You are on page 1of 1

REQUESTFORINSPECTION(RFI)LOGSHEET,SGCPProject

FAHHAD SALEH GENERAL CONTRACTING COMPANY (FCC) / SAUDIARABIANSAIPEMCO.LTD.

SouthGasCompressionPlant(SGCP)PipelineProject

CONTRACT#6600042366,BI-10-01996-0006
Saipem Aramco Contract StatusOF StatusOF
PipelineTyp Date of Time of LineTag/Locat ItemTagNo. Drawing No PMT
Sl.No. ContractorRFIN0 EPMRFINo. Location Discipl. SATIP # Activity # SAIC # DescriptionofActivity Insp. Insp. or /Sub PID Insp. Status HardCop ScanCop Remarks
e Inspection Inspection ion & Rev# Insp.
Level Level Con Insp y y

SECURITY
TA151762- Inspection of Epoxy Coated Steel Bars / Wire Mesh
MDRK RH-B-
FCC-SGCP-CIV- SUPPORT Angelo / Edgardo Mohamm
1 00207 N/A 26-Sep-21 8:30 AM BUILDING
MDRK RH-B 151762-001- CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 002-V0F2B for Grade on Slab at GL A-B/1-5, Security Support H H Ziaul Haq Bangco ed I Khan
BLDG-D83 Building , MDRK RH-B
(SSB)

SECURITY
FCC-SGCP-CIV- SUPPORT MDRK RH-B- TA151762- Structural Concrete (4640 Psi) Sampling, Testing Angelo / Edgardo Mohamm
2 00208 N/A 26-Sep-21 8:45 AM BUILDING
MDRK RH-B 151762-001- CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 002-V0F2B and Placement Inspection for Gradeon Slab at GL W W Ziaul Haq Bangco ed I Khan
(SSB) BLDG-D83 A-B/1-5, Security Support Building , MDRK RH-B

Hollow Core Panels ( 16 units -Except-L2-2105-


SECURITY
S.HRDH-LSS- 2001-12 and L2-2105-2001-13), Scupper (3 Units) Edgardo Mohamm
FCC-SGCP-CIV- SUPPORT HARADH SH
3 00209 N/A 26-Sep-21 1:30 PM
BUILDING LSS
148846-001- CIV SATIP-Q-012-01 2.1 SAIC-Q-1064 TA-148846 and Splash block (3 Units) receiving and storage H W Romeo/Zi Bangco ed Al
BLDG-D83 inspection to be erected for Security Support aul Haq (Navab) Rashidi
(SSB) Building at Haradh SH LSS

You might also like