 2013 -
Mei 2013
 Traffic Survey for Indi II Sumatera and Java Project, Client: Dacrea Konsultan, Jan 2013 - Maret
2013
 Road Engineering Planning National Road on Jayapura 1 Region, Abepura-Arso-Waris Segments,
Client: Kogas Driyap Konsultan, Aug 2014 - Des 2014
 Road Engineering Planning Leger Data's for National Road of Gatentiri - Tanah Merah, Client:
Pillar Pusaka Inti, Apr - Aug 2014

111
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

 Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
 Special Handling of Road Avalanches in Nabire - Bedudipa Segment , Client: Kogas Driyap
Konsultan, April 2011 - Aug 2011
 Special Handling of Road Avalanches in Nabire - Bedudipa Segment , Client: Kogas Driyap
Konsultan, Jan 2011 - Apr 2011
 Road Engineering Planning Leger Data's for National Road of Jayapura, Client: Kogas Driyap
Konsultan, Aug 2010 - Des 2010
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Review Study of Toll Road Kunciran - Serpong - Bandar Soekarno Hatta, Client: Cipta Strada, Jan
- March 2010

5. Fatchi Handoyo 19 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked as
a hydrology engineer for following projects:

 Review Study of Toll Road Development Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015
 Technical Assistance Sub Directorate of Highways and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
 Regional Design and Supervision consultants-2 (RDSC-2) for Second Eastern Indonesia Region
Transport Project (EIRTP-2) Under IBRD Loan No. 4744-IND, Client : Directorate General of
Highways (Bina Marga), Technical Guidance Unit for Roads and Bridges, November 2006 -
October 2010
 Road and Bridge Engineering Planning in Lubuk Linggau, Client : Directorate General of Road,

112
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

Ministry of Public Works, September 2005 - December 2005


 Road Rehabilitation (Sector) Project Design and Field Team Consultants Under ADB LOAN
NO.1798-IND, Client : PT Jasa Marga (Persero), November 2003 - January 2004
 Road Planning at West Java Province, Cirebon - Kuningan Segment, Jul 2001 - Des 2001

6. Lubab 26 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a transport planner for following projects:
 Consultancy Service of Financing Scheme of Semarang-Batang Toll Road, Pandaan-Malang,
Balikpapan-Samarinda, and Manado-Bitung, Client: Mandiri Sekuritas, Aug 2016 - April 2017
 Study and Analysis Traffic at Ciawi - Sukabumi Toll Road, Client: Trans Jabar Tol, Sep 2015 - Juli
2016
 Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road, Jan
- March 2015
 Study Bali Mandara Toll Road Networking, Client: Jasa Marga Bali Tol, Oct 2014 - Desember 2014
 Technical Assistance Sub Directorate of Highways and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
 Traffic Study and Basic Design Toll Road Bogor Ring Road Sekci II B, Client: Marga Sarana Jabar
- Multhiphibeta, Jan 2013 - Juli 2013
 Traffic Study of Road Engineering Planning, Nusa Dua-Ngurah Rai-Benoa Toll Road (Paket-04),
Client: Waskita Karya, Jul 2012 - Des 2012
 Preparation of Masterplan of Marine Transportation of Kepulauan Riau Province
Riau Islands Province, Client: Bappeda Riau Island Province, Jul 2011 - Des 2011
 Engineering Consulting Service For Jakarta Mass Rapid Transit System Project Jakarta, Client:
JMEC-Wiratman, March 2010 - Jan 2011
 Basic Design Toll Road Bakauheni - Terbanggi Besar, Client: PU Bina Marga, Sept 2009 - Feb
2010
 Final Engineering Design Ciawi - Sukabumi Toll Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
 Intercodal Transportation Planning Study and Pedestrian System of Banda Aceh City, Client:

113
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

Qorina-BRR NAD Nias, Sep 2007 - Des 2007


 Detail Design Urip Soemaharjo Fly Over, Makasar, South Sulawesi, Client: Bina Marga, Aug 2006
- Des 2006
 Final Engineering Desain Rest Area and On/Off Toll Road Jakarta – Cikampek – Sadang, Sept
2003 - Aug 2004
 Road Planning at West Java Province, Cirebon - Kuningan Segment, Jul 2001 - Des 2001
 Design and Construction Supervision of The Sumatra East Coast Highways Project, Feb 1999 -
March 2000
7. Eko Prihriyadi 25 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
Subagyo a geodetic engineer for following projects:
 Technical Planning of Bojonegoro Regional Road, Client : Bina Marga and Irrigation Bandung,
March 2015 - September 2015
 Road Engineering Planning in 124 KM's Denpasar - Packages 12 (Bon Dalem/Tembok Village) -
Amlapura, Client : P2JN Bali, March 2013 - April 2013
 Review Study of Toll Road Kunciran - Serpong - Bandar Soekarno Hatta, Client: Cipta Strada,
Jan - March 2010
 Road Engineering Planning in Alor Island (PR-02 Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT Province, September 2007 - March 2008
 Road and Bridge Engineering Planning in Lubuk Linggau; Client : Directorate General of Road,
Ministry of Public Works, September 2005 - December 2005
 DED of Kulonprogo Fly Over (2), Kulonprogo District, Client : Directorate General of Road,
Ministry of Public Works, January 2004 - August 2004
 Road Planning at West Java Province, Cirebon - Kuningan Segment, Jul 2001 - Des 2001
 Design and Construction Supervision of The Sumatra East Coast Highways Project, Feb 1999 -
March 2000
 Engineering Design of Urban Bridge, Kupang and Manado, Binkot - Directorate General of
Highways, Sept 1996 - Mar 1997
8. Eko Suliyanto Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
20 as a cost and quantity engineer for following projects:

114
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

 Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
 Traffic Study and Basic Design Toll Road Bogor Ring Road Sekci II B, Client: Marga Sarana
Jabar - Multhiphibeta, Jan 2013 - Juli 2013
 Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
 Intercodal Transportation Planning Study and Pedestrian System of Banda Aceh City, Client:
Qorina-BRR NAD Nias, Sep 2007 - Des 2007
 Detail Engineering Design Special Bridge Busung and Kangboi, Client : Bina Marga Riau, July
2005 - February 2006
 Toll Road Technical Planning Cikampek - South Purwakarta - Pleret Segment's, Client : PT Jasa
Marga (Persero), October 2003 - September 2004
 Road Planning at West Java Province, Cirebon - Kuningan Segment, Jul 2001 - Des 2001
 Planning Access Road Ramp Ciawi, Jagorawi Toll Road, Client : PT. Jasa Marga (Persero),
August 2000 - October 2000

9. Wisnu Wibowo 30 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
as a geotechnical engineer for following projects:

 Technical Planning of Bojonegoro Regional Road, Client : Bina Marga and Irrigation Bandung,
March 2015 - September 2015
 Periodical Road and Bridge Technical Planning in Timika, Client : SKNVT Road Planning and
Supervision Province Papua, April 2014 - September 2014
 Bridge Technical Preparation, Client : SKNVT Road Planning and Supervision, July 2013 -
November 2013

115
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

 Road Engineering Planning Segment Maruni - Warmare - Prafi, Client : SKNVT Road Supervision
and Planning West Papua, August 2012 - December 2012
 Detail Engineering Design Cross Island I (Package 23/2011), Client : SNVT Road Supervision
and Planning Province Aceh, April 2011 - September 2011
 Bridge Engineering Planning Tirasai River, Client : SKNVT Road Supervision and Planning West
Papua, August 2010 - December 2010
 Road and Bridge Geitechnical Planning, Client : Publics Works Service, June 2009 - October
2009
 Bridge Engineering Planning Fly Over Jomin, Client : DPU Bina Marga, September 2007 -
December 2007
 Detail Engineering Design Special Bridge Busung and Kangboi, Client : Bina Marga Riau, July
2005 - February 2006
 Road and Bridge Engineering Planning Sayati - Palasari, Client : Bina Marga Bandung, June
2004 - October 2004
 Road Planning in East Kalimantan Province Package - 11 Road Sections Mensalong - Tau
Lumbis and Tau Lumbis - Long Bawan, Client : Directorate General of Regional Infrastructure of
the Department of Settlements and Regional Infrastructure, April 2003 - December 2003
 Road and Bridge Engineering Planning in Segment Jatibarang - Palimanan Stage I, Client :
Department of Settlement and Regional Infrastructure, January 2001 - November 2001

10. Dedi Tarmedi 11 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
as a contract document specialist for following projects:
 Review Study of Toll Road Develompent Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan 2015 -
19 Aug 2015
 Technical Assistance Sub Directorate of Highways and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
 Engineering Consulting Service For Jakarta Mass Rapid Transit System Project Jakarta, Client:
JMEC-Wiratman, March 2010 - Jan 2011
 Road and Bridge Geotechnical Planning, Client : Publics Works Service, June 2009 - October 2009

116
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

 Road Engineering Planning in Alor Island (PR-02 Package); Client : SNVT Planning and Supervision
of Roads and Bridges of NTT Province, September 2007 - March 2008
11. Tri Wanto Ardi 14 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
Wibawa as a road safety specialist for following projects:
 Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road, Jan
- March 2015
 Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
 FS Access Road North Kalibaru Port (Tanjung Priok New Port), Client: Cipta Strada, Maret 2013 -
Mei 2013
 Special Handling of Road Avalanches in Nabire - Bedudipa Segment , Client: Kogas Driyap
Konsultan, April 2011 - Aug 2011
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Final Engineering Design Ciawi - Sukabumi Toll Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
 Road Engineering Planning of Kapitu - Tumpaan Kapitu Tumpaan Location, Minahasa District
South Minahasa, Client : South Minahasa District Department of Public Works, September 2006 -
January 2007
 DED of Bridge - Pakckage 7, Client : Directorate General of Road, Ministry of Public Works,
January 2005 - June 2005
12. Maryoni 31 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
as a economic and financial analysis expert for following projects:

 Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
 Road Engineering Planning, Bintuni - Wondama, Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
 Traffic Study of Road Engineering Planning, Nusa Dua-Ngurah Rai-Benoa Toll Road (Paket-04),

117
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

Client: Waskita Karya, Jul 2012 - Des 2012


 Engineering Consulting Service For Jakarta Mass Rapid Transit System Project Jakarta, Client:
JMEC-Wiratman, March 2010 - Jan 2011
 Review Study of Toll Road Kunciran - Serpong - Bandar Soekarno Hatta, Client: Cipta Strada,
Jan - March 2010
 Road Engineering Planning in Alor Island (PR-02 Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT Province, September 2007 - March 2008
 Bridge Engineering Planning Fly Over Jomin, Client : DPU Bina Marga, September 2007 -
December 2007
 Information System in Sekayu and Lubuk Linggau, Client : Directorate General of Road, Ministry
of Public Works, July 2005 - September 2005
13. Sugih Jaya 28 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
as a procurement specialist for following projects:

 Review Study of Toll Road Development Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan


2015 - 19 Aug 2015,Client: PT. Cipta Strada
 Technical Assistance Sub Directorate of Highways and Urban Roads, Dit. Bina Teknik, Ditjen.
Bina Marga, Ministry of Public Works Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
 Traffic Study of Road Engineering Planning, Nusa Dua-Ngurah Rai-Benoa Toll Road (Paket-04),
Client: Waskita Karya, Jul 2012 - Des 2012
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Final Engineering Design Ciawi - Sukabumi Toll Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
 Road Engineering Planning of Kapitu - Tumpaan Kapitu Tumpaan Location, Minahasa District
South Minahasa, Client : South Minahasa District Department of Public Works, September 2006
- January 2007
 Toll Road Technical Planning Cikampek - South Purwakarta - Pleret Segment's, Client : PT
Jasa Marga (Persero), October 2003 - September 2004

118
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

 Design and Construction Supervision of The Sumatra East Coast Highways Project, Feb 1999 -
March 2000
 Engineering Design of Bridge Package 1, Semarang, Binkot-Directorate General of Highways,
Aug 1995 - Mar 1996
 Engineering Design of Road and Bridge, P3TNas-Directorate General of Highways, Lampung,
May 1993- Feb 1994
 Engineering Design of Bridge Package XI, West Kalimantan, P3TNas Kalbar - Directorate
General of Highways, Jul 1991- Nov 1991

14. Utari Dewi 29 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
as a institutional and legal specialist for following projects:

 Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
 Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Detail Engineering Design Special Bridge Busung and Kangboi, Client : Bina Marga Riau, July
2005 - February 2006
 Toll Road Technical Planning Cikampek - South Purwakarta - Pleret Segment's, Client : PT Jasa
Marga (Persero), October 2003 - September 2004
 Planning Access Road Ramp Ciawi, Jagorawi Toll Road, Client : PT. Jasa Marga (Persero),
August 2000 - October 2000
 Engineering Preparation Design of Road at the Location of Landslide and Preparation of Tender
Document Package 1, Jambi, Bintek - Directorate General of Highways, May 1998 - Mar 1999
 Engineering Design of Urban Bridge, Kupang and Manado, Binkot - Directorate General of
Highways, Sept 1996 - Mar 1997
15. Syakti Kirana Eka 34 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked

119
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

Sidharta as a social safeguards specialist for following projects:


 Review Study of Toll Road Development Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan
2015 - 19 Aug 2015
 Traffic Study and Basic Design Toll Road Bogor Ring Road Sekci II B, Client: Marga Sarana
Jabar - Multhiphibeta, Jan 2013 - Juli 2013
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Road Engineering Planning in Alor Island (PR-02 Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT Province, September 2007 - March 2008
 Road Rehabiltation (Sector) Project Design and Field Team Consultants Under ADB LOAN
NO.1798-IND, Client : PT Jasa Marga (Persero), November 2003 - January 2004
 Design and Construction Supervision of The Sumatra East Coast Highways Project, Feb 1999 -
March 2000
 Engineering Design Package II, Engineering Design of Road / Pulo Gadung Fly Over, Jakarta,
P3Tprop DKI - Public Works Jabotabek, Sept 1997 - Mar 1998
 Engineering Design of Urban Bridge, Kupang and Manado, Binkot - Directorate General of
Highways, Sept 1996 - Mar 1997
 Engineering Design of Bridge Package 1, Semarang, Binkot-Directorate General of Highways,
Aug 1995 - Mar 1996
 Engineering Design of Bridge in West Regional Package 1, DI Aceh, North Sumatera, Riau and
Jambi, Binkot - Directorate General of Highways, Aug 1994 - Jan 1995
 Engineering Design of Road and Bridge, P3TNas-Directorate General of Highways, Lampung,
May 1993- Feb 1994
 Engineering Design of Bridge Package IV, West Kalimantan, P3TNas Kalbar - Directorate
General of Highways, Nov 1992- Mar 1993
 Engineering Design of Bridge Package IV, West Kalimantan, P3TNas Kalbar - Directorate
General of Highways, May 1992 - Okt 1992
 Engineering Design of Bridge Total Length 350m, East Nusa Tenggara, P3TNas NTT -
Directorate General of Highways, Dec 1991 - Mar 1992

120
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

 Engineering Design of Bridge Package XI, West Kalimantan, P3TNas Kalbar - Directorate
General of Highways, Jul 1991- Nov 1991
 ADB 7 Supervision Project Link Dompu - Sila and Talabiu - Parado, in Dompu West Nusa
Tenggara, Directorate General of Highways, Apr 1990- Feb 1991
16. Achmad Widarto 26 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a environmental expert for following projects:
 Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
 Road Engineering Planning in 124 KM's Denpasar - Packages 12 (Bon Dalem/Tembok Village) -
Amlapura, Client : P2JN Bali, March 2013 - April 2013
 Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
 Road Engineering Planning in Alor Island (PR-02 Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT Province, September 2007 - March 2008
 Bridge Engineering Planning Spread in East Java South Cross (Paket-2), Client : Public Works
Office of Bina Marga East Java, June 2006 - October 2006
 DED of Bridge - Pakckage 7, Client : Directorate General of Road, Ministry of Public Works,
January 2005 - June 2005
 Technical Assistance For Second Road Rehabilitation Project, UNDER ADB LOAN NO. 3989 -
IND, Client : PT. Jasa Marga (Persero), April 2003 - January 2004
 Design and Construction Supervision of The Sumatra East Coast Highways Project, Feb 1999 -
March 2000

17. He has experience in, planning, design, programming, managing, monitoring, and supervising
construction of roads, flyovers and bridges (The Project is Detail Engineering Design (DED) Bali
Ir. Muhammad Proyek Jalan Tol Benoa-Kuta-Nusa Dua, Project DED Jalan Tol Seksi 1 (Ruas Bakauhuni –
28 Babatan) dan Seksi 3 (Ruas Tegineneng-Terbanggi Besar) pada Kegiatan Perencanaan
Ridwan, MSc
Pembangunan Jalan dan Jembatan, Dinas Pekerjaan Umum Propinsi Lampung Tahun
Anggaran 2009,etc)

121
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

18. He has responsible for carrying out all types of structural design especially fly over, bridge and
highway design related to road works (The Project is Improvement in Metropolitan and Large Cities
Ir. Sukris Santoso 32 Project (under JBIC Loan IP : 488) Package 2 : Suprapto Flyover and Pramuka Pemuda Flyover,
Project DED Perempatan Jalan Cibarusah Raya dan Jalan M.H. Thamrin Lippo Cikarang, etc)

19. He has experience in the design, construction and supervision of highways, fly over and bridges (The
Ir. Ganda Project is Rencana Perencanaan Jalan Lingkar Pantai dan UKL/UPL, Pekerjaan Detail Engineering
22
Sumekarjaya Design Jalan Sambaliung – Mataritif Kabupaten Berau Kaltim, etc)

20. He has Experience for carrying out all types of traffic analysis especially fly over, bridge and highway
Ir. Ganda design related to road works (The Project is Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol
22 Trans Sumatera Ruas Medan – Banda Aceh, Rencana Perencanaan Jalan Lingkar Pantai dan
Sumekarjaya
UKL/UPL, etc)

21. He has experience for carrying out all types ofhidrology and drainage works especially for fly over,
bridge and highway designrelated to road works (The Project is Proyek Penyusunan Dokumen teknis
Ir. Bunedi 18 Pembangunan lalan palu - p.arigi by pass, Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol
Trans Sumatera Ruas Medan – Banda, etc)

22. He has experience for carrying out all types of transport planning element especially related with fly
Ir. Hendra Ananda, over, bridge and highway works (The Project is Review Kajian dan Basic Design Busway Layang
20 Koridor 15 Pasar Minggu - Manggarai, Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol
ME
Trans Sumatera Ruas Medan – Banda, etc)

23. He has experience in the planning, design and implementation of road, flyover and bridge projects
Ir. Kharis Subarkah 12 (The Project is FS Jalan Nasional Lintas Tengah Pegunungan Papua, Detai Desain Ruas Toll Ciawi
Sukabumi Tahap 2, etc)

122
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

24. He has experiences in estimation of roads, flyovers and bridges projects with qualification in civil
engineering and relevant project experience in Indonesia (The Project is Pekerjaan Lanjutan
Pembangunan Gerbang Tol Tangerang 2 dan Gardu Satelit Meruya 1 Tahap II (Pelebaran Jalan dan
Ir. Yahmanto 31 PO Khusus di Km 19 + 000 B-GT, Tangerang Km 05 + 870 – 05 + 960 A pada Ruas Jalan Tol
Jakarta - Tangerang, Proyek Pekerjaan Scrapping dan Filling Aspal, Expansion Joint dan Marka
Jalan di Jalan Tol Ir. Wiyoto Wiyono, MSc. Ruas Cawang Interchange s/d Rawamangun, etc)

25. He has experinces in undertaking geotechnical surveys and investigations for road projectsthat
Elon Ahmadi comply with the DGH requirements ((The Project is Penyusunan Studi Kelayakan dan Desain Awal
12
Wiranta Jalan Tol Trans Sumatera Ruas Medan – Banda Aceh,etc)

26. He has experience in contract procurement philosophy and procedures currently used for civil works
Ir. Herold in Indonesia (The Project is Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol Trans
28
Hutagalung Sumatera Ruas Medan – Banda Aceh,etc)

27. He has experience in road safety issues in Indonesia and must have project experience with a wide
range of safety-related projects of government agencies (The Project is Review Design Jalan Tol
Widiyagung, SH 30 Lingkar Luar Jakarta Ruas W2 Utara (Kebon Jeruk-Ulujami), Rencana Teknik Akhir Pembangunan
Jalan Tol Semarang Seksi A (Krapyak – Jatingaleh), etc)

28. He has many experiences as economist and/or financial analyst in developing infrastructure projects.
He also has experience and understanding of economic and financial analyses of infrastructure
Eko Broto Budiarto, projects per government requirement and ADB standards (The Project is Project Jasa Konsultasi
12 Bantuan Teknik Pengadaan Tanah Ruas Jalan Tol Kunciran – Serpong Banten, Regional Project
ST
Management Consultant (RPMC) Region II South Sumatera. Rural Infrastruktur ndiri (RIS-PNPM)
ADB Loan 2249-INO (SF), etc)

123
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

29. He has experiences in procurement of goods, works and services as well as contract management of
infrastructure projects in accordance with Indonesian public procurement regulations (The Project is
Ateng Sunarya 30 Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol Trans Sumatera Ruas Medan – Banda
Aceh, etc)

30. He has more than 10 years of experiences in drafting contract agreements and in resolving legal
Maryana 20 issues in public procurements in Indonesia.

31.
He has 7 years working experience on project related social safeguards. He’s has experience on the
Irmani Indroyono 28 project social impacts consistent with the country’s (The Project is Penyusunan Studi Kelayakan dan
Desain Awal Jalan Tol Trans Sumatera Ruas Medan – Banda Aceh,etc)

32. She has many experiences in environmental science, engineering, and related field with experience
in overseeing environmental management plans of infrastructure projects, including Indonesia’s
Ir. Andi Yulianto 27 regulatory framework (The Project is Project DED Jalan Tol Dukungan Pemerintah, Final Engineering
Design CibitungCilincing Toll Road Project, etc)

33. He has responsible for carrying out all types of structural design especially fly over, bridge and
highway design related to road works (The Project is Improvement in Metropolitan and Large Cities
Ir. Muhwinardini 19 Project (under JBIC Loan IP : 488) Package 2 : Suprapto Flyover and Pramuka Pemuda Flyover,
Project DED Perempatan Jalan Cibarusah Raya dan Jalan M.H. Thamrin Lippo Cikarang, etc)

34. Mamik Radyantono,


23 Ahli Teknik Jalan - Utama
Ir, MT, Indonesia
35.
Dadan Rusli, ST ,
18 Ahli Teknik Jalan - Madya
MT, Indonesia

124
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

36. Houdman
Tambunan, Ir, MT, 19 Ahli Teknik Jalan - Utama
Indonesia
37. Agus Budi
Satriawan, Ir, 20 Ahli Teknik Jalan - Utama
Indonesia
38.
Abdurahman, Ir,
20 Ahli Teknik Jalan - Utama
Indonesia

39. Sabaruddin, Ir,


20 Ahli Teknik Jalan - Madya
Indonesia
40.
Asiano, Ir, Indonesia 25 Ahli Teknik Jalan-Utama
41. Houdman
Tambunan, Ir, MT, 21 Ahli Madya Pengawas
Indonesia
42. Edi Susanto,Ir, MT,
19 Ahli Teknik Jalan - Utama, Ahli Teknik Jembatan - Madya
Indonesia
43. M. Daud Nasution,
15 Ahli Teknik Jalan - Madya
ST, Indonesia
44. Bontor Rumahorbo,
20 Ahli Teknik Jalan - Madya
Ir, Indonesia
45.
Limin, Ir, Indonesia 22 Ahli Teknik Jalan - Madya

46.
Yandri Yalmi, Ir,
19 Ahli Madya Pengawas
Indonesia

125
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

47. Abdul Mutholib, Ir,


16 Ahli Teknik Jembatan - Madya
Indonesia
48. AS. Sulistyo, Ir,
20 Ahli Teknik Jembatan - Madya
Indonesia
49. M. Yazied, Ir,
20 Ahli Teknik Jembatan - Madya
Indonesia
50.
Haryanto, Ir, MT,
19 Ahli Teknik Irigasi - Muda
Indonesia

51. Rachman Syarief, Ir,


18 Ahli Teknik Jalan-Madya
Indonesia
52.
Mardijati, Ir,
20 Arsitek - muda
Indonesia

53. Irwin Bahar Rasyid,


19 Ahli Teknik Jalan - Utama
Ir, MT, Indonesia
54.
Bambang Gustiarso,
20 Ahli Teknik Jalan - Madya
Ir, Indonesia
55.
Jafar Rasyid, Ir,
19 Ahli Teknik Jalan - Madya
Indonesia
56.
Sugeng Bintoro, ST,
16 Ahli Teknik Jalan - Madya
Indonesia

126
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

57.
Gentur J, ST,
18 Ahli Teknik Jalan - Madya
Indonesia

58.
Tjarli, Ir, Indonesia 20 Ahli Teknik Jalan - Madya

59. Adi Paria Bardam, Ir,


19 Ahli Madya Pengawas
Indonesia
60. Achmad Mudawari,
29 Ahli Teknik Tenaga Listrik-Madya
Ir, MT., Indonesia
61. Dr.-Ing.Josia Irwan
Rastandi, ST., MT, 13 Ahli Teknik Bangunan Gedung - Utama
Indonesia
62. Ikyha Bavadal, Ir,
13 Ahli Geoteknik Madya
MT, Indonesia
63. Djoko Budi
Pramono, ST, 15 Ahli Teknik Lingkungan-Madya
Indonesia
64. Nurul Fadhlya H.
15 Ahli Teknik Lingkungan-Muda
S.Si, Indonesia
65. Zaidadin Razmel, Ir,
31 Ahli Teknik Mekanikal - Madya
Indonesia

127
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

66. Ir. Yohannes


Haryanto
26 Feasibility Study / DED
Indonesia
polajkt@hotmail.com
67. Ir. Sumarsono, MBA
Indonesia 19
polajkt@hotmail.com Feasibility Study / DED
68.
Ir. Yohannes
Haryanto
26 Feasibility Study / DED
Indonesia,
polajkt@hotmail.com

69.
Ir. Sumarsono, MBA
Indonesia, 19 Feasibility Study / DED
polajkt@hotmail.com

70.
Ir. Berton Siahaan
Indonesia, 27 Feasibility Study / DED
polajkt@hotmail.com
71. Ir. Drs. Sukarni
Ginting
27 Feasibility Study / DED
Indonesia,
polajkt@hotmail.com

128
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

72. Muhammad Arifin,


ST
23 Feasibility Study / DED
Indonesia,
polajkt@hotmail.com
73. Ir. Pramono
Indonesia, 28 Feasibility Study / DED
polajkt@hotmail.com
74. Ir. Lanny Hidayat
Indonesia, 35 Environment
polajkt@hotmail.com
75.
Dr. Ir. Fauzri
Fahimmudin M.Eng
13 Feasibility Study / DED
Indonesia,
polajkt@hotmail.com

76. Ir. M. Zaenuri Arifin,


MT
25 Feasibility Study / DED
Indonesia,
polajkt@hotmail.com
77. Sukma Rahardian,
ST. MT
15 Feasibility Study / DED
Indonesia,
polajkt@hotmail.com
78. Muhammad Isnaeni,
ST, MT.
20 Feasibility Study / DED
Indonesia,
polajkt@hotmail.com

129
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

79. Heru Kunadi


Indonesia, 19 Feasibility Study / DED
polajkt@hotmail.com
80. Ir. Eko Buyung
Rahmad Santoso
18 Feasibility Study / DED
Indonesia,
polajkt@hotmail.com
81. Ir. Supono
Indonesia, 30 Environment
polajkt@hotmail.com
82. Ir. Yom-yom
Hadiyanty
20 Feasibility Study / Environment
Indonesia,
polajkt@hotmail.com
83. Prihadi Utomo, ST
Indonesia, 18 Feasibility Study / Environment
polajkt@hotmail.com
84. Ir. Agus Subekti
Indonesia, 21 Feasibility Study / DED
polajkt@hotmail.com
85.
Drs. Marsidi
Indonesia, 21 Feasibility Study / DED
polajkt@hotmail.com

86. Susana Rahmi Yeni,


SE
23 Feasibility Study
Indonesia,
polajkt@hotmail.com
130
Accelerating Infrastructure Delivery through Better Engineering Services Project

S. No Name of Expert, No. of Details of


Citizenship, Email, years of Expertise/ Experience
relevant
experience

87.
Ir. Agus Satimo
Indonesia, 18 Feasibility Study / Environment
polajkt@hotmail.com
88. Ir. Djayadi
Indonesia, 22 Feasibility Study
polajkt@hotmail.com
89. Ali Imron, ST
Indonesia, 18 Feasibility Study
polajkt@hotmail.com
90. Abdul Wachid, ST
Indonesia, 7 Feasibility Study
polajkt@hotmail.com
91. Pasrah Pamuji, ST
Indonesia, 7 Environment
polajkt@hotmail.com
92.
Sylvia Yuniar, ST
Indonesia, 5 Feasibility Study
polajkt@hotmail.com
93. Rima Ekawati,ST
Indonesia, 1 Feasibility Study
polajkt@hotmail.com

131
Accelerating Infrastructure Delivery through Better Engineering Services Project

VII. EOI Attachments4


Refer to requirements specified under Section VI. Submission of Expressions of Interest and Annex-2
(Criteria for evaluation of EOIs) of the REOI to ensure that sufficient information is provided for
evaluation/prequalification purposes. Tentative list of the documents are prescribed hereunder (this is
NOT exhaustive). Also attach all other relevant documents.

SN Description
1 Certificate of Incorporation of the lead member
2 Certificate of Incorporation of the JV member (for each member) – 2a to 2e
3 JV Agreement, Power of Attorneys of JV Firms
4 Details of at least 5 Clients listed in B(iv) of Part VI
5 Lead firm’s audited financial statements for the last three (3) years showing positive net worth
and no qualified opinion by an independent auditor (If not required by the law of the lead firm’s
country, other financial statements acceptable to the IA)
6 ISO 9000 family of Quality Management certification of the lead firm and other JV firms – 6a to
6f
7 Information regarding experts/personnel available with the firm, joint venture partners and sub-
consultants (including access of pool of experts) highlighting the key qualifications and details
of similar experience of each expert (tabular form in the Tables prescribed in EOI template) –
Table 1
8 List of experts having experience in Indonesia – Table-2
9 Certificate that the key experts to be nominated for a call-down assignment shall be from the
list of experts provided at the empanelment stage – 9a to 9l
10 Details of experience of the firms (project summary) – 10a,10b,10c,10d,10e, 10f

VIII. Eligibility Declaration5

We, the undersigned, certify to the best of our knowledge and belief:

We have read the advertisement, including the terms of reference (TOR), for this assignment.

Neither the consulting firm nor its JV member or sub-consultant or any of its experts prepared the
TOR for this activity.

We confirm that the project references submitted as part of this EOI accurately reflect the
experience of the specified firm/consortium.

We further confirm that, if any of our experts is engaged to prepare the TOR for any ensuing
assignment resulting from our work product under this assignment, our firm, JV member or sub-
consultant, and the expert(s) will be disqualified from short-listing and participation in the
assignment.

4 There are no prescribed forms or formal requirements for the certifications mentioned in this section, as well as for
association documents or agreements among firms and association members. The firms may use the legal/formal
requirements applicable in the country/place of execution. It should be noted, however, that the association
agreements are not yet required during the EOI submission and evaluation. If the consortium is selected to be
included in the panel, the IA will require submission of these agreements along with other relevant documents, prior to
signing or amendment of the IDC.
5
Eligibility refers to ADB’s Guidelines on the Use of Consultants by Asian Development Bank and its Borrowers,
Clause 1.13 together with Clauses 1.10-1.11 and 1.23-1.25 on integrity and anti-corruption policies.

132
Accelerating Infrastructure Delivery through Better Engineering Services Project

All consulting entities and experts proposed in this EOI are eligible to participate in ADB-funded, -
supported and –administered activities.

The lead entity and JV member or sub-consultant are NOT currently sanctioned by ADB or other
MDBs. Neither the consulting firm nor the JV member or sub-consultant has ever been convicted
of an integrity-related offense or crime related to theft, corruption, fraud, collusion or coercion.

We understand that it is our obligation to notify ADB should any member of the consortium
become ineligible to work with ADB or other MDBs or be convicted of an integrity-related offense
or crime as described above.

JV member or sub-consultant, including all proposed experts named in this EOI, confirmed their
interest in this activity in writing.

JV member or sub-consultant, including all proposed experts named in this EOI, authorized us in
writing to represent them in expressing interest in this activity.

None of the proposed consortiums are subsidiaries of and/or dependent on the Executing Agency
or the Implementing Agency or individuals related to them.

We understand that any misrepresentations that knowingly or recklessly mislead, or attempt to


mislead may lead to the automatic rejection of the proposal or cancellation of the contract, if
awarded, and may result in further remedial action, in accordance with ADB’s Anticorruption
Policy.

Jakarta, August 18, 2017


Consortium of WAPCOS Limited

Rohit Mishra
Representative of the Consortium

133