BRIDGE REPAIR ITEMS


1 Sand blasting to the concrete Sq.M. 95.00 11.00
surface including all material
machinery and labour etc.
complete.
2 Applying acqua epoxy tack coat Sq.M. 185.00 28.00
on cleaned surface including cost
of materials labour etc. complete.
(Excluding cost of scaffolding)
3 Providing and applying shot Sq.M. 550.00 105.00
creating in C.C. 1:1:2 to an
average thickness of 75 mm under
pressure of 2.1 Kg./ Sq.cm. to 2.8
Kg./ Sq.cm including providing
necessary approved quick setting
admixture, cleaning, watering,
curing etc. with all machinery
material labour etc. complete
without scaffolding.
4 Providing epoxy mortar for Cum. 150150.00 2520.00
repairs to the cracked girders
including chipping the loose and
cracked concrete exposing the
sheathing cables wherever
corroded cleaning rust by means of
wire mesh and sand blasting
rebuilding and giving minimum 3
days compressive strength of 525
Kg./Sq.m and maximum epoxy
consumption of 258 Kg/Cum. of
mortar with all materials, labour
equipment etc. complete as
directed.
5 Providing and laying epoxy Cum. 116750.00 2520.00
concrete using epoxy sand
course sand and trap metal in
suitable proportion by weight
including mixing, placing,
compacting inclusive of cleaning
the surface for applying the tack
coat of epoxy as directed and
giving minimum 3 days
compressive strength of 525 Kg./
Sq.cm and maximum epoxy
consumption of 214 Kg./Cum. of
concrete including necessary form
Rates as per Rates as per
Description of Items &
Sr. No. Unit 2012-2013 (in Rs.) 2013-2014 (in Rs.)
Item Code
Completed Labour Completed Labour
concrete including necessary form
work with all materials, labour,
centering equipment etc. complete
as directed.
6 Providing epoxy coating in Sq.M. 560.00 140.00
primer + 2 coats to the girders
including cleaning by sand blasting
brushing cost of materials,
machinery, equipment, labour etc.
complete as directed.
7 Providing and injecting epoxy Kg. 1120.00 70.00
grout including strutting of crack in
the body of slab girder by sand
blasting, fixing inlet tube
arrangements including cost of all
materials, machinery required for
the work, labour charges etc.
complete.
8 Providing and applying Sq.M. 38.00 15.00
waterproof cement paint in two
coats to the concrete surface
including cleaning cost of
materials, machinery equipment,
labour etc. complete.
9 Providing and applying Sq.M. 210.00 109.00
approved coal tar epoxy painting
in 3 coats to concrete surface.