RENCANA ANGGARAN BIAYA

Desa : Indang Sari


Kecamatan : Luwuk Timur Dimensi : 5 X 7.5 M
Kabupaten : Banggai Bidang : Pembangunan
Provinsi : Sulawesi Tengah Kegiatan : Pembangunan Sanggar Tani

No URAIAN Volume Satuan Harga Satuan (Rp)

I BAHAN
1 Atap Zincalume 80 x 170 cm, T= 0,30 mm 87.00 Lbr 74,000
2 Nok Zincalume, Tebal 0,25 mm 35.00 M 46,000
3 Seng Plat (Talang) 8.00 M 26,000
4 Lisplank GRC 30 Cm 11.00 Lbr 83,000
5 Truss Canal / TS C75.75 43.00 Btg 48,000
6 Reng - Kanal U Tebal = 0,6 mm 85.00 Btg 45,000
7 L. Braket 1,5 mm 3.00 Bh 25,000
8 List Profil Gypsum 9 - 11 Cm 42.00 M1 34,700
9 Screw 1" 160.00 Bh 500
10 Screw 10 - 16 x 16 2,039.00 Bh 600
11 Screw 12 - 14 x 20 232.00 Bh 700
12 Skrup Fixer 15.00 Kg 1,400
13 Penggantung dan Ramset 382.00 Bh 4,000
14 Stifenner/ Braket 287.00 Bh 4,000
15 Hollow Galvalum 4 x 4 cm 128.00 Btg 35,000
16 Kalsiboard 4 mm 35.00 Lbr 95,000
17 Semen 50 Kg 100.00 Sak 89,000
18 Semen Warna 5.00 Bungkus 50,000
19 Besi Ø 12 (SNI) 12m 32.00 Btg 124,000
20 Besi Ø 6 (SNI) 12m 30.00 Btg 77,000
21 Kawat beton / Bendrat 8.00 Kg 30,000
22 Paku Biasa 7.00 Kg 23,000
23 Minyak Cat / Thiner 1.00 Kg 70,000
24 Plamuur Tembok 10.00 Kg 15,000
25 Cat dasar /tembok 20.00 Kg 30,000
26 Cat penutup /tembok 38.00 Kg 35,000
27 Cat Dasar Kayu/Besi 3.00 Kg 40,000
28 Cat Penutup Kayu/Besi 5.00 Kg 80,000
29 Cornice Adhesive 6.00 Kg 39,000
30 Papan 2/20 x 4 (Kls. II) 0.14 Kg 1,900,000
31 Papan 2/20 x 4 (Kls. III) 0.63 m3 1,750,000
32 Kayu Klas III (mal) 0.27 M3 1,750,000
33 Balok 5/7 x 4 (Kls. III) 0.51 m3 1,750,000
34 Dolken kayu Ø 8-10cm –panjang 4 m 23.00 btg 15,000
35 Batu Bata 1,924.00 bh 1,000
36 Batu Gunung / Kali 19.00 M3 225,000
37 Kerikil Sungai Pilihan/Koral Beton 7.00 m3 200,000
38 Pasir Pasangan / Betonan / Beton 14.00 M3 200,000
39 Pasir urug 6.00 M3 200,000
40 Tanah Timbunan 15.00 M3 150,000

Bahan
460K
No URAIAN Volume Satuan Harga Satuan (Rp)

I BAHAN
II ALAT
1 Papan Proyek 1.00 Bh Rp 150,000.00
2 Kuas 4" 2.00 Bh Rp 15,000.00
3 Kuas Rol 2.00 Lbr Rp 30,000.00
4 Amplas 4.00 Lbr Rp 5,000.00
5 Kepi (Pisau Pempul) 2.00 Bh Rp 3,500.00
6 Meteran (5M) 1.00 Bh Rp 19,300.00
Alat
III UPAH
1 Pekerja 191.00 OH 95,000.00
2 Tukang 130.00 OH 125,000.00
3 Mandor 11.00 OH 100,000.00

Upah
JUMLAH BIAYA
DI BULATKAN

460K
an Sanggar Tani

Jumlah (Rp)

Rp 6,438,000.00
Rp 1,610,000.00
Rp 208,000.00
Rp 913,000.00
Rp 2,064,000.00
Rp 3,825,000.00
Rp 75,000.00
Rp 1,457,400.00
Rp 80,000.00
Rp 1,223,400.00
Rp 162,400.00
Rp 21,000.00
Rp 1,528,000.00
Rp 1,148,000.00
Rp 4,480,000.00
Rp 3,325,000.00
Rp 8,900,000.00
Rp 250,000.00
Rp 3,968,000.00
Rp 2,310,000.00
Rp 240,000.00
Rp 161,000.00
Rp 70,000.00
Rp 150,000.00
Rp 600,000.00
Rp 1,330,000.00
Rp 120,000.00
Rp 400,000.00
Rp 234,000.00
Rp 266,000.00
Rp 1,102,500.00
Rp 472,500.00
Rp 892,500.00
Rp 345,000.00
Rp 1,924,000.00
Rp 4,275,000.00
Rp 1,400,000.00
Rp 2,800,000.00
Rp 1,200,000.00
Rp 2,250,000.00

Rp 64,218,700.00
460K
Jumlah (Rp)

Rp 150,000.00
Rp 30,000.00
Rp 60,000.00
Rp 20,000.00
Rp 7,000.00
Rp 19,300.00
Rp 286,300.00

Rp 18,145,000.00
Rp 16,250,000.00
Rp 1,100,000.00

35,495,000.00
100,000,000.00
100,000,000.00

460K
ANALISA KEBUTUHAN BAHAN ALAT UPAH

Kegiatan : Pembangunan Sanggar Tani

Dimensi : 5 X 7,5

Desa : Indang Sari

Kecamatam : Luwuk Utara

Volume Pekerjaan (M) 1

T.02.b.2) Pasang 1 m' bouwplank 24.00

PUPR (2016/88)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.1000 2.40

2 Tukang L.02 OH 0.0100 0.24

3 Kepela Tukang L.03 OH 0.0100 0.24

4 Mandor L.04 OH 0.0050 0.12

B Bahan

1 Balok 5/7 x 4 (Kls. III) M.37.b m3 0.0130 0.31

2 Papan 2/20 x 4 (Kls. III) M.35.e m3 0.0070 0.17

3 Paku Biasa M.71.b Kg 0.0200 0.48

C Peralatan

Volume Pekerjaan (M3) 2

T.06.a.2) 1 m3 galian tanah biasa sedalam > 1 m s.d. 2 m 18.34

PUPR (2016/90)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.6750 12.38

2 Tukang L.02 OH 0.0675 1.24

B Bahan

C Peralatan

- Pelaksanaan galian tanah T.06 sampai dengan T.11 sudah termasuk

pembuangan hasil galian dengan jarak angkut L < 5 m serta perataan

Volume Pekerjaan (M3) 3

A.2.3.1.9 Pengurugan Kembali 1 m3 galian Tanah 6.11

PUPR (2016)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.5000 3.06

2 Tukang L.02 OH -

B Bahan

-
C Peralatan

Volume Pekerjaan (M3) 4

A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug 3.48

PUPR (2016/583)

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan

1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.3000 1.04

2 Mandor L.04 OH 0.0100 0.03

B Bahan

Pasir urug M3 1.2000 4.17

C Peralatan

Volume Pekerjaan (M3) 5

A.2.3.1.14 Pengurugan 1 m3 Tanah padat 12.50

PUPR (2016/584)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.2500 3.13

2 Mandor L.04 OH 0.0250 0.31

B Bahan

Tanah Timbunan M3 1.2000 15.00

C Peralatan

Volume Pekerjaan (M3) 6

A.3.2.1.9 (K3) Pemasangan 1 m3 batu kosong (anstamping) 4.11

PUPR (2016/589)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.7800 3.21

2 Tukang L.02 OH 0.3900 1.60

3 Kepela Tukang L.03 OH 0.0390 0.16

4 Mandor L.04 OH 0.0390 0.16

B Bahan

Batu Gunung / Kali M3 1.2000 4.93

Pasir urug M3 0.4320 1.78

C Peralatan

Volume Pekerjaan (M3) 7

A.3.2.1.2 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP 11.56

PUPR (2016/585)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 1.5000 17.34

2 Tukang L.02 OH 0.7500 8.67

3 Kepela Tukang L.03 OH 0.0750 0.87

4 Mandor L.04 OH 0.0750 0.87

B Bahan

Batu Gunung / Kali M3 1.2000 13.87

Pasir Pasangan / Betonan / Beton M3 0.5200 6.01

Semen 50 Kg Sak 3.2600 37.69

C Peralatan

Volume Pekerjaan (M3) 8

A.4.1.1.1 Membuat Beton Mutu f'c = 14,5 MPa (K 175), Slump (12 ± 2) cm, W/C = 0,66 8.67

PUPR (2016/590)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 1.6500 14.30

2 Tukang L.02 OH 0.2750 2.38

3 Kepela Tukang L.03 OH 0.0280 0.24

4 Mandor L.04 OH 0.0830 0.72

B Bahan

1 Semen 50 Kg Sak 4.9400 42.81

2 Pasir Pasangan / Betonan / Beton m3 0.6207 5.38

3 Kerikil Sungai Pilihan/Koral Beton m3 0.7400 6.41

4 Air m3 0.2150 1.86

C Peralatan

Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

Volume Pekerjaan (M2) 8

A.4.1.1.21 Pemasangan 1 m2 bekisting untuk Sloof 5.98

PUPR 2016
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.5200 3.11

2 Tukang L.02 OH 0.2600 1.55

3 Kepela Tukang L.03 OH 0.0260 0.16

4 Mandor L.04 OH 0.0260 0.16

B Bahan

Kayu Klas III (mal) M3 0.0450 0.27

Paku Biasa Kg 0.3000 1.79

C Peralatan
Volume Pekerjaan (M2) 9

A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 3.50

PUPR (2016/601)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.6600 2.31

2 Tukang L.02 OH 0.3300 1.16

3 Kepela Tukang L.03 OH 0.0330 0.12

4 Mandor L.04 OH 0.0330 0.12

B Bahan

Papan 2/20 x 4 (Kls. III) M3 0.0400 0.14

Balok 5/7 x 4 (Kls. III) M3 0.0150 0.05

Paku Biasa Kg 0.4000 1.40

Dolken kayu Ø 8-10cm –panjang 4 m btg 2.0000 7.00

C Peralatan

Volume Pekerjaan (M2) 10

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 7.88

PUPR (2016/602)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.6600 5.20

2 Tukang L.02 OH 0.3300 2.60

3 Kepela Tukang L.03 OH 0.0330 0.26

4 Mandor L.04 OH 0.0330 0.26

B Bahan

Papan 2/20 x 4 (Kls. III) M3 0.0400 0.32

Balok 5/7 x 4 (Kls. III) M3 0.0180 0.14

Paku Biasa Kg 0.4000 3.15

Dolken kayu Ø 8-10cm –panjang 4 m btg 2.0000 15.75

C Peralatan

Volume Pekerjaan (Kg) 11

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir 47.14

PUPR (2016/598)

Besi Ø 12 (SNI) 12m 31.15 Btg

Besi Ø 6 (SNI) 12m 29.58 Btg

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.0700 3.30

2 Tukang L.02 OH 0.0700 3.30


3 Kepela Tukang L.03 OH 0.0070 0.33

4 Mandor L.04 OH 0.0040 0.19

B Bahan

Besi Ø 12 (SNI) 12m Btg 1.0000

Besi Ø 6 (SNI) 12m Btg 1.0000

Kawat beton / Bendrat Kg 0.1500 7.07

C Peralatan

Volume Pekerjaan (M2) 12

Pemasangan Dinding Bata Merah (5 x 11 x 22) cm Tebal 1/2 Batu, Camp 1 SP : 4 PP 23.18

SNI 2008
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.3000 6.95

2 Tukang L.02 OH 0.1000 2.32

3 Kepela Tukang L.03 OH 0.0100 0.23

4 Mandor L.04 OH 0.0150 0.35

B Bahan

Batu Bata bh 83.0000 1,923.53

Semen 50 Kg Sak 0.2300 5.33

Pasir Pasangan / Betonan / Beton M3 0.0430 1.00

C Peralatan

Volume Pekerjaan (M2) 13

A.4.4.2.4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 55.05

PUPR (2016/644)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.3000 16.52

2 Tukang L.02 OH 0.1500 8.26

3 Kepela Tukang L.03 OH 0.0150 0.83

4 Mandor L.04 OH 0.0150 0.83

B Bahan

Semen 50 Kg sak 0.1248 6.87

Pasir Pasangan / Betonan / Beton m3 0.0240 1.32

C Peralatan

Volume Pekerjaan (M2) 14

A.4.4.2.27 Pemasangan 1 m2 acian 97.05

PUPR (2016/655)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.2000 19.41


2 Tukang L.02 OH 0.1000 9.71

3 Kepela Tukang L.03 OH 0.0100 0.97

4 Mandor L.04 OH 0.0100 0.97

B Bahan

Semen 50 Kg sak 0.0650 6.31

C Peralatan

Volume Pekerjaan (M2)

Pemasangan Lantai Keramik Ukuran 40 cm x 40 cm

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.2500 -

2 Tukang L.02 OH 0.1250 -

3 Kepela Tukang L.03 OH 0.0130 -

4 Mandor L.04 OH 0.0130 -

B Bahan

Keramik 40X40 Bh 6.6300 -

Semen 50 Kg sak 0.1960 -

Semen Warna sak 0.0260 -

Semen 50 Kg M3 0.0450 -

C Peralatan

Volume Pekerjaan (M2)

Pasang Plafond Kalsiboard + Rangka Hollow Galvalum 95.38

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.2500 23.85

2 Tukang L.02 OH 0.3000 28.62

3 Kepela Tukang L.03 OH 0.0250 2.38

4 Mandor L.04 OH 0.0130 1.24

B Bahan

Kalsiboard 4 mm Lbr 0.3640 34.72

Hollow Galvalum 4 x 4 cm Btg 1.0250 97.77

Stifenner/ Braket Bh 3.0000 286.15

Skrup Fixer Kg 0.1500 14.31

Penggantung dan Ramset Bh 4.0000 381.54

C Peralatan

Volume Pekerjaan (M)


Pemasangan List Plafond Profil Gypsum 9 - 11 CM 40.00

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.0600 2.40

2 Tukang L.02 OH 0.0600 2.40

3 Kepela Tukang L.03 OH 0.0060 0.24

4 Mandor L.04 OH 0.0030 0.12

B Bahan

List Profil Gypsum 9 - 11 Cm M1 1.0500 42.00

Cornice Adhesive Kg 0.1500 6.00

C Peralatan

Volume Pekerjaan (M2)

Pemasangan Rangka Atap Baja Ringan 115.66

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.1800 20.82

2 Tukang L.02 OH 0.2400 27.76

3 Kepela Tukang L.03 OH 0.0180 2.08

4 Mandor L.04 OH 0.0240 2.78

B Bahan

Truss Canal / TS C75.75 Btg 0.3670 42.45

Reng - Kanal U Tebal = 0,6 mm Btg 0.7330 84.78

L. Braket 1,5 mm Bh 0.0250 2.89

Screw 12 - 14 x 20 Bh 2.0000 231.31

Screw 10 - 16 x 16 Bh 8.0000 925.25

C Peralatan

Volume Pekerjaan (M2)

Pemasangan Atap Zincalume 115.66

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.1200 13.88

2 Tukang L.02 OH 0.0600 6.94

3 Kepela Tukang L.03 OH 0.0060 0.69

4 Mandor L.04 OH 0.0060 0.69

B Bahan
Atap Zincalume 80 x 170 cm, T= 0,30 mm Lbr 0.7500 86.74

Screw 10 - 16 x 16 Btg 8.0000 925.25

C Peralatan

Volume Pekerjaan (M)

Pemasangan Nok Zincalume (Pada Rangka Baja Ringan) 31.32

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.2500 7.83

2 Tukang L.02 OH 0.1500 4.70

3 Kepela Tukang L.03 OH 0.0150 0.47

4 Mandor L.04 OH 0.0130 0.41

B Bahan

Nok Zincalume, Tebal 0,25 mm M 1.1000 34.45

Screw 10 - 16 x 16 Bh 6.0000 187.92

C Peralatan

Volume Pekerjaan (M)

Talang Datar/Jurai Seng BJLS 28 Lebar 90 cm 6.90

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.2000 1.38

2 Tukang L.02 OH 0.2000 1.38

3 Kepela Tukang L.03 OH 0.0200 0.14

4 Mandor L.04 OH 0.0010 0.01

B Bahan

Seng Plat (Talang) M 1.0500 7.25

Paku Biasa Kg 0.0150 0.10

Papan 2/20 x 4 (Kls. II) Kg 0.0190 0.13

C Peralatan

Volume Pekerjaan (M) 18

Pemasangan Listplank GRC 30 cm 40.00

Terapan
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.2400 9.60

2 Tukang L.02 OH 0.2800 11.20

3 Kepela Tukang L.03 OH 0.2800 11.20

4 Mandor L.04 OH 0.2800 11.20

B Bahan

Lisplank GRC 30 Cm Lbr 0.2750 11.00

Hollow Galvalum 4 x 4 cm Btg 0.7500 30.00

Screw 1" Bh 4.0000 160.00

C Peralatan

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

Volume Pekerjaan (M2) 19

A.4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 97.05

PUPR (2016/745)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.0200 1.94

2 Tukang L.02 OH 0.0630 6.11

3 Kepela Tukang L.03 OH 0.0063 0.61

4 Mandor L.04 OH 0.0030 0.29

B Bahan

Plamuur Tembok Kg 0.1000 9.71

Cat dasar /tembok Kg 0.1000 9.71

Cat penutup /tembok Kg 0.1300 12.62

C Peralatan

Volume Pekerjaan (M2)

Pengecatan Plafond Kalsiboard (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 95.38

Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.0200 1.91

2 Tukang L.02 OH 0.0630 6.01

3 Kepela Tukang L.03 OH 0.0063 0.60

4 Mandor L.04 OH 0.0030 0.29

B Bahan
Cat dasar /tembok Kg 0.1000 9.54

Cat penutup /tembok Kg 0.2600 24.80

C Peralatan

Volume Pekerjaan (M2) 13

A.4.7.1.20 Pengecatan Listplank GRC (1 Lapis Cat Dasar, 3 Lapis Cat Penutup) 12.00

PUPR (2016\)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6

A Tenaga Kerja

1 Pekerja L.01 OH 0.0700 0.84

2 Tukang L.02 OH 0.1050 1.26

3 Kepela Tukang L.03 OH 0.0040 0.05

4 Mandor L.04 OH 0.0030 0.04

B Bahan

Cat Dasar Kayu/Besi Kg 0.1700 2.04

Cat Penutup Kayu/Besi Kg 0.3500 4.20

Minyak Cat / Thiner Kg 0.0300 0.36

C Peralatan

Kuas 4" Bh 0.0100 0.12

Ampelas Lbr 0.2000 2.40


A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa
6.66667

A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm


DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022

BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Instalasi Listrik
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pemasangan Instalasi Titik Lampu 7.00 Ttk 7.00
2 Lampu SL 11 Watt, Komplit Fitting 7.00 bh 7.00
3 Pemasangan Lampu SL 8 Watt 7.00 bh 7.00
4 Stop Kontak 1.00 bh 1.00
5 Saklar Ganda 1.00 bh 1.00
6 Saklar tunggal 2.00 bh 2.00
7 Box Sekring 1.00 bh 1.00

SKETSA / FOTO
112 224
200
200

8.5 2 17
11.5 2 23
2 2 4
1.2 1 1.2
45.2
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022

BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Pengecatan
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pengecatan Tembok (1 Lapis Plamur, 1 Lapis Cat Dasar, LXTX∑ 1.00 M 2
97.05 Tembok
2 Lapis Cat Penutup)

2 Pengecatan Plafond Kalsiboard (1 Lapis Cat Dasar, 1.00 M2 95.38


2 Lapis Cat Penutup)

5 Pengecatan Listplang 40.00 0.30 1.00 M2 12.00

SKETSA / FOTO
112 224
200
200

8.5 2 17
11.5 2 23
2 2 4
1.2 1 1.2
45.2
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022

BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Kusen Pintu dan Sanitasi
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pemasangan Pintu WC Aluminium LXTX∑ 0.70 1.80 1.00 M 2
1.26

2 Pemasangan Bak Air Fiber 1.00 Bh


3 Pemasangan Closet Jongkok 1.00 Bh
4 Pemasangan Kran 1.00 bh
5 Pemasangan Flor Drain 1.00 Bh
6 Pemipaan air bersih Pipa 1/2" 16.00 M
Hanger + Support Pipa PVC Ø 1/2" (Sambungan Pipa) 5.00 Set
7 Pemipaan air Kotor Pipa 1" 8.00 M
Hanger + Support Pipa PVC Ø 1" (Sambungan Pipa) 3.00 Set
8 Septiktang 1.00 Unit

SKETSA / FOTO
112 224
200
200

8.5 2 17
11.5 2 23
2 2 4
1.2 1 1.2
45.2
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022

BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Penutup Atap dan Plafond
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pasang Plafond Kalsiboard + Rangka Hollow Galvalum PXLX∑ 2.50 2.00 1.00 M 2
5.00 Teras
7.50 5.00 1.00 M2 37.50 Ruangan
45.20 1.17 1.00 M2 52.88 Keliling
M2 95.38

2 Pemasangan List Plafond Profil Gypsum 9 - 11 CM 40.00 1.00 M 40.00 Keliling


M 40.00

3 Pemasangan Rangka Atap Baja Ringan 1.90


5.13 2.00 M2 66.95
11.15
8.15 5.13 2.00 M2 41.81
3.45 2.00 2.00 M2 6.90
M2 115.66
4 Pemasangan Atap Zincalume M2 115.66

5 Pemasangan Nok Zincalume 5.13 4.00 M 20.52


3.45 2.00 M 6.90
2.00 1.00 M 2.00
1.90 1.00 M 1.90
M 31.32

6 Pemasangan Talang 3.45 2.00 M 6.90

7 Pemasangan Lisplank GRC 30 Cm 40.00 1.00 M 40.00

SKETSA / FOTO
112 224
200
200

7.5 2 15
10.5 2 21
2 2 4

40
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022

BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Finishing Lantai
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pemasangan dinding bata merah 1/2 batu camp 1PC:4PP PXLX∑
Pemasangan 1 m2 lantai keramik 40x40 2.50 2.00 1.00 M2 5.00 Teras
2.50 0.80 1.00 M2 2.00 tangga
7.50 5.00 1.00 M2 37.50 Ruangan
M2 44.50

SKETSA / FOTO
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022

BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Dinding dan Plesteran
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pemasangan dinding bata merah 1/2 batu camp 1PC:4PP PXTX∑ 2.25 0.60 7.00 M2 9.45 Ruangan
2.25 3.05 2.00 M2 13.73
Luas Dinding M2 23.18

2 Pemasangan Plesteran Dinding, Camp 1SP: 4PP T 15 mm 2X Luas Dinding M2 46.35


Plesteran Beton dan Pondasi Camp 1 SP : 4 PP T 15 mm 29.00 0.15 1.00 M2 4.35 Slof
29.00 0.15 1.00 M2 4.35 Pondasi
M2 55.05

3 Pemasangan Acian Semen Dinding, Camp 1SP: 4PP T 1 2X Luas Dinding M2 46.35
4 Acian Semen Beton dan Pondasi Camp 1 SP : 4 PP T 15 mm 29.00 0.15 1.00 M2 4.35 Slof
29.00 0.15 1.00 M2 4.35 Pondasi
3.50 1.00 12.00 M2 42.00
M2 97.05

SKETSA / FOTO
7.00
30.00
5.50
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022

BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Sloof, Kolom, Balok, Ring Balok,Lantai Beton
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pekerjaan Sloof Beton PXLXTX∑ 6.50 0.15 0.15 1.00 M3 0.15 Teras
Membuat Beton Mutu f'c = 14,5 MPa (K 175) 25.00 0.15 0.20 1.00 M3 0.75 Ruangan
M3 0.90

2 Pemasangan 1 m2 bekisting untuk sloof PXTX∑ 6.50 0.15 1.00 M3 0.98 Teras
2Xpakai 25.00 0.20 1.00 M3 5.00 Ruangan
M3 5.98

3 Pembesian 10 kg dengan besi polos atau ulir Panjang ∑pjang Jumlah Berat
∑pjang X berat ∑pek (unit) ∑besi (Bh) Ø
Pembesian Slof pot (M) (M) (Kg)
Besi Ø12mm 2.20 2 4 17.60 12 15.62 Teras
2.70 1 4 10.80 12 9.58
Besi Ø6mm 0.50 1 33 16.50 6 3.66
Besi Ø12mm 5.20 2 4 41.60 12 36.91 Ruangan
7.90 2 4 63.20 12 56.08
Besi Ø6mm 0.60 1 125 75.00 6 16.64
Kg 138.50
Jumlah Besi Ø12mm Btg 8.88
Jumlah Besi Ø6mm Btg 7.63

4 Pekerjaan Kolom Beton PXLXTX∑ 3.50 0.25 0.25 2.00 M3 0.44 Teras
Membuat Beton Mutu f'c = 14,5 MPa (K 175) 3.50 0.25 0.25 10.00 M3 2.19 Ruangan
M3 2.63

5 Pemasangan 1 m2 bekisting untuk Kolom PXTX∑ 3.50 0.25 2.00 M3 1.75 Teras
2Xpakai 3.50 0.25 2.00 M3 1.75 Ruangan
M3 3.50

6 Pembesian 10 kg dengan besi polos atau ulir Panjang ∑pjang Jumlah Berat
∑pjang X berat ∑pek (unit) ∑besi (Bh) Ø
Pembesian Kolom pot (M) (M) (Kg)
Besi Ø12mm 3.75 2 4 30.00 12 26.62 Teras
Besi Ø6mm 0.65 2 18 23.40 6 5.19
Besi Ø12mm 3.75 10 4 150.00 12 133.10 Ruangan
Besi Ø6mm 0.65 10 18 117.00 6 25.96
Besi Ø12mm 2.60 2 4 20.80 12 WC
Besi Ø6mm 0.65 2 12 15.60 6
Kg 190.87
Jumlah Besi Ø12mm Btg 13.39
Jumlah Besi Ø6mm Btg 13.00

7 Pekerjaan Ring Balk Beton PXLXTX∑ 6.50 0.15 0.20 1.00 M3 0.20 Teras
Membuat Beton Mutu f'c = 14,5 MPa (K 175) 25.00 0.15 0.20 1.00 M3 0.75 Ruangan
M3 0.95

8 Pemasangan 1 m2 bekisting untuk Ring Balk PXTX∑ 6.50 0.25 1.00 M3 1.63 Teras
2Xpakai 25.00 0.25 1.00 M3 6.25 Ruangan
M3 7.88

9 Pembesian 10 kg dengan besi polos atau ulir Panjang ∑pjang Jumlah Berat
∑pjang X berat ∑pek (unit) ∑besi (Bh) Ø
Pembesian Ring Balk pot (M) (M) (Kg)
Besi Ø12mm 2.20 2 4 17.60 12 15.62 Teras
2.70 1 4 10.80 12 9.58
Besi Ø6mm 0.50 1 35 17.50 6 3.88
Besi Ø12mm 5.20 2 4 41.60 12 36.91 Ruangan
7.90 2 4 63.20 12 56.08
Besi Ø6mm 0.60 1 150 90.00 6 19.97
Kg 142.04
Jumlah Besi Ø12mm Btg 8.88
Jumlah Besi Ø6mm Btg 8.96

10 Pekerjaan Lantai Beton Tebal 7 cm PXLXTX∑ 3.00 2.00 0.07 1.00 M3 0.42 Teras
Membuat Beton Mutu f'c = 14,5 MPa (K 175) 9.00 6.00 0.07 1.00 M3 3.78 Ruangan
M3 4.20

SKETSA / FOTO
((3,14*7850)/4/1000000)*I26^2

0.89 12 15000 159,725.52

0.22 12 15000 39,931.38


DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022

BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Galian, Urugan dan Pondasi
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pengukuran dan pemasangan 1 m’ Bouwplank PX∑ 1.50 16.00 M 1
24.00

2 Penggalian 1 m3 tanah biasa sedalam 1 m PXLXTX∑ 6.50 0.60 0.60 1.00 M3 2.34 Teras
25.00 0.80 0.80 1.00 M3 16.00 Ruangan
M3 18.34

3 Pengurugan Kembali 1 m3 galian Tanah 1/3 X Galian M3 6.11

4 Pengurugan 1 m3 dengan pasir urug bawah pondasi PXLXTX∑ 6.50 0.70 0.05 1.00 M3 0.23 Teras
25.00 0.90 0.05 1.00 M3 1.13 Ruangan
5 Pengurugan 1 m3 dengan pasir urug bawah Lantai PXLXTX∑ 2.50 2.00 0.05 1.00 M3 0.25 Teras
7.50 5.00 0.05 1.00 M3 1.88 Ruangan
M3 3.48

6 Pengurugan 1 m3 Tanah padat PXLXTX∑ 2.50 2.00 0.25 1.00 M3 1.25 Teras
7.50 5.00 0.30 1.00 M3 11.25 Ruangan
M3 12.50
7 Pemadatan tanah 1 m3 tanah ( per 20 cm) M3 12.50

8 Pemasangan 1 m3 batu kosong (anstamping) PXLXTX∑ 7.00 0.70 0.15 1.00 M3 0.74 Teras
25.00 0.90 0.15 1.00 M3 3.38 Ruangan
M3 4.11

9 Pemasangan 1 m3 pondasi batu belah camp 1SP : 4PP PX((La+Lb)/2)XTX∑ 0.30 Teras
6.50 0.60 1.00 M3 1.56
0.50
0.30 Ruangan
25.00 0.80 1.00 M3 10.00
0.70
M3 11.56

SKETSA / FOTO
RENCANA ANGGARAN BIAYA
RUANG GURU DAN TATA USAHA
SATUAN KERJA :
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :

HARGA JUMLAH
ITEM
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
PEMBAYARAN
(Rp) (Rp)
A B C D E F G
I DIVISI 1.0 PEKERJAAN PERSIAPAN

II DIVISI 2.0 PEKERJAAN STRUKTUR


Section 2.1 Pekerjaan Galian, Urugan dan Pondasi
1 Penggalian tanah biasa sedalam 1 m 18.34 M3 63,125.00 1,157,712.50
2 Pengurugan 1 m3 dengan pasir urug bawah pondasi 3.48 M3 325,250.00 1,131,056.88
3 Pengurugan 1 m3 dengan pasir urug bawah lantai M3 325,250.00 -
4 Pengurugan dengan sirtu padat 12.50 M3 263,125.00 3,289,062.50
5 Pemasangan batu kosong (aanstamping) 4.11 M3 526,755.00 2,164,963.05
6 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP 11.56 M3 902,875.00 10,437,235.00
Jumlah Section 2.1 18,180,029.93

Section 2.2 Pekerjaan Sloof, Kolom, Ring Balok,Lantai Beton


1 Membuat Slof Beton Mutu f'c = 14,5 MPa (K 175) 0.90 M3 1,000,454.84 896,657.65
2 Pemasangan 1 m2 bekisting untuk sloof 5.98 M2 177,070.00 1,057,993.25
3 Pembesian Slof per 10 kg dengan besi polos atau ulir 13.85 Kg 152,156.50 2,107,296.56

4 Membuat Kolom Beton Mutu f'c = 14,5 MPa (K 175) 2.63 M3 1,000,454.84 2,626,193.96
5 Pemasangan 1 m2 bekisting untuk Kolom 3.50 M2 277,527.50 971,346.25
6 Pembesian Kolom per 10 kg dengan besi polos atau ulir 19.09 Kg 152,156.50 2,904,241.49

7 Membuat Ring Balk Beton Mutu f'c = 14,5 MPa (K 175) 0.95 M3 1,000,454.84 945,429.83
8 Pemasangan 1 m2 bekisting untuk Ring Balk 7.88 M2 284,127.50 2,237,504.06
9 Pembesian Ring Balk per 10 kg dengan besi polos atau ulir 14.20 Kg 152,156.50 2,161,303.84

10 Membuat Lantai Beton Mutu f'c = 14,5 MPa (K 175) Tebal 7 cm 4.20 M3 1,000,454.84 4,201,910.33
Jumlah Section 2.2 20,109,877.23
Jumlah Devisi 2.0 38,289,907.16

III DIVISI 3.0 PEKERJAAN ARSITEKTUR


Section 3.1 Pekerjaan Dinding dan Plesteran
1 Pemasangan dinding bata merah 1/2 batu campuran 1PC:4PP 23.18 M2 119,575.00 2,771,150.63
2 Pemasangan Plesteran Dinding, Campuran 1 SP : 4 PP Tebal 15 mm 55.05 M2 60,785.00 3,346,214.25
3 Plesteran Beton dan Pondasi Campuran 1 SP : 4 PP Tebal 15 mm M2 60,785.00 -
4 Pemasangan acian Dinding,Beton dan Pondasi 97.05 M2 35,325.00 3,428,291.25
Jumlah Section 3.1 9,545,656.13

Section 3.2 Pekerjaan Finishing Lantai


1 Pemasangan 1 m2 lantai keramik 40x40 44.50 M2 158,485.00 7,052,582.50
2 Pemasangan 1 m2 lantai keramik 20x40 Kamar Mandi M2 232,845.00 -
3 Pemasangan 1 m2 Dinding keramik 20x40 Kamar Mandi M2 256,015.00 -
Jumlah Section 3.2 7,052,582.50

Section 3.3 Pekerjaan Penutup Atap dan Plafond


1 Pasang Plafond Kalsiboard + Rangka Hollow Galvalum 95.38 M2 187,900.26 17,922,678.40
2 Pemasangan List Plafond Profil Gypsum 9 - 11 CM 40.00 M 57,325.50 2,293,020.00
3 Pemasangan Rangka Atap Baja Ringan 115.66 M2 168,811.50 19,524,062.84
4 Pemasangan Atap Zincalume 115.66 M2 93,350.00 10,796,487.60
5 Pemasangan Nok Zincalume 31.32 M 126,485.00 3,961,510.20
Pemasangan Talang 6.90 M 126,485.00 872,746.50
6 Pemasangan Lisplank GRC 30 Cm 40.00 M 84,946.50 3,397,860.00
Jumlah Section 3.3 58,768,365.54

Section 3.4 Pekerjaan Kusen dan Pintu


Pemasangan Pintu WC Aluminium 1.00 M2 750,000.00 750,000.00
Pemasangan Bak Air Fiber 1.00 Bh 750,000.00 750,000.00
Pemasangan Closet Jongkok 1.00 Bh 300,000.00 300,000.00
HARGA JUMLAH
ITEM
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
PEMBAYARAN
(Rp) (Rp)
A B C D E F G
Pemasangan Kran 1.00 bh 30,000.00 30,000.00
Pemasangan Flor Drain 1.00 Bh 25,000.00 25,000.00
Pemipaan air bersih Pipa 1/2" 16.00 M 10,000.00 160,000.00
Hanger + Support Pipa PVC Ø 1/2" (Sambungan Pipa) 5.00 Set 25,000.00 125,000.00
Pemipaan air Kotor Pipa 1" 8.00 M 14,000.00 112,000.00
Hanger + Support Pipa PVC Ø 1" (Sambungan Pipa) 3.00 Set 30,000.00 90,000.00
Septiktang 1.00 Unit 7,000,000.00 7,000,000.00

Jumlah Section 3.4

Section 3.5 Pekerjaan Pengecatan


1 Pengecatan Tembok (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 97.05 M2 20,262.20 1,966,446.51
2 Pengecatan Plafond Kalsiboard (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 95.38 M2 19,010.20 1,813,268.92
3 Pengecatan Listplang 12.00 M2 43,794.00 525,528.00
4 Pengecatan Bidang Kayu Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup) M2 -
Jumlah Section 3.5 4,305,243.43
Jumlah Devisi 3.0

DIVISI 4.0 PEKERJAAN ELEKTRIKAL DAN SANITAIR


Section 4.1 Pekerjaan Instalasi dan Armatur Lampu
1 Pemasangan Instalasi Titik Lampu 7.00 Titik 143,038.53 1,001,269.68
2 Lampu SL 11 Watt, Komplit Fitting 7.00 Bh 70,046.00 490,322.00
3 Pemasangan Lampu SL 8 Watt -
4 Stop Kontak 1.00 Bh 101,100.00 101,100.00
5 Saklar Ganda 1.00 Bh 91,120.00 91,120.00
6 Saklar tunggal 2.00 Bh 73,840.00 147,680.00
7 Box Sekring 1.00 Bh 75,350.00 75,350.00
Jumlah Section 4.1

Section 4.2 Pekerjaan Plumbing dan Sanitair


- Ember + Gayung Bh 125,000.00 -
Jumlah Section 4.2 -

Section 4.3 Pekerjaan Septictank dan Bak Kontrol

Jumlah Section 4.3 -


Jumlah Devisi 4.0
XV. ANL. TERAPAN HARGA SATUAN PEKERJAAN TAMBAHAN

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 01 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Rangka Atap Baja Ringan
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.180 80,000.00 14,400.00
Tukang Alumunium L.02 Org/Hari 0.240 120,000.00 28,800.00
Kepala Tukang L.03 Org/Hari 0.018 120,000.00 2,160.00
Mandor L.04 Org/Hari 0.024 125,000.00 3,000.00
JUMLAH TENAGA KERJA 48,360.00
B. BAHAN :
Cord - Kanal C Tebal = 1 mm - Btg 0.367 109,000.00 40,003.00
Reng - Kanal U Tebal = 0,6 mm - Btg 0.733 104,500.00 76,598.50
L. Braket 1,5 mm - Bh 0.025 2,000.00 50.00
Screw 12 - 14 x 20 - Bh 2.000 300.00 600.00
Screw 10 - 16 x 16 - Bh 8.000 400.00 3,200.00
JUMLAH HARGA BAHAN 120,451.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 168,811.50
E. Overhead & Profit 10% x D 16,881.15
F. Harga Satuan Pekerjaan(D + E) 185,692.65

Halaman-39
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 02 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Lisplank GRC 30 Cm
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.094 80,000.00 7,520.00
Tukang Kayu L.02 Org/Hari 0.156 120,000.00 18,720.00
Kepala Tukang L.03 Org/Hari 0.016 120,000.00 1,920.00
Mandor L.04 Org/Hari 0.016 125,000.00 2,000.00
JUMLAH TENAGA KERJA 30,160.00
B. BAHAN :
Lisplank GRC 30 Cm - Lbr 0.275 104,860.00 28,836.50
Holo 4X4 - Btg 0.750 33,000.00 24,750.00
Screw 1" - Bh 4.000 300.00 1,200.00
JUMLAH HARGA BAHAN 54,786.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 84,946.50
E. Overhead & Profit 10% x D 8,494.65
F. Harga Satuan Pekerjaan(D + E) 93,441.15

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 03 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pasang Plafond Gypsumboard + Rangka Hollow Galvalum
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 80,000.00 20,000.00 0.300
Tukang Allumunium L.02 Org/Hari 0.300 120,000.00 36,000.00 0.500
Kepala Tukang L.03 Org/Hari 0.025 120,000.00 3,000.00 0.050
Mandor L.04 Org/Hari 0.013 125,000.00 1,625.00 0.150
JUMLAH TENAGA KERJA 60,625.00
B. BAHAN :
Gypsumboard 9 mm - Lbr 0.364 99,190.00 36,105.16
Rangka Hollow Galvalum 2x4 cm, T = 0,35 mm - Btg 1.025 26,400.00 27,060.00
Stifenner/ Braket - Bh 3.000 5,140.00 15,420.00
Skrup Fixer - Kg 0.150 24,130.00 3,619.50
Penggantung dan Ramset - Bh 4.000 11,800.00 47,200.00
JUMLAH HARGA BAHAN 129,404.66
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 190,029.66
E. Overhead & Profit 10% x D 19,002.97
F. Harga Satuan Pekerjaan(D + E) 209,032.63

Halaman-40
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 04 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pasang Plafond Kalsiboard + Rangka Hollow Galvalum
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 80,000.00 20,000.00 0.300
Tukang Allumunium L.02 Org/Hari 0.300 120,000.00 36,000.00 0.500
Kepala Tukang L.03 Org/Hari 0.025 120,000.00 3,000.00 0.050
Mandor L.04 Org/Hari 0.013 125,000.00 1,625.00 0.150
JUMLAH TENAGA KERJA 60,625.00
B. BAHAN :
Kalsiboard 4 mm - Lbr 0.364 93,340.00 33,975.76
Rangka Hollow 4x4 cm, T = 0,35 mm - Btg 1.025 26,400.00 27,060.00
Stifenner/ Braket - Bh 3.000 5,140.00 15,420.00
Skrup Fixer - Kg 0.150 24,130.00 3,619.50
Penggantung dan Ramset - Bh 4.000 11,800.00 47,200.00
JUMLAH HARGA BAHAN 127,275.26
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 187,900.26
E. Overhead & Profit 10% x D 18,790.03
F. Harga Satuan Pekerjaan(D + E) 206,690.29

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 05 AHSP - A.4.4.3


KODE/ JENIS PEKERJAAN : Pemasangan Dinding Keramik Ukuran 20 cm x 40 cm
SATUAN PEMBAYARAN : M2

URAIAN HARGA SATUAN JUMLAH HARGA


No. KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.240 80,000.00 19,200.00
Tukang Batu L.02 Org/Hari 0.120 120,000.00 14,400.00
Kepala Tukang L.03 Org/Hari 0.012 120,000.00 1,440.00
Mandor L.04 Org/Hari 0.012 125,000.00 1,500.00
JUMLAH TENAGA KERJA 36,540.00
B. BAHAN :
Keramik Ukuran 20 cm x 40 cm - Buah 12.500 9,680.00 121,000.00 2.800
Semen Portland - Kg 9.300 1,500.00 13,950.00
Semen Warna - Kg 1.940 3,500.00 6,790.00
Pasir Pasang - M3 0.018 250,000.00 4,500.00
JUMLAH HARGA BAHAN 146,240.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 182,780.00
E. Overhead & Profit 10% x D 18,278.00
F. Harga Satuan Pekerjaan(D + E) 201,058.00

Halaman-41
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 06 AHSP - A.4.4.3


KODE/ JENIS PEKERJAAN : Pemasangan Dinding Keramik Ukuran 20 cm x 40 cm (Bermotif)
SATUAN PEMBAYARAN : M2

URAIAN HARGA SATUAN JUMLAH HARGA


No. KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.240 80,000.00 19,200.00
Tukang Batu L.02 Org/Hari 0.120 120,000.00 14,400.00
Kepala Tukang L.03 Org/Hari 0.012 120,000.00 1,440.00
Mandor L.04 Org/Hari 0.012 125,000.00 1,500.00
JUMLAH TENAGA KERJA 36,540.00
B. BAHAN :
Keramik Bermotif Ukuran 20 cm x 40 cm - Buah 12.500 10,160.00 127,000.00 2.800
Semen Portland - Kg 9.300 1,500.00 13,950.00
Semen Warna - Kg 1.940 3,500.00 6,790.00
Pasir Pasang - M3 0.018 250,000.00 4,500.00
JUMLAH HARGA BAHAN 152,240.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 188,780.00
E. Overhead & Profit 10% x D 18,878.00
F. Harga Satuan Pekerjaan(D + E) 207,658.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 07 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pengecatan Plafond Gypsum (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 80,000.00 1,600.00
Tukang Kayu L.02 Org/Hari 0.063 120,000.00 7,560.00
Kepala Tukang L.03 Org/Hari 0.0063 120,000.00 756.00
Mandor L.04 Org/Hari 0.0025 125,000.00 312.50
JUMLAH TENAGA KERJA 10,228.50
B. BAHAN :
Cornice Adhesive - Kg 0.250 5,000.00 1,250.00
Perban Gypsum - Roll 0.235 45,000.00 10,575.00
Cat Plafond ( Dasar ) - Kg 0.100 24,220.00 2,422.00
Cat Plafond ( Penutup 2 x ) - Kg 0.260 24,220.00 6,297.20
JUMLAH HARGA BAHAN 20,544.20
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 30,772.70
E. Overhead & Profit 10% x D 3,077.27
F. Harga Satuan Pekerjaan(D + E) 33,849.97

Halaman-42
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 08 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pengecatan Pelapis Kedap Air (Water Proofing)
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 80,000.00 1,600.00
Tukang Kayu L.02 Org/Hari 0.063 120,000.00 7,560.00
Kepala Tukang L.03 Org/Hari 0.0063 120,000.00 756.00
Mandor L.04 Org/Hari 0.0025 125,000.00 312.50
JUMLAH TENAGA KERJA 10,228.50
B. BAHAN :
Polimer Mortar - Kg 2.000 28,000.00 56,000.00
JUMLAH HARGA BAHAN 56,000.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 66,228.50
E. Overhead & Profit 10% x D 6,622.85
F. Harga Satuan Pekerjaan(D + E) 72,851.35

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 09 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Instalasi Titik Lampu
SATUAN PEMBAYARAN : Titik

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.250 80,000.00 20,000.00
Tukang istrik L.02 Org/Hari 0.420 120,000.00 50,400.00
Kepala Tukang Listrik L.03 Org/Hari 0.030 120,000.00 3,600.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 125,000.00 1,250.00
JUMLAH TENAGA KERJA 75,250.00
B. BAHAN :
Kabel NYM 2 x 1 x 2,5 mm2 - M1 3.000 20,656.00 61,968.00
Pipa Hight Impact Ø 20 mm - M1 2.000 1,296.25 2,592.50
fitting, kotak sambung, klem & alat bantu lainnya - Ls 5% x 64,560.50 3,228.03
Material
JUMLAH HARGA BAHAN 67,788.53
C. PERALATAN :

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 143,038.53
E. Overhead & Profit 10% x D 14,303.85
F. Harga Satuan Pekerjaan(D + E) 157,342.38

Halaman-43
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 10 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Instalasi Titik Saklar dan Stop Kontak
SATUAN PEMBAYARAN : Titik

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.350 80,000.00 28,000.00
Tukang istrik L.02 Org/Hari 0.520 120,000.00 62,400.00
Kepala Tukang Listrik L.03 Org/Hari 0.030 120,000.00 3,600.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 125,000.00 1,250.00
JUMLAH TENAGA KERJA 95,250.00
B. BAHAN :
Kabel NYM 2 x 1 x 2,5 mm - M1 4.000 20,656.00 82,624.00
Pipa Hight Impact Ø 20 mm - M1 3.000 1,296.25 3,888.75
fitting, kotak sambung, klem & alat bantu lainnya - Ls 5% x 86,512.75 4,325.64
Material
JUMLAH HARGA BAHAN 90,838.39
C. PERALATAN :

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 186,088.39
E. Overhead & Profit 10% x D 18,608.84
F. Harga Satuan Pekerjaan(D + E) 204,697.23

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 11 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Stop Kontak 1P, 13 A
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 80,000.00 24,000.00
Tukang istrik L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.050 120,000.00 6,000.00
Mandor Tukang Listrik L.04 Org/Hari 0.050 125,000.00 6,250.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN :
Stop Kontak 1P, 13 A - Bh 1.000 28,000.00 28,000.00
Inbow Does - Bh 1.000 5,500.00 5,500.00
JUMLAH HARGA BAHAN 33,500.00
C. PERALATAN :

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 81,750.00
E. Overhead & Profit 10% x D 8,175.00
F. Harga Satuan Pekerjaan(D + E) 89,925.00

Halaman-44
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 12 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Stop Kontak 2P, 13 A
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 80,000.00 24,000.00
Tukang istrik L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.050 120,000.00 6,000.00
Mandor Tukang Listrik L.04 Org/Hari 0.050 125,000.00 6,250.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN :
Stop Kontak 2 Phase, 16 A - Bh 1.000 47,350.00 47,350.00
Inbow Does - Bh 1.000 5,500.00 5,500.00
JUMLAH HARGA BAHAN 52,850.00
C. PERALATAN :

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 101,100.00
E. Overhead & Profit 10% x D 10,110.00
F. Harga Satuan Pekerjaan(D + E) 111,210.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 13 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Switch Socket AC + Indikator Lamp 16 A
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 80,000.00 24,000.00
Tukang istrik L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.050 120,000.00 6,000.00
Mandor Tukang Listrik L.04 Org/Hari 0.050 125,000.00 6,250.00
JUMLAH TENAGA KERJA 48,250.00
B. BAHAN :
Switch Socket AC + Indikator Lamp 16 A - Bh 1.000 24,265.00 24,265.00
Inbow Does - Bh 1.000 5,500.00 5,500.00
JUMLAH HARGA BAHAN 29,765.00
C. PERALATAN :

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 78,015.00
E. Overhead & Profit 10% x D 7,801.50
F. Harga Satuan Pekerjaan(D + E) 85,816.50

Halaman-45
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 14 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Saklar Tunggal, 10 A, 250 VAC
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 80,000.00 24,000.00
Tukang istrik L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 125,000.00 1,250.00
JUMLAH TENAGA KERJA 38,450.00
B. BAHAN :
Saklar Tunggal, 10 A, 250 VAC - Bh 1.000 29,890.00 29,890.00
Inbow Does - Bh 1.000 5,500.00 5,500.00
JUMLAH HARGA BAHAN 35,390.00
C. PERALATAN :

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 73,840.00
E. Overhead & Profit 10% x D 7,384.00
F. Harga Satuan Pekerjaan(D + E) 81,224.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 15 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Saklar Seri, 10 A, 250 VAC
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 80,000.00 24,000.00
Tukang istrik L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 125,000.00 1,250.00
JUMLAH TENAGA KERJA 38,450.00
B. BAHAN :
Saklar Seri, 10 A, 250 VAC - Bh 1.000 47,170.00 47,170.00
Inbow Does - Bh 1.000 5,500.00 5,500.00
JUMLAH HARGA BAHAN 52,670.00
C. PERALATAN :

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 91,120.00
E. Overhead & Profit 10% x D 9,112.00
F. Harga Satuan Pekerjaan(D + E) 100,232.00

Halaman-46
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 16 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Saklar Triple, 10 A, 250 VAC
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pembantu Tukang Listrik L.01 Org/Hari 0.300 80,000.00 24,000.00
Tukang istrik L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang Listrik L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor Tukang Listrik L.04 Org/Hari 0.010 125,000.00 1,250.00
JUMLAH TENAGA KERJA 38,450.00
B. BAHAN :
Saklar Triple, 10 A, 250 VAC - Bh 1.000 40,600.00 40,600.00
Inbow Does - Bh 1.000 5,500.00 5,500.00
JUMLAH HARGA BAHAN 46,100.00
C. PERALATAN :

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 84,550.00
E. Overhead & Profit 10% x D 8,455.00
F. Harga Satuan Pekerjaan(D + E) 93,005.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 17 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Lampu TL 20 Watt
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Lampu Lampu TL 20 Watt - Bh 1.000 68,700.00 68,700.00
JUMLAH HARGA BAHAN 68,700.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 82,200.00
E. Overhead & Profit 10% x D 8,220.00
F. Harga Satuan Pekerjaan(D + E) 90,420.00

Halaman-47
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 18 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Lampu SL 11 Watt, Komplit Fitting Tempel
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Lampu Lampu SL 11 Watt - Bh 1.000 46,200.00 46,200.00
Fitting Lampu - Bh 1.000 10,346.00 10,346.00
JUMLAH HARGA BAHAN 56,546.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 70,046.00
E. Overhead & Profit 10% x D 7,004.60
F. Harga Satuan Pekerjaan(D + E) 77,050.60

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 19 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Lampu SL 18 Watt
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Lampu SL 18 Watt - Bh 1.000 57,800.00 57,800.00
Fitting Lampu - Bh 1.000 10,346.00 10,346.00
JUMLAH HARGA BAHAN 68,146.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 81,646.00
E. Overhead & Profit 10% x D 8,164.60
F. Harga Satuan Pekerjaan(D + E) 89,810.60

Halaman-48
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 20 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Lampu SL 18 Watt + Downlight Metal Ø 4"
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Lampu Philips 18 Watt - Bh 1.000 57,800.00 57,800.00
Down Light Metal Ø 4" - Bh 1.000 87,000.00 87,000.00
JUMLAH HARGA BAHAN 144,800.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 158,300.00
E. Overhead & Profit 10% x D 15,830.00
F. Harga Satuan Pekerjaan(D + E) 174,130.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 21 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Lampu SL 8 Watt + Downlight Metal Ø 3"
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Lampu Philips 8 Watt - Bh 1.000 35,075.00 35,075.00
Down Light Metal Ø 3" - Bh 1.000 -
JUMLAH HARGA BAHAN 35,075.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 48,575.00
E. Overhead & Profit 10% x D 4,857.50
F. Harga Satuan Pekerjaan(D + E) 53,432.50

Halaman-49
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 22 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Sekring Kast
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah Pasang Ls 1.000 8,500.00 8,500.00
JUMLAH TENAGA KERJA 8,500.00
B. BAHAN :
Sekring Kas Kosong DN 3 G - Bh 1.000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 55,000.00
C. PERALATAN :
Material Bantu/ Alat Bantu Ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00
D. Jumlah (A+B+C) 68,500.00
E. Overhead & Profit 10% x D 6,850.00
F. Harga Satuan Pekerjaan(D + E) 75,350.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 23 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Exhaust Fan
SATUAN PEMBAYARAN : Set

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Tukang Instalasi Listrik L.02 Ls 1.000 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Exhaust Fan - Set 1.000 226,000.00 226,000.00
Perlengkapan 35% Harga Bahan - Ls 0.350 79,100.00 27,685.00
JUMLAH HARGA BAHAN 253,685.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 253,685.00
E. Overhead & Profit 10% x D 25,368.50
F. Harga Satuan Pekerjaan(D + E) 279,053.50

Halaman-50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 24 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Kayu Kaso Gording Kayu Kls II
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.500 80,000.00 40,000.00
Tukang Kayu L.02 Org/Hari 0.050 120,000.00 6,000.00
Kepala Tukang L.03 Org/Hari 0.005 120,000.00 600.00
Mandor L.04 Org/Hari 0.0025 125,000.00 312.50
JUMLAH TENAGA KERJA 46,912.50
B. BAHAN :
Balok Kayu Kls II - M3 0.006 2,200,000.00 13,200.00
Paku 2" - 5" - Kg 0.075 23,000.00 1,725.00
JUMLAH HARGA BAHAN 14,925.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 61,837.50
E. Overhead & Profit 10% x D 6,183.75
F. Harga Satuan Pekerjaan(D + E) 68,021.25

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 25 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Dinding Batu Andesit Bintik 30 x 30 cm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 80,000.00 20,000.00
Tukang Batu L.02 Org/Hari 0.125 120,000.00 15,000.00
Kepala Tukang L.03 Org/Hari 0.013 120,000.00 1,560.00
Mandor L.04 Org/Hari 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 38,185.00
B. BAHAN :
Batu Andesit Bintik 30 x 30 cm - M2 1.100 250,000.00 275,000.00
Semen Portland - Kg 9.300 1,500.00 13,950.00
Pasir Pasang - M3 0.018 250,000.00 4,500.00
JUMLAH HARGA BAHAN 293,450.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 331,635.00
E. Overhead & Profit 10% x D 33,163.50
F. Harga Satuan Pekerjaan(D + E) 364,798.50

Halaman-51
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 26 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pemasangan Kunci Pintu Lemari
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.025 80,000.00 2,000.00
Tukang Kayu L.02 Org/Hari 0.250 120,000.00 30,000.00
Kepala Tukang L.03 Org/Hari 0.025 120,000.00 3,000.00
Mandor L.04 Org/Hari 0.00125 125,000.00 156.25
JUMLAH TENAGA KERJA 35,156.25
B. BAHAN :
Kunci Lemari - Bh 1.0000 35,000.00 35,000.00

JUMLAH HARGA BAHAN 35,000.00


C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 70,156.25
E. Overhead & Profit 10% x D 7,015.63
F. Harga Satuan Pekerjaan(D + E) 77,171.88

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 27 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pengelasan Dengan Listrik
SATUAN PEMBAYARAN : Cm

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Oh 0.04 80,000.00 3,200.00
Tukang L.02 Oh 0.02 120,000.00 2,400.00
Kepala Tukang L.03 Oh 0.002 120,000.00 240.00
Mandor L.04 Oh 0.002 125,000.00 250.00
JUMLAH TENAGA KERJA 6,090.00
B. BAHAN :
Kawat Las Kg 0.400 128,000.00 51,200.00
Solar Industri Ltr 0.300 8,500.00 2,550.00
Minyak Pelumas Ltr 0.004 27,000.00 108.00
JUMLAH HARGA BAHAN 53,858.00
C. PERALATAN :
Sewa Alat (Welding Set) - Hari 0.170 200,000.00 34,000.00
JUMLAH HARGA ALAT 34,000.00
D. Jumlah (A+B+C) 93,948.00
E. Harga Satuan Pekerjaan(D + E) 93,948.00
Harga Satuan Pekerjaan Untuk 1 Cm Pengelasan Anls/100 939.48

Halaman-52
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 28 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Menggosok Bidang Besi
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Oh 0.3 80,000.00 24,000.00
Tukang L.02 Oh 0 120,000.00 -
Kepala Tukang L.03 Oh 0 120,000.00 -
Mandor L.04 Oh 0.015 125,000.00 1,875.00
JUMLAH TENAGA KERJA 25,875.00
B. BAHAN :
Ampelas Lbr 0.500 4,875.00 2,437.50
Sikat Besi Bh 0.050 14,500.00 725.00
Soda Api Kg 0.050 17,500.00 875.00
JUMLAH HARGA BAHAN 4,037.50
C. PERALATAN :
Sewa Alat (Welding Set) - Hari - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 29,912.50
E. Harga Satuan Pekerjaan(D + E) 29,912.50

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 29 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Meni Besi
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Oh 0.075 80,000.00 6,000.00
Tukang L.02 Oh 0 120,000.00 -
Kepala Tukang L.03 Oh 0 120,000.00 -
Mandor L.04 Oh 0.004 125,000.00 500.00
JUMLAH TENAGA KERJA 6,500.00
B. BAHAN :
Cat Meny Kg 0.100 64,540.00 6,454.00
Minyak Cat Kg 0.100 70,300.00 7,030.00
Ampelas Lbr 0.050 4,875.00 243.75
Kuas Bh 0.015 5,680.00 85.20
JUMLAH HARGA BAHAN 13,812.95
C. PERALATAN :
Sewa Alat (Welding Set) - Hari - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 20,312.95
E. Harga Satuan Pekerjaan(D + E) 20,312.95

Halaman-53
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 30 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Cat Bidang Besi
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Oh 0.02 80,000.00 1,600.00
Tukang L.02 Oh 0.15 120,000.00 18,000.00
Kepala Tukang L.03 Oh 0.001 120,000.00 120.00
Mandor L.04 Oh 0.001 125,000.00 125.00
JUMLAH TENAGA KERJA 19,845.00
B. BAHAN :
Minyak Cat Kg 0.100 70,300.00 7,030.00
Cat Warna Kg 0.015 50,500.00 757.50
JUMLAH HARGA BAHAN 7,787.50
C. PERALATAN :
Sewa Alat (Welding Set) - Hari - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 27,632.50
E. Harga Satuan Pekerjaan(D + E) 27,632.50

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 31 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pembuatan dan Pemasangan Pintu Pagar Besi Hollo
SATUAN PEMBAYARAN : Unit

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :

JUMLAH TENAGA KERJA -


B. BAHAN :
Bingkai Pintu Besi □ 50.50.2 mm Btg 4.583 149,500.00 685,208.333
Bingkai Pintu Besi □ 40.40.1,7 mm Btg 1.853 122,500.00 227,033.333
Teralis Besi □ 20.40.1,7 mm Btg 7.060 119,800.00 845,788.000
Panil Pagar Besi Plat Hitam Uk. 120 x 240 cm Lbr 0.425 1,300,000.00 552,951.389
Rel Pintu GIP Ø 3/4" Btg 1.667 60,946.00 101,576.667
Slot Pintu Bh 1.000 65,000.00 65,000.000
Lahar Pintu Besi Bh 2.000 2,260.00 4,520.000
Roda Pintu Besi Bh 2.000 55,000.00 110,000.000
Angkur Besi Beton Ø 12 Kg 7.522 17,170.62 129,153.245
Pengelasan Cm 2,602.300 939.48 2,444,808.804
Perakitan + Pemasangan 10% Harga Bahan Ls 0.100 5,166,039.77 516,603.977
Beton Tidak Bertulang K.175 M3 0.450 1,148,179.83 516,680.921
Menggosok Bidang Besi M2 27.248 29,912.50 815,055.800
Meni Besi - M2 14.812 20,312.95 300,883.541
Cat Bidang Besi - M2 14.812 27,632.50 409,303.643
JUMLAH HARGA BAHAN 7,724,567.65
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 7,724,567.65
E. Overhead & Profit 10% x D 772,456.77
F. Harga Satuan Pekerjaan(D + E) 8,497,024.42

Halaman-54
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 32 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pembuatan dan Pemasangan Pagar Besi Hollo Lebar 3,0 m
SATUAN PEMBAYARAN : Unit

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :

JUMLAH TENAGA KERJA -


B. BAHAN :
Bingkai Pagar Besi □ 40.40.1,7 mm Btg 1.407 122,500.00 172,316.667
Teralis Besi □ 20.40.1,7 mm Btg 4.628 119,800.00 554,474.333
Angkur Besi Beton Ø 12 Kg 2.129 17,170.62 36,552.805
Pengelasan Cm 1,128.000 939.48 1,059,733.440
Perakitan + Pemasangan 10% Harga Bahan Ls 0.100 1,823,077 182,307.725
Menggosok Bidang Besi M2 1.700 29,912.50 50,851.250
Meni Besi - M2 1.000 20,312.95 20,312.950
Cat Bidang Besi - M2 1.000 27,632.50 27,632.500
JUMLAH HARGA BAHAN 2,104,181.67
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 2,104,181.67
E. Overhead & Profit 10% x D 210,418.17
F. Harga Satuan Pekerjaan(D + E) 2,314,599.84

Halaman-55
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 33 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Mesin Pompa Air (Automatic)
SATUAN PEMBAYARAN : Buah

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1.200 80,000.00 96,000.00
Tukang Pipa L.02 Org/Hari 1.450 120,000.00 174,000.00
Kepala Tukang L.03 Org/Hari 0.150 120,000.00 18,000.00
Mandor L.04 Org/Hari 0.060 125,000.00 7,500.00
JUMLAH TENAGA KERJA 295,500.00
B. BAHAN :
Mesin Pompa Air (Automatic) - Unit 1.000 600,000.00 600,000.00
Perlengkapan 12 % Harga Mesin Pompa Air - Ls 0.120 72,000.00 8,640.00
JUMLAH HARGA BAHAN 608,640.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 904,140.00
E. Overhead & Profit 10% x D 90,414.00
F. Harga Satuan Pekerjaan (D + E) 994,554.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 34 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Pembongkaran Dinding Keramik
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 100,000.00 10,000.00
Mandor L.04 Org/Hari 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 13,250.00
B. BAHAN :

JUMLAH HARGA BAHAN -


C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 13,250.00
E. Overhead & Profit 10% x D 1,325.00
F. Harga Satuan Pekerjaan(D + E) 14,575.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 35 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Penanaman Gebalan Rumput
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.050 100,000.00 5,000.00
Mandor L.04 Org/Hari 0.010 130,000.00 1,300.00

Halaman-56
JUMLAH TENAGA KERJA 6,300.00
B. BAHAN :
Rumput Jepang (Rumput Lokal) - M2 1.100 60,500.00 66,550.00
JUMLAH HARGA BAHAN 66,550.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 72,850.00
E. Overhead & Profit 10% x D 7,285.00
F. Harga Satuan Pekerjaan(D + E) 80,135.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 36 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Penanaman Bunga Agave Hijau
SATUAN PEMBAYARAN : Plbg

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.036 100,000.00 3,600.00
Tukang Tanam L.02 Org/Hari 0.036 150,000.00 5,400.00
Mandor L.04 Org/Hari 0.007 130,000.00 910.00
JUMLAH TENAGA KERJA 9,910.00
B. BAHAN :
Bunga Agave Hijau - Bh 1.000 55,000.00 55,000.00
Pupuk - Kg 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 55,750.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 65,660.00
E. Overhead & Profit 10% x D 6,566.00
F. Harga Satuan Pekerjaan(D + E) 72,226.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 37 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Penanaman Bunga Sikas, T= 50 cm
SATUAN PEMBAYARAN : Plbg

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.036 100,000.00 3,600.00
Tukang Tanam L.02 Org/Hari 0.036 150,000.00 5,400.00
Mandor L.04 Org/Hari 0.007 130,000.00 910.00
JUMLAH TENAGA KERJA 9,910.00
B. BAHAN :
Bunga Sikas, T=50 - Plbg 1.000 485,000.00 485,000.00
Pupuk - Kg 0.050 15,000.00 750.00
Galian Tanah 20 x 20 x 30 cm - M3 0.012 86,075.00 1,032.90
JUMLAH HARGA BAHAN 486,782.90
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 496,692.90
E. Overhead & Profit 10% x D 49,669.29
F. Harga Satuan Pekerjaan(D + E) 546,362.19

Halaman-57
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 38 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Pembongkaran Partisi dan Rangka
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 100,000.00 10,000.00
Mandor L.04 Org/Hari 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 10,130.00
B. BAHAN :

JUMLAH HARGA BAHAN -


C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 10,130.00
E. Overhead & Profit 10% x D 1,013.00
F. Harga Satuan Pekerjaan(D + E) 11,143.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 39 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Pembongkaran Plafond dan Rangka
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.150 100,000.00 15,000.00
Mandor L.04 Org/Hari 0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 15,260.00
B. BAHAN :

JUMLAH HARGA BAHAN -


C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 15,260.00
E. Overhead & Profit 10% x D 1,526.00
F. Harga Satuan Pekerjaan(D + E) 16,786.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 40 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Pembongkaran Plafond Plafond Lambersering dan Rangka
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.175 100,000.00 17,500.00

Halaman-58
Mandor L.04 Org/Hari 0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 17,760.00
B. BAHAN :

JUMLAH HARGA BAHAN -


C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 17,760.00
E. Overhead & Profit 10% x D 1,776.00
F. Harga Satuan Pekerjaan(D + E) 19,536.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 41 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Pembongkaran Atap
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.165 100,000.00 16,500.00
Mandor L.04 Org/Hari 0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 16,760.00
B. BAHAN :

JUMLAH HARGA BAHAN -


C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 16,760.00
E. Overhead & Profit 10% x D 1,676.00
F. Harga Satuan Pekerjaan(D + E) 18,436.00

Halaman-59
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 09 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Gantungan Teralis Type-1, Rangka Besi Hollow 40.40.2 mm (Lihat Gbr. Rencana)
SATUAN PEMBAYARAN : Unit

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1.375 100,000.00 137,500.00
Tukang Besi L.02 Org/Hari 1.375 150,000.00 206,250.00
Kepala Tukang L.03 Org/Hari 0.138 180,000.00 24,750.00
Mandor L.04 Org/Hari 0.072 130,000.00 9,295.00
JUMLAH TENAGA KERJA 377,795.00
B. BAHAN :
Rangka Metal Hollow 40.40.2 mm - M1 1.100 20,416.67 22,458.33
Peralatan dan Accesories (Perkuatan, Las, dll) - Ls 25 % x 5,614.58 5,614.58
Material
Pengecatan Besi Hollow AHSP - A.4.7.1.16.a M2 1.540 44,355.08 68,306.82
JUMLAH HARGA BAHAN 96,379.74
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 474,174.74
E. Overhead & Profit 10% x D 47,417.47
F. Harga Satuan Pekerjaan(D + E) 521,592.21

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : Analisa Praktis - 10 ANALISA TERAPAN


KODE/ JENIS PEKERJAAN : Pemasangan Gantungan Teralis Type-2, Rangka Besi Hollow 40.40.2 mm (Lihat Gbr. Rencana)
SATUAN PEMBAYARAN : Unit

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.500 100,000.00 50,000.00
Tukang Besi L.02 Org/Hari 0.500 150,000.00 75,000.00
Kepala Tukang L.03 Org/Hari 0.250 180,000.00 45,000.00
Mandor L.04 Org/Hari 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 173,250.00
B. BAHAN :
Rangka Metal Hollow 40.40.2 mm - M1 6.350 20,416.67 129,645.83
Peralatan dan Accesories (Perkuatan, Las, dll) - Ls 25 % x 32,411.46 32,411.46
Material
Pengecatan Besi Hollow AHSP - A.4.7.1.5.1 M2 0.867 44,355.08 38,455.85
JUMLAH HARGA BAHAN 200,513.15
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 373,763.15
E. Overhead & Profit 10% x D 37,376.31
F. Harga Satuan Pekerjaan(D + E) 411,139.46

Halaman-60
#REF!

Halaman-61
0.150
0.250
0.025
0.075

0.100
0.050
0.005
0.005

Halaman-62
0.150
0.250
0.025
0.075

0.100
0.050
0.005
0.005

0.3
0.6
0.18
1
5.56 1.562

0.20
0.40 8.19 0.2 (0.200)
0.080 0.045 0.080 (0.080)
1.000 0.65 0.5 0.500
12.5

0.09

Halaman-63
0.3
0.6
0.18
1
5.56 1.562

0.20
0.40 8.19 0.2 (0.200)
0.080 0.045 0.080 (0.080)
1.000 0.65 0.5 0.500
12.5

0.09

Halaman-64
0.500
0.500
0.250
0.025

4 4
4 2
8 6
14

0.12 0.08
0.480 #REF!
#REF!

0.500
0.500
0.250
0.025

4 4
4 2
8 6
14

0.12 0.08
0.480 #REF!
#REF!

Halaman-65
I. AHSP - A.2.2.1 ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.2.2.1.4 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Pengukuran dan Pemasangan Bouwplank
SATUAN PEMBAYARAN : 1 M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 80,000.00 8,000.00
Tukang Kayu L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 21,825.00
B. BAHAN :
Kayu 5/7 Kelas III/ Daerah - M3 0.120 2,000,000.00 240,000.00
Paku Biasa 2" - 3" - Kg 0.060 23,000.00 1,380.00
Kayu Papan 2/30 - M3 0.007 2,000,000.00 14,000.00
JUMLAH HARGA BAHAN 255,380.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 277,205.00
E. Overhead & Profit 10% x D 27,720.50
F. Harga Satuan Pekerjaan(D + E) 304,925.50

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.2.2.1.11 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Pembuatan Kotak Adukan 40 x 50 x 25 cm
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Tukang Kayu L.02 Org/Hari 0.300 120,000.00 36,000.00
Kepala Tukang L.03 Org/Hari 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 39,600.00
B. BAHAN :
Kayu Papan Kelas III/ Daerah - M3 0.036 2,000,000.00 72,000.00
Kayu 5/7 Kelas III/ Daerah - M3 0.014 2,000,000.00 28,000.00
Paku Biasa 2" - 5" - Kg 0.080 23,000.00 1,840.00
JUMLAH HARGA BAHAN 101,840.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 141,440.00
E. Overhead & Profit 10% x D 14,144.00
F. Harga Satuan Pekerjaan(D + E) 155,584.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.2.2.1.17 AHSP - A.2.2.1


KODE/ JENIS PEKERJAAN : Pemasangan Papan Nama Proyek
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 6.667 80,000.00 533,360.00
Mandor L.04 Org/Hari 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B. BAHAN :

JUMLAH HARGA BAHAN -


C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 573,320.00
E. Overhead & Profit 10% x D 57,332.00
F. Harga Satuan Pekerjaan(D + E) 630,652.00

II. AHSP - A.2.3.1 ANALISA HARGA SATUAN PEKERJAAN TANAH

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.2.3.1.1 AHSP - A.2.3.1


KODE/ JENIS PEKERJAAN : Penggalian Tanah Biasa Sedalam 1 Meter
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.750 80,000.00 60,000.00
Mandor L.04 Org/Hari 0.025 125,000.00 3,125.00
JUMLAH TENAGA KERJA 63,125.00
B. BAHAN :
- - - - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 63,125.00
E. Overhead & Profit 10% x D 6,312.50
F. Harga Satuan Pekerjaan(D + E) 69,437.50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.2.3.1.9 AHSP - A.2.3.1


KODE/ JENIS PEKERJAAN : Pengurugan kembali 1 M3 galian tanah
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.500 80,000.00 40,000.00
Mandor L.04 Org/Hari 0.050 125,000.00 6,250.00
JUMLAH TENAGA KERJA 46,250.00
B. BAHAN :
- - - - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 46,250.00
E. Overhead & Profit 10% x D 4,625.00
F. Harga Satuan Pekerjaan(D + E) 50,875.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.2.3.1.11 AHSP - A.2.3.1


KODE/ JENIS PEKERJAAN : Pengurugan Dengan Pasir Urug
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.300 80,000.00 24,000.00
Mandor L.04 Org/Hari 0.010 125,000.00 1,250.00
JUMLAH TENAGA KERJA 25,250.00
B. BAHAN :
Pasir Urug - M3 1.200 250,000.00 300,000.00
JUMLAH HARGA BAHAN 300,000.00
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 325,250.00
E. Overhead & Profit 10% x D 32,525.00
F. Harga Satuan Pekerjaan(D + E) 357,775.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.2.3.1.14.a AHSP - A.2.3.1


KODE/ JENIS PEKERJAAN : Pengurugan Tanah Timbunan
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 80,000.00 20,000.00
Mandor L.04 Org/Hari 0.025 125,000.00 3,125.00
JUMLAH TENAGA KERJA 23,125.00
B. BAHAN :
Tanah Timbunan - M3 1.200 200,000.00 240,000.00
JUMLAH HARGA BAHAN 240,000.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 263,125.00
E. Overhead & Profit 10% x D 26,312.50
F. Harga Satuan Pekerjaan(D + E) 289,437.50

III. AHSP - A.3.2.1 ANALISA HARGA SATUAN PEKERJAAN PONDASI

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.3.2.1.2 AHSP - A.3.2.1


KODE/ JENIS PEKERJAAN : Pemasangan Pondasi Batu Belah Campuran 1 SP : 4 PP
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1.500 80,000.00 120,000.00
Tukang Batu L.02 Org/Hari 0.750 120,000.00 90,000.00
Kepala Tukang L.03 Org/Hari 0.075 120,000.00 9,000.00
Mandor L.04 Org/Hari 0.075 125,000.00 9,375.00
JUMLAH TENAGA KERJA 228,375.00
B. BAHAN :
Batu Kali/ Batu Gunung - M3 1.200 250,000.00 300,000.00
Semen Portland - Kg 163.000 1,500.00 244,500.00
Pasir Pasang - M3 0.520 250,000.00 130,000.00
JUMLAH HARGA BAHAN 674,500.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 902,875.00
E. Overhead & Profit 10% x D 90,287.50
F. Harga Satuan Pekerjaan(D + E) 993,162.50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.3.2.1.9 AHSP - A.3.2.1


KODE/ JENIS PEKERJAAN : Pemasangan Batu Kosong (Aanstamping)
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.780 80,000.00 62,400.00
Tukang Batu L.02 Org/Hari 0.390 120,000.00 46,800.00
Kepala Tukang L.03 Org/Hari 0.039 120,000.00 4,680.00
Mandor L.04 Org/Hari 0.039 125,000.00 4,875.00
JUMLAH TENAGA KERJA 118,755.00
B. BAHAN :
Batu Kali/ Batu Gunung - M3 1.200 250,000.00 300,000.00
Pasir Urug - M3 0.432 250,000.00 108,000.00
JUMLAH HARGA BAHAN 408,000.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 526,755.00
E. Overhead & Profit 10% x D 52,675.50
F. Harga Satuan Pekerjaan(D + E) 579,430.50

IV.1 AHSP - A.4.1.1 HARGA SATUAN PEKERJAAN BETON

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.4.1.1.2 AHSP - A.4.1.1


KODE/ JENIS PEKERJAAN : Membuat Beton Mutu f'c = 9,8 MPa (K 125), Slump (12 ± 2) cm, W/C = 0,78
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1.650 80,000.00 132,000.00
Tukang Batu L.02 Org/Hari 0.275 120,000.00 33,000.00
Kepala Tukang L.03 Org/Hari 0.028 120,000.00 3,360.00
Mandor L.04 Org/Hari 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 178,735.00
B. BAHAN :
Semen Portland - Kg 276.000 1,500.00 414,000.00
Pasir Beton - Kg 828.000 178.57 147,857.14
Kerikil Sungai Pilihan/Koral - Kg 1,012.000 185.19 187,407.41
Air - Liter 215.000 30.00 6,450.00
JUMLAH HARGA BAHAN 755,714.55
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 934,449.55
E. Overhead & Profit 10% x D 93,444.96
F. Harga Satuan Pekerjaan(D + E) 1,027,894.51
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.4.1.1.5 AHSP - A.4.1.1


KODE/ JENIS PEKERJAAN : Membuat Beton Mutu f'c = 14,5 MPa (K 175), Slump (12 ± 2) cm, W/C = 0,66
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1.650 80,000.00 132,000.00
Tukang Batu L.02 Org/Hari 0.275 120,000.00 33,000.00
Kepala Tukang L.03 Org/Hari 0.028 120,000.00 3,360.00
Mandor L.04 Org/Hari 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 178,735.00
B. BAHAN :
Semen Portland - Kg 326.000 1,500.00 489,000.00
Pasir Beton - Kg 760.000 178.57 135,714.29
Kerikil Sungai Pilihan/Koral - Kg 1,029.000 185.19 190,555.56
Air - Liter 215.000 30.00 6,450.00
JUMLAH HARGA BAHAN 821,719.84
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,000,454.84
E. Overhead & Profit 10% x D 100,045.48
F. Harga Satuan Pekerjaan(D + E) 1,100,500.33

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.4.1.1.17 AHSP - A.4.1.1


KODE/ JENIS PEKERJAAN : Pembesian 10 Kg Dengan Besi Polos atau Besi Ulir
SATUAN PEMBAYARAN : 10 Kg

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
1. Besi Beton (Polos/ Ulir) Ǿ 6 mm
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 80,000.00 5,600.00
Tukang Besi L.02 Org/Hari 0.070 120,000.00 8,400.00
Kepala Tukang L.03 Org/Hari 0.007 120,000.00 840.00
Mandor L.04 Org/Hari 0.004 125,000.00 500.00
JUMLAH TENAGA KERJA 15,340.00
B. BAHAN :
a. Besi Beton Polos - Kg 10.500 12,673.00 133,066.50
b. Kawat Beton - Kg 0.150 25,000.00 3,750.00
JUMLAH HARGA BAHAN 136,816.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 152,156.50
E. Overhead & Profit 10% x D 15,215.65
F. Harga Satuan Pekerjaan(D + E) 167,372.15
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.4.1.1.21 AHSP - A.4.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Sloof
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.520 80,000.00 41,600.00
Tukang Kayu L.02 Org/Hari 0.260 120,000.00 31,200.00
Kepala Tukang L.03 Org/Hari 0.026 120,000.00 3,120.00
Mandor L.04 Org/Hari 0.026 125,000.00 3,250.00
JUMLAH TENAGA KERJA 79,170.00
B. BAHAN :
Kayu Kelas III - M3 0.045 2,000,000.00 90,000.00
Paku 5 - 10 cm - Kg 0.300 23,000.00 6,900.00
Minyak Bekisting - Liter 0.100 10,000.00 1,000.00
JUMLAH HARGA BAHAN 97,900.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 177,070.00
E. Overhead & Profit 10% x D 17,707.00
F. Harga Satuan Pekerjaan(D + E) 194,777.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.4.1.1.22 AHSP - A.4.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Kolom
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.660 80,000.00 52,800.00
Tukang Kayu L.02 Org/Hari 0.330 120,000.00 39,600.00
Kepala Tukang L.03 Org/Hari 0.033 120,000.00 3,960.00
Mandor L.04 Org/Hari 0.033 125,000.00 4,125.00
JUMLAH TENAGA KERJA 100,485.00
B. BAHAN :
Kayu Kelas III - M3 0.040 2,000,000.00 80,000.00
Paku 5 - 12 cm - Kg 0.400 23,000.00 9,200.00
Minyak Bekisting - Liter 0.200 10,000.00 2,000.00
Balok Kayu Kelas II - M3 0.015 2,200,000.00 33,000.00
Plywood Tebal 9 mm - Lembar 0.350 99,550.00 34,842.50
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' - Batang 2.000 9,000.00 18,000.00
JUMLAH HARGA BAHAN 177,042.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 277,527.50
E. Overhead & Profit 10% x D 27,752.75
F. Harga Satuan Pekerjaan(D + E) 305,280.25
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.4.1.1.23 AHSP - A.4.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Balok
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.660 80,000.00 52,800.00
Tukang Kayu L.02 Org/Hari 0.330 120,000.00 39,600.00
Kepala Tukang L.03 Org/Hari 0.033 120,000.00 3,960.00
Mandor L.04 Org/Hari 0.033 125,000.00 4,125.00
JUMLAH TENAGA KERJA 100,485.00
B. BAHAN :
Kayu Kelas III - M3 0.040 2,000,000.00 80,000.00
Paku 5 - 12 cm - Kg 0.400 23,000.00 9,200.00
Minyak Bekisting - Liter 0.200 10,000.00 2,000.00
Balok Kayu Kelas II - M3 0.018 2,200,000.00 39,600.00
Plywood Tebal 9 mm - Lembar 0.350 99,550.00 34,842.50
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' - Batang 2.000 9,000.00 18,000.00
JUMLAH HARGA BAHAN 183,642.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 284,127.50
E. Overhead & Profit 10% x D 28,412.75
F. Harga Satuan Pekerjaan(D + E) 312,540.25

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.4.1.1.24 AHSP - A.4.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Lantai
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.660 80,000.00 52,800.00
Tukang Kayu L.02 Org/Hari 0.330 120,000.00 39,600.00
Kepala Tukang L.03 Org/Hari 0.033 120,000.00 3,960.00
Mandor L.04 Org/Hari 0.033 125,000.00 4,125.00
JUMLAH TENAGA KERJA 100,485.00
B. BAHAN :
Kayu Kelas III - M3 0.040 2,000,000.00 80,000.00
Paku 5 - 12 cm - Kg 0.400 23,000.00 9,200.00
Minyak Bekisting - Liter 0.200 10,000.00 2,000.00
Balok Kayu Kelas II - M3 0.015 2,200,000.00 33,000.00
Plywood Tebal 9 mm - Lembar 0.350 99,550.00 34,842.50
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' - Batang 6.000 9,000.00 54,000.00
JUMLAH HARGA BAHAN 213,042.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 313,527.50
E. Overhead & Profit 10% x D 31,352.75
F. Harga Satuan Pekerjaan(D + E) 344,880.25
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.4.1.1.24.a AHSP - A.4.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Plat Dack
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.660 80,000.00 52,800.00
Tukang Kayu L.02 Org/Hari 0.330 120,000.00 39,600.00
Kepala Tukang L.03 Org/Hari 0.033 120,000.00 3,960.00
Mandor L.04 Org/Hari 0.033 125,000.00 4,125.00
JUMLAH TENAGA KERJA 100,485.00
B. BAHAN :
Kayu Kelas III - M3 0.040 2,000,000.00 80,000.00
Paku 5 - 12 cm - Kg 0.250 23,000.00 5,750.00
Minyak Bekisting - Liter 0.200 10,000.00 2,000.00
Balok Kayu Kelas II - M3 2,200,000.00 -
Papan Mall - M3 0.020 2,000,000.00 40,000.00
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' - Batang 2.000 9,000.00 18,000.00
JUMLAH HARGA BAHAN 145,750.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 246,235.00
E. Overhead & Profit 10% x D 24,623.50
F. Harga Satuan Pekerjaan(D + E) 270,858.50

VI. AHSP - A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.4.1.9 AHSP - A.4.4.1


KODE/ JENIS PEKERJAAN : Pemasangan Dinding Bata Merah (5 x 11 x 22) cm Tebal 1/2 Batu, Campuran 1 SP : 4 PP
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.300 80,000.00 24,000.00
Tukang Batu L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.015 125,000.00 1,875.00
JUMLAH TENAGA KERJA 39,075.00
B. BAHAN :
Bata Merah - Buah 70.000 750.00 52,500.00
Semen Portland - Kg 11.500 1,500.00 17,250.00
Pasir Pasang - Kg 0.043 250,000.00 10,750.00
JUMLAH HARGA BAHAN 80,500.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 119,575.00
E. Overhead & Profit 10% x D 11,957.50
F. Harga Satuan Pekerjaan(D + E) 131,532.50
VII. AHSP - A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.4.2.4 AHSP - A.4.4.2


KODE/ JENIS PEKERJAAN : Pemasangan Plesteran, Campuran 1 SP : 4 PP Tebal 15 mm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.300 80,000.00 24,000.00
Tukang Batu L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.015 125,000.00 1,875.00
JUMLAH TENAGA KERJA 45,675.00
B. BAHAN :
Semen Portland - Kg 6.240 1,500.00 9,360.00
Pasir Pasang - Kg 0.023 250,000.00 5,750.00
JUMLAH HARGA BAHAN 15,110.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 60,785.00
E. Overhead & Profit 10% x D 6,078.50
F. Harga Satuan Pekerjaan(D + E) 66,863.50

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.4.2.27 AHSP - A.4.4.2


KODE/ JENIS PEKERJAAN : Pemasangan Acian
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 80,000.00 16,000.00
Tukang Batu L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.010 125,000.00 1,250.00
JUMLAH TENAGA KERJA 30,450.00
B. BAHAN :
Semen Portland - Kg 3.250 1,500.00 4,875.00
JUMLAH HARGA BAHAN 4,875.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 35,325.00
E. Overhead & Profit 10% x D 3,532.50
F. Harga Satuan Pekerjaan(D + E) 38,857.50
VIII. AHSP - A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.4.3.4 AHSP - A.4.4.3


KODE/ JENIS PEKERJAAN : Pemasangan Lantai Keramik Ukuran 40 cm x 40 cm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 80,000.00 20,000.00
Tukang Batu L.02 Org/Hari 0.125 120,000.00 15,000.00
Kepala Tukang L.03 Org/Hari 0.013 120,000.00 1,560.00
Mandor L.04 Org/Hari 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 38,185.00
B. BAHAN :
Keramik Ukuran 40 cm x 40 cm - Buah 6.630 13,544.49 89,800.00
Semen Portland - Kg 9.800 1,500.00 14,700.00
Semen Warna - Kg 1.300 3,500.00 4,550.00
Pasir Pasang - M3 0.045 250,000.00 11,250.00
JUMLAH HARGA BAHAN 120,300.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 158,485.00
E. Overhead & Profit 10% x D 15,848.50
F. Harga Satuan Pekerjaan(D + E) 174,333.50

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.4.3.5 AHSP - A.4.4.3


KODE/ JENIS PEKERJAAN : Pemasangan Lantai Keramik Ukuran 30 cm x 30 cm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.260 80,000.00 20,800.00
Tukang Batu L.02 Org/Hari 0.130 120,000.00 15,600.00
Kepala Tukang L.03 Org/Hari 0.013 120,000.00 1,560.00
Mandor L.04 Org/Hari 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 39,585.00
B. BAHAN :
Keramik Ukuran 40 cm x 40 cm - Buah 11.870 7,565.29 89,800.00
Semen Portland - Kg 10.000 1,500.00 15,000.00
Semen Warna - Kg 1.500 3,500.00 5,250.00
Pasir Pasang - M3 0.045 250,000.00 11,250.00
JUMLAH HARGA BAHAN 121,300.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 160,885.00
E. Overhead & Profit 10% x D 16,088.50
F. Harga Satuan Pekerjaan(D + E) 176,973.50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.4.3.36 AHSP - A.4.4.3


KODE/ JENIS PEKERJAAN : Pemasangan Lantai Keramik Ukuran 20 cm x 40 cm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.700 80,000.00 56,000.00
Tukang Batu L.02 Org/Hari 0.350 120,000.00 42,000.00
Kepala Tukang L.03 Org/Hari 0.035 120,000.00 4,200.00
Mandor L.04 Org/Hari 0.035 125,000.00 4,375.00
JUMLAH TENAGA KERJA 106,575.00
B. BAHAN :
Keramik 20 cm x 40 cm - Buah 12.500 7,500.00 93,750.00
Semen Portland - Kg 10.400 1,500.00 15,600.00
Semen Warna - Kg 1.620 3,500.00 5,670.00
Pasir Pasang - M3 0.045 250,000.00 11,250.00
JUMLAH HARGA BAHAN 126,270.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 232,845.00
E. Overhead & Profit 10% x D 23,284.50
F. Harga Satuan Pekerjaan(D + E) 256,129.50

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.4.3.54 AHSP - A.4.4.3


KODE/ JENIS PEKERJAAN : Pemasangan Dinding Keramik Ukuran 20 cm x 20 cm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.900 80,000.00 72,000.00
Tukang Batu L.02 Org/Hari 0.450 120,000.00 54,000.00
Kepala Tukang L.03 Org/Hari 0.045 120,000.00 5,400.00
Mandor L.04 Org/Hari 0.045 125,000.00 5,625.00
JUMLAH TENAGA KERJA 137,025.00
B. BAHAN :
Keramik 20 cm x 20 cm - Buah 12.500 7,500.00 93,750.00
Semen Portland - Kg 9.300 1,500.00 13,950.00
Semen Warna - Kg 1.940 3,500.00 6,790.00
Pasir Pasang - M3 0.018 250,000.00 4,500.00
JUMLAH HARGA BAHAN 118,990.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 256,015.00
E. Overhead & Profit 10% x D 25,601.50
F. Harga Satuan Pekerjaan(D + E) 281,616.50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.4.3.54 AHSP - A.4.4.3


KODE/ JENIS PEKERJAAN : Pemasangan Dinding Keramik Ukuran 20 cm x 40 cm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.900 80,000.00 72,000.00
Tukang Batu L.02 Org/Hari 0.450 120,000.00 54,000.00
Kepala Tukang L.03 Org/Hari 0.045 120,000.00 5,400.00
Mandor L.04 Org/Hari 0.045 125,000.00 5,625.00
JUMLAH TENAGA KERJA 137,025.00
B. BAHAN :
Keramik 20 cm x 40 cm - Buah 12.500 7,500.00 93,750.00
Semen Portland - Kg 9.300 1,500.00 13,950.00
Semen Warna - Kg 1.940 3,500.00 6,790.00
Pasir Pasang - M3 0.018 250,000.00 4,500.00
JUMLAH HARGA BAHAN 118,990.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 256,015.00
E. Overhead & Profit 10% x D 25,601.50
F. Harga Satuan Pekerjaan(D + E) 281,616.50

IX. AHSP - A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.1.5 AHSP - A.4.5.1


KODE/ JENIS PEKERJAAN : Pemasangan Langit-langit Tripleks Ukuran (60 x 120) cm, Tebal 3 mm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 80,000.00 8,000.00
Tukang Kayu L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 21,825.00
B. BAHAN :
Tripleks Tebal 3 mm - Lbr 0.375 59,500.00 22,312.50
Paku Tripleks - Kg 0.030 30,000.00 900.00
JUMLAH HARGA BAHAN 23,212.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 45,037.50
E. Overhead & Profit 10% x D 4,503.75
F. Harga Satuan Pekerjaan(D + E) 49,541.25
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.1.7 AHSP - A.4.5.1


KODE/ JENIS PEKERJAAN : Pemasangan Langit-langit Gypsum board Ukuran (120 x 240 x 9) mm, Tebal 9 mm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 80,000.00 8,000.00
Tukang Kayu L.02 Org/Hari 0.050 120,000.00 6,000.00
Kepala Tukang L.03 Org/Hari 0.005 120,000.00 600.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 15,225.00
B. BAHAN :
Gypsum board Ukuran (120 x 240 x 9) mm - Lbr 0.364 99,190.00 36,105.16
Paku Skrup - Kg 0.110 1,630.00 179.30
JUMLAH HARGA BAHAN 36,284.46
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 51,509.46
E. Overhead & Profit 10% x D 5,150.95
F. Harga Satuan Pekerjaan(D + E) 56,660.41

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.20 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pemasangan Rangka Langit-langit (60 x 120 cm), Kayu Kelas II
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 80,000.00 16,000.00
Tukang Kayu L.02 Org/Hari 0.300 120,000.00 36,000.00
Kepala Tukang L.03 Org/Hari 0.030 120,000.00 3,600.00
Mandor L.04 Org/Hari 0.010 125,000.00 1,250.00
JUMLAH TENAGA KERJA 56,850.00
B. BAHAN :
Balok 5/7 cm Kayu Kelas II - M3 0.0163 2,200,000.00 35,860.00
Paku 7 - 10 cm - Kg 0.250 23,000.00 5,750.00
JUMLAH HARGA BAHAN 41,610.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 98,460.00
E. Overhead & Profit 10% x D 9,846.00
F. Harga Satuan Pekerjaan(D + E) 108,306.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.1.9 AHSP - A.4.5.1


KODE/ JENIS PEKERJAAN : Pemasangan List Plafond Profil Kayu
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.050 80,000.00 4,000.00
Tukang Kayu L.02 Org/Hari 0.050 120,000.00 6,000.00
Kepala Tukang L.03 Org/Hari 0.005 120,000.00 600.00
Mandor L.04 Org/Hari 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 10,975.00
B. BAHAN :
List Kayu Profil - M1 1.050 9,500.00 9,975.00
Paku 1 cm - 2,5 cm - Kg 0.010 23,000.00 230.00
JUMLAH HARGA BAHAN 10,205.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 21,180.00
E. Overhead & Profit 10% x D 2,118.00
F. Harga Satuan Pekerjaan(D + E) 23,298.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : ANL. SNI 2839-2008 (6.8) AHSP - A.4.5.1


KODE/ JENIS PEKERJAAN : Pemasangan List Plafond Profil Gypsum 9 - 11 CM
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.060 80,000.00 4,800.00
Tukang Kayu L.02 Org/Hari 0.060 120,000.00 7,200.00
Kepala Tukang L.03 Org/Hari 0.006 120,000.00 720.00
Mandor L.04 Org/Hari 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 13,095.00
B. BAHAN :
List Profil Gypsum 9 - 11 Cm - M1 1.050 41,410.00 43,480.50
Cornice Adhesive - Kg 0.150 5,000.00 750.00
JUMLAH HARGA BAHAN 44,230.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 57,325.50
E. Overhead & Profit 10% x D 5,732.55
F. Harga Satuan Pekerjaan(D + E) 63,058.05
X. AHSP - A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.2.32.a AHSP - A.4.5.2


KODE/ JENIS PEKERJAAN : Pemasangan Atap Genteng Metal Zincalume (Type 2 Susun)
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 80,000.00 16,000.00
Tukang Alumunium L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.001 125,000.00 125.00
JUMLAH TENAGA KERJA 29,325.00
B. BAHAN :
Genteng Metal 0,800 x 0,770 - T= 0,25 mm - Lbr 1.623 37,900.00 61,511.70
Screw 10 - 16 x 16 - Bh 9.000 2,260.00 20,340.00
JUMLAH HARGA BAHAN 81,851.70
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 111,176.70
E. Overhead & Profit 10% x D 11,117.67
F. Harga Satuan Pekerjaan(D + E) 122,294.37

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.2.36 AHSP - A.4.5.2


KODE/ JENIS PEKERJAAN : Pemasangan Nok Genteng Metal Zincalume (Pada Rangka Kayu)
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 80,000.00 20,000.00
Tukang Alumunium L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 41,425.00
B. BAHAN :
Nok Genteng Metal Zincalume - Bh 1.100 22,330.00 24,563.00
Paku Seng Kepala Kecil - Kg 0.050 30,000.00 1,500.00
JUMLAH HARGA BAHAN 26,063.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 67,488.00
E. Overhead & Profit 10% x D 6,748.80
F. Harga Satuan Pekerjaan(D + E) 74,236.80
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.2.36.a AHSP - A.4.5.2


KODE/ JENIS PEKERJAAN : Pemasangan Nok Genteng Metal Zincalume (Pada Rangka Baja Ringan)
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 80,000.00 20,000.00
Tukang Alumunium L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 41,425.00
B. BAHAN :
Nok Genteng Metal Zincalume - Bh 1.100 22,330.00 24,563.00
Screw 10 - 16 x 16 - Bh 6.000 2,260.00 13,560.00
JUMLAH HARGA BAHAN 38,123.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 79,548.00
E. Overhead & Profit 10% x D 7,954.80
F. Harga Satuan Pekerjaan(D + E) 87,502.80

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.2.36.b AHSP - A.4.5.2


KODE/ JENIS PEKERJAAN : Pemasangan Nok Zincalume (Pada Rangka Baja Ringan)
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.250 80,000.00 20,000.00
Tukang Alumunium L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.013 125,000.00 1,625.00
JUMLAH TENAGA KERJA 41,425.00
B. BAHAN :
Nok Zincalume, Tebal 0,25 mm - M1 1.100 65,000.00 71,500.00
Screw 10 - 16 x 16 - Bh 6.000 2,260.00 13,560.00
JUMLAH HARGA BAHAN 85,060.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 126,485.00
E. Overhead & Profit 10% x D 12,648.50
F. Harga Satuan Pekerjaan(D + E) 139,133.50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.2.38.a AHSP - A.4.5.2


KODE/ JENIS PEKERJAAN : Pemasangan Atap Zincalume
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.120 80,000.00 9,600.00
Tukang Alumunium L.02 Org/Hari 0.060 120,000.00 7,200.00
Kepala Tukang L.03 Org/Hari 0.006 120,000.00 720.00
Mandor L.04 Org/Hari 0.006 125,000.00 750.00
JUMLAH TENAGA KERJA 18,270.00
B. BAHAN :
Atap Zincalume 80 x 170 cm, T= 0,30 mm - Lbr 0.750 76,000.00 57,000.00
Screw 10 - 16 x 16 - Bh 8.000 2,260.00 18,080.00
JUMLAH HARGA BAHAN 75,080.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 93,350.00
E. Overhead & Profit 10% x D 9,335.00
F. Harga Satuan Pekerjaan(D + E) 102,685.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.2.38.b AHSP - A.4.5.2


KODE/ JENIS PEKERJAAN : Pemasangan Atap Zincalume (Pada Rangka Kayu)
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.120 80,000.00 9,600.00
Tukang Alumunium L.02 Org/Hari 0.060 120,000.00 7,200.00
Kepala Tukang L.03 Org/Hari 0.006 120,000.00 720.00
Mandor L.04 Org/Hari 0.006 125,000.00 750.00
JUMLAH TENAGA KERJA 18,270.00
B. BAHAN :
Atap Zincalume 80 x 170 cm, T= 0,25 mm - Lbr 0.750 76,000.00 57,000.00
Paku Seng Kepala Kecil - Kg 0.020 30,000.00 600.00
JUMLAH HARGA BAHAN 57,600.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 75,870.00
E. Overhead & Profit 10% x D 7,587.00
F. Harga Satuan Pekerjaan(D + E) 83,457.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.2.39.a AHSP - A.4.5.2


KODE/ JENIS PEKERJAAN : Pemasangan Nok Zincalume (Pada Rangka Kayu)
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.150 80,000.00 12,000.00
Tukang Alumunium L.02 Org/Hari 0.070 120,000.00 8,400.00
Kepala Tukang L.03 Org/Hari 0.007 120,000.00 840.00
Mandor L.04 Org/Hari 0.006 125,000.00 750.00
JUMLAH TENAGA KERJA 21,990.00
B. BAHAN :
Nok Zincalume, Tebal 0,25 mm - M1 1.100 65,000.00 71,500.00
Paku Seng Kepala Kecil - Kg 0.040 30,000.00 1,200.00
JUMLAH HARGA BAHAN 72,700.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 94,690.00
E. Overhead & Profit 10% x D 9,469.00
F. Harga Satuan Pekerjaan(D + E) 104,159.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.5.2.39.b AHSP - A.4.5.2


KODE/ JENIS PEKERJAAN : Pemasangan Nok Zincalume (Pada Rangka Baja Ringan)
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.150 80,000.00 12,000.00
Tukang Alumunium L.02 Org/Hari 0.070 120,000.00 8,400.00
Kepala Tukang L.03 Org/Hari 0.007 120,000.00 840.00
Mandor L.04 Org/Hari 0.006 125,000.00 750.00
JUMLAH TENAGA KERJA 21,990.00
B. BAHAN :
Nok Zincalume, Tebal 0,25 mm - M1 1.100 65,000.00 71,500.00
Screw 10 - 16 x 16 - Bh 6.000 2,260.00 13,560.00
JUMLAH HARGA BAHAN 85,060.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 107,050.00
E. Overhead & Profit 10% x D 10,705.00
F. Harga Satuan Pekerjaan(D + E) 117,755.00
XI. AHSP - A.4.6.1 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.2 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pembuatan dan Pemasangan Kusen Pintu dan Kusen Jendela, Kayu Kelas II
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 6.000 80,000.00 480,000.00
Tukang Kayu L.02 Org/Hari 18.000 120,000.00 2,160,000.00
Kepala Tukang L.03 Org/Hari 1.800 120,000.00 216,000.00
Mandor L.04 Org/Hari 0.300 125,000.00 37,500.00
JUMLAH TENAGA KERJA 2,893,500.00
B. BAHAN :
Balok Kayu Kelas II - M3 1.200 2,200,000.00 2,640,000.00
Paku 10 cm - Kg 1.250 23,000.00 28,750.00
Lem Kayu - Kg 1.000 15,491.00 15,491.00
JUMLAH HARGA BAHAN 2,684,241.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 5,577,741.00
E. Overhead & Profit 10% x D 557,774.10
F. Harga Satuan Pekerjaan(D + E) 6,135,515.10

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.5 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pembuatan dan Pemasangan Daun Pintu Panil, Kayu Kelas II
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1.000 80,000.00 80,000.00
Tukang Kayu L.02 Org/Hari 3.000 120,000.00 360,000.00
Kepala Tukang L.03 Org/Hari 0.300 120,000.00 36,000.00
Mandor L.04 Org/Hari 0.050 125,000.00 6,250.00
JUMLAH TENAGA KERJA 482,250.00
B. BAHAN :
Papan Kayu Kelas II - M3 0.040 3,000,000.00 120,000.00
Lem Kayu - Kg 0.500 15,491.00 7,745.50
JUMLAH HARGA BAHAN 127,745.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 609,995.50
E. Overhead & Profit 10% x D 60,999.55
F. Harga Satuan Pekerjaan(D + E) 670,995.05
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.6 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pembuatan dan Pemasangan Daun Pintu dan Jendela Kaca, Kayu Kelas II
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.800 80,000.00 64,000.00
Tukang Kayu L.02 Org/Hari 2.400 120,000.00 288,000.00
Kepala Tukang L.03 Org/Hari 0.240 120,000.00 28,800.00
Mandor L.04 Org/Hari 0.040 125,000.00 5,000.00
JUMLAH TENAGA KERJA 385,800.00
B. BAHAN :
Papan Kayu Kelas II - M3 0.024 3,000,000.00 72,000.00
Lem Kayu - Kg 0.300 15,491.00 4,647.30
JUMLAH HARGA BAHAN 76,647.30
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 462,447.30
E. Overhead & Profit 10% x D 46,244.73
F. Harga Satuan Pekerjaan(D + E) 508,692.03

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.10 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pemasangan Jalusi Kusen, Kayu Kelas II
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.670 80,000.00 53,600.00
Tukang Kayu L.02 Org/Hari 2.000 120,000.00 240,000.00
Kepala Tukang L.03 Org/Hari 0.200 120,000.00 24,000.00
Mandor L.04 Org/Hari 0.335 125,000.00 41,875.00
JUMLAH TENAGA KERJA 359,475.00
B. BAHAN :
Papan Kayu Kelas II - M3 0.060 2,200,000.00 132,000.00
Paku 1 cm - 2,5 cm - Kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 135,450.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 494,925.00
E. Overhead & Profit 10% x D 49,492.50
F. Harga Satuan Pekerjaan(D + E) 544,417.50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.13 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pemasangan Konstruksi Kuda-kuda Konvensional, Kayu Kelas II
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 4.000 80,000.00 320,000.00
Tukang Kayu L.02 Org/Hari 12.000 120,000.00 1,440,000.00
Kepala Tukang L.03 Org/Hari 1.200 120,000.00 144,000.00
Mandor L.04 Org/Hari 0.200 125,000.00 25,000.00
JUMLAH TENAGA KERJA 1,929,000.00
B. BAHAN :
Balok Kayu Kelas II - M3 1.100 2,200,000.00 2,420,000.00
Besi Strip Tebal 5 mm - Kg 8.000 10,000.00 80,000.00
Paku Biasa 4" - 10" - Kg 5.600 23,000.00 128,800.00
JUMLAH HARGA BAHAN 2,628,800.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 4,557,800.00
E. Overhead & Profit 10% x D 455,780.00
F. Harga Satuan Pekerjaan(D + E) 5,013,580.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.15 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pemasangan Konstruksi Gording Kuda-kuda Kayu
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 6.700 80,000.00 536,000.00
Tukang Kayu L.02 Org/Hari 20.100 120,000.00 2,412,000.00
Kepala Tukang L.03 Org/Hari 2.010 120,000.00 241,200.00
Mandor L.04 Org/Hari 0.335 125,000.00 41,875.00
JUMLAH TENAGA KERJA 3,231,075.00
B. BAHAN :
Balok Kayu Kelas II - M3 1.100 2,200,000.00 2,420,000.00
Paku Biasa 4" - 10" - Kg 0.800 23,000.00 18,400.00
JUMLAH HARGA BAHAN 2,438,400.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 5,669,475.00
E. Overhead & Profit 10% x D 566,947.50
F. Harga Satuan Pekerjaan(D + E) 6,236,422.50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.20 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pemasangan Rangka Langit-Langit 60 x 120 cm, Kayu Kelas II
SATUAN PEMBAYARAN : M3

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 80,000.00 16,000.00
Tukang Kayu L.02 Org/Hari 0.300 120,000.00 36,000.00
Kepala Tukang L.03 Org/Hari 0.030 120,000.00 3,600.00
Mandor L.04 Org/Hari 0.010 125,000.00 1,250.00
JUMLAH TENAGA KERJA 56,850.00
B. BAHAN :
Balok Kayu 5x7 cm, Kelas II - M3 0.0163 2,200,000.00 35,860.00
Paku 7 - 10 cm - Kg 0.250 23,000.00 5,750.00
JUMLAH HARGA BAHAN 41,610.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 98,460.00
E. Overhead & Profit 10% x D 9,846.00
F. Harga Satuan Pekerjaan(D + E) 108,306.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.1.22 AHSP - A.4.6.1


KODE/ JENIS PEKERJAAN : Pemasangan Listplank Papan 2,5 x 25 cm, Kayu Kelas II
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.100 80,000.00 8,000.00
Tukang Kayu L.02 Org/Hari 0.200 120,000.00 24,000.00
Kepala Tukang L.03 Org/Hari 0.020 120,000.00 2,400.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 35,025.00
B. BAHAN :
Papan Kayu Kelas II - M3 0.007 2,200,000.00 15,400.00
Paku Biasa 2,5" - 3,5" - Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 16,550.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 51,575.00
E. Overhead & Profit 10% x D 5,157.50
F. Harga Satuan Pekerjaan(D + E) 56,732.50
XII. AHSP - A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.2 AHSP - A.4.6.2


KODE/ JENIS PEKERJAAN : Pemasangan Kunci Tanam 2 Slaag
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 80,000.00 800.00
Tukang Kayu L.02 Org/Hari 0.500 120,000.00 60,000.00
Kepala Tukang L.03 Org/Hari 0.050 120,000.00 6,000.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 67,425.00
B. BAHAN :
Kunci Tanam 2 Slaag - Bh 1.000 109,000.00 109,000.00
JUMLAH HARGA BAHAN 109,000.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 176,425.00
E. Overhead & Profit 10% x D 17,642.50
F. Harga Satuan Pekerjaan(D + E) 194,067.50

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.5 AHSP - A.4.6.2


KODE/ JENIS PEKERJAAN : Pemasangan Engsel Pintu Tanam
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 80,000.00 1,200.00
Tukang Kayu L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.0008 125,000.00 100.00
JUMLAH TENAGA KERJA 21,100.00
B. BAHAN :
Engsel Pintu Kualitas Baik - Bh 1.000 56,440.00 56,440.00
JUMLAH HARGA BAHAN 56,440.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 77,540.00
E. Overhead & Profit 10% x D 7,754.00
F. Harga Satuan Pekerjaan(D + E) 85,294.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.6 AHSP - A.4.6.2


KODE/ JENIS PEKERJAAN : Pemasangan Engsel Jendela
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 80,000.00 800.00
Tukang Kayu L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.0005 125,000.00 62.50
JUMLAH TENAGA KERJA 14,062.50
B. BAHAN :
Engsel Jendela - Bh 1.000 35,650.00 35,650.00
JUMLAH HARGA BAHAN 35,650.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 49,712.50
E. Overhead & Profit 10% x D 4,971.25
F. Harga Satuan Pekerjaan(D + E) 54,683.75

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.8.a AHSP - A.4.6.2


KODE/ JENIS PEKERJAAN : Pemasangan Grendel Jendela
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 80,000.00 1,200.00
Tukang Kayu L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.008 125,000.00 1,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN :
Grendel Jendela - Bh 1.000 12,520.00 12,520.00
JUMLAH HARGA BAHAN 12,520.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 34,520.00
E. Overhead & Profit 10% x D 3,452.00
F. Harga Satuan Pekerjaan(D + E) 37,972.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.8.b AHSP - A.4.6.2


KODE/ JENIS PEKERJAAN : Pemasangan Grendel Pintu
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 80,000.00 1,200.00
Tukang Kayu L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.008 125,000.00 1,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN :
Grendel Pintu - Bh 1.000 24,130.00 24,130.00
JUMLAH HARGA BAHAN 24,130.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 46,130.00
E. Overhead & Profit 10% x D 4,613.00
F. Harga Satuan Pekerjaan(D + E) 50,743.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.9 AHSP - A.4.6.2


KODE/ JENIS PEKERJAAN : Pemasangan Kait Angin Jendela
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 80,000.00 1,200.00
Tukang Kayu L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.008 125,000.00 1,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN :
Kait Angin Jendela - Bh 1.000 29,890.00 29,890.00
JUMLAH HARGA BAHAN 29,890.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 51,890.00
E. Overhead & Profit 10% x D 5,189.00
F. Harga Satuan Pekerjaan(D + E) 57,079.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.9.b AHSP - A.4.6.2


KODE/ JENIS PEKERJAAN : Pemasangan Gagang Pintu/Jendela
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 80,000.00 1,200.00
Tukang Kayu L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.008 125,000.00 1,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN :
Gagang Jendela - Set 1.000 29,890.00 29,890.00
JUMLAH HARGA BAHAN 29,890.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 51,890.00
E. Overhead & Profit 10% x D 5,189.00
F. Harga Satuan Pekerjaan(D + E) 57,079.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.17 AHSP - A.4.6.2


KODE/ JENIS PEKERJAAN : Memasang Kaca Bening, Tebal 5 mm
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 80,000.00 1,200.00
Tukang Kayu L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.0008 125,000.00 100.00
JUMLAH TENAGA KERJA 21,100.00
B. BAHAN :
Kaca Bening Tebal 5 mm - m2 1.100 243,370.00 267,707.00
Sealant - Kg 0.050 51,300.00 2,565.00
JUMLAH HARGA BAHAN 270,272.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 291,372.00
E. Overhead & Profit 10% x D 29,137.20
F. Harga Satuan Pekerjaan(D + E) 320,509.20
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.6.2.9.a AHSP - A.4.6.2


KODE/ JENIS PEKERJAAN : Pemasangan Handle Pintu Stainless Steel, 80 cm
SATUAN PEMBAYARAN : Set (2 Sisi Bidang Pintu)

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.015 80,000.00 1,200.00
Tukang Kayu L.02 Org/Hari 0.150 120,000.00 18,000.00
Kepala Tukang L.03 Org/Hari 0.015 120,000.00 1,800.00
Mandor L.04 Org/Hari 0.008 125,000.00 1,000.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN :
Handle Pintu Stainless Steel 80 cm - Set 1.000 787,500.00 787,500.00
JUMLAH HARGA BAHAN 787,500.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 809,500.00
E. Overhead & Profit 10% x D 80,950.00
F. Harga Satuan Pekerjaan(D + E) 890,450.00

XIV. AHSP - A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.7.1.5 AHSP - A.4.7.1


KODE/ JENIS PEKERJAAN : Pengecatan Bidang Kayu Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup)
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 80,000.00 5,600.00
Tukang Kayu L.02 Org/Hari 0.105 120,000.00 12,600.00
Kepala Tukang L.03 Org/Hari 0.004 120,000.00 480.00
Mandor L.04 Org/Hari 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 19,055.00
B. BAHAN :
Cat Meni - Kg 0.200 87,580.00 17,516.00
Plamur Kayu - Kg 0.150 51,850.00 7,777.50
Cat Dasar - Kg 0.170 43,410.00 7,379.70
Cat Penutup - Kg 0.350 43,410.00 15,193.50
Kuas - Buah 0.010 5,680.00 56.80
Pengencer - Kg 0.030 70,300.00 2,109.00
Ampelas - Lbr 0.200 4,875.00 975.00
JUMLAH HARGA BAHAN 51,007.50
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 70,062.50
E. Overhead & Profit 10% x D 7,006.25
F. Harga Satuan Pekerjaan(D + E) 77,068.75
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.7.1.5.a AHSP - A.4.7.1


KODE/ JENIS PEKERJAAN : Pengecatan Listplank GRC (1 Lapis Cat Dasar, 3 Lapis Cat Penutup)
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.070 80,000.00 5,600.00
Tukang Kayu L.02 Org/Hari 0.105 120,000.00 12,600.00
Kepala Tukang L.03 Org/Hari 0.004 120,000.00 480.00
Mandor L.04 Org/Hari 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 19,055.00
B. BAHAN :
Cat Dasar - Kg 0.170 43,410.00 7,379.70
Cat Penutup - Kg 0.350 43,410.00 15,193.50
Kuas - Buah 0.010 5,680.00 56.80
Pengencer - Kg 0.030 70,300.00 2,109.00
JUMLAH HARGA BAHAN 24,739.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 43,794.00
E. Overhead & Profit 10% x D 4,379.40
F. Harga Satuan Pekerjaan(D + E) 48,173.40

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.7.1.10 AHSP - A.4.7.1


KODE/ JENIS PEKERJAAN : Pengecatan Tembok dan Plafond Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 80,000.00 1,600.00
Tukang Kayu L.02 Org/Hari 0.063 120,000.00 7,560.00
Kepala Tukang L.03 Org/Hari 0.0063 120,000.00 756.00
Mandor L.04 Org/Hari 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 10,291.00
B. BAHAN :
Plamur - Kg 0.100 12,520.00 1,252.00
Cat Dasar - Kg 0.100 24,220.00 2,422.00
Cat Penutup - Kg 0.260 24,220.00 6,297.20
JUMLAH HARGA BAHAN 9,971.20
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 20,262.20
E. Overhead & Profit 10% x D 2,026.22
F. Harga Satuan Pekerjaan(D + E) 22,288.42
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.7.1.10.a AHSP - A.4.7.1


KODE/ JENIS PEKERJAAN : Pengecatan Plafond Kalsiboard (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 80,000.00 1,600.00
Tukang Kayu L.02 Org/Hari 0.063 120,000.00 7,560.00
Kepala Tukang L.03 Org/Hari 0.0063 120,000.00 756.00
Mandor L.04 Org/Hari 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 10,291.00
B. BAHAN :
Cat Dasar - Kg 0.100 24,220.00 2,422.00
Cat Penutup - Kg 0.260 24,220.00 6,297.20
JUMLAH HARGA BAHAN 8,719.20
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 19,010.20
E. Overhead & Profit 10% x D 1,901.02
F. Harga Satuan Pekerjaan(D + E) 20,911.22

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.7.1.10.b AHSP - A.4.7.1


KODE/ JENIS PEKERJAAN : Pengecatan Pondasi (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 80,000.00 1,600.00
Tukang Kayu L.02 Org/Hari 0.063 120,000.00 7,560.00
Kepala Tukang L.03 Org/Hari 0.0063 120,000.00 756.00
Mandor L.04 Org/Hari 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 10,291.00
B. BAHAN :
Cat Dasar - Kg 0.100 24,220.00 2,422.00
Cat Penutup - Kg 0.260 24,220.00 6,297.20
JUMLAH HARGA BAHAN 8,719.20
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 19,010.20
E. Overhead & Profit 10% x D 1,901.02
F. Harga Satuan Pekerjaan(D + E) 20,911.22
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.7.1.16 AHSP - A.4.7.1


KODE/ JENIS PEKERJAAN : Pengecatan Permukaan Baja Dengan Menie Besi
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 80,000.00 1,600.00
Tukang Kayu L.02 Org/Hari 0.200 120,000.00 24,000.00
Kepala Tukang L.03 Org/Hari 0.0200 120,000.00 2,400.00
Mandor L.04 Org/Hari 0.0025 125,000.00 312.50
JUMLAH TENAGA KERJA 28,312.50
B. BAHAN :
Menie Besi - Kg 0.100 41,410.00 4,141.00
Kuas - Bh 0.010 5,680.00 56.80
JUMLAH HARGA BAHAN 4,197.80
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 32,510.30
E. Overhead & Profit 10% x D 3,251.03
F. Harga Satuan Pekerjaan(D + E) 35,761.33

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.7.1.16.a AHSP - A.4.7.1


KODE/ JENIS PEKERJAAN : Pengecatan Permukaan Besi/ GRC
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.020 80,000.00 1,600.00
Tukang Kayu L.02 Org/Hari 0.200 120,000.00 24,000.00
Kepala Tukang L.03 Org/Hari 0.0200 120,000.00 2,400.00
Mandor L.04 Org/Hari 0.0025 125,000.00 312.50
JUMLAH TENAGA KERJA 28,312.50
B. BAHAN :
Cat Besi - Kg 0.100 43,410.00 4,341.00
Kuas - Bh 0.010 5,680.00 56.80
JUMLAH HARGA BAHAN 4,397.80
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 32,710.30
E. Overhead & Profit 10% x D 3,271.03
F. Harga Satuan Pekerjaan(D + E) 35,981.33
XIII. AHSP - A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.1 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Kloset Jongkok
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 3.300 80,000.00 264,000.00
Tukang Batu L.02 Org/Hari 1.100 120,000.00 132,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.160 125,000.00 20,000.00
JUMLAH TENAGA KERJA 417,200.00
B. BAHAN :
Kloset jongkok INA - Unit 1.000 163,000.00 163,000.00
Perlengkapan 6 % Harga Kloset - Ls 0.060 9,780.00 586.80
JUMLAH HARGA BAHAN 163,586.80
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 580,786.80
E. Overhead & Profit 10% x D 58,078.68
F. Harga Satuan Pekerjaan(D + E) 638,865.48

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.1.a AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Kloset Duduk Standar
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 3.300 80,000.00 264,000.00
Tukang Batu L.02 Org/Hari 1.100 120,000.00 132,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.160 125,000.00 20,000.00
JUMLAH TENAGA KERJA 417,200.00
B. BAHAN :
Kloset Duduk Standar - Unit 1.000 541,000.00 541,000.00
Perlengkapan 6 % Harga Kloset - Ls 0.060 32,460.00 1,947.60
JUMLAH HARGA BAHAN 542,947.60
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 960,147.60
E. Overhead & Profit 10% x D 96,014.76
F. Harga Satuan Pekerjaan(D + E) 1,056,162.36
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.14 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Floor Drain
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 80,000.00 800.00
Tukang Pipa L.02 Org/Hari 0.100 120,000.00 12,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 14,625.00
B. BAHAN :
Floor Drain - Bh 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 39,625.00
E. Overhead & Profit 10% x D 3,962.50
F. Harga Satuan Pekerjaan(D + E) 43,587.50

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.18 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Pipa GIP 1/2"
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.054 80,000.00 4,320.00
Tukang Pipa L.02 Org/Hari 0.090 120,000.00 10,800.00
Kepala Tukang L.03 Org/Hari 0.009 120,000.00 1,080.00
Mandor L.04 Org/Hari 0.027 125,000.00 3,375.00
JUMLAH TENAGA KERJA 19,575.00
B. BAHAN :
Pipa GIP 1/2" - M1 1.200 7,394.17 8,873.00
Perlengkapan 35% Harga Pipa - Ls 0.350 3,105.55 1,086.94
JUMLAH HARGA BAHAN 9,959.94
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 29,534.94
E. Overhead & Profit 10% x D 2,953.49
F. Harga Satuan Pekerjaan(D + E) 32,488.44
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.19 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Kran ø 1/2" atau ø 3/4"
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 80,000.00 800.00
Tukang Pipa L.02 Org/Hari 0.400 120,000.00 48,000.00
Kepala Tukang L.03 Org/Hari 0.040 120,000.00 4,800.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 54,225.00
B. BAHAN :
Kran Air Biasa - Buah 1.000 15,000.00 15,000.00
Seal Tape - Bh 0.0025 6,850.00 17.13
JUMLAH HARGA BAHAN 15,017.13
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 69,242.13
E. Overhead & Profit 10% x D 6,924.21
F. Harga Satuan Pekerjaan(D + E) 76,166.34

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.19.a AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Shower Basuh Gantung
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 80,000.00 800.00
Tukang Pipa L.02 Org/Hari 0.400 120,000.00 48,000.00
Kepala Tukang L.03 Org/Hari 0.040 120,000.00 4,800.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 54,225.00
B. BAHAN :
Shower Basuh - Buah 1.000 - -
Seal Tape - Bh 0.0025 6,850.00 17.13
JUMLAH HARGA BAHAN 17.13
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 54,242.13
E. Overhead & Profit 10% x D 5,424.21
F. Harga Satuan Pekerjaan(D + E) 59,666.34
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.22 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Pipa GIP 1,5"
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.108 80,000.00 8,640.00
Tukang Pipa L.02 Org/Hari 0.180 120,000.00 21,600.00
Kepala Tukang L.03 Org/Hari 0.018 120,000.00 2,160.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 33,025.00
B. BAHAN :
Pipa GIP 1,5" - M1 1.200 20,416.67 24,500.00
Perlengkapan 35% Harga Pipa - Ls 0.350 8,575.00 3,001.25
JUMLAH HARGA BAHAN 27,501.25
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 60,526.25
E. Overhead & Profit 10% x D 6,052.63
F. Harga Satuan Pekerjaan(D + E) 66,578.88

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.23 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Pipa GIP 3"
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.135 80,000.00 10,800.00
Tukang Pipa L.02 Org/Hari 0.225 120,000.00 27,000.00
Kepala Tukang L.03 Org/Hari 0.023 120,000.00 2,760.00
Mandor L.04 Org/Hari 0.007 125,000.00 875.00
JUMLAH TENAGA KERJA 41,435.00
B. BAHAN :
Pipa GIP 3" - M1 1.200 23,416.67 28,100.00
Perlengkapan 35% Harga Pipa - Ls 0.350 9,835.00 3,442.25
JUMLAH HARGA BAHAN 31,542.25
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 72,977.25
E. Overhead & Profit 10% x D 7,297.73
F. Harga Satuan Pekerjaan(D + E) 80,274.98
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.25 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Pipa PVC 1/2"
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.036 80,000.00 2,880.00
Tukang Pipa L.02 Org/Hari 0.060 120,000.00 7,200.00
Kepala Tukang L.03 Org/Hari 0.006 120,000.00 720.00
Mandor L.04 Org/Hari 0.002 125,000.00 250.00
JUMLAH TENAGA KERJA 11,050.00
B. BAHAN :
Pipa PVC 1/2" - M1 1.200 5,425.00 6,510.00
Perlengkapan 35% Harga Pipa - Ls 0.350 2,278.50 797.48
JUMLAH HARGA BAHAN 7,307.48
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 18,357.48
E. Overhead & Profit 10% x D 1,835.75
F. Harga Satuan Pekerjaan(D + E) 20,193.22

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.30 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Pipa PVC Type AW Diameter 2,5"
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.081 80,000.00 6,480.00
Tukang Pipa L.02 Org/Hari 0.135 120,000.00 16,200.00
Kepala Tukang L.03 Org/Hari 0.0135 120,000.00 1,620.00
Mandor L.04 Org/Hari 0.004 125,000.00 500.00
JUMLAH TENAGA KERJA 24,800.00
B. BAHAN :
Pipa PVC 2,5" - M1 1.200 14,312.50 17,175.00
Perlengkapan 35% Harga Pipa - Ls 0.350 6,011.25 2,103.94
JUMLAH HARGA BAHAN 19,278.94
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 44,078.94
E. Overhead & Profit 10% x D 4,407.89
F. Harga Satuan Pekerjaan(D + E) 48,486.83
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.32 AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Pipa PVC Type AW Diameter 4"
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.081 80,000.00 6,480.00
Tukang Batu L.02 Org/Hari 0.135 120,000.00 16,200.00
Kepala Tukang L.03 Org/Hari 0.0135 120,000.00 1,620.00
Mandor L.04 Org/Hari 0.004 125,000.00 500.00
JUMLAH TENAGA KERJA 24,800.00
B. BAHAN :
Pipa PVC 4" - M1 1.200 29,000.00 34,800.00
Perlengkapan 35% Harga Pipa - Ls 0.350 12,180.00 4,263.00
JUMLAH HARGA BAHAN 39,063.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 63,863.00
E. Overhead & Profit 10% x D 6,386.30
F. Harga Satuan Pekerjaan(D + E) 70,249.30

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.19.b AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Wastavel Standar
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 80,000.00 800.00
Tukang Pipa L.02 Org/Hari 0.400 120,000.00 48,000.00
Kepala Tukang L.03 Org/Hari 0.040 120,000.00 4,800.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 54,225.00
B. BAHAN :
Wastavel Biasa KIA - Buah 1.000 378,400.00 378,400.00
Perlengkapan 6 % Harga Wastavel - Bh 0.0600 6,850.00 411.00
JUMLAH HARGA BAHAN 378,811.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 433,036.00
E. Overhead & Profit 10% x D 43,303.60
F. Harga Satuan Pekerjaan(D + E) 476,339.60
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.19.c AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Urinoir
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.010 80,000.00 800.00
Tukang Pipa L.02 Org/Hari 0.400 120,000.00 48,000.00
Kepala Tukang L.03 Org/Hari 0.040 120,000.00 4,800.00
Mandor L.04 Org/Hari 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 54,225.00
B. BAHAN :
Urinoir - Buah 1.000 1,500,000.00 1,500,000.00
Perlengkapan 30 % Harga urinor - Bh 0.3000 6,850.00 2,055.00
JUMLAH HARGA BAHAN 1,502,055.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,556,280.00
E. Overhead & Profit 10% x D 155,628.00
F. Harga Satuan Pekerjaan(D + E) 1,711,908.00

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : A.5.1.1.1.a AHSP - A.5.1.1


KODE/ JENIS PEKERJAAN : Pemasangan Kloset Duduk monoblock
SATUAN PEMBAYARAN : Buah

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 3.300 80,000.00 264,000.00
Tukang Batu L.02 Org/Hari 1.100 120,000.00 132,000.00
Kepala Tukang L.03 Org/Hari 0.010 120,000.00 1,200.00
Mandor L.04 Org/Hari 0.160 125,000.00 20,000.00
JUMLAH TENAGA KERJA 417,200.00
B. BAHAN :
Kloset Duduk Standar - Unit 1.000 3,014,200.00 3,014,200.00
Perlengkapan 6 % Harga Kloset - Ls 0.060 180,852.00 10,851.12
JUMLAH HARGA BAHAN 3,025,051.12
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 3,442,251.12
E. Overhead & Profit 10% x D 344,225.11
F. Harga Satuan Pekerjaan(D + E) 3,786,476.23
V. AHSP - A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALLUMINIUM

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.2.1.11 AHSP - A.4.2.1


KODE/ JENIS PEKERJAAN : Pemasangan Kusen Pintu dan Jendela Alumunium, Open Back 4" x 1,3/4"
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.043 80,000.00 3,440.00
Tukang Khusus Allumunium L.02 Org/Hari 0.043 120,000.00 5,160.00
Kepala Tukang L.03 Org/Hari 0.0043 120,000.00 516.00
Mandor L.04 Org/Hari 0.0021 125,000.00 262.50
JUMLAH TENAGA KERJA 9,378.50
B. BAHAN :
Kusen Alumunium Open Back 4" x 1,3/4" - M1 1.100 79,166.67 87,083.33
Skrup Fixer - Buah 2.000 2,260.00 4,520.00
JUMLAH HARGA BAHAN 91,603.33
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 100,981.83
E. Overhead & Profit 10% x D 10,098.18
F. Harga Satuan Pekerjaan(D + E) 111,080.02

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.2.1.11.a AHSP - A.4.2.1


KODE/ JENIS PEKERJAAN : Pemasangan Rangka Penutup Open Back (Tutup Polos), Untuk Kusen Alumunium 4" x 1,3/4"
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.022 80,000.00 1,720.00
Tukang Khusus Allumunium L.02 Org/Hari 0.022 120,000.00 2,580.00
Kepala Tukang L.03 Org/Hari 0.0022 120,000.00 258.00
Mandor L.04 Org/Hari 0.0011 125,000.00 131.25
JUMLAH TENAGA KERJA 4,689.25
B. BAHAN :
Rangka Tutup Polos, Untuk Kusen Alumunium - M1 1.100 33,333.33 36,666.67
Skrup Fixer - Buah 2.000 2,260.00 4,520.00
JUMLAH HARGA BAHAN 41,186.67
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 45,875.92
E. Overhead & Profit 10% x D 4,587.59
F. Harga Satuan Pekerjaan(D + E) 50,463.51
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.2.1.12 AHSP - A.4.2.1


KODE/ JENIS PEKERJAAN : Pemasangan Pintu Alluminium Strip Lebar 8 CM
SATUAN PEMBAYARAN : M2

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.085 80,000.00 6,800.00
Tukang Khusus Allumunium L.02 Org/Hari 0.085 120,000.00 10,200.00
Kepala Tukang L.03 Org/Hari 0.0085 120,000.00 1,020.00
Mandor L.04 Org/Hari 0.0042 125,000.00 525.00
JUMLAH TENAGA KERJA 18,545.00
B. BAHAN :
Profil Alluminium (Slimar Allumunium 3/10) - M1 4.400 67,600.00 297,440.00
Alluminium Strip - M1 14.600 - -
JUMLAH HARGA BAHAN 297,440.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 315,985.00
E. Overhead & Profit 10% x D 31,598.50
F. Harga Satuan Pekerjaan(D + E) 347,583.50

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : AHSP - A.4.2.1.18 AHSP - A.4.2.1


KODE/ JENIS PEKERJAAN : Talang Datar/Jurai Seng BJLS 28 Lebar 90 cm
SATUAN PEMBAYARAN : M1

HARGA SATUAN JUMLAH HARGA


No. URAIAN KODE SATUAN KOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0.200 80,000.00 16,000.00
Tukang L.02 Org/Hari 0.200 120,000.00 24,000.00
Kepala Tukang L.03 Org/Hari 0.020 120,000.00 2,400.00
Mandor L.04 Org/Hari 0.001 125,000.00 125.00
JUMLAH TENAGA KERJA 42,525.00
B. BAHAN :
Seng Plat - M1 1.050 76,000.00 79,800.00
Paku 1 cm - 2,5 cm - Kg 0.015 23,000.00 345.00
Papan Kayu Kelas II - M3 0.019 2,200,000.00 41,800.00
JUMLAH HARGA BAHAN 121,945.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 164,470.00
E. Overhead & Profit 10% x D 16,447.00
F. Harga Satuan Pekerjaan(D + E) 180,917.00
atu, Campuran 1 SP : 4 PP

0.23
0.196
0.026
12.5

13
0

90,000
7,200
9) mm, Tebal 9 mm
0.133333333333333
sar, 3 Lapis Cat Penutup)
s Cat Dasar, 2 Lapis Cat Penutup)
k Kusen Alumunium 4" x 1,3/4"
Atap Zincalume 80 x 170 cm, T= 0,30 mm
Nok Zincalume, Tebal 0,25 mm
Seng Plat (Talang)
Lisplank GRC 30 Cm
Truss Canal / TS C75.75 Truss Canal / TS C75.75
Reng - Kanal U Tebal = 0,6 mm
L. Braket 1,5 mm
List Profil Gypsum 9 - 11 Cm
Screw 1"
Screw 10 - 16 x 16
Screw 12 - 14 x 20
Skrup Fixer
Penggantung dan Ramset
Stifenner/ Braket
Hollow Galvalum 4 x 4 cm
Kalsiboard 4 mm
Keramik 40X40
Semen 50 Kg
Semen Warna
Besi Ø 12 (SNI) 12m
Besi Ø 6 (SNI) 12m
Kawat beton / Bendrat
Paku Biasa
Minyak Cat / Thiner
Plamuur Tembok
Cat dasar /tembok
Cat penutup /tembok
Cat Dasar Kayu/Besi
Cat Penutup Kayu/Besi
Cornice Adhesive
Papan 2/20 x 4 (Kls. II)
Papan 2/20 x 4 (Kls. III)
Kayu Klas III (mal)
Balok 5/7 x 4 (Kls. III)
Dolken kayu Ø 8-10cm –panjang 4 m
Batu Bata
Batu Gunung / Kali
Kerikil Sungai Pilihan/Koral Beton
Pasir Pasangan / Betonan / Beton
Pasir urug
Tanah Timbunan

Ampelas
Kuas 4"

You might also like