DAFTAR HARGA SATUAN UPAH DAN BAHAN

KECAMATAN TANAH ABANG TAHUN ANGGARAN 2013

I. UPAH

UPAH
NO URAIAN
Rp.

1 Pekerja Rp. 50,000.00 / OH


2 Tukang Rp. 65,000.00 / OH
3 Kepala Tukang Rp. 70,000.00 / OH
4 Mandor Rp. 50,000.00 / OH
5 Penjaga Malam Rp. 45,000.00 / OH

II. B A H A N
HARGA SATUAN PAJAK JUMLAH AKHIR
NO NAMA BARANG
( Rp ). GOL. C Rp.
1 Batu Bata Biasa Rp. 350.00 / bh 10.00 360.00 / bh
2 Batu bata besar Rp. 900.00 / bh 30.00 930.00 / bh
3 Batu kali Rp. 200,000.00 / m3 12,500.00 212,500.00 / m3
4 Batu koral Rp. 240,000.00 / m3 17,500.00 257,500.00 / m3
5 Bahan timbunan pilihan Rp. 35,000.00 / m3 8,750.00 43,750.00 / m3
6 Batu Split Rp. 165,000.00 / m3 7,000.00 172,000.00 / m3
7 Baja Propil Rp. 20,000.00 / kg 20,000.00 / kg
8 Besi Beton Rp. 11,000.00 / kg 11,000.00 / kg
9 Closed Jongkok Sedang Rp. 80,000.00 / bh 80,000.00 / bh
10 Closed jongkok Baik Rp. 190,000.00 / bh 190,000.00 / bh
11 Closed duduk lengkap sedang Rp. 900,000.00 / bh 900,000.00 / bh
12 Closed duduk baik Rp. 2,000,000.00 / bh 2,000,000.00 / bh
13 Conblok Rp. 2,000.00 / bh 2,000.00 / bh
14 Cat tembok 20 kg Rp. 180,000.00 / gln 180,000.00 / gln
15 Cat tembok Rp. 15,000.00 / kg 15,000.00 / kg
16 Cat tembok weathershield Rp. 76,000.00 / kg 76,000.00 / kg
17 Cat dasar Rp. 13,000.00 / kg 13,000.00 / kg
18 Cat besi dan kayu mutu baik Rp. 50,000.00 / kg 50,000.00 / kg
19 Cat meni Rp. 8,000.00 / kg 8,000.00 / kg
20 Compound kaleng kecil Rp. 5,000.00 / kg 5,000.00 / m2
21 Dempul Jadi Rp. 15,000.00 / kg 15,000.00 / kg
22 Door Closer Rp. 150,000.00 / bh 150,000.00 / bh
23 Eternit Rp. 16,000.00 / m2 16,000.00 / m2
24 Kaca tebal 3 mm Rp. 77,000.00 / m2 77,000.00 / m2
25 Kaca tebal 5 mm Rp. 89,700.00 / m2 89,700.00 / m2
26 Kawat baja Rp. 10,500.00 / kg 10,500.00 / kg
27 Kawat ikat Rp. 15,000.00 / kg 15,000.00 / kg
28 Keramik polos mutu baik uk. 60 x 60 cm Rp. 150,000.00 / ktk 150,000.00 / ktk
29 Keramik polos mutu baik uk. 30 x 30 cm Rp. 37,500.00 / ktk 37,500.00 / ktk
30 Keramik polos mutu baik uk. 40 x 40 cm Rp. 70,000.00 / ktk 70,000.00 / ktk
31 Keramik polos uk. 30 x 30 cm Rp. 33,000.00 / ktk 33,000.00 / ktk
32 Keramik bermotif mutu baik uk. 30 x 30 Rp. 45,000.00 / ktk 45,000.00 / ktk
33 Kayu kls II Rp. 4,175,000.00 / m3 4,175,000.00 / m3
34 Kayu kls III Rp. 2,755,000.00 / m3 2,755,000.00 / m3
35 Kayu kls IV Rp. 2,087,000.00 / m3 2,087,000.00 / m3
36 Kayu dulken / bulat dia 8 - 10 / 4 m Rp. 10,000.00 / btg 10,000.00 / btg
37 Kayu profil A1 Rp. 9,000.00 / btg 9,000.00 / btg
38 Kayu profil A3 Rp. 15,000.00 / btg 15,000.00 / btg
39 Kayu profil A4 Rp. 17,500.00 / btg 17,500.00 / btg
40 Kusen pintu kayu kelas II Rp. 345,000.00 / lbg 345,000.00 / lbg
41 Kusen pintu kayu kelas III Rp. 272,000.00 / lbg 272,000.00 / lbg
42 Kusen jendela kayu kelas II Rp. 284,000.00 / lbg 284,000.00 / lbg
43 Kusen jendela kayu kelas III Rp. 260,000.00 / lbg 260,000.00 / lbg
44 Kran biasa Rp. 10,000.00 / bh 10,000.00 / bh
45 Kran air mutu baik Rp. 25,000.00 / bh 25,000.00 / bh
46 Kran Washtafel mutu baik Rp. 42,000.00 / bh 42,000.00 / bh
47 Kran Leher angsa mutu baik Rp. 36,000.00 / bh 36,000.00 / bh
48 Karpet talang Rp. 10,000.00 / m' 10,000.00 / m'
49 Kawat harmonika Rp. 20,000.00 / m2 20,000.00 / m'
50 List profil gypsum Rp. 48,300.00 / m' 48,300.00 / m'
51 Lem dempul Rp. 5,000.00 / kg 5,000.00 / kg
52 Lem kayu Rp. 5,000.00 / ktk 5,000.00 / ktk
53 Minyak bekisting Rp. 10,000.00 / ltr 10,000.00 / ltr
54 Minyak cat / thinner Rp. 19,000.00 / ltr 19,000.00 / ltr
55 Minyak oli Rp. 20,000.00 / ltr 20,000.00 / ltr
56 Melamik Rp. 36,250.00 / ltr 36,250.00 / ltr
HARGA SATUAN PAJAK JUMLAH AKHIR
NO NAMA BARANG
( Rp ). GOL. C Rp.

57 Metal roof type A berpasir Rp. 70,000.00 / bh 70,000.00 / bh


58 Metal roof type B berpasir Rp. 45,000.00 / bh 45,000.00 / bh
59 Metal roof biasa Rp. 38,000.00 / bh 38,000.00 / bh
60 Rangka Baja Ringan Rp. 165,000.00 / m2 165,000.00 / m2
61 Nok Asbes Gelombang Rp. 26,450.00 / bh 26,450.00 / bh
62 Nok Aluminium Rp. 5,200.00 / bh 5,200.00 / bh
63 Nok Metal roof berpasir Rp. 22,500.00 / bh 22,500.00 / bh
64 Nok Metal roof biasa Rp. 15,500.00 / bh 15,500.00 / bh
65 Paper Holder Rp. 125,000.00 / bh 125,000.00 / bh
66 Pasir Urug Rp. 135,000.00 / m3 13,750.00 148,750.00 / m3
67 Pasir Pasang Rp. 135,000.00 / m3 18,750.00 153,750.00 / m3
68 Plamir Tembok Rp. 8,510.00 / kg 8,510.00 / kg
69 Plamir Tembok 20 kg Rp. 90,000.00 / kg 90,000.00 / kg
70 Plamir kayu Rp. 18,113.00 / kg 18,113.00 / kg
71 Plywood 18 mm Rp. 93,750.00 / m2 93,750.00 / m2
72 Plywood 12 mm Rp. 76,388.89 / m2 76,388.89 / m2
73 Plywood 9 mm Rp. 52,083.33 / m2 52,083.33 / m2
74 Paku 2 - 6 ", 1 1/2 ", 3/4 " Rp. 25,000.00 / kg 25,000.00 / kg
75 Paku Seng Rp. 15,000.00 / kg 15,000.00 / kg
76 Semen 50 kg Rp. 78,000.00 / zak 78,000.00 / zak
77 Semen Putih Rp. 90,000.00 / zak 90,000.00 / zak

Muara Enim, - - 2013

Mengetahui Diperiksa Disusun Oleh,


Kepala Dinas PU Cipta Karya dan Tata Ruang KABID PERENCANAAN TEKNIS Koordinator Survey,
Kabupaten Muara Enim, Dan Pengawasan Kabid perumahan

H. RAMLAN SURYADI, ST, M.Si ILHAM YAHOLI, ST H.HERMAIN TOMI, ST


NIP. 19690710 199703 1 009 NIP.19640616 1990003 1 007 NIP. 19600801 198003 1 004
DAFTAR ANALISA
KECAMATAN TANAH ABANG
TAHUN ANGGARAN 2013

HARGA PENGELUARAN
KODE URAIAN SATUAN UPAH BAHAN
NO JUMLAH
ANALISA PEKERJAAN UPAH/BAHAN ( Rp. ) ( Rp. )
( Rp. )
1 2 3 4 5 6 7
II ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH
2.1 1 m3 Galian tanah biasa sedalam 1 m
0.400 oh Pekerja 50,000.00 20,000.00
0.040 oh Mandor 50,000.00 2,000.00
22,000.00 22,000.00
2.4 1 m3 Urugan kembali
0.192 oh Pekerja 50,000.00 9,600.00
0.019 oh Mandor 50,000.00 950.00
10,550.00 10,550.00
2.5 1 m3 Urugan pasir
1.200 m3 148,750.00 178,500.00

0.300 oh Pekerja 50,000.00 15,000.00


0.010 oh Mandor 50,000.00 500.00
15,500.00 178,500.00 194,000.00
2.6 1 m3 Timbunan Tanah
0.192 oh Pekerja 50,000.00 9,600.00
0.019 oh Mandor 50,000.00 950.00

1.200 m3 Tanah Timbunan 43,750.00 52,500.00


10,550.00 52,500.00 63,050.00
III ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI
3.2 1 m3 Pondasi batu bata ad.1:4
500.00 bh Batu bata 930.00 465,000.00
2.024 zak Semen 78,000.00 157,872.00
0.406 m3 Pasir pasangan 153,750.00 62,422.50

3.600 oh Pekerja 50,000.00 180,000.00


1.200 oh Tukang 65,000.00 78,000.00
0.120 oh Kepala Tukang 70,000.00 8,400.00
0.100 oh Mandor 50,000.00 5,000.00
271,400.00 685,294.50 956,694.50
IV ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
4.2 1 m2 Pas. batu bata merah tbl. 1/2 bata ad. 1 PC : 4 PS
45.000 bh Bata merah 930.00 41,850.00
0.094 zak Semen Portland 78,000.00 7,332.00
0.018 m3 Pasir pasangan 153,750.00 2,767.50

0.320 oh Pekerja 50,000.00 16,000.00


0.100 oh Tukang batu 65,000.00 6,500.00
0.010 oh Kepala Tukang 70,000.00 700.00
0.015 oh Mandor 50,000.00 750.00
23,950.00 51,949.50 75,899.50
V ANALISA BIAYA KONSTRUKSI PEK. PLESTERAN
5.2 1 m2 Plesteran 1 PC : 4 PS tbl 15 mm
0.104 zak Semen Portland 78,000.00 8,112.00
0.020 m3 Pasir Pasangan 153,750.00 3,075.00

0.200 oh Pekerja 50,000.00 10,000.00


0.150 oh Tukang batu 65,000.00 9,750.00
0.015 oh Kepala Tukang 70,000.00 1,050.00
0.010 oh Mandor 50,000.00 500.00
21,300.00 11,187.00 32,487.00
6.21 1 M2 Pengecatan Tembok ( 1 Lapis Plamir, 1 Lapis Cat
dasar, 2 Lapis cat penutup )
0.1000 kg Plamir 8,510.00 851.00
0.1000 kg Cat Dasar 13,000.00 1,300.00
0.2600 kg Cat Penutup 2 x 15,000.00 3,900.00

0.0200 oh Pekerja 50,000.00 1,000.00


0.0630 oh Tukang kayu 65,000.00 4,095.00
0.0063 oh Kepala Tukang 70,000.00 441.00
0.0025 oh Mandor 50,000.00 125.00
5,661.00 6,051.00 11,712.00
VII ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
7.1 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr
4.640 zak Semen PC 78,000.00 361,920.00
0.520 m3 Pasir beton 153,750.00 79,950.00
0.780 m3 Batu Koral 257,500.00 200,850.00

1.650 oh Pekerja 50,000.00 82,500.00


0.250 oh Tukang batu 65,000.00 16,250.00
0.025 oh Kepala Tukang 70,000.00 1,750.00
0.080 oh Mandor 50,000.00 4,000.00
104,500.00 642,720.00 747,220.00
HARGA PENGELUARAN
KODE URAIAN SATUAN UPAH BAHAN
NO JUMLAH
ANALISA PEKERJAAN UPAH/BAHAN ( Rp. ) ( Rp. )
( Rp. )
1 2 3 4 5 6 7
7.2 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Split
6.720 zak Semen PC 78,000.00 524,160.00
0.540 m3 Pasir beton 153,750.00 83,025.00
0.810 m3 Batu Split 172,000.00 139,320.00

2.000 oh Pekerja 50,000.00 100,000.00


0.350 oh Tukang batu 65,000.00 22,750.00
0.035 oh Kepala Tukang 70,000.00 2,450.00
1.000 oh Mandor 50,000.00 50,000.00
175,200.00 746,505.00 921,705.00
7.3 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 6 Kr
3.940 zak Semen PC 78,000.00 307,320.00
0.470 m3 Pasir 153,750.00 72,262.50
0.940 m3 Koral beton 257,500.00 242,050.00

1.650 oh Pekerja 50,000.00 82,500.00


0.250 oh Tukang 65,000.00 16,250.00
0.025 oh Kepala Tukang 70,000.00 1,750.00
0.080 oh Mandor 50,000.00 4,000.00
104,500.00 621,632.50 726,132.50
7.4 1 kg Pembesian dengan besi polos atau besi ulir
1.050 kg Besi beton ( polos / ulir ) 11,000.00 11,550.00
0.015 kg Kawat ikat 15,000.00 225.00

0.007 oh Paku biasa 2 ' - 5 " 50,000.00 350.00


0.007 oh Tukang besi 65,000.00 455.00
0.0007 oh Kepala Tukang 70,000.00 49.00
0.0003 oh Mandor 50,000.00 15.00
869.00 11,775.00 12,644.00
7.5 1 m2 Pasang Bekisting untuk pondasi
0.040 m3 Kayu kls IV 2,087,000.00 83,480.00
0.300 kg Paku biasa 2 ' - 5 " 25,000.00 7,500.00
0.100 lt Minyak Oli 10,000.00 1,000.00

0.300 oh Pekerja 50,000.00 15,000.00


0.260 oh Tukang kayu 65,000.00 16,900.00
0.026 oh Kepala Tukang 70,000.00 1,820.00
0.005 oh Mandor 50,000.00 250.00
33,970.00 91,980.00 125,950.00
7.6 1 m2 Pasang bekisting untuk sloof
0.045 m3 Kayu kls IV 2,087,000.00 93,915.00
0.300 kg Paku biasa 2 ' - 5 " 25,000.00 7,500.00
0.100 lt Minyak oli 10,000.00 1,000.00

0.300 oh Pekerja 50,000.00 15,000.00


0.260 oh Tukang kayu 65,000.00 16,900.00
0.026 oh Kepala Tukang 70,000.00 1,820.00
0.005 oh Mandor 50,000.00 250.00
33,970.00 102,415.00 136,385.00
7.7 1 m2 Pasang bekisting untuk kolom
0.040 m3 Kayu kls IV 2,087,000.00 83,480.00
0.400 kg Paku biasa 2 ' - 5 " 25,000.00 10,000.00
0.200 lt Minyak oli 10,000.00 2,000.00
0.015 m3 Balok kayu kls IV 2,087,000.00 31,305.00
0.350 m2 Plywood tebal 9 mm 52,083.33 18,229.17
2.000 btg Dolken kayu galam Ø 8 - 10/4 m 10,000.00 20,000.00

0.300 oh Pekerja 50,000.00 15,000.00


0.330 oh Tukang kayu 65,000.00 21,450.00
0.033 oh Kepala Tukang 70,000.00 2,310.00
0.006 oh Mandor 50,000.00 300.00
39,060.00 165,014.17 204,074.17
7.8 1 m2 Pasang Bekisting untuk balok
0.040 m3 Kayu kls IV 2,087,000.00 83,480.00
0.400 kg Paku biasa 2 ' - 5 " 25,000.00 10,000.00
0.200 lt Minyak oli 10,000.00 2,000.00
0.018 m3 Balok kayu kls IV 2,087,000.00 37,566.00
0.350 m2 Plywood tebal 9 mm 52,083.33 18,229.17
2.000 btg Dolken kayu galam Ø 8 - 10/4 m 10,000.00 20,000.00

0.320 oh Pekerja 50,000.00 16,000.00


0.330 oh Tukang kayu 65,000.00 21,450.00
0.033 oh Kepala Tukang 70,000.00 2,310.00
0.006 oh Mandor 50,000.00 300.00
40,060.00 171,275.17 211,335.17
7.9 1 m2 Pasang bekisting untuk lantai
0.040 m3 Kayu kls IV 2,087,000.00 83,480.00
0.400 kg Paku biasa 2 ' - 5 " 25,000.00 10,000.00
0.200 lt Minyak Oli 10,000.00 2,000.00
0.015 m3 Balok kayu kls IV 2,087,000.00 31,305.00
1.000 m2 Plywood tebal 9 mm 52,083.33 52,083.33
6.000 btg Dolken kayu galam Ø 8 - 10/4 m 10,000.00 60,000.00

0.320 oh Pekerja 50,000.00 16,000.00


0.330 oh Tukang Batu 65,000.00 21,450.00
0.033 oh Kepala Tukang 70,000.00 2,310.00
0.006 oh Mandor 50,000.00 300.00
40,060.00 238,868.33 278,928.33
HARGA PENGELUARAN
KODE URAIAN SATUAN UPAH BAHAN
NO JUMLAH
ANALISA PEKERJAAN UPAH/BAHAN ( Rp. ) ( Rp. )
( Rp. )
1 2 3 4 5 6 7
8.6.a 1 m2 Pasang atap genteng metal
1.620 lbr Genteng metal roof 38,000.00 61,560.00
0.200 kg Paku biasa 2 " - 5 " 25,000.00 5,000.00

0.200 oh Pekerja 50,000.00 10,000.00


0.100 oh Tukang kayu 65,000.00 6,500.00
0.010 oh Kepala Tukang 70,000.00 700.00
0.001 oh Mandor 50,000.00 50.00
17,250.00 66,560.00 83,810.00
8.8.a 1 m' Pasang Nok genteng metal
3.000 bh Nok Genteng Metal 15,500.00 46,500.00
0.050 kg Paku biasa 1/2 " - 1 " 25,000.00 1,250.00
0.250 oh Pekerja 50,000.00 12,500.00
0.150 oh Tukang kayu 65,000.00 9,750.00
0.015 oh Kepala Tukang 70,000.00 1,050.00
0.013 oh Mandor 50,000.00 650.00
23,950.00 47,750.00 71,700.00
8.14 1 m2 Langit - langit asbes ( 1,00 x 1,00 ) m tbl. 3.2 mm +
rangka kayu kls III
0.012 m3 Kayu kls III 2,755,000.00 33,060.00
0.060 kg Paku biasa 25,000.00 1,500.00
1.100 lbr Eternit 16,000.00 17,600.00

0.180 oh Pekerja 50,000.00 9,000.00


0.320 oh Tukang kayu 65,000.00 20,800.00
0.032 oh Kepala Tukang 70,000.00 2,240.00
0.009 oh Mandor 50,000.00 450.00
32,490.00 52,160.00 84,650.00

MUARA ENIM, - - 2013

MENGETAHUI DIPERIKSA KOORDINATOR TEAM SURVEY,


KADIN PU CIPTA KARYA DAN TATA RUANG KABID PERENCANAAN TEKNIS KEPALA BIDANG PERUMAHAN
KABUPATEN MUARA ENIM, DAN PENGAWASAN

H. RAMLAN SURYADI, ST. M.Si ILHAM YAHOLI, ST H.HERMAIN TOMI, ST


NIP. 19690710 199703 1 009 NIP.19640616 1990003 1 007 NIP. 19600801 198003 1 004
RENCANA ANGGARAN BIAYA ( RAB )
KABUPATEN : MUARA ENIM
DINAS/LEMBAGA/SATUAN KERJA : DINAS PU CIPTA KARYA DAN TATA RUANG
NAMA PEKERJAAN : PEMBANGUNAN SARANA PENGOLAHAN SAMPAH 3R KEC. TANAH ABANG
LOKASI : KECAMATAN TANAH ABANG
TAHUN ANGGARAN : 2013 KEBUTUHAN MATERIAL
BIAYA 600,000,000.00

NO URAIAN PEKERJAAN ANL VOLUME UPAH (Rp) BAHAN (Rp) JUMLAH (Rp)

A PEKERJAAN PERSIAPAN D. 12
1 Pek. Pembersihan lokasi ls 2,000,000.00
2 Pek. Direksiket/ sewa gedung ls 1,770,000.00
3 Pek. Papan nama proyek 1.00 bh 350,000.00
4 Pek. Fhoto dokumentasi dan administrasi ls 779,000.00
5 Pek. Air kerja ls 1,800,000.00
SUBJUMLAH PEKERJAAN PERSIAPAN 2,000,000.00 4,699,000.00 6,699,000.00
B PEKERJAAN PEMBUATAN TEMPAT KOMPOS DAN
GUDANG
I PEKERJAAN TANAH
1 Pek. Galian Tanah 2.1 14.28 m3 314,160.00
Upah Rp 22,000.00
2 Pek. Urugan Tanah Kembali 2.4 4.76 m3 50,218.00
Upah Rp 10,550.00
3 Pek. Pasir Urug 2.5 1.63 m3 25,226.25 290,508.75
Upah Rp 15,500.00 Bahan Rp 178,500.00
PEKERJAAN PEMBUATAN TEMPAT KOMPOS DAN 389,604.25 290,508.75 680,113.00
II PEKERJAAN BATU DAN BETON COR
1 Pek pondasi Batu bata 3.2 2.70 m3 732,780.00 1,850,295.15
Upah Rp 271,400.00 Bahan Rp 685,294.50
2 Pek. Pas Dinding Batu bata 4.2 92.43 m2 2,213,602.70 4,801,484.49
Upah Rp 23,950.00 Bahan Rp 51,949.50
3 Pek. Plesteran 5.2 184.85 m2 3,937,347.60 2,067,939.32
Upah Rp 21,300.00 Bahan Rp 11,187.00
4 Pek Cat Dinding Dan Plafond 6.21 198.85 m2 1,125,701.17 1,203,253.45
Upah Rp 5,661.00 Bahan Rp 6,051.00
5 Pek. Beton cor ad. 1:2:3 7.1 8.42 m3 879,994.50 5,412,345.12
Upah Rp 104,500.00 Bahan Rp 642,720.00
6 Pek. Beton cor untuk lantai ad. 1:3:6 7.3 24.00 m3 2,508,000.00 14,919,180.00
Upah Rp 104,500.00 Bahan Rp 621,632.50
7 Pek. Pembesian 7.4 1,373.01 kg 1,193,144.53 16,167,177.05
Upah Rp 869.00 Bahan Rp 11,775.00
8 Pek. Bekisting Pondasi 7.5 6.78 m2 230,316.60 623,624.40
Upah Rp 33,970.00 Bahan Rp 91,980.00
9 Pek. Bekisting sloof 7.6 12.56 m2 426,663.20 1,286,332.40
Upah Rp 33,970.00 Bahan Rp 102,415.00
10 Pek. Bekisting kolom 7.7 15.67 m2 612,070.20 2,585,771.99
Upah Rp 39,060.00 Bahan Rp 165,014.17
11 Pek. Bekisting Balok 7.8 11.45 m2 458,687.00 1,961,100.66
Upah Rp 40,060.00 Bahan Rp 171,275.17
PEKERJAAN BATU DAN BETON COR 14,318,307.50 52,878,504.03 67,196,811.54

III PEKERJAN PINTU DAN JENDELA KACA


1 Pek. Kusen Pintu ventilasi Kayu Kls III --- 1.00 bh 475,000.00
Bahan Rp 475,000.00
2 Pek. Kusen jendela dan ventilasi Kayu Kls III --- 1.00 bh 275,000.00
Bahan Rp 275,000.00
3 Pek. Daun Pintu Kayu Kls III --- 1.00 bh 450,000.00
Bahan Rp 450,000.00
4 Pek Jendela Kaca T 5mm kayu kls III --- 1.00 bh 300,000.00
Bahan Rp 300,000.00
5 Pek. Kunci Tanam @Rp 125,000.00 --- 1.00 bh 125,000.00
6 Pek. Ensel Pintu @Rp 15,000.00 --- 3.00 bh 45,000.00
7 Pek. Engsel Jendela @Rp 10,000.00 --- 2.00 bh 20,000.00
8 Pek. Grendel Jendela @Rp 10,000.00 --- 2.00 bh 20,000.00
9 Pek. Kait Angin Jendela @Rp 12,000.00 --- 2.00 bh 24,000.00

PEKERJAN PINTU DAN JENDELA KACA 1,734,000.00 1,734,000.00


IV PEKERJAAN ATAP
1 Pek. Kuda Kuda Baja Ringan --- 201.60 m2 33,264,000.00
Bahan Rp 165,000.00
2 Pek. Atap Metal Roof 8.6 201.60 m2 3,477,600.00 13,418,496.00
Upah Rp 17,250.00 Bahan Rp 66,560.00
3 Pek. Nok Genteng Metal 8.8a 16.00 m' 383,200.00 764,000.00
Upah Rp 23,950.00 Bahan Rp 47,750.00
4 Pek. Woodplank 17.04 m2 852,000.00
Bahan Rp 50,000.00
5 Pek. Talang Air --- 1.00 ls 2,000,000.00
6 Pek. Plapond etrnit 8.14 14.00 m2 454,860.00 730,240.00
Upah Rp 32,490.00 Bahan Rp 52,160.00

PEKERJAAN ATAP 4,315,660.00 51,028,736.00 55,344,396.00

V PEKERJAAN INSTALASI LISTRIK


1 Pek. Instalasi Listrik + Lampu SL Lenkap --- 4.00 ttk 880,000.00
@Rp. 220,000.00
2 Pas. Stop Kontak @Rp. 15,000.00 --- 3.00 bh 45,000.00
3 Pas. Box sekring @Rp. 300,000.00 --- 1.00 bh 300,000.00
4 Pek. Pemasukan Api PLN @Rp. 7,500,000.00 --- 1.00 ls 7,500,000.00
PEKERJAAN INSTALASI LISTRIK - 8,725,000.00 8,725,000.00

VI PEKERJAAN SANITAIR
1 Pek. Instalasi Air Kotor --- 1.00 ls 750,000.00
2 Pek. Instalasi Air Bersih --- 1.00 ls 750,000.00
3 Pek. Siring Kll Bangunan --- 1.00 ls 1,000,000.00
4 Pek. Box Saluran Lendi ( 0.80 x 0.80 ) --- 1.00 ls 1,250,000.00
5 Pek. Saluran Lendi 20 x20 --- 1.00 ls 500,000.00
PEKERJAAN SANITAIR - 4,250,000.00 4,250,000.00
JUMLAH PEKERJAAN PEMBUATAN TEMPAT KOMPOSAN DAN GUDANG 19,023,571.75 118,906,748.78 137,930,320.54

C ALAT PENGUMPUL DAN PERALATAN PEMBUAT KOMPOS


1 Pengadaan Gerobak Sampah (Kap. 1m3) --- 8.00 Unit 36,000,000.00
@Rp. 4,500,000.00
2 Mesin Pencacah Pupuk Organik (Kap. 3000 kg/hari ) --- 1.00 Unit 25,000,000.00
@Rp. 25,000,000.00
3 Mesin Pencacah Plastik (Kap. 100 kg/jam) --- 1.00 Unit 17,000,000.00
@Rp. 17,000,000.00
4 Ayakan Kasar (10 mm) @Rp. 400,000.00 --- 2.00 Unit 800,000.00
5 Ayakan Halus (5 mm) @Rp. 500,000.00 --- 2.00 Unit 1,000,000.00
6 Thermometer Alkohol @Rp. 50,000.00 --- 1.00 Unit 50,000.00
7 Cangkul @Rp. 75,000.00 --- 2.00 Bh 150,000.00
8 Skop @Rp. 75,000.00 --- 2.00 Bh 150,000.00
9 Sepatu Kerja @Rp. 90,000.00 --- 5.00 Psg 450,000.00
10 Sarung Tangan @Rp. 15,000.00 --- 10.00 Psg 150,000.00
11 Masker @Rp. 15,000.00 --- 5.00 Bh 75,000.00
12 Ember @Rp. 20,000.00 --- 2.00 Bh 40,000.00
13 Alat Siram @Rp. 45,000.00 --- 2.00 Bh 90,000.00
14 Bin 3R (1 Set 3 unit - Merah, Kuning , Hinjau+ tiang) 10.00 Set 5,250,000.00
@Rp. 525,000.00
15 Box Method Pengomposan (Kap.1m3) --- 8.00 Unit 3,600,000.00
@Rp. 450,000.00
16 Bio Activator (Pusri) @Rp. 50,000.00 --- 10.00 btl 500,000.00
17 Rolly @Rp. 450,000.00 --- 2.00 Unit 900,000.00
18 Garu @Rp. 75,000.00 --- 2.00 Unit 150,000.00
19 Kontainer @Rp. 30,000,000.00 --- 2.00 Unit 60,000,000.00
20 Motor Sampah @Rp. 22,000,000.00 --- 1.00 Unit 22,000,000.00
21 Penutup Bak Permentasi Anaerobic --- 9.00 Unit 1,125,000.00
@Rp. 125,000.00
22 Pek. Pembelian Mesin jahit karung --- 1.00 bh 2,400,000.00
23 Mesin Jahit Biasa --- 1.00 bh 1,000,000.00
24 Mesin Biji Plastik --- 1.00 bh 25,000,000.00

ALAT PENGUMPUL DAN PERALATAN PEMBUAT KOMPOS - 202,880,000.00 202,880,000.00


D PEKERJAAN PAGAR
1 Pek. Galian Tanah 2.1 8.57 m3 188,496.00 -
Upah Rp 22,000.00 Bahan Rp
2 Pek. Urugan Tanah Kembali 2.4 2.86 m3 30,130.80 -
Upah Rp 10,550.00 Bahan Rp
3 Pek Pasir Urug 2.5 0.61 m3 9,486.00 109,242.00
Upah Rp 15,500.00 Bahan Rp 178,500.00
4 Pek. Pas. Batu Bata 4.2 198.00 m2 4,742,100.00 10,286,001.00
Upah Rp 23,950.00 Bahan Rp 51,949.50
5 Pek. Plesteran 5.2 480.00 m2 10,224,000.00 5,369,760.00
Upah Rp 21,300.00 Bahan Rp 11,187.00
6 Pek. Cor beton untuk Pondasi kolom sloof , balok 7.1 8.59 m3 897,393.75 5,519,358.00
Upah Rp 104,500.00 Bahan Rp 642,720.00
7 Pek. Pembesian 7.4 1,809.36 kg 1,572,330.54 21,305,169.26
Upah Rp 869.00 Bahan Rp 11,775.00
8 Pek. Cat Tembok 6.21 480.00 m2 2,717,280.00 2,904,480.00
Upah Rp 5,661.00 Bahan Rp 6,051.00
9 Pek Pintu Pagar Holow ( 2 x 4.5 ) + pengecatan 9.00 m2 5,400,000.00
Bahan Rp 600,000.00

PEKERJAAN PAGAR 20,381,217.09 50,894,010.26 71,275,227.34

E PEKERJAAN SUMUR BOR


1 Pek. Pengeboran sumur + pipa Kesing lengkap ls 1.00 Unit 13,000,000.00
2 Pek. Mesin Jet Pum ls 1.00 bh 3,000,000.00
3 Pek. Instalasi Air Lengkap ls 1.00 bh 700,000.00
4 Pek. Pembelian Galon air 1m3 ls 1.00 bh 1,250,000.00
5 Pek. Dudukan air Galon 1.20 x 1.20 x 1.20 ls 1.00 bh 2,500,000.00
6 Pek. Mesin air biasa ls 1.00 bh 1,200,000.00

PEKERJAAN SUMUR BOR 21,650,000.00 21,650,000.00

F PEKERJAAN TEMPAT PENJEMURAN PLASTIK


1 Pek. Galian Tanah 2.1 0.80 m3 17,600.00 -
Upah Rp 22,000.00 Bahan Rp
2 Pek. Urugan Pasir 2.5 1.20 m3 18,600.00 214,200.00
Upah Rp 15,500.00 Bahan Rp 178,500.00
3 Pek Cor Beton ad. 1:2:3 7.1 4.05 m3 423,225.00 2,603,016.00
Upah Rp 104,500.00 Bahan Rp 642,720.00
4 Pek. Bekisting 7.6 3.00 m2 101,910.00 307,245.00
Upah Rp 33,970.00 Bahan Rp 102,415.00
PEKERJAAN TEMPAT PENJEMURAN PLASTIK 561,335.00 3,124,461.00 3,685,796.00

G PEKERJAAN LANDASAN KONTAINER


1 Pek. Galian Tanah 2.1 0.80 m3 17,600.00 -
Upah Rp 22,000.00 Bahan Rp
2 Pek. Urugan Pasir 2.5 0.75 m3 11,625.00 133,875.00
Upah Rp 15,500.00 Bahan Rp 178,500.00
3 Pek Cor Beton ad. 1:2:3 7.1 4.15 m3 433,675.00 2,667,288.00
Upah Rp 104,500.00 Bahan Rp 642,720.00
4 Pek. Bekisting 7.6 3.75 m2 127,387.50 384,056.25
Upah Rp 33,970.00 Bahan Rp 102,415.00
PEKERJAAN LANDASAN KONTAINER 590,287.50 3,185,219.25 3,775,506.75

F PEKERJAAN JALAN MASUK


1 Pek. Galian Tanah 2.1 2.00 m3 44,000.00 -
Upah Rp 22,000.00 Bahan Rp
2 Pek. Urugan Pasir 2.5 1.20 m3 18,600.00 214,200.00
Upah Rp 15,500.00 Bahan Rp 178,500.00
3 Pek Cor Beton ad. 1:2:3 7.1 20.75 m3 2,168,375.00 13,336,440.00
Upah Rp 104,500.00 Bahan Rp 642,720.00
4 Pek. Bekisting 7.6 12.50 m2 424,625.00 1,280,187.50
Upah Rp 33,970.00 Bahan Rp 102,415.00
PEKERJAAN JALAN MASUK 2,655,600.00 14,830,827.50 17,486,427.50
G PEKERJAAN KAMAR MANDI/WC
1 Pek. Galian Tanah Pondasi 2.1 7.35 m3 161,700.00 -
Upah Rp 22,000.00 Bahan Rp
2 Pek. Urugan Tanah 2.4 2.45 m3 25,847.50 -
Upah Rp 10,550.00 Bahan Rp
3 Pek. Pasir Urug 2.5 0.49 m3 7,595.00 87,465.00
Upah Rp 15,500.00 Bahan Rp 178,500.00
4 pek. Pondasi batu bata 3.2 2.52 m3 683,928.00 1,726,942.14
Upah Rp 271,400.00 Bahan Rp 685,294.50
5 Pek. Pas. Dinding batu Bata 4.2 29.54 m2 707,483.00 1,534,588.23
Upah Rp 23,950.00 Bahan Rp 51,949.50
6 Pek. Plesteran 5.2 70.00 m2 1,491,000.00 783,090.00
Upah Rp 21,300.00 Bahan Rp 11,187.00
7 Pek. Pengecatan 6.21 70.00 m2 396,270.00 423,570.00
Upah Rp 5,661.00 Bahan Rp 6,051.00
8 Pek. Beton cor ad. 1:2:3 7.1 3.19 m3 333,355.00 2,050,276.80
Upah Rp 104,500.00 Bahan Rp 642,720.00
9 Pek. Cor lantai ad. 1:3:6 t 7 cm 7.3 1.23 m3 128,012.50 761,499.81
Upah Rp 104,500.00 Bahan Rp 621,632.50
10 Pek. Pembesian 7.4 399.59 kg 347,246.84 4,705,214.64
Upah Rp 869.00 Bahan Rp 11,775.00
11 Pek. Bekisting sloof 7.6 8.40 m2 285,348.00 860,286.00
Upah Rp 33,970.00 Bahan Rp 102,415.00
12 Pek. Bekisting Kolom 7.7 13.59 m2 530,825.40 2,242,542.53
Upah Rp 39,060.00 Bahan Rp 165,014.17
13 Pek. Bekisting balok 7.8 12.60 m2 504,756.00 2,158,067.10
Upah Rp 40,060.00 Bahan Rp 171,275.17
14 Pek. Bekisting plat lantai 7.9 17.50 m2 701,050.00 4,180,195.83
Upah Rp 40,060.00 Bahan Rp 238,868.33
15 Pek. Klosed jongkok @Rp 250,000.00 --- 2.00 bh 500,000.00
16 Pintu Fiber @Rp 400,000.00 --- 2.00 bh 800,000.00
17 Pek. Bak air @Rp 450,000.00 --- 2.00 bh 900,000.00
18 Pek. Intalasi air bersih @Rp 700,000.00 --- 1.00 ls 700,000.00
19 Pek. Istalasi listrik Lengkap + lampu --- 1.00 ls 700,000.00
@Rp 700,000.00
20 Pek. Instalasi air kotor @Rp 700,000.00 1.00 ls 700,000.00
21 Pek. Subtictank uk. 1.5x1.5x2 @Rp 2,500,000.00 1.00 ls 2,500,000.00

PEKERJAAN KAMAR MANDI/WC 6,304,417.24 28,313,738.08 34,618,155.32


REKAPITULASI PEKERJAAN

NO URAIAN PEKERJAAN UPAH (Rp) BAHAN (Rp) JUMLAH ( Rp )

I PEKERJAAN PERSIAPAN 2,000,000.00 4,699,000.00 6,699,000.00


II PEKERJAAN PEMBUATAN KOMPOS DAN GUDANG 19,023,571.75 118,906,748.78 137,930,320.54
III ALAT PENGUMPUL DAN PERALATAN PEMBUAT KOMPOS 202,880,000.00 202,880,000.00
IV PEKERJAAN PAGAR 20,381,217.09 50,894,010.26 71,275,227.34
V PEKERJAAN SUMUR BOR 21,650,000.00 21,650,000.00
VI PEKERJAAN TEMPAT PENJEMURAN PLASTIK 561,335.00 3,124,461.00 3,685,796.00
VII PEKERJAAN LANDASAN KONTAINER 590,287.50 3,185,219.25 3,775,506.75
VIII PEKERJAAN JALAN MASUK 2,655,600.00 14,830,827.50 17,486,427.50
IX PEKERJAAN KAMAR MANDI/WC 6,304,417.24 28,313,738.08 34,618,155.32

FISIK 51,516,428.58 448,484,004.87 500,000,433.45


JASA KONTRAKTOR 10% 50,000,043.34
PPN 10% 50,000,043.34
JUMLAH 600,000,520.14
DIBULATKAN 600,000,000.00

TERBILANG : Err:511

MUARA ENIM, JANUARI2013


MENGETAHUI DIPERIKSA DIHITUNG
KADIN PU CIPTA KARYA DAN TATA RUANG KABID PERENCANAAN TEKNIS
KABUPATEN MUARA ENIM DAN PENGAWASAN

H. RAMLAN SURYADI, ST. M.Si ILHAM YAHOLI, ST AHMAD HIDAYAT,


NIP.19770907 201101 ST
1 004
NIP. 19690710 199703 1 009 NIP.19640616 1990003 1 007
Perhitungan pagar
Panjang 14

Pekerjaan Tanah P L T ToT


Galian : 14 0.7 0.75 7.35
Pasir Urug : 14 0.7 0.05 0.49

Panjang
Lebar

pekerjaan pondasi P L T ToT


batuBATA : 14 0.2 0.2 0.56
14 0.4 0.2 1.12
14 0.6 0.1 0.84
2.52

P L T ToT
Pas. Batu Bata 14 2.3 32.2 29.54
plesteran 14 2.5 70

Panjang sloof 25/30 14


tinggi kolom 2.5 6 asli 2
panjang balok 25/30 14

Pek. Beton Cor P L T ToT bnyak


SLOOF 14 0.15 0.2 0.42
KOLOM 15 0.2 0.2 0.60
BALOK 14 0.15 0.2 0.42
pondasi
plat lantai 3.5 5 0.1 1.75

3.19

600,000,000.00
kolom sloof balok
30/30 25/30 25/30

jendela
Pintu 1.9 0.7 2.66
2.66

pembesian

P jm bs ToT bnyak P jm bs
14 4 0.887 49.67 71 0.6 0.394
15 4 0.887 53.22 76 0.7 0.394
14 4 0.887 49.67 71 0.6 0.394

192.50

345.06
bekisting

ToT bnyak P jm nt ToT


16.78 14 2 0.3 8.40
20.96 15 4 0.3 13.59
16.78 14 3 0.3 12.60

3.5 5 1 17.50

54.53 399.59
Perhitungan pagar
Panjang 120

Pekerjaan Tanah P L T ToT


Galian : 0.6 0.6 0.7 8.568
Pasir Urug : 0.6 0.6 0.05 0.612

Panjang
Lebar

pekerjaan pondasi P L T ToT


batu kali : 0 0 0.6 0

P L T ToT
Pas. Batu Bata 120 1.65 198 177
plesteran 120 2 480

Panjang sloof 25/30 120


tinggi kolom 2.5 34 asli 2
panjang balok 25/30 36

Pek. Beton Cor P L T ToT bnyak


SLOOF 120 0.15 0.2 3.60
KOLOM 85 0.15 0.15 1.91
BALOK 120 0.1 0.15 1.80
pondasi 34 0.5 0.5 0.15 1.275
plat lantai

8.59

600,000,000.00
kolom sloof balok
30/30 25/30 25/30

jendela 1.9 1.6 12.16


Pintu 1.7 2.6 8.84
21

pembesian

P jm bs ToT bnyak P jm bs
120 4 0.887 425.76 601 0.7 0.394
85 4 0.887 301.58 426 0.6 0.394
120 4 0.887 425.76 601 1 0.394
153

1,306.10
bekisting

ToT bnyak P jm nt ToT


165.76 120 2 0.3 72.00
100.71 85 4 0.3 77.01
236.79 120 3 0.3 108.00

0 0 1 -

503.26 1,809.36
Perhitungan pagar
Panjang 60

Pekerjaan Tanah P L T ToT


Galian : 0.6 0.6 0.7 8.568
Pasir Urug : 0.6 0.6 0.05 0.612

Panjang
Lebar

pekerjaan pondasi P L T ToT


batu kali : 0 0 0.6 0

P L T ToT
Pas. Batu Bata 60 1.65 99 78
plesteran 60 2 240

Panjang sloof 25/30 60


tinggi kolom 1.5 34 asli 2
panjang balok 25/30 36

Pek. Beton Cor P L T ToT bnyak


SLOOF 60 0.15 0.2 1.80
KOLOM 51 0.15 0.15 1.15
BALOK 60 0.1 0.15 0.90
pondasi 34 0.5 0.5 0.15 1.275
plat lantai

5.12

600,000,000.00
kolom sloof balok
30/30 25/30 25/30

jendela 1.9 1.6 12.16


Pintu 1.7 2.6 8.84
21

pembesian

P jm bs ToT bnyak P jm bs
60 4 0.887 212.88 301 0.7 0.394
51 4 0.887 180.95 256 0.6 0.394
60 4 0.887 212.88 301 1 0.394
153

759.71
bekisting

ToT bnyak P jm nt ToT


83.02 60 2 0.3 36.00
60.52 51 4 0.3 46.21
118.59 60 3 0.3 54.00

0 0 1 -

262.13 1,021.84
DAFTAR KUANTITAS DAN HARGA

NAMA PEKERJAAN : KAJIAN PENGELOLAAN PERSAMPAHAN 3R DALAM KABUPATEN MUARA ENIM


LOKASI/KABUPATEN : TANAH ABANG/ MUARA ENIM
KONSULTAN : PT. CATUR INTIREKA
TAHUN ANGGARAN : 2012 - 2013

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
a b c d e f

I PEKERJAAN PERSIAPAN 5,500,000.00


1 Pengukuran, Pembersihan dan pemasangan Bouwplank LS 1 2,000,000.00 2,000,000.00
2 Pembuatan Papan Nama Proyek LS 1 500,000.00 500,000.00
3 Mobilisasi dan Keamanan Proyek LS 1 3,000,000.00 3,000,000.00

II PEKERJAAN PEMBUATAN TEMPAT PEMBUATAN KOMPOS 135,551,512.93


DAN GUDANG

2.1 Pekerjaan Tanah dan Pasir 3,625,579.63


1 Pekerjaan Galian Tanah Biasa M3 14.28 18,580.00 265,322.40
2 Pekerjaan Urugan Tanah Kembali Bekas Galian M3 3.57 8,903.50 31,785.50
3 Pekerjaan Urugan Tanah di Bawah Lantai M3 32.00 59,150.00 1,892,800.00
4 Pekerjaan Urugan Pasir di Bawah Pondasi M3 1.63 81,445.00 132,551.74
5 Pekerjaan Urugan Pasir di Bawah Lantai M3 16.00 81,445.00 1,303,120.00

2.2 Pekerjaan Beton 74,437,590.74


1 Pekerjaan Pondasi Batu Bata ad. 1 : 3 M3 8.20 725,500.00 5,949,100.00
2 Pasang Pondasi Bertulang 60/60 ad. 1 : 2 : 3 M3 0.73 4,044,309.50 2,948,301.63
3 Pasang Sloof Beton Bertulang Adk 1:2:3 M3 2.46 4,111,809.50 10,115,051.37
4 Pasang Kolom Beton Bertulang Adk 1:2:3 M3 2.53 4,424,589.50 11,203,060.61
5 Pasang Ring Balok Ad. 1 : 2 : 3 15/20 M3 1.98 4,472,889.50 8,856,321.21
6 Pasang Dinding Batu Bata Ad. 1 : 4 M2 78.30 65,952.50 5,163,948.85
7 Pasang Plesteran Ad. 1 : 4 M2 156.60 27,131.50 4,248,684.37
8 Pasang Rabat Beton Ad. 1 : 2 : 3 (t=15 cm) M3 7.20 793,284.50 5,711,648.40
9 Pasang Lantai Beton Ad. 1:2:3 (t=15 cm) M3 16.80 793,284.50 13,327,179.60
5 Pasang Ring Balok Ad. 1 : 2 : 3 15/30 M3 0.72 4,472,889.50 3,220,480.44
11 Kuda - kuda dari Beton Bertulang 12/12 Ad. 1:2:3 M3 0.45 4,472,889.50 1,995,409.68
12 Tebeng Layar Batu Bata Ad. 1:4 M2 14.13 65,952.50 931,776.92
13 Plesteran Tebeng Layar M2 28.26 27,131.50 766,627.66

2.3 Pekerjaan Kayu 19,419,298.27


1 Pasang Rangka. Kuda-kuda, Gording Kayu Lokal ( Kelas III) M3 3.23 4,128,900.00 13,332,152.04
2 Pasang Kusen Pintu Kayu Lokal Kelas III BH 1.00 950,000.00 950,000.00
3 Pasang Daun Pintu Double Teak Wood M2 2.94 310,585.00 913,119.90
4 Pasang Kusen ventilasi Kayu Lokal Kelas III BH 1.00 300,000.00 300,000.00
6 Pasang ventilasi Kaca M2 0.34 87,672.13 29,457.83
7 Pasang Listplank 3/20 kayu Lokal Kelas III M' 56.80 38,810.00 2,204,408.00
8 Pasang Plafond Gudang Triplek 2,5 mm M2 14.00 120,726 1,690,160.50

2.4 Pekerjaan Atap 17,233,532.93


1 Pekerjaan Asbes Gelombang Kecil M2 201.60 41,614.50 8,389,483.20
2 Pekerjaan Bubungan Asbes M' 16.00 61,804.00 988,864.00
3 Talang Air 1/2 Lingkaran Dia 20 Alluminium M' 32.00 181,898.13 5,820,740.00
4 Pipa PVC Dia. 3" M' 25.50 69,193.95 1,764,445.73
5 Elbow Dia. 3" Unit 18.00 15,000.00 270,000.00

20
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
a b c d e f

2.5 Pekerjaan Pengecatan Bangunan 6,604,011.68


1 Pekerjaan Pengecatan Dinding M2 156.60 23,768.10 3,721,989.39
2 Pekerjaan Pengecatan Kayu M2 10.00 39,643.75 396,437.50
3 Pekerjaan Residu Rangka Atap M2 107.63 11,697.00 1,258,980.86
4 Pengecatan Tebeng Layar M2 28.26 23,768.10 671,591.43
5 Pengecatan Plafond M2 14.00 39,643.75 555,012.50

2.6 Pekerjaan Alat Gantung 163,344.88


1 Pas. Kunci Pintu Ps 1.00 116,294.75 116,294.75
2 Pas. Engsel Pintu Ps 3.00 15,683.38 47,050.13

2.7 Pekerjaan Instalasi Listrik 8,190,000.00


1 Pas. Titik Lampu + Bola lampu Ttk 4.00 120,000.00 480,000.00
2 Pas. Stop Kontak Bh 3.00 120,000.00 360,000.00
4 Pas. Box NCB `` Bh 1.00 350,000.00 350,000.00
5 Biaya Pemasangan Listrik PLN + Iǹ Set 1.00 7,000,000.00 7,000,000.00

2.8 Pekerjaan Sanitair 5,878,154.80


1 Pas. Box Rembesan Lindi ( 0.8 m x 0.8 m ) + Tutup + Pipa Acceroris LS 1.00 1,800,000.00 1,800,000.00
2 Pas. Saluran Air Keliling Gedung 20 x 20 cm M' 60.00 57,438.80 3,446,328.00
3 Pas. Saluran Lindi Dalam Gedung (20 x 20) M' 11.00 57,438.80 631,826.80
``
III WC/Kamar Mandi Unit 1.00 13,961,918.38 13,961,918.38

IV Landasan Kontainer Unit 1.00 13,753,760.70 13,753,760.70

V Jalan Masuk m 23.00 535,404.20 12,314,296.60

VI Penjemuran Plastik 4 x 6 m 2,383,270.80


- Urugan Tanah m3 4.80 59,150.00 283,920.00
- Urugan Pasir m3 2.40 81,445.00 195,468.00
,- Beton Ad. 1:2:3 t=10 cm m3 2.40 793,284.50 1,903,882.80

VII ALAT PENGUMPUL DAN PERALATAN PEMBUAT KOMPOS 344,890,500.00


1 Pengadaan Gerobak Sampah (Kap. 1m3) Unit 10 4,500,000.00 45,000,000.00
2 Mesin Pencacah Pupuk Organik (Kap. 500 - 600 kg/jam) Unit 1 37,000,000.00 37,000,000.00
3 Mesin Pencacah Plastik (Kap. 75 - 150 kg/jam) Unit 1 37,000,000.00 37,000,000.00
4 Ayakan Kasar (10 mm) Unit 2 400,000.00 800,000.00
5 Ayakan Halus (5 mm) Unit 2 500,000.00 1,000,000.00
6 Thermometer Alkohol Unit 1 50,000.00 50,000.00
7 Cangkul Bh 2 75,000.00 150,000.00
8 Skop Bh 2 75,000.00 150,000.00
9 Sepatu Kerja Psg 5 90,000.00 450,000.00
10 Sarung Tangan Psg 10 19,000.00 190,000.00
11 Masker Bh 5 15,100.00 75,500.00
12 Ember Bh 2 75,000.00 150,000.00
13 Alat Siram Bh 2 75,000.00 150,000.00
14 Bin 3R (1 Set 3 unit - Merah, Kuning , Hinjau - Lengkap Dengan Tiang) Set 250 525,000.00 131,250,000.00
15 Box Method Pengomposan (Kap.1m3) Unit 8 475,000.00 3,800,000.00
16 Bio Activator (Pusri) Botol 10 50,000.00 500,000.00
17 Rolly Unit 2 450,000.00 900,000.00
18 Garu Unit 2 75,000.00 150,000.00
19 Kontainer Unit 2 30,000,000.00 60,000,000.00
20 Motor Sampah Unit 1 25,000,000.00 25,000,000.00
21 Penutup Bak Permentasi Anaerobic Unit 9 125,000.00 1,125,000.00

VIII PEKERJAAN LAIN-LAIN 17,100,000.00


1 Pompa Air + Accesories Pipa Unit 2 800,000.00 1,600,000.00
2 Pemasangan Sambungan Air PDAM Unit 1 4,000,000.00 4,000,000.00
3 Menara Air, Bak, Pipa dan Accesories Pipa dan lain-lain Unit 1 6,000,000.00 6,000,000.00
4 Dudukan Mesin Plastik Bh 1 1,000,000.00 1,000,000.00
5 Dudukan Mesin Kompos Bh 1 500,000.00 500,000.00
6 Laporan Dan Foto Dokumentasi Lapangan Set 1 2,000,000.00 2,000,000.00
7 Gambar As Built Drawing Set 1 2,000,000.00 2,000,000.00

21
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN KUANTITAS
(Rp) (Rp)
a b c d e f

22
DAFTAR PERHITUNGAN V
NAMA PEKERJAAN : KAJIAN PENGELOLAAN PERSAMPAHAN 3R DALAM KABUPATEN MUARA ENIM
LOKASI/KABUPATEN : TANAH ABANG/ MUARA ENIM
KONSULTAN : PT. CATUR INTIREKA
TAHUN ANGGARAN : 2012 - 2013

PERHITUNGAN VOL. POLIGON

II PEK. BETON
2.1 Pek. Pondasi Batu Bata (uk. 20 x 50)
Panjang

Volume

2.2 Pas. Pondasi Beton Bertulang 60/60


Volume 1 Pondasi
Jumlah Pondasi
Vol. total

2.3 PAS. SLOOF BETON BERTULANG 15/20

Panjang Sloof

VOLUME :

2.4 PAS. TIANG BETON 20/20


Panjang Kolom 1 kolom

24b Kolom Praktis 10/10


Pjng Kolom urtk Gudang
Pjng Kolom urtk Bak air
Pjng Kolom urtk Dinding 1m
Volume

2.5 PAS. RING BALOK 15/20


Panjang Ring Balok :

VOLUME :

2.5 PAS. RING BALOK 15/30


Panjang Ring Balok :

VOLUME :

2.6 Pas. Dinding Batu Bata 1/2 bata


1. Gudang (uk. 4 x 3.5)m
- Tinggi Dinding

- Panjang Dinding

Pengurangan Pintu
Pengurangan Ventilasi

2. Dinding Tinggi 1m (Bak permentasi)


Jumlah Panjang Dindi

3. Lebar 20 cm (Bak Permentasi)

3. Tinggi 60 cm (Bak air)

2.8 Lantai Cor Beton


Panjang lantai
lebar lantai
Luas Lantai
Tebal
Volume

2.9 Pemb. Jalan Masuk


panjang
lebar
tebal

Ris Batu bata

2.10 Pembuatan Rabat


Panjang Rabat
lebar
Tebal Rabat
Volume
Urugan Tanah Utk Rabat 10 cm
Urugan Pasir Utk Rabat 5 cm

2.11 Pembuatan Bak Air Mesin Pencacah Plastik 1 x 1


Galian Tanah

2.12 Pembuatan Pondasi Mesin Pencacah Plastik

2.13 Pembuatan Pondasi Mesin Pencacah Kompos

III PEKERJAAN ATAP


3.1 Pek. Asbes Gelombang Kecil

Panjang Miring Atap


Panjang Atap
Luas
Luas Kiri kanan

KUDA2
BATANG MIRING PJG
BATANG MIRING PJG
BATANG MIRING PENDEK
BATANG MIRING PENDEK
`
BATANG TEGAK PJG
BATANG TEGAK PDK
BATANG TEGAK PDK

MENDATAR balok tarik gapit ( 2bh)

LUAS PENAMPANG 6/12

BATANG GAPIT (2 bh)

GORDING
1 gording
14 gording
skor
1 skor
8 skor

KUDA2 BETON

LISPLANK 3/20
PANJANG

SALURAN
R PERHITUNGAN VOLUME
AM KABUPATEN MUARA ENIM

42.00
40.00
-
Total = 82.00 0.6 1.2 0.9

8.20 M3 OK OK

besi
0.5*0.5x0.135= 0.05
15 bh
0.73 M3 OK OK 87.48

P
induk 99.50
14+14+14 42.00 cincin 663.33
8+8+8+8+8 = 40.00
1x10= 10.00
4+3.5 7.50
-
Total = 99.50 m

2.99 M3 OK OK

p
Bawah Lantai 0.67 telapak induk 55.05
Atas Lantai 3.00 cincin 367.00
Total Panjang 3.67 m 55.05

Jumlah kolom 15.00 bh


Volume Kolom 2.20 M3 OK OK

3 3.00
11 11.00
1x19 19.00
33.00
0.33 m3 OK OK 26.40

p
14 x 3 42.00 induk 66.00
8x3 24.00 cincin 440.00

Total = 66.00

1.98 M3 OK OK

p
induk 16.00
cincin 106.67
8x2 16.00

Total = 16.00

0.72 M3 OK OK

3 m

3.50
3.50
4.00
4.00
Total 15 m
Tebal - m
Luas dinding 45.00 m2

0.8x 2 x 0.1 0.16


0.4 x 0.6 x 0.1 0.024
Total Pengurangan 0.184 m3

Luas dinding 1 44.82 m2 OK

Panjang Dinding 18
3.6
0
0
0
0
Jumlah Panjang Dinding 21.6
Tinggi Dinding 1

Luas dinding 2 21.60 M2 OK

Lebar Dinding 2
Tinggi 1

Luas dinding 3 2.00 M2

Panjang 16.47
Tinggi 0.6
Luas dinding 4 9.882 M2

Luas Total 78.30 M2

3 1

14
8
112 m
0.15 M
16.8 M3 OK

38.5
3.0
0.2
vol. 23.1 M3 UDH

tinggi 0.5
tebal 0.1
panjang sebelah 38.5
volume 1.925
kiri kanan 3.85 M3

,(2*16)+(2*8) 48 m
1
0.15 m
7.2 m3 OK
7.2 m3 OK
3.6 m3 OK

1x1x1 1 m3

10

6.3 m
16.0 m
100.8 m2
201.6 m2 OK

6.0 BLK 6/12


6.0 BLK 6/12
2.1 BLK 6/12
2.1 BLK 6/12
`
2.3 BLK 6/12
1.2 BLK 6/12
1.2 BLK 6/12

18.0 BLK 6/12


JUMLAH 38.9 M

0.01 M2
VOLUME 0.28 M3

9.0 BLK 6/12


VOLUME 0.06

TOTAL 0.34 M3

3 BH KUDA2 1.03 M3 OK

16
224
volume 1.61 M3 OK
5.0 m
40.0 m
volume 0.29 M3

total 2.94
lain2 5% 0.29
total 3.23 OK ok

balok miring 11.70


balok tegak 3.79
jumlah 15.5
volume 0.223 m3
2 bh 0.446 m3

0.006

MENDATAR 16
MENDATAR 16
MIRING 6.2
6.2
6.2
6.2
TOTAL 56.8 M

8
8
10.5
10.5
7
TOTAL 44

4
3.5
4
4
3
3
5
29.15
lebar 0.4
11.66
12.5

2.7

4 0.887 353.03
0.6 0.394 156.81
509.84

4 0.887 195.32
0.7 0.394 101.22
296.54
4 0.887 234.17
0.6 0.394 104.02
338.18

6 0.887 85.15
0.7 0.394 29.42
114.57

jumlah besi seluruh 1,373.01


192