KEGIATAN -
-
PEKERJAAN -
-
-
-
LOKASI -
TAHUN 2021
HARGA SATUAN
NO. URAIAN SATUAN
(RP)
1 2 3 4
A AGREGAT, BAHAN PEREKAT, dan BAHAN JADINYA 0.825
1 Tanah Urug m3 271,000.00 -
2 Tanah Subur m3 125,000.00 -
3 Pasir Urug m3 271,000.00 -
4 Pasir Pasang m3 285,000.00 -
5 Pasir Beton m3 300,000.00 -
6 Abu Batu m3 270,000.00 -
7 Kerikil m3 271,000.00 -
8 Batu Pecah Mesin 2/3 m3 308,000.00 -
9 Batu Pecah 5/7 m3 234,000.00 -
10 Batu Pecah 10/15 m3 249,000.00 -
11 Batu Belah Pondasi m3 249,000.00 -
12 Bata Ringan 100x200x600 m3 8,674.70 -
13 Portland Cement 50 Kg zak 75,000.00 -
14 Portland Cement kg 1,703.57 -
15 Semen Putih zak 92,000.00 -
16 Semen Warna kg 11,000.00 -
17 Sirtu m3 274,000.00 -
18 Beton Ready Mix Mutu K - 175 m3 948,000.00 -
19 Beton Ready Mix Mutu K - 225 m3 969,000.00 -
20 Beton Ready Mix Mutu K - 250 m3 979,000.00 -
21 Biaya Sewa Pompa Beton Ready Mix m3 500,000.00 -
22 Grass Blok Natural 8 cm m2 180,000.00 -
23 Paving Block Natural 6 cm m2 120,000.00 -
24 Kansteen Paving Block 5 x 10 x 15 bh 96,000.00 -
25 Kansteen Jalan 15 x 30 x 60, K-225 bh 96,000.00 -
26 U - Ditch 300x400x1200 bh 348,000.00 -
27 Graffel U 20 cm m1 750,000.00 -
28 Pagar Panel Beton 240.40.5 lbr 890,000.00 -
29 H-Beam, h = 260 cm btg 4,160,000.00 -
30 Biaya Pasang Pagar Panel Beton m2 75,000.00 -
31 Buis Beton Ø 30 cm berikut Galian dan Urugan Kembali m1 67,000.00 -
32 Batu Alam (Terpasang) m2 135,000.00 -
33 Rooster Beton 10x20 (Terpasang) bh 17,000.00 -
34 Pasang WaterStop m1 350,000.00 -
35 Batu Apung m3 316,000.00 -
36 Air L 3.50
D BAHAN ATAP
1 Rangka Atap Baja Ringan (Terpasang) m2 60,000.00
2 Genteng Beton Flat Warna Hitam Cisangkan bh 9,000.00
3 Nok Genteng Beton Cisangkan bh 21,000.00
4 List Plank GRC I = 30 cm m1 75,000.00
5 Alumunium Composite Panel 1.22x4.88 m lbr 550,000.00
6 Penutup Atap Zincalume (Terpasang) m2 350,000.00
7 Rockwool kg 5,000.00
8 Atap Bitumen Onduline Gelombang Motif Genteng 3 mm H.38 lbr 50,900.00
E KUSEN, PARTISI, dan ACCESSORIES 0.9 -
1 Kusen Alumunium Warna 4" Alexindo m1 125,000.00 -
2 Kusen Alumunium Warna 3" Alexindo m1 81,000.00 -
3 Daun Jendela Alumunium Warna Alexindo m1 660,000.00 -
4 Daun Pintu Alumunium Warna Alexindo m1 120,000.00 -
5 Panel Spandrel sek. Alexindo + Assesories m2 350,000.00 -
6 Jalusi Alumunium Warna m2 475,000.00 -
7 Kusen+Daun Pintu PVC Lengkap Engsel/Kunci unit 650,000.00 -
8 Kalsiboard 120 x 240 t = 6 mm ex DN lbr 87,000.00 -
9 Cubicle Ukuran 1,845x2,440, tebal 12 mm m2 730,000.00 -
10 Sealent bh 35,000.00 -
11 Path Lock set 25,000.00 -
12 Pull Handle psg 350,000.00 -
13 Floor Hinges set 980,000.00 -
14 geser Handle psg 150,000.00 -
15 Lever Handle psg 250,000.00 -
16 Tarikan Jendela Alumunium psg 85,000.00 -
17 Body Kunci+Cylinder set 125,000.00 -
18 Rambucis bh 78,000.00 -
19 Engsel Pintu psg 35,000.00 -
20 Engsel Pintu Besi (Engsel bubut) bh 56,000.00 -
21 Door Closer set 1,200,000.00 -
22 Engsel Casement psg 53,000.00 -
23 Kunci Pintu Double Slaag bh 75,000.00 -
24 Kunci Bulat KM/WC bh 25,000.00 -
25 Kunci Pintu besi bh 45,000.00 -
26 Kunci Slot 4" Stainless Steel Di Las bh 75,000.00 -
27 Gembok bh 115,000.00 -
28 Roda Pagar bh 150,000.00 -
29 Jendela Nako bh 75,000.00 -
30 Kunci Tanam bh 45,000.00 -
31 Kayu meranti batu, papan m3 9,400,000.00 -
32 Rell Pintu Geser bh 350,000.00 -
33 Karet Kusen m1 15,000.00 -
34 Plastik m2 100,000.00 -
35 Akrilik lbr 390,000.00 -
F BAHAN KACA
1 Kaca Es 5 mm ( ASAHI ) m2 129,800.00 -
2 Kaca Polos 5 mm ( ASAHI ) m2 118,000.00 -
3 Kaca Polos 8 mm ( ASAHI ) m2 350,000.00 -
4 Kaca Rayband 5 mm ( ASAHI ) m2 105,000.00 -
5 Kaca Patri Lokal Terpasang ( ASAHI ) m2 350,000.00 -
6 Kaca Polos 12 mm (ASAHI) m2 215,000.00 -
7 Kaca Tempered 12 mm Terpasang ( ASAHI ) m2 250,000.00 -
8 Kaca Tempered 8 mm ( ASAHI ) m2 225,000.00 -
9 Kaca Tempered 8 mm Lapis Sandblusting m2 265,000.00 -
10 Glass Block DN 20 x 20 bh 75,000.00 -
11 Pasang Jendela Kaca Curtaiwall Panasap Stopsol Silver Green + m2 1,200,000.00 -
Alumunium warna 4" (Terpasang)
12 Plat Alumunium Pb Timbal 3 mm m2 2,800,000.00 -
13 Kaca Pb 10 mm Lb 3,500,000.00 -
G BAHAN FLAPOND
1 Gypsum 120 x 240, t = 9 mm ex. DN lbr 125,000.00
2 GRC 4 mm, 120 x 240 lbr 95,000.00
3 List Profil Gypsum m1 15,000.00
4 List Profil Kayu m1 185,000.00
5 Drop Ceiling Flapond (Terpasang) m1 150,000.00
I BAHAN FINISHING
1 Plamir Tembok kg 20,000.00
2 Cat Tembok ICI Eksterior kg 42,000.00
3 Cat Tembok ICI Interior kg 32,000.00
4 Cat Kayu/Besi kg 31,000.00
5 Cat Tembok Vinilex kg 54,000.00
6 Cat Marka / Spotlight kg 45,000.00
7 Water Proofing Master Guard m2 120,000.00
8 Roll Cat bh 12,000.00
9 Kape Tembok bh 7,500.00
10 Kape Kayu bh 9,500.00
11 Prime Coat kg 15,000.00
12 Kwas 3" bh 5,000.00
13 Dempul Halus / Imfra (Wood Filler) kg 5,000.00
14 Terpentin ltr 7,500.00
15 Thiner A ltr 2,500.00
16 Thiner B ltr 3,500.00
17 Ampelas lbr 3,000.00
18 Dempul Kayu kg 19,000.00
19 Meni Kayu / Besi kg 31,000.00
20 Lem Putih FOX kg 87,000.00
21 Lem Kuning kg 105,000.00
22 Minyak bekisting ltr 62,000.00
23 Bahan Bakar Solar ltr 6,800.00
24 Minyak Pelumas ltr 7,500.00
25 Pasang Wallpaper + Border (Terpasang) m2 150,000.00
26 Pekerjaan depan megatik Meja finis Counter/melamik Pelayanan, kaca 6 mm bahan m' 1,500,000.00
lapistop sanblas table lapis green granit, dinding 1.5cm,
27 Gordeng Horizontal Blind (Terpasang) m2 350,000.00
28 Melamin Sending Siller MSS 123 kg 75,000.00
29 Lem Vinyl kg 105,000.00
J BAHAN PERPIPAAN
1 Pipa GIP Medium A Ø 1/2" ( 6 m1 ) btg 186,000.00
2 Pipa GIP Medium A Ø 3/4" ( 6 m1 ) btg 245,000.00
3 Pipa GIP Medium A Ø 1" ( 6 m' ) btg 376,000.00
4 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) btg 532,000.00
5 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) btg 557,000.00
6 Pipa GIP Medium A Ø 2" ( 6 m1 ) btg 781,000.00
7 Pipa GIP Medium B Ø 3" ( 6 m1 ) btg 1,310,000.00
8 Pipa GIP Medium B Ø 4" ( 6 m1 ) btg 1,878,000.00
9 Pipa Stainlesstell Ø 1/2" ( 6 m1 ) btg 151,000.00
10 Pipa Stainlesstell A Ø 3/4" ( 6 m1 ) btg 192,000.00
11 Pipa Stainlesstell A Ø 3", ( 6 m' ) btg 660,000.00
12 Pipa Stainlesstell A Ø 2,5", ( 6 m' ) btg 637,000.00
13 Pipa Stainlesstell A Ø 2" ( 6 m' ) btg 607,000.00
14 Pipa Stainlesstell A Ø 1" ( 6 m' ) btg 295,000.00
15 Pipa Stainlesstell A Ø 1 1/4" ( 6 m1 ) btg 457,000.00
16 Pipa Stainlesstell A Ø 1 1/2" ( 6 m1 ) btg 457,000.00
17 Pipa PVC Ø 15 mm S.10 m1 21,000.00
18 Pipa PVC Ø 20 mm S.10 m1 26,000.00
19 Pipa PVC Ø 25 mm S.10 m1 31,000.00
20 Pipa PVC Ø 32 mm S.10 m1 38,000.00
21 Pipa PVC Ø 40 mm S.10 m1 56,000.00
22 Pipa PVC Ø 50 mm S.10 m1 76,000.00
23 Pipa PVC Ø 63 mm S.12.5 m1 118,000.00
24 Pipa PVC Ø 75 mm S.12.5 m1 178,000.00
25 Pipa PVC Ø 90 mm S.12.5 m1 86,000.00
26 Pipa PVC Ø 110 mm S.12.5 m1 281,000.00
27 Pipa PVC Ø 140 mm S.12.5 + Pasang m1 448,000.00
28 Pipa BSP dia 4" m1 943,000.00
29 Pipa BSP dia 2" m1 607,000.00
K BAHAN MEKANIKAL
1 Stop Kran 3/4" KIT bh 43,000.00
2 Stop Kran 1" KIT bh 56,000.00
3 Check Valve 1/2" bh 75,000.00
4 Double Neple bh 85,000.00
5 Water Mur 1/2" bh 45,000.00
6 Gate Valve 1/2" bh 45,000.00
7 Kran Stainless Lokal Kait bh 70,000.00
8 Shower Dengan Tiang Setara san Ei bh 750,000.00
9 Shower Tanpa Tiang bh 350,000.00
10 Kran Tembok San Ei dia. 1/2" bh 35,000.00
11 Kran Tembok ITAP dia. 1/2" bh 54,000.00
12 Kran Bebek San Ei dia. 1/2" bh 75,000.00
13 Kran Bebek San ITAP dia. 1/2" bh 83,000.00
14 Washtafel Lengkap TOTO LW. 230 unit 880,000.00
15 Closet Jongkok Poslin Warna TOTO unit 350,000.00
16 Closet Jongkok Standard Putih Poslin TOTO unit 750,000.00
17 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 3,200,000.00
18 Washtafel Bulat Warna Standard Lengkap unit 650,000.00
19 Urinoir Lengkap TOTO Warna Standard lengkap unit 950,000.00
20 Penyekat Poslin Urinoir TOTO lbr 500,000.00
21 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh 3,500,000.00
22 Bak Mandi Fiberglass Standard Lokal bh 450,000.00
23 Roof Drain Stainless Stell 4" bh 145,000.00
24 Floor Drain Stainlessstell 2,5" bh 280,000.00
25 Tangki Air Kap. 1000 ltr unit 1,900,000.00
26 Pompa Air "Jet Pump" 250watt "SANYO" unit 4,500,000.00
27 Pemasangan Pipa PPR-PN10 dia. 20 mm m¹ 69,000.00
28 Pemasangan Pipa PPR-PN10 dia. 25 mm m¹ 75,000.00
29 Pemasangan Pipa PPR-PN10 dia. 32 mm m¹ 82,500.00
30 Pemasangan Pipa PPR-PN10 dia. 40 mm m¹ 95,600.00
31 Gate Valve Dia. 40 mm bh 75,000.00
32 Gate Valve Dia. 32 mm bh 75,000.00
33 Jet Washer bh 156,000.00
34 Paper Holder bh 150,000.00
35 Soap Holder bh 150,000.00
36 Pemasangan Bio Septictank Kapasitas 7 m³/hari Lengkap dengan Aksesories, Set 89,000,000.00
galian, pondasi dan Instalasi
37 Pekerjaan Pemasangan Pompa Transfer Kapasitas 100 liter/menit Head 60 meter unit 5,600,000.00
lengkap dengan Gate Valve, Strainer, Check Valv dan Aksesories
38 Pekerjaan pembuatan sumur Bor Minimal kedalam ± 45 Meter unit 8,500,000.00
39 Pekerjaan Pemsangan Pompa Zet Pump 1.5 kW lengkap dengan Gate Valve, unit 3,500,000.00
Strainer, Check Valv dan Aksesories Pendukung Lainnya
40 Pekerjaan Pemasangan Roof Tank Kapasitas 1 m³ unit 5,400,000.00
Lengkap dengan Gate Valve, Header dan aksesories lainnya -
41 Pekerjaan Pemasangan Pompa Booster 150 Watt lengkap dengan Gate Valve, unit 4,500,000.00
Strainer, Check Valv dan Aksesories Pendukung Lainnya
42 AC Split Wall Kapasitas 18.000 btu/h unit 4,500,000.00
43 AC Split Wall Kapasitas 24.000 btu/h unit 5,400,000.00
44 AC Ceilling Cassete Kapasitas 35.830 btu/h unit 8,900,000.00
45 Pemasangan Ex-haust Fan unit 600,000.00
46 AC Split Wall Kapasitas 12.000 btu/h unit 3,800,000.00
47 Pemasangan alat pemadam api kapasitas 6 Kg bh 1,890,000.00
48 Water Drain set 2,300,000.00
49 Seal Tape bh 5,000.00
50 Knee Pipa Udara 1,5" bh 3,500.00
O TANAMAN
1 Tanaman Rumput Gajah m2 85,000.00
2 Tanaman Pohon Mangga t.2m phn 350,000.00
3 Tanaman Pohon Palm Raja t.3m phn 375,000.00
4 Tanaman Pohon Keras/Pelindung tinggi batang 3.m phn 500,000.00
5 Semboja Bali Tinggi batang keras 3m (warna merah, Putih & kuning) phn 750,000.00
6 Tanaman Kecil t. 50 cm (pareasi) phn 25,000.00
Depok, 2021
DAFTAR HARGA SATUAN DASAR UPAH
KEGIATAN -
-
PEKERJAAN -
-
-
-
LOKASI -
TAHUN 2021
HARGA SATUAN
NO. URAIAN SATUAN
(RP)
1 2 3 4
1 Pekerja Orang / Hari 125,000.00
2 Tukang Batu Orang / Hari 150,000.00
3 Kepala Tukang batu Orang / Hari 160,000.00
4 Tukang Kayu Orang / Hari 150,000.00
5 Kepala Tukang Kayu Orang / Hari 160,000.00
6 Tukang Besi Profil / Tukang Las Orang / Hari 150,000.00
7 Kepala Tukang Besi Profil / Tukang Las Orang / Hari 160,000.00
8 Tukang Besi Beton Orang / Hari 150,000.00
9 Kepala Tukang Besi Beton Orang / Hari 160,000.00
10 Tukang Cat Orang / Hari 150,000.00
11 Kepala Tukang Cat Orang / Hari 160,000.00
12 Tukang Gali Orang / Hari 150,000.00
13 Kepala Tukang Gali Orang / Hari 160,000.00
14 Tukang Pipa Orang / Hari 150,000.00
15 Kepala Tukang Pipa Orang / Hari 160,000.00
16 Mandor Orang / Hari 180,000.00
17 Operator Orang / Hari 180,000.00
18 Pembantu Operator Orang / Hari 125,000.00
19 Supir Truk Orang / Hari 160,000.00
20 Kenek Truk Orang / Hari 125,000.00
21 Upah Pasang Instalasi Lampu Titik 150,000.00
22 Sewa Excavator jam 470,000.00
23 Upah Pasang Instalasi Stop Kontak Titik 150,000.00
14 Tukang Listrik Orang / Hari 150,000.00
15 Kepala Tukang Listrik Orang / Hari 160,000.00
Depok, 2021
ANALISA HARGA SATUAN PEKERJAAN PINTU, JENDELA, dan PARTISI
yang 1,115 M
###
Tenaga Kerja : ###
5.0000 oh Pekerja 125,000.00 625,000.00 625,000.00
0.2500 oh Mandor 180,000.00 45,000.00 45,000.00
Sub Jumlah : 670,000.00
Keuntungan Max. 10% : 67,000.00
Jumlah : 737,000.00
Dibulatkan : 737,000.00
2 PAGAR SEMENTARA DARI SENG GELOMBANG, h = 2 m M1 ###
Tenaga Kerja :
0.4000 oh Pekerja 125,000.00 50,000.00 50,000.00
0.2000 oh Tukang Kayu 150,000.00 30,000.00 30,000.00
0.0200 oh Kepala Tukang Kayu 160,000.00 3,200.00 3,200.00
0.0200 oh Mandor 180,000.00 3,600.00 3,600.00
Bahan :
1.0000 lbr Seng gelombang, BJls 25 162,000.00 162,000.00 162,000.00
1.2500 btg Dolken kayu dia 8 - 10/400 cm 85,000.00 106,250.00 106,250.00
0.0720 M3 Kayu 5/7 2,000,000.00 144,000.00 144,000.00
0.0600 kg Paku biasa 2" - 5" 16,000.00 960.00 960.00
0.4500 kg Meni besi 31,000.00 13,950.00 13,950.00
Sub Jumlah : 513,960.00
Keuntungan Max. 10% : 51,396.00
Jumlah : 565,356.00
Dibulatkan : 565,300.00
3 PEMBUATAN DIREKSI KEET M2 ###
Tenaga Kerja :
2.0000 oh Pekerja 125,000.00 250,000.00 250,000.00
ANALISA HARGA SATUAN PEKERJAAN
yang 1,115 M
PEKERJAAN : I. STRUKTUR
II. ARSITEK
TAHUN : 2020
1 2 3 4 5 6=5X3
A PEKERJAN PERSIAPAN
Tahun 2021
1 2 3 4 5 6 = 5X3 1 2 3 4 5 6 7 1 2 3 4 5 6 7
A PEKERJAN PERSIAPAN WAKTU PELAKSANAAN
14 HARI KERJA
101
1 Persiapan 1.00 ls 700,000.00 700,000.00 1.55 1.55
81
B PEKERJAAN DINDING
1 Pekerjaan Pasang Alumunium 88.00 m' 277,270.00 24,399,760.00 53.90 8.98 8.98 8.98 8.98 8.98 8.98
61
2 Pekerjaan Pasang dinding gypsum 10.00 m2 284,000.00 2,840,000.00 6.27 1.57 1.57 1.57 1.57
3 Pekerjaan Pasang dinding Akrilik 20.00 m2 401,200.00 8,024,000.00 17.72 2.95 2.95 2.95 2.95 2.95 2.95
41
4 Pekerjaan Pengecatan dinding interior 20.00 m2 50,100.00 1,002,000.00 2.21 0.55 0.55 0.55 0.55
C 21
PEKERJAAN PINTU
1 Pekerjaan pasang pintu alumunium 2.00 unit 4,152,800.00 8,305,600.00 18.35 3.06 3.06 3.06 3.06 3.06 3.06
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Hasyim Azhari
PERSIAPAN BH TB
Pengukuran 6.6 4.6 11.2
JUMLAH 11.2
PEKERJAAN DINDING
Pasang dinding alumunium 63.7 63.7
Pasang dinding gypsum 10 4 14
Pasang dinding plastik 11.5 7.5 4 23
Pengecatan dinding Interior 28
JUMLAH 128.7