Professional Documents
Culture Documents
Heart of Hightech
E n er gy
About Scherzinger Service Repair and The Flow Divider consists ■ All double gear pump ■ Every drive gear is directly proportional to
Exchange program of multiple gear pump elements have one drive connected to the other by the speed of the Flow
elements with a single gear and two driven coupling bushes to Divider.
Since 1937 Scherzinger Delivering results due to... Scherzinger provides As a consequence of long inlet and multiple outlets gears, rotating in the synchronize the speed of
■ As a consequence each 2
has specialized in the an extensive range of term experience and expertise in a linear double element gear chamber with small all gear pump elements.
fuel nozzle of the gas
development, design, ■ Comprehensive product specialists to support all Flow Divider repairs are arrangement. diametral and lateral
■ Each gear pump element turbine is provided with 3
and optimization of Gear consultancy and service OEM’s, plant owners and maintained at the Scherzinger clearances.
is driven by the fuel the same fuel quantity.
Pumps, Flow Dividers operators of Gas Turbines Head Office. In order to assure
■ Professional and compe- stream and therefore
and Valves. worldwide. you reliable performance, each
tent development team
repaired unit passes the same
Scherzinger products offer ■ Highly innovative thinking Due to a worldwide network test procedure like any
intelligent solutions for of representatives Scher- new unit.
■ Realization of specific
very individual and specific zinger can continuously
and customized concepts Operating Range: Design Principle:
requirements in the energy provide you with: Depending on your requirements
for high-tech applications
industry. Decades of expe- Scherzinger offers you different
■ Complete repair and
rience in development and ■ State-of-the-art production repair possibilities:
overhaul
production of Flow Dividers methods and processing
■ Individual evaluation of your
and Valves ensure optimum of a wide range of ■ Technical support and GE Frame 6B, GE Frame
used unit including inspection
customer benefits. materials expertise 6C, GE Frame 6FA, GE
report and competitive Designed for:
■ Complete verification and ■ Information and training quotation Frame 7FA, GE Frame 9E,
Scherzinger is certified GE Frame 9FA
extensive testing prior to service
after ISO 9001, VDA 6.1 ■ Flow divider exchange
delivery
and ISO 14001 since 1993 ■ Retrofitting and program for short delivery Number of elements: 6; 10; 14; 18
– assuring best quality. upgrading intervals including possible
upgrading (upon request) 75 l/min (19.8 GPM) at
Flow rate per element:
2000 RPM
The Flow Divider con- ■ All gear pump elements ■ Every driven gear is ■ Each gear pump element The Flow Divider consists ■ All gear pump elements ■ Every drive gear is ■ Each gear pump element
sists of multiple gear are equipped with two connected to the other by is driven by the fuel of multiple gear pump have one drive gear and connected to the other is driven by the fuel
pump elements with a driven gears, rotating in a central sun gear to stream and therefore elements with a single inlet one driven gear, rotating by coupling bushes stream and therefore
single inlet and multiple the gear chamber with synchronize the speed of directly proportional to the and multiple outlets in in the gear chamber with to synchronize the directly proportional to the
4
outlets in a circular small diametral and lateral all gear pump elements. speed of the Flow Divider. a linear arrangement. small diametral and speed of all gear pump speed of the Flow Divider.
arrangement. clearances. lateral clearances. elements. 5
■ As a consequence each ■ As a consequence each
fuel nozzle of the gas fuel nozzle of the gas
turbine is provided with turbine is provided with
the same fuel quantity. the same fuel quantity.
The valve consists of ■ The cartridges are ■ When the hydraulic The Purge Valve is used ■ The valve consists of a ■ By rotation of a sealing ■ With this purge valve
multiple valve cartridges operated by one common cylinder is actuated all on gas turbines operated multi ported casing disc all connected lines all fuel lines between
in a circular arrangement. central hydraulic cylinder. valve cartridges are on liquid fuel. where each port is are either sealed or the Flow Divider and
opened at the same time, connected to one fuel opened into one common the nozzles can be
■ At initial state the 6
to release the flow of the line, between the Flow drain connection. purged – e.g. when
cartridges are “closed” by
fuel to all combustion Divider and the nozzle of the fuel is changed
spring force and the ■ The valve can be operated 7
chambers. the gas turbine. from liquid to gas, or
pressure load of the fuel. either hydraulically,
when the turbine is
manually, or as an
shut down.
alternative pneumatically.
Operating pressure: 96 bar (1400 psig) Fuel temperature: Max. 150 °C (302 °F)
Fuels: Distillate
w w w. s c h e r z i n g e r. d e
Scherzinger Pumpen
GmbH & Co. KG
Bregstraße 23-25
15-200 | 03-2015 | 400 E | We