I. UPAH
UPAH
NO URAIAN
Rp.
II. B A H A N
HARGA SATUAN PAJAK JUMLAH AKHIR
NO NAMA BARANG
( Rp ). GOL. C Rp.
1 Batu Bata Biasa Rp. 350.00 / bh 10.00 360.00 / bh
2 Batu bata besar Rp. 900.00 / bh 30.00 930.00 / bh
3 Batu kali Rp. 200,000.00 / m3 12,500.00 212,500.00 / m3
4 Batu koral Rp. 240,000.00 / m3 17,500.00 257,500.00 / m3
5 Bahan timbunan pilihan Rp. 35,000.00 / m3 8,750.00 43,750.00 / m3
6 Batu Split Rp. 165,000.00 / m3 7,000.00 172,000.00 / m3
7 Baja Propil Rp. 20,000.00 / kg 20,000.00 / kg
8 Besi Beton Rp. 11,000.00 / kg 11,000.00 / kg
9 Closed Jongkok Sedang Rp. 80,000.00 / bh 80,000.00 / bh
10 Closed jongkok Baik Rp. 190,000.00 / bh 190,000.00 / bh
11 Closed duduk lengkap sedang Rp. 900,000.00 / bh 900,000.00 / bh
12 Closed duduk baik Rp. 2,000,000.00 / bh 2,000,000.00 / bh
13 Conblok Rp. 2,000.00 / bh 2,000.00 / bh
14 Cat tembok 20 kg Rp. 180,000.00 / gln 180,000.00 / gln
15 Cat tembok Rp. 15,000.00 / kg 15,000.00 / kg
16 Cat tembok weathershield Rp. 76,000.00 / kg 76,000.00 / kg
17 Cat dasar Rp. 13,000.00 / kg 13,000.00 / kg
18 Cat besi dan kayu mutu baik Rp. 50,000.00 / kg 50,000.00 / kg
19 Cat meni Rp. 8,000.00 / kg 8,000.00 / kg
20 Compound kaleng kecil Rp. 5,000.00 / kg 5,000.00 / m2
21 Dempul Jadi Rp. 15,000.00 / kg 15,000.00 / kg
22 Door Closer Rp. 150,000.00 / bh 150,000.00 / bh
23 Eternit Rp. 16,000.00 / m2 16,000.00 / m2
24 Kaca tebal 3 mm Rp. 77,000.00 / m2 77,000.00 / m2
25 Kaca tebal 5 mm Rp. 89,700.00 / m2 89,700.00 / m2
26 Kawat baja Rp. 10,500.00 / kg 10,500.00 / kg
27 Kawat ikat Rp. 15,000.00 / kg 15,000.00 / kg
28 Keramik polos mutu baik uk. 60 x 60 cm Rp. 150,000.00 / ktk 150,000.00 / ktk
29 Keramik polos mutu baik uk. 30 x 30 cm Rp. 37,500.00 / ktk 37,500.00 / ktk
30 Keramik polos mutu baik uk. 40 x 40 cm Rp. 70,000.00 / ktk 70,000.00 / ktk
31 Keramik polos uk. 30 x 30 cm Rp. 33,000.00 / ktk 33,000.00 / ktk
32 Keramik bermotif mutu baik uk. 30 x 30 Rp. 45,000.00 / ktk 45,000.00 / ktk
33 Kayu kls II Rp. 4,175,000.00 / m3 4,175,000.00 / m3
34 Kayu kls III Rp. 2,755,000.00 / m3 2,755,000.00 / m3
35 Kayu kls IV Rp. 2,087,000.00 / m3 2,087,000.00 / m3
36 Kayu dulken / bulat dia 8 - 10 / 4 m Rp. 10,000.00 / btg 10,000.00 / btg
37 Kayu profil A1 Rp. 9,000.00 / btg 9,000.00 / btg
38 Kayu profil A3 Rp. 15,000.00 / btg 15,000.00 / btg
39 Kayu profil A4 Rp. 17,500.00 / btg 17,500.00 / btg
40 Kusen pintu kayu kelas II Rp. 345,000.00 / lbg 345,000.00 / lbg
41 Kusen pintu kayu kelas III Rp. 272,000.00 / lbg 272,000.00 / lbg
42 Kusen jendela kayu kelas II Rp. 284,000.00 / lbg 284,000.00 / lbg
43 Kusen jendela kayu kelas III Rp. 260,000.00 / lbg 260,000.00 / lbg
44 Kran biasa Rp. 10,000.00 / bh 10,000.00 / bh
45 Kran air mutu baik Rp. 25,000.00 / bh 25,000.00 / bh
46 Kran Washtafel mutu baik Rp. 42,000.00 / bh 42,000.00 / bh
47 Kran Leher angsa mutu baik Rp. 36,000.00 / bh 36,000.00 / bh
48 Karpet talang Rp. 10,000.00 / m' 10,000.00 / m'
49 Kawat harmonika Rp. 20,000.00 / m2 20,000.00 / m'
50 List profil gypsum Rp. 48,300.00 / m' 48,300.00 / m'
51 Lem dempul Rp. 5,000.00 / kg 5,000.00 / kg
52 Lem kayu Rp. 5,000.00 / ktk 5,000.00 / ktk
53 Minyak bekisting Rp. 10,000.00 / ltr 10,000.00 / ltr
54 Minyak cat / thinner Rp. 19,000.00 / ltr 19,000.00 / ltr
55 Minyak oli Rp. 20,000.00 / ltr 20,000.00 / ltr
56 Melamik Rp. 36,250.00 / ltr 36,250.00 / ltr
HARGA SATUAN PAJAK JUMLAH AKHIR
NO NAMA BARANG
( Rp ). GOL. C Rp.
HARGA PENGELUARAN
KODE URAIAN SATUAN UPAH BAHAN
NO JUMLAH
ANALISA PEKERJAAN UPAH/BAHAN ( Rp. ) ( Rp. )
( Rp. )
1 2 3 4 5 6 7
II ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH
2.1 1 m3 Galian tanah biasa sedalam 1 m
0.400 oh Pekerja 50,000.00 20,000.00
0.040 oh Mandor 50,000.00 2,000.00
22,000.00 22,000.00
2.4 1 m3 Urugan kembali
0.192 oh Pekerja 50,000.00 9,600.00
0.019 oh Mandor 50,000.00 950.00
10,550.00 10,550.00
2.5 1 m3 Urugan pasir
1.200 m3 148,750.00 178,500.00
NO URAIAN PEKERJAAN ANL VOLUME UPAH (Rp) BAHAN (Rp) JUMLAH (Rp)
A PEKERJAAN PERSIAPAN D. 12
1 Pek. Pembersihan lokasi ls 2,000,000.00
2 Pek. Direksiket/ sewa gedung ls 1,770,000.00
3 Pek. Papan nama proyek 1.00 bh 350,000.00
4 Pek. Fhoto dokumentasi dan administrasi ls 779,000.00
5 Pek. Air kerja ls 1,800,000.00
SUBJUMLAH PEKERJAAN PERSIAPAN 2,000,000.00 4,699,000.00 6,699,000.00
B PEKERJAAN PEMBUATAN TEMPAT KOMPOS DAN
GUDANG
I PEKERJAAN TANAH
1 Pek. Galian Tanah 2.1 14.28 m3 314,160.00
Upah Rp 22,000.00
2 Pek. Urugan Tanah Kembali 2.4 4.76 m3 50,218.00
Upah Rp 10,550.00
3 Pek. Pasir Urug 2.5 1.63 m3 25,226.25 290,508.75
Upah Rp 15,500.00 Bahan Rp 178,500.00
PEKERJAAN PEMBUATAN TEMPAT KOMPOS DAN 389,604.25 290,508.75 680,113.00
II PEKERJAAN BATU DAN BETON COR
1 Pek pondasi Batu bata 3.2 2.70 m3 732,780.00 1,850,295.15
Upah Rp 271,400.00 Bahan Rp 685,294.50
2 Pek. Pas Dinding Batu bata 4.2 92.43 m2 2,213,602.70 4,801,484.49
Upah Rp 23,950.00 Bahan Rp 51,949.50
3 Pek. Plesteran 5.2 184.85 m2 3,937,347.60 2,067,939.32
Upah Rp 21,300.00 Bahan Rp 11,187.00
4 Pek Cat Dinding Dan Plafond 6.21 198.85 m2 1,125,701.17 1,203,253.45
Upah Rp 5,661.00 Bahan Rp 6,051.00
5 Pek. Beton cor ad. 1:2:3 7.1 8.42 m3 879,994.50 5,412,345.12
Upah Rp 104,500.00 Bahan Rp 642,720.00
6 Pek. Beton cor untuk lantai ad. 1:3:6 7.3 24.00 m3 2,508,000.00 14,919,180.00
Upah Rp 104,500.00 Bahan Rp 621,632.50
7 Pek. Pembesian 7.4 1,373.01 kg 1,193,144.53 16,167,177.05
Upah Rp 869.00 Bahan Rp 11,775.00
8 Pek. Bekisting Pondasi 7.5 6.78 m2 230,316.60 623,624.40
Upah Rp 33,970.00 Bahan Rp 91,980.00
9 Pek. Bekisting sloof 7.6 12.56 m2 426,663.20 1,286,332.40
Upah Rp 33,970.00 Bahan Rp 102,415.00
10 Pek. Bekisting kolom 7.7 15.67 m2 612,070.20 2,585,771.99
Upah Rp 39,060.00 Bahan Rp 165,014.17
11 Pek. Bekisting Balok 7.8 11.45 m2 458,687.00 1,961,100.66
Upah Rp 40,060.00 Bahan Rp 171,275.17
PEKERJAAN BATU DAN BETON COR 14,318,307.50 52,878,504.03 67,196,811.54
VI PEKERJAAN SANITAIR
1 Pek. Instalasi Air Kotor --- 1.00 ls 750,000.00
2 Pek. Instalasi Air Bersih --- 1.00 ls 750,000.00
3 Pek. Siring Kll Bangunan --- 1.00 ls 1,000,000.00
4 Pek. Box Saluran Lendi ( 0.80 x 0.80 ) --- 1.00 ls 1,250,000.00
5 Pek. Saluran Lendi 20 x20 --- 1.00 ls 500,000.00
PEKERJAAN SANITAIR - 4,250,000.00 4,250,000.00
JUMLAH PEKERJAAN PEMBUATAN TEMPAT KOMPOSAN DAN GUDANG 19,023,571.75 118,906,748.78 137,930,320.54
TERBILANG : Err:511
Panjang
Lebar
P L T ToT
Pas. Batu Bata 14 2.3 32.2 29.54
plesteran 14 2.5 70
3.19
600,000,000.00
kolom sloof balok
30/30 25/30 25/30
jendela
Pintu 1.9 0.7 2.66
2.66
pembesian
P jm bs ToT bnyak P jm bs
14 4 0.887 49.67 71 0.6 0.394
15 4 0.887 53.22 76 0.7 0.394
14 4 0.887 49.67 71 0.6 0.394
192.50
345.06
bekisting
3.5 5 1 17.50
54.53 399.59
Perhitungan pagar
Panjang 120
Panjang
Lebar
P L T ToT
Pas. Batu Bata 120 1.65 198 177
plesteran 120 2 480
8.59
600,000,000.00
kolom sloof balok
30/30 25/30 25/30
pembesian
P jm bs ToT bnyak P jm bs
120 4 0.887 425.76 601 0.7 0.394
85 4 0.887 301.58 426 0.6 0.394
120 4 0.887 425.76 601 1 0.394
153
1,306.10
bekisting
0 0 1 -
503.26 1,809.36
Perhitungan pagar
Panjang 60
Panjang
Lebar
P L T ToT
Pas. Batu Bata 60 1.65 99 78
plesteran 60 2 240
5.12
600,000,000.00
kolom sloof balok
30/30 25/30 25/30
pembesian
P jm bs ToT bnyak P jm bs
60 4 0.887 212.88 301 0.7 0.394
51 4 0.887 180.95 256 0.6 0.394
60 4 0.887 212.88 301 1 0.394
153
759.71
bekisting
0 0 1 -
262.13 1,021.84
DAFTAR KUANTITAS DAN HARGA
20
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
a b c d e f
21
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
a b c d e f
22
DAFTAR PERHITUNGAN V
NAMA PEKERJAAN : KAJIAN PENGELOLAAN PERSAMPAHAN 3R DALAM KABUPATEN MUARA ENIM
LOKASI/KABUPATEN : TANAH ABANG/ MUARA ENIM
KONSULTAN : PT. CATUR INTIREKA
TAHUN ANGGARAN : 2012 - 2013
II PEK. BETON
2.1 Pek. Pondasi Batu Bata (uk. 20 x 50)
Panjang
Volume
Panjang Sloof
VOLUME :
VOLUME :
VOLUME :
- Panjang Dinding
Pengurangan Pintu
Pengurangan Ventilasi
KUDA2
BATANG MIRING PJG
BATANG MIRING PJG
BATANG MIRING PENDEK
BATANG MIRING PENDEK
`
BATANG TEGAK PJG
BATANG TEGAK PDK
BATANG TEGAK PDK
GORDING
1 gording
14 gording
skor
1 skor
8 skor
KUDA2 BETON
LISPLANK 3/20
PANJANG
SALURAN
R PERHITUNGAN VOLUME
AM KABUPATEN MUARA ENIM
42.00
40.00
-
Total = 82.00 0.6 1.2 0.9
8.20 M3 OK OK
besi
0.5*0.5x0.135= 0.05
15 bh
0.73 M3 OK OK 87.48
P
induk 99.50
14+14+14 42.00 cincin 663.33
8+8+8+8+8 = 40.00
1x10= 10.00
4+3.5 7.50
-
Total = 99.50 m
2.99 M3 OK OK
p
Bawah Lantai 0.67 telapak induk 55.05
Atas Lantai 3.00 cincin 367.00
Total Panjang 3.67 m 55.05
3 3.00
11 11.00
1x19 19.00
33.00
0.33 m3 OK OK 26.40
p
14 x 3 42.00 induk 66.00
8x3 24.00 cincin 440.00
Total = 66.00
1.98 M3 OK OK
p
induk 16.00
cincin 106.67
8x2 16.00
Total = 16.00
0.72 M3 OK OK
3 m
3.50
3.50
4.00
4.00
Total 15 m
Tebal - m
Luas dinding 45.00 m2
Panjang Dinding 18
3.6
0
0
0
0
Jumlah Panjang Dinding 21.6
Tinggi Dinding 1
Lebar Dinding 2
Tinggi 1
Panjang 16.47
Tinggi 0.6
Luas dinding 4 9.882 M2
3 1
14
8
112 m
0.15 M
16.8 M3 OK
38.5
3.0
0.2
vol. 23.1 M3 UDH
tinggi 0.5
tebal 0.1
panjang sebelah 38.5
volume 1.925
kiri kanan 3.85 M3
,(2*16)+(2*8) 48 m
1
0.15 m
7.2 m3 OK
7.2 m3 OK
3.6 m3 OK
1x1x1 1 m3
10
6.3 m
16.0 m
100.8 m2
201.6 m2 OK
0.01 M2
VOLUME 0.28 M3
TOTAL 0.34 M3
3 BH KUDA2 1.03 M3 OK
16
224
volume 1.61 M3 OK
5.0 m
40.0 m
volume 0.29 M3
total 2.94
lain2 5% 0.29
total 3.23 OK ok
0.006
MENDATAR 16
MENDATAR 16
MIRING 6.2
6.2
6.2
6.2
TOTAL 56.8 M
8
8
10.5
10.5
7
TOTAL 44
4
3.5
4
4
3
3
5
29.15
lebar 0.4
11.66
12.5
2.7
4 0.887 353.03
0.6 0.394 156.81
509.84
4 0.887 195.32
0.7 0.394 101.22
296.54
4 0.887 234.17
0.6 0.394 104.02
338.18
6 0.887 85.15
0.7 0.394 29.42
114.57