You are on page 1of 75

June 2, 2021

[Project Name]
Author

Operating and
Maintenance Manual
[Document Number]
[revision]
Contents
1.0 Introduct ion: .............................................................................................. 5

2.0 Project Information: ................................................................................... 5

3.0 Project Specifications: ............................................................................... 6

3.1 Building Management System [BMS] Specification: ..................................... 7

3.2 Extra Low Voltage System [ELV] Specification: .......................................... 8

3.3 Electrical Systems [EE] Specif icat ion: ....................................................... 9

3.4 Fire Systems [FS] Specification: ............................................................. 10

3.5 Mechanical/ HVAC Systems [MVAC] Specification: .................................... 11

3.6 Plumbing and System [PD] Specif icat ion: ................................................ 12

4.0 As-Built Drawings: ................................................................................... 13

4.1 Building Management System [BM S] Drawings: ........................................ 14

4.1.1 BMS Schemat ics: ............................................................................. 15

4.1.2 BMS Layouts: .................................................................................. 16

4.2 Control Systems [CONT] Drawings: ......................................................... 17

4.2.1 CONT Logics: .................................................................................. 18

4.3 Extra Low Voltage System [ELV]Drawings: .............................................. 19

4.3.1 ELV Schematics: ............................................................................. 20

4.3.2 ELV Layouts: ................................................................................... 21

4.4 Electrical Systems [EE]Drawings: ........................................................... 22

4.4.1 EE Schemat ics: ............................................................................... 23

4.4.2 EE Layouts: .................................................................................... 24

4.5 Fire Systems [FS] Drawings: .................................................................. 25

4.5.1 FS Schemat ics: ............................................................................... 26

4.5.2 FS Layouts: .................................................................................... 27

4.6 Mechanic al/ HVAC Systems [MVAC]Drawings: .......................................... 28

4.6.1 MVAC Schematics: .......................................................................... 29

4.6.2 MVAC Layouts: ................................................................................ 30

4.7 Plumbing and System [PD] Drawings: ...................................................... 31

4.7.1 PD Schemat ic s: ............................................................................... 32

4.7.2 PD Layouts: .................................................................................... 33

5.0 Electrical Discriminat ion St udy: ................................................................. 34


Sunday, 6 June 2021 1 O&M Manual Template
6.0 BMS Graphic Document: ........................................................................... 35

7.0 BMS Access/Messaging As -Built Information .............................................. 36

8.0 Summary of Syst ems Installed: ................................................................. 37

8.1 Building Management Systems: .............................................................. 37

8.2 Control Systems: .................................................................................. 37

8.3 Extra Low Voltage Systems: ................................................................... 37

8.4 Electrical Systems: ................................................................................ 37

8.5 Fire Systems: ....................................................................................... 37

8.6 Mechanical/ HVAC Systems: ................................................................... 37

8.7 Plumbing & Drainage Systems: ............................................................... 37

9.0 Asset Register: ........................................................................................ 38

9.1 Buildi ng Management Systems Asset Register: .......................................... 0

9.2 Control Systems Asset Register Asset Register: ......................................... 1

9.3 Extra Low Voltage Systems Asset Register: ............................................... 2

9.4 Electrical Systems Asset Regist er: ............................................................ 3

9.5 Fire Systems A sset Register: ................................................................... 4

9.6 Mechanical/ HVAC Systems Asset Register: ............................................... 5

9.7 Plumbing & Drainage Systems Asset Register: ........................................... 6

10.0 Syst ems Operation: .................................................................................. 7

10.1 Building Management Systems: .............................................................. 7

10.2 Control System s: ................................................................................... 7

10.3 Extra Low Volt age Systems: ................................................................... 7

10.4 Electr ical Syst ems: ................................................................................ 7

10.5 Fire Syst ems: ........................................................................................ 7

10.6 Mechanical/HVAC Systems: .................................................................... 7

10.7 Plumbing & Drainage Systems: ............................................................... 7

11.0 Manufacturers Literatur e & Informat ion ...................................................... 8

11.1 Building Management Systems Manufacturers Literature: .......................... 9

11.1.1 BMS Literat ure Register ................................................................... 9

11.1.2 BMS Literat ure: ............................................................................. 10

11.2 Controls Systems Manufacturers Lit erature: ........................................... 11

11.2.1 CONT Literat ure Register ............................................................... 11

Sunday, 6 June 2021 2 O&M Manual Template


11.2.2 CONT Literat ure: ........................................................................... 12

11.3 Extra Low Volt age Systems Man ufacturers Literat ure: ............................. 13

11.3.1 ELV Literatur e Register .................................................................. 13

11.3.2 ELV Literatur e: .............................................................................. 14

11.4 Electr ical Syst ems Manufacturers Lit erature: ......................................... 15

11.4.1 EE Lit erature Register .................................................................... 15

11.4.2 EE Lit erature: ................................................................................ 16

11.5 Fire Syst ems Manufactur ers Lit erature: ................................................. 17

11.5.1 FS Liter ature Register .................................................................... 17

11.5.2 FS Liter ature: ................................................................................ 18

11.6 Mechanical/HVAC Systems Manufac turers Liter ature: ............................. 19

11.6.1 MVAC Literat ure Register ............................................................... 19

11.6.2 MVAC Literat ure: ........................................................................... 20

11.7 Plumbing & Drainage Systems Manufacturers Lit erature: ......................... 21

11.7.1 PD Literature Register .................................................................... 21

11.7.2 PD Literature: ................................................................................ 22

12.0 Healt h & Saf ety: .................................................................................... 23

12.1 Safety Procedures ............................................................................... 23

12.1.1 Saf ety Procedure Register .............................................................. 23

12.1.2 Saf ety Procedures ......................................................................... 24

12.2 Control of Substances Hazardous to Health [COSHH] ............................. 25

12.2.1 COSHH Register ............................................................................ 25

12.2.2 COSHH Data ................................................................................. 26

12.3 Risk Assessments ............................................................................... 27

12.3.1 Risk Assessmen Regist er ............................................................... 27

12.3.2 Risk Assessments .......................................................................... 28

12.4 Arc Flash Study .................................................................................. 29

13.0 Disposal of Equipment/Pr oducts: ............................................................. 30

14.0 Maintenance: ......................................................................................... 31

14.1 Planned Maintenance Instructions and Schedules ................................... 31

15.0 Equipment/Syst em Spares: ..................................................................... 32

15.1 Handover Spar es List .......................................................................... 32

Sunday, 6 June 2021 3 O&M Manual Template


15.2 Recommended Spares & Purchase Information ....................................... 32

16.0 Service Level Agreements: ...................................................................... 33

17.0 Final Testing and Commissioning Report: ................................................. 34

Sunday, 6 June 2021 4 O&M Manual Template


1.0 Introduction:
Descr ipt ion of the m anual conten t and structure. How to use it and why it is being
issued.

[could be standardized across all your projects]

2.0 Project Information:


Include det ailed information on the project .

[can take information from the OPR, BOD, Specif icat ions, Cx Plan ]

Sunday, 6 June 2021 5 O&M Manual Template


3.0 Project Specifications:
Include a register of Specifications that were utilized on the pr oject.

Type Document Number

Building Management S ystems BMS [insert]

Extra Low Voltage Systems ELV [insert]

Electrical Systems EE [insert]

Fire Systems FS [insert]

Mechanical/HVAC System s MVAC [insert]

Plum bing & Dr ainage Systems PD [insert]

Sunday, 6 June 2021 6 O&M Manual Template


3.1 Building Management System [BMS] Specification:
Insert copy of final spec ification.

Sunday, 6 June 2021 7 O&M Manual Template


3.2 Extra Low Voltage System [ELV] Specification:
Insert copy of final spec ification.

Sunday, 6 June 2021 8 O&M Manual Template


3.3 Electrical Systems [EE] Specification:
Insert copy of final spec ification.

Sunday, 6 June 2021 9 O&M Manual Template


3.4 Fire Systems [FS] Specification:
Insert copy of final spec ification.

Sunday, 6 June 2021 10 O&M Manual Template


3.5 Mechanical/HVAC Systems [MVAC] Specification:
Insert copy of final spec ification.

Sunday, 6 June 2021 11 O&M Manual Template


3.6 Plumbing and System [PD] Specification:
Insert copy of final spec ification.

Sunday, 6 June 2021 12 O&M Manual Template


4.0 As-Built Drawings:
Include a register of as-built drawings that have been issued and appr oved for the
project.
Type: BMS | | CONT | EE | ELV | FS | MVAC | PD

Description Type Drawing Number

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

[insert] [insert] [insert]

Sunday, 6 June 2021 13 O&M Manual Template


4.1 Building Management System [BMS] Drawings:
Insert copy of as -built schemat ic/layout drawings.

Sunday, 6 June 2021 14 O&M Manual Template


4.1.1 BMS Schematics:

Sunday, 6 June 2021 15 O&M Manual Template


4.1.2 BMS Layouts:

Sunday, 6 June 2021 16 O&M Manual Template


4.2 Control Systems [CONT] Drawings:
Insert copy of as -built logic drawings.

Sunday, 6 June 2021 17 O&M Manual Template


4.2.1 CONT Logics:

Sunday, 6 June 2021 18 O&M Manual Template


4.3 Extra Low Voltage System [ELV]Drawings:
Insert copy of as -built schemat ic/layout drawings.

Sunday, 6 June 2021 19 O&M Manual Template


4.3.1 ELV Schematics:

Sunday, 6 June 2021 20 O&M Manual Template


4.3.2 ELV Layouts:

Sunday, 6 June 2021 21 O&M Manual Template


4.4 Electrical Systems [EE]Drawings:
Insert copy of as -built schemat ic/layout drawings.

Sunday, 6 June 2021 22 O&M Manual Template


4.4.1 EE Schematics:

Sunday, 6 June 2021 23 O&M Manual Template


4.4.2 EE Layouts:

Sunday, 6 June 2021 24 O&M Manual Template


4.5 Fire Systems [FS] Drawings:
Insert copy of as -built schemat ic/layout drawings.

Sunday, 6 June 2021 25 O&M Manual Template


4.5.1 FS Schematics:

Sunday, 6 June 2021 26 O&M Manual Template


4.5.2 FS Layouts:

Sunday, 6 June 2021 27 O&M Manual Template


4.6 Mechanical/HVAC Systems [MVAC]Drawings:
Insert copy of as -built schemat ic/layo ut drawings.

Sunday, 6 June 2021 28 O&M Manual Template


4.6.1 MVAC Schematics:

Sunday, 6 June 2021 29 O&M Manual Template


4.6.2 MVAC Layouts:

Sunday, 6 June 2021 30 O&M Manual Template


4.7 Plumbing and System [PD] Drawings:
Insert copy of as -built schemat ic/layout drawings.

Sunday, 6 June 2021 31 O&M Manual Template


4.7.1 PD Schematics:

Sunday, 6 June 2021 32 O&M Manual Template


4.7.2 PD Layouts:

Sunday, 6 June 2021 33 O&M Manual Template


5.0 Electrical Discrimination Study:
Include the approved discr imination study report for the electrical systems.

Sunday, 6 June 2021 34 O&M Manual Template


6.0 BMS Graphic Document:
Include the approved BMS Graphic Document .

Sunday, 6 June 2021 35 O&M Manual Template


7.0 BMS Access/Messaging As-Built Information
Include the approved BMS Access/Messaging documents .

Sunday, 6 June 2021 36 O&M Manual Template


8.0 Summary of Systems Installed:
Provide a summary of each systems component , location, and how they are
designed to oper ate.

[can take from specif icat ions, drawings, control logics]

8.1 Building Management Systems:


Insert summary.

8.2 Control Systems:


Insert summary.

8.3 Extra Low Voltage Systems:


Insert summary.

8.4 Electrical Systems:


Insert summary.

8.5 Fire Systems:


Insert summary.

8.6 Mechanical/HVAC Systems:


Insert summary.

8.7 Plumbing & Drainage Systems:


Insert summary.

Sunday, 6 June 2021 37 O&M Manual Template


9.0 Asset Register:
Include a detailed list of equipment for each type of system that has been in stalled ,
modify the following pages to suit.

[a lot of inf ormation can be taken form the progress trackers t o give a good start, if
they are detailed enough]

Sunday, 6 June 2021 38 O&M Manual Template


9.1 Building Management Systems Asset Register:

Equipment ID Type Manufacturer Model Size/Rating Building Floor Room


9.2 Control Systems Asset Register Asset Register:

Equipment ID Type Manufacturer Model Size/Rating Building Floor Room

Sunday, 6 June 2021 1 O&M Manual Template


9.3 Extra Low Voltage Systems Asset Register:

Equipment ID Type Manufacturer Model Size/Rating Building Floor Room

Sunday, 6 June 2021 2 O&M Manual Template


9.4 Electrical Systems Asset Register:

Equipment ID Type Manufacturer Model Size/Rating Building Floor Room

Sunday, 6 June 2021 3 O&M Manual Template


9.5 Fire Systems Asset Register:

Equipment ID Type Manufacturer Model Size/Rating Building Floor Room

Sunday, 6 June 2021 4 O&M Manual Template


9.6 Mechanical/HVAC Systems Asset Register:

Equipment ID Type Manufacturer Model Size/Rating Building Floor Room

Sunday, 6 June 2021 5 O&M Manual Template


9.7 Plumbing & Drainage Systems Asset Register:

Equipment ID Type Manufacturer Model Size/Rating Building Floor Room

Sunday, 6 June 2021 6 O&M Manual Template


10.0 Systems Operation:
Expand on the way in which each of the systems o perat e, covering start-up interf aces
and inter locks, set points, running, shut do wn interfaces and inter locks , fault finding and
problem solving.

[can take from specif icat ions, drawings, control logics , manufacturers data and
informat ion]

10.1 Building Management Systems:


Insert detailed operation description

10.2 Control Systems:


Insert detailed operation description

10.3 Extra Low Voltage Systems:


Insert detailed operation description

10.4 Electrical Systems:


Insert detailed operation description

10.5 Fire Systems:


Insert detailed operation description

10.6 Mechanical/HVAC Systems:


Insert detailed operation description

10.7 Plumbing & Drainage Systems:


Insert detailed operation description

Sunday, 6 June 2021 7 Commissioning Monthly Report


11.0 Manufacturers Literature & Information
Include all the manuf acturers information r elat ing to the equipment, ancillar ies, and
systems.

[Use the asset regist ers for reference for what would be needed]

Sunday, 6 June 2021 8 Commissioning Monthly Report


11.1 Building Management Systems Manufacturers Literature:

11.1.1 BMS Literature Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 9 Commissioning Monthly Report


11.1.2 BMS Literature:

Attach documents…

Sunday, 6 June 2021 10 Commissioning Monthly Report


11.2 Controls Systems Manufacturers Literature:

11.2.1 CONT Literature Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 11 Commissioning Monthly Report


11.2.2 CONT Literature:

Attach documents…

Sunday, 6 June 2021 12 Commissioning Monthly Report


11.3 Extra Low Voltage Systems Manufacturers Literature:

11.3.1 ELV Literature Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 13 Commissioning Monthly Report


11.3.2 ELV Literature:

Attach documents…

Sunday, 6 June 2021 14 Commissioning Monthly Report


11.4 Electrical Systems Manufacturers Literature:

11.4.1 EE Literature Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 15 Commissioning Monthly Report


11.4.2 EE Literature:

Attach documents…

Sunday, 6 June 2021 16 Commissioning Monthly Report


11.5 Fire Systems Manufacturers Literature:

11.5.1 FS Literature Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 17 Commissioning Monthly Report


11.5.2 FS Literature:

Attach documents…

Sunday, 6 June 2021 18 Commissioning Monthly Report


11.6 Mechanical/HVAC Systems Manufacturers Literature:

11.6.1 MVAC Literature Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 19 Commissioning Monthly Report


11.6.2 MVAC Literature:

Attach documents…

Sunday, 6 June 2021 20 Commissioning Monthly Report


11.7 Plumbing & Drainage Systems Manufacturers Literature:

11.7.1 PD Literature Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 21 Commissioning Monthly Report


11.7.2 PD Literature:

Attach documents…

Sunday, 6 June 2021 22 Commissioning Monthly Report


12.0 Health & Safety:
12.1 Safety Procedures
Include all safety pr ocesses and procedures related to the operation, access, and
maintenance of the equipment and systems.

[Use the project health and sa fety f ile for examples and reference]

12.1.1 Safety Procedure Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 23 Commissioning Monthly Report


12.1.2 Safety Procedures

Attach/include safety procedur es

Sunday, 6 June 2021 24 Commissioning Monthly Report


12.2 Control of Substances Hazardous to He alth [COSHH]
Include all COSHH data sheets for items related to the maintenanc e, cleaning, and
disposal of chemicals [paint, adhesives, gases, and chem icals] .

[Use the project health and sa fety f ile for examples and reference]

12.2.1 COSHH Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 25 Commissioning Monthly Report


12.2.2 COSHH Data

Attached/include COSHH data sheets and inf ormat ion.

Sunday, 6 June 2021 26 Commissioning Monthly Report


12.3 Risk Assessments
Include all r isk assessments related to t he oper ation, access, and maint enance of the
equipment and s ystems.

[Use the project health and sa fety f ile for examples and reference]

12.3.1 Risk Assessment Register

Description Document Number

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

[insert] [insert]

Sunday, 6 June 2021 27 Commissioning Monthly Report


12.3.2 Risk Assessments

Attached/include r isk assessments and information.

Sunday, 6 June 2021 28 Commissioning Monthly Report


12.4 Arc Flash Study
Include the approved Arc Flash Study for the electrical systems

Sunday, 6 June 2021 29 Commissioning Monthly Report


13.0 Disposal of Equipment/Products:
Provide informat ion on how equipment and prod ucts should be disposed of .

Sunday, 6 June 2021 30 Commissioning Monthly Report


14.0 Maintenance:
14.1 Planned Maintenance Instructions and Schedules
Provide instruct ions and schedules on how to maintain each piece of equipment,
systems, and ancillaries of the installat ion.

Cover: monthly, half yearly, year ly programme on items such as lubrication, adjust ment,
replacement, rout ine maint enance, cleaning, filt er changing, access & safety etc.

[Mostly provided by t he manufact urer s].

Sunday, 6 June 2021 31 Commissioning Monthly Report


15.0 Equipment/System Spares:
15.1 Handover Spares List
Provide the list of spares that have been provided under the contract.

15.2 Recommended Spares & Purchase Information


Provide a list of sp ar es that are recommended to be hel d by t he oper ator /facilities
department including any purchasing information needed.

Sunday, 6 June 2021 32 Commissioning Monthly Report


16.0 Service Level Agreements:
Include information f rom the suppliers, vendors , and contractors relat ing to any service
agreements/ warrant ies that are to be include for the operation of the building and
systems after handover.

Sunday, 6 June 2021 33 Commissioning Monthly Report


17.0 Final Testing and Commissioning Report:
Include the f inal com missioning report that is usually to be wr itten and issued by the
commissioning agent/authorit y.

Sunday, 6 June 2021 34 Commissioning Monthly Report


-END-

Sunday, 6 June 2021 35 Commissioning Monthly Report

You might also like