You are on page 1of 2

TubeLock ®

Tubular handling - HESS ” Hess says, With full focus


throughout the Campaign to Manage
Risk & limit exposure to un-safe con-
During a recently completed • Mounting centralizer onshore
ditions, the TubeLock® racks allowed
UBD / MPD Drilling and Comple- • Measuring and tally onshore us to prepare our tubulars on-shore,
tion
• Space optimizing and mini- witnessed by HESS – Inspect, Drift,
Campaign in 2013 to 2016 car-
mum tubular handling Tally (Pre-doping optional) – with a
ried out in the Danish North Sea.
HESS decided to use the Tube- Improvements: spreadsheet compiled, forwarded to us
Lock® ‘Tubing Racking System’ • Improved QHSE throughout / rig showing detail of the tubes loaded
offered by Global Gravity to be the loading / transportation, & the loading position on the vessel.
the system of choice for use • Improved equipment prote-
through the entire completion ction – for chrome materials The feedback from the rig DSV,
Campaign. especially, tool-pusher & Completion Supv. & Logi-
• Improved QA on compiling stics Controller was very positive being
Project data: / checking running tallies seen as a ‘pro-active’ step in improving
• Transport and logistic hand- ahead of time, QHSE and making tubular handling
ling 4½” S13Cr% 110 tubing • Minimal footprint required on safer and less risky at the rig, where
• More than 3 years off use the rig, space was at a premium.
without an incident Going forward I can see no down-side
• Ability to pick pipe from the
• Global Gravity Supervisor racks using knuckle-boom in trying to improve the management of
involved on and offshore crane to TFM our tubulars in the industry – They are
• +20 shipments over the in essence the part we leave behind
• Running tally prepared in
years advance for 20+ years – so I believe we should
invest a little to gain a great deal – all
• Easy to man handle, easy to
round, ever strive for improvement and
Challenges: use
safer working environment.
• Minimum deck space due to
fluid treatment system
Kevin Manning


• Risk of damage to the tu-
Well Completion Engineer - HESS
bing’s
HSEQ and Certifications
The TubeLock® System has been through very harsh tests to
demonstrate the strength and document the certified hand-
ling.

Design approval
TubeLock® has an approved Design approval from DNV ac-
cording to Lifting Appliance sec. 2.22

HSEQ and certification are cornerstones in the offshore indu-


stry and a constant focus in our operation.
Our HSEQ and certifications are the sum of the knowledge
and experience we learn from these testings.

The system was nominated for a safety prize at the ”Task


Force Zero” conference in Esbjerg in March 2012.

OUR GOALS
zero accidents
safe and smart tubular handling
Globalgravity.dk
cost reduction on handling support@globalgrativy.dk
Increase efficiency in drilling operations Tel: +45 76 56 99 00

You might also like