RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN BALE LANTANG


DESA PENINJOAN, KECAMATAN TEMBUKU, KABUPATEN BANGLI
TAHUN ANGGARAN 2020
1 KEGIATAN : PEMBANGUNAN BALE LANTANG

2 LOKASI : BR BENGANG
3 NAMA KELIAN :
4 NO. HP :
RINCIAN PENDANAAN
NO URAIAN VOLUME HARGA SATUAN JUMLAH
( Rp.) ( Rp.)
1 2 3 4 5

1 Pasir Pasang 14.00 m3 272,000.00 3,808,000.00


2 Semen 100.00 zak 63,000.00 6,300,000.00
3 Bambu 91.00 btg 8,000.00 728,000.00
4 Batu Belah 25.00 m3 325,000.00 8,125,000.00
5 Besi 12 80.00 btg 110,000.00 8,800,000.00
6 besi gelang 60.00 btg 45,000.00 2,700,000.00
7 kawat beton 40.00 glg 20,000.00 800,000.00
8 Usuk kayu lokal 0.50 m3 2,500,000.00 1,250,000.00
9 papan bagesting 42.00 BTG 30,000.00 1,260,000.00
10 Koral 8.00 m3 311,000.00 2,488,000.00
11 Batako 1,400.00 bh 2,300.00 3,220,000.00
12 Pemucu pemade propil kayu kruwing 22.00 btg 150,000.00 3,300,000.00
13 Usuk kayu kruwing profil 163.00 btg 105,000.00 17,115,000.00
14 ris Plang 15/3x4 12.00 btg 110,000.00 1,320,000.00
15 ris Plang 12/3x4 24.00 btg 100,000.00 2,400,000.00
16 Ris Plang 25/3 42.00 m1 75,000.00 3,150,000.00
17 Tatak Jagut 24.00 btg 85,000.00 2,040,000.00
18 Paku 14.00 kg 20,000.00 280,000.00
19 Reng 6.00 pak 380,000.00 2,280,000.00
20 Genteng 3,400.00 bh 1,700.00 5,780,000.00
21 benoh 152.00 bh 3,000.00 456,000.00

Ongkos Kerja
21 Pekerja 100.00 Hok 100,000.00 10,000,000.00
22 Tukang 62.00 Hok 125,000.00 7,750,000.00
23 Kepala Tukang 31.00 Hok 150,000.00 4,650,000.00

Jumlah = Rp 100,000,000.00

Peninjoan,
Kelian

(……………………………………….)
1400

DENAH
1400

RENCANA ATAP
1400

Kayu kruwing
Tugeh kayu kupak
Ring 15/20

saka beton cor 15/15

Pondasi Batu

GAMBAR POTONGAN
Mudra

TAMPAK DEPAN
TAMPAK SAMPING