A. Pondasi
1 Batu Kali 76 M3 Rp 180,000.00 Rp 13,680,000.00
2 Semen 93 Zak Rp 80,000.00 Rp 7,440,000.00
3 Pasir 48 M3 Rp 150,000.00 Rp 7,200,000.00
3
4 Kayu (Bouplang) 3 M Rp 2,900,000.00 Rp 8,700,000.00
5 Paku P2, P2,5 P3 15 Kg Rp 26,000.00 Rp 390,000.00
6 Benang 6 Bh Rp 25,000.00 Rp 150,000.00
Sub Total Rp 37,560,000.00
B. Konstruksi
1 Besi ø 6 85 Btg Rp 40,000.00 Rp 3,400,000.00
2 Besi ø 8 65 Btg Rp 65,000.00 Rp 4,225,000.00
3 Besi ø 10 93 Btg Rp 89,000.00 Rp 8,277,000.00
4 Semen 65 Zak Rp 80,000.00 Rp 5,200,000.00
5 Pasir 39 M3 Rp 150,000.00 Rp 5,850,000.00
3
6 Koral 38 M Rp 150,000.00 Rp 5,700,000.00
3
7 Kayu (Bekisting) 2.5 M Rp 2,900,000.00 Rp 7,250,000.00
8 Paku P2, P2,5 P3, P4 20 Kg Rp 26,000.00 Rp 520,000.00
9 Kawat Ikat 5 Roll Rp 495,000.00 Rp 2,475,000.00
10 Triplek 9 mm 20 Hl Rp 140,000.00 Rp 2,800,000.00
11 Benang 6 Bh Rp 25,000.00 Rp 150,000.00
Sub Total Rp 45,847,000.00
C. Dinding
1 Batu Bata 18,500 Bh Rp 700.00 Rp 12,950,000.00
2 Semen 80 Zak Rp 80,000.00 Rp 6,400,000.00
3 Pasir Pasang 35 M3 Rp 150,000.00 Rp 5,250,000.00
4 Doropon 28 Bh Rp 18,000.00 Rp 504,000.00
5 Benang 6 Bh Rp 25,000.00 Rp 150,000.00
Sub Total Rp 25,254,000.00
E Pekerjaan Lantai
1 Timbunan 75 M3 Rp 170,000.00 Rp 12,750,000.00
2 Granit 72 Ktk Rp 186,000.00 Rp 13,392,000.00
3 Granit Hitam 14 Ktk Rp 250,000.00 Rp 3,500,000.00
4 Semen 89 Zak Rp 80,000.00 Rp 7,120,000.00
5 Pasir 32 M3 Rp 150,000.00 Rp 4,800,000.00
3
6 Koral 10 M Rp 150,000.00 Rp 1,500,000.00
7 Semen Warna 10 Bks Rp 35,000.00 Rp 350,000.00
8 Benang 6 Bh Rp 25,000.00 Rp 150,000.00
Sub Total Rp 43,562,000.00
F Pekerjaan Plafond
1 Fuering 231 Btg Rp 35,000.00 Rp 8,085,000.00
2 Papan Gibsum 48 Hl Rp 80,000.00 Rp 3,840,000.00
3 List Sudut 18 Btg Rp 45,000.00 Rp 810,000.00
4 Tepung Gibsum 10 Zak Rp 95,000.00 Rp 950,000.00
5 Baut fuering 6 Ktk Rp 85,000.00 Rp 510,000.00
6 Baut Gibsum 6 Ktk Rp 85,000.00 Rp 510,000.00
7 GRC 8 Hl Rp 75,000.00 Rp 600,000.00
8 Paku Beton P1, P1,5 6 Ktk Rp 39,000.00 Rp 234,000.00
9 Benang 5 Bh Rp 25,000.00 Rp 125,000.00
10 Lakban 5 Bh Rp 30,000.00 Rp 150,000.00
Sub Total Rp 15,814,000.00
J Pekerjaan Fising
1 Timbunan 40 M3 Rp 170,000.00 Rp 6,800,000.00
2 Septik Tank 1 Unit Rp 1,000,000.00 Rp 1,000,000.00
3 Instalasi Air Bersih Pipa (3/4) 1 Unit Rp 3,906,000.00 Rp 3,906,000.00
4 Instalasi Air Kotor Pipa (3-4) 1 Unit Rp 5,500,000.00 Rp 5,500,000.00
5 Instalasi & Meteran Listrik 1 Unit Rp 6,500,000.00 Rp 6,500,000.00
Sub Total Rp 23,706,000.00