DAFTAR UPAH KERJA

VOLUME HARGA
NO TENAGA KERJA KET
SATUAN (Rp.)
1 Mandor Oh 55,000.00
2 Kepala Tukang Oh 55,000.00
3 Tukang Kayu Oh 50,000.00
4 Tukang Batu Oh 50,000.00
5 Tukang Besi Oh 50,000.00
6 Tukang Cat Oh 50,000.00
7 Pekerja Oh 32,500.00

DAFTAR HARGA BAHAN


HARGA
NO. BAHAN SATUAN KET
(Rp.)
1 Kayu Balok Klas II (Uru, Kondongio, Kalapi) m3 1,200,000.00
2 Kayu Papan Klas II (Uru,Kondongio,Kalapi) m3 1,200,000.00
3 Kayu Balok Klas II (Bitti) m3 1,200,000.00
4 Kayu Papan Klas II (Bitti) m3 1,200,000.00
5 Kayu Balok Klas III m3 900,000.00
6 Pasir Urug m3 150,000.00
7 Sirtu m3 100,000.00
8 Batu Kali m3 110,000.00
9 Semen Portland Kg 6,250.00
10 Pasir Pasangan m3 200,000.00
11 Paku Biasa Kg 28,000.00
12 Minyak Cat Kg 60,000.00
13 Kawat Ram m 40,000.00
14 Pasir Beton m3 200,000.00
15 Kerikil Beton m3 200,000.00
16 Seng Gelombang BJLS 20 kk 12,000.00
17 Seng Plat Lbr 75,000.00
18 Beugel U Bh 19,500.00
19 Beugel T Bh 19,500.00
20 Baut 12-15cm Bh 7,000.00
21 Besi Strip Kg 8,550.00
22 Kloset Jongkok Global Bh 390,000.00
23 Pipa PVC Dia. 3/4" M 16,000.00
24 Pipa PVC Dia. 4" M 30,625.00
25 Kunci Tanam Biasa 2 Slag Bh 85,000.00
26 Kunci Tanam 2 Slag Bh 90,000.00
27 Engsel Pintu Pcs 12,050.00
28 Engsel Jendela Pcs 9,500.00
29 Kait Angin Bh 2,000.00
30 Grendel Pintu Bh 5,500.00
31 Grendel Jendela Bh 3,500.00
32 Cat Tembok Metrolite Kg 24,000.00
33 Cat Kayu Apian Kg 40,000.00
34 Cat Seng (Nippon Paint) Kg 70,000.00
35 Cat Meni Kg 15,000.00
36 Seal Tape bh 2,200.00

Masamba, 2009
Konsultan Perencana
CV. BALAWANG
SYAHRUM, ST
Direktur
ANALISA BIAYA KONSTRUKSI

A2 1 M3 Galian Tanah Biasa


- Pekerja 0.400 Oh X Rp 32,500.00 = Rp 13,000.00
- Mandor 0.040 Oh X Rp 55,000.00 = Rp 2,200.00
= Rp 15,200.00
A3 1 M3 Urugan Kembali
- Pekerja 0.192 Oh X Rp 32,500.00 = Rp 6,240.00
- Mandor 0.019 Oh X Rp 55,000.00 = Rp 1,056.00
= Rp 7,296.00
A4 1 M3 Urugan Pasir
- Pasir Urug 1.200 m3 X Rp 150,000.00 = Rp 180,000.00
- Sirtu 1.200 m3 X Rp 100,000.00 = Rp 120,000.00
- Pekerja 0.300 Oh X Rp 32,500.00 = Rp 9,750.00
- Mandor 0.010 Oh X Rp 55,000.00 = Rp 550.00
Pasir Urug = Rp 190,300.00
Sirtu = Rp 130,300.00
A5 1 M3 Pasangan Pondasi Batu Kosong
- Batu Kali 1.200 m3 X Rp 110,000.00 = Rp 132,000.00
- Pasir Urug 0.300 m3 X Rp 150,000.00 = Rp 45,000.00
- Pekerja 0.780 Oh X Rp 32,500.00 = Rp 25,350.00
- Tukang Batu 0.390 Oh X Rp 50,000.00 = Rp 19,500.00
- Kepala Tukang 0.039 Oh X Rp 55,000.00 = Rp 2,145.00
- Mandor 0.039 Oh X Rp 55,000.00 = Rp 2,145.00
= Rp 226,140.00
A6 1 M3 Pasangan Pondasi Batu Kali 1 Pc : 4 Ps
- Batu Kali 1.100 m3 X Rp 110,000.00 = Rp 121,000.00
- Semen Portland 163.000 Kg X Rp 6,250.00 = Rp 1,018,750.00
- Pasir Pasangan 0.520 m3 X Rp 200,000.00 = Rp 104,000.00
- Pekerja 1.500 Oh X Rp 32,500.00 = Rp 48,750.00
- Tukang Batu 0.600 Oh X Rp 50,000.00 = Rp 30,000.00
- Kepala Tukang 0.060 Oh X Rp 55,000.00 = Rp 3,300.00
- Mandor 0.075 Oh X Rp 55,000.00 = Rp 4,125.00
= Rp 1,329,925.00
A7 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm
- Semen Portland 5.200 Kg X Rp 6,250.00 = Rp 32,500.00
- Pasir Pasangan 0.020 m3 X Rp 200,000.00 = Rp 4,000.00
- Pekerja 0.200 Oh X Rp 32,500.00 = Rp 6,500.00
- Tukang Batu 0.150 Oh X Rp 50,000.00 = Rp 7,500.00
- Kepala Tukang 0.015 Oh X Rp 55,000.00 = Rp 825.00
- Mandor 0.010 Oh X Rp 55,000.00 = Rp 550.00
= Rp 51,875.00
A8 1 M3 Pasang Kusen Pintu dan Jendela Kayu
- Kayu Klas II 1.100 m3 X Rp 1,200,000.00 = Rp 1,320,000.00
- Pekerja 6.000 Oh X Rp 32,500.00 = Rp 195,000.00
- Tukang Kayu 20.000 Oh X Rp 50,000.00 = Rp 1,000,000.00
- Kepala Tukang 2.000 Oh X Rp 55,000.00 = Rp 110,000.00
- Mandor 0.300 Oh X Rp 55,000.00 = Rp 16,500.00
= Rp 2,641,500.00
A9 1 M2 Pasang Pintu Panel
- Kayu Papan Klas II 0.040 m3 X Rp 1,200,000.00 = Rp 48,000.00
- Pekerja 1.000 Oh X Rp 32,500.00 = Rp 32,500.00
- Tukang Kayu 2.500 Oh X Rp 50,000.00 = Rp 125,000.00
- Kepala Tukang 0.250 Oh X Rp 55,000.00 = Rp 13,750.00
- Mandor 0.050 Oh X Rp 55,000.00 = Rp 2,750.00
= Rp 222,000.00
A10 1 M2 Pasang Jalusi Kusen
- Kayu Klas II 0.060 m3 X Rp 1,200,000.00 = Rp 72,000.00
- Paku Biasa 1/2 " - 1 " 0.150 Kg X Rp 28,000.00 = Rp 4,200.00
- Pekerja 0.500 Oh X Rp 32,500.00 = Rp 16,250.00
- Tukang Kayu 2.000 Oh X Rp 50,000.00 = Rp 100,000.00
- Kepala Tukang 0.200 Oh X Rp 55,000.00 = Rp 11,000.00
- Mandor 0.025 Oh X Rp 55,000.00 = Rp 1,375.00
= Rp 204,825.00
A11 1 M3 Pasang Konstruksi Kuda - Kuda Kayu
- Kayu - Balok 1.100 m3 X Rp 1,200,000.00 = Rp 1,320,000.00
- Besi Strip 15.000 Kg X Rp 8,550.00 = Rp 128,250.00
- Paku Biasa 2 " - 5 " 0.800 Kg X Rp 28,000.00 = Rp 22,400.00
- Pekerja 4.000 Oh X Rp 32,500.00 = Rp 130,000.00
- Tukang Kayu 12.000 Oh X Rp 50,000.00 = Rp 600,000.00
- Kepala Tukang 1.200 Oh X Rp 55,000.00 = Rp 66,000.00
- Mandor 0.200 Oh X Rp 55,000.00 = Rp 11,000.00
= Rp 2,277,650.00
A13 1 M2 Pasang Rangka Langit - Langit
- Kayu - Balok Klas III 0.012 m3 X Rp 900,000.00 = Rp 10,800.00
- Paku Biasa 2 " - 5 " 0.100 Kg X Rp 28,000.00 = Rp 2,800.00
- Pekerja 0.150 Oh X Rp 32,500.00 = Rp 4,875.00
- Tukang Kayu 0.250 Oh X Rp 50,000.00 = Rp 12,500.00
- Kepala Tukang 0.025 Oh X Rp 55,000.00 = Rp 1,375.00
- Mandor 0.075 Oh X Rp 55,000.00 = Rp 4,125.00
= Rp 36,475.00
A14 1 M1 Pasang Papan Lisplang
- Kayu - Papan 0.0086 m3 X Rp 1,200,000.00 = Rp 10,320.00
- Paku Biasa 2 " - 5 " 0.060 Kg X Rp 28,000.00 = Rp 1,680.00
- Pekerja 0.100 Oh X Rp 32,500.00 = Rp 3,250.00
- Tukang Kayu 0.100 Oh X Rp 50,000.00 = Rp 5,000.00
- Kepala Tukang 0.010 Oh X Rp 55,000.00 = Rp 550.00
- Mandor 0.050 Oh X Rp 55,000.00 = Rp 2,750.00
= Rp 23,550.00
A16 1 M3 Membuat Beton Tumbuk 1 Pc, 3 Ps, 5 Kr
- Semen Portland 218.000 kg X Rp 6,250.00 = Rp 1,362,500.00
- Pasir Pasangan 0.520 m3 X Rp 200,000.00 = Rp 104,000.00
- Kerikil Beton 0.870 m3 X Rp 200,000.00 = Rp 174,000.00
- Pekerja 1.6500 Oh X Rp 32,500.00 = Rp 53,625.00
- Tukang Batu 0.2500 Oh X Rp 50,000.00 = Rp 12,500.00
- Kepala Tukang 0.0250 Oh X Rp 55,000.00 = Rp 1,375.00
- Mandor 0.0800 Oh X Rp 55,000.00 = Rp 4,400.00
= Rp 1,712,400.00
A19 1 M2 Pasang Atap Seng Gelombang
- Seng Gelombang 0.700 Lbr X Rp 84,000.00 = Rp 58,800.00
- Paku Seng 0.020 Kg X Rp 28,000.00 = Rp 560.00
- Pekerja 0.120 Oh X Rp 32,500.00 = Rp 3,900.00
- Tukang Kayu 0.060 Oh X Rp 50,000.00 = Rp 3,000.00
- Kepala Tukang 0.006 Oh X Rp 55,000.00 = Rp 330.00
- Mandor 0.006 Oh X Rp 55,000.00 = Rp 330.00
= Rp 66,920.00
A20 1 M1 Pasang Atap Nok Seng
- Seng Plat 0.300 Lbr X Rp 75,000.00 = Rp 22,500.00
- Paku Seng 0.040 Kg X Rp 28,000.00 = Rp 1,120.00
- Pekerja 0.150 Oh X Rp 32,500.00 = Rp 4,875.00
- Tukang Kayu 0.070 Oh X Rp 50,000.00 = Rp 3,500.00
- Kepala Tukang 0.008 Oh X Rp 55,000.00 = Rp 440.00
- Mandor 0.006 Oh X Rp 55,000.00 = Rp 330.00
= Rp 32,765.00
A24 1 Bh Pasangan Kunci Tanam 2 Slag
- Kunci Tanam Biasa 1.000 Bh X Rp 90,000.00 = Rp 90,000.00
- Pekerja 0.010 Oh X Rp 32,500.00 = Rp 325.00
- Tukang Kayu 0.500 Oh X Rp 50,000.00 = Rp 25,000.00
- Kepala Tukang 0.010 Oh X Rp 55,000.00 = Rp 550.00
- Mandor 0.005 Oh X Rp 55,000.00 = Rp 275.00
= Rp 116,150.00
A25 1 Bh Pasangan Engsel Pintu
- Engsel Pintu 1.000 Bh X Rp 12,050.00 = Rp 12,050.00
- Pekerja 0.015 Oh X Rp 32,500.00 = Rp 487.50
- Tukang Kayu 0.150 Oh X Rp 50,000.00 = Rp 7,500.00
- Kepala Tukang 0.015 Oh X Rp 55,000.00 = Rp 825.00
- Mandor 0.00075 Oh X Rp 55,000.00 = Rp 41.25
= Rp 20,903.75
A33 1 Bh Pasangan Kloset jongkok
- Kloset Jongkok 1.000 Bh X Rp 390,000.00 = Rp 390,000.00
- Semen Portland 6.000 Kg X Rp 6,250.00 = Rp 37,500.00
- Pasir Pasang 0.010 m3 X Rp 200,000.00 = Rp 2,000.00
- Pekerja 1.000 Oh X Rp 32,500.00 = Rp 32,500.00
- Tukang Batu 1.500 Oh X Rp 50,000.00 = Rp 75,000.00
- Kepala Tukang 1.500 Oh X Rp 55,000.00 = Rp 82,500.00
- Mandor 0.160 Oh X Rp 55,000.00 = Rp 8,800.00
= Rp 628,300.00
A34 1 M1 Memasang Pipa PVC diameter 3/4"
- Pipa PVC 1.000 M X Rp 16,000.00 = Rp 16,000.00
- Perlengkapan 35 % dari harga Pipa = Rp 5,600.00
- Pekerja 0.036 Oh X Rp 32,500.00 = Rp 1,170.00
- Tukang Batu 0.060 Oh X Rp 50,000.00 = Rp 3,000.00
- Kepala Tukang 0.006 Oh X Rp 55,000.00 = Rp 330.00
- Mandor 0.002 Oh X Rp 55,000.00 = Rp 99.00
= Rp 26,199.00
A35 1 M1 Memasang Pipa PVC diameter 4"
- Pipa PVC 1.000 M X Rp 30,625.00 = Rp 30,625.00
- Perlengkapan 35 % dari harga Pipa = Rp 10,718.75
- Pekerja 0.081 Oh X Rp 32,500.00 = Rp 2,632.50
- Tukang Batu 0.135 Oh X Rp 50,000.00 = Rp 6,750.00
- Kepala Tukang 0.014 Oh X Rp 55,000.00 = Rp 742.50
- Mandor 0.004 Oh X Rp 55,000.00 = Rp 225.50
= Rp 51,694.25
A39 1 M2 Pengecetan Bidang Kayu Baru
- Cat Meni 0.200 Kg X Rp 15,000.00 = Rp 3,000.00
- Minyak Cat 0.150 Kg X Rp 60,000.00 = Rp 9,000.00
- Cat Penutup 2 Kali 0.260 Kg X Rp 40,000.00 = Rp 10,400.00
- Pekerja 0.070 Oh X Rp 32,500.00 = Rp 2,275.00
- Tukang Cat 0.009 Oh X Rp 50,000.00 = Rp 450.00
- Kepala Tukang 0.006 Oh X Rp 55,000.00 = Rp 330.00
- Mandor 0.0025 Oh X Rp 55,000.00 = Rp 137.50
= Rp 25,592.50
A40 1 M2 Pengecetan Dinding Papan
- Cat Dasar 0.100 Kg X Rp 24,000.00 = Rp 2,400.00
- Cat Penutup 2 Kali 0.260 Kg X Rp 24,000.00 = Rp 6,240.00
- Pekerja 0.200 Oh X Rp 32,500.00 = Rp 6,500.00
- Tukang Cat 0.063 Oh X Rp 50,000.00 = Rp 3,150.00
- Kepala Tukang 0.0063 Oh X Rp 55,000.00 = Rp 346.50
- Mandor 0.0025 Oh X Rp 55,000.00 = Rp 137.50
= Rp 18,774.00
A41 1 M2 Pengecetan Permukaan Baja Lapis Seng (Galbani) Secara Manual sistem 1 Lapis cat mutakhir dengan tebal
200 um
- Cat 0.300 Kg X Rp 70,000.00 = Rp 21,000.00
- Pekerja 0.006 Oh X Rp 32,500.00 = Rp 195.00
- Tukang Cat 0.060 Oh X Rp 50,000.00 = Rp 3,000.00
- Kepala Tukang 0.012 Oh X Rp 55,000.00 = Rp 660.00
- Mandor 0.006 Oh X Rp 55,000.00 = Rp 330.00
= Rp 25,185.00
A47 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm
- Semen Portland 8.520 Kg X Rp 6,250.00 = Rp 53,250.00
- Pasir Pasangan 0.017 m3 X Rp 200,000.00 = Rp 3,400.00
- Pekerja 0.200 Oh X Rp 32,500.00 = Rp 6,500.00
- Tukang Batu 0.150 Oh X Rp 50,000.00 = Rp 7,500.00
- Kepala Tukang 0.015 Oh X Rp 55,000.00 = Rp 825.00
- Mandor 0.0100 Oh X Rp 55,000.00 = Rp 550.00
= Rp 72,025.00
A48 1 M2 Lantai Ploor 1 Pc : 3 Ps Tebal 15mm (Dilicin)
- Semen Portland 9.720 Kg X Rp 6,250.00 = Rp 60,750.00
- Pasir Pasangan 0.015 m3 X Rp 200,000.00 = Rp 3,000.00
- Pekerja 0.150 Oh X Rp 32,500.00 = Rp 4,875.00
- Tukang Batu 0.150 Oh X Rp 50,000.00 = Rp 7,500.00
- Kepala Tukang 0.015 Oh X Rp 55,000.00 = Rp 825.00
- Mandor 0.0100 Oh X Rp 55,000.00 = Rp 550.00
= Rp 77,500.00
A51 1 M2 Pekerjaan Lantai Papan
- Papan Kayu 0.020 M3 X Rp 1,200,000.00 = Rp 24,000.00
- Paku 0.100 Kg X Rp 28,000.00 = Rp 2,800.00
- Pekerja 0.150 Oh X Rp 32,500.00 = Rp 4,875.00
- Tukang 0.450 Oh X Rp 50,000.00 = Rp 22,500.00
- Kepala Tukang 0.045 Oh X Rp 55,000.00 = Rp 2,475.00
- Mandor 0.075 Oh X Rp 55,000.00 = Rp 4,125.00
Rp 60,775.00
A51a 1 M2 Pekerjaan Dinding Papan
- Papan Kayu 0.020 M3 X Rp 1,200,000.00 = Rp 24,000.00
- Paku 0.400 Kg X Rp 28,000.00 = Rp 11,200.00
- Pekerja 0.250 Oh X Rp 32,500.00 = Rp 8,125.00
- Tukang 0.350 Oh X Rp 50,000.00 = Rp 17,500.00
- Kepala Tukang 0.050 Oh X Rp 55,000.00 = Rp 2,750.00
- Mandor 0.010 Oh X Rp 55,000.00 = Rp 550.00
Rp 64,125.00
A51b 1 M2 Pekerjaan Plafond Papan
- Papan Kayu 0.030 M3 X Rp 1,200,000.00 = Rp 36,000.00
- Paku 0.030 Kg X Rp 28,000.00 = Rp 840.00
- Pekerja 0.070 Oh X Rp 32,500.00 = Rp 2,275.00
- Tukang 0.600 Oh X Rp 50,000.00 = Rp 30,000.00
- Kepala Tukang 0.060 Oh X Rp 55,000.00 = Rp 3,300.00
- Mandor 0.010 Oh X Rp 55,000.00 = Rp 550.00
Rp 72,965.00
A52 1 M2 Pasang Kawat Ram
- Kawat Ram 1.100 Lbr X Rp 40,000 Rp 44,000.00
- Paku Biasa 0.020 m3 X Rp 28,000 Rp 560.00
- Kayu 0.002 Oh X Rp 1,200,000.00 Rp 2,160.00
- Pekerja 0.100 Oh X Rp 32,500.00 Rp 3,250.00
- Tukang Kayu 0.100 Oh X Rp 50,000.00 Rp 5,000.00
- Kepala Tukang 0.010 Oh X Rp 55,000.00 Rp 550.00
- Mandor 0.0005 Oh X Rp 55,000.00 Rp 27.50
Rp 55,547.50

Masamba, 2009
Konsultan Perencana
CV. BALAWANG

SYAHRUM, ST
Direktur
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PENGADAAN BARANG DAN JASA DIKORDA T.A 2009
PEKERJAAN : REHAB SDN No. 066 SINGKALONG
LOKASI : KECAMATAN SEKO

No. URAIAN PEKERJAAN KODE VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6
I PEKERJAAN PENDAHULUAN
1 Pembongkaran Bangunan Lama - Ls Rp. 1,000,000.00 Rp. 1,000,000.00
2 Listrik Kerja - Ls Rp. 1,000,000.00 Rp. 1,000,000.00
Jumlah Harga Pekerjaan I (Masuk Pada Rekapitulasi Perkiraan Harga Pekerjaan) Rp. 2,000,000.00
II PEKERJAAN BATU, KAYU & ATAP
1 Pek. Umpak -Umpak Beton 1:3:5 A16 2.03 M3 Rp. 1,712,400.00 Rp. 3,467,610.00
2 Pek. Tiang, Rangka Dinding, Gelagar A11 5.03 M3 Rp. 2,277,650.00 Rp. 11,459,301.29
Tangga dan Siku (Kayu Klas II )
3 Pek. Kuda-Kuda, Gording, Skor Angin dan A11 5.88 M3 Rp. 2,277,650.00 Rp. 13,382,372.43
Rangka Lantai & Rangka Plafond (ky Klas II)
4 Pek. Lantai Papan (Kayu Klas II) A51 183.75 M2 Rp. 60,775.00 Rp. 11,167,406.25
5 Pek. Dinding Papan (Kayu Klas II) A51a 181.58 M2 Rp. 64,125.00 Rp. 11,643,932.93
6 Pek. Plafond Papan (Kayu Klas II) A51a 207.99 M2 Rp. 72,965.00 Rp. 15,175,990.35
7 Pas. Listplank Kayu Klas II A14 65.00 M1 Rp. 23,550.00 Rp. 1,530,750.00
8 Beugel Letter T LS 8.00 bh Rp. 19,500.00 Rp. 156,000.00
9 Baut / Angker dia. 12mm LS 112.00 bh Rp. 7,000.00 Rp. 784,000.00
10 Pek. Kosen Kayu Klas II A8 0.96 M3 Rp. 2,641,500.00 Rp. 2,534,519.25
11 Pek. Jalusi dan Railing A10 22.00 M2 Rp. 204,825.00 Rp. 4,506,150.00
12 Pas. Pintu Panil A9 7.20 M2 Rp. 222,000.00 Rp. 1,598,400.00
13 Pas. Kawat Ram A52 10.92 M2
Rp. 55,547.50 Rp. 606,578.70
14 Pas. Kunci Pintu 2 Slag A24 4.00 bh Rp. 116,150.00 Rp. 464,600.00
15 Pas. Engsel Pintu A25 12.00 bh Rp. 20,903.75 Rp. 250,845.00
16 Pas. Atap Seng Gelombang BJLS 20 A19 297.00 M2
Rp. 66,920.00 Rp. 19,875,240.00
17 Pas. Nok Seng A20 27.00 M1 Rp. 32,765.00 Rp. 884,655.00
Jumlah Harga Pekerjaan II (Masuk Pada Rekapitulasi Perkiraan Harga Pekerjaan) Rp. 99,488,351.20
III PEK. CAT & FINISHING
1 Pengecetan Atap A41 297.00 M2 Rp. 25,185.00 Rp. 7,479,945.00
2 Pengecetan Daun Pintu Panil A39 14.40 M2
Rp. 25,592.50 Rp. 368,532.00
3 Pengecatan Dinding Papan, Tiang dan A40 363.16 M2 Rp. 18,774.00 Rp. 6,818,033.43
Rangka Dinding
4 Pengecatan Plafond Papan A40 207.99 M2 Rp. 18,774.00 Rp. 3,904,804.26
5 Pengecetan Kusen, Jalusi dan Railing A40 88.00 M2 Rp. 25,592.50 Rp. 2,252,140.00
6 Pengecetan Lisplank A39 16.25 M2 Rp. 25,592.50 Rp. 415,878.13
Jumlah Harga Pekerjaan III (Masuk Pada Rekapitulasi Perkiraan Harga Pekerjaan) Rp. 21,239,332.81
REKAPITULASI PERKIRAAN HARGA PEKERJAAN
KEGIATAN : PENGADAAN BARANG DAN JASA DIKORDA T.A 2009
PEKERJAAN : REHAB SDN No. 066 SINGKALONG
LOKASI : KECAMATAN SEKO

NO U R A I A N P E K E R J A AN JUMLAH HARGA

I PEKERJAAN PENDAHULUAN Rp 2,000,000.00

II PEKERJAAN BATU, KAYU DAN ATAP Rp 99,488,351.20

III PEKERJAAN CAT DAN FINISHING Rp 21,239,332.81

(A) Jumlah Harga Pekerjaan (termasuk biaya umum dan keuntungan) Rp 122,727,684.01
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) Rp 12,272,768.40
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) Rp 135,000,452.41
(D) PEMBULATAN JUMLAH TOTAL HARGA PEKERJAAN = (C) Rp 135,000,000.00

TERBILANG :
SERATUS TIGA PULUH LIMA JUTA RUPIAH,-

Masamba, 2009
Diperiksa Konsultan Perencana
Pejabat Pelaksana Teknis Kegiatan CV. BALAWANG

AWALUDDIN SARUMAN, ST SYAHRUM, ST


Nip : 580 024 619 Direktur

Diketahui Disetujui
Kepala Dinas Pendidikan, Olah Raga Kabid Sarana dan Prasarana
Dan Pemuda Kab. Luwu Utara Dinas DIKORDA

MUH. THAHAR RUM, SH SYAIFUL BASRI, SE, M.M


Nip : 010 170 081 Nip : 130 813 172
No Uraian Panjang Lebar Tinggi Jumlah

a b c d e f
1 Pek. Umpak -Umpak Beton 1:3:5 0.3 0.25 0.3 90
2 Pek. Tiang, Rangka Dinding, Gelagar
Tangga dan Siku (Kayu Klas II )
3 Pek. Kuda-Kuda, Gording, Skor Angin dan
Rangka Lantai & Rangka Plafond (ky Klas II)
4 Pek. Lantai Papan (Kayu Klas II) 24.5 7.5
5 Pek. Dinding Papan (Kayu Klas II)
6 Pek. Plafond Papan (Kayu Klas II)
8 Pas. Listplank Kayu Klas II 65
9 Beugel Letter U
10 Baut / Angker dia. 12mm
11 Pek. Kosen Kayu Klas II
12 Pek. Jalusi dan Railing
13 Pas. Pintu Panil 0.9 2 4
14 Pas. Kawat Ram 0.65 0.4 42
15 Pas. Kunci Pintu 2 Slag 4
16 Pas. Engsel Pintu 12
17 Pas. Atap Seng Gelombang BJLS 20 27 5.5 148.5
18 Pas. Nok Seng 27
19 Pengecetan Atap
20 Pengecetan Kusen dan Daun Pintu
21 Pengecatan Dinding Papan, Tiang dan
Rangka Dinding
22 Pengecatan Plafond Papan
23 Pengecetan Jalusi dan Railing
24 Pengecetan Lisplank 65 0.25

c b
d
e

Pekerjaan Kuda"
a 0.06 0.12 5.5 0.0396

b 0.06 0.12 1.69 0.012168

c 0.06 0.12 1.42 0.010224

d 0.06 0.12 1.21 0.008712


e 0.06 0.12 8.15 0.05868

Balok Kuda" 0.05 0.1 24.85 0.12425

Balok Sambungan 0.06 0.12 2.42 0.017424

Skor Angin 0.05 0.1 4 0.02

Gording 0.05 0.1 26.96 0.1348

Rangka Lantai 0.05 0.05 7.85 0.019625

Rangka Plafond 0.05 0.05 7.85 0.019625

Tiang Menerus 0.15 0.15 3.2 0.072

Tiang Setengah 0.15 0.15 0.32 0.0072

Tiang Setengah Teras 0.15 0.15 1.07 0.024075

Tiang Rangka Dinding 0.05 0.1 3.2 0.016

Gelagar Melintang 0.05 0.1 7.85 0.03925

Gelagar Memanjang 0.06 0.12 24.85 0.17892

AnakTangga 0.03 0.2 1.15 0.0069

Tiang Tangga 0.05 0.2 0.93 0.0093

Balok Siku 0.05 0.1 0.48 0.0024

Kusen Jendela 0.05 0.1 10.95 0.05475


Kusen Ventilasi 0.05 0.1 6 0.03
Kusen Pintu Jendela 0.05 0.1 17.6 0.088

Pekerjaan Dinding Melintang 2.69 6 16.14


3.9 1.9 7.41
Pekerjaan Dinding Memanjang 2.69 24.66 66.3354

Luasan Kusen
Kusen PJ 1.995 2.5 4.495
Kusen J 2.85 0.95 2.7075
Kusen V 1.295 0.6 0.777
Total

g 90
2.025
5.031195
78
5.8755175

183.75
181.5818
207.99 183.75 12.12 12.12 207.99
65
8
112 0.00 64 48
0.9595
22 11 6 1 4 22
7.2
10.92 12 12 24 48
4
12
297
27 0.00
297
14.4
363.1636

207.99
88
16.25

Jumlah
16 0.6336

16 0.194688

32 0.327168

16 0.139392
8 0.46944
1.764288

4 0.497

8 0.139392

14 0.28

13 1.7524

49 0.961625

24.5 0.4808125
5.8755175

30 2.16

53 0.3816

7 0.168525

24 0.384

15 0.58875

6 1.07352 28.35

12 0.0828

8 0.0744

49 0.1176
5.031195

10 0.5475 6.7 4.25 10.95


2 0.06
4 0.352 10.05 2.55 5 17.6
0.9595

5 80.7
2 14.82
2 132.6708
228.1908

4 17.98
10 27.075
2 1.554
46.609
181.5818