Professional Documents
Culture Documents
I BAHAN
1 Atap Zincalume 80 x 170 cm, T= 0,30 mm 87.00 Lbr 74,000
2 Nok Zincalume, Tebal 0,25 mm 35.00 M 46,000
3 Seng Plat (Talang) 8.00 M 26,000
4 Lisplank GRC 30 Cm 11.00 Lbr 83,000
5 Truss Canal / TS C75.75 43.00 Btg 48,000
6 Reng - Kanal U Tebal = 0,6 mm 85.00 Btg 45,000
7 L. Braket 1,5 mm 3.00 Bh 25,000
8 List Profil Gypsum 9 - 11 Cm 42.00 M1 34,700
9 Screw 1" 160.00 Bh 500
10 Screw 10 - 16 x 16 2,039.00 Bh 600
11 Screw 12 - 14 x 20 232.00 Bh 700
12 Skrup Fixer 15.00 Kg 1,400
13 Penggantung dan Ramset 382.00 Bh 4,000
14 Stifenner/ Braket 287.00 Bh 4,000
15 Hollow Galvalum 4 x 4 cm 128.00 Btg 35,000
16 Kalsiboard 4 mm 35.00 Lbr 95,000
17 Semen 50 Kg 100.00 Sak 89,000
18 Semen Warna 5.00 Bungkus 50,000
19 Besi Ø 12 (SNI) 12m 32.00 Btg 124,000
20 Besi Ø 6 (SNI) 12m 30.00 Btg 77,000
21 Kawat beton / Bendrat 8.00 Kg 30,000
22 Paku Biasa 7.00 Kg 23,000
23 Minyak Cat / Thiner 1.00 Kg 70,000
24 Plamuur Tembok 10.00 Kg 15,000
25 Cat dasar /tembok 20.00 Kg 30,000
26 Cat penutup /tembok 38.00 Kg 35,000
27 Cat Dasar Kayu/Besi 3.00 Kg 40,000
28 Cat Penutup Kayu/Besi 5.00 Kg 80,000
29 Cornice Adhesive 6.00 Kg 39,000
30 Papan 2/20 x 4 (Kls. II) 0.14 Kg 1,900,000
31 Papan 2/20 x 4 (Kls. III) 0.63 m3 1,750,000
32 Kayu Klas III (mal) 0.27 M3 1,750,000
33 Balok 5/7 x 4 (Kls. III) 0.51 m3 1,750,000
34 Dolken kayu Ø 8-10cm –panjang 4 m 23.00 btg 15,000
35 Batu Bata 1,924.00 bh 1,000
36 Batu Gunung / Kali 19.00 M3 225,000
37 Kerikil Sungai Pilihan/Koral Beton 7.00 m3 200,000
38 Pasir Pasangan / Betonan / Beton 14.00 M3 200,000
39 Pasir urug 6.00 M3 200,000
40 Tanah Timbunan 15.00 M3 150,000
Bahan
460K
No URAIAN Volume Satuan Harga Satuan (Rp)
I BAHAN
II ALAT
1 Papan Proyek 1.00 Bh Rp 150,000.00
2 Kuas 4" 2.00 Bh Rp 15,000.00
3 Kuas Rol 2.00 Lbr Rp 30,000.00
4 Amplas 4.00 Lbr Rp 5,000.00
5 Kepi (Pisau Pempul) 2.00 Bh Rp 3,500.00
6 Meteran (5M) 1.00 Bh Rp 19,300.00
Alat
III UPAH
1 Pekerja 191.00 OH 95,000.00
2 Tukang 130.00 OH 125,000.00
3 Mandor 11.00 OH 100,000.00
Upah
JUMLAH BIAYA
DI BULATKAN
460K
an Sanggar Tani
Jumlah (Rp)
Rp 6,438,000.00
Rp 1,610,000.00
Rp 208,000.00
Rp 913,000.00
Rp 2,064,000.00
Rp 3,825,000.00
Rp 75,000.00
Rp 1,457,400.00
Rp 80,000.00
Rp 1,223,400.00
Rp 162,400.00
Rp 21,000.00
Rp 1,528,000.00
Rp 1,148,000.00
Rp 4,480,000.00
Rp 3,325,000.00
Rp 8,900,000.00
Rp 250,000.00
Rp 3,968,000.00
Rp 2,310,000.00
Rp 240,000.00
Rp 161,000.00
Rp 70,000.00
Rp 150,000.00
Rp 600,000.00
Rp 1,330,000.00
Rp 120,000.00
Rp 400,000.00
Rp 234,000.00
Rp 266,000.00
Rp 1,102,500.00
Rp 472,500.00
Rp 892,500.00
Rp 345,000.00
Rp 1,924,000.00
Rp 4,275,000.00
Rp 1,400,000.00
Rp 2,800,000.00
Rp 1,200,000.00
Rp 2,250,000.00
Rp 64,218,700.00
460K
Jumlah (Rp)
Rp 150,000.00
Rp 30,000.00
Rp 60,000.00
Rp 20,000.00
Rp 7,000.00
Rp 19,300.00
Rp 286,300.00
Rp 18,145,000.00
Rp 16,250,000.00
Rp 1,100,000.00
35,495,000.00
100,000,000.00
100,000,000.00
460K
ANALISA KEBUTUHAN BAHAN ALAT UPAH
Dimensi : 5 X 7,5
PUPR (2016/88)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
PUPR (2016/90)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
PUPR (2016)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
2 Tukang L.02 OH -
B Bahan
-
C Peralatan
PUPR (2016/583)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
PUPR (2016/584)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
PUPR (2016/589)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
PUPR (2016/585)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
A.4.1.1.1 Membuat Beton Mutu f'c = 14,5 MPa (K 175), Slump (12 ± 2) cm, W/C = 0,66 8.67
PUPR (2016/590)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
PUPR 2016
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Volume Pekerjaan (M2) 9
PUPR (2016/601)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
PUPR (2016/602)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
PUPR (2016/598)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Pemasangan Dinding Bata Merah (5 x 11 x 22) cm Tebal 1/2 Batu, Camp 1 SP : 4 PP 23.18
SNI 2008
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
PUPR (2016/644)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
PUPR (2016/655)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
Semen 50 Kg M3 0.0450 -
C Peralatan
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
Atap Zincalume 80 x 170 cm, T= 0,30 mm Lbr 0.7500 86.74
C Peralatan
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Terapan
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
A.4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 97.05
PUPR (2016/745)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
Pengecatan Plafond Kalsiboard (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 95.38
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
Cat dasar /tembok Kg 0.1000 9.54
C Peralatan
A.4.7.1.20 Pengecatan Listplank GRC (1 Lapis Cat Dasar, 3 Lapis Cat Penutup) 12.00
PUPR (2016\)
Jumlah Kebutuhan
No Uraian Kode Satuan Koefisien
Bahan
1 2 3 4 5 6
A Tenaga Kerja
B Bahan
C Peralatan
BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Instalasi Listrik
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pemasangan Instalasi Titik Lampu 7.00 Ttk 7.00
2 Lampu SL 11 Watt, Komplit Fitting 7.00 bh 7.00
3 Pemasangan Lampu SL 8 Watt 7.00 bh 7.00
4 Stop Kontak 1.00 bh 1.00
5 Saklar Ganda 1.00 bh 1.00
6 Saklar tunggal 2.00 bh 2.00
7 Box Sekring 1.00 bh 1.00
SKETSA / FOTO
112 224
200
200
8.5 2 17
11.5 2 23
2 2 4
1.2 1 1.2
45.2
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022
BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Pengecatan
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pengecatan Tembok (1 Lapis Plamur, 1 Lapis Cat Dasar, LXTX∑ 1.00 M 2
97.05 Tembok
2 Lapis Cat Penutup)
SKETSA / FOTO
112 224
200
200
8.5 2 17
11.5 2 23
2 2 4
1.2 1 1.2
45.2
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022
BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Kusen Pintu dan Sanitasi
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pemasangan Pintu WC Aluminium LXTX∑ 0.70 1.80 1.00 M 2
1.26
SKETSA / FOTO
112 224
200
200
8.5 2 17
11.5 2 23
2 2 4
1.2 1 1.2
45.2
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022
BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Penutup Atap dan Plafond
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pasang Plafond Kalsiboard + Rangka Hollow Galvalum PXLX∑ 2.50 2.00 1.00 M 2
5.00 Teras
7.50 5.00 1.00 M2 37.50 Ruangan
45.20 1.17 1.00 M2 52.88 Keliling
M2 95.38
SKETSA / FOTO
112 224
200
200
7.5 2 15
10.5 2 21
2 2 4
40
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022
BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Finishing Lantai
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pemasangan dinding bata merah 1/2 batu camp 1PC:4PP PXLX∑
Pemasangan 1 m2 lantai keramik 40x40 2.50 2.00 1.00 M2 5.00 Teras
2.50 0.80 1.00 M2 2.00 tangga
7.50 5.00 1.00 M2 37.50 Ruangan
M2 44.50
SKETSA / FOTO
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022
BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Dinding dan Plesteran
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pemasangan dinding bata merah 1/2 batu camp 1PC:4PP PXTX∑ 2.25 0.60 7.00 M2 9.45 Ruangan
2.25 3.05 2.00 M2 13.73
Luas Dinding M2 23.18
3 Pemasangan Acian Semen Dinding, Camp 1SP: 4PP T 1 2X Luas Dinding M2 46.35
4 Acian Semen Beton dan Pondasi Camp 1 SP : 4 PP T 15 mm 29.00 0.15 1.00 M2 4.35 Slof
29.00 0.15 1.00 M2 4.35 Pondasi
3.50 1.00 12.00 M2 42.00
M2 97.05
SKETSA / FOTO
7.00
30.00
5.50
DESA : INDANG SARI
KECAMATAN : LUWUK TIMUR
KABUPATEN : BANGGAI
PROVINSI : SULAWESI TENGAH
BIDANG : PEMBANGUNAN
KEGIATAN : PEMBANGUNAN SANGGAR TANI
DIMENSI :
TAHUN ANGGARAN : 2022
BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Sloof, Kolom, Balok, Ring Balok,Lantai Beton
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pekerjaan Sloof Beton PXLXTX∑ 6.50 0.15 0.15 1.00 M3 0.15 Teras
Membuat Beton Mutu f'c = 14,5 MPa (K 175) 25.00 0.15 0.20 1.00 M3 0.75 Ruangan
M3 0.90
2 Pemasangan 1 m2 bekisting untuk sloof PXTX∑ 6.50 0.15 1.00 M3 0.98 Teras
2Xpakai 25.00 0.20 1.00 M3 5.00 Ruangan
M3 5.98
3 Pembesian 10 kg dengan besi polos atau ulir Panjang ∑pjang Jumlah Berat
∑pjang X berat ∑pek (unit) ∑besi (Bh) Ø
Pembesian Slof pot (M) (M) (Kg)
Besi Ø12mm 2.20 2 4 17.60 12 15.62 Teras
2.70 1 4 10.80 12 9.58
Besi Ø6mm 0.50 1 33 16.50 6 3.66
Besi Ø12mm 5.20 2 4 41.60 12 36.91 Ruangan
7.90 2 4 63.20 12 56.08
Besi Ø6mm 0.60 1 125 75.00 6 16.64
Kg 138.50
Jumlah Besi Ø12mm Btg 8.88
Jumlah Besi Ø6mm Btg 7.63
4 Pekerjaan Kolom Beton PXLXTX∑ 3.50 0.25 0.25 2.00 M3 0.44 Teras
Membuat Beton Mutu f'c = 14,5 MPa (K 175) 3.50 0.25 0.25 10.00 M3 2.19 Ruangan
M3 2.63
5 Pemasangan 1 m2 bekisting untuk Kolom PXTX∑ 3.50 0.25 2.00 M3 1.75 Teras
2Xpakai 3.50 0.25 2.00 M3 1.75 Ruangan
M3 3.50
6 Pembesian 10 kg dengan besi polos atau ulir Panjang ∑pjang Jumlah Berat
∑pjang X berat ∑pek (unit) ∑besi (Bh) Ø
Pembesian Kolom pot (M) (M) (Kg)
Besi Ø12mm 3.75 2 4 30.00 12 26.62 Teras
Besi Ø6mm 0.65 2 18 23.40 6 5.19
Besi Ø12mm 3.75 10 4 150.00 12 133.10 Ruangan
Besi Ø6mm 0.65 10 18 117.00 6 25.96
Besi Ø12mm 2.60 2 4 20.80 12 WC
Besi Ø6mm 0.65 2 12 15.60 6
Kg 190.87
Jumlah Besi Ø12mm Btg 13.39
Jumlah Besi Ø6mm Btg 13.00
7 Pekerjaan Ring Balk Beton PXLXTX∑ 6.50 0.15 0.20 1.00 M3 0.20 Teras
Membuat Beton Mutu f'c = 14,5 MPa (K 175) 25.00 0.15 0.20 1.00 M3 0.75 Ruangan
M3 0.95
8 Pemasangan 1 m2 bekisting untuk Ring Balk PXTX∑ 6.50 0.25 1.00 M3 1.63 Teras
2Xpakai 25.00 0.25 1.00 M3 6.25 Ruangan
M3 7.88
9 Pembesian 10 kg dengan besi polos atau ulir Panjang ∑pjang Jumlah Berat
∑pjang X berat ∑pek (unit) ∑besi (Bh) Ø
Pembesian Ring Balk pot (M) (M) (Kg)
Besi Ø12mm 2.20 2 4 17.60 12 15.62 Teras
2.70 1 4 10.80 12 9.58
Besi Ø6mm 0.50 1 35 17.50 6 3.88
Besi Ø12mm 5.20 2 4 41.60 12 36.91 Ruangan
7.90 2 4 63.20 12 56.08
Besi Ø6mm 0.60 1 150 90.00 6 19.97
Kg 142.04
Jumlah Besi Ø12mm Btg 8.88
Jumlah Besi Ø6mm Btg 8.96
10 Pekerjaan Lantai Beton Tebal 7 cm PXLXTX∑ 3.00 2.00 0.07 1.00 M3 0.42 Teras
Membuat Beton Mutu f'c = 14,5 MPa (K 175) 9.00 6.00 0.07 1.00 M3 3.78 Ruangan
M3 4.20
SKETSA / FOTO
((3,14*7850)/4/1000000)*I26^2
BACK UP DATA
JENIS PEKERJAAN : Pekerjaan Galian, Urugan dan Pondasi
Panjang Lebar Tinggi
No. Item Pekerjaan Rumus Unit Sat Volume Keterangan
(m) (m) (m)
1 Pengukuran dan pemasangan 1 m’ Bouwplank PX∑ 1.50 16.00 M 1
24.00
2 Penggalian 1 m3 tanah biasa sedalam 1 m PXLXTX∑ 6.50 0.60 0.60 1.00 M3 2.34 Teras
25.00 0.80 0.80 1.00 M3 16.00 Ruangan
M3 18.34
4 Pengurugan 1 m3 dengan pasir urug bawah pondasi PXLXTX∑ 6.50 0.70 0.05 1.00 M3 0.23 Teras
25.00 0.90 0.05 1.00 M3 1.13 Ruangan
5 Pengurugan 1 m3 dengan pasir urug bawah Lantai PXLXTX∑ 2.50 2.00 0.05 1.00 M3 0.25 Teras
7.50 5.00 0.05 1.00 M3 1.88 Ruangan
M3 3.48
6 Pengurugan 1 m3 Tanah padat PXLXTX∑ 2.50 2.00 0.25 1.00 M3 1.25 Teras
7.50 5.00 0.30 1.00 M3 11.25 Ruangan
M3 12.50
7 Pemadatan tanah 1 m3 tanah ( per 20 cm) M3 12.50
8 Pemasangan 1 m3 batu kosong (anstamping) PXLXTX∑ 7.00 0.70 0.15 1.00 M3 0.74 Teras
25.00 0.90 0.15 1.00 M3 3.38 Ruangan
M3 4.11
9 Pemasangan 1 m3 pondasi batu belah camp 1SP : 4PP PX((La+Lb)/2)XTX∑ 0.30 Teras
6.50 0.60 1.00 M3 1.56
0.50
0.30 Ruangan
25.00 0.80 1.00 M3 10.00
0.70
M3 11.56
SKETSA / FOTO
RENCANA ANGGARAN BIAYA
RUANG GURU DAN TATA USAHA
SATUAN KERJA :
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :
HARGA JUMLAH
ITEM
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
PEMBAYARAN
(Rp) (Rp)
A B C D E F G
I DIVISI 1.0 PEKERJAAN PERSIAPAN
4 Membuat Kolom Beton Mutu f'c = 14,5 MPa (K 175) 2.63 M3 1,000,454.84 2,626,193.96
5 Pemasangan 1 m2 bekisting untuk Kolom 3.50 M2 277,527.50 971,346.25
6 Pembesian Kolom per 10 kg dengan besi polos atau ulir 19.09 Kg 152,156.50 2,904,241.49
7 Membuat Ring Balk Beton Mutu f'c = 14,5 MPa (K 175) 0.95 M3 1,000,454.84 945,429.83
8 Pemasangan 1 m2 bekisting untuk Ring Balk 7.88 M2 284,127.50 2,237,504.06
9 Pembesian Ring Balk per 10 kg dengan besi polos atau ulir 14.20 Kg 152,156.50 2,161,303.84
10 Membuat Lantai Beton Mutu f'c = 14,5 MPa (K 175) Tebal 7 cm 4.20 M3 1,000,454.84 4,201,910.33
Jumlah Section 2.2 20,109,877.23
Jumlah Devisi 2.0 38,289,907.16
Halaman-39
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-40
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-41
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-42
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-43
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-44
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-45
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-46
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-47
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-48
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-49
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-51
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-52
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-53
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-54
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-55
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-56
JUMLAH TENAGA KERJA 6,300.00
B. BAHAN :
Rumput Jepang (Rumput Lokal) - M2 1.100 60,500.00 66,550.00
JUMLAH HARGA BAHAN 66,550.00
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 72,850.00
E. Overhead & Profit 10% x D 7,285.00
F. Harga Satuan Pekerjaan(D + E) 80,135.00
Halaman-57
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-58
Mandor L.04 Org/Hari 0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 17,760.00
B. BAHAN :
Halaman-59
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Halaman-60
#REF!
Halaman-61
0.150
0.250
0.025
0.075
0.100
0.050
0.005
0.005
Halaman-62
0.150
0.250
0.025
0.075
0.100
0.050
0.005
0.005
0.3
0.6
0.18
1
5.56 1.562
0.20
0.40 8.19 0.2 (0.200)
0.080 0.045 0.080 (0.080)
1.000 0.65 0.5 0.500
12.5
0.09
Halaman-63
0.3
0.6
0.18
1
5.56 1.562
0.20
0.40 8.19 0.2 (0.200)
0.080 0.045 0.080 (0.080)
1.000 0.65 0.5 0.500
12.5
0.09
Halaman-64
0.500
0.500
0.250
0.025
4 4
4 2
8 6
14
0.12 0.08
0.480 #REF!
#REF!
0.500
0.500
0.250
0.025
4 4
4 2
8 6
14
0.12 0.08
0.480 #REF!
#REF!
Halaman-65
I. AHSP - A.2.2.1 ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN
0.23
0.196
0.026
12.5
13
0
90,000
7,200
9) mm, Tebal 9 mm
0.133333333333333
sar, 3 Lapis Cat Penutup)
s Cat Dasar, 2 Lapis Cat Penutup)
k Kusen Alumunium 4" x 1,3/4"
Atap Zincalume 80 x 170 cm, T= 0,30 mm
Nok Zincalume, Tebal 0,25 mm
Seng Plat (Talang)
Lisplank GRC 30 Cm
Truss Canal / TS C75.75 Truss Canal / TS C75.75
Reng - Kanal U Tebal = 0,6 mm
L. Braket 1,5 mm
List Profil Gypsum 9 - 11 Cm
Screw 1"
Screw 10 - 16 x 16
Screw 12 - 14 x 20
Skrup Fixer
Penggantung dan Ramset
Stifenner/ Braket
Hollow Galvalum 4 x 4 cm
Kalsiboard 4 mm
Keramik 40X40
Semen 50 Kg
Semen Warna
Besi Ø 12 (SNI) 12m
Besi Ø 6 (SNI) 12m
Kawat beton / Bendrat
Paku Biasa
Minyak Cat / Thiner
Plamuur Tembok
Cat dasar /tembok
Cat penutup /tembok
Cat Dasar Kayu/Besi
Cat Penutup Kayu/Besi
Cornice Adhesive
Papan 2/20 x 4 (Kls. II)
Papan 2/20 x 4 (Kls. III)
Kayu Klas III (mal)
Balok 5/7 x 4 (Kls. III)
Dolken kayu Ø 8-10cm –panjang 4 m
Batu Bata
Batu Gunung / Kali
Kerikil Sungai Pilihan/Koral Beton
Pasir Pasangan / Betonan / Beton
Pasir urug
Tanah Timbunan
Ampelas
Kuas 4"