You are on page 1of 10

area l

masonry retaining work a


5.67 43.5

b
Gabion

2 16
2

1
0.3
cutt off structure 34.45 10.34

2.1

0.3
3.2
reinforcment bar
floor 3.15 15.75 17 6.85 116.45

6.45 32.25 33 3.55 117.15

wall 2.05 10.25 11 6.85 150.7

6.45 32.25 33 2.45 161.7

total volume of concrete C-25/20 = 10.4


Total Reinforcment bar of Cuttoff structure =

conc vol reinforcment bar


wett well wall 1.92 1.55 7.75 9 3.55 127.80
3.15 15.75 17 1.95 132.60

conc slab 1.024 1.55 7.75 9 3.55 31.95


Total Conc c-25 2.94 3.15 15.75 17 1.95 33.15
Total Reinforcment Bar
add cuttoff 13.34
Forwork 32.46
volume
17749.56 16000 0.901431
246.645 15904.33 15000 0.943139
13623.4 15001 1.10112

32

0.222 2.826E-05 7855.626 5.024E-05 0.394667


∅8
45.96 0.2 0.2
3.15
46.24 0.2 0.2
6.45
59.48 0.2

2.05

0.2

63.82 0.2
215.49
6.45

0.2
430.98

0.222 2.826E-05 7855.626 0.00011304 0.888

∅ 12
113.49 1.6
117.75

3.2
28.37
29.44
289.04
21.217 90 4.241882
Area L
Masonry retaining wall 0.6 3.7825 14.3
excavation add 25%

2.5

1.25
0.6

2.45

c-25/20 rc slab 6.30


RC Handrails 0.20
culvert slab reinforcment bar
floor 4.50 22.5 23 6.27 144.21 227.66
-
Wall 5.87 29.35 30 4.90 147 232.06
0 291.21 919.45
Concr. Hand rails ∅6 ∅8
0.95 3.166667 3 1 3 8.478E-05 34.8 13.73
3.65 12.16667 12 1 12 0.000339
0.000424
Form Work slab 20.7702
handrail 4.665
volume
108.1795
135.2244

7855.626 2.826E-05 5.024E-05 7.85E-05 0.000113 0.000154 0.000201 0.000254


0.22 0.39 0.62 0.89 1.21 1.58 2.00
6 8 10 12 14 16 18

0.2 0.2
5.87
0.2 0.2
4.50
0.222 2.826E-05 7855.62633 5.024E-05 0.394667

8.19
0.000314
2.47
20
Excavation
4.6875

Volume Rebar wt kg
Lm ∅6 ∅ 12 ∅6 ∅ 12

Foundation 0.6 5.2 4.62


Column 0.4 13.50 25.6 3.00 22.73
Anchoring pad 0.36 4.2 3.73
Total 1.36 3.00 31.08

Form work 5.25


0.222 2.826E-05 7855.626 0.000113 0.888