You are on page 1of 1

Problem: Dephenolization of Aqueous Wastes

Ref: El-Halwagi, M.M. "Pollution Prevention through Process Integration -


Systematic Design Tools "
Academic Press, San Diego 1997 (p. 62, 132)

L1 L2 L3 L4 L5 Objective
5.0000 2.0800 0.1127 0.0000 0.0000 Function
Lower bound 0 0 0 0 0 2,88,308
Upper bound 5 3 $/year
Link
DELTA1 DELTA2 DELTA3 DELTA4 DELTA5 DELTA6
5.2000E-03 1.4992E-02 1.1288E-02 0.0000E+00 2.4000E-03 8.4000E-03
https://drive.google.com/file/d/1trkeFwfwE-du_fGuuHwTDBKRzPQeVleN/view
DELTA7 DELTA8 DELTA9 DELTA10 DELTA11
1.2400E-02 1.2400E-02 6.6509E-03 3.9455E-04 1.1273E-04

Interval
1
Equation
0.0052
Target
0.0052
Excelent File
2 0.0308 0.0308
3 0.0040 0.004
4 0.0396 0.0396 https://sites.google.com/view/processdesignandsimulation/home
5 0.0144 0.0144
6 0.0060 0.006
7 0.0040 0.004
8 0.0000 0
9 0.0000 0
10 0.0000 0
11 0.0000 0
12 0.0000 0

Solved by:
Spreadsheets in Chemical Engineering Education – a tool in process design and process integration
Eugénio C. Ferreira, R. Lima and R. Salcedo (Int. J. Engineering Education , 20:6, 928-938, 2004)

You might also like