I Rp
II Rp
III Rp
IV Rp
V Rp
VI Rp
VII Rp
SUB TOTAL Rp
Terbilang :
Mengetahui
Ka. DPMD
DZULKIFLI, S.Ip
RENCANA ANGGARAN BIAYA
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEMBANGUNAN UNIT USAHA / KAFE BUMDES
VOLUME : 1 UNIT
DESA : KALE KO'MARA
KECAMATAN : POLONGBANGKENG TIMUR
KABUPATEN : TAKALAR
PROVINSI : SULAWESI SELATAN
SUMBER DANA : DANA BUMDES
TAHUN ANGGARAN : 2023
Harga Satuan Jumlah Harga (Rp)
NO Uraian Vol Volume Satuan
(Rp) (Rp)
A BAHAN
1 Pasir Urug 3.21 4.00 m³ 175,000.00 700,000.00
2 Batu gunung 22.12 22.00 m³ 236,000.00 5,192,000.00
3 Semen 40 Kg 180.57 181.00 zak 76,000.00 13,756,000.00
4 Perekat Bata Ringan 31.47 32.00 zak 175,000.00 5,600,000.00
5 Pasir Pasang 29.06 29.00 m³ 265,000.00 7,685,000.00
6 Tanah Timbunan 6.27 7.00 m³ 155,000.00 1,085,000.00
7 Besi Beton Ø12 55.00 55.00 btg 115,000.00 6,325,000.00
8 Besi Beton Ø10 2.00 2.00 btg 94,000.00 188,000.00
9 Besi Beton Ø8 73.11 74.00 btg 75,000.00 5,550,000.00
10 Kawat Beton 8.00 8.00 kg 30,000.00 240,000.00
11 Bata ringan tebal 10 cm 10.95 11.00 m3 850,000.00 9,350,000.00
12 Kerikil 3.39 4.00 m³ 300,000.00 1,200,000.00
13 Papan Kayu klass III 1.69 2.00 m³ 2,500,000.00 5,000,000.00
14 Paku Biasa 0.40 0.50 kg 20,000.00 10,000.00
15 Cat Dasar 6.53 7.00 ltr 15,000.00 105,000.00
16 Cat Tembok 17.63 18.00 ltr 15,000.00 270,000.00
17 Nak lantai 0.06 1.00 zak 25,000.00 25,000.00
18 keramik 40x40 16.47 17.00 dos 85,000.00 1,445,000.00
19 keramik 20x20 1.56 2.00 dos 45,000.00 90,000.00
20 Besi Hollow 4/4 34.30 34.00 btg 27,000.00 918,000.00
21 Sekrup hollow 0.60 1.00 dos 46,000.00 46,000.00
22 Plafond Calsiboard (1.2x2.4) 13.49 14.00 m³ 130,000.00 1,820,000.00
23 Sekrup Plafond 4.02 4.00 kg 70,000.00 280,000.00
24 Main Truss ( C-75.38.1,00) 34.81 35.00 btg 80,000.00 2,800,000.00
25 Reng ( U-40.33.0,45) 11.73 12.00 btg 40,000.00 480,000.00
26 Sekrup Main Truss (C-75.38.1,00) 315.00 315.00 bh 500.00 157,500.00
27 Sekrup Reng 175.00 175.00 bh 500.00 87,500.00
28 Baut Dinabolt 21.00 21.00 bh 1,000.00 21,000.00
29 Atap Spandek bjls 0,35mm 13.49 14.00 btg 50,000.00 700,000.00
30 Paku 3 - 10 cm 0.70 1.00 btg 20,000.00 20,000.00
31 Bubungan 11.00 11.00 bh 78,000.00 858,000.00
32 Lisplank 3.90 4.00 lbr 100,000.00 400,000.00
33 kabel listrik 13.00 13.00 m 25,000.00 325,000.00
34 lampu 4.00 4.00 bh 50,000.00 200,000.00
35 saklar ganda 2.00 2.00 bh 35,000.00 70,000.00
36 saklar tunggal 2.00 2.00 bh 30,000.00 60,000.00
37 mcb 1.00 1.00 bh 150,000.00 150,000.00
38 stop kontak 2.00 2.00 bh 15,000.00 30,000.00
39 Closet jongkok 2.00 2.00 bh 150,000.00 300,000.00
40 ember 2.00 2.00 bh 60,000.00 120,000.00
41 timba 2.00 2.00 bh 15,000.00 30,000.00
42 Pipa PVC 1/2" 5.00 5.00 btg 35,000.00 175,000.00
43 Pipa PVC 4 4.00 4.00 btg 250,000.00 1,000,000.00
44 Elbow 1/2 3.00 3.00 bh 5,000.00 15,000.00
45 Elbow 4 3.00 3.00 bh 17,000.00 51,000.00
46 kran air 1/2 3.00 3.00 bh 30,000.00 90,000.00
47 kusen pintu 1.00 1.00 bh 300,000.00 300,000.00
48 daun pintu 1.00 1.00 bh 500,000.00 500,000.00
49 kusen pintu daun pintu wc 2.00 2.00 bh 750,000.00 1,500,000.00
50 daun jendela 2.00 2.00 bh 250,000.00 500,000.00
51 kusen jendela 2.00 2.00 bh 300,000.00 600,000.00
52 Grendel Kuningan Besar 2.00 2.00 bh 26,000.00 52,000.00
53 Engsel Kuningan Besar 4.00 4.00 bh 36,000.00 144,000.00
54 Kuncian Pintu Handle 2x Slag 3.00 3.00 bh 260,000.00 780,000.00
55 Grendel jendela 2.00 2.00 bh 12,000.00 24,000.00
56 Engsel jendela 4.00 4.00 bh 25,000.00 100,000.00
57 loster 4.00 4.00 bh 50,000.00 200,000.00
58 Paving Blok 40.40 41.00 m2 92,000.00 3,772,000.00
59 papan kegiatan 1.00 1.00 ls 150,000.00 150,000.00
60 prasasti 1.00 1.00 ls 350,000.00 350,000.00
Sub Total 1 83,992,000.00
B ALAT
1 Alat Bantu 2 2 set 350,000.00 700,000.00
2 Biaya Angkut Semen 181.00 zak 5,000.00 905,000.00
Sub Total 2 1,605,000.00
C UPAH
1 Pekerja 217.05 217 hok 100,000.00 21,700,000.00
2 Tukang Batu 70.04 70 hok 150,000.00 10,500,000.00
3 Tukang Kayu 11.86 12 hok 150,000.00 1,800,000.00
4 Kepala Tukang 20.90 21 hok 175,000.00 3,675,000.00
5 Desain & Penyusunan RAB 1 Is 2,475,000.00 2,475,000.00
Pembersihan
0.100 Oh Pekerja Rp. 0.00
0.050 Oh Mandor Rp. 0.00
An. 6.10 1M2 Pasang bata merah tebal 1/2 bata 1Pc : 3 Ps
90.0000 Bh Bata merah 5 x 11 x 22 cm Rp. 0.00
0.29 11.5000 Kg Semen portland Rp. 0.00
0.0430 M3 Pasir pasang Rp. 0.00
0.3000 Oh Pekerja Rp. 0.00
0.1000 Oh Tukang batu Rp. 0.00
0.0100 Oh Kepala Tukang Rp. 0.00
0.0150 Oh Mandor Rp. 0.00
1m2 Acian
3.2500 Kg Semen portland Rp. 0.00
0.2000 Oh Pekerja Rp. 0.00
0.1000 Oh Tukang Batu Rp. 0.00
0.0100 Oh Kepala Tukang Rp. 0.00
0.0100 Oh Mandor Rp. 0.00
1 M2 Pekerjaan Plamur Dinding
0.1800 Kg Plamur Rp. 0.00
0.0840 org/hr Pekerja Rp. 0.00
0.0130 org/hr Tukang Cat Rp. 0.00
0.1260 org/hr Kepala Tukang Rp. 0.00
0.0080 org/hr Mandor Rp. 0.00
1 M2 Pengecatan Tembok Baru Bagian Dalam & Luar (1 lapis Cat dasar,2 lapis cat penutup)
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
RENCANA ANGGARAN BIAYA DETAIL
PARAWANGSA SUDIRMAN
Pembersihan
P= 10
L= 5
= p x l
= 10 x 5
= 50
pek. Bowplank
P= 10
L= 5
P x L
= 10 x 2
= 20
Pek. Galian Pondasi
P= 48.5
La = 0.3 Lb = 0.6
T= 0.7
= P x L x T
= 48.5 x 0.45 x 0.7
= 15.2775 m³
Urugan Pasir
P= 48.5
L= 0.6
T= 0.05
= P x L x T
= 48.5 x 0.6 x 0.05
= 1.455 m³
pembesian S = tul = 4
p= 48.5
= 4 x 48.5
= 194 / 12
= 16.167 btg Ø12 10.7 172.98333
begel sloff
p begel = 0.8
jarak/begel = 0.15
p sloff= 48.5
= 48.5 / 0.15
= 323.333
= 258.667
= 21.556 btg Ø8 4.74 102.17333 275.1567 kg
2.501424
Vol. Ringbalk Cor = 1.940
pembesian tulangan= 16.167 btg Ø12
begel = 21.556 btg Ø8
begel kolom
p begel = 0.8
jarak/begel = 0.15
p kolom= 4
= 4 / 0.15
= 26.67
= 21.33
= 1.78 /klom
= 16 btg Ø8
begel kolom
p begel = 0.6
jarak/begel = 0.15
p kolom= 4
= 4 / 0.15
= 26.67
= 16.00
= 1.33 /klom
= 12 btg Ø8
p dinding ½ 1.5
l= 6.1
= 1.5 x 6.1
= 9.15 m2
plesteran
dinding full = 92.555
dinding ½ = 9.15
Vol. = 110.855 m2
Acian
dinding full = 92.555
dinding ½ = 9.15
Vol. = 110.855 m2
Cat
dinding full = 92.555
dinding ½ = 9.15
Vol. = 110.855 m2
pek. Atap
perhitungan canal
canal C = 26.11 35
jumlah kuda" = 8 x 26.11
208.88
34.81
bubungan 11 bh
reng jumlah 8
70.40 m
= 11.73 btg
luasan plafond
Gantungan 50
= 67.8
= 88 34.300 btg hollow
panjang pipa
pipa 4 = 15 m L Bow 3 bh
pipa 1/2 = 18 m L Bow 3 bh
Septictank galian panjang= 2
lebar= 1.1
tinggi= 1.5
vol= 2 x 1.1 x 1.5
vol= 3.3
Mengetahui
Ka. DPMD
DZULKIFLI, S.Ip
DAFTAR HARGA SATUAN UPAH
DESA : KOMBILING
KECAMATAN : PANGALE
KABUPATEN : MAMUJU TENGAH
PROVINSI : SULAWESI BARAT
SUMBER DANA : DDS (APBN)
TAHUN ANGGARAN : 2021
III UPAH
1 Kepala Tukang Hok 175,000.00
2 Tukang Kayu Hok 150,000.00
3 Tukang Batu Hok 150,000.00
4 Tukang Besi Hok 150,000.00
5 Tukang Cat Hok 150,000.00
6 Pekerja Hok 100,000.00
7 Mandor Hok 175,000.00
ISKANDAR Nasra
Menyetujui
Kepala Desa Kombiling
NASPARUDDIN
DAFTAR HARGA SATUAN UPAH
DESA : KOMBILING
KECAMATAN : PANGALE
KABUPATEN : MAMUJU TENGAH
PROVINSI : SULAWESI BARAT
SUMBER DANA : DDS (APBN)
TAHUN ANGGARAN : 2021
II PERALATAN
1 Dump Truck Hari 1,000,000.00
2 Pick Up Hari 500,000.00
3 Excavator Hari 4,200,000.00
4 Motor Grader Hari 5,000,000.00
5 Vibrator Roller/Bomag Hari 3,000,000.00
6 Moleng Hari 400,000.00
7 Angkut Material Semen Zak 5,000.00
8 Sekop Buah 75,000.00
ISKANDAR Nasra
Menyetujui
Kepala Desa Kombiling
NASPARUDDIN
DAFTAR HARGA SATUAN BAHAN
DESA : KOMBILING
KECAMATAN : PANGALE
KABUPATEN : MAMUJU TENGAH
PROVINSI : SULAWESI BARAT
SUMBER DANA : DDS (APBN)
TAHUN ANGGARAN : 2021
I BAHAN MATERIAL
GALIAN C
1 Batu Gunung M³ 236,000.00
2 Pasir Pasang M³ 265,000.00
3 Kerikil M³ 300,000.00
4 Tanah Timbunan Pilihan M³ 155,000.00
5 Pasir Urug M³ 175,000.00
BAHAN BANGUNAN
1 Batako bh 3,200.00
2 Semen Portland 40 Kg zak 76,000.00
3 nak lantai zak 25,000.00
4 Besi Beton Ø 10 btg 94,000.00
5 Besi Beton Ø 6 btg 40,000.00
6 Besi Beton Ø 12 btg 115,000.00
7 Besi Beton Ø 8 btg 75,000.00
8 Kawat Beton Kg 30,000.00
9 Paku Biasa (4-10 cm) Kg 20,000.00
10 Balok Kayu Kelas II (0,5/0,5/400) M³ 3,000,000.00
11 Papan kayu Kelas III M³ 2,500,000.00
12 Balok kayu Kelas III M³ 2,500,000.00
13 kusen dan daun pintu WC Set 750,000.00
14 Kusen Pintu bh 300,000.00
15 Kusen Jendela bh 300,000.00
16 Daun Pintu (0,8 x 2 m) bh 500,000.00
17 Daun Jendela + Kaca Bening 3mm bh 250,000.00
18 Engsel Kuningan Kecil psg 25,000.00
19 Engsel Kuningan Besar psg 36,000.00
20 Grendel Kuningan Kecil bh 12,000.00
21 Grendel Kuningan Besar bh 26,000.00
22 Kuncian Pintu Handle 2x Slag bh 260,000.00
23 Keramik 30 x 30 Cm Polos dos 60,000.00
24 Kanal C 75-65 btg 80,000.00
25 Besi Hollow 4/4 btg 27,000.00
26 Sekrup hollow dos 46,000.00
27 Bubungan btg 78,000.00
28 lisplank btg 100,000.00
29 Reng btg 40,000.00
30 Baut Canal dos 200,000.00
31 Dinabol bh 1,000.00
32 Baut Spandek dos 250,000.00
33 Spandek 0,35 M² 50,000.00
34 Seng Gelombang Kaki 7,300.00
35 Plafond Calsiboard (1.2x2.4) m³ 130,000.00
36 Sekrup Plafond dos 70,000.00
37 Sekrup Main Truss (C-75.38.1,00) bh 500.00
38 Sekrup Reng bh 500.00
39 Tripleks (120 x 240) Cm tebal 3 mm lbr 54,000.00
40 Tripleks (120 x 240) Cm tebal 4 mm lbr 75,000.00
41 Tripleks (120 x 240) Cm tebal 6 mm lbr 85,000.00
42 Tripleks (120 x 240) Cm tebal 9 mm lbr 165,000.00
43 Pintu PVC bh 200,000.00
44 Kloset Jongkok bh 150,000.00
45 Pipa 4 ״ btg 250,000.00
46 Pipa 3 ״ btg 175,000.00
47 Pipa ¾ ״ btg 42,000.00
48 Pipa ½ ״ btg 35,000.00
49 timba bh 15,000.00
50 ember bh 60,000.00
51 kran air 1/2 bh 30,000.00
52 Sambungan Pipa L ½ ״ bh 5,000.00
53 Sambungan Pipa L 4 ״ bh 17,000.00
54 Sambungan Pipa L 3 ״ bh 10,000.00
55 Skim cat 20 Kg zak 65,000.00
56 Cat Tembok ltr 15,000.00
57 Cat Kayu/Besi kaleng 55,000.00
58 Cat Atap kaleng 105,000.00
59 Cat Marka ltr 72,000.00
60 Meni ltr 30,000.00
61 Tenner ltr 24,000.00
62 Dempul Kg 24,000.00
63 Kertas Gosok lbr 9,000.00
64 Lem Kayu Kg 25,000.00
65 Minyak Bekisting Ltr 15,000.00
66 Kuas 3 ״ bh 10,000.00
67 Kuas 5 ״ bh 15,000.00
68 Roll bh 45,000.00
69 Sekop bh 75,000.00
70 Linggis bh 150,000.00
71 Gerobak bh 700,000.00
72 Keramik 40 x 40 dos 85,000.00
73 Keramik 20 x 20 dos 45,000.00
74 kabel listrik m 25,000.00
75 lampu 5 watt bh 50,000.00
76 saklar ganda bh 35,000.00
77 saklar tunggal bh 30,000.00
78 mcb 1 group bh 150,000.00
79 stop kontak bh 15,000.00
80 Prasasti bh 500,000.00
81 papan kegiatan bh 150,000.00
82 Batu bata merah bh 1,000.00
83 loster bh 50,000.00
ISKANDAR Nasra
Menyetujui
Kepala Desa Kombiling
NASPARUDDIN