You are on page 1of 4

BACK PROPPING BY GENERAL NOTES

This drawing is confidential and is the property of Brogan Group. The drawing is supplied subject to the Company's standard

CAMAC 3000 CLIENT IF REQUIRED! Conditions as applicable. No unauthorised use, copy or disclosure is to be made without written permission.

UP UP UP UP UP UP UP
Design Basis

NOT FOR CONSTRUCTION


This drawing has been prepared from information supplied to us by, or on behalf of the Client, who should check that their
requirements have been correctly interpreted and that all loadings, dimensions, details, erection, and striking sequences etc. are as
required and practicable.

RO4000
SCANCLIMBER RO RO RO RO RO RO
G G G G G G G Design Based Hazards actively eliminated where possible in

AN AN AN AN AN AN AN
the Design Process. Where Hazards cannot be eliminated, this
symbol on the drawing with an attached note means:

NO

NO

NO

NO

NO

NO
1. Design Based Hazards Exists within this proposal

SCANCLIMBER 5000
G G G G G G G
2. Action is required by the person supervising the
work to manage the design Hazards during construction

RO O O O O RO O In accordance with Brogan Group Procedures the PERSON SUPERVISING

TF

TF

TF

TF

TF

TF
R R R BR R
the construction MUST CONTACT the Design Office, BEFORE
WORK COMMENCES, for CLARIFICATION of the Identified Hazards

B SCANCLIMBER 10000 B B B B B

O
O

O
R

R
R

R
TIES TO EXISTING STRUCTURE
MASTCLIMBER KEY PLAN

CO

CO

CO

CO
CO

CO
MCWP TIE DETAILS
SINGLE SINGLE

NS

NS

NS

NS
NS

NS
FIRM AND LEVEL GROUND
SCAN 5000 SCAN 5000

TR

TR

TR

TR
TR

TR
02 03

U
UC

UC
P UP UP UP UP UP UP

CT

CT

CT

CT
U LENGTH = 10.5mL LENGTH = 10.50mL
RO RO RO RO RO RO RO
TIO

TIO
IO

IO

IO

IO
S.W.L = 1150kg S.W.L = 1050kg
G G G G G G G

N
N

N
AN AN AN AN AN AN AN
HEIGHT = 160.50mH HEIGHT = 168.10mH
SCAFFOLDING WITH
NO

NO

NO

NO

NO

NO
CANTILEVER
G G G G G G G
O O RO O RO RO O
TF

TF

TF

TF

TF

TF
B R 12 11

BR 10

B
9 8

B R 7
7600
6
7600
B
5 4

B
3 2

B R 1

O
O

O
A.014

600 600 600

A
R

R
R

R
C1 1200
59271

CO

CO

CO

CO
CO

CO
550 350 100

300

3700
3700

SINGLE
3200

3200
RWO RWO RWO RWO RWO RWO RWO

SINGLE

NS

NS

NS

NS
NS

NS
W26A W26A W26A

D
L43W031
W26A
L43W026 L43W023 L43W018

SCAN 5000 SCAN 5000

TR

TR

TR

TR
T

T
W24 ? W23F W21A W23A W23A W21A W23F W23F W21A W23A W23A W21A W23E

05
L43W034 ? L43W032 L43W030 L43W029 L43W028 L43W027 L43W025 L43W024 L43W022 L43W021 L43W020 L43W019 L43W017
RU

RU
W25A

04
L43W035 W25E

UC

UC

UC

UC
10.50mL

10.50mL
L43W016

UP UP UP UP UP UPLENGTH = 10.50mL UP
CT

CT
4100

4100
LENGTH = 5.70mL
RO RO RO RO RO RO RO
ID ID ID

5900
T

T
5900

ID ID ID
A43-19 A43-25 A43-26
A43-34 A43-39 A43-47

IO

IO

IO
= 1750kg

IO
IO

IO
S.W.L
S.W.L = 2000kg
G G G G G G G

N
N

N
ID
FFL +168.280 APT.5 ID FFL +168.280 APT.6
HEIGHT = 168.10mH

AN AN AN AN AN AN AN
SSL +168.205 A43-05 A43-28 SSL +168.205 A43-06 ID
A43-18 ID
A43-27 FD
A43-48 HEIGHT = 168.10mH
NO

ID
NO

NO

NO

NO

NO
ID
3200

3200
A43-11 ID ID A43-49
ID ID A43-24 A43-40 ID ID
D1 KEY PLAN
G G G G G G G
A43-22 A43-23 FD A43-41 A43-42 ID
ID ID ID A43-46 FD
A43-02 A43-20 A43-21 ID FD
ID FD FD FD FD

O O RO O RO RO O
FD FD A43-43
A43-01 FD
APT.4
TF

TF

TF

TF

TF

TF
FD

R R R R
A43-04

3575
3575

5 1850

B B B B 5
B B REFER TO BG-DWG-2021-R0-372 B
FFL +168.280
W28A
SSL +168.205
ID ID
FHC 4 CORRIDOR 01 FFL +168.280 66604
W25D
(08.08.21)

800
A43-03 A43-10 ID L43W015
O

O
O

O
L43W036 A43-37 66604
24004 A43-30 SSL +168.205 A43-44
0.5 m² ID
A43-53
R

R
R

R
E
4000

ID
A43-04 FD FD
FD ID
CO

CO

CO

CO
CO

CO

5.70mL
WATER METER 2000 KG
W27F
ID
A43-05 FD ID
FD
FD ID FD A43-13
ID
A43-45
A43-52 1
ID ID

4100
L43W037 A43-14 ID APT.2 APT.1 68701
A43-12 STAIR 2 A43-30 A43-35 4.3 m² FF LOBBY
A43-38 A43-29 A43-02 ID ID A43-01 FD A43-20 FFL +168.280 FHC
FD
ID
FD
FD
ID
A43-17 15.3 m² FFL +168.280
A43-31
ID
FD FD
ID A43-36
FFL +168.280
3 8.3 m² SSL +168.205 A43-28
1.7 m²
24455
A43-06 SSL +168.205 A43-32 A43-37
SSL +168.205 66603 DM01
NS

NS

NS

NS
NS

NS
FFL +168.280 APT.3 A43-54 STAIR LOBBY
ID ID
SSL +168.205 A43-13 A43-03

6025
A43-29
6025

A43-16
ID ID ID
7.9 m²
A43-07
12.10mL

A43-33 A43-38

3200
800
TR

TR

TR

TR
T

T
DM01
ID
DM01 A43-56 1
4100

RU

RU
A43-55
A43-08
ID
1

1600 KG

1600 KG
A43-15 24002
UC

UC

UC

UC
LIFT LOBBY 24002

UP UP UP UP UP UP UP
A43-16
36.2 m²
CT

CT
FD FD
ID REFUSE
A43-09
F

RO RO RO RO RO RO RO
T

T
FFL +168.280
77

10.50mL
IO

IO

IO

IO
IO

IO
W21B W26C W23F W21D W27B W23D W25C W27B W27B W25C W21A
SSL +168.205
L43W001 L43W002 L43W003 L43W005 L43W006 L43W008 L43W009 L43W010 L43W011 L43W012 L43W014 37700
FD PASSAGE 37700

4100
1600 KG

1600 KG
G G G G G G G SCAN CLIMBER BASE
A43-25
W26A W25B W25A STAIR 1 8.1 m²
N

N
N

4115
4115

200 L43W004 SWL = 1000 KGSL43W007 SWL = 1000 KGS SWL = 1000 KGS L43W013 A43-22
4000

AN AN7510 AN AN AN AN AN
SWL 230 300 14.2 m²

300
1000 KGS SWL = 1000 KGS
2500 3000 3000
RWO RWO RWO RWO
NO

NO

NO

NO

NO

NO
SWL
1500 3000
4145 3995
300

1000 KGS
300

6045
300

SCAFFOLDING LEGEND:
G G G G G G G
300 1000
ELEC TEL ROOM
A43-24

1600 KG

1600 KG
G 4300 A43-23

O O RO O RO O O
500 2500 400 3300 400 2500 400 11.2 m² 200 2000 500 5.2 m²
TF

TF

TF

TF

TF

TF
MEP PLANT ROOF BELOW

R R 4.10mL
R R R

3200
ID FFL +168.280 FFL +168.280 .......... UNIVERSAL HEAD (U-HEAD) .......... SWIVEL COUPERS
A

A43-57 SSL +168.205 SSL +168.205

B B B B B B B
SHOWN IN PLAN

4100 4100
(FOR DIFFERENT ANGLE TUBES)

SINGLE
O

O
O

O
SUSPENDED .......... DROPHEAD SHOWN IN PLAN .......... DOUBLE COUPERS
(FOR PARALLEL TUBES)

5485
DM01 DM01
3 .......... STEELPROPS SHOWN IN PLAN
CARDLE SCAN 10000
R

R
R

R
A43-58 A43-59 SSL +164.705 .......... PUTLOG COUPERS
5485

CORRIDOR 02 FFL +168.280


66603
A43-08 SSL +168.205
SCAFFOLDING WITH .......... HORIZONTAL LEDGERS (SOLID
CO

CO

CO

CO
CO

CO
3000 LINE) SHOWN IN PLAN .......... CUPLOCK FOR STD & LEDGER

CANTILEVER 08 .......... SCAFFOLD TUBES (HIDDEN

3200
LINE) SHOWN IN PLAN
.......... CANTILEVER FRAME
NS

NS

NS

NS
NS

LENGTH = 4.10mL

NS
.......... TIE LINKING TUBES (HIDDEN
3200

LINE) SHOWN IN PLAN


G1

.......... H20 TIMBER BEAM .......... BEAM BRACKET


S.W.L = 5000kg
TR

TR

TR

TR
TR

TR
MEP PLANT ROOF BELOW

2750
2750

.......... ALUMINUM BEAM

10.50mL
UC

UC

UC

UC
UC

UC
HEIGHT = 173.50mH
UP UP UP UP UP UP UP
.......... VERTICAL STANDARD

SINGLE

4100
10.50mL

G2
.......... ADJUSTABLE U-HEAD
4100 4100

RO RO RO RO RO RO RO
TIO

TIO

TIO

TIO
TIO

TIO
SCAN 5000

2900
.......... STEEL PROP ELEVATION
2900

SINGLE .......... ADJUSTABLE BASE JACK

G 01 G G10000 G G G G
N

N
N

N
.......... BRC COUPLERS

SCAN
AN AN N AN AN AN AN
H

A 07

3200
..... INTERMEDIATE TRANSOM
NO

NO

NO

NO

NO

NO
LENGTH = 12.1mL (SHOWN IN PLAN) .......... ACCESS LADDER
2400

G G G G G G G .......... BRACING TUBE WITH

10
3950

00
SWIVEL COUPLERS
= 1450kg
O S.W.L
O OLENGTH = 10.50mL O O RO
5900
O
TF

TF

TF

TF

TF

TF
R R R R BR R
800 5 797

B HEIGHT = 160.50mH 8200

B 8200 8200

B S.W.L = 4800kg 8200 8200

B 8200 8200

B B PRELIMINARY
O

O
O

O
R

R
R

HEIGHT = 173.50mH
DRAWING
CO

CO

CO

CO
CO

CO

CRADLE AND MCWP SC5000 & SC10000 PLAN LAYOUT (42ND - 43RD)
NS

NS

NS

NS
NS

NS

SINGLE
TR

TR

TR

TR
TR

TR

SCAN 5000
UC

UC

UC

UC
UC

UC

UP UP UP UP UP UPLENGTH06 UP
RO RO RO RO RO RO RO
TIO

TIO

TIO

TIO
TIO

TIO

= 10.50mL

G G SUMMARY:
G G G G S.W.L = 1700kg G 00 SUBMITTED DS 05-09-21
N

N
N

AN AN AN AN AN AN AN
REV DESCRIPTION BY DATE
1500

1.00m

HEIGHT = 168.10mH
NO

NO

NO

NO

NO

NO
500

G G G G G G G B RO G A N
O O O O O RO O
1.00m
TF

TF

TF

TF

TF

TF
2500

B R B R B R B R BR B B R
1000

1200 GROUP
3000

O
O

O
R

R
R

OFFICE 13C, FLOOR 28, I RISE TOWER, BARSHA HEIGHTS


00 (TECOM) Dubai
30

UNITED ARAB EMIRATES


CO

CO

CO

CO
CO

CO

1.00m
1000

www.brogangroup.com
NS

NS

NS

NS
NS

NS

Title:
Title:
TR

TR

TR

TR
TR

TR

1.00m
DCH PALACE (ISLAND PLOT 14) - APARTMENT
RESTRICTED ACCESS DUE TO PROFILE PROPOSED SCAFFOLDING, CRADLE AND MCWP - SC5000 & SC 10000
U

U
UC

UC

UP UP UP UP UP UP UP
CT

CT

CT

CT
1000 SCAFFOLDING, CRADLE AND MCWP PLAN LAYOUT

RO RO RO RO RO RO RO
TIO

TIO
IO

IO

IO

IO
Customer:
INVENTURE
G G G G G G G
N

N
N

AN TYPICAL SCAFFOLDING
AN SECTION AN AN AN AN AN
SUITABLE GROUND CONDITIONS Depot:

Prepd By:
DUBAI
Date:
Scale:

Drg. No:
NTS

G G G G G G G DS 05-SEPT-2021

R O R O RO RO O O O BG-DWG-2021-R0-371
BR R BR
Approved By: Pages:
01 OF 04

B B B B B
GENERAL NOTES

This drawing is confidential and is the property of Brogan Group. The drawing is supplied subject to the Company's standard
Conditions as applicable. No unauthorised use, copy or disclosure is to be made without written permission.
CAMAC 3000
UP UP UP UP UP UP UP
Design Basis

NOT FOR CONSTRUCTION


This drawing has been prepared from information supplied to us by, or on behalf of the Client, who should check that their
requirements have been correctly interpreted and that all loadings, dimensions, details, erection, and striking sequences etc. are as
BACK PROPPING BY required and practicable.

RO4000
SCANCLIMBER
CLIENT IF REQUIRED!
RO RO RO RO RO RO
G G G G G G G Design Based Hazards actively eliminated where possible in

AN AN AN AN AN AN AN
the Design Process. Where Hazards cannot be eliminated, this
symbol on the drawing with an attached note means:

NO

NO

NO

NO

NO

NO
1. Design Based Hazards Exists within this proposal

SCANCLIMBER 5000
G G G G G G G
2. Action is required by the person supervising the
work to manage the design Hazards during construction

RO O O O O RO O In accordance with Brogan Group Procedures the PERSON SUPERVISING

TF

TF

TF

TF

TF

TF
R R R BR R
the construction MUST CONTACT the Design Office, BEFORE
WORK COMMENCES, for CLARIFICATION of the Identified Hazards

B SCANCLIMBER 10000 B B B B B

O
O

O
R

R
R

R
TIES TO EXISTING STRUCTURE
MASTCLIMBER KEY PLAN

CO

CO

CO

CO
CO

CO
MCWP TIE DETAILS
SINGLE SINGLE

NS

NS

NS

NS
NS

NS
FIRM AND LEVEL GROUND
SCAN 5000 SCAN 5000

TR

TR

TR

TR
TR

TR
02 03

U
UC

UC
P UP UP UP UP UP UP

CT

CT

CT

CT
U LENGTH = 10.5mL LENGTH = 10.50mL
RO RO RO RO RO RO RO
TIO

TIO
IO

IO

IO

IO
S.W.L = 1150kg S.W.L = 1050kg
G G G G G G G

N
N

N
AN AN AN AN AN AN AN
HEIGHT = 160.50mH HEIGHT = 168.10mH
SCAFFOLDING WITH
NO

NO

NO

NO

NO

NO
CANTILEVER
G G G G G G G
O O RO O RO RO O
TF

TF

TF

TF

TF

TF
B R 12 11

BR 10

B
9 8

B R 7 6

B
5 4

B
3 2

B R 1

O
O

O
A.014

A
R

R
R

R
C1 926
59271

CO

CO

CO

CO
CO

CO
3700

SINGLE
3200

3200
RWO RWO RWO RWO RWO RWO RWO

SINGLE

NS

NS

NS

NS
NS

NS
D
WP WP WP WP

SCAN 5000 SCAN 5000

TR

TR

TR

TR
T

T
W24 W23F W26A W21A W23A W23A W21A W26A W23F W23F W26A W21A W23A W23A W21A W26A W23E

05
L40W048
RU

RU
W25A L40W059 L40W057 L40W056 L40W055 L40W054 L40W053 L40W052 L40W051 L40W050 L40W049 L40W047 L40W046 L40W045 L40W044 L40W043 L40W042

04
L40W060
W25E

UC

UC

UC

UC
10.50mL

10.50mL
UP UP UP UP UP UPLENGTH = UP
L40W041
CT

CT
4100

4100
LENGTH = 5.70mL
RO RO RO RO RO RO RO
5900

T
ID ID ID ID
A40-19 A40-25 A40-26 A40-47

IO

IO

IO
= 1750kg

IO
IO

IO
S.W.L
S.W.L = 2000kg
G G G G G G G
ID ID
APT.05 A40-34 A40-39 APT.06

N
N

N
FFL +157.780
SSL +157.705
A40-05 ID ID
A40-06
FFL +157.780
HEIGHT = 168.10mH

AN AN AN AN AN AN AN
ID SSL +157.705 ID
A40-18
162.1 m² A40-27 A40-28
FD
163.6 m²
A40-48
ID
HEIGHT = 168.10mH
NO

ID
NO

NO

NO

NO

NO
3200

3200
A40-11 A40-49
ID ID ID ID
ID FD
D1 A40-24 A40-40
ID
KEY PLAN
G G G G G G G
A40-22 A40-23 A40-41 A40-42 ID
ID
A40-20 ID A40-46
ID FD
FD A40-21 FD ID FD FD
ID

O O RO O RO RO O
A40-01 FD FD FD
FD A40-43
A40-02
TF

TF

TF

TF

TF

TF
FD
5
R R R R
3575

5 1850

B B B B B B B
FFL +157.780 APT.04 66604
W28A ID A40-04 4
1840

CORRIDOR 01
L40W061 SSL +157.705 A40-03
FHC FFL +157.780 ID
CORRIDOR 01 FFL +157.780 66604 W25D 1
O

O
O

O
136.2 m² ID
A40-10
24004 A40-41
0.5 m²
SSL +157.705 A40-34
82.2 m² A40-44 A40-34
82.2 m²
SSL +157.705
ID
L40W040
1
68701
68701
SCAFFOLDING WITH
CANTILEVER
R

R
R

R
ID ID A40-53
E A40-30 A40-35
ID FD FD FHC
3200

A40-04 FD
A40-33
CO

CO

CO

CO
CO

CO

5.70mL
WATER METER

A
W27F ID FD ID
A40-05 FD ID ID ID FD APT.02 FD A40-16 A40-45 ID 0.6 m²

4100
L40W062 A40-12 A40-14 APT.01 FF LOBBY A40-52
A40-29 A40-02 4.3 m²
A40-01 FD PL1/FF
FD
FD
FD
ID
FFL +157.780
52.1 m² ID
A40-31
ID
A40-36 52.1 m²
3 A40-23
A40-24
8.3 m² FFL +157.780 24455
ID A40-17
24795

STAIR LOBBY
SSL +157.705 ID FD FD ID 9.0 m² SSL +157.705 200
A40-06 66603
FFL +157.780 A40-32 A40-37 FFL +157.780 180

300
DM01

300
4425
APT.03

A40-32
NS

NS

NS

NS
NS

NS

7.9 m²
FFL +157.780 SSL +157.705 SSL +157.705 A40-54
ID A40-03 ID
SSL +157.705 A40-13
6025

79.3 m² A40-16
RWO RWO RWO RWO
ID
A40-07
ID ID 1

3200
A40-33 A40-38
124002

800
TR

TR

TR

TR
T

T
11.30mL

DM01 DM01 W27E


4100

RU

RU
ID ID 24002
A40-55 A40-56 L40W039 RWP
A40-08 A40-15
UC

UC

UC

UC
UP UP UP UP UP UP UP
LIFT LOBBY W23F W23F W26A W21A W22 W24
A40-19
CT

CT
FD STAIR 2 L40W038 L40W037 L40W036 L40W035 L40W034 L40W032
FD

10550
ID A40-42 36.2 m²
A40-09 16.0 m²
F

RO RO RO RO RO RO RO
T

T
W21D
77

10.50mL
W21B W23F W26A W27B W25B W21A FFL +157.780
IO

IO

IO

IO
IO

IO
W26C W23D W25C W27B W27B W25C W25A PASSAGE
L40W001 L40W002 L40W003 L40W004 L40W005 L40W006 L40W007 L40W008 L40W009 L40W010 L40W011 L40W012 L40W013 L40W014 PL 5,6,7 SSL +157.705 PL 2,3,4 37700
37700 FD
A40-29

4100
A40-13 A40-22 8.1 m²

G WP WP

G G 22.6 m²

G 22.6 m²

G ID

G G SCAN CLIMBER BASE


40400

STAIR 1 2860 A40-67


N

N
N

N
4115

200 SWL = 1000 KGS WP SWL = 1000 KGS SWL = 1000 KGS 360 A40-26
4000

AN AN7510 N AN AN AN AN
230
SWL 14.1 m²

300
SWL = 1000 KGS ID
1000 KGS
2500 3000 3000 A40-61

A
NO

NO

NO

NO

NO

NO
RWO RWO RWO SWL RWO ID
1500 3000 FFL +157.780 ID APT.08
300

1000 KGS
300

6045 4145 3995 TEL A40-65 A40-08


A40-68
300

SSL +157.705
APT.07
SCAFFOLDING LEGEND:
G G G G G G G
300 1000 A40-28 ID A40-07
79.0 m²
ELEC 4.7 m² FD A40-60 51.0 m²
G A40-27 13 ID ID

O O RO O RO RO O
A40-62 FD
8.8 m² FFL +157.780 A40-69
TF

TF

TF

TF

TF

TF
A

21807 ID ID

R R R R
SSL +157.705 ID

4.10mL

3200
ID A40-63 FD FD FD A40-66 ID
FFL +157.780 A40-64 .......... UNIVERSAL HEAD (U-HEAD) .......... SWIVEL COUPERS
A40-57 ID A40-73

B B B B B B B
SSL +157.705 SHOWN IN PLAN

4100 4100
FD A40-72 (FOR DIFFERENT ANGLE TUBES)

SINGLE FD
FD
FD
O

O
O

O
SUSPENDED .......... DROPHEAD SHOWN IN PLAN .......... DOUBLE COUPERS
(FOR PARALLEL TUBES)
ID ID APT.09 FFL +157.780 W28B .......... STEELPROPS SHOWN IN PLAN
CARDLE SCAN 10000
R

R
R

R
5485

3 A40-58 A40-59 CORRIDOR 02 1 FHC A40-09


ID
SSL +157.705 .......... PUTLOG COUPERS

1840
L40W031

1870
W25D FFL +157.780 FFL +157.780 A40-71
A40-72 A40-75 128.5 m²
SCAFFOLDING WITH SUSPENDED 66603 L40W015 SSL +157.705
58.0 m² SSL +157.705 24007
0.6 m² ID .......... HORIZONTAL LEDGERS (SOLID
CO

CO

CO

CO
CO

CO
3000 A40-70 .......... CUPLOCK FOR STD & LEDGER
LINE) SHOWN IN PLAN

CANTILEVER CARDLE 08 ID
A40-85 .......... SCAFFOLD TUBES (HIDDEN

3200
FD ID LINE) SHOWN IN PLAN
FD FD
FD A40-74 ID .......... CANTILEVER FRAME
FD ID ID ID A40-75 W27G
ID ID FD
NS

NS

NS

NS
NS

LENGTH = 4.10mL

NS
FD APT.10 .......... TIE LINKING TUBES (HIDDEN
3200

A40-96 A40-94 A40-87 FD A40-83 L40W030


A40-84
A40-10 LINE) SHOWN IN PLAN
G1 FD
FD ID
ID FD 51.8 m²
ID
A40-82 FD ID
A40-90 A40-76
A40-91 ACCESS HATCH ID FD
ABOVE FFL +157.780 A40-81
.......... H20 TIMBER BEAM .......... BEAM BRACKET
S.W.L = kg
5000kg W26B FFL +157.780 APT.12 APT.11 FFL +157.780 SSL +157.705
TR

TR

TR

TR
TR

TR
ID ID
2750

L40W016 A40-12 ID ID A40-11 SSL +157.705


SSL +157.705 A40-95 A40-88 A40-86
80.6 m² A40-92 79.6 m²
ID
ID

7350
.......... ALUMINUM BEAM

10.50mL
A40-77
UC

UC

UC

UC
UC

UC
A40-80
HEIGHT = 173.50mH
UP UP UP UP UP UP UP
ID
.......... VERTICAL STANDARD

SINGLE

4100
A40-78
ID ID
10.50mL

G2 A40-93 A40-89
.......... ADJUSTABLE U-HEAD
4100 4100

RO RO RO RO RO RO RO
TIO

TIO

TIO

TIO
TIO

TIO
SCAN 5000 FD
2900

FD .......... STEEL PROP ELEVATION

SINGLE STAIR 3
A40-76
ID
A40-79
.......... ADJUSTABLE BASE JACK

G G G10000 G G G G
16.0 m²

01
N

N
N

N
W23F W26A W21A W29B W29B W21A W26A W23E W23C W26A W27E W26C W21C .......... BRC COUPLERS

SCAN L40W025 L40W026

AN AN N AN AN AN AN
L40W017 L40W018 L40W019 L40W020 L40W021 L40W022 L40W023 L40W024 L40W027 L40W028 L40W029
H

A 07

3200
..... INTERMEDIATE TRANSOM
NO

NO

NO

NO

NO

NO
RWP
LENGTH = 12.1mL RWP SWL = 1000 KGS 200 SWL = 1000 KGS 125 (SHOWN IN PLAN) .......... ACCESS LADDER
2400

G G G G G G G

300
SWL
230

300
SWL = 1000 KGS 1000 KGS
7000 3000 .......... BRACING TUBE WITH

10
RWO RWO RWO RWO

00
SWL SWIVEL COUPLERS
= 1450kg
kg
O S.W.L
O OLENGTH = 10.50mL O O RO O

300
3000 1000 KGS 1500
5900
TF

TF

TF

TF

TF

TF
270
7455 200 7425 4045 5900

R R R R BR R
800 1000 797
5950

B HEIGHT = 160.50mH
B B S.W.L = 4800kg B B B PRELIMINARY
O

O
O

A
0kg
R

R
R

HEIGHT = 173.50mH
DRAWING
CO

CO

CO

CO
CO

CO

CRADLE AND MCWP SC5000 & SC10000 PLAN LAYOUT (40TH - 41ST)
NS

NS

NS

NS
NS

NS

SINGLE
TR

TR

TR

TR
TR

TR

SCAN 5000
UC

UC

UC

UC
UC

UC

UP UP UP UP UP UPLENGTH06 UP
RO RO RO RO RO RO RO
TIO

TIO

TIO

TIO
TIO

TIO

= 10.50mL

G G SUMMARY:
G G G G S.W.L = 1700kg
kg G 00 SUBMITTED DS 05-09-21
N

N
N

AN AN AN AN AN AN AN
REV DESCRIPTION BY DATE
1500

1.00m

HEIGHT = 168.10mH
NO

NO

NO

NO

NO

NO
500

G G G G G G G B RO G A N
O O O O O RO O
1.00m
TF

TF

TF

TF

TF

TF
2500

B R B R B R B R BR B B R
1000

1200 GROUP
3000

O
O

O
R

R
R

OFFICE 13C, FLOOR 28, I RISE TOWER, BARSHA HEIGHTS


00 (TECOM) Dubai
30

UNITED ARAB EMIRATES


CO

CO

CO

CO
CO

CO

1.00m
1000

www.brogangroup.com
NS

NS

NS

NS
NS

NS

Title:
Title:
TR

TR

TR

TR
TR

TR

1.00m
DCH PALACE (ISLAND PLOT 14) - APARTMENT
RESTRICTED ACCESS DUE TO PROFILE PROPOSED SCAFFOLDING, CRADLE AND MCWP - SC5000 & SC 10000
U

U
UC

UC

UP UP UP UP UP UP UP
CT

CT

CT

CT
1000 SCAFFOLDING, CRADLE AND MCWP PLAN LAYOUT

RO RO RO RO RO RO RO
TIO

TIO
IO

IO

IO

IO
Customer:
INVENTURE
G G G G G G G
N

N
N

AN TYPICAL SCAFFOLDING
AN SECTION AN AN AN AN AN
SUITABLE GROUND CONDITIONS Depot:

Prepd By:
DUBAI
Date:
Scale:

Drg. No:
NTS

G G G G G G G DS 05-SEPT2021

R O R O RO RO O O O BG-DWG-2021-R0-371
BR R BR
Approved By: Pages:
02 OF 04

B B B B B
GENERAL NOTES

This drawing is confidential and is the property of Brogan Group. The drawing is supplied subject to the Company's standard
Conditions as applicable. No unauthorised use, copy or disclosure is to be made without written permission.
CAMAC 3000
UP UP UP UP UP UP UP
Design Basis

NOT FOR CONSTRUCTION


This drawing has been prepared from information supplied to us by, or on behalf of the Client, who should check that their
requirements have been correctly interpreted and that all loadings, dimensions, details, erection, and striking sequences etc. are as
BACK PROPPING BY required and practicable.

RO4000
SCANCLIMBER
CLIENT IF REQUIRED!
RO RO RO RO RO RO
G G G G G G G Design Based Hazards actively eliminated where possible in

AN AN AN AN AN AN AN
the Design Process. Where Hazards cannot be eliminated, this
symbol on the drawing with an attached note means:

NO

NO

NO

NO

NO

NO
1. Design Based Hazards Exists within this proposal

SCANCLIMBER 5000
G G G G G G G
2. Action is required by the person supervising the
work to manage the design Hazards during construction

RO O O O O RO O In accordance with Brogan Group Procedures the PERSON SUPERVISING

TF

TF

TF

TF

TF

TF
R R R BR R
the construction MUST CONTACT the Design Office, BEFORE
WORK COMMENCES, for CLARIFICATION of the Identified Hazards

B SCANCLIMBER 10000 B B B B B

O
O

O
R

R
R

R
TIES TO EXISTING STRUCTURE
MASTCLIMBER KEY PLAN

CO

CO

CO

CO
CO

CO
MCWP TIE DETAILS
SINGLE SINGLE

NS

NS

NS

NS
NS

NS
FIRM AND LEVEL GROUND
SCAN 5000 SCAN 5000

TR

TR

TR

TR
TR

TR
02 03

U
UC

UC
P UP UP UP UP UP UP

CT

CT

CT

CT
U LENGTH = 10.5mL LENGTH = 10.50mL
RO RO RO RO RO RO RO
TIO

TIO
IO

IO

IO

IO
S.W.L = 1150kg S.W.L = 1050kg
G G G G G G G

N
N

N
AN AN AN AN AN AN AN
HEIGHT = 160.50mH HEIGHT = 168.10mH
SCAFFOLDING WITH
NO

NO

NO

NO

NO

NO
CANTILEVER
G G G G G G G
O O RO O RO RO O
TF

TF

TF

TF

TF

TF
BR 12 11

BR 10

B
9 8

B R 7 6

B
5 4

B
3 2

B R 1

O
O

O
A.014

A
R

R
R

R
C1 926

CO

CO

CO

CO
CO

CO
16874 33472
520 300 390

300
190

300

300
700

SINGLE
3200

3200
RWO RWO RWO RWO RWO RWO RWO

SINGLE
7000

NS

NS

NS

NS
NS

NS
SWL = 1000 KGS

D
WP WP WP WP

SCAN 5000 SCAN 5000

TR

TR

TR

TR
T

T
W24 W23F W26A W21A W29B W29B W21A W26A W23F W23F W26A W21A W23A W23A W21A W26A W23E

05
RU

RU
W25A L21W058 L21W056 L21W055 L21W054 L21W053 L21W052 L21W051 L21W050 L21W049 L21W048 L21W047 L21W046 L21W045 L21W044 L21W043 L21W042 L21W041

04
L21W059 W25E

UC

UC

UC

UC
10.50mL

10.50mL
L21W040

UP UP UP UP UP UPLENGTH = UP
CT

CT
4100

4100
LENGTH = 5.70mL
RO RO RO RO RO RO RO
ID

T
ID ID ID
A21-20 A21-25 A21-40 A21-48

IO

IO

IO
= 1750kg

IO
IO

IO
S.W.L
S.W.L = 2000kg
G G ID
G G G G G

N
N

N
ID ID ID
FFL +91.280 ID
A21-18
APT.05 A21-21
ID
A21-24
APT.06
A21-27
FFL +91.280 FFL +91.280 A21-39
APT.07 ID ID
A21-47
APT.08
A21-50 FFL +91.280
HEIGHT = 168.10mH

AN AN AN AN AN AN AN
SSL +91.205 A21-05 A21-06 SSL +91.205 SSL +91.205 A21-07 A21-42 A21-08 SSL +91.205
78.8 m² 79.7 m² 79.7 m² 78.8 m² HEIGHT = 168.10mH
NO

NO

NO

NO

NO

NO
ID ID FD FD ID ID
3200

3200
FD A21-22 A21-23 FD FD A21-43 A21-46 FD
ID
D1 ID ID
KEY PLAN
G G G G G G G
ID FD ID ID ID A21-49 FD ID
FD A21-11 A21-26 FD FD A21-41 A21-51 FD
A21-19 A21-28 A21-34
ID FD FD FD FD

O O RO O RO RO O
A21-01 ID FD
FD
A21-02
TF

TF

TF

TF

TF

TF
BR W28A
L21W060
FFL +91.280
SSL +91.205
ID
A21-03
BR APT.04
A21-04 4 FHC
1870
B FFL +91.280 CORRIDOR 01
B R ID
5 66604
5

B W25D
1850
1
B B R
O

O
O

O
136.2 m²
ID
A21-10 24004 A21-43
0.5 m²
475 SSL +91.205 A21-36
82.8 m²
A21-44 66604 L21W039 68701 SCAFFOLDING WITH
CANTILEVER
R

R
R

R
E
ID FD FD
3200

A21-04 FD
CO

CO

CO

CO
CO

CO

5.70mL

A
W27F ID FD ID ID
FD ID ID WATER METER FHC
A21-05 ID ID ID FD A21-45 A21-52
APT.01

4100
L21W061 A21-12 A21-14 APT.02 A21-15 FF LOBBY ID A21-34
A21-29 A21-30 A21-35 A21-01
A21-02 ID ID 4.3 m² FD PL1/FF A21-26 FFL +91.280 A21-53 0.6 m²
FD
ID
FD
FD
ID
A21-17
FFL +91.280
SSL +88.305
52.1 m²
FFL +91.280
A21-31
ID FD FD ID
A21-36 52.1 m²
FFL +91.280
A21-24
8.9 m²
8.4 m² SSL +91.205 24455
A21-06 A21-32 200 180
A21-37 SSL +91.205

300
SSL +91.205 DM01
NS

NS

NS

NS
NS

NS

300
FFL +91.280 APT.03 A21-54 STAIR LOBBY
ID ID
A21-03
SSL +91.205 A21-13
79.3 m²
A21-16 7 7
A21-35
7.9 m²
ID RWO RWO RWO RWO
ID ID 37700
A21-07 A21-33 A21-38 37700

3200
800
TR

TR

TR

TR
T

T
11.30mL

DM01 DM01 W27E W26A


4100

RU

RU
ID ID A21-55 A21-56
L21W038 WP L21W062 RWP WP
A21-08 A21-15
UC

UC

UC

UC
UP UP UP UP UP UP UP
W23F W23F W21A W22 ? W24
L21W037 L21W036 L21W035 L21W034 ? L21W032
CT

CT
ID FD LIFT LOBBY
STAIR 2
A21-09 A21-21
A21-44
36.2 m²
F

RO RO RO RO RO RO RO
16.0 m²
T

T
FFL +91.280 FD

10.50mL
IO

IO

IO

IO
IO

IO
W21B W26C W23F W26A W21D W27B W25B W23D W25C W27B W27B W25C W21A
SSL +91.205 1 1
L21W001 L21W002 L21W003 L21W004 L21W005 L21W006 L21W007 L21W008 L21W009 L21W010 L21W011 L21W012 L21W014

4100
24002

G G G G G G G
24002
WP WP
PL 5,6,7
A21-18
PL 2,3,4
A21-25 STAIR 1 PASSAGE
ID
A21-67 SCAN CLIMBER BASE
N

N
N

N
W25A
200 SWL = 1000 KGS WP SWL = 1000 KGS SWL = 1000 KGS 360 22.6 m² 22.6 m² A21-28 A21-31
4000

L21W013

AN AN7510 N AN AN AN AN
SWL 230 14.1 m² 8.1 m²

300
SWL = 1000 KGS ID APT.09
1000 KGS
2500 3000 3000 A21-61 A21-09

A
RWO
NO

NO

NO

NO

NO

NO
RWO RWO RWO SWL 51.0 m²
1500 3000 FFL +91.280 ID ID
300

1000 KGS APT.10


300

6045 4145 3995 TEL


FFL +91.280 SSL +91.205 A21-65 A21-68 FD
300

A21-10
SCAFFOLDING LEGEND:
G G G G G G G
300 1000 A21-30
ID SSL +91.205 79.0 m²
ELEC 4.7 m²
FD A21-60
A21-29
G 13 ID

O O RO O
ID

RO RO O
FD
8.8 m² A21-62 A21-69
TF

TF

TF

TF

TF

TF
21807

R R R R
ID ID

4.10mL
FD ID

3200
ID FFL +91.280 ID
A21-63 FD FD
A21-64 A21-66 A21-72 ID .......... UNIVERSAL HEAD (U-HEAD) .......... SWIVEL COUPERS
A21-57 SSL +91.205

B B B B B B B
A21-73 SHOWN IN PLAN

4100 4100
(FOR DIFFERENT ANGLE TUBES)
3
SINGLE FD FD
O

O
O

O
SUSPENDED 66603 FD
FD .......... DROPHEAD SHOWN IN PLAN .......... DOUBLE COUPERS
(FOR PARALLEL TUBES)
ID ID APT.11 W28B .......... STEELPROPS SHOWN IN PLAN
CARDLE SCAN 10000 1 FFL +91.280
R

R
R

R
ID .......... PUTLOG COUPERS
A21-58 A21-59 CORRIDOR 02 FHC A21-11 SSL +91.205 L21W031
3 W25D FFL +91.280
A21-74 24007
A21-77 ID 128.5 m²
A21-71

SCAFFOLDING WITH 66603


L21W015 SSL +91.205
58.0 m² 0.6 m² A21-70 .......... HORIZONTAL LEDGERS (SOLID
CO

CO

CO

CO
CO

CO
3000 LINE) SHOWN IN PLAN .......... CUPLOCK FOR STD & LEDGER

CANTILEVER 08 ID
A21-74 .......... SCAFFOLD TUBES (HIDDEN

3200
FD ID LINE) SHOWN IN PLAN
FD FD
FD A21-75 .......... CANTILEVER FRAME
FD ID ID ID ID FD FD W27G
ID ID
NS

NS

NS

NS
NS

LENGTH = 4.10mL

NS
APT.12 .......... TIE LINKING TUBES (HIDDEN
3200

A21-96 A21-94 A21-87 A21-85 L21W030


FD A21-84 A21-83
A21-12 ID LINE) SHOWN IN PLAN
G1 ID ID 51.8 m² A21-82
FD
FD A21-91
FFL +91.280 ID FD ID
FD A21-90 FD SSL +88.130 A21-81 A21-76
.......... H20 TIMBER BEAM .......... BEAM BRACKET
S.W.L = 5000kg W26B FFL +91.280
TR

TR

TR

TR
TR

TR
FFL +91.280 APT.14 APT.13 FFL +91.280
L21W016 SSL +91.205 ID A21-14 ID A21-13 ID
SSL +91.205 SSL +91.205
A21-95 A21-92 ID A21-86 ID
80.7 m² A21-88
79.5 m² A21-77
ID .......... ALUMINUM BEAM

10.50mL
UC

UC

UC

UC
UC

UC
A21-80
HEIGHT = 173.50mH
UP UP UP UP UP UP UP
.......... VERTICAL STANDARD

SINGLE

4100
ID
ID ID A21-78
10.50mL

G2 A21-93 A21-89
.......... ADJUSTABLE U-HEAD
4100 4100

RO RO RO RO RO RO RO
TIO

TIO

TIO

TIO
TIO

TIO
SCAN 5000 SINGLE
STAIR 3
A21-78
16.0 m²
FD FD
ID
A21-79
.......... ADJUSTABLE BASE JACK .......... STEEL PROP ELEVATION

G 01 G G10000 G G G G
N

N
N

N
W23F W26A W21A W29B W29B W21A W26A W23E W23C W26A W27E W26C W21C .......... BRC COUPLERS

SCAN
AN AN N AN AN AN AN
L21W017 L21W018 L21W019 L21W020 L21W021 L21W022 L21W023 L21W024 L21W025 L21W026 L21W027 L21W028 L21W029
H

A 07

3200
..... INTERMEDIATE TRANSOM
NO

NO

NO

NO

NO

NO
RWP
LENGTH = 12.1mL RWP SWL = 1000 KGS WP
200 SWL = 1000 KGS 125 WP (SHOWN IN PLAN) .......... ACCESS LADDER
2400

G G G G G G G

300
SWL
230

300
SWL = 1000 KGS 1000 KGS
7000 3000 .......... BRACING TUBE WITH

10
00
RWO RWO RWO SWL RWO SWIVEL COUPLERS
= 1450kg
O S.W.L
O OLENGTH = 10.50mL O O O O

300
3000 1000 KGS 1500
7455 7425 4045 5900
TF

TF

TF

TF

TF

TF
270 200

R R R R BR R R
1000 797

B HEIGHT = 160.50mH
B B S.W.L = 4800kg B 7600 3710 3709

B B PRELIMINARY
O

O
O

A
600 600 181 600
H1
R

R
R

HEIGHT = 173.50mH
DRAWING
CO

CO

CO

CO
CO

CO

CRADLE AND MCWP SC5000 & SC10000 PLAN LAYOUT (21ST - 39TH)
NS

NS

NS

NS
NS

NS

SINGLE
TR

TR

TR

TR
TR

TR

SCAN 5000
UC

UC

UC

UC
UC

UC

UP UP UP UP UP UPLENGTH06 UP
RO RO RO SUMMARY: RO RO RO RO
TIO

TIO

TIO

TIO
TIO

TIO

= 10.50mL

G G G G G G S.W.L = 1700kg G 00 SUBMITTED DS 05-09-21


N

N
N

AN AN AN AN AN AN AN
REV DESCRIPTION BY DATE
1500

1.00m

HEIGHT = 168.10mH
NO

NO

NO

NO

NO

NO
500

G G G G G G G B RO G A N
O O O O O RO O
1.00m
TF

TF

TF

TF

TF

TF
2500

B R B R B R B R BR B B R
1000

1200 GROUP
3000

O
O

O
R

R
R

OFFICE 13C, FLOOR 28, I RISE TOWER, BARSHA HEIGHTS


00 (TECOM) Dubai
30

UNITED ARAB EMIRATES


CO

CO

CO

CO
CO

CO

1.00m
1000

www.brogangroup.com
NS

NS

NS

NS
NS

NS

Title:
Title:
TR

TR

TR

TR
TR

TR

1.00m
DCH PALACE (ISLAND PLOT 14) - APARTMENT
RESTRICTED ACCESS DUE TO PROFILE PROPOSED SCAFFOLDING, CRADLE AND MCWP - SC5000 & SC 10000
U

U
UC

UC

UP UP UP UP UP UP UP
CT

CT

CT

CT
1000 SCAFFOLDING, CRADLE AND MCWP PLAN LAYOUT

RO RO RO RO RO RO RO
TIO

TIO
IO

IO

IO

IO
Customer:
INVENTURE
G G G G G G G
N

N
N

AN TYPICAL SCAFFOLDING
AN SECTION AN AN AN AN AN
SUITABLE GROUND CONDITIONS Depot:

Prepd By:
DUBAI
Date:
Scale:

Drg. No:
NTS

G G G G G G G DS 05-SEPT-2021

R O R O RO RO O O O BG-DWG-2021-R0-371
BR R BR
Approved By: Pages:
03 OF 04

B B B B B
GENERAL NOTES

This drawing is confidential and is the property of Brogan Group. The drawing is supplied subject to the Company's standard
Conditions as applicable. No unauthorised use, copy or disclosure is to be made without written permission.
CAMAC 3000
UP UP UP UP UP UP UP
Design Basis

NOT FOR CONSTRUCTION


This drawing has been prepared from information supplied to us by, or on behalf of the Client, who should check that their
requirements have been correctly interpreted and that all loadings, dimensions, details, erection, and striking sequences etc. are as
BACK PROPPING BY required and practicable.

RO4000
SCANCLIMBER
CLIENT IF REQUIRED!
RO RO RO RO RO RO
G G G G G G G Design Based Hazards actively eliminated where possible in

AN AN AN AN AN AN AN
the Design Process. Where Hazards cannot be eliminated, this
symbol on the drawing with an attached note means:

NO

NO

NO

NO

NO

NO
1. Design Based Hazards Exists within this proposal

SCANCLIMBER 5000
G G G G G G G
2. Action is required by the person supervising the
work to manage the design Hazards during construction

RO O O O O RO O In accordance with Brogan Group Procedures the PERSON SUPERVISING

TF

TF

TF

TF

TF

TF
R R R BR R
the construction MUST CONTACT the Design Office, BEFORE
WORK COMMENCES, for CLARIFICATION of the Identified Hazards

B SCANCLIMBER 10000 B B B B B

O
O

O
R

R
R

R
TIES TO EXISTING STRUCTURE
MASTCLIMBER KEY PLAN

CO

CO

CO

CO
CO

CO
MCWP TIE DETAILS
SINGLE SINGLE

NS

NS

NS

NS
NS

NS
FIRM AND LEVEL GROUND
SCAN 5000 SCAN 5000

TR

TR

TR

TR
TR

TR
02 03

U
UC

UC
P UP UP UP UP UP UP

CT

CT

CT

CT
U LENGTH = 10.5mL LENGTH = 10.50mL
RO RO RO RO RO RO RO
TIO

TIO
IO

IO

IO

IO
S.W.L = 1150kg S.W.L = 1050kg
G G G G G G G

N
N

N
AN AN AN AN AN AN AN
HEIGHT = 160.50mH HEIGHT = 168.10mH
SCAFFOLDING WITH
NO

NO

NO

NO

NO

NO
CANTILEVER
G G G G G G G
O O RO O RO RO O
TF

TF

TF

TF

TF

TF
BR 12 11

BR 10

B
9 8

B R 7 6

B
5 4

B
3 2

B R 1

O
O

O
A.014

A
R

R
R

R
C1 926

16874 33472

CO

CO

CO

CO
CO

CO
520 300 390

300
190

300

300
700
3700

SINGLE
3200

3200
RWO RWO RWO RWO RWO RWO
RWO

SINGLE
7000

NS

NS

NS

NS
NS

NS
SWL = 1000 KGS

D
WP WP WP WP

SCAN 5000 SCAN 5000

TR

TR

TR

TR
T

T
W23F W26A W21A W23A W23A W21A W26A W23E
W24 W23F W26A W21A W29B W29B W21A W26A W23F

05
L02W049 L02W048 L02W047
RU

RU
W25A L02W058 L02W057 L02W056 L02W055 L02W054 L02W053 L02W052 L02W051 L02W050 L02W046 L02W045 L02W044 L02W043 L02W042

04
L02W059
W25E

UC

UC

UC

UC
10.50mL

10.50mL
UP UP UP UP UP UPLENGTH = UP
L02W041
CT

CT
4100

4100
LENGTH = 5.70mL
RO RO RO RO RO RO RO

T
ID
5900

ID ID ID
A2-20 A2-25 A2-40 A2-48

IO

IO

IO
= 1750kg

IO
IO

IO
S.W.L
S.W.L = 2000kg
G G ID ID
G G ID
G G G

N
N

N
ID ID APT.08
FFL +21.980
A2-18
APT.05
A02-05
A2-21 A2-24 APT.06
A2-27
FFL +21.980 FFL +21.980
??? ID
A2-39
APT.07
A02-07
ID
A2-42
A2-47
A02-08
ID
A2-50 FFL +21.980
HEIGHT = 168.10mH

AN AN AN AN AN AN AN
SSL +21.905 A02-06 SSL +21.905 SSL +21.905
??? SSL +21.905
78.8 m² 79.7 m² 79.6 m² 78.8 m²
HEIGHT = 168.10mH
NO

NO

NO

NO

NO

NO
ID ID FD ID ID FD
3200

3200
FD A2-22 A2-23 FD FD A2-43 A2-46 FD
D1 ID ID
KEY PLAN
G G G G G G G
FD ID ID FD ID ID
A2-11 A2-19 ID FD FD A2-41 A2-51 FD
ID FD A2-28 A2-49
A2-26
A2-01 FD FD FD
FD

O O RO O RO RO O
ID FD FD
A2-02
TF

TF

TF

TF

TF

TF
R R R R
ID
3575

A2-34
FFL +21.980 1850

B APT.04

B B B B B B
W28A ID SSL +21.905 FHC CORRIDOR 01 W25D
L02W060 A02-04 A2-03 ID FFL +21.980
O

O
O

O
136.2 m² ID
A2-10
A02-46
0.5 m²
A2-44 SSL +21.905
A02-37
82.2 m²
L02W040
SCAFFOLDING WITH
CANTILEVER
R

R
R

R
E
ID FD FD FHC
3200

A2-04 FD A02-35
CO

CO

CO

CO
CO

CO

5.70mL
ID FD WATER METER ID
W27F ID 2000 KG
A2-05 FD
ID
FD FD
A02-19 A2-52 0.6 m²
ID ID ID ID ID A2-45

4100
L02W061 A2-12 A2-14 A2-29 APT.02 A2-30 A2-35 APT-01 4.3 m² FD ID
A2-17 FF LOBBY
A02-02 A02-01

A
ID ID PL1/FF A2-53
FD
ID
FD
FD FFL +21.980
SSL +21.905
52.1 m² A2-31
ID FD FD ID
A2-36 52.0 m² A02-26
A02-27
8.9 m²
24455
A2-06 A2-32 A2-37 FFL +21.980
??? 8.3 m²
DM01 STAIR LOBBY
NS

NS

NS

NS
NS

NS

300
FFL +21.980 APT.03 SSL +21.905
??? A2-54
SSL +21.905 ID ID A02-36
A02-03
7.9 m²
6025

A2-13 A2-16
79.3 m² RWO RWO RWO 200 RWO
ID FFL +21.980

300
FFL +21.980 ID ID
A2-07 SSL +21.905

3200
SSL +21.905 A2-33 A2-38 180

800
TR

TR

TR

TR
T

T
11.30mL

DM01 DM01 W27E


ID W26A
4100

RU

RU
ID A2-55 A2-56 WP RWP WP
A2-08 L02W039 L02W036
A2-15
UC

UC

UC

UC
UP UP UP UP UP UP UP
W23F W23F W21A W22 W24
L02W038 L02W037 L02W035 L02W034 L02W033
CT

CT
FD FD LIFT LOBBY
STAIR 2 A02-22
ID
A2-09 A02-44 36.2 m²
F

RO RO RO RO RO RO RO
16.0 m²
T

10.50mL
IO

IO

IO

IO
IO

IO
W21B W26C W23F W21D W27B W25B W23D W25C W27B W27B W25C W21A FFL +21.980 FD FD
L02W001 L02W002 L02W003 L02W005 L02W006 L02W007 L02W008 L02W009 L02W010 L02W011 L02W012 L02W014 SSL +21.905
P LIFTS PL 2,3,4 PASSAGE

4100
G G G G G G G
A02-16 A02-25 A02-32
W26A W25A 22.6 m² 22.6 m²
STAIR 1
8.1 m²
FFL +21.980
SSL +21.905 SCAN CLIMBER BASE
N

N
N

N
WP WP L02W004 L02W013
4115

200 SWL = 1000 KGS WP SWL = 1000 KGS SWL = 1000 KGS 430 A02-29
4000

AN AN7510 N AN AN AN AN
SWL 300

300
SWL = 1000 KGS 14.1 m² ID APT.09
1000 KGS
2500 3000 3000 A2-61 A02-09 ID

A
RWO RWO RWO RWO
NO

NO

NO

NO

NO

NO
SWL 51.0 m² A2-67
1500 3000
300

1000 KGS
300

6045 4145 3995 FFL +21.980


ID FD
300

235 A2-68
SCAFFOLDING LEGEND:
G G G G G G G
1000 ID
FFL +21.980 SSL +21.905
SSL +21.905 ID ID
ELEC TEL A2-60
FD A2-65 A2-66
G ID

O O RO O RO RO O
A02-30 A02-31 APT.10 FD
A2-62 A02-10
11.2 m² 5.2 m²
TF

TF

TF

TF

TF

TF
ID ID

R R 4.10mL
R R
79.0 m²

3200
ID A2-63 FD A2-69 ID
FFL +21.980 FD FD A2-72 ID .......... UNIVERSAL HEAD (U-HEAD) .......... SWIVEL COUPERS
A2-57

B B B B B B B
SSL +21.905 A2-73 SHOWN IN PLAN

4100 4100
(FOR DIFFERENT ANGLE TUBES)

SINGLE FFL +21.980


SSL +21.905
FD FD
FD FD
O

O
O

O
SUSPENDED CORRIDOR 02
ID
A2-64 ID
.......... DROPHEAD SHOWN IN PLAN .......... DOUBLE COUPERS
(FOR PARALLEL TUBES)
ID ID APT.11 A2-71 W28B .......... STEELPROPS SHOWN IN PLAN
CARDLE SCAN 10000 W25D A02-73 FFL +21.980
R

R
R

R
ID .......... PUTLOG COUPERS
5485

A2-58 A2-59 FHC A02-11 L02W032


L02W015 FFL +21.980 58.2 m² A2-70 SSL +21.905
SSL +21.905 A02-76 128.5 m²
SCAFFOLDING WITH FFL +21.980 0.6 m² .......... HORIZONTAL LEDGERS (SOLID
CO

CO

CO

CO
CO

CO
3000 SSL +21.905 LINE) SHOWN IN PLAN .......... CUPLOCK FOR STD & LEDGER

CANTILEVER 08 ID
A2-84
ID
A2-83
ID
A2-74 .......... SCAFFOLD TUBES (HIDDEN

3200
FD FD FD FD ID LINE) SHOWN IN PLAN
FD .......... CANTILEVER FRAME
ID A2-75
ID FD FD ID FD FD W27G
ID A2-82
NS

NS

NS

NS
NS

LENGTH = 4.10mL

NS
.......... TIE LINKING TUBES (HIDDEN
3200

A2-93 APT.15 APT.14 A2-89 A2-85 L02W031


A02-14 FFL +21.980 APT.12 FFL +21.980 ID LINE) SHOWN IN PLAN
G1 ID A02-15 ID ID
SSL +21.905 A02-12 SSL +21.905 A2-81 FD
A2-94 52.4 m² 52.4 m² A2-90 ID ID A2-86
ID
FD ID FD FD APT.13 51.8 m² FD
FFL +21.980 A2-91 A2-87 ID A2-76
A2-95 FFL +21.980 A02-13 .......... BEAM BRACKET
.......... H20 TIMBER BEAM
S.W.L = 5000kg W26B SSL +21.905 A2-80
TR

TR

TR

TR
TR

TR
SSL +21.905 51.6 m²
L02W016
2750

FFL +21.980 ID
SSL +21.905 A2-77
ID ID ID .......... ALUMINUM BEAM

10.50mL
UC

UC

UC

UC
UC

UC
HEIGHT = 173.50mH A2-96 A2-92 A2-88

UP UP UP UP UP UP UP
.......... VERTICAL STANDARD

SINGLE

4100
ID
A2-78
10.50mL

G2
.......... ADJUSTABLE U-HEAD
4100 4100

RO RO RO RO RO RO RO
TIO

TIO

TIO

TIO
TIO

TIO
SCAN 5000 STAIR 3 FD FD
.......... STEEL PROP ELEVATION
2900

SINGLE A02-77
16.0 m²
ID
A2-79
.......... ADJUSTABLE BASE JACK

G 01 G G10000 G G G G
N

N
N

N
W23G W23G W26A W27C W27D W23E W23C W27E W26C W21C
W27C W26A .......... BRC COUPLERS

SCAN L02W020 L02W021

AN AN N AN AN AN AN
L02W018 L02W019 L02W022 L02W023 L02W025 L02W026 L02W028 L02W029 L02W030
L02W017
H

A 07

3200
..... INTERMEDIATE TRANSOM
NO

NO

NO

NO

NO
W26A

NO
W26A RWP
LENGTH = 12.1mL SWL = 1000 KGS 300 RWP SWL = 1000 KGSL02W024 300 WP 300 L02W027 SWL = 1000 KGS 125
WP
(SHOWN IN PLAN) .......... ACCESS LADDER
2400

SWL = 1000 KGS

G G G G G G G
SWL
230

300

200

200
SWL = 1000 KGS 1000 KGS
3000 3000 3000 .......... BRACING TUBE WITH
3000

10
00
RWO RWO SWL RWO RWO SWL RWO
3950

SWIVEL COUPLERS
= 1450kg
O S.W.L
O OLENGTH = 10.50mL O O O O
1000 KGS 3000 1000 KGS 1500
9071 4080 4045 5900
TF

TF

TF

TF

TF

TF
R R R R BR R R
800 1000 1000 797

B HEIGHT = 160.50mH
B B S.W.L = 4800kg B A
B B PRELIMINARY
O

O
O

H1
R

R
R

HEIGHT = 173.50mH
DRAWING
CO

CO

CO

CO
CO

CO

CRADLE AND MCWP SC5000 & SC10000 PLAN LAYOUT (1ST - 20TH)
NS

NS

NS

NS
NS

NS

SINGLE
TR

TR

TR

TR
TR

TR

SCAN 5000
UC

UC

UC

UC
UC

UC

UP UP UP UP UP UPLENGTH06 UP
RO RO RO SUMMARY: RO RO RO RO
TIO

TIO

TIO

TIO
TIO

TIO

= 10.50mL

G G G G G G S.W.L = 1700kg G 00 SUBMITTED DS 05-09-21


N

N
N

AN AN AN AN AN AN AN
REV DESCRIPTION BY DATE
1500

1.00m

HEIGHT = 168.10mH
NO

NO

NO

NO

NO

NO
500

G G G G G G G B RO G A N
O O O O O RO O
1.00m
TF

TF

TF

TF

TF

TF
2500

B R B R B R B R BR B B R
1000

1200 GROUP
3000

O
O

O
R

R
R

OFFICE 13C, FLOOR 28, I RISE TOWER, BARSHA HEIGHTS


00 (TECOM) Dubai
30

UNITED ARAB EMIRATES


CO

CO

CO

CO
CO

CO

1.00m
1000

www.brogangroup.com
NS

NS

NS

NS
NS

NS

Title:
Title:
TR

TR

TR

TR
TR

TR

1.00m
DCH PALACE (ISLAND PLOT 14) - APARTMENT
RESTRICTED ACCESS DUE TO PROFILE PROPOSED SCAFFOLDING, CRADLE AND MCWP - SC5000 & SC 10000
U

U
UC

UC

UP UP UP UP UP UP UP
CT

CT

CT

CT
1000 SCAFFOLDING, CRADLE AND MCWP PLAN LAYOUT

RO RO RO RO RO RO RO
TIO

TIO
IO

IO

IO

IO
Customer:
INVENTURE
G G G G G G G
N

N
N

AN TYPICAL SCAFFOLDING
AN SECTION AN AN AN AN AN
SUITABLE GROUND CONDITIONS Depot:

Prepd By:
DUBAI
Date:
Scale:

Drg. No:
NTS

G G G G G G G DS 05-SEPT-2021

R O R O RO RO O O O BG-DWG-2021-R0-371
BR R BR
Approved By: Pages:
04 OF 04

B B B B B

You might also like