You are on page 1of 10
PELATIHAN INSPEKTUR BEJANA TEKAN ANGKATAN XLIt 6 September 2017 API, OVER VIEW, MATERIAL (uy No. Ujian : 4. JIBT-42/MigasiKPOMI‘17 Tanda tangan: 1. At what position is MAWP calculated for in a vertical pressure vessel? a_ At the bottom of the vessel b.| At the top of the vessel T Halfway up the vessel d Al the pressure gauge position, wherever it happens te be repair of a pressure vessel, who is the API-certified vessel inspector responsible 2. During the to? The owner/user of the vessel API The repair contractor All the parties, as the inspecto, ; acting in an ‘honest broker’ capacity aoe 3. When would a pneumatic test be used instead of a hydrostatic test? Because a vessel contains refractory lining Because a vessel contains rubber or giass-reinforced plastic (GRP) linings Because a vessel is constructed of 300 series stainless stec! Because a vessel is of riveted construction ao ofp |. What is the interval between internal inspections for a vessel with a projected remaining of 30 years that is in continuous use? a 5S years b| 10 years c iSyears ZXdd. Atthe discretion of the engineer and inspector fon the com ad on weld root r inimum joint efficiency 9 nleted pleted risk of brittle f 4 stre ty sibility « tressure Vessel Authorized ins a | are utilized in performing NDE during in ser tanggung jawab Pressure Vesel Authorized Inspector untuk onel yang berkualifikasi yang dapat mé@lakukan penena saan in service a, The statement above is correct Pemyataan diatas benar b| The statement above incorrect Pernyataan diatas salah » MTR for pis Ff plate shall contain MTR i UNtUk plat harus berisi Tensile § Tensile a ‘s, Yield stress, Impact Value and chemical © Stress, Yield stress, Elongation and cl Rn oe tis S. Yield stress, @e2ao|c|’ pRaFENAATANVapengers Man harus dilengkar i ada yang tepat M Gata re Bw perhitungan unt, ana tes bahwa salah sat me ta yar Wai dengan paragraph UG-2 2gur Y enggunaan material tersebut kare : a PeNgG' ie, pat diterima prima karena sesuai UG -10 un listed mater al masih dane enuhi persyaratan UG — 10 alaan diatas tidak ada yang sesuai ess material SA- 516 gr. 70 is required to be impact tested a vith MDMT - 5° F mial SA 516-70 dengan ketebalan 1 * disyaratkan impact test jika a tekan dengan MDMT — § ° f Yes, except that the vessel ig PWHT Ya, kecuali bejana tekan tersebut di PWHT Not required Tidak disyaratkan fl Die wi « Mavenal Lhe S of foe vessel (ué-9 re wa ee hee] ya Jor 49-9) J f__ peek a vessel Conan ae antag | (fetsfor 586 (Be. [Le CARL plor &- co) JI. esse? cfianetir or 20 Z ee S/o, 7.9.21) if: Weld are at pase ’ yo, @-f.2.2) _ C. Use mat ith bight et ifs jk We: 3) \B- Thee tee ata “incase, | Sie 2) ‘& Be y yet CU B- oe tape val] Bw = katijors «no peeal ioc Dapet diferima bila ment U6-10. Cb) ice ee B/°F OT renTS, PP Tani B: oe flat Hoe oben ee auaiilke (ue-9ocel) C. Cvsltagon OF QS fer adtguacy - <= B. Suh Can be ae! CU-icd)) ) PELATIHAN INSPEKTUR BEJANA TEKAN ANGKATAN XLil 6 September 2017 API, OVER VIEW, MATERIAL (W) No. Ujian :2? 1BT-421MigasmPDMNT Tanda tangan: A Pressure vessel built in 2000 has been repaired and has the fol allowable working piessure = 400 psig at 700°F: allowable str&$é of material = 17 500 psi at est temperature and 16.600 Psi at design temperature minimum design metal temperature = - vie whole numbers, the minimum required hydrostatic test pressure and the ninimum pressure for visual inspection of joints and connections, respectively, are ® 520 psig : 400 psig ing conditions Maximum uring the repair of a Pressure vessel, who is ultimately responsible for compliance with the nts of API 510 fhe API-certified inspector owner/user contractor depends on the contractual arrangements. in force ‘Subject to changes in process operation: awe and scoriun intemal inspection performed wed to determine whether the changes remote from the weld governs corrosion allowance. The MAWP. the width of the band of the wel was 1.000 in? , » Which inciud e est ' es a 0.1 500 psig, S = 17500 psi, E = 7 andtris4 Sid". id a: Sa result of the evaluation if the width from tos Tin 2in 3.022 in. 7.044 in. eorm 6 A ves j i sel has just changed service and no published or ‘similar service’ data ar to predict the pri A inspector do? probable corrosion rate under the new service regime. What a. Specify the first internal inspection after 1000 hours of operation Specify thickness measurements after 1000 hours of operation c. Assume a conservative corrosion rate of 0.5 mm per 1000 hours d. Check the service conditions after 1000 hours to see if they are still th specify an internal inspection 7. Which of these is a description of brittle fracture? . Sudden rapid fracture of a material with plastic deformation Sudden rapid fracture of a material without plastic deformation c. Unexpected failure as a result of cyclic stress d, Fracture caused by reaction with sulphur compounds kali tidak mempunyai marking namun mempunyal 8. Material yang sama se kan untuk pembuatan benjana tekan bila telah rese! lengkap boleh diperguna a. UG-10 (a) b. UG -— 10 (b) (2 UG- 10 (c) j | Tidak ada yang sesual i ection Agency : : ae Saami at authorized to write boiler and pressur * within a particular jurisdiction accredited by ASME b. The Jurisdiction charge with enforcement of safety for ope pressure vessel Both d. None deformation occurs when s is terjadi bila stress (Elastic 10. ape ror (bellow) theyield point 71. oe Anda Melakukan review Mill Test Re ¥ Stee] , Sebaiknya anda mengacu pada - ASME Section {1 Pana. ‘ ASME Section Part D ASME Section [1 PantB ASTM Material Table Port pada receiving material Carbon dan | 2 9 off) 12. SA672 Gr. ASS Material may be used for non Pressure part welded to pressure part a: the material 'S proven of weld able quality Material SA 672 Gr A 55 boleh digunakan untuk non pressure part yang dilas pada pr Parts pada sebuah bejana tekan asalkan memenuhi persyaratan mampu dilas al Pernyataan diatas benar - Pemyataan diatas salah 13. The Inspector shail sign the Manufacturer data report after a. Sal completion of Hyfrostatic test aes Setelah selesia pelaksanaan uji tekan yang memenuhi sya' hed Name plate with "ASME" stamp marker has been attac . Plat co yang terdapatmarka “ASME dipasang NDE and Test completed ‘ aon NDE dan Test sudah dilaksanakan None of the above » ASME adalah ’ ja pemenuhan persyaratan = a nay or ASME code compliance is issues report m rt” for his sc partial data and stamps “U pai = i eat a uarkan Partial Data Report dan menye' Perusahaan yang mengel Ge] ; t haat ate That er ak « T : None of the above cannot Ar! ee PEPY bea les f ’ Hike 2 ; MMe y KD ff Ae < ! y Z r 40 = tS Ap “ 1.2 a Me prbrea Ee apy “1, 9.3.6.2) . = fe _ are. Oftrefyor ff d 14 shdeg tt é (ae Vacht efor" > Ce lou Ujetdl fort po “Aaa Ee port A A & VOLE - + @ ( Ué-4b) 3 hone OF rh Yurry D. none ENS Ts! +} - Ch fh. Fares Lemar sine ( u6-90 00) CNG) who rsgues MOF - -- ha of ane Av b pmo faaterial md

You might also like