Wires need to be routed properly( inside wire way )-Fuse #2 in WU2 on Terminal X21 is lifted-Fuse #9 in WU6
2 FS45 FS-400C-R1 GEN SPACE ROOM 108 on Terminal X61 is lifted-Fuse #2 in WU5 on Terminal X51 is lifted-(FS45 PICTURES)
Fuse #5,6 in WU6 on Terminal X61 are lifted-Various cables are crossing over modules,they need to be
properly routed in wireway provided,-plastic terminal connector hanging in the cabinet needs to replaced with
3 FS46 FS-400C-R1 GEN SPACE ROOM 108 a terminal secure in rail DIN provided(FS46 Pictures)
Fuse #5 in WU5 on Terminal X51 is lifted-Fuse #3,4,5,6 on Terminal X61 are lifted-Fuse #2 in WU2 on
4 FS47 FS-400C-R1 Drilling DRIVE ROOM Terminal X21 is lifted-Wire tag#w9521 is loose inside the enclosure-(FS47 Picture)
IS THIS CABINET A SPARE ONE ?NO POWER: VARIOUS FUSES LIFTED -LOOSE SPBUS P2
5 FS48 FS-400C-R1 GEN SPACE ROOM 108 CONNECTORS HANGING IN THE ENCLOSURE-(FS48 Pictures)
Fuse#4 on WU2 in X21 lifted-wire on top of U9 need to be routed properly-fuse#4 on WU3 in X31 lifted-plastic
6 FS33 FS-240C-R1 STBD BOW THUSTER 3 terminal connector hanging in the cabinet needs to replaced with a terminal secure in rail DIN provided
Loose connector needs to be secured-plastic terminal connector hanging in the cabinet needs to replaced with a
8 FS50 FS-400C-R1 GEN EL ROOM 108 terminal secure in rail DIN provided-
Loose connector needs to be secured-plastic terminal connector hanging in the cabinet needs to replaced with a
9 FS51 FS-400C-R1 U-DECK ROOM 108 terminal secure in rail DIN provided-
Fuse #1,4 in WU3 on Terminal X31 are lifted-Fuse #4 in WU2 on Terminal X21 is lifted-plastic terminal
connector hanging in the cabinet needs to replaced with a terminal secure in rail DIN provided-Wires above U9
need to be routed properly( inside wire way )-Ground wire under U2 needs to be terminated-loose SPBUS
10 FS32 FS-240C-R1 PORT BOW TH2 terminal need to be secured in wireway-Breaker feeding Q1,Q2,Q3,Q4 is mounted backward.
Various cables are crossing over modules,they need to be properly routed in wireway provided-Fuse #2 in WU2
11 FS41 FS-400C-R1 DRILL SWITCH GEAR ROOM on Terminal X21 is lifted
Fuse#2 in WU2 on Terminal X21 is lifted-fuses1,2,3,4,5,6 on WU6 in X61 lifted,SPBUS connectors are hanging
12 FS43 FS-400C-R1 ECR inside the cabinet
13 FS44 FS-400C-R1 ECR Fuse#2 in WU2 on Terminal X21 is lifted-Wires need to be routed properly( inside wire way )
14 FS37 FS-400C-R1 MAIN SWITCH ROOM PORT Fuse#2 in WU2 on Terminal X21 is lifted-Wires need to be routed properly( inside wire way )
15 FS38 FS-400C-R1 MAIN SWITCH ROOM PORT Wires need to be routed properly( inside wire way )-
Fuse#2 in WU2 on Terminal X21 is lifted-fuses2,3,4,5,6 on WU6 in X61 lifted,Wires need to be routed
16 FS39 FS-400C-R1 MAIN SWITCH ROOM CENTER properly( inside wire way )
Fuse#2 in WU2 on Terminal X21 is lifted-fuses1,2,3,4,5,6 on WU6 in X61 lifted,SPBUS connectors are hanging
17 FS40 FS-400C-R1 MAIN SWITCH ROOM CENTER inside the cabinet
19 FS42 FS-400C-R1 MAIN SWITCH ROOM STBD Fuse#2 in WU2 on Terminal X21 is lifted-
plastic terminal connector hanging in the cabinet needs to replaced with a terminal secure in rail DIN
20 FS34 FS-240C-R1 PORT STERN TH4 provided-C0nnectors need to be secured
plastic terminal connector hanging in the cabinet needs to replaced with a terminal secure in rail DIN
21 FS36 FS-240C-R1 PORT STERN TH6 provided-
plastic terminal connector hanging in the cabinet needs to replaced with a terminal secure in rail DIN
25 FS35 FS-400C-R1 STBD STERN THRUSTER provided-Wires need to be routed properly( inside wire way )
26 AFT SPBUS BOOST CABINET EMERG. DIESEL ROOM 108 UPPER DOOR has lock broken-WIRE IN THE CABINET NEED TO BE ROUTED PROPERLY
27 STBD SPBUS BOOST CABINET EMERG. DIESEL ROOM 108 WIRE IN THE CABINET NEED TO BE ROUTED PROPERLY