The Zora BSD City

Luas lahan 19ha


Project:
1. Cluster KEIA
Start: Januari 2018
Type:

T10 190/302
T9 153/262
T8 120/195
Ready Hand Over

2. Cluster Kimora
Start: Mei 2018
Type:

T9 153/262
T8 120/198
Progress Hand Over

3. Cluster Kazumi
Start: June 2019
Type:

T10 200/338
T9 180/280
T8+ 136/235
T8 120/268
Estimasi Hand Over
Phase 1 December 2021
Phase 2 & 3 June 2022

4. Cluster Kiyomi
Start: December 2020
Type:

T12 240/430
T10 200/350
T9 153/275
T8+ 136/235
Estimasi Hand Over

5. Ruko Daikanyama
Start: July – Agustus 2021
Type:

Standar 28 Unit 5x20 100/243 Rp 6,8M


Corner 1 Unit 6x20 120/274 Rp 8,2M
Estimasi Hand Over 22 Bulan

Notes Pembayaran:
Rata2 Kenaikan Harga per Tahun 10-15%
Unit Ready KEIA maksimal cicilan KPR 12 bulan
Unit Indent Kiyomi maksimal cicilan KPR 22 bulan

Ruko DP 20%  KPA 24 bulan


Bertahap 30x

Diskon maks KEIA cara bayar cash 10%


Diskon maks KIYOMI & Kazumi cara bayar cash 6,5%
Sistem diskon mengurangi cicilan di akhir (bertahap) atau mengurangi nominal akad (KPR)

Notes Unit
Ceiling 3 meter, double ceiling 7 meter
Kiyomi T12 dapat Dry Kitchen
Semua Tipe lain hanya dapat Wet Kitchen

Dining Room & Master Bedroom pakai kaca low eglass


Centralized Solar Hot Water Heater System
Emergency Lamp Activation during power outage at living room, main stair & master
bedroom

Kiyomi dan Kazumi dapat full marmer


Semua bedroom menggunakan premium vinyl

Type 9 Up Imported Marble


Type 8 & 8+ Local Marble

Estimasi IPL Rp 9200 x LT (exclude PPN)

Notes Kawasan
Festive Garden  Nama museum di Jepang
Daikanyama  CBD di Shibuya