You are on page 1of 2

CHECK LIST FOR P127 RELAY

TEST DETAILS

UNIT
BUS NAME/ PANEL
NO
EQUIPMENT NAME
L/C NO:
L/C DETAILS
L/C AVALIED ON L/C RETURN ON

TESTED ON

RELAY DETAILS DETAILS OF C/T & P/T

RELAY TYPE CTR


E/G-CTR
SL. NO.
PTR
RELAY ADDRESS
SOFTWARE
VERSION

TERMINALS DETAILS(TB)
R Y B N E/F

PROCEDURE TO BE FOLLWED BEFORE MEASUREMENTS:

1. Protection current TB terminals 1, 2, 3, 4, 5, 6 & 7 link to be opened.

2. One spare NO contact (13 & 14) leads to be removed in 86 lockout relay.

3. This NO contact was extended to testing kit for stop contact purpose.

4. 67N E/G Earth Fault to be disabled for current measurement.

CURRENT MEASUREMENT

CURRENT MEASURED CURRENT


INJECTING
Ia Ib Ic In I1 I2 I0
PHASE
R PHASE (RN)
Y PHASE (YN)
B PHASE (BN)
PHASE(RY)
PROCEDURE TO BE FOLLWED BEFORE PROTECTION CHECKING:

Protection Terminals Ct injected in Time Alarm in LED


Amps measured in display Indicated
seconds
67 PHASE O/C Current settings to be set at test kit two times of I
I>Fn yes I>
I>= RN
D.Type=
Tms= YN
Treset=
BN
I>>Fn yes
I>>= RY
D.Type=
tI>>= YB
I>>
YB
BR
67 N E/G Ie>
Ie>Fn yes RN
Ie>=
D.Type= Ie>>
tIe>=
Treset=
Ie>>Fn yes
Ie>>= YN
D.Type=
tIe>>=
Treset=
Ammeter Range 50% scale OFF scale
Full scale-

Remarks

Test result

• DC OFF for checking the ammeter.

• All disabled protections are to be enabled.

• All opened terminals are to be closed & checked for continuity.

TESTING ENGINEER

EE/MRT

ACM/MRT

You might also like