You are on page 1of 10

Plaxis 2D V20 I Bintang

Plaxis 2D V20
SHORING SYSTEM (Tie Back Wall)

o Data Tanah

o Data Wall

PLAXIS 2D V20 I Bintang


Plaxis 2D V20 I Bintang

o Data Node to Node Anchor

o Data Grout Body

Tahapan Penggalian :
1. Galian 3 m
2. Galian 4 m
3. Galian 3 m

Muka air tanah ada di elevasi - 18 m.

PLAXIS 2D V20 I Bintang


Plaxis 2D V20 I Bintang

➢ PLAXIS INPUT
• Open Plaxis Input → New Project → ok

• Input Project Title : Shoring System


• Pada Dimensi masukkan : Right = 80 ; Top = 20

1. Create Borehole
2. Klik di koordinat posisi borehole (Contoh di 0,0)
3. Modify soil Layer:
• Input setiap lapisan tanah
• Tentukan muka air tanah
• Input data Material Tanah
• Drag Soil ke Modify Layer

PLAXIS 2D V20 I Bintang


Plaxis 2D V20 I Bintang

4. Pada Toolbar → Structure → klik Create Plate


o Input di Command : 30 0 30 -16 & 50 0 50 -16

5. Pada Toolbar → Structure → klik Show Material


o Input di Material Plate
o Drag ke Geometry Plate

PLAXIS 2D V20 I Bintang


Plaxis 2D V20 I Bintang

6. Pada Toolbar → Structure → klik Create Line


o Input di Command : 30 -3 50 -3
o Input di Command : 30 -7 50 -7
o Input di Command : 30 -10 50 -10

7. Pada Toolbar → Structure → klik Create Interfaces on the Boundary

8. Pada Toolbar → Structure → klik Create Line (Create Interface)

PLAXIS 2D V20 I Bintang


Plaxis 2D V20 I Bintang

9. Pada Toolbar → Structure → klik Create node to node Anchor


o Input di Command : 30 -3 21 -9 & 50 -3 59 -9
o Input di Command : 30 -7 21 -13 & 50 -7 59 -13
o Input di Material Anchor
o Drag ke Geometry Anchor

10. Pada Toolbar → Structure → klik Create Embedded Beam Row


o Input di Command : 21 -9 20 -10 & 59 -9 60 -10
o Input di Command : 21 -13 20 -14 & 59 -13 60 -14
o Input di Material Embedded Beam
o Drag ke Geometry Embedded Beam

11. Pada Toolbar → Structure → klik Create Line Load


o Input di Load : -10 kN/m/m

PLAXIS 2D V20 I Bintang


Plaxis 2D V20 I Bintang

12. Pada Toolbar → Mesh → Generate Mesh


o Select Points for curves

13. Pada Toolbar → Flow Condition

14. Pada Toolbar → Staged Construction


• Initial Phase
• Phase 1 : Wall dan Interface
• Phase 2 : DeActive Galian 1
• Phase 3 : Active node to node Anchor dan Embedded Beam 1
• Phase 4 : DeActive Galian 2
• Phase 5 : Active node to node Anchor dan Embedded Beam 2
• Phase 6 : DeActive Galian 3
• Phase 7 : Active Load

PLAXIS 2D V20 I Bintang


Plaxis 2D V20 I Bintang

15. Pada Toolbar → Staged Construction → CALCULATE

16. Pada Toolbar → Staged Construction → View Calculation Results

PLAXIS 2D V20 I Bintang


Plaxis 2D V20 I Bintang

o Total Displacement

o Principal Effective Stresss

o Axial Forces

PLAXIS 2D V20 I Bintang


Plaxis 2D V20 I Bintang

o Bending Moment

o Table Forces

PLAXIS 2D V20 I Bintang