Material On Site (MOS)

Project Gondowangi Sentra Menteng MN-61 Bintaro

No. Bahan Vol Sat Harsat Jumlah


1 MU mortar 301 3 zak Rp 85,000.00 Rp 255,000.00
2 MU Acian 1 zak Rp 130,000.00 Rp 130,000.00
3 Pasir + split 1 rit Rp 370,000.00 Rp 370,000.00
4 Semen 2 zak Rp 56,500.00 Rp 113,000.00
5 Gypsum 3 lbr Rp 66,000.00 Rp 198,000.00
6 Compond 1 zak Rp 60,000.00 Rp 60,000.00
7 Besi 10mm 2 btg Rp 78,000.00 Rp 156,000.00
8 Talang PVC 2 btg Rp 137,500.00 Rp 275,000.00
9 Pipa 3'' 1 btg Rp 125,000.00 Rp 125,000.00
10 Corong talang + tutup 1 lot Rp 67,500.00 Rp 67,500.00
11 Knee 3'' 3 pcs Rp 15,000.00 Rp 45,000.00
12 Multiplek 12mm 5 lbr Rp 175,000.00 Rp 875,000.00
13 Baut baja 4 Dus Rp 300,000.00 Rp 1,200,000.00
14 Dinabolt 8x40 60 pcs Rp 2,000.00 Rp 120,000.00
15 Dinabolt 10x65 30 pcs Rp 3,000.00 Rp 90,000.00
16 Kabel 2x1.5 1 roll Rp 455,000.00 Rp 455,000.00
17 paralon conduit 6 btg Rp 19,500.00 Rp 117,000.00

TOTAL Rp 4,651,500.00