You are on page 1of 1

HIGH

HIGH

HIGH

HIGH
HIGH

HIGH
LOW

AS RECEIVED FINAL OTHER


MFG: JOB#:
WESTINGHOUSE
ALL PHASE ANGLES RECORDED ___________________ MOD#: CUST:
W-101
________________ AS VIEWED FROM __________ END. DESCR: INSPECTOR:
G/T
S/N: DATE INSPECTED:
"ZERO" DEGREE POINT IS _________________________ {SULZER HICKHAM INC.}

_________________________________________. EQUIP#: APPROVED BY: TITLE:


TURBINE SECTION
DRAWN BY: REV#:
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF SULZER HICKHAM
INC. (SHI) AND SHALL NOT BE REPRODUCED, USED, TRANSFERED, OR
R. Anderson 000 RUN-OUT
DISCLOSED TO OTHERS, WITHOUT THE WRITTEN PERMISSION OF SHI, DATE DRAWN:
EXCEPT AS AUTHORIZED BY CONTRACT WITH SHI. 9-28-06
DWG#:
W101TSRO INSPECTION

You might also like