This document provides a table listing 9 items and their associated codes, units of measurement, and rates in Indian Rupees (Rs.) for the years 2012-2013 and 2013-2014. The items relate to bridge repair work and include activities like sand blasting, applying epoxy tack coats, shot creating, epoxy mortar and concrete repairs, epoxy coating, epoxy grout injection, and applying waterproof cement and coal tar epoxy paints. The rates provided indicate the completed labor costs for each item and year.
This document provides a table listing 9 items and their associated codes, units of measurement, and rates in Indian Rupees (Rs.) for the years 2012-2013 and 2013-2014. The items relate to bridge repair work and include activities like sand blasting, applying epoxy tack coats, shot creating, epoxy mortar and concrete repairs, epoxy coating, epoxy grout injection, and applying waterproof cement and coal tar epoxy paints. The rates provided indicate the completed labor costs for each item and year.
This document provides a table listing 9 items and their associated codes, units of measurement, and rates in Indian Rupees (Rs.) for the years 2012-2013 and 2013-2014. The items relate to bridge repair work and include activities like sand blasting, applying epoxy tack coats, shot creating, epoxy mortar and concrete repairs, epoxy coating, epoxy grout injection, and applying waterproof cement and coal tar epoxy paints. The rates provided indicate the completed labor costs for each item and year.
Sr. No. Unit 2012-2013 (in Rs.) 2013-2014 (in Rs.) Item Code Completed Labour Completed Labour
BRIDGE REPAIR ITEMS
1 Sand blasting to the concrete Sq.M. 95.00 11.00 surface including all material machinery and labour etc. complete. 2 Applying acqua epoxy tack coat Sq.M. 185.00 28.00 on cleaned surface including cost of materials labour etc. complete. (Excluding cost of scaffolding) 3 Providing and applying shot Sq.M. 550.00 105.00 creating in C.C. 1:1:2 to an average thickness of 75 mm under pressure of 2.1 Kg./ Sq.cm. to 2.8 Kg./ Sq.cm including providing necessary approved quick setting admixture, cleaning, watering, curing etc. with all machinery material labour etc. complete without scaffolding. 4 Providing epoxy mortar for Cum. 150150.00 2520.00 repairs to the cracked girders including chipping the loose and cracked concrete exposing the sheathing cables wherever corroded cleaning rust by means of wire mesh and sand blasting rebuilding and giving minimum 3 days compressive strength of 525 Kg./Sq.m and maximum epoxy consumption of 258 Kg/Cum. of mortar with all materials, labour equipment etc. complete as directed. 5 Providing and laying epoxy Cum. 116750.00 2520.00 concrete using epoxy sand course sand and trap metal in suitable proportion by weight including mixing, placing, compacting inclusive of cleaning the surface for applying the tack coat of epoxy as directed and giving minimum 3 days compressive strength of 525 Kg./ Sq.cm and maximum epoxy consumption of 214 Kg./Cum. of concrete including necessary form Rates as per Rates as per Description of Items & Sr. No. Unit 2012-2013 (in Rs.) 2013-2014 (in Rs.) Item Code Completed Labour Completed Labour concrete including necessary form work with all materials, labour, centering equipment etc. complete as directed. 6 Providing epoxy coating in Sq.M. 560.00 140.00 primer + 2 coats to the girders including cleaning by sand blasting brushing cost of materials, machinery, equipment, labour etc. complete as directed. 7 Providing and injecting epoxy Kg. 1120.00 70.00 grout including strutting of crack in the body of slab girder by sand blasting, fixing inlet tube arrangements including cost of all materials, machinery required for the work, labour charges etc. complete. 8 Providing and applying Sq.M. 38.00 15.00 waterproof cement paint in two coats to the concrete surface including cleaning cost of materials, machinery equipment, labour etc. complete. 9 Providing and applying Sq.M. 210.00 109.00 approved coal tar epoxy painting in 3 coats to concrete surface.