table. The cost of a breakdown is $1,000 and the cost of preventive maintenance is
$1,250 per month. If preventive maintenance is performed, the probability of a
machine breakdown is negligible. Should the manager use preventive maintenance,
or would it be cheaper to repair the machine when it breaks down?
Number of breakdowns: 0 1 2 3
Year 1 2 3 4 5 6 7 8
Resale value 12000 950 750 570 420 3900 210 2000
0 0 0 0 0
Annual maintenance cost 600 800 105 140 210 3500 500 6800
0 0 0 0
Problem # 3: A firm is considering replacement of a machine, whose cost price is $12,200 and
the scrap value is $200. The running (maintenance and operating) costs are found from
experience to be as follows:
Year 1 2 3 4 5 6 7 8