Project - Irrigation Project Princess

Princes of Araguaia
Location: The project area is Local Geology: The
located in the region of the area belongs to the Peripheral
middle Araguaia, in the Depression of southern Pará,
municipality of Santana do where the Araguaia River
Araguaia in southern Pará, in floodplain has a more restricted,
northern Brazil, inserting itself corresponds to a stretch of old
between the parallel 9° 25' and geological basement of the
9º 30' south latitude and Tocantins Province and the
between the meridians 50º 10' Amazon craton. In the lower
and 50º 06' west longitude. It lies Project Goals: a rational
occupation of 30,000 ha, 15,000 parts there are the Cenozoic
at the confluence of the rivers sediments. The domain
ha on irrigated rice crops,
Araguaia and Campo Alegre, geomorphological site shows the
soybeans and corn and 15,000
being confined between the left ha, with livestock in system prevalenc
prevalence of plateaus and
bank of the Araguaia River and integration with crops of depressions, featuring a relief,
right bank of the Campo Alegre soybeans and corn. It is also generally very flat, but with
River. foreseen for the development of
several steps associated with
agro industries processing of the
products in place, especially cycles of erosion.
rice, soybean and maize.

The Project implementation


period is 05 years of forecasting Relief
Relief: The Araguaia River
at the end, the stabilization
floodplain have flat terrain with
achieved annual production of
slopes around 50 cm per km,
150,000 ton. grain and 60,000
which results in the rainy season
tons. beef.
the stagnation of the runoff of
Set in rural areas families
rainwater and consequent
through the creation of 500
Includes a geographical area of flooding of wetlands with clean
direct jobs and increase local
46,000 ha, whose currency is water. Every year the floods
income workers and contribute
starting to the south bordering dump sediment eroded from
to improving the quality of
extends along the Araguaia land in these areas and high
regional life.
River approximately 20 km until organic matter derived from
Supply the regional market, the
you reach the mouth of the river decompositions carried by the
market share of Brasilia - D. F.
Campo Alegre, by this rising in rivers.
and generate surpluses for
the east west direction for about export through the North - South
18 km, then angled almost railway, distant about 300 km of The meadows are interspersed
i
straight back in a north south the Project. with tears known as leaky, which
parallel to the Araguaia River. In are normally drains that connect
this sense covers approximately to rivers and wetlands but during
18 km and then search the east the period without rain they are
in the westbound starting point dry. They also have small hills
on the banks of the Araguaia. called mounds, formed by the
Is distant about 30 km from the annual floods through the
main city of the region, so-called remains of wood, trees and a
Santana do Araguaia, with road organic matter that roll with the
access in primary coating. flood waters.
Project - Irrigation Project Princess of Araguaia
reduced, because it uses up the
1,700 mm of rainfall, as well as
during the months April to
September, which coincides with
the dry period is used the
planting of soybeans and corn
that are less demanding of water
than rice and irrigation method is
the sub-irrigation with water only
fill the channels that feed the
Soil: Most soils in the water table.
Vegetation: savannah lowlands, was formed and is Annual Plan Cultivation: For
influenced by groundwater and Irrigation Project (15,000) will be
predominates (SAVANNAH) that two annual harvests, with the
by annual floods. They are
presents trees isolated from first planting in April with the
called hydromorphic soils with
each other and between them cultivation of soybeans and corn
patches of loam oxisol Plinthic,
the space is covered with with alternative also for
hydromorphic laterite of gray watermelon, pumpkin, sunflower
grasses of various species. Field
hydromorphic eutrophic. The and other varieties. After harvest
Clean are present in low areas
prominent skyline feature, of this season begins in
and wetlands, Camp Dirty where
texture averaged over 15%. The September rice cultivation,
it occur Trash (Curatella exclusively, to be harvested
sequence of horizons is A, B
americana), the Murici between January and March.
and C is thicker than 300 cm.
(Byrsonina Verbasafolia, Rich), For the Livestock Project
The presence of plinthita B
Pau de Arara (Salvertia Convalla (15,000 ago) integration with
horizon, shows the temporary crop year 3000 ha will be
Riodora) and other species.
saturation of the profile with planted in soybeans, corn and
Finally occur the Forest and
water. Are acidic soils that grass.
Savanna. The most common
require an average of 3 tons by.
species of the latter two are the
ha a limestone for the correction.
pequi, Pau Santo, Ipe, the
The soils of the uplands are the
Caraiba, the Sucupira the Cega
yellow oxisols, with sandy loam
Machado, the Pau Ferro, the
horizon to horizon and the red
Jatoba, the Landi and others.
oxisols clay-free sand.

1. INVESTMENTS
For Irrigation Project
Nº Discrimination Values in U$ %
1. Preliminary services 6,000,000.00 4%
2. Deforestation 13,500,000.00 9%
3. Earthworks 72,000,000.00 48%
4. Road System 4,500,000.00 3%
5. Water Works 27,000,000.00 18%
6. Pumping Stations 19,500,000.00 13%
7. Works of Art Special 2,250,000.00 1.5%
8. Tillage 4,500,000.00 3%
9. Complementary Works 750,000.00 0.5%
Water Resources for Total 150,000,000.00 100%
The values found for the internal rate (TIR), 10.27% rate of the benefit /
the Project: The cost (IBC), 1.64, and the Annual Income (rice and soybeans) about U $

Climate: According to the 56,000,000.00.


maximum flow demand, in the 2. For the livestock integrated farming project:
methodology Koeppen type driest month is 2.67 l / s / ha,
Nº Discrimination U$ For 15,000 ha %
1. Machinary & Implements 1,122.00 16,830,000.00 69.5%
climate is identified with AW (hot with the use of flood irrigation for 2. Conventional Tillage 345.00 5,175,000.00 21.3%
3. Lime&transport 149.00 2,235,000.00 9.2%
and humid megathermic): rice cultivation, which designed Total 24,240,000.00 100%
annual rainfall of about 1700 to serve 15,000 ha would require
The Economic Studies Project for this livestock tell the internal rate (TIR), 11:46%
and the rate of benefit / cost (IBC), 1.17, and the annual income (meat and

mm, average monthly 40 m³ / s of water to be captured


soybeans) about U $ 5,500,000.00

temperatures ranging between through 05 outlets of water along Contact: Eng. Oton
24 and 26 ° C, dry period in the the Araguaia River, which has in
Nascimento Júnior
Director President
quarter June to August, when the driest month minimum flow Fones: 55 62 3295-6055 / 55 62 8486-7878
the monthly total rainfall is less of 600 m³/s. However, for the 55 62 9959-1005
than 10 mm. e-mail: otonjr@onaengenharia.com.br
rainy months this demand is http://www.onaengenharia.com.br