You are on page 1of 107

Al-Zour Refinery Project

Contract No.: ZOR/EPC-0055-B

Document Title : SUBSYSTEM MECHANICAL


COMPLETION TURNOVER
PACKAGE

Unit Number : 70

Unit Description : EICS

System Number : 70-70-00-C002

System Description : EICS COPPER CABLE

Subsystem Number : 70-70-00-C002-043

Subsystem Description : EICS - Copper Cable - U96 & U92 FAR to


Building

Total Volume No. : 1


Notice of MC :
Notice of PTO :
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

SUBSYSTEM MECHANICAL COMPLETION TURNOVER PACKAGE


System No.: Subsystem No.: Subsystem Description:

EICS - Copper Cable - U96 & U92 FAR to Building


70-70-00-C002 70-70-00-C002-043

TABLE OF CONTENTS
YES - Applicable N/A - Not Applicable
- Validation * - MCPlus Team to Provide

SECTION NUMBER AND DESCRIPTION YES N/A


SECTION 1.0 TURNOVER NOTICE DOCUMENTS
1.1 Construction Completion Handover Certificate 
✔ 
1.2 MC Walkdown Notice and Attendance Sheet 
✔ 
1.3 Mechanical Completion Certificate 
✔ 

SECTION 2.0 GENERAL


2.1 Subsystem Description
2.1.1 Master Drawing Index 
✔ 
2.1.2 Scope Boundary Index & Drawings* 
✔ 
2.1.3 Vendor Index & Drawings 
✔ 
2.2 Red-Line Index and Drawings 
✔ 
2.3 Non-Conformance Report Log  

2.4 Components List* 
✔ 
2.5 Overall Master Punch List Report* 
✔ 
2.6 Exception List* 
✔ 

SECTION 3.0 QUALITY VERIFYING DOCUMENTS (QVD’s)


3.1 Site and Civil Works
3.1.1 Site & Civil QVD’s Status Report*  

3.1.2 Site & Civil QVD’s  

3.2 Structural Works
3.2.1 Structural QVD’s Status Report*  

3.2.2 Structural QVD’s  

3.3 Architectural
3.3.1 Architectural QVD’s Status Report*  

3.3.2 Architectural QVD’s  

3.4 Mechanical
3.4.1 Mechanical QVD’s Status Report*  

3.4.2 Mechanical QVD’s  

Table of Contents Rev.1 1|P a g e


Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

3.5 Heating, Ventilation and Air Conditioning (HVAC)


3.5.1 HVAC QVD’s Status Report*  

3.5.2 HVAC QVD’s  

3.6 Electrical
3.6.1 Electrical QVD’s Status Report*  

3.6.2 Electrical QVD’s  

3.7 Piping / Plumbing
3.7.1 Piping/Plumbing QVD’s Status Report*  

3.7.2 Piping/Plumbing QVD’s  

3.8 Enterprise Integration Communication System (EICS)
3.8.1 EICS QVD’s Status Report* 
✔ 
3.8.2 EICS QVD’s 
✔ 
3.9 Instrumentation, Control & Safety Systems (ICSS)
3.9.1 ICSS QVD’s Status Report*  

3.9.2 ICSS QVD’s  

3.10 Painting / Coating / Insulation
3.10.1 Painting / Coating / Insulation QVD’s Status Report*  

3.10.2 Painting / Coating / Insulation QVD’s  

3.11 Health, Safety and Environment (HSE)
3.11.1 HSE QVD’s Status Report*  

3.11.2 HSE QVD’s  

SECTION 4.0 PRESERVATION HISTORY REPORTS*  


SECTION 5.0 FIRST FILLS, OILS AND LUBRICANTS  


SECTION 6.0 HAZARD / SAFETY


6.1 Lock Out / Tag Out (LOTO) Reports  

6.2 Piping Blind Lists  

SECTION 7.0 PHASED TRANSFER OF SUBSTANTIALLY COMPLETE SYSTEM


7.1 Marked-up PEFS of Partial Sub-System  

7.2 Blind List of Boundary Blinds  

SECTION 8.0 ENGINEERING REFERENCE DOCUMENTATION


8.1 As-Built (Endorsement by 3rd Party, if Required)
8.1.1 Underground Services Drawings  

8.1.2 Process Flow Scheme (PFS)  

8.1.3 Shutdown and Logic Sequence  

Table of Contents Rev.1 2|P a g e


Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

8.1.4 Shutdown Matrix  



8.1.5 Underground Piping Layout Drawings  

8.1.6 Overall Power Distribution Drawings  

8.1.7 Area Classification Drawings  

8.1.8 Underground Conduit, Cable and Ductbank Layouts  

8.1.9 Power Line Routing Drawings  

8.1.10 Electrical Termination Drawings  

8.1.11 Electrical Protection Device Settings  

8.1.12 Loop Drawings  

8.1.13 Pipeline Design Basis  

8.1.14 Pipeline Schematics  

8.1.15 Pipeline Route Drawings  

8.1.16 Control System Configuration, PID and Graphics for All Main System  

and Peripheral Programmable Logic Controller (PLC) Systems
8.1.17 Operation and Maintenance (O&M) Manuals  

8.1.18 Spare Parts and Interchangeability Record (SPIR)  

8.2 Cause & Effect
8.2.1 Cause and Effect Diagrams  

8.3 Certificates and Registrations (Copy Only)
8.3.1 Plant Registration Certificates  

8.3.2 Statutory Certificates  

8.3.3 Certificate of Conformance  

8.3.4 Certificates of Code Compliance  ✔

8.3.5 Hazardous Area Classification Certificates  ✔

8.3.6 Certificate of Occupancy  

8.3.7 Electrical Certificates of Testing and Safety  

8.3.8 Lifting Equipment Certificates and Registrations  

8.3.9 Pressure Vessel Register  

8.4 Critical Operating Parameters (COP)
8.4.1 COP Include Safe Operating, Conditions and Safe Operating  

Envelopes
8.5 Data Sheets
8.5.1 Process  

8.5.2 Instrument  

8.5.3 Mechanical  

8.5.4 Rotating Equipment  ✔

8.5.5 Static Equipment  

8.5.6 Package Equipment  

8.5.7 Electrical  ✔

8.5.8 Control Valve  

8.5.9 Material Safety Data Sheets (MSDS)  

Table of Contents Rev.1 3|P a g e
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

8.6 Dossier
8.6.1 Hazardous Area Dossier  

8.6.2 Hazardous Material Inventory (Including Maximum Intended Inventory  

and Associated Engineering Standards)
8.7 Isolation
8.7.1 Isolations Packages  

8.8 Laboratory Analysis
8.8.1 Laboratory and Site Analysis Results Including Third Party Test and  

Analysis Reports for:
 a. Lube Oil sampling
 b. Transformer Oil
 c. Emissions
 d. Potable Water
 e. Dust
 f. Vibration
8.9 Manufacturers Data Reports (MDR)  

8.10 Procedures
8.10.1 Critical Function Test Procedure  ✔

8.10.2 Facility Start-up Procedure  

8.10.3 Normal and Emergency Shutdown Procedure  

8.10.4 Black Start Procedure  

8.10.5 High Voltage (HV) Switching Procedure  ✔

8.10.6 Load Shed Procedure  

8.10.7 Factory Acceptance Test Plans and Procedures  

8.10.8 Site Acceptance Test Plans and Procedures (SAT-Control System)  ✔

8.10.9 Performance and Acceptance Test Plan and Procedures  

8.11 Miscellaneous
8.11.1 Third Party Hazardous Area Inspections  

8.11.2 Hazard Identification (HAZID) Studies Report  ✔

8.11.3 Hazard and Operability (HAZOP) Report  

8.11.4 Safety Integrity Level (SIL) Studies Report  ✔

8.11.5 Hazard and SIL Studies Action Implementation Records  ✔

8.12 Registers
8.12.1 Lock and Key Register  

8.12.2 Overpressure Device Register  

Table of Contents Rev.1 4|P a g e


Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

SECTION 1.0
TURNOVER NOTICE
DOCUMENTS
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

1.1 Construction Completion


Handover Certificate
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

1.2 MC Walkdown Notice and


Attendance Sheet
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

1.3 Mechanical Completion


Certificate
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

SECTION 2.0
GENERAL
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

2.1 Subsystem Description


Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

2.1.1 Master Drawing Index


Master Drawings Index

No. Document Number Document Title

70-70-00-C002-043 : EICS - Copper Cable - U96 & U92 FAR to Building

1 P055BZOR-39-64-0-K002_A AL-ZOUR REFINERY PROJECT - UNIT 39 E AND I - POWER LAYOUT

2 P055BZOR-39-64-0-K003_A AL-ZOUR REFINERY PROJECT - UNIT 39 E AND I - POWER LAYOUT

3 P055BZOR-74-64-0-K432_O AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

4 P055BZOR-74-64-0-K434_O AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

5 P055BZOR-74-64-0-K435_O AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

6 P055BZOR-74-64-0-K436_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

7 P055BZOR-74-64-0-K441_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

8 P055BZOR-74-64-0-K445_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

9 P055BZOR-74-64-0-K446_B AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

10 P055BZOR-74-64-0-K453_B AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

11 P055BZOR-74-64-1-K553_C AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

12 P055BZOR-74-64-1-K555_B AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

13 P055BZOR-74-64-1-K560_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

14 P055BZOR-74-64-1-K561_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

15 P055BZOR-74-64-1-K562_B AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

16 P055BZOR-74-64-1-K565_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

17 P055BZOR-74-64-1-K566_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

18 P055BZOR-74-64-1-K570_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

19 P055BZOR-74-64-1-K573_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

20 P055BZOR-74-64-1-K578_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

78-B-65 MOB NUMBER 6 SULFUR BLOCK - COMMUNICATION SYSTEM EQUIPMENT CABLE


21 P055BZOR-78-17-1-B065-T201
ROUTING LAYOUT
78-B-74 SMOKING SHELTER - RESTROOM COMMUNICATION SYSTEM EQUIPMENT CABLE
22 P055BZOR-78-17-1-B074-T201
ROUTING LAYOUT
78-SH-MOB6 TROPICAL SHELTER MOB NO6 COMMUNICATION SYSTEM EQUIPMENT
23 P055BZOR-78-17-1-B865-T201
CABLE ROUTING LAYOUT
24 P055BZOR-79-64-0-K080_A AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

25 P055BZOR-79-64-0-K081_B AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

26 P055BZOR-79-64-0-K082_B AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

27 P055BZOR-79-64-0-K083_B AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

29 P055BZOR-79-64-1-K213_A AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

30 P055BZOR-79-64-1-K214_A AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT


No. Document Number Document Title

70-70-00-C002-043 : EICS - Copper Cable - U96 & U92 FAR to Building

31 P055BZOR-79-64-1-K219_A AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

32 P055BZOR-96-64-0-K002_A UNIT 96 - E AND I POWER LAYOUT

33 P055BZOR-96-64-1-K012_A UNIT 96 - E AND I POWER LAYOUT


Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

2.1.2 Scope Boundary Index &


Drawings*
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

2.1.3 Vendor Index & Drawings


Vendor Drawing Index

No. Document Number Document Title

70-70-00-C002-043 : EICS - Copper Cable - U96 & U92 FAR to Building


GENERAL ARRANGEMENT - EICS UPS POWER DISTRIBUTION PANEL - TYPICAL MAIN
1 V-P055BZOR-7-0050-A-71-0000000-00923
DISTRIBUTION SUBSTATION_73-MDS-03_04_05_06_07

2 V-P055BZOR-7-0050-A-71-0000000-00963 GENERAL ARRANGEMENT - EICS UPS POWER DISTRIBUTION PANEL - FAR - UNIT 96_96-FAR-01

FIELD TERMINATION DRAWINGS - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR - UNIT
3 V-P055BZOR-7-0050-A-71-0000000-01959
96_96-FAR-01
FIELD TERMINATION DRAWING - LAN WLAN TELEPHONY SCS AND PROCESS CCTV - FAR - UNIT 96
4 V-P055BZOR-7-0050-A-71-0000000-01698
_96-FAR-01
FIELD TERMINATION DRAWING - PUBLIC ADDRESS GENERAL ALARM SYSTEM - FAR - UNIT 92 _92-
5 V-P055BZOR-7-0050-A-71-0000000-01958
FAR-01
FIELD TERMINATION DRAWING - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR - UNIT
6 V-P055BZOR-7-0050-A-71-0000000-01929
21_21-FAR-01

FIELD TERMINATION DRAWING - LAN WLAN TELEPHONY SCS AND PROCESS CCTV - FAR - UNIT 92
7 V-P055BZOR-7-0050-A-71-0000000-01695
_92-FAR-01
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

E E

F F

DWG. NO. TITLE

REFERENCE DRAWING
SUPPLIER :

COMMTEL NETWORKS
SUPPLIER NUMBER SHEET No. REVISION

G CT-T5098-ED-00281 SHT 26 OF 53 E G
PO NUMBER

L9ZR-7-0050-A01-FAM
CONFIDENTIAL INFORMATION
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER FOR HIS CONFIDENTIAL USE ONLY.
DRAWN
APP.
DRAWN BY SS IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISESAND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE
REV DATE REVISION DESCRIPTION
NO CHECK REPRODUCED, COPIED, LENT OR OTHERWISE DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT
CHECKED BY SE FOR WHICH IT IS FURNISHED.

SUPERVISOR RELEASE DATE

D 02.01.19 RE ISSUED FOR APPROVAL SS SE UHM 02.01.19 GENERAL ARRANGEMENT - EICS UPS POWER DISTRIBUTION PANEL
SIZE A2 (420 X 594)

AGN RH UHM
SUPERVISOR ENGR. INITIALS TYPICAL MAIN DISTRIBUTION
C 01.11.18 RE ISSUED FOR APPROVAL
SUBSTATION _73-MDS-03_04_05_06_07
B 19.09.18 RE ISSUED FOR APPROVAL SS RH UHM PROJECT ENGR. APP. DATE

A 23.08.18 ISSUED FOR APPROVAL SK RH UHM CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
CLIENT APP. DATE
O 12.04.18 ISSUED FOR APPROVAL SS RH UHM L9ZR-7-0050-A-01-FAM-00923 5 N.T.S V-P055BZOR-7-0050-A-71-0000000-00923 D
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

E E

F F

DWG. NO. TITLE

REFERENCE DRAWING
SUPPLIER :

COMMTEL NETWORKS
SUPPLIER NUMBER SHEET No. REVISION

G CT-T5098-ED-00281 SHT 31 OF 53 E G
PO NUMBER

L9ZR-7-0050-A01-FAM
CONFIDENTIAL INFORMATION
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER FOR HIS CONFIDENTIAL USE ONLY.
DRAWN
APP.
DRAWN BY SS IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISESAND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE
REV DATE REVISION DESCRIPTION
NO CHECK REPRODUCED, COPIED, LENT OR OTHERWISE DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT
CHECKED BY SE FOR WHICH IT IS FURNISHED.

SUPERVISOR RELEASE DATE

D 02.01.19 RE ISSUED FOR APPROVAL SS SE UHM 02.01.19 GENERAL ARRANGEMENT - EICS UPS POWER DISTRIBUTION PANEL
SIZE A2 (420 X 594)

AGN RH UHM
SUPERVISOR ENGR. INITIALS TYPICAL MAIN DISTRIBUTION
C 01.11.18 RE ISSUED FOR APPROVAL
SUBSTATION _73-MDS-03_04_05_06_07
B 19.09.18 RE ISSUED FOR APPROVAL SS RH UHM PROJECT ENGR. APP. DATE

A 23.08.18 ISSUED FOR APPROVAL SK RH UHM CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
CLIENT APP. DATE
O 12.04.18 ISSUED FOR APPROVAL SS RH UHM L9ZR-7-0050-A-01-FAM-00923 5 N.T.S V-P055BZOR-7-0050-A-71-0000000-00923 D
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

E E

F F

DWG. NO. TITLE

REFERENCE DRAWING
SUPPLIER :

COMMTEL NETWORKS
SUPPLIER NUMBER SHEET No. REVISION

G CT-T5098-ED-00281 SHT 18 OF 53 E G
PO NUMBER

L9ZR-7-0050-A01-FAM
CONFIDENTIAL INFORMATION
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER FOR HIS CONFIDENTIAL USE ONLY.
DRAWN
APP.
DRAWN BY SS IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISESAND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE
REV DATE REVISION DESCRIPTION
NO CHECK REPRODUCED, COPIED, LENT OR OTHERWISE DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT
CHECKED BY SE FOR WHICH IT IS FURNISHED.

SUPERVISOR RELEASE DATE

D 02.01.19 RE ISSUED FOR APPROVAL SS SE UHM 02.01.19 GENERAL ARRANGEMENT - EICS UPS POWER DISTRIBUTION PANEL
SIZE A2 (420 X 594)

AGN RH UHM
SUPERVISOR ENGR. INITIALS TYPICAL MAIN DISTRIBUTION
C 01.11.18 RE ISSUED FOR APPROVAL
SUBSTATION _73-MDS-03_04_05_06_07
B 19.09.18 RE ISSUED FOR APPROVAL SS RH UHM PROJECT ENGR. APP. DATE

A 23.08.18 ISSUED FOR APPROVAL SK RH UHM CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
CLIENT APP. DATE
O 12.04.18 ISSUED FOR APPROVAL SS RH UHM L9ZR-7-0050-A-01-FAM-00923 5 N.T.S V-P055BZOR-7-0050-A-71-0000000-00923 D
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

E E

F F

DWG. NO. TITLE

REFERENCE DRAWING
SUPPLIER :

COMMTEL NETWORKS
SUPPLIER NUMBER SHEET No. REVISION

G CT-T5098-ED-00281 SHT 21 OF 53 E G
PO NUMBER

L9ZR-7-0050-A01-FAM
CONFIDENTIAL INFORMATION
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER FOR HIS CONFIDENTIAL USE ONLY.
DRAWN
APP.
DRAWN BY SS IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISESAND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE
REV DATE REVISION DESCRIPTION
NO CHECK REPRODUCED, COPIED, LENT OR OTHERWISE DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT
CHECKED BY SE FOR WHICH IT IS FURNISHED.

SUPERVISOR RELEASE DATE

D 02.01.19 RE ISSUED FOR APPROVAL SS SE UHM 02.01.19 GENERAL ARRANGEMENT - EICS UPS POWER DISTRIBUTION PANEL
SIZE A2 (420 X 594)

AGN RH UHM
SUPERVISOR ENGR. INITIALS TYPICAL MAIN DISTRIBUTION
C 01.11.18 RE ISSUED FOR APPROVAL
SUBSTATION _73-MDS-03_04_05_06_07
B 19.09.18 RE ISSUED FOR APPROVAL SS RH UHM PROJECT ENGR. APP. DATE

A 23.08.18 ISSUED FOR APPROVAL SK RH UHM CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
CLIENT APP. DATE
O 12.04.18 ISSUED FOR APPROVAL SS RH UHM L9ZR-7-0050-A-01-FAM-00923 5 N.T.S V-P055BZOR-7-0050-A-71-0000000-00923 D
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

E E

F F

DWG. NO. TITLE

REFERENCE DRAWING
SUPPLIER :

COMMTEL NETWORKS
SUPPLIER NUMBER SHEET No. REVISION

G CT-T5098-ED-00321 SHT 05 OF 13 E G
PO NUMBER

L9ZR-7-0050-A01-FAM
CONFIDENTIAL INFORMATION
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER FOR HIS CONFIDENTIAL USE ONLY.
DRAWN
APP.
DRAWN BY SKK IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISESAND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE
REV DATE REVISION DESCRIPTION
NO CHECK REPRODUCED, COPIED, LENT OR OTHERWISE DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT
CHECKED BY SE FOR WHICH IT IS FURNISHED.

SUPERVISOR RELEASE DATE

D 24.07.19 RE-ISSUED FOR APPROVAL (FAT COMMENTS INCORPORATED) SKK SE UHM 24.07.19
SIZE A2 (420 X 594)

AN SE UHM
SUPERVISOR ENGR. INITIALS GENERAL ARRANGEMENT - EICS UPS POWER DISTRIBUTION PANEL
C 20.03.19 RE-ISSUED FOR APPROVAL
FAR - UNIT 96 _96-FAR-01
B 04.03.19 RE-ISSUED FOR APPROVAL AN SE UHM PROJECT ENGR. APP. DATE

A 12.09.18 RE-ISSUED FOR APPROVAL AN RH UHM CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
CLIENT APP. DATE
O 18.04.18 ISSUED FOR APPROVAL SS RH UHM L9ZR-7-0050-A-01-FAM-00963 5 N.T.S V-P055BZOR-7-0050-A-71-0000000-00963 D
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D D

E E

F F

G G

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-07154 SHT 03 OF 06 B
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE RT
CHECKED BY

SUPERVISOR
SC
RELEASE DATE
FIELD TERMINATION DRAWING
V-P055BZOR-7-0050-A-71-0000000-00131 GENERAL ARRANGEMENT - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DRAWING
13.05.19 PUBLIC ADDRESS GENERAL ALARM SYSTEM
SUPERVISOR ENGR. INITIALS
FAR - UNIT 92 _92-FAR-01
SIZE A1 (594 X 841)

V-P055BZOR-7-0050-A-71-0000000-00233 PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DETAILED BLOCK DIAGRAM

V-P055BZOR-7-0050-A-71-0000000-01305 INTERNAL WIRING DRAWING - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR - UNIT 92 _92-FAR-01 PROJECT ENGR. APP. DATE
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 13.05.19 RE-ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-01695 FIELD TERMINATION DRAWINGS - LAN WLAN IP TELEPHONY AND SCS - FAR - UNIT 92 _92-FAR-01

O 28.05.18 ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-01817 FIELD TERMINATION DRAWINGS - HOTLINE AND EMERGENCY TELEPHONY - FAR - UNIT 92 _92-FAR-01 L9ZR-7-0050-A-01-FAM-01958 2 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01958 A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D D

E E

F F

G G

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-07154 SHT 05 OF 06 B
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE RT
CHECKED BY

SUPERVISOR
SC
RELEASE DATE
FIELD TERMINATION DRAWING
V-P055BZOR-7-0050-A-71-0000000-00314 PAGA SOUND COVERAGE STUDY - UNIT 73

13.05.19 PUBLIC ADDRESS GENERAL ALARM SYSTEM


SUPERVISOR ENGR. INITIALS
FAR - UNIT 92 _92-FAR-01
SIZE A1 (594 X 841)

V-P055BZOR-7-0050-A-71-0000000-01986 PAGA SOUND COVERAGE STUDY - FAR - UNIT 92_92-FAR-01

V-P055BZOR-7-0050-A-71-0000000-00131 GENERAL ARRANGEMENT - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DRAWING PROJECT ENGR. APP. DATE
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 13.05.19 RE-ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-00233 PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DETAILED BLOCK DIAGRAM

O 28.05.18 ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-01305 INTERNAL WIRING DRAWING - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR - UNIT 92 _92-FAR-01 L9ZR-7-0050-A-01-FAM-01958 2 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01958 A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D D

E E

F F

G G

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-02437 SHT 04 OF 06 C
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE VK
CHECKED BY

SUPERVISOR
SV
RELEASE DATE
FIELD TERMINATION DRAWING
22.04.19 LAN WLAN TELEPHONY SCS AND PROCESS CCTV
SUPERVISOR ENGR. INITIALS
FAR - UNIT 96 _96-FAR-01
SIZE A1 (594 X 841)

VK SV PROJECT ENGR. APP. DATE


B 22.04.19 RE-ISSUED FOR APPROVAL V-P055BZOR-7-0050-A-71-0000000-01306 INTERNAL WIRING DRAWING - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR - UNIT 96 _96-FAR-01
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 28.12.18 RE-ISSUED FOR APPROVAL VK SV V-P055BZOR-7-0050-A-71-0000000-01238 INTERNAL WIRING DRAWING-HOTLINE AND EMERGENCY TELEPHONY-FAR-UNIT 96_96-FAR-01

O 22.05.18 ISSUED FOR APPROVAL VK SV V-P055BZOR-7-0050-A-71-0000000-01119 INTERNAL WIRING DRAWING-LOCAL AREA NETWORK-FAR-UNIT 96_96-FAR-01 L9ZR-7-0050-A-01-FAM-01698 3 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01698 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D D

E E

F F

G G

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-02437 SHT 05 OF 06 C
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE VK
CHECKED BY

SUPERVISOR
SV
RELEASE DATE
FIELD TERMINATION DRAWING
22.04.19 LAN WLAN TELEPHONY SCS AND PROCESS CCTV
SUPERVISOR ENGR. INITIALS
FAR - UNIT 96 _96-FAR-01
SIZE A1 (594 X 841)

VK SV V-P055BZOR-7-0050-A-71-0000000-01070 INTERNAL WIRING DRAWING-LOCAL AREA NETWORK-MOB-6-SULPHUR 78-B-65 PROJECT ENGR. APP. DATE
B 22.04.19 RE-ISSUED FOR APPROVAL
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 28.12.18 RE-ISSUED FOR APPROVAL VK SV V-P055BZOR-7-0050-A-71-0000000-01123 INTERNAL WIRING DRAWING - LOCAL AREA NETWORK - GATE HOUSE AT MEW POWER EASEMENT AREA _98-B-81

O 22.05.18 ISSUED FOR APPROVAL VK SV V-P055BZOR-7-0050-A-71-0000000-01238 INTERNAL WIRING DRAWING-HOTLINE AND EMERGENCY TELEPHONY-FAR-UNIT 96_96-FAR-01 L9ZR-7-0050-A-01-FAM-01698 3 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01698 B
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

2.2 Red-Line Index and


Drawings
Redline Drawing Index

No. Document Number Document Title

70-70-00-C002-043 : EICS - Copper Cable - U96 & U92 FAR to Building


FIELD TERMINATION DRAWING - LAN WLAN TELEPHONY SCS AND PROCESS CCTV - FAR -
1 V-P055BZOR-7-0050-A-71-0000000-01695
UNIT 92 _92-FAR-01
FIELD TERMINATION DRAWINGS - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM -
2 V-P055BZOR-7-0050-A-71-0000000-01959
FAR - UNIT 96_96-FAR-01
FIELD TERMINATION DRAWING - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR -
3 V-P055BZOR-7-0050-A-71-0000000-01929
UNIT 21_21-FAR-01

4 P055BZOR-74-64-0-K434_O AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

5 P055BZOR-74-64-0-K436_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

6 P055BZOR-74-64-0-K441_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

7 P055BZOR-74-64-0-K453_B AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

8 P055BZOR-74-64-1-K553_C AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

9 P055BZOR-74-64-1-K555_B AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

10 P055BZOR-74-64-1-K560_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

11 P055BZOR-74-64-1-K561_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

12 P055BZOR-74-64-1-K562_B AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

13 P055BZOR-74-64-1-K565_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

14 P055BZOR-74-64-1-K566_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

15 P055BZOR-74-64-1-K570_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

16 P055BZOR-74-64-1-K573_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

17 P055BZOR-74-64-1-K578_A AL-ZOUR REFINERY PROJECT UNIT-74 EPC 2 E AND I_POWER LAYOUT

78-B-65 MOB NUMBER 6 SULFUR BLOCK - COMMUNICATION SYSTEM EQUIPMENT CABLE


18 P055BZOR-78-17-1-B065-T201
ROUTING LAYOUT
78-B-74 SMOKING SHELTER - RESTROOM COMMUNICATION SYSTEM EQUIPMENT CABLE
19 P055BZOR-78-17-1-B074-T201
ROUTING LAYOUT
78-SH-MOB6 TROPICAL SHELTER MOB NO6 COMMUNICATION SYSTEM EQUIPMENT
20 P055BZOR-78-17-1-B865-T201
CABLE ROUTING LAYOUT

21 P055BZOR-79-64-0-K080_A AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

22 P055BZOR-79-64-0-K081_B AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

23 P055BZOR-79-64-0-K083_B AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

24 P055BZOR-79-64-1-K213_A AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

25 P055BZOR-79-64-1-K214_A AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT

26 P055BZOR-79-64-1-K219_A AL-ZOUR REFINERY PROJECT UNIT-79 OSBL E AND I POWER LAYOUT


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D D

E E

F F

G G

A - Proceed
Authorization to proceed does not
H
relieve Contractor / Supplier of its
responsibility or liability under the H

Contract and or Purchase Order.


By Vaibhav Tare on Aug 26, 2019
I

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-07155 SHT 01 OF 06 C
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE DK
CHECKED BY

SUPERVISOR
SC
RELEASE DATE
FIELD TERMINATION DRAWING
20.08.19 PUBLIC ADDRESS GENERAL ALARM SYSTEM
SUPERVISOR ENGR. INITIALS
FAR - UNIT 96 _96-FAR-01
SIZE A1 (594 X 841)

DK SC V-P055BZOR-7-0050-A-71-0000000-00028 FIBRE OPTIC STRAND ALLOCATION PROJECT ENGR. APP. DATE


B 20.08.19 RE-ISSUED FOR APPROVAL
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 16.04.19 RE-ISSUED FOR APPROVAL RT SC P055BZOR-70-71-1-B002 EICS TOPOLOGY UNIT -70 - COPPER NETWORK DISTRIBUTION

O 31.05.18 ISSUED FOR APPROVAL RT SC P055BZOR-70-71-1-B001 EICS TOPOLOGY UNIT -70 - FIBRE OPTIC NETWORK DISTRIBUTION L9ZR-7-0050-A-01-FAM-01959 3 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01959 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C
NOTE: RED LINE MARKUP AS PER CABLE SCHEDULE
P055BZOR-7071-R-012

RED LINE MARK UP NO CHANGE / WITH CHANGES

Contractor Name: IMCO Engineering & Construction Co.

D Contract No: L9ZR-FI-70-K013 D


Contractor
Representative:
Name/Signature/Date
Intermediate ‐ Approved                               
Verified FDHJV Field Eng.
Name/Signature/Date By Vishal Kumar Sharma on Aug 23, 2020
                                                                   

E   E
By Randy Eguia at 1:09 am, Aug 22, 2020

96002PAC0038031E
F F

G G

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-07155 SHT 03 OF 06 C
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE DK
CHECKED BY

V-P055BZOR-7-0050-A-71-0000000-00131 GENERAL ARRANGEMENT - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DRAWING
SUPERVISOR
SC
RELEASE DATE
FIELD TERMINATION DRAWING
V-P055BZOR-7-0050-A-71-0000000-01123

V-P055BZOR-7-0050-A-71-0000000-01702
INTERNAL WIRING DRAWING - LOCAL AREA NETWORK - GATE HOUSE AT MEW POWER EASEMENT AREA _98-B-81

FIELD TERMINATION DRAWINGS - LAN WLAN IP TELEPHONY AND SCS - GATE HOUSE AT MEW POWER EASEMENT AREA _98-B-81
20.08.19 PUBLIC ADDRESS GENERAL ALARM SYSTEM
SUPERVISOR ENGR. INITIALS
FAR - UNIT 96 _96-FAR-01
SIZE A1 (594 X 841)

V-P055BZOR-7-0050-A-71-0000000-00233 PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DETAILED BLOCK DIAGRAM

DK SC V-P055BZOR-7-0050-A-71-0000000-01119 INTERNAL WIRING DRAWING - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR - UNIT 96 _96-FAR-01 PROJECT ENGR. APP. DATE
B 20.08.19 RE-ISSUED FOR APPROVAL
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 16.04.19 RE-ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-01698 FIELD TERMINATION DRAWINGS - LAN WLAN IP TELEPHONY AND SCS - FAR - UNIT 96 _96-FAR-01

O 31.05.18 ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-01818 FIELD TERMINATION DRAWINGS - HOTLINE AND EMERGENCY TELEPHONY - FAR - UNIT 96 _96-FAR-01 L9ZR-7-0050-A-01-FAM-01959 3 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01959 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

RED LINE MARK UP NO CHANGE / WITH CHANGES

Contractor Name: IMCO Engineering & Construction Co.


B B
Contract No: L9ZR-FI-70-K013
Contractor
Representative: Christus J Mathew
01-June-2020
Name/Signature/Date
Intermediate ‐ Approved                               
Verified FDHJV Field Eng.
Name/Signature/Date By Vishal kumar sharma on Jun 02, 2020
                                                                   

C C
By Randy Eguia at 4:22 am, Jun 02, 2020

1 Red line markup as per L9ZR-FI-70-K013-ERFI-0090_0

S S RED LINE MARK UP NO CHANGE / WITH CHANGES

Contractor Name: IMCO Engineering & Construction Co.


96PAC0035002E 1
D Contract No: L9ZR-FI-70-K013 D
S
Contractor
96PAC0034002E 1
98-JB-TSPI-9305 Representative:
1 1 Name/Signature/Date
Intermediate ‐ Approved                               
Verified FDHJV Field Eng.
Name/Signature/Date By Vishal Kumar Sharma on Aug 23, 2020
                                                                   

E   E
By Randy Eguia at 1:09 am, Aug 22, 2020
78147501PAC00362132E
S S S S S S S

S S S S S S S
F F

S S S S S S S

G G

S S S S S S S

S S S S

I
SUPPLIER :

S
COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-07155 SHT 04 OF 06 C
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE DK
V-P055BZOR-7-0050-A-71-0000000-01904 PAGA SOUND COVERAGE STUDY -TROPICAL SHELTER - MOB NUMBER 6_ 78-SH-MOB6
CHECKED BY

V-P055BZOR-7-0050-A-71-0000000-01907 PAGA SOUND COVERAGE STUDY - SMOKING SHELTER-RESTROOM-74_78-B-74

SUPERVISOR
SC
RELEASE DATE
FIELD TERMINATION DRAWING
V-P055BZOR-7-0050-A-71-0000000-00315

V-P055BZOR-7-0050-A-71-0000000-01967
PAGA SOUND COVERAGE STUDY - MOBs 5,6 AND 7

PAGA SOUND COVERAGE STUDY - GATE HOUSE AT MEW POWER EASEMENT AREA - 98-B-81

20.08.19 PUBLIC ADDRESS GENERAL ALARM SYSTEM


SUPERVISOR ENGR. INITIALS
FAR - UNIT 96 _96-FAR-01
SIZE A1 (594 X 841)

V-P055BZOR-7-0050-A-71-0000000-01613 PAGA SOUND COVERAGE STUDY - FAR - UNIT 96 _96-FAR-01

DK SC V-P055BZOR-7-0050-A-71-0000000-00131 GENERAL ARRANGEMENT - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DRAWING PROJECT ENGR. APP. DATE
B 20.08.19 RE-ISSUED FOR APPROVAL
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 16.04.19 RE-ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-00233 PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DETAILED BLOCK DIAGRAM

O 31.05.18 ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-01119 INTERNAL WIRING DRAWING - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR - UNIT 96 _96-FAR-01 L9ZR-7-0050-A-01-FAM-01959 3 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01959 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

96PAC0031002E
C C

D D

E E

F F

Red line markup as per P055BZOR-9671-R-001

G G
RED LINE MARK UP NO CHANGE / WITH CHANGES

Contractor Name: IMCO Engineering & Construction Co.

Contract No: L9ZR-FI-70-K013


Contractor
Representative: Christus J Mathew
Name/Signature/Date 01-June-2020
Intermediate ‐ Approved                               
Verified FDHJV Field Eng.
Name/Signature/Date By Vishal Kumar Sharma on Aug 23, 2020
                                                                   

 
H  

By Randy Eguia at 1:09 am, Aug 22, 2020 H

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-07155 SHT 05 OF 06 C
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE DK
CHECKED BY

SUPERVISOR
SC
RELEASE DATE
FIELD TERMINATION DRAWING
V-P055BZOR-7-0050-A-71-0000000-00279 PAGA SOUND COVERAGE STUDY - UNIT 96
20.08.19 PUBLIC ADDRESS GENERAL ALARM SYSTEM
SUPERVISOR ENGR. INITIALS
FAR - UNIT 96 _96-FAR-01
SIZE A1 (594 X 841)

V-P055BZOR-7-0050-A-71-0000000-01898 PAGA SOUND COVERAGE STUDY -TROPICAL SHELTER-EMERGENCY SHELTER 2_78-SH-02

DK SC V-P055BZOR-7-0050-A-71-0000000-00131 GENERAL ARRANGEMENT - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DRAWING PROJECT ENGR. APP. DATE
B 20.08.19 RE-ISSUED FOR APPROVAL
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 16.04.19 RE-ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-00233 PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DETAILED BLOCK DIAGRAM

O 31.05.18 ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-01119 INTERNAL WIRING DRAWING - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR - UNIT 96 _96-FAR-01 L9ZR-7-0050-A-01-FAM-01959 3 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01959 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D D

E E

F F

G G

A - Proceed
Authorization to proceed does not
H
relieve Contractor / Supplier of its
responsibility or liability under the
Contract and or Purchase Order.
By Vaibhav Tare on Jun 03, 2019

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-07125 SHT 01 OF 06 D
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE RT
CHECKED BY

SUPERVISOR
SC
RELEASE DATE
FIELD TERMINATION DRAWING
29.05.19 PUBLIC ADDRESS GENERAL ALARM SYSTEM
SUPERVISOR ENGR. INITIALS
FAR - UNIT 21 _21-FAR-01
SIZE A1 (594 X 841)

C 29.05.19 RE-ISSUED FOR APPROVAL RT SC

RT SC V-P055BZOR-7-0050-A-71-0000000-00028 FIBRE OPTIC STRAND ALLOCATION PROJECT ENGR. APP. DATE


B 10.05.19 RE-ISSUED FOR APPROVAL
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 04.03.19 RE-ISSUED FOR APPROVAL RT SC P055BZOR-70-71-1-B002 EICS TOPOLOGY UNIT -70 - COPPER NETWORK DISTRIBUTION

O 07.06.18 ISSUED FOR APPROVAL RT SC P055BZOR-70-71-1-B001 EICS TOPOLOGY UNIT -70 - FIBRE OPTIC NETWORK DISTRIBUTION L9ZR-7-0050-A-21-FAM-01929 4 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01929 C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D D

E E
RED LINE MARK UP NO CHANGE / WITH CHANGES

Contractor Name: IMCO Engineering & Construction Co.

Contract No: L9ZR-FI-70-K013


Contractor
Representative: Christus J Mathew
Name/Signature/Date 23-June-2020
F Verified FDHJV Field Eng.
Intermediate ‐ Approved                                F
Name/Signature/Date By Vishal kumar sharma on Jun 24, 2020
                                                                   

 
By Randy Eguia at 3:59 am, Jun 23, 2020

G S S G

I
SUPPLIER :

9
COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
10 CT-T5098-ED-07125 SHT 04 OF 06 D
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE RT
CHECKED BY

SUPERVISOR
SC
RELEASE DATE
FIELD TERMINATION DRAWING
V-P055BZOR-7-0050-A-71-0000000-01981

V-P055BZOR-7-0050-A-71-0000000-01988
PAGA SOUND COVERAGE STUDY- OPERATOR SHELTERS _EPC-1

PAGA SOUND COVERAGE STUDY- SUBSTATIONS _EPC-1


29.05.19 PUBLIC ADDRESS GENERAL ALARM SYSTEM
SUPERVISOR ENGR. INITIALS
FAR - UNIT 21 _21-FAR-01
SIZE A1 (594 X 841)

C 29.05.19 RE-ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-01973 PAGA SOUND COVERAGE STUDY- FARS _EPC-1

RT SC V-P055BZOR-7-0050-A-71-0000000-00131 GENERAL ARRANGEMENT - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DRAWING PROJECT ENGR. APP. DATE
B 10.05.19 RE-ISSUED FOR APPROVAL
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 04.03.19 RE-ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-00233 PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DETAILED BLOCK DIAGRAM

O 07.06.18 ISSUED FOR APPROVAL RT SC V-P055BZOR-7-0050-A-71-0000000-01275 INTERNAL WIRING DRAWING - PUBLIC ADDRESS AND GENERAL ALARM SYSTEM - FAR - UNIT 21 _21-FAR-01 L9ZR-7-0050-A-21-FAM-01929 4 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01929 C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

C C

D D

E E

F F

G G

PRO
A - Proceed
H Authorization to proceed does not
relieve Contractor / Supplier of its
H
responsibility or liability under the
Contract and or Purchase Order.
By Vaibhav Tare on Apr 22, 2019
I

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-02434 SHT 01 OF 06 B
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE VK
CHECKED BY

SUPERVISOR
SV
RELEASE DATE
FIELD TERMINATION DRAWING
V-P055BZOR-7-0050-A-71-0000000-00028

V-P055BZOR-7-0050-A-71-0000000-00132
FIBRE OPTIC STRAND ALLOCATION

GENERAL ARRANGEMENT-PROCESS CCTV SYSTEM


07.03.19 LAN WLAN TELEPHONY SCS AND PROCESS CCTV
SUPERVISOR ENGR. INITIALS
FAR - UNIT 92 _92-FAR-01
SIZE A1 (594 X 841)

V-P055BZOR-7-0050-A-71-0000000-00233 PUBLIC ADDRESS AND GENERAL ALARM SYSTEM DETAILED BLOCK DIAGRAM
PROJECT ENGR. APP. DATE
V-P055BZOR-7-0050-A-71-0000000-00230 HOTLINE and EMERGENCY TELEPHONY SYSTEM DETAILED BLOCK DIAGRAM
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 07.03.19 RE-ISSUED FOR APPROVAL VK SV V-P055BZOR-7-0050-A-71-0000000-00226 LAN_WLAN_IP TELEPHONY AND SCS DETAILED BLOCK DIAGRAM

O 22.05.18 ISSUED FOR APPROVAL VK SV V-P055BZOR-7-0050-A-71-0000000-00110 FIBRE OPTIC PATCH PANEL TYPICAL WIRING DRAWING L9ZR-7-0050-A-01-FAM-01695 2 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01695 A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

B B

92001COMC0032003E
1

C C

D 92001COMC0026002E
D

NOTE: AS PER CABLE SCHEDULE (P055BZOR-7371-R-401_O)


1 NOTE: AS PER CABLE SCHEDULE (P055BZOR-7371-R-501_O)
E RED LINE MARK UP NO CHANGE / WITH CHANGES E
RED LINE MARK UP NO CHANGE / WITH CHANGES

Contractor Name: IMCO Engineering & Construction Co.


Contractor Name: IMCO Engineering & Construction Co.

Contract No: L9ZR-FI-70-K013 Contract No: L9ZR-FI-70-K013


Contractor Contractor
Representative: Christus J Mathew Representative: Christus J Mathew
F 22-August-2020 02-Sept.-2020 F
Name/Signature/Date Name/Signature/Date
Intermediate ‐ Approved                               
Intermediate ‐ Approved                                Verified FDHJV Field Eng.
Verified FDHJV Field Eng. Name/Signature/Date By Vishal Kumar Sharma on Sep 02, 2020
                                                                   
Name/Signature/Date By Vishal Kumar Sharma on Aug 23, 2020
                                                                   
 
 
 
 
By Randy Eguia at 8:21 am, Sep 02, 2020
G By Randy Eguia at 6:39 am, Aug 22, 2020 G

I
SUPPLIER :

COMMTEL NETWORKS
J SUPPLIER NUMBER SHEET No. REVISION J
CT-T5098-ED-02434 SHT 05 OF 06 B
PO NUMBER

L9ZR-7-0050-A-01-FAM

CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
K
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH

IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE VK
CHECKED BY

SUPERVISOR
SV
RELEASE DATE
FIELD TERMINATION DRAWING
07.03.19 LAN WLAN TELEPHONY SCS AND PROCESS CCTV
SUPERVISOR ENGR. INITIALS
FAR - UNIT 92 _92-FAR-01
SIZE A1 (594 X 841)

PROJECT ENGR. APP. DATE


V-P055BZOR-7-0050-A-71-0000000-01104 INTERNAL WIRING DRAWING - LOCAL AREA NETWORK - MAIN DISTRIBUTION SUBSTATION - UNIT 73 _73-MDS-05
CONTRACTOR DRAWING NUMBER REVISION SCALE DRAWING NUMBER REVISION
A 07.03.19 RE-ISSUED FOR APPROVAL VK SV V-P055BZOR-7-0050-A-71-0000000-01103 INTERNAL WIRING DRAWING - LOCAL AREA NETWORK - MAIN DISTRIBUTION SUBSTATION - UNIT 73 _73-MDS-04

O 22.05.18 ISSUED FOR APPROVAL VK SV V-P055BZOR-7-0050-A-71-0000000-01237 INTERNAL WIRING DRAWING-HOTLINE AND EMERGENCY TELEPHONY-FAR-UNIT 92_92-FAR-01 L9ZR-7-0050-A-01-FAM-01695 2 CLIENT APP. DATE
N.T.S V-P055BZOR-7-0050-A-71-0000000-01695 A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES
1. FOR GENERAL NOTES, REFER DWG NO. P055BZ0R-79-64-0-K002.

2. CABLES SHOWN IN THESE DRAWINGS ARE THE LATEST ONES UP TO THE DATE, AND
A 100
MAY NOT BE THE FINAL LIST. THEREFORE, THE ACTUAL CABLES TO BE INSTALLED A
180 SHALL BE CONFIRMED WITH THE RESPECTIVE CABLE SCHEDULE, BEFORE
FINISHED TRENCH TOP 180 FINISHED TRENCH TOP INSTALLATION OF THE CABLES.
FINISHED TRENCH TOP
3. CABLE BETWEEN FOPP AND CCTV ARE FIELD ROUTED,REFER
P055BZOR-70-71-1-B003-012 AND P055BZOR-7971-R-001.
WARNING TAPE 300 300

200
WARNING TAPE WARNING TAPE

200

200
(TYP.) (TYP.) (TYP.) 4. POWER CABLE BETWEEN SJB AND CCTV JUNCTION BOX ARE FIELD ROUTED, REFER
COMPACTED COMPACTED COMPACTED P055BZOR-70-64-1-E005 AND P055BZOR-7971-R-001.

350

350
EARTH BACKFILL EARTH BACKFILL EARTH BACKFILL
CABLE PROTECTION CABLE PROTECTION A 5. CABLES FROM SJB TO CCTV SHALL BE FIELD ROUTED BY E&I CONTRACTOR.
CABLE PROTECTION
TILES (TYP.) TILES (TYP.) TILES (TYP.)
B B
SPACE FOR FUTURE USE
PEC

900

900

900
(NOTE 24 TYP.)
PEC (REFER DWG. NO.
SPACE P055BZOR-79-64-0-K002 PEC
(NOTE 24 TYP.) SPACE (NOTE 24 TYP.)
CLEAN
FOR
FUTURE
(REFER DWG. NO. P055BZOR-79-64-0-K002
CLEAN CLEAN
FOR
FUTURE
(REFER DWG. NO. P055BZOR-79-64-0-K002 LEGEND
COMPACTED USE COMPACTED COMPACTED
SANDFILL USE
SANDFILL SANDFILL
(SIEVED FREE A (SIEVED FREE (SIEVED FREE
OF STONES) OF STONES) OF STONES) A
C C
B A A B

100
1 1 2 3 45 12 3 1

100

100
FO CABLE Cu CABLES FO CABLES
LV CABLE (TYP.) (TYP.) (TYP.)
CCTV POWER CABLE CCTV FO CABLES CCTV POWER CABLE CCTV FO CABLES
( SEE NOTE 4 ) (SEE NOTE 3) ( SEE NOTE 4 )
SECTION G60 - G60 (SEE NOTE 3)

D SECTION G55 - G55 REFER DWG NO. P055BZOR-79-64-0-K060


SECTION G56 - G56 D
REFER DWG NO. P055BZOR-79-64-0-K041 REFER DWG NO. P055BZOR-79-64-0-K062
TO P055BZOR-79-64-0-K048 TO P055BZOR-79-64-0-K065

CABLE CABLE
CABLES CABLES
LOCATION LOCATION
A1 62JBAD0002-IS B1 62F01FO06C62F01P001
A2 62JBDD0003-IS CABLE
CABLES
LOCATION
CABLE A3 62FAR01DTC201 NOTE: RED LINE MARKUP AS PER SITE
CABLES — CCTV FO CABLE
E LOCATION CONDITION. CCTV CALES REROUTED E
— CCTV POWER CABLE A DUE TO TRENCH NOT AVAILABLE EPC-4
A1 79010SECYF4021003E
AREA.
A2 79010SECYF4049003E
A3 79011SECYF4023003E RED LINE MARK UP NO CHANGE / WITH CHANGES
A4 79012SECYF4025003E
A5 62F01FO06C62F01P001
Contractor Name: IMCO Engineering & Construction Co.

B1 78-DB-66-01F11-01 Contract No: L9ZR-FI-70-K013


— CCTV FO CABLE
Contractor
F — CCTV POWER CABLE Representative: Christus J Mathew F
Name/Signature/Date 25-June-2020
A Intermediate ‐ Approved                               
Verified FDHJV Field Eng. By Vishal kumar sharma on Jul 27, 2020
200 FINISHED TRENCH TOP Name/Signature/Date                                                                    

180 FINISHED TRENCH TOP  

WARNING TAPE 300

200
WARNING TAPE 300
(TYP.)
200

(TYP.) COMPACTED By Randy Eguia at 2:04 am, Jun 25, 2020

350
COMPACTED EARTH BACKFILL
G G
350

EARTH BACKFILL
CABLE PROTECTION
CABLE PROTECTION TILES (TYP.)
TILES (TYP.)

900
900

PEC
SPACE PEC SPACE (NOTE 24 TYP.)
FOR (NOTE 24 TYP.) FOR (REFER DWG. NO. P055BZOR-79-64-0-K002
CLEAN FUTURE
CLEAN FUTURE (REFER DWG. NO. P055BZOR-79-64-0-K002 COMPACTED USE
H COMPACTED
SANDFILL
USE SANDFILL H
(SIEVED FREE
(SIEVED FREE A OF STONES) 300
OF STONES)
E
D B C B A
A 1 12345 23 1234

100
1
100

Cu CABLE FO CABLE
FO CABLE (TYP.) (TYP.)

I CCTV POWER CABLE CCTV FO CABLES


CCTV FO CABLES
(SEE NOTE 3) I
( SEE NOTE 4 ) (SEE NOTE 3)

SECTION G59 - G59 SECTION G58 - G58


REFER DWG NO. P055BZOR-74-64-0-K436
REFER DWG NO. P055BZOR-79-64-0-K065
& P055BZOR-79-64-0-K081
TO P055BZOR-79-64-0-K071

CABLE CABLE CABLE


CABLES CABLES CABLES
LOCATION LOCATION LOCATION IFC - Issued for Construction
A1 79028SECYF4019005E C1
A1 79005SECYF4010005E B1 96PAC0036002E
J C2
J
— CCTV FO CABLE A2 79005SECYF4048005E B2 96PAC0030002E By APRIL ROSE MIRASOL on Aug 23, 2018

— CCTV POWER CABLE A C3


A3 79006SECYF4012005E B3 96PAC0031002E
C4
A4 79007SECYF4014005E D1 78-DB-65-01F11-01
79005SECYF4009005E C5 CCTV FO CABLE
A1
— CCTV FO CABLE
A2 79005SECYF4047005E E LV/CCTV POWER CABLE
A3 79006SECYF4011005E
A4 79007SECYF4013005E
LU-01-F-79-JB-01F260
CONFIDENTIAL INFORMATION
A D2
K D3 96PAP0037002E A
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER K
CONTRACT NUMBER: FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE

L9ZR-FI-70-K013
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
DRAWN

AL-ZOUR REFINERY PROJECT


REV DATE REVISION DESCRIPTION CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE PS/SG
O 20-04-18 ISSUED FOR CONSRTUCTION PS/SG NA/NR P055BZOR-79-64-0-K001 UNIT-79 OSBL E&I POWER LAYOUT INDEX DRAWING
CHECKED BY

A 22-08-18 RE-ISSUED FOR CONSTRUCTION GK/SG NA/NR P055BZOR-74-64-0-K400 UNIT-74 EPC #2 E&I POWER LAYOUT INDEX DRAWING NA/NR UNIT-79
OSBL E&I
SUPERVISOR RELEASE DATE
P055BZOR-7071-R-002 EICS CABLE SCHEDULE BACKBONE AND OSP
JM/S.DAS 20-04-18
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
P055BZOR-00-19-3-C017-001

P055BZOR-7130-R-002
UNPAVED, BRICK PAVED OR TILED AREAS
ICSS FIBER OPTIC CABLE SCHEDULE
SUPERVISOR ENGR.
SC/A.AGLAVE
INITIALS
POWER LAYOUT
SIZE A1 (594 X 841)

P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT -79 SECURITY CCTV FENCE PROJECT ENGR. APP. DATE
CONTRACTOR DRAWING NUMBER
VS SCALE DRAWING NUMBER REVISION

P055BZOR-79-64-1-K219
P055BZOR-74-64-0-H501 E&I ROAD CROSSING DRAWING INDEX
CLIENT APP. DATE NTS A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
GENERAL NOTES: NOTES
1. FOR GENERAL NOTES, REFER DWG NO. P055BZ0R-79-64-0-K002.
180 FINISHED TRENCH TOP 2. CABLES SHOWN IN THESE DRAWINGS ARE THE LATEST ONES UP TO THE DATE, AND
A 400
MAY NOT BE THE FINAL LIST. THEREFORE, THE ACTUAL CABLES TO BE INSTALLED A
FINISHED TRENCH TOP SHALL BE CONFIRMED WITH THE RESPECTIVE CABLE SCHEDULE, BEFORE
INSTALLATION OF THE CABLES.

200
WARNING TAPE 300
COMPACTED (TYP.) 3. CABLE BETWEEN FOPP AND CCTV ARE FIELD ROUTED,REFER

350
WARNING TAPE 300 EARTH BACKFILL P055BZOR-70-71-1-B003-012 AND P055BZOR-7971-R-001.

200
(TYP.) COMPACTED CABLE PROTECTION 4. POWER CABLE BETWEEN SJB AND CCTV JUNCTION BOX ARE FIELD ROUTED, REFER

350
EARTH BACKFILL TILES (TYP.) NOTES:
P055BZOR-70-64-1-E005 AND P055BZOR-7971-R-001.
CABLE PROTECTION
TILES (TYP.) SPACE A 5. CABLES FROM SJB TO CCTV SHALL BE FIELD ROUTED BY E&I CONTRACTOR.
PEC
FOR (NOTE 24 TYP.)

900
B PEC
FUTURE (REFER DWG. NO. P055BZOR-79-64-0-K002) B
(NOTE 24 TYP.) USE
900

(REFER DWG. NO. P055BZOR-79-64-0-K002)


CLEAN
COMPACTED
CLEAN SANDFILL
(SIEVED FREE
A COMPACTED
SANDFILL OF STONES) LEGEND
(SIEVED FREE
M1-M4 M5-M8 M9-M12M13-M16 M17-M20 OF STONES)
2 4 6 8 10 12 14 16 18 20 A
M D 300
C C 1 C

100
B
A F F
1 3 5 7 9 11 13 15 17 19 1 23
100

LV CABLE

MULTI-CELL SCHEDULE 40 INNER DUCT FO CABLE Cu CABLE Cu CABLE


(TYP.) (TYP.) (TYP.) (TYP.) (TYP.)

SECTION G35 - G35


D SECTION G46 - G46 REFER DWG NO. P055BZOR-79-64-0-K081 D
REFER DWG NO. P055BZOR-79-64-0-K103
TO P055BZOR-79-64-0-K105 CABLE
CABLES
LOCATION
A1 78-DB-65-01F11-01

CABLE CABLE CABLE


MULTI-CELL CABLES CABLES CABLES
LOCATION LOCATION LOCATION
M1 78009COMF0012606E A1 78B31FO48C01F01S001 B19 78B31FO48C35F01S001
M2 78009COMF0013607E A2 78B31FO48C01F01S002 B20 78B31FO48C35F01S002
78009COMF0014608E
E M3 78009COMF0014808E
A3 78B31FO48C02F01S001 C1 78B31FO48C39F01S001 E
M10 M4 78009COMF0019704E C2 78B31FO48C39F01S002
A4 78B31FO48C02F01S002
M5 78013COMF0015002E
A5 78B31FO48C03F01S001
C3 78B31FO48C43F01S001 NOTE: AS PER SITE CONDITION AND CABLE SCHEDULE (P055BZOR-7071-R002_E)
M6 78013COMF0016005E C4 78B31FO48C43F01S002
A6 78B31FO48C03F01S002
M7 78013COMF0017127E C5 78B31FO48C43F02S001
A7 78B31FO48C04F01S001 RED LINE MARK UP NO CHANGE / WITH CHANGES
M4 M8 78013COMF0011128E C6 78B31FO48C43F02S002
A8 78B31FO48C04F01S002 C7 78B31FO48C60F01S001
M8 M10 78013COMF0020802E
A9 78B31FO48C05F01S001 C8 78B31FO48C60F01S002 Contractor Name: IMCO Engineering & Construction Co. A
M11-M20, SPARE
A
F M9
A10 78B31FO48C05F01S002 C9 78B31FO48C61F01S001 F
A11 78B31FO48C06F01S001 C10 78B31FO48C61F01S002 Contract No: L9ZR-FI-70-K013
A12 78B31FO48C06F01S002 C11 78B31FO48C62F01S001
CABLE Contractor
LOCATION
CABLES
A13 78B31FO48C11F01S001 C12 78B31FO48C62F01S002
Representative: Muhammed Rafeeq
F1 78PAC0307017E C13 78B31FO48C62F02S001 FINISHED TRENCH TOP
A14 78B31FO48C11F01S002 Name/Signature/Date 100
F2 78PAC0306017E C14 78B31FO48C62F02S002
A15 78B31FO48C12F01S001 Intermediate ‐ Approved                               
F3 78PAC0305017E C15 78B31FO48C63F01S001 Verified FDHJV Field Eng.
A16 78B31FO48C12F01S002
Name/Signature/Date WARNING TAPE

200
C16 78B31FO48C63F01S002 By Vishal kumar sharma on Jul 21, 2020
A17 78B31FO48C13F01S001                                                                    
COMPACTED (TYP.)
C17 78B31FO48C67F02S001

350
G A18 78B31FO48C13F01S002  
EARTH BACKFILL G
C18 78B31FO48C67F02S002
CABLE PROTECTION
A19 78B31FO48C14F01S001 C19 78B31FO48C67F03S001 TILES (TYP.)
 
A20 78B31FO48C14F01S002 C20 78B31FO48C67F03S002
B1 78B31FO48C21F01S001
By Randy Eguia at 6:27 am, Jul 21, 2020 PEC
D1 78B31FO48C69F01S001 SPACE FOR FUTURE USE (NOTE 24 TYP.)

900
B2 78B31FO48C21F01S002 D2 78B31FO48C69F01S002 (REFER DWG. NO.
B3 78B31FO48C22F01S001 D3 78B31FO48C75F01S001 P055BZOR-
79-64-0-K002)
B4 78B31FO48C22F01S002 D4 78B31FO48C75F01S002
CLEAN
B5 78B31FO48C23F01S001 D5 78B31FO48C76F01S001 COMPACTED
H D6 78B31FO48C76F01S002
SANDFILL H
B6 78B31FO48C23F01S002 (SIEVED FREE
D7 78B31FO48C84F01S001 OF STONES)
B7 78B31FO48C25F01S001
D8 78B31FO48C84F01S002 300
B8 78B31FO48C25F01S002
D9 78B31FO48C85R01S001
B9 78B31FO48C31F01S001 A A
D10 78B31FO48C85R01S002 1 23

100
B10 78B31FO48C31F01S002 D11 78B31FO48C86F01S001
B11 78B31FO48C32F01S001 D12 78B31FO48C86F01S002
B12 78B31FO48C32F01S002 D13 78B31FO48C92F01S001
Cu CABLE Cu CABLE
(TYP.) (TYP.)
I B13 78B31FO48C33F01S001 D14 78B31FO48C92F01S002 I
B14 78B31FO48C33F01S002 D15 78B31FO48C96F01S001 SECTION G34 - G34
B15 78B31FO48C33F02S001 D16 78B31FO48C96F01S002 REFER DWG NO. P055BZOR-79-64-0-K082
D17 78B31FO48C98R01S001 & P055BZOR-79-64-0-K083
B16 78B31FO48C33F02S002 A
D18 78B31FO48C98R01S002
B17 78B31FO48C34F01S001
D19 78B31FO48C98R02S001
B18 78B31FO48C34F01S002 CABLE
D20 78B31FO48C98R02S002 CABLES
LOCATION
A1 96PAC0036002E IFC - Issued for Construction
J A2 96PAC0030002E J
By APRIL ROSE MIRASOL on Aug 23, 2018
A3 96PAC0031002E
A

A
CONFIDENTIAL INFORMATION
K NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER K
CONTRACT NUMBER: FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE

L9ZR-FI-70-K013
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY

AL-ZOUR REFINERY PROJECT


REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE GK/SG
O 20-04-18 ISSUED FOR CONSTRUCTION GK/SG NA/NR P055BZOR-79-64-0-K001 UNIT-79 OSBL E&I POWER LAYOUT INDEX DRAWING
CHECKED BY

A 22-08-18 RE-ISSUED FOR CONSTRUCTION GK/SG NA/NR P055BZOR-74-64-0-K400 UNIT-74 EPC #2 E&I POWER LAYOUT INDEX DRAWING NA/NR UNIT-79
OSBL E&I
SUPERVISOR RELEASE DATE
P055BZOR-7071-R-002 EICS CABLE SCHEDULE BACKBONE AND OSP
JM/S.DAS 20-04-18
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
P055BZOR-00-19-3-C017-001

P055BZOR-7130-R-002
UNPAVED, BRICK PAVED OR TILED AREAS
ICSS FIBER OPTIC CABLE SCHEDULE
SUPERVISOR ENGR.
SC/A.AGLAVE
INITIALS
POWER LAYOUT
SIZE A1 (594 X 841)

P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT -79 SECURITY CCTV FENCE PROJECT ENGR. APP. DATE
CONTRACTOR DRAWING NUMBER
VS SCALE DRAWING NUMBER REVISION

P055BZOR-79-64-1-K214
P055BZOR-74-64-0-H501 E&I ROAD CROSSING DRAWING INDEX
CLIENT APP. DATE NTS A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES
1. FOR GENERAL NOTES, REFER DWG. NO. P055BZOR-79-64-0-K002.

2. FOR CONTINUATION REFER APPLICABLE SHELTER LIGHTING AND SMALL POWER


LAYOUT.
A A

PLANT NORTH
KTM NORTH

E 6235.650
PR W
EV IND
H
KA

B MATCHLINE N 5591.380 B
AI
AK

LI
N
M

SEE DWG P055BZOR-79-64-0-K084 DRAWING LIMIT N 5591.380


G

79-JB-TCSO-0112

CCTV FOUNDATIO STREET LIGHT TRENCH


79TRN6-017 (TYP.)

STREET LIGHT TRENCH


C 79TRN4-034 C

FENCE LIGHT
FOUNDATION (TYP.)

FENCE TYPE-B
(TYP.)

D D
FENCE TYPE-C
(TYP.)

E E

79-JB-01F29
75-DB-01F01A-18
79-JB-01F258
U01D
LJB

LU-01-F-79-JB-01F258

SJ
F LU-01-F-79-JB-01F259
LEGEND F

B
STREET LIGHT FOUNDATION (TYP.)

1. FOR GENERAL LEGEND & SYMBOLS, REFER DWG. NO P055BZOR-00-64-1-F001-SERIES.

79-JB-TCSO-0113
LJB LIGHTING JUNCTION BOX

SJB SUB JUNCTION BOX

DRAWING LIMIT E 6294.000


G G
65
DRAWING LIMIT E 6134.000

0S
T

A
CL O
F8
M
PL

A89
AN
TR

RED LINE MARK UP NO CHANGE / WITH CHANGES


A89
OA
EP

H EICS TRENCH (TYP.) Contractor Name: IMCO Engineering & Construction Co. H
C-3

PA
EP

Contract No: L9ZR-FI-70-K013

TR
P055BZOR-79-64-1-K172
LV TRENCH (TYP.)

OL
C-4

Contractor
Christus J Mathew

RO
Representative:
26 April. 2020

AD
Name/Signature/Date

Verified FDHJV Field Eng. Intermediate ‐ Approved                               


P4

Name/Signature/Date
EP ZOR

74DBS6-098 By Vishal kumar sharma on Apr 26, 2020


A                                                                    
059
C-4 -8

 
I I
RE 4-64

 
FE -0-
R D H0
WG 16-0

HPFS EL. 109.750 HPFS EL. 108.600


NO 01

G31
P055BZOR-79-64-1-K213
.

J STREET LIGHT TRENCH


A90 G31 J
A90
A

P055BZOR-79-64-1-K172 By Randy Eguia at 9:42 am, Apr 26, 2020


KEY PLAN

PLANT NORTH
KTM NORTH
THIS DRAWING
79-JB-TCSO-0114
K K

PR W
EV IND
H
KA

AI
AK

LI
74DBS6-096

N
M

G
79TRN4-015
N 5499.000
A88
72
SEE DWG P055BZOR-74-64-0-K431

-1-K1
STREET LIGHT TRENCH -64
R-79
ZO 74TRN6-019
A88 055B
MATCHLINE E 6134.000

P
FIELD ROUTED 300Wx600D
79TRN6-019
L L
75-DB-01F01A-18
SHELTER LIGHTING AND SMALL
POWER CABLE
G34
A (FIELD ROUTED)
(SEE NOTE 2)
G34
EP

ACCESS / EMERGENCY
GATE AND SHELTER
P055BZOR-79-64-1-K214
A86
C-4

78-SH-02
A86 STREET LIGHT TRENCH
EP

FOR LIGHTING AND SMALL POWER LAYOUT


REFER DWG NO. P055BZOR-78-64-1-J821
C-3

79TRN4-034
79TRN4-015 79TRN6-017
M STREET LIGHT LV TRENCH (TYP.)
M
P055BZOR-79-64-1-K172
E 6192.180

MATCHLINE N 5479.500 MATCHLINE N 5479.500


SEE DWG P055BZOR-74-64-0-K431 SEE DWG P055BZOR-79-64-0-K082 0 5m 10m 15m 20m

SCALE: 1:200
PLAN VIEW
N N
BILL OF QUANTITY
STICK BUILT
ITEM / SIA CONTINUED:-
QTY.
REFERENCE DRAWING

DWG. NO. TITLE


U01D 1 NO.
TYPICAL PERIMETER SECURITY CCTV COMMUNICATION
P055BZOR-70-71-1-B003-012

CONFIDENTIAL INFORMATION
SYSTEMS LOGICAL BLOCK DIAGRAMS
P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT-79 SECURITY CCTV FENCE

O P055BZOR-79-71-1-P001 EICS EQUIPMENT LOCATION PLAN UNIT-79 SECURITY


FENCE CCTV KEY PLAN
O
P055BZOR-70-71-1-M002-M014 MAINTENANCE HOLE/PIT BUTTERFLY LAYOUT HPFS EL. 109.750 NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
HPFS EL. 108.600
P055BZOR-70-64-1-E005-001 TYPICAL SINGLE LINE DIAGRAM - COVER SHEET -
SECURITY FENCE CCTV POWER DISTRIBUTION DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
CONTRACT NUMBER: CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING
IT IS FURNISHED.

DRAWN BY
L9ZR-FI-70-K013 A REV
NO
DATE REVISION DESCRIPTION DRAWN CHECK
CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE
UNIT-79 OSBL E&I UNDERGROUND TRENCH DRAWING
PS AL-ZOUR REFINERY PROJECT
L9ZR-FI-60-K034 O 25-01-18 ISSUED FOR CONSTRUCTION PS NA/ART P055BZOR-79-64-0-H001
INDEX CHECKED BY

IFC - Issued for Construction A 30-08-18 RE-ISSUED FOR CONSTRUCTION GK NA P055BZOR-79-64-1-J031


UNIT 79 STREET LIGHTING AND OVERALL EARTHING
DRAWING INDEX
NA/ART UNIT-79
CWP NO. 7900ZB01A P055BZOR-79-64-0-K001 UNIT-79 OSBL E&I POWER LAYOUT INDEX DRAWING
SUPERVISOR
JM
RELEASE DATE
25-01-18 OSBL E&I
By APRIL ROSE MIRASOL on Sep 06, 2018
SIZE A0 (841 X 1189)

CWP NO. 7403ZU01A P055BZOR-74-64-0-K400 UNIT-74 EPC #2 E&I POWER LAYOUT INDEX DRAWING

POWER LAYOUT
SUPERVISOR ENGR. INITIALS
SC/SR
CWP NO. 7900CA01A A P055BZOR-73-64-3-K003 CABLE SCHEDULE FOR SUBSTATION 73-MDS-05
PROJECT ENGR. APP. DATE
P055BZOR-79-64-3-K001 ELECTRICAL CABLE SCHEDULE UNIT-79
CWP NO. 7900AU11A P055BZOR-7130-R-002 ICSS FIBER OPTIC CABLE SCHEDULE
CONTRACTOR DRAWING NUMBER VS SCALE DRAWING NUMBER REVISION

CWP NO. 7900DA01A


P055BZOR-7071-R-002
P055BZOR-00-19-3-C017-001
EICS CABLE SCHEDULE BACKBONE AND OSP
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
CLIENT APP. DATE 1:200 P055BZOR-79-64-0-K083 A
UNPAVED, BRICK PAVED OR TILED AREAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES
1. FOR GENERAL NOTES, REFER DWG. NO. P055BZOR-79-64-0-H002.

PLANT NORTH
A
2. CABLING FROM JBs TO SAINTARY LIFT STATION MOTORS ARE IN VENDER SCOPE.

KTM NORTH
A A

PR W
EV IND
H
KA

AI
AK

LI
N
M

G
B B

E 6425.500
A 79TRN6-096 MATCHLINE N 5262.825
A46 SEE DWG P055BZOR-79-64-0-K081 DRAWING LIMIT N 5262.825

A37 79TRN6-017
P055BZOR-79-64-1-K166
74TRN4-285
C C

EP 059Z
A46 74TRN4-268

P4
74DBS6-288
P055BZOR-79-64-1-K164

C-4 OR
A37 74TRN5-112

DW -67-
D16 P055BZOR-74-64-1-K502
G32

G N 10-
79-TBPP-030037
75-DB-01F01A-18 A3 P055BZOR-79-64-1-K213

O. 30-4
NOTE: RED LINE MARKUP AS PER
P055BZOR-79-64-1-K164 79-TBPP-030057 CABLE ENTRY INSIDE BUILDING AND
D16 HV CABLE TRENCH G32 SITE CONDITION
D 33 & 6.6 kV (TYP.)
A3 D
EICS FO CABLE PULL PIT (TYP.) RED LINE MARK UP NO CHANGE / WITH CHANGES

02
79TRN6-017
74TRN4-285 Contractor Name: IMCO Engineering & Construction Co.
74DBS5-013
Contract No: L9ZR-FI-70-K013
EPC-4 DWG NO. STREET LIGHT TRENCH
P055BZOR-74-64-1-K523 Contractor
P4059ZOR-67-10-30-402 Representative: Christus J Mathew
D15 74-TBPP-030029
Name/Signature/Date 24-June-2020
P4059ZOR-00-64-1-H004-001 74TRN4-268
Intermediate ‐ Rejected                               
Verified FDHJV Field Eng.
E P4059ZOR-84-64-0-H016-001 79-TBPP-030036 Name/Signature/Date By Vishal kumar sharma on Jun 24, 2020 E
-3
                                                                   
D15 C
EP
 
74TRN5-112 79-JB-TCSO-0120
 

By Randy Eguia at 1:29 am, Jun 21, 2020


74TRN4-285
4
74DBS4-030
PC-
E
P055BZOR-79-64-1-K212 98-JB-TPAA-9201
F Rejected. LEGEND F
G33
FOR CABLE ROUTING IN EPC-4 AREA 74TRN4-268 Note: Provide reason for change. Why these cables are rerouted. We have already - FOR GENERAL LEGENDS & SYMBOLS, REFER DWG. NO P055BZOR-00-64-1-F001-001
REFER RESPECTIVE POWER LAYOUT done lots of redline mark up in this area (With your engineer. Mr. Jitto). these are
OF EPC-4.
G30 interface points with EPC#4. And these were finalize earlier. Why these changes
FLBS FUSE LOAD BREAK SWITCH
P055BZOR-79-64-1-K212 required are again. Which cable is "78M16FO06C98B81S001".
74DBS6-576
Please provide details. It is not easy to cross verify each cross section again. SJB SUB JUNCTION BOX
G33 79TRN4-041 What are the changes in section G33-G33. Where is redline for cross section.
79-TBPP-030035 G30 79TRN4-041

P0
55
74DBS2-018

BZ

PA
G G
SEE DWG P055BZOR-74-64-0-K436

OR

TR

DRAWING LIMIT E 6469.000


G33

-79

OL
-64

RO
MATCHLINE E 6309.000

-1-
.

AD
NO

K2
STREET LIGHT TRENCH W G

11
-B -81 SE) R D
U E
98 HO REF K002
74DBS4-029 E -
TO SANITARY PUMP AT UT 4-1 IP-00457-02
(G AYO 98-6
-
MOTOR
E R L ZOR
(SEE NOTE 2) W B 79TRN6-018
R PO P055
FO
78-JB-01F-85
H LP-02-F-78-A-1324-PM-01A-001 74DBS6-580 H
74TRN4-268
B

78-JB-01F-86
PJ

LP-02-F-78-A-1324-PM-01B-001 STREET LIGHT TRENCH


B

-4
IP-00457-01
PJ

S12A
C
EP 79-TBPP-030034 (TYP. 02)
A15 79TRN6-108
5
43-RU-02F44 A1
IJB 79TRN4-040
C1-02-F-78-A-1324-PM-01A IJB

C-3 74DBS6-579

IFC - Issued for Construction


73-DB-05F01A-01
I EP STREET LIGHT TRENCH
43-RU-02F45
C1-02-F-78-A-1324-PM-01B
U01E
(TYP. 04)
I
S01D 78-JBDD-8665
(TYP. 02) 78JBDD8665
78M16FO06C98B81S001 A
166
79TRN6-017 4-1-K 96001COMF0002031E 78-JBFD-8619 79-JB-TCSO-0121 By Emma Conception Dela Cerna on Jan 28, 2019
9-6
OR-7 78JBFD8619
5BZ 74DBS2-017
P05
A37 79TRN6-018 A34
79TRN6-071

A37 A45 79TRN6-108


P055BZOR-79-64-1-K163
A34
J B J
A45
P055BZOR-79-64-1-K164

79TRN6-109
79TRN6-017
79TRN6-017

KEY PLAN
73-DB-05F01A-01
78-DB-65-01F11-02

PLANT NORTH
74DBS6-091

KTM NORTH
G36 G29
K THIS DRAWING K

PR W
EV IND
H
G29

KA

AI
AK

LI
N
M

G
D15 78JBDD8665 79TRN4-040 G36 P055BZOR-79-64-1-K208
78JBFD8619 P055BZOR-79-64-1-K211
74TRN6-173
P055BZOR-79-64-1-K164
79TRN4-016
D15 FENCE TYPE-B
(TYP.)
N 5170.000 74DBS4-092 79TRN4-016 LV TRENCH (TYP.)
79TRN4-034
P055BZOR-74-64-0-K442
MATCHLINE E 6309.000

EICS TRENCH (TYP.)


L 74DBS4-115 L
79TRN6-017 FENCE TYPE-C
65

(TYP.)
A85
0
ST
SEE DWG

G57 A85
.

79-SW-01F06
LU-01-F-79-SW-01F06
CL O

G57

FL
LU-01-F-79-JB-01F260

B
S
F8

79-JB-01F261
P055BZOR-79-64-1-K212
M

P055BZOR-79-64-1-K172 LU-01-F-79-JB-01F261
PL

SJ
LU-01-F-79-SW-01F06
AN

B
STREET LIGHT FOUNDATION (TYP.)
TR

STREET LIGHT LV TRENCH (TYP.)


M M
OA
D

MATCHLINE N 5155.500
E 6367.500

MATCHLINE N 5155.500
A
SEE DWG P055BZOR-74-64-0-K443 SEE DWG P055BZOR-79-64-0-K079 0 5m 10m 15m 20m

SCALE: 1:200

N
PLAN VIEW N
A A

ELECTRICAL BILL OF QUANTITY A B


CONTINUED:-

REFERENCE DRAWING

STICK BUILT 78M16FO06C98B81S001 LP-02-F-78-A-1324-PM-01A-001 DWG. NO. TITLE


ITEM/SIA 96001COMF0002031E LP-02-F-78-A-1324-PM-01B-001
QTY. TYPICAL PERIMETER SECURITY CCTV COMMUNICATION
P055BZOR-70-71-1-B003-012
LP-02-F-98-EB-81-02F01-01 C1-02-F-78-A-1324-PM-01A SYSTEMS LOGICAL BLOCK DIAGRAMS
LP-02-F-98-DB-81-02F01-01-2 C1-02-F-78-A-1324-PM-01B P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT-79 SECURITY CCTV FENCE

O
U01E 4 NOS. LP-02-F-98-DB-81-02F01-01-1
P055BZOR-79-71-1-P001

P055BZOR-70-71-1-M002-M014
EICS EQUIPMENT LOCATION PLAN UNIT-79 SECURITY
FENCE CCTV KEY PLAN
MAINTENANCE HOLE/PIT BUTTERFLY LAYOUT
A CONFIDENTIAL INFORMATION O
S01D 1 NO. VENDOR DRAWING REFERENCE
TYPICAL SINGLE LINE DIAGRAM - COVER SHEET - NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
P055BZOR-70-64-1-E005-001
A SECURITY FENCE CCTV POWER DISTRIBUTION
PACKAGE GENERAL ARRANGEMENT DRAWING LIFT
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
V-P055BZOR-4-0724-27-78A1324-00088 AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
S12A 2 NO. P055BZOR-43-64-3-K002 CABLE SCHEDULE SUBSTATION 43-SS-02 STATION 78 BUILDING 78-A-1324 HPFS EL. 108.600 DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
IT IS FURNISHED.
CONTRACT NUMBER: A DATE REVISION DESCRIPTION DRAWN
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY

AL-ZOUR REFINERY PROJECT


CHECK
L9ZR-FI-70-K013
REV
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE PS
UNIT-79 OSBL E&I UNDERGROUND TRENCH DRAWING
O 19-03-18 ISSUED FOR CONSTRUCTION PS NA/ART P055BZOR-79-64-0-H001
L9ZR-FI-60-K034 A 25-01-19 RE-ISSUED FOR CONSTRUCTION RK NA P055BZOR-79-64-1-J031
INDEX
UNIT 79 STREET LIGHTING AND OVERALL EARTHING
CHECKED BY
NA/ART UNIT-79
DRAWING INDEX
L9ZR-HI-60-K404 SUPERVISOR RELEASE DATE
P055BZOR-79-64-0-K001 UNIT-79 OSBL E&I POWER LAYOUT INDEX DRAWING
JM 19-03-18 OSBL E&I
SIZE A0 (841 X 1189)

CWP NO. 7900ZB01A P055BZOR-74-64-0-K400

P055BZOR-73-64-3-K003
UNIT-74 EPC #2 E&I POWER LAYOUT INDEX DRAWING

CABLE SCHEDULE FOR SUBSTATION 73-MDS-05


SUPERVISOR ENGR.
SC/SR
INITIALS
POWER LAYOUT
CWP NO. 7403ZU01A P055BZOR-79-64-3-K001 ELECTRICAL CABLE SCHEDULE UNIT-79 PROJECT ENGR. APP. DATE

CWP NO. 7900CA03A VS


CONTRACTOR DRAWING NUMBER SCALE DRAWING NUMBER REVISION
P055BZOR-7130-R-002 ICSS FIBER OPTIC CABLE SCHEDULE

CWP NO. 7900BA02A


P055BZOR-7071-R-002
P055BZOR-00-19-3-C017-001
EICS CABLE SCHEDULE BACKBONE AND OSP
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
CLIENT APP. DATE 1:200 P055BZOR-79-64-0-K080 A
UNPAVED, BRICK PAVED OR TILED AREAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
NOTES
1. FOR GENERAL NOTES, REFER DWG. NO. P055BZOR-79-64-0-H002.

PLANT NORTH
A
2. CABLING FROM JBs TO SAINTARY LIFT STATION MOTORS ARE IN VENDER SCOPE.

KTM NORTH
A A

PR W
EV IND
H
KA

AI
AK

LI
N
M

G
B B

E 6425.500
A 79TRN6-096 MATCHLINE N 5262.825
A46 SEE DWG P055BZOR-79-64-0-K081 DRAWING LIMIT N 5262.825

A37 79TRN6-017
P055BZOR-79-64-1-K166
74TRN4-285
C C

EP 059Z
A46 74TRN4-268

P4
74DBS6-288
P055BZOR-79-64-1-K164

C-4 OR
A37 74TRN5-112

DW -67-
D16 P055BZOR-74-64-1-K502
G32

G N 10-
79-TBPP-030037
75-DB-01F01A-18 A3 P055BZOR-79-64-1-K213

O. 30-4
NOTE: RED LINE MARKUP AS PER
P055BZOR-79-64-1-K164 79-TBPP-030057 CABLE ENTRY INSIDE BUILDING AND
D16 HV CABLE TRENCH G32 SITE CONDITION
D 33 & 6.6 kV (TYP.)
A3 D
EICS FO CABLE PULL PIT (TYP.) RED LINE MARK UP NO CHANGE / WITH CHANGES

02
79TRN6-017
74TRN4-285 Contractor Name: IMCO Engineering & Construction Co.
74DBS5-013
Contract No: L9ZR-FI-70-K013
EPC-4 DWG NO. STREET LIGHT TRENCH
P055BZOR-74-64-1-K523 Contractor
P4059ZOR-67-10-30-402 Representative: Christus J Mathew
D15 74-TBPP-030029
Name/Signature/Date 24-June-2020
P4059ZOR-00-64-1-H004-001 74TRN4-268
Verified FDHJV Field Eng. Intermediate ‐ Approved                               
E P4059ZOR-84-64-0-H016-001 79-TBPP-030036 Name/Signature/Date E
-3
By Vishal kumar sharma on Jun 25, 2020
D15 C
                                                                   

74TRN5-112 EP 79-JB-TCSO-0120  

  By Randy Eguia at 1:29 am, Jun 21, 2020


74TRN4-285
4
74DBS4-030
PC-
E
P055BZOR-79-64-1-K212 98-JB-TPAA-9201
F LEGEND F
G33
FOR CABLE ROUTING IN EPC-4 AREA 74TRN4-268 - FOR GENERAL LEGENDS & SYMBOLS, REFER DWG. NO P055BZOR-00-64-1-F001-001
REFER RESPECTIVE POWER LAYOUT
OF EPC-4.
G30 FLBS FUSE LOAD BREAK SWITCH
P055BZOR-79-64-1-K212 74DBS6-576
SJB SUB JUNCTION BOX
G33 79TRN4-041
79-TBPP-030035 G30 79TRN4-041

P0
55
74DBS2-018

BZ

PA
G G
SEE DWG P055BZOR-74-64-0-K436

OR

TR

DRAWING LIMIT E 6469.000


G33

-79

OL
-64

RO
MATCHLINE E 6309.000

-1-
.

AD
NO

K2
STREET LIGHT TRENCH W G

11
-B -81 SE) R D
U E
98 HO REF K002
74DBS4-029 E -
TO SANITARY PUMP AT UT 4-1 IP-00457-02
(G AYO 98-6
-
MOTOR
E R L ZOR
(SEE NOTE 2) W B 79TRN6-018
R PO P055
FO
78-JB-01F-85
H LP-02-F-78-A-1324-PM-01A-001 74DBS6-580 H
74TRN4-268
B

78-JB-01F-86
PJ

LP-02-F-78-A-1324-PM-01B-001 STREET LIGHT TRENCH


B

-4
IP-00457-01
PJ

S12A
C
EP 79-TBPP-030034 (TYP. 02)
A15 79TRN6-108
5
43-RU-02F44 A1
IJB 79TRN4-040
C1-02-F-78-A-1324-PM-01A IJB

C-3 74DBS6-579

IFC - Issued for Construction


73-DB-05F01A-01
I EP STREET LIGHT TRENCH
43-RU-02F45
C1-02-F-78-A-1324-PM-01B
U01E
(TYP. 04)
I
S01D 78-JBDD-8665
(TYP. 02) 78JBDD8665
78M16FO06C98B81S001 A
166
79TRN6-017 4-1-K 96001COMF0002031E 78-JBFD-8619 79-JB-TCSO-0121 By Emma Conception Dela Cerna on Jan 28, 2019
9-6
OR-7 78JBFD8619
5BZ 74DBS2-017
P05
A37 79TRN6-018 A34
79TRN6-071

A37 A45 79TRN6-108


P055BZOR-79-64-1-K163
A34
J B J
A45
P055BZOR-79-64-1-K164

79TRN6-109
79TRN6-017
79TRN6-017

KEY PLAN
73-DB-05F01A-01
78-DB-65-01F11-02

PLANT NORTH
74DBS6-091

KTM NORTH
G36 G29
K THIS DRAWING K

PR W
EV IND
H
G29

KA

AI
AK

LI
N
M

G
D15 78JBDD8665 79TRN4-040 G36 P055BZOR-79-64-1-K208
78JBFD8619 P055BZOR-79-64-1-K211
74TRN6-173
P055BZOR-79-64-1-K164
79TRN4-016
D15 FENCE TYPE-B
(TYP.)
N 5170.000 74DBS4-092 79TRN4-016 LV TRENCH (TYP.)
79TRN4-034
P055BZOR-74-64-0-K442
MATCHLINE E 6309.000

EICS TRENCH (TYP.)


L 74DBS4-115 L
79TRN6-017 FENCE TYPE-C
65

(TYP.)
A85
0
ST
SEE DWG

G57 A85
.

79-SW-01F06
LU-01-F-79-SW-01F06
CL O

G57

FL
LU-01-F-79-JB-01F260

B
S
F8

79-JB-01F261
P055BZOR-79-64-1-K212
M

P055BZOR-79-64-1-K172 LU-01-F-79-JB-01F261
PL

SJ
LU-01-F-79-SW-01F06
AN

B
STREET LIGHT FOUNDATION (TYP.)
TR

STREET LIGHT LV TRENCH (TYP.)


M M
OA
D

MATCHLINE N 5155.500
E 6367.500

MATCHLINE N 5155.500
A
SEE DWG P055BZOR-74-64-0-K443 SEE DWG P055BZOR-79-64-0-K079 0 5m 10m 15m 20m

SCALE: 1:200

N
PLAN VIEW N
A A

ELECTRICAL BILL OF QUANTITY A B


CONTINUED:-

REFERENCE DRAWING

STICK BUILT 78M16FO06C98B81S001 LP-02-F-78-A-1324-PM-01A-001 DWG. NO. TITLE


ITEM/SIA 96001COMF0002031E LP-02-F-78-A-1324-PM-01B-001
QTY. TYPICAL PERIMETER SECURITY CCTV COMMUNICATION
P055BZOR-70-71-1-B003-012
LP-02-F-98-EB-81-02F01-01 C1-02-F-78-A-1324-PM-01A SYSTEMS LOGICAL BLOCK DIAGRAMS
LP-02-F-98-DB-81-02F01-01-2 C1-02-F-78-A-1324-PM-01B P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT-79 SECURITY CCTV FENCE

O
U01E 4 NOS. LP-02-F-98-DB-81-02F01-01-1
P055BZOR-79-71-1-P001

P055BZOR-70-71-1-M002-M014
EICS EQUIPMENT LOCATION PLAN UNIT-79 SECURITY
FENCE CCTV KEY PLAN
MAINTENANCE HOLE/PIT BUTTERFLY LAYOUT
A CONFIDENTIAL INFORMATION O
S01D 1 NO. VENDOR DRAWING REFERENCE
TYPICAL SINGLE LINE DIAGRAM - COVER SHEET - NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
P055BZOR-70-64-1-E005-001
A SECURITY FENCE CCTV POWER DISTRIBUTION
PACKAGE GENERAL ARRANGEMENT DRAWING LIFT
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
V-P055BZOR-4-0724-27-78A1324-00088 AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
S12A 2 NO. P055BZOR-43-64-3-K002 CABLE SCHEDULE SUBSTATION 43-SS-02 STATION 78 BUILDING 78-A-1324 HPFS EL. 108.600 DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
IT IS FURNISHED.
CONTRACT NUMBER: A DATE REVISION DESCRIPTION DRAWN
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY

AL-ZOUR REFINERY PROJECT


CHECK
L9ZR-FI-70-K013
REV
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE PS
UNIT-79 OSBL E&I UNDERGROUND TRENCH DRAWING
O 19-03-18 ISSUED FOR CONSTRUCTION PS NA/ART P055BZOR-79-64-0-H001
L9ZR-FI-60-K034 A 25-01-19 RE-ISSUED FOR CONSTRUCTION RK NA P055BZOR-79-64-1-J031
INDEX
UNIT 79 STREET LIGHTING AND OVERALL EARTHING
CHECKED BY
NA/ART UNIT-79
DRAWING INDEX
L9ZR-HI-60-K404 SUPERVISOR RELEASE DATE
P055BZOR-79-64-0-K001 UNIT-79 OSBL E&I POWER LAYOUT INDEX DRAWING
JM 19-03-18 OSBL E&I
SIZE A0 (841 X 1189)

CWP NO. 7900ZB01A P055BZOR-74-64-0-K400

P055BZOR-73-64-3-K003
UNIT-74 EPC #2 E&I POWER LAYOUT INDEX DRAWING

CABLE SCHEDULE FOR SUBSTATION 73-MDS-05


SUPERVISOR ENGR.
SC/SR
INITIALS
POWER LAYOUT
CWP NO. 7403ZU01A P055BZOR-79-64-3-K001 ELECTRICAL CABLE SCHEDULE UNIT-79 PROJECT ENGR. APP. DATE

CWP NO. 7900CA03A VS


CONTRACTOR DRAWING NUMBER SCALE DRAWING NUMBER REVISION
P055BZOR-7130-R-002 ICSS FIBER OPTIC CABLE SCHEDULE

CWP NO. 7900BA02A


P055BZOR-7071-R-002
P055BZOR-00-19-3-C017-001
EICS CABLE SCHEDULE BACKBONE AND OSP
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
CLIENT APP. DATE 1:200 P055BZOR-79-64-0-K080 A
UNPAVED, BRICK PAVED OR TILED AREAS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
400
FINISHED TRENCH TOP NOTES
200 FINISHED TRENCH TOP FINISHED TRENCH TOP
1. FOR GENERAL NOTES, REFER DWG NO. P055BZ0R-74-64-0-K401.
2. CABLES SHOWN IN THESE DRAWINGS ARE THE LATEST ONES UP TO THE DATE, AND
WARNING WARNING WARNING MAY NOT BE THE FINAL LIST. THEREFORE, THE ACTUAL CABLES TO BE INSTALLED
A 300 300 300 A

200

200

200
TAPE TAPE TAPE SHALL BE CONFIRMED WITH THE RESPECTIVE CABLE SCHEDULE, BEFORE
COMPACTED (TYP.) COMPACTED (TYP.) COMPACTED (TYP.) INSTALLATION OF THE CABLES.

350

350

350
EARTH BACKFILL EARTH BACKFILL EARTH BACKFILL
CABLE PROTECTION CABLE PROTECTION CABLE PROTECTION
TILES (TYP.) TILES (TYP.) TILES (TYP.)

900

900

900
SPACE
SPACE PEC SPACE PEC FOR PEC
FOR (NOTE 24 TYP.) FOR (NOTE 24 TYP.) FUTURE (NOTE 24 TYP.)
FUTURE (REFER DWG. NO. P055BZOR-74-64-0-K401) FUTURE (REFER DWG. NO. P055BZOR-74-64-0-K401) USE (REFER DWG. NO. P055BZOR-74-64-0-K401)
CLEAN USE CLEAN USE CLEAN
COMPACTED COMPACTED COMPACTED
B SANDFILL M1-M4 M5-M8 SANDFILL B SANDFILL B
(SIEVED FREE 300 (SIEVED FREE D (SIEVED FREE E B
OF STONES) M OF STONES) C OF STONES) D
B C
F F
B A B E A B F A F
1 1 2 3 4 5 6 78 9 2 3 45 1 2 3 1 2 3 12345 1

100

100

100
12 34 5 6 7 8 1 2 3 4 5 6 7 8 910
LEGEND
FO CABLE FO CABLE OTHER CABLES OTHER CABLES FO CABLE
(TYP.) FO CABLE Cu CABLE MULTI-CELL SCHEDULE 40
(TYP.) (TYP.) (TYP.) (TYP.) (TYP.)
(TYP.) CONDUIT (TYP.)
INNER DUCT
(TYP.)
C C
SECTION F68-F68 SECTION F69-F69 SECTION F70-F70
REFER DWG NO. P055BZOR-74-64-0-K453 REFER DWG NO. P055BZOR-74-64-0-K446 REFER DWG NO. P055BZOR-74-64-0-K446
& P055BZOR-74-64-0-K453 NOTE:
& P055BZOR-74-64-0-K454
& P055BZOR-74-64-0-K442 & P055BZOR-74-64-0-K445 1. 92PAC0012002E, 92PAC0013002E, 92001COMC0032003E SHIFTED TO SECTION F69&F70 DUE
TO ROAD CROSSING SLEEVE UNAVAILABILITY
2. 73JBDF3015-2, 73JBDF3016-2, 73JBDF3016-3 SHIFTED AS PER L9ZR-FI-70-K013-ERFI-0174_0
CABLE CABLE CABLE CABLE CABLE CABLE
MULTI-CELL CABLES CABLES CABLES CABLES ENMC CABLES CABLES
LOCATION LOCATION LOCATION LOCATION LOCATION LOCATION
M2 78011COMF0010801E B1 96COMC0037001E E1 92001COMF0001003E B8 73JBDF4142-IS A1 78B31FO48C92F01P001 C7 73JBDF4146

D M3-M8,M1 SPARE B2 96PAC0034002E


CABLE
C1 73JBDF4147 A2 78B31FO48C92F01P002 C8 73JBDF4149 RED LINE MARK UP NO CHANGE / WITH CHANGES D
CABLES C2 73JBDF4148 A3 78004COMF0028001E C9 73JBDF4148
B3 96PAC0035002E LOCATION
A1 73JBAF4107 C3 73JBDF4149 A4 92001COMF0001003E C10 73JBDD6004 Contractor Name: IMCO Engineering & Construction Co.
CABLE B4 98B81FACP01-1
CABLES
LOCATION A2 73JBDF4101 C4 73JBDD6004 A5 92F01FO24C39S01P001 D1 73JBDD6005
B5 98B81FACP01-2 Contract No: L9ZR-FI-70-K013
A1 78B31FO48C85R01P001
A3 73JBDF4102 C5 73JBDD6005 D2 73JBDF5021
Contractor
A2 78B31FO48C85R01P002
A4 73JBDF4121-IS C6 73JBDF5021 CABLE
CABLES D3 73JBDF3015-1 B
Representative: Christus J Mathew
A3 78B31FO48C86F01P001 B
LOCATION Name/Signature/Date 06-July-2020
A5 73JBDF4136 C7 73JBDF3015-1 D4 73JBDF3016-1
B1 73JBDF4121-IS Intermediate ‐ Approved                               
A4 78B31FO48C86F01P002 Verified FDHJV Field Eng.
A6 73JBDF4137 C8 73JBDF3016-1 D5 73JBDF3017
B2 73JBDF4122-IS Name/Signature/Date
E A5 78B31FO48C98R01P001
A7 73JBDF4138 D1 73JBDF3017 D6 73JBAF3018
B By Vishal kumar sharma on Jul 07, 2020
                                                                    E
B3 73JBDF4101
A6 78B31FO48C98R01P002 B  
A8 73JBDF4139 D2 73JBAF3018 D7 73JBDF3013-IS
B4 73JBDF4102
A7 78B31FO48C98R02P001  
B1 73JBDF4140 D3 73JBDF3013-IS D8 73JBDF3014-IS
B5 73JBDF4147
A8 78B31FO48C98R02P002 By Randy Eguia at 4:03 am, Jul 05, 2020
B2 73JBDF4141 D4 73JBDF3014-IS D9 73MDS05CP01-01
B6 73JBAF4107
A9 96001COMF0001031E B
B3 73JBDF4142 D5 73MDS05CP01-01 D10 73JBDF3015-2
B7 73JBDF4136
B4 73JBDF4143 D6 73JBDF3015-2 B E1 73JBDF3016-2
B8 73JBDF4137
B5 73JBDF4144 D7 73JBDF3016-2 E2 73JBDF3016-3
B9 73JBDF4138
F B6 73JBDF4145 D8 73JBDF3016-3 F1 92001COMC0032003E F
B10 73JBDF4139
F1 92001COMC0032003E F2 92PAC0012002E
B7 73JBDF4146
C1 73JBDF4140 F3 92PAC0013002E
CABLE PROTECTION F2 92PAC0012002E
TILES (TYP.) C2 73JBDF4141
F3 92PAC0013002E
FINISHED TRENCH TOP C3 73JBDF4142 Note: 300 mm minimum gap shall be maintained between F1 & F2/F3 cables.
WARNING TAPE (TYP.) C4 73JBDF4143
Note: 300 mm minimum gap shall be maintained between F1 & F2/F3 cables. C5 73JBDF4144
C6 73JBDF4145
200

COMPACTED
G G
350

EARTH BACKFILL
SPACE FOR FUTURE USE

900

PEC
(NOTE 24 TYP.)
FINISHED TRENCH TOP
(REFER DWG. NO.
CLEAN P055BZOR-74-64-0-K401)
COMPACTED
WARNING
SANDFILL 300

200
TAPE
(SIEVED FREE
H OF STONES)
COMPACTED (TYP.) H

350
EARTH BACKFILL CABLE CABLE CABLE
CABLES MULTI-CELL CABLES CABLES
A B LOCATION LOCATION LOCATION
CABLE PROTECTION M2 78011COMF0010801E
100

12 12 A1 78B31FO48C85R01P001 E1 96COMC0037001E
TILES (TYP.)
SPACE
900 A2 78B31FO48C85R01P002 M3-M8,M1 SPARE E2 96PAC0034002E
OTHER CABLES FOR PEC A3 78B31FO48C86F01P001 E3 96PAC0035002E
Cu CABLE
(TYP.) (TYP.) FUTURE (NOTE 24 TYP.)
USE (REFER DWG. NO. P055BZOR-74-64-0-K401) A4 78B31FO48C86F01P002 E4 98B81FACP01-1
CLEAN
A5 78B31FO48C98R01P001 E5 98B81FACP01-2
COMPACTED
SECTION F97-F97 SANDFILL 400 M5-M8
B1 78B31FO48C98R01P002
I REFER DWG NO. P055BZOR-74-64-0-K418 (SIEVED FREE I
OF STONES) D M B2 78B31FO48C98R02P001
C
E B B3 78B31FO48C98R02P002
A E
CABLE 1 1 2 3 45 2 3 4 5
100

CABLES B4 78M16FO06C98B81P001
LOCATION
B5 78004COMF0027001E
A1 33PAC0081003E Cu CABLE
(TYP.) FO CABLE Cu CABLE MULTI-CELL SCHEDULE 40 C1 96001COMF0001031E
A2 33COMC0418001E (TYP.) (TYP.) CONDUIT (TYP.)
C2 79005SECYF4009005E
INNER DUCT
CABLE
CABLES
SECTION F71-F71 (TYP.) C3 79005SECYF4047005E
LOCATION
J B1 78JBFD8617
REFER DWG NO. P055BZOR-74-64-0-K442 C4 79006SECYF4011005E J
REFER DWG NO. P055BZOR-74-64-0-K436
IFC - Issued for Construction REFER DWG NO. P055BZOR-79-64-0-K080 C5 79007SECYF4013005E
B2 78JBDD8663
D1 79008SECYF4015005E
By Emma Conception Dela Cerna on Mar 14, 2019

CONTINUED:-
D2 79009SECYF4017005E
DWG. NO. TITLE D3 79028SECYF4019005E
P055BZOR-73-64-3-K006 ENMC FIBRE OPTIC CABLE SCHEDULE

P055BZOR-00-19-3-C017-001

P055BZOR-70-71-1-P302
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
UNPAVED, BRICK PAVED OR TILED AREAS
OVERALL FO CABLE ROUTING SECURITY FENCE
CCTV PATCH PANEL
CONFIDENTIAL INFORMATION
K CONTRACT NUMBER: P055BZOR-33-30-3-W301 UNIT 33 TRAIN 03 INSTRUMENT AND FIRE AND GAS CABLE
SCHEDULE
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER K
L9ZR-FI-70-K013 P055BZOR-74-64-0-H501 E&I ROAD CROSSING DRAWING INDEX
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
L9ZR-FI-60-K034 P055BZOR-7071-R-002 EICS CABLE SCHEDULE BACKBONE AND OSP IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK

O
NO

04-04-18 ISSUED FOR CONSTRUCTION GK/AS RK/NR


CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO.

P055BZOR-7130-R-002
TITLE

ICSS FIBER OPTIC CABLE SCHEDULE


GK/AS
AL-ZOUR REFINERY PROJECT
CHECKED BY

A 05-11-18 RE-ISSUED FOR CONSTRUCTION GK/AS NA/NR P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT -79 SECURITY CCTV FENCE RK/NR UNIT-74
SUPERVISOR RELEASE DATE
B 08-03-19 RE-ISSUED FOR CONSTRUCTION SK UD BPP VS P055BZOR-7371-R-401

P055BZOR-7371-R-501
EICS CABLE SCHEDULE BUILDINGS 73-MDS-04

EICS CABLE SCHEDULE BUILDINGS 73-MDS-05


JM/S.DAS 04-04-18 EPC #2 E&I
P055BZOR-7371-R-601 EICS CABLE SCHEDULE BUILDINGS 73-MDS-06
SUPERVISOR ENGR.
SC/A.AGLAVE
INITIALS
POWER LAYOUT
SIZE A1 (594 X 841)

P055BZOR-73-30-3-W061 UNIT 73 MDS 04 FIRE AND GAS CABLE SCHEDULE PROJECT ENGR. APP. DATE
CONTRACTOR DRAWING NUMBER SCALE DRAWING NUMBER
SG REVISION
P055BZOR-73-30-3-W081 UNIT 73 MDS 06 FIRE AND GAS CABLE SCHEDULE

P055BZOR-73-30-3-W051 UNIT 73 MDS 05 FIRE AND GAS CABLE SCHEDULE


CLIENT APP. DATE NTS P055BZOR-74-64-1-K562 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
400
FINISHED TRENCH TOP NOTES
200 FINISHED TRENCH TOP FINISHED TRENCH TOP
1. FOR GENERAL NOTES, REFER DWG NO. P055BZ0R-74-64-0-K401.
2. CABLES SHOWN IN THESE DRAWINGS ARE THE LATEST ONES UP TO THE DATE, AND
WARNING WARNING WARNING MAY NOT BE THE FINAL LIST. THEREFORE, THE ACTUAL CABLES TO BE INSTALLED
A 300 300 300 A

200

200

200
TAPE TAPE TAPE SHALL BE CONFIRMED WITH THE RESPECTIVE CABLE SCHEDULE, BEFORE
COMPACTED (TYP.) COMPACTED (TYP.) COMPACTED (TYP.) INSTALLATION OF THE CABLES.

350

350

350
EARTH BACKFILL EARTH BACKFILL EARTH BACKFILL
CABLE PROTECTION CABLE PROTECTION CABLE PROTECTION
TILES (TYP.) TILES (TYP.) TILES (TYP.)

900

900

900
SPACE
SPACE PEC SPACE PEC FOR PEC
FOR (NOTE 24 TYP.) FOR (NOTE 24 TYP.) FUTURE (NOTE 24 TYP.)
FUTURE (REFER DWG. NO. P055BZOR-74-64-0-K401) FUTURE (REFER DWG. NO. P055BZOR-74-64-0-K401) USE (REFER DWG. NO. P055BZOR-74-64-0-K401)
CLEAN USE CLEAN USE CLEAN
COMPACTED COMPACTED COMPACTED
B SANDFILL M1-M4 M5-M8 SANDFILL B SANDFILL B
(SIEVED FREE 300 (SIEVED FREE D (SIEVED FREE E B
OF STONES) M OF STONES) C OF STONES) D
B C
B A B E A B A
1 1 2 3 4 5 6 78 9 2 3 45 1 12345

100

100

100
12 34 5 6 7 8 1 2 3 4 5 6 7 8 910
LEGEND
FO CABLE FO CABLE OTHER CABLES OTHER CABLES FO CABLE
(TYP.) FO CABLE Cu CABLE MULTI-CELL SCHEDULE 40
(TYP.) (TYP.) (TYP.) (TYP.) (TYP.)
(TYP.) CONDUIT (TYP.)
INNER DUCT
(TYP.)
C C
SECTION F68-F68 SECTION F69-F69 SECTION F70-F70
REFER DWG NO. P055BZOR-74-64-0-K453 REFER DWG NO. P055BZOR-74-64-0-K446 REFER DWG NO. P055BZOR-74-64-0-K446
& P055BZOR-74-64-0-K454 & P055BZOR-74-64-0-K453 NOTE: RED LINE MARKUP AS
& P055BZOR-74-64-0-K442 & P055BZOR-74-64-0-K445 PER SITE CONDITION BECAUSE
OF CABLE REROUTED DUE TO
CABLE CABLE CABLE CABLE CABLE 96-FAR-01 MCT ENTRY
MULTI-CELL CABLES CABLE CABLES ENMC CABLES CABLES
LOCATION CABLES CABLES LOCATION LOCATION
LOCATION LOCATION LOCATION
M2 78011COMF0010801E B8 73JBDF4142-IS A1 78B31FO48C92F01P001 C7 73JBDF4146
NO CHANGE / WITH CHANGES
B1 96COMC0037001E E1 92001COMF0001003E RED LINE MARK UP
D M3-M8,M1 SPARE B2 96PAC0034002E
CABLE
C1 73JBDF4147 A2 78B31FO48C92F01P002 C8 73JBDF4149 D
B3 96PAC0035002E LOCATION
CABLES C2 73JBDF4148 A3 78004COMF0028001E C9 73JBDF4148 Contractor Name: IMCO Engineering & Construction Co.
CABLE B4 98B81FACP01-1 A1 73JBAF4107 C3 73JBDF4149 A4 92001COMF0001003E C10 73JBDD6004
CABLES Contract No: L9ZR-FI-70-K013
LOCATION A2 73JBDF4101 C4 73JBDD6004 A5 92F01FO24C39S01P001 D1 73JBDD6005
B5 98B81FACP01-2
Contractor
A1 78B31FO48C85R01P001
A3 73JBDF4102 C5 73JBDD6005 D2 73JBDF5021
Representative:
Christus J Mathew
A2 78B31FO48C85R01P002 CABLE D3 73JBDF3015-1 B Name/Signature/Date
25-June-2020
A4 73JBDF4121-IS C6 73JBDF5021 CABLES Intermediate ‐ Approved                               
A3 78B31FO48C86F01P001 LOCATION
A5 73JBDF4136 C7 73JBDF3015-1 B D4 73JBDF3016-1 Verified FDHJV Field Eng.
B1 73JBDF4121-IS By Vishal kumar sharma on Jul 27, 2020
A4 78B31FO48C86F01P002
D5 73JBDF3017 Name/Signature/Date                                                                    
A6 73JBDF4137 C8 73JBDF3016-1 B2 73JBDF4122-IS
E A5 78B31FO48C98R01P001
A7 73JBDF4138 D1 73JBDF3017 D6 73JBAF3018
B   E
B3 73JBDF4101
A6 78B31FO48C98R01P002 B  
A8 73JBDF4139 D2 73JBAF3018 D7 73JBDF3013-IS
B4 73JBDF4102
A7 78B31FO48C98R02P001
B1 73JBDF4140 D3 73JBDF3013-IS D8 73JBDF3014-IS
B5 73JBDF4147 By Randy Eguia at 2:04 am, Jun 25, 2020
A8 78B31FO48C98R02P002
B2 73JBDF4141 D4 73JBDF3014-IS D9 73MDS05CP01-01
B6 73JBAF4107
A9 96001COMF0001031E B
B3 73JBDF4142 D5 73MDS05CP01-01 D10 73JBDF3015-2
B7 73JBDF4136
B4 73JBDF4143 D6 73JBDF3015-2 B E1 73JBDF3016-2
B8 73JBDF4137
B5 73JBDF4144 D7 73JBDF3016-2 E2 73JBDF3016-3
B9 73JBDF4138
F B6 73JBDF4145 D8 73JBDF3016-3 B10 73JBDF4139 F
B7 73JBDF4146
C1 73JBDF4140
CABLE PROTECTION
TILES (TYP.) C2 73JBDF4141
FINISHED TRENCH TOP C3 73JBDF4142

WARNING TAPE (TYP.) C4 73JBDF4143


C5 73JBDF4144
C6 73JBDF4145
200

COMPACTED
G G
350

EARTH BACKFILL
SPACE FOR FUTURE USE

900

PEC
(NOTE 24 TYP.)
FINISHED TRENCH TOP
(REFER DWG. NO.
CLEAN P055BZOR-74-64-0-K401)
COMPACTED
WARNING
SANDFILL 300

200
TAPE
(SIEVED FREE
H OF STONES)
COMPACTED (TYP.) H

350
EARTH BACKFILL CABLE CABLE CABLE
CABLES MULTI-CELL CABLES CABLES
A B LOCATION LOCATION LOCATION
CABLE PROTECTION M2 78011COMF0010801E
100

12 12 A1 78B31FO48C85R01P001 E1 96COMC0037001E
TILES (TYP.)
SPACE
900 A2 78B31FO48C85R01P002 M3-M8,M1 SPARE E2 96PAC0034002E
OTHER CABLES FOR PEC A3 78B31FO48C86F01P001 E3 96PAC0035002E
Cu CABLE
(TYP.) (TYP.) FUTURE (NOTE 24 TYP.)
USE (REFER DWG. NO. P055BZOR-74-64-0-K401) A4 78B31FO48C86F01P002 E4 98B81FACP01-1
CLEAN
A5 78B31FO48C98R01P001 E5 98B81FACP01-2
COMPACTED
SECTION F97-F97 SANDFILL 400 M5-M8
B1 78B31FO48C98R01P002
I REFER DWG NO. P055BZOR-74-64-0-K418 (SIEVED FREE I
OF STONES) D M B2 78B31FO48C98R02P001
C
E B B3 78B31FO48C98R02P002
A E
CABLE 1 1 2 3 45 2 3 4 5
100

CABLES B4 78M16FO06C98B81P001
LOCATION
B5 78004COMF0027001E
A1 33PAC0081003E Cu CABLE
(TYP.) FO CABLE Cu CABLE MULTI-CELL SCHEDULE 40 C1 96001COMF0001031E
A2 33COMC0418001E (TYP.) (TYP.) CONDUIT (TYP.)
C2 79005SECYF4009005E
INNER DUCT
CABLE
CABLES
SECTION F71-F71 (TYP.) C3 79005SECYF4047005E
LOCATION
J B1 78JBFD8617
REFER DWG NO. P055BZOR-74-64-0-K442 C4 79006SECYF4011005E J
REFER DWG NO. P055BZOR-74-64-0-K436
IFC - Issued for Construction REFER DWG NO. P055BZOR-79-64-0-K080 C5 79007SECYF4013005E
B2 78JBDD8663
D1 79008SECYF4015005E
By Emma Conception Dela Cerna on Mar 14, 2019

CONTINUED:-
D2 79009SECYF4017005E
DWG. NO. TITLE D3 79028SECYF4019005E
P055BZOR-73-64-3-K006 ENMC FIBRE OPTIC CABLE SCHEDULE

P055BZOR-00-19-3-C017-001

P055BZOR-70-71-1-P302
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
UNPAVED, BRICK PAVED OR TILED AREAS
OVERALL FO CABLE ROUTING SECURITY FENCE
CCTV PATCH PANEL
CONFIDENTIAL INFORMATION
K CONTRACT NUMBER: P055BZOR-33-30-3-W301 UNIT 33 TRAIN 03 INSTRUMENT AND FIRE AND GAS CABLE
SCHEDULE
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER K
L9ZR-FI-70-K013 P055BZOR-74-64-0-H501 E&I ROAD CROSSING DRAWING INDEX
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
L9ZR-FI-60-K034 P055BZOR-7071-R-002 EICS CABLE SCHEDULE BACKBONE AND OSP IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY
REV DATE REVISION DESCRIPTION DRAWN CHECK

O
NO

04-04-18 ISSUED FOR CONSTRUCTION GK/AS RK/NR


CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO.

P055BZOR-7130-R-002
TITLE

ICSS FIBER OPTIC CABLE SCHEDULE


GK/AS
AL-ZOUR REFINERY PROJECT
CHECKED BY

A 05-11-18 RE-ISSUED FOR CONSTRUCTION GK/AS NA/NR P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT -79 SECURITY CCTV FENCE RK/NR UNIT-74
SUPERVISOR RELEASE DATE
B 08-03-19 RE-ISSUED FOR CONSTRUCTION SK UD BPP VS P055BZOR-7371-R-401

P055BZOR-7371-R-501
EICS CABLE SCHEDULE BUILDINGS 73-MDS-04

EICS CABLE SCHEDULE BUILDINGS 73-MDS-05


JM/S.DAS 04-04-18 EPC #2 E&I
P055BZOR-7371-R-601 EICS CABLE SCHEDULE BUILDINGS 73-MDS-06
SUPERVISOR ENGR.
SC/A.AGLAVE
INITIALS
POWER LAYOUT
SIZE A1 (594 X 841)

P055BZOR-73-30-3-W061 UNIT 73 MDS 04 FIRE AND GAS CABLE SCHEDULE PROJECT ENGR. APP. DATE
CONTRACTOR DRAWING NUMBER SCALE DRAWING NUMBER
SG REVISION
P055BZOR-73-30-3-W081 UNIT 73 MDS 06 FIRE AND GAS CABLE SCHEDULE

P055BZOR-73-30-3-W051 UNIT 73 MDS 05 FIRE AND GAS CABLE SCHEDULE


CLIENT APP. DATE NTS P055BZOR-74-64-1-K562 B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES
1. FOR GENERAL NOTES, REFER DWG NO. P055BZ0R-74-64-0-K401.
2. CABLES SHOWN IN THESE DRAWINGS ARE THE LATEST ONES UP TO THE DATE, AND
MAY NOT BE THE FINAL LIST. THEREFORE, THE ACTUAL CABLES TO BE INSTALLED
A 200 A
SHALL BE CONFIRMED WITH THE RESPECTIVE CABLE SCHEDULE, BEFORE A
FINISHED TRENCH TOP FINISHED TRENCH TOP INSTALLATION OF THE CABLES.
200 400
FINISHED TRENCH TOP 3. INSTALLATION OF HEAT TRACING SKIN EFFECT RTD CABLE IS IN THE SCOPE OF
EPC # 4 (SPES).
WARNING
300

200
TAPE WARNING WARNING
300 300

200

200
COMPACTED (TYP.) TAPE TAPE

350
EARTH BACKFILL COMPACTED (TYP.) COMPACTED (TYP.)

350

350
EARTH BACKFILL EARTH BACKFILL
CABLE PROTECTION
TILES (TYP.) CABLE PROTECTION CABLE PROTECTION
TILES (TYP.) SPACE TILES (TYP.)

900
FOR
B SPACE B

900

900
PEC SPACE FUTURE PEC
FOR (NOTE 24 TYP.) PEC
FOR USE (NOTE 24 TYP.)
FUTURE (REFER DWG. NO. P055BZOR-74-64-0-K401) (NOTE 24 TYP.)
CLEAN USE FUTURE (REFER DWG. NO. P055BZOR-74-64-0-K401) (REFER DWG. NO. P055BZOR-74-64-0-K401)
COMPACTED CLEAN USE CLEAN 1000
SANDFILL COMPACTED COMPACTED M9-M12 M13-M16
300 SANDFILL M1-M4 M5-M8 SANDFILL M1-M4 M5-M8
(SIEVED FREE
OF STONES) A (SIEVED FREE
300
(SIEVED FREE E
D M 450 M LEGEND
OF STONES) E M OF STONES) C C
C B B A B 10 B
C B
1 1 234567 1234567 D A A G G H A NOTE: RED LINE MARKUP AS PER CABLE SCHEDULE

100
D 1234 5
1 1 1 2 345 6 7 89 234 1 234 5 12 3 67 8 9 P055BZOR-7071-R-012 AND SOME CABLES REROUTED DUE

100

100
TO 96-FAR-01 MCT ENTRY. DELATED CABLES AVAILABLE
C RTD CABLE Cu CABLE FO CABLE
FO CABLE SECTION F100,F99,F82,F81, F84 AS PER SITE CONDITION
C
(TYP.) (TYP.) RTD CABLE Cu CABLE FO CABLE
(SEE NOTE 3.) FO CABLE (TYP.) MULTI-CELL SCHEDULE 40 Cu CABLE (TYP.)
(SEE NOTE 3.) (TYP.) INNER DUCT
Cu CABLE (TYP.) CONDUIT (TYP.) (TYP.)
(TYP.) (TYP.) RED LINE MARK UP NO CHANGE / WITH CHANGES
INNER DUCT MULTI-CELL SCHEDULE 40 OTHER CABLE
A (TYP.) MULTI-CELL SCHEDULE 40
(TYP.) CONDUIT (TYP.) (TYP.)
1000 Contractor Name: IMCO Engineering & Construction Co.
SECTION F65-F65 INNER DUCT
(TYP.)
A Contract No: L9ZR-FI-70-K013
REFER DWG NO. P055BZOR-74-64-0-K437
SECTION F67-F67 A
& P055BZOR-74-64-0-K440
REFER DWG NO. P055BZOR-74-64-0-K440
SECTION F100-F100 Contractor
Representative:
REFER DWG NO. P055BZOR-74-64-0-K441
D & P055BZOR-74-64-0-K453
Name/Signature/Date D
CABLE CABLE
CABLES CABLES
LOCATION LOCATION CABLE CABLE CABLE Verified FDHJV Field Eng. Intermediate ‐ Approved                               
MULTI-CELL CABLES CABLES LV CABLES Name/Signature/Date
B1 96COMC0037001E A1 78B31FO48C96F01P001 LOCATION LOCATION LOCATION By Vishal kumar sharma on Jul 27, 2020
                                                                   

B2 96PAC0034002E A2 78B31FO48C96F01P002 M2 78011COMF0006004E A1 78B31FO48C85R01P001 M7 78011COMF0006004E  

B3 96PAC0035002E A3 78M16FO06C96F01P001 M3 78011COMF0010801E A2 78B31FO48C85R01P002 M10 78013COMF0016005E  

B4 78B65FACP01-1 A4 78004COMF0029001E M4-M8,M1 SPARE A3 78B31FO48C86F01P001 M1-M6,


A4 78B31FO48C86F01P002 M3-M16, SPARE
By Randy Eguia at 7:48 am, Jul 26, 2020
B5 98B81FACP01-1 A5 96001COMF0001031E A
A M8,M9
B6 78B65FACP01-2 A6 96COMF0003003E A5 78B31FO48C98R01P001
E A A6 78B31FO48C98R01P002
E
B7 98B81FACP01-2 A7 96F01FO24C43S02P001
CABLE
CABLES
LOCATION A7 78B31FO48C98R02P001 CABLE
CABLES
CABLE
CABLES
D1 96COMC0037001E A8 78B31FO48C98R02P002 LOCATION Note: Contractor Sign are missing.
A LOCATION A1 78M16FO06C96F01P001
D2 96PAC0034002E A9 78M16FO06C96F01P001
C1 73-DB-05E01-C1 A2 78M16FO06C98B81P001
D3 96PAC0035002E A10 78004COMF0025001E
A3 78004COMF0025001E
D4 78B65FACP01-1 B1 78004COMF0026001E
A
A4 78004COMF0026001E
E1 98B81FACP01-1 B2 78004COMF0028001E
A5 78004COMF0027001E CABLE
F E2 78B65FACP01-2 B3 78004COMF0029001E
A6 78M16FO06C96F01S001 LOCATION
CABLES F
E3 98B81FACP01-2 B4 78004COMF0030001E
G1 96PAC0028501E
A7 78M16FO06C98B81S001
B5 78004COMF0031002E
200 G2 96001COMC0038099E
FINISHED TRENCH TOP A A8 79005SECYF4009005E
B6 78004COMF0032001E
G3 96001COMC0039099E
A9 79005SECYF4047005E
CABLE B7 96001COMF0001031E
WARNING CABLES G4 78B65FACP01-1
B1 78005COMF0038001E
300 LOCATION
200

TAPE B8 96COMF0003003E
G5 78B65FACP01-2
COMPACTED (TYP.) C1 73-DB-05E01-C1 B2 78005COMF0039001E
350

EARTH BACKFILL B3 78005COMF0040001E


CABLE PROTECTION CABLE
G TILES (TYP.)
A B4 78004COMF0028001E
LOCATION
CABLES G
B5 78004COMF0029001E
H1 78JBAF1401
900

SPACE PEC B6 79006SECYF4011005E


FOR H2 78JBAF1402
(NOTE 24 TYP.)
FUTURE (REFER DWG. NO. P055BZOR-74-64-0-K401) B7 79007SECYF4013005E
H3 78JBAF1403
CLEAN USE B8 79008SECYF4015005E
COMPACTED
SANDFILL B9 79009SECYF4017005E
(SIEVED FREE
A C1 78004COMF0030001E
OF STONES) A
C2 78004COMF0031002E
H A
1234567 C3 78004COMF0032001E
H
100

C4 78005COMF0041002E
FO CABLE
C5 78005COMF0050001E
(TYP.)
C6 79028SECYF4019005E
D1 78005COMF0052001E
D2 78005COMF0054001E

SECTION F66-F66 D3 79005SECYF4010005E

I REFER DWG NO. P055BZOR-74-64-0-K440


& P055BZOR-74-64-0-K445
D4 79005SECYF4048005E IFC - Issued for Construction I
D5 79006SECYF4012005E
By Emma Conception Dela Cerna on Nov 07, 2018
E1 79007SECYF4014005E
CABLE E2 79008SECYF4016005E
CABLES
LOCATION
E3 79009SECYF4018005E
A1 78B31FO48C39F01P001
E4 79028SECYF4020005E
A2 78B31FO48C39F01P002
A3 78B31FO48C92F01P001
A4 78B31FO48C92F01P002
J J
A5 78004COMF0026001E
A6 78004COMF0028001E
A
A7 96F01FO24C39S01P001
CONTINUED:-
DWG. NO. TITLE

P055BZOR-73-64-3-K006 ENMC FIBRE OPTIC CABLE SCHEDULE

P055BZOR-00-19-3-C017-001

P055BZOR-70-71-1-P302
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
UNPAVED, BRICK PAVED OR TILED AREAS
OVERALL FO CABLE ROUTING SECURITY FENCE
CONFIDENTIAL INFORMATION
K CONTRACT NUMBER:
CCTV PATCH PANEL

A
P055BZOR-33-30-3-W301 UNIT 33 TRAIN 03 INSTRUMENT AND FIRE AND GAS CABLE
SCHEDULE
NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER K
L9ZR-FI-70-K013 P055BZOR-74-64-0-H501 E&I ROAD CROSSING DRAWING INDEX
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE

L9ZR-FI-60-K034
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
P055BZOR-7071-R-002 EICS CABLE SCHEDULE BACKBONE AND OSP IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY

AL-ZOUR REFINERY PROJECT


REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE GK/AS
O 04-04-18 ISSUED FOR CONSTRUCTION GK/AS RK/NR P055BZOR-7130-R-002 ICSS FIBER OPTIC CABLE SCHEDULE
CHECKED BY

A 05-11-18 RE-ISSUED FOR CONSTRUCTION GK/AS NA/NR P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT -79 SECURITY CCTV FENCE RK/NR UNIT-74
EPC #2 E&I
SUPERVISOR RELEASE DATE
P055BZOR-7371-R-401 EICS CABLE SCHEDULE BUILDINGS 73-MDS-04
JM/S.DAS 02-04-18
P055BZOR-7371-R-501 EICS CABLE SCHEDULE BUILDINGS 73-MDS-05

P055BZOR-7371-R-601 EICS CABLE SCHEDULE BUILDINGS 73-MDS-06


SUPERVISOR ENGR.
SC/A.AGLAVE
INITIALS
POWER LAYOUT
SIZE A1 (594 X 841)

P055BZOR-73-30-3-W061 UNIT 73 MDS 04 FIRE AND GAS CABLE SCHEDULE PROJECT ENGR. APP. DATE
CONTRACTOR DRAWING NUMBER
SG SCALE DRAWING NUMBER REVISION
P055BZOR-73-30-3-W081
P055BZOR-74-64-1-K561
UNIT 73 MDS 06 FIRE AND GAS CABLE SCHEDULE

P055BZOR-73-30-3-W051 UNIT 73 MDS 05 FIRE AND GAS CABLE SCHEDULE


CLIENT APP. DATE NTS A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES
1. FOR GENERAL NOTES, REFER DWG NO. P055BZ0R-74-64-0-K401.
FINISHED TRENCH TOP 2. CABLES SHOWN IN THESE DRAWINGS ARE THE LATEST ONES UP TO THE DATE, AND
400
FINISHED TRENCH TOP MAY NOT BE THE FINAL LIST. THEREFORE, THE ACTUAL CABLES TO BE INSTALLED
A 200 SHALL BE CONFIRMED WITH THE RESPECTIVE CABLE SCHEDULE, BEFORE A
INSTALLATION OF THE CABLES.
WARNING
300

200
TAPE WARNING
300

200
COMPACTED (TYP.) TAPE

350
EARTH BACKFILL COMPACTED (TYP.)

350
EARTH BACKFILL
CABLE PROTECTION
TILES (TYP.) CABLE PROTECTION
TILES (TYP.)

900
SPACE

900
FOR PEC
FUTURE (NOTE 24 TYP.) SPACE
PEC
B USE (REFER DWG. NO. P055BZOR-74-64-0-K401) FOR
FUTURE
(NOTE 24 TYP.) B
CLEAN (REFER DWG. NO. P055BZOR-74-64-0-K401)
COMPACTED CLEAN USE
M1-M4 M5-M8 M9-M12
SANDFILL COMPACTED
(SIEVED FREE M SANDFILL M1-M4 M5-M8 M9-M12
10 12 14 300
OF STONES) C (SIEVED FREE
B OF STONES) E G B M
D
1
A
12 34 56 78 9 11 13 15 F
D B
F
LEGEND
C

100
A
1 1 2 1 2 345 23 1

100
ENMC CABLE FO CABLE INNER DUCT Cu CABLE
C (TYP.) (TYP.) (TYP.) ENMC CABLE
(TYP.)
(TYP.) INNER DUCT C
MULTI-CELL SCHEDULE 40 (TYP.)
FO CABLE
(TYP.) (TYP.) MULTI-CELL SCHEDULE 40
CONDUIT (TYP.)
SECTION F54-F54
REFER DWG NO. P055BZOR-74-64-0-K426

SECTION F74-F74 NOTE:


REFER DWG NO. P055BZOR-74-64-0-K453 1. 92PAC0012002E, 92PAC0013002E, 92001COMC0032003E SHIFTED TO SECTION F69&F70 DUE
REFER DWG NO. P055BZOR-74-64-0-K457 TO ROAD CROSSING SLEEVE UNAVAILABILITY
2. 73JBDF3015-2, 73JBDF3016-2, 73JBDF3016-3 SHIFTED AS PER L9ZR-FI-70-K013-ERFI-0174_0
D CABLE
CABLES
CABLE
CABLES
CABLE
CABLES
CABLE
ENMC CABLES D
LOCATION LOCATION LOCATION LOCATION
A1 78B31FO48C01F01P001 B4 78B31FO48C14F01P001 C7 78B31FO48C63F01P001 D1 C6-01-M-06-EN-01G01-085 CABLE CABLE CABLE
ENMC CABLES MULTI-CELL CABLES CABLES
LOCATION LOCATION LOCATION
A2 78B31FO48C01F01P002 B5 78B31FO48C14F01P002 C8 78B31FO48C63F01P002
C1 C6-01-M-39-EN-01G01-134 M1 78009COMF0012606E A1 78005COMF0038001E RED LINE MARK UP NO CHANGE / WITH CHANGES
A3 78B31FO48C02F01P001 B6 78B31FO48C21F01P001 C9 78B31FO48C69F01P001
C2 C6-05-M-73-EN-05G02-160 M2 78009COMF0013607E A2 78005COMF0039001E
A4 78B31FO48C02F01P002 B7 78B31FO48C21F01P002 C10 78B31FO48C69F01P002 Contractor Name: IMCO Engineering & Construction Co.
D1 C6-05-M-73-EN-05G01-154 M3 78009COMF0014608E A3 78005COMF0041002E
A5 78B31FO48C03F01P001 B8 78B31FO48C22F01P001 C11 78B31FO48C76F01P001
D2 C6-03-M-73-EN-03G01-166 M4 78013COMF0011128E A4 78005COMF0050001E
A6 78B31FO48C03F01P002 B9 78B31FO48C22F01P002 C12 78B31FO48C76F01P002
Contract No: L9ZR-FI-70-K013
E1 C6-02-M-73-EN-02G02-162 M6 78013COMF0017127E A5 78005COMF0052001E
Contractor Christus J Mathew
E A7 78B31FO48C04F01P001 B10 78B31FO48C23F01P001 C13 60F01FO12C33F02P001
E2 C6-31-M-78-EN-31G01-168 M7-M12, B1 78005COMF0054001E Representative: E
A8 78B31FO48C04F01P002 B11 78B31FO48C23F01P002 SPARE 06-July-2020
M5 Name/Signature/Date
B2 92001COMF0005003E
A9 78B31FO48C05F01P001 B12 78B31FO48C25F01P001 Intermediate ‐ Approved                               
CABLE B3 78B31FO48C92F01S001 Verified FDHJV Field Eng.
MULTI-CELL CABLES Name/Signature/Date
A10 78B31FO48C05F01P002 B13 78B31FO48C25F01P002 LOCATION By Vishal kumar sharma on Jul 07, 2020
B4 78B31FO48C92F01S002                                                                    
A11 78B31FO48C06F01P001 B14 78B31FO48C34F01P001 M1 78011COMF0002602E CABLE
CABLES B5 96F01FO24C39S01S001  
A12 78B31FO48C06F01P002 B15 78B31FO48C34F01P002 M2 78011COMF0004604E LOCATION
F1 92001COM0032003E G1 92COMF0001001E
A13 78B31FO48C11F01P001 C1 78B31FO48C60F01P001 M3 78011COMF0007003E  
F2 92PAC0012002E
A14 78B31FO48C11F01P002 C2 78B31FO48C60F01P002 M4 78011COMF0001601E
B
F A15 78B31FO48C12F01P001 C3 78B31FO48C61F01P001 M6 78011COMF0003603E
F3 92PAC0013002E By Randy Eguia at 4:03 am, Jul 05, 2020 F
F1 73JBDF3015-2
B1 78B31FO48C12F01P002 C4 78B31FO48C61F01P002
M7-M12, F2 73JBDF3016-2
B2 78B31FO48C13F01P001 C5 78B31FO48C62F01P001 M5
SPARE
F3 73JBDF3016-3 HOLD
B3 78B31FO48C13F01P002 C6 78B31FO48C62F01P002

G G

CABLE PROTECTION
TILES (TYP.)
FINISHED TRENCH TOP

WARNING TAPE (TYP.)


100
H H
CABLE
200

CABLES
COMPACTED LOCATION
350

EARTH BACKFILL A1 78JBFD8616


SPACE FOR FUTURE USE

A2 78JBDD8660

NON CONTINUOUS LOAD CARRYING CABLES


900

PEC CABLE
CABLES
(NOTE 24 TYP.) LOCATION
(REFER DWG. NO.
I CLEAN P055BZOR-74-64-0-K401)
B1 96COMC0038001E I
COMPACTED B2 96PAC0033002E
SANDFILL
(SIEVED FREE 300
OF STONES)
B A
1 12 2
100

IFC - Issued for Construction


OTHER CABLES Cu CABLE
(TYP.) (TYP.)
J J

SECTION F112-F112 CONTINUED:-

REFER DWG NO. P055BZOR-74-64-0-K441 DWG. NO. TITLE


By Ann Sugar Espelembergo on Nov 06, 2019
P055BZOR-73-64-3-K006 ENMC FIBRE OPTIC CABLE SCHEDULE
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
P055BZOR-00-19-3-C017-001
UNPAVED, BRICK PAVED OR TILED AREAS

CONFIDENTIAL INFORMATION
P055BZOR-70-71-1-P302 OVERALL FO CABLE ROUTING SECURITY FENCE
CCTV PATCH PANEL
CONTRACT NUMBER: P055BZOR-33-30-3-W301 UNIT 33 TRAIN 03 INSTRUMENT AND FIRE AND GAS CABLE
SCHEDULE

K L9ZR-FI-70-K013 P055BZOR-74-64-0-H501 E&I ROAD CROSSING DRAWING INDEX


NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER K
L9ZR-FI-60-K034 B
P055BZOR-7071-R-002 EICS CABLE SCHEDULE BACKBONE AND OSP
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
B
L9ZR-HI-60-K404 P055BZOR-92-71-3-M001-001 CABLE SCHEDULES FOR ALL COMMUNICATION CABLES- DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
UNIT 92 IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY

AL-ZOUR REFINERY PROJECT


REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE GK/AS
O 22-03-18 ISSUED FOR CONSTRUCTION GK/AS RK/NR P055BZOR-7130-R-002 ICSS FIBER OPTIC CABLE SCHEDULE
CHECKED BY

A 31-10-18 RE-ISSUED FOR CONSTRUCTION GK/AS NA/NR P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT -79 SECURITY CCTV FENCE RK/NR UNIT-74
EPC #2 E&I
SUPERVISOR RELEASE DATE
B 01-11-19 RE-ISSUED FOR CONSTRUCTION ( REFER IFCUN-UOI-00233_0 ) RKS BRG MG VS P055BZOR-7371-R-401 EICS CABLE SCHEDULE BUILDINGS 73-MDS-04
JM/S.DAS 22-03-18
P055BZOR-7371-R-501 EICS CABLE SCHEDULE BUILDINGS 73-MDS-05

P055BZOR-7371-R-601 EICS CABLE SCHEDULE BUILDINGS 73-MDS-06


SUPERVISOR ENGR.
SC/A.AGLAVE
INITIALS
POWER LAYOUT
SIZE A1 (594 X 841)

P055BZOR-73-30-3-W061 UNIT 73 MDS 04 FIRE AND GAS CABLE SCHEDULE PROJECT ENGR. APP. DATE
CONTRACTOR DRAWING NUMBER
SG SCALE DRAWING NUMBER REVISION
P055BZOR-73-30-3-W081
P055BZOR-74-64-1-K555
UNIT 73 MDS 06 FIRE AND GAS CABLE SCHEDULE

P055BZOR-73-30-3-W051 UNIT 73 MDS 05 FIRE AND GAS CABLE SCHEDULE


CLIENT APP. DATE NTS B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES
FINISHED TRENCH TOP 400 FINISHED TRENCH TOP
400 1. FOR GENERAL NOTES, REFER DWG NO. P055BZ0R-74-64-0-K401.
2. CABLES SHOWN IN THESE DRAWINGS ARE THE LATEST ONES UP TO THE DATE, AND
MAY NOT BE THE FINAL LIST. THEREFORE, THE ACTUAL CABLES TO BE INSTALLED
A WARNING
WARNING
300
SHALL BE CONFIRMED WITH THE RESPECTIVE CABLE SCHEDULE, BEFORE A

200
300 TAPE INSTALLATION OF THE CABLES.

200
TAPE (TYP.)
COMPACTED
COMPACTED (TYP.)

350
EARTH BACKFILL

350
EARTH BACKFILL
CABLE PROTECTION
CABLE PROTECTION
TILES (TYP.)
TILES (TYP.)
SPACE

900
FOR SPACE

900
FUTURE FOR PEC
PEC (NOTE 24 TYP.)
USE (NOTE 24 TYP.) FUTURE
USE (REFER DWG. NO. P055BZOR-74-64-0-K401)
(REFER DWG. NO. P055BZOR-74-64-0-K401) CLEAN
CLEAN 1000 1300
B COMPACTED M1-M4 M5-M8 M9-M12
COMPACTED
SANDFILL 300 B
SANDFILL 300
M (SIEVED FREE 10 12 14 16 18 20 22
(SIEVED FREE N OF STONES) 10 C
OF STONES) D
C C A B D D A
F
A B E E A 1 23 1 2 3 4 5 6 7 8 9 11 13 15 17 19 21 1 23 4 5 6 78 9 4 5 678 9

100
1 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 1 2 3 45 6 2 3 4 5 6 7 8 910

100
LEGEND
FO CABLE OTHER CABLES Cu CABLE
FO CABLE OTHER CABLES Cu CABLE FO CABLE
(TYP.) (TYP.) (TYP.)
(TYP.) NOTE:
(TYP.) (TYP.) FO CABLE INNER DUCT (TYP.)
(TYP.) (TYP.) 1. 92PAC0012002E, 92PAC0013002E, 92001COMC0032003E SHIFTED TO SECTION F69&F70 DUE
ENMC CABLES TO ROAD CROSSING SLEEVE UNAVAILABILITY
C (TYP.) MULTI-CELL SCHEDULE 40
(TYP.)
2. 92PAC0010002E, 92PAC0011002E TRANSFER TO 21-FAR-01 TO MDS-04(P055BZOR-7371-R-401) C
3. 73JBDF3015-2, 73JBDF3016-2, 73JBDF3016-3 SHIFTED AS PER L9ZR-FI-70-K013-ERFI-0174_0
SECTION F110-F110
SECTION F40-F40 REFER DWG NO. P055BZOR-74-64-0-K446
& P055BZOR-74-64-0-K457
REFER DWG NO. P055BZOR-74-64-0-K457 RED LINE MARK UP NO CHANGE / WITH CHANGES
& P055BZOR-74-64-0-K458

Contractor Name: IMCO Engineering & Construction Co.

CABLE CABLE CABLE Contract No: L9ZR-FI-70-K013


CABLES MULTI-CELL CABLES ENMC CABLES
LOCATION LOCATION LOCATION
D A1 92001COMF0004002E M1 78009COMF0012606E F1 C6-01-M-39-EN-01G01-134 NON CONTINUOUS LOAD CARRYING CABLES
Contractor
Christus J Mathew D
Representative:
Name/Signature/Date 06-July-2020
A2 78002COMF0045001E M2 78009COMF0013607E F2 C6-05-M-73-EN-05G02-160 CABLE CABLE
CABLES CABLES
A3 78005COMF0038001E M3 78009COMF0014608E F3 C6-05-M-73-EN-05G01-154
LOCATION LOCATION Verified FDHJV Field Eng. Intermediate ‐ Approved                               
A1 92001COMF0004002E B1 73JBDF4072-IS Name/Signature/Date
A4 78005COMF0039001E M4 78013COMF0011128E F4 C6-03-M-73-EN-03G01-166 By Vishal kumar sharma on Jul 07, 2020
A2 MISFACP9101 B2 73JCDF4073-IS                                                                    
A5 78005COMF0041002E M6 78013COMF0017127E F5 C6-02-M-73-EN-02G02-162
A3 MISFACP9102 B3 73JBDF4052  
A6 78005COMF0050001E M7-M12, F6 C6-31-M-78-EN-31G01-168
SPARE A4 92001COMF0008002E B4 73JCDF4053
A7 78005COMF0052001E M5  
A5 92001COMF0005003E B5 73JCDF4111
E A8 78005COMF0054001E
A6 78002COMF0045001E B6 73JCDF4112
By Randy Eguia at 4:04 am, Jul 05, 2020 E
A9 92001COMF0008002E
A7 78B31FO48C92F01S001 B7 73JCAF4058
A10 96F01FO24C39S01S001 CABLE
NON CONTINUOUS LOAD CARRYING CABLES CABLES A8 78B31FO48C92F01S002 B8 73JBDF4086
LOCATION
E1 92PAC0103002E A9 92F01FO24C39S01S001 B9 73JBDF4087
CABLE C
PCS/CONTROL CABLES E2 92001C0MC0026002E A10 92COMF0001001E B10 73JBDF4088
LOCATION
B1 73JBDF4072-IS E3 92PAC0101002E B11 73BDF4089

B2 73JCDF4073-IS E4 92PAC0102002E B12 73JBDF4090


CABLE
F B3 73JBDF4052 E5 92PAC0010002E
LOCATION
CABLES B13 73JBDF4091 F
B4 73JCDF4053 E6 92PAC0011002E D1 92PAC0103002E B14 73JBDF4092

B5 73JCDF4111 D2 92001COMC0026002E B15 73JBDF4093

B6 73JCDF4112 D3 92001COMC0032003E B16 73JBDF4094

B7 73JCAF4058 D4 92PAC0101002E B17 73JCDF4131

B8 73JBDF4086 D5 92PAC0102002E B18 73JCDF4132

B9 73JBDF4087 D6 92PAC0010002E B19 73JBDF4096

B10 73JBDF4088 D7 92PAC0011002E B20 73JBDD6002


G B21 73JBDD6003
G
C1 73BDF4089 D8 92PAC0012002E
C2 73JBDF4090 D9 92PAC0013002E B22 73JBDD6011

C3 73JBDF4091 C14 73JBDF3015-2 C1 73JBDF5011


C15 73JBDF3016-2 C2 73JBDF3008-IS
C4 73JBDF4092
C16 73JBDF3016-3 C3 73JBDF3009-1
C5 73JBDF4093
C6 73JBDF4094 C4 73JBDF3010-1

C7 73JCDF4131 C5 73JBDF3011

H C8 73JCDF4132 C6 73JCAF3012 H
C9 73JBDF4096 C7 73JBDF3009-2

C10 73JBDD6002 C8 73JBDD6004

D1 73JBDD6003 C9 73JBDD6005

D2 73JBDD6011 C10 73MDS04CP01-01

D3 73JBDF5011 C11 73JBDF3007-IS

D4 73JBDF3008-IS C12 73JBDF3010-2

D5 73JBDF3009-1 C13 73JBDF3010-3


I D6 73JBDF3010-1
I
D7 73JBDF3011
D8 73JCAF3012
D9 73JBDF3009-2
D10 73MDS04CP01-01
N1 73JBDF3007-IS

J
N2
N3
73JBDF3010-2
73JBDF3010-3
IFC - Issued for Construction J

CONTINUED:-
DWG. NO. TITLE
By Ann Sugar Espelembergo on Nov 06, 2019
P055BZOR-73-64-3-K006 ENMC FIBRE OPTIC CABLE SCHEDULE
CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
P055BZOR-00-19-3-C017-001
UNPAVED, BRICK PAVED OR TILED AREAS

CONFIDENTIAL INFORMATION
P055BZOR-70-71-1-P302 OVERALL FO CABLE ROUTING SECURITY FENCE

CONTRACT NUMBER: P055BZOR-33-30-3-W301


CCTV PATCH PANEL
UNIT 33 TRAIN 03 INSTRUMENT AND FIRE AND GAS CABLE
SCHEDULE

K L9ZR-FI-70-K013 P055BZOR-74-64-0-H501 E&I ROAD CROSSING DRAWING INDEX NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER K
L9ZR-FI-60-K034 C C
P055BZOR-7071-R-002 EICS CABLE SCHEDULE BACKBONE AND OSP
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES
AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE

L9ZR-HI-60-K404 CABLE SCHEDULES FOR ALL COMMUNICATION CABLES- DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
P055BZOR-92-71-3-M001-001 IT IS FURNISHED.
UNIT 92
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING DRAWN BY

AL-ZOUR REFINERY PROJECT


REV DATE REVISION DESCRIPTION DRAWN CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE GK/AS
O 22-03-18 ISSUED FOR CONSTRUCTION GK/AS RK/NR P055BZOR-7130-R-002 ICSS FIBER OPTIC CABLE SCHEDULE
CHECKED BY

A 31-10-18 RE-ISSUED FOR CONSTRUCTION GK/AS NA/NR P055BZOR-7971-R-001 EICS CABLE SCHEDULE UNIT -79 SECURITY CCTV FENCE RK/NR UNIT-74
EPC #2 E&I
SUPERVISOR RELEASE DATE
B 08-03-19 RE-ISSUED FOR CONSTRUCTION SK UD BPP VS P055BZOR-7371-R-401 EICS CABLE SCHEDULE BUILDINGS 73-MDS-04
JM/S.DAS 22-03-18
C 01-11-19 RE-ISSUED FOR CONSTRUCTION ( REFER IFCUN-UOI-00233_0 ) RKS BRG MG VS P055BZOR-7371-R-501 EICS CABLE SCHEDULE BUILDINGS 73-MDS-05

P055BZOR-7371-R-601 EICS CABLE SCHEDULE BUILDINGS 73-MDS-06


SUPERVISOR ENGR.
SC/A.AGLAVE
INITIALS
POWER LAYOUT
SIZE A1 (594 X 841)

P055BZOR-73-30-3-W061 UNIT 73 MDS 04 FIRE AND GAS CABLE SCHEDULE PROJECT ENGR. APP. DATE
CONTRACTOR DRAWING NUMBER
SG SCALE DRAWING NUMBER REVISION
P055BZOR-73-30-3-W081
P055BZOR-74-64-1-K553
UNIT 73 MDS 06 FIRE AND GAS CABLE SCHEDULE

P055BZOR-73-30-3-W051 UNIT 73 MDS 05 FIRE AND GAS CABLE SCHEDULE


CLIENT APP. DATE NTS C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
GENERAL NOTES: NOTES
1. FOR GENERAL NOTES, REFER DWG. NO P055BZOR-74-64-0-K401.

2. FOR LV CABLE SCHEDULE OF UNIT-43 REFER DOC. NO. P055BZOR-43-64-3-K002

A A

PLANT NORTH
KTM NORTH
NOTES:

PR W NOTE: RED LINE MARKUP AS PER CABLE SCHEDULE P055BZOR-7971-R-001


EV IND
H

B B
KA

AI
AK

LI RED LINE MARK UP NO CHANGE / WITH CHANGES


N
M

G
Contractor Name: IMCO Engineering & Construction Co.

Contract No: L9ZR-FI-70-K013

E 6250.500
Contractor
Representative:
Name/Signature/Date
Intermediate ‐ Approved                               
C Verified FDHJV Field Eng.
C
MATCHLINE N 5262.825 MATCHLINE N 5262.825 Name/Signature/Date
By Vishal Kumar Sharma on Oct 04, 2020
                                                                   
SEE DWG P055BZOR-74-64-0-K432 SEE DWG P055BZOR-79-64-0-K081
 

 
By Randy Eguia at 5:57 am, Sep 19, 2020

EP
STREET LIGHT TRENCH

C-
4
EP
D D

C-
2
79TRN4-016

E E
HPFS EL. 108.600

FO E
P4 59ZO
P4
HPFS EL. 109.750

624 ST CL OF 8M PLANT ROAD

05

R C EPC7-10- -H00
0

SE OR-6 -64-
9Z R-00

ON -4 30-4 4-00
F LEGEND F
G58

TIN DW 02 1
1. FOR GENERAL LEGEND & SYMBOLS, REFER DWG. NO P055BZOR-00-64-1-F001-SERIES.

G58

UA G
TIO
1

N
P055BZOR-74-64-1-K219

&
SEE DWG P055BZOR-74-64-0-K435

SEE DWG P055BZOR-79-64-0-K080


G G
MATCHLINE E 6200.000

MATCHLINE E 6309.000
2
-K5
36 G3
-1
-64
-74
6A
R
A ZO 2
A
P055B
A4 G3P055BZOR-74-64-1-K213
6A
H 74TRN6-173 P055BZOR-74-64-1-K536 LV TRENCH (TYP.) A 74DBS6-243 74TRN6-173 A4 H
F73
THIS DWG.
A46 DB
DB D15 A3
A46 F73 F119
P055BZOR-74-64-1-K578
F119
P055BZOR-74-64-1-K565
D15 A3
74TRN5-112 F83 HV TRENCH 33 & 6.6kV (TYP.) P055BZOR-74-64-1-K523 74DBS5-049 P055BZOR-74-64-1-K502 74TRN5-112

P055BZOR-74-64-1-K578
I I
F83
74TRN4-285 EICS TRENCH (TYP.) 74-TBPP-030026 74DBS4-092 74-TBPP-030027 74TRN4-285 74-TBPP-030028
EICS FO CABLE PULL PIT (TYP.)

74TRN6-173 79TRN4-016
A
74TRN6-121

J J

78-DB-65-01F11-02
78-DB-65-01F11-01 KEY PLAN
96COMP0039004E

PLANT NORTH
KTM NORTH
STREET LIGHT FOUNDATION (TYP.)
K 74TRN4-268 K
2

PR W
3 61

EV IND
H
KA
10

AI
AK

LI
N
M

G
62
4

6
THIS DRAWING
A
11
8
7

F71 9

P055BZOR-74-64-1-K562 15 29 30

31
12 13 14 A

STREET LIGHT LV TRENCH (TYP.) F71 16

L 74TRN6-121 17
33 34
32
L
35 36
B

37
D
E 38

18 20 41 42
43

19

MATCHLINE N 5170.000
39 40

22

Direct buried power cable splice(joint)


45 53 54 55

SEE DWG P055BZOR-74-64-0-K442


56
B 21

78-DB-65-01F11-02
44 G
F

23 46
57

E 6214.621 24 25 H

48 49 58

N 5180.686
47
28

M M
26 C

A 27
50 51 52 59
60

300 PLAN VIEW


(TYP.)

0 5m 10m 15m 20m


1 2 3

IFC - Issued for Construction SCALE: 1:200


N SLEEVE By Gift de la Cruz on Jan 11, 2019
N
DIA 200MM
(TYP.)

SECTION DB
THIS DWG

CABLE LOCATION POWER CABLES CONTROL (FIBRE OPTIC)


/ ENMC CABLES

O
LP-02-F-98-EB-81-02F01-01 CONFIDENTIAL INFORMATION O
A1 LP-02-F-98-DB-81-02F01-01-2
LP-02-F-98-DB-81-02F01-01-1
HPFS EL. 108.600 NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF KIPIC. IT IS LENT TO THE BORROWER
FOR HIS CONFIDENTIAL USE ONLY. IN CONSIDERATION OF THE LOAN OF THIS DRAWING, THE BORROWER PROMISES

A2 LP-02-F-78-A-1324-PM-01B LP-02-F-78-A-1324-PM-01B HPFS EL. 109.750 AND AGREES TO RETURN IT UPON REQUEST, AGREES THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISE
DISPOSED OF DIRECTLY OR INDIRECTLY AND, THAT IT SHALL NOT BEUSED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH
IT IS FURNISHED.
CONTRACTOR APPROVAL KIPIC APPROVAL REFERENCE DRAWING
A3 LP-02-F-78-A-1324-PM-01A LP-02-F-78-A-1324-PM-01A DATE REVISION DESCRIPTION DRAWN
DRAWN BY

AL-ZOUR REFINERY PROJECT


REV CHECK
NO CSA PIPING MECH. ELEC. PROCESS CIT PROJ. ENGR PROJ. DWG. NO. TITLE NJ
CONTRACT NUMBER: O 20-02-18 ISSUED FOR CONSTRUCTION NJ SB P055BZOR-79-64-0-K001 UNIT-79 OSBL E&I POWER LAYOUT INDEX DRAWING CHECKED BY

L9ZR-FI-70-K013
A A 09-01-19 RE-ISSUED FOR CONSTRUCTION RK NA P055BZOR-74-64-0-H400 EPC#2 E&I UNDERGROUND TRENCH DRAWING INDEX RK UNIT-74
SUPERVISOR RELEASE DATE

L9ZR-FI-60-K034
P055BZOR-79-64-1-J031 STREET LIGHTING AND OVERALL EARTHING DRAWING
JM 20-02-18 EPC #2 E&I
SIZE A0 (841 X 1189)

P055BZOR-74-64-0-K400 EPC #2 E&I POWER LAYOUT INDEX DRAWING

POWER LAYOUT
SUPERVISOR ENGR. INITIALS
L9ZR-HI-60-K404 P055BZOR-7130-R-002 ICSS FIBRE OPTIC CABLE SCHEDULE SC/SR  

P055BZOR-73-64-3-K003 PROJECT ENGR. APP. DATE

CWP NO. 7900AB01A


CABLE SCHEDULE FOR SUBSTATION 73-MDS-05
CONTRACTOR DRAWING NUMBER SG SCALE DRAWING NUMBER REVISION

P055BZOR-74-64-0-K436
P055BZOR-79-64-3-K001 ELECTRICAL CABLE SCHEDULE UNIT-79
CWP NO. 7402BU05A P055BZOR-00-19-3-C017-001 CIVIL STRUCTURAL STANDARD CABLE ROUTING IN
CLIENT APP. DATE 1:200 A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

2.3 Non-Conformance
Report Log

Not Applicable
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

2.4 Components List


Al-ZOUR Refinery Project

Component List PTO all TOSS


9/23/2020 4:14:01 PM

Subsystem Tag Tag Description Drawing Discipline Remarks


70-70-00-C002- LU-05-G-73-DB- Instrument
73-MDS-05 EICS CABLE FROM: 39-DB-01G03 TO: 73-DB-05G01
043 05G01 Cable
70-70-00-C002- LU-05-G-73-DB- Instrument
73-MDS-05 EICS CABLE FROM: 39-DB-01G03 TO: 73-DB-05G01
043 05G02 Cable
70-70-00-C002- 92001COMC00260 EICS Signal Cable; Underground, From Tag No: 92-EICS-SYS-001 Telecom
043 02E To Tag No: 73-EICS-NP-002 Cable
70-70-00-C002- EICS Signal Cable;UG,Fire resistant,1 PR;NIS (4.0mm²); From Tag: 96 Telecom
96PAC0028501E P055BZOR-9671-R-001
043 -EICS-SYS-002 To Tag: 78-JB-TSPI-7501 Cable
70-70-00-C002- 96001COMC00390 EICS Signal Cable;UG,Flame retardant,2 PR;NIS (0.5mm²); From Tag: Telecom
P055BZOR-9671-R-001
043 99E 96-EICS-SYS-001 To Tag: 78-EICS-NP-099 Cable
70-70-00-C002- EICS Signal Cable;UG,Fire resistant,1 PR;NIS (4.0mm²); From Tag: 96 Telecom
96PAC0030002E P055BZOR-9671-R-001
043 -EICS-SYS-002(96-FAR-01) To Tag: 78-JB-TSPO-8520(78-SH-02) Cable
70-70-00-C002- EICS Signal Cable;UG,Fire resistant,1 PR;NIS (4.0mm²); From Tag: 78 Telecom
96PAC0031002E P055BZOR-9671-R-001
043 -JB-TSPO-8523(78-SH-02) To Tag: 96-EICS-SYS-002(96-FAR-01) Cable
70-70-00-C002- EICS Signal Cable;UG,Fire resistant,1 PR;NIS (4.0mm²); From Tag: 78 Telecom
96PAC0033002E P055BZOR-9671-R-001
043 -JB-TSPI-2132(78-B-74) To Tag: 96-EICS-SYS-002(96-FAR-01) Cable
70-70-00-C002- EICS Signal Cable;UG,Fire resistant,2 PR;NIS (0.5mm²); From Tag: 96 Telecom
96PAC0036002E P055BZOR-9671-R-001
043 -EICS-SYS-002(96-FAR-01) To Tag: 78-JB-TPAA-8520(78-SH-02) Cable
70-70-00-C002- LV_UG_Fire Resistant_2C+1E x 4.0 mm²; From Tag: 96-EICS-SYS- Telecom
96PAP0037002E P055BZOR-9671-R-001
043 002(96-FAR-01) To Tag: 78-JB-TPAA-8520(78-SH-02) Cable
70-70-00-C002- EICS Signal Cable;UG,Flame retardant,2 PR;NIS (0.5mm²); From Tag: Telecom
96COMC0038001E P055BZOR-9671-R-001
043 96-EICS-SYS-001(96-FAR-01) To Tag: 78-JB-TTTEL-2131 Cable
70-70-00-C002- LV_UG_Flame Retardant_2C+1E x 4.0 mm²; From Tag: 96-DB-02G04 Telecom
96COMP0039004E P055BZOR-9671-R-001
043 (96-FAR-01) To Tag: 78-JB-TTTEL-2131 Cable
70-70-00-C002- 96COMC0037TTEE Telecom
EICS Signal Cable;UG,Flame retardant,2 PR;NIS (0.5mm²)
043 9201E Cable
70-70-00-C002- 96002PAC0038031 Telecom
EICS Signal Cable;UG,Fire resistant,2 PR;NIS (0.5mm²)
043 E Cable
70-70-00-C002- Telecom
96PAC0039002E EICS Signal Cable;UG,Fire resistant,2 PR;NIS (0.5mm²)
043 Cable
70-70-00-C002- Telecom
96PAP0040002E LV_UG_Fire Resistant_2C+1E x 4.0 mm²
043 Cable
70-70-00-C002- Telecom
96PAC0034002E EICS Signal Cable;UG,Fire resistant,1 PR;NIS (4.0mm²)
043 Cable
70-70-00-C002- Telecom
96PAC0035002E EICS Signal Cable;UG,Fire resistant,1 PR;NIS (4.0mm²)
043 Cable
70-70-00-C002- EICS Signal Cable; Underground, Fire resistant, 1Pair; Non IS Signals Telecom
92PAC0012002E P055BZOR-73-71-1-P501
043 (4 mm2); From Tag: 92-EICS-SYS-002 To Tag: 73-JB-TSPI-0502 Cable
70-70-00-C002- EICS Signal Cable; Underground, Fire resistant, 1Pair; Non IS Signals Telecom
92PAC0013002E P055BZOR-73-71-1-P501
043 (4 mm2); From Tag: 73-JB-TSPI-0501 To Tag: 92-EICS-SYS-002 Cable
EICS Signal Cable; Underground, Flame retardant, 2 Pair; Non IS
70-70-00-C002- 92001COMC00320 Telecom
Signals (22 AWG / 0.33mm2); From Tag: 92-EICS-SYS-001 To Tag: P055BZOR-73-71-1-P501
043 03E Cable
73-EICS-NP-003
70-70-00-C002- Telecom
92PAC0102002E EICS Signal Cable;UG,Fire resistant,1 PR;NIS (4.0mm²)
043 Cable
70-70-00-C002- Telecom
92PAC0101002E EICS Signal Cable;UG,Fire resistant,1 PR;NIS (4.0mm²)
043 Cable
70-70-00-C002- Telecom
92PAC0103002E EICS Signal Cable;UG,Fire resistant,2 PR;NIS (0.5mm²)
043 Cable
70-70-00-C002- Telecom
92PAP0104002E LV_UG_Fire Resistant_2C+1E x 4.0 mm²
043 Cable
Power Cable Underground, flame retardant, Cu/XLPE/PVC/SWA/PVC
70-70-00-C002- LU-01-G-73-DB- Telecom
- From Tag No: 21-FAR01-COMP-01, Feeder-A To Tag No: 73-DB-
043 04G01 Cable
04G01
Power Cable Underground, flame retardant, Cu/XLPE/PVC/SWA/PVC
70-70-00-C002- LU-01-G-73-DB- Telecom
- From Tag No: 21-FAR01-COMP-01, Feeder-B To Tag No: 73-DB-
043 04G02 Cable
04G01
70-70-00-C002- 96001COMC00380 EICS Signal Cable;UG,Flame retardant,2 PR;NIS (0.5mm²); From Tag: Telecom
P055BZOR-9671-R-001
043 99E 96-EICS-SYS-001 To Tag: 78-EICS-NP-099 Cable
EICS Signal Cable; Underground, Fire resistant, 1Pair; Non IS Signals
70-70-00-C002- Telecom
92PAC0011002E (4mm2) - From Tag No: 73-JB-TSPI-0401 To Tag No: 92-EICS-SYS-
043 Cable
002
EICS Signal Cable; Underground, Fire resistant, 1Pair; Non IS Signals
70-70-00-C002- Telecom
92PAC0010002E (4mm2) - From Tag No: 92-EICS-SYS-002 To Tag No: 73-JB-TSPI-
043 Cable
0402

Wednesday, September 23, 2020 4:14 PM Page 1 / 2


Subsystem Tag Tag Description Drawing Discipline Remarks
70-70-00-C002- 787524PAC003480 EICS Signal Cable; UG, Fire resistant, 1 PR; NIS (4.0mm²); From Tag: Telecom
043 81E 78-JB-TSPI-8081, To Tag: 78-JB-TSPI-7524 Cable
70-70-00-C002- 78147501PAC0036 EICS Signal Cable; UG, Fire resistant, 1 PR; NIS (4.0mm²); From Tag: Telecom
043 2132E 78-JB-TSPI-14750, To Tag: 78-JB-TSPI-2132 Cable

Printed by: ahm21421


Component List PTO all TOSS

Wednesday, September 23, 2020 4:14 PM Page 2 / 2


Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

2.5 Overall Master


Punch List Report
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

2.6 Exception List


Al-ZOUR Refinery Project

QVD Status Index Summary "A" Sheets

EXCEPTION LIST
Tag Discipline Tag Description QVD QVD Description Completed Date Contr. Reason of Exception

Subsystem: 70-70-00-C002-043 EICS - Copper Cable - U96 & U92 FAR to Building
EICS Signal Cable;UG,Fire resistant,2
96PAC0039002E Tel.Cables 812 Cable Installation No K013
PR;NIS (0.5mm²)
Outdoor telephone station
96PAC0039002E
EICS Signal Cable;UG,Fire resistant,2 Inspec. Test Report for Telecom Cable
No K013
cannot be installed now due to
Tel.Cables 829
PR;NIS (0.5mm²) (Tel_Data Network, PA, CCTV & PAC) location used as temporary
LV_UG_Fire Resistant_2C+1E x 4.0 vehicle access. Also, Gate
96PAP0040002E Tel.Cables 812 Cable Installation No K013
mm² House building 98-B-81 contract
LV_UG_Fire Resistant_2C+1E x 4.0 Inspec. Test Report for Telecom Cable was just recently awarded.
96PAP0040002E Tel.Cables 829 No K013
mm² (Tel_Data Network, PA, CCTV & PAC)
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

SECTION 3.0
QUALITY VERIFYING
DOCUMENTS (QVD’s)
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

3.8 Enterprise Integration


Communication System
(EICS)
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

3.8.1 EICS QVD’s Status Report


Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

3.8.2 EICS QVD’s


Al-ZOUR Refinery Project

QVD Status Index Summary "A" Sheets


by Subsystem
Tag Discipline Tag Description QVD QVD Description Completed Date Contr.
Subsystem: 70-70-00-C002-043 EICS - Copper Cable - U96 & U92 FAR to Building
EICS Signal Cable; UG, Fire
78147501PAC0036213 resistant, 1 PR; NIS (4.0mm²); From
Tel.Cables 812 Cable Installation Yes 22-Jun-20 K013
2E Tag: 78-JB-TSPI-14750, To Tag: 78
-JB-TSPI-2132
EICS Signal Cable; UG, Fire
78147501PAC0036213 resistant, 1 PR; NIS (4.0mm²); From Inspec. Test Report for Insulation
Tel.Cables 824 Yes 15-Jun-20 K013
2E Tag: 78-JB-TSPI-14750, To Tag: 78 Resistance & Continuity
-JB-TSPI-2132
EICS Signal Cable; UG, Fire
resistant, 1 PR; NIS (4.0mm²); From
787524PAC00348081E Tel.Cables 812 Cable Installation Yes 22-Jun-20 K013
Tag: 78-JB-TSPI-8081, To Tag: 78-
JB-TSPI-7524
EICS Signal Cable; UG, Fire
resistant, 1 PR; NIS (4.0mm²); From Inspec. Test Report for Insulation
787524PAC00348081E Tel.Cables 824 Yes 15-Jun-20 K013
Tag: 78-JB-TSPI-8081, To Tag: 78- Resistance & Continuity
JB-TSPI-7524
EICS Signal Cable; Underground,
92001COMC0026002E Tel.Cables From Tag No: 92-EICS-SYS-001 To 812 Cable Installation Yes 12-Sep-20 K013
Tag No: 73-EICS-NP-002
EICS Signal Cable; Underground,
Inspec. Test Report for Telecom Cable
92001COMC0026002E Tel.Cables From Tag No: 92-EICS-SYS-001 To 829 Yes 10-Sep-20 K013
(Tel_Data Network, PA, CCTV & PAC)
Tag No: 73-EICS-NP-002
EICS Signal Cable; Underground,
Flame retardant, 2 Pair; Non IS
92001COMC0032003E Tel.Cables Signals (22 AWG / 0.33mm2); From 812 Cable Installation Yes 07-Sep-20 K013
Tag: 92-EICS-SYS-001 To Tag: 73-
EICS-NP-003
EICS Signal Cable; Underground,
Flame retardant, 2 Pair; Non IS
Inspec. Test Report for Telecom Cable
92001COMC0032003E Tel.Cables Signals (22 AWG / 0.33mm2); From 829 Yes 12-Sep-20 K013
(Tel_Data Network, PA, CCTV & PAC)
Tag: 92-EICS-SYS-001 To Tag: 73-
EICS-NP-003
EICS Signal Cable; Underground,
Fire resistant, 1Pair; Non IS Signals
92PAC0010002E Tel.Cables (4mm2) - From Tag No: 92-EICS- 812 Cable Installation Yes 29-Jul-20 K013
SYS-002 To Tag No: 73-JB-TSPI-
0402
EICS Signal Cable; Underground,
Fire resistant, 1Pair; Non IS Signals
Inspec. Test Report for Telecom Cable
92PAC0010002E Tel.Cables (4mm2) - From Tag No: 92-EICS- 829 Yes 29-Jul-20 K013
(Tel_Data Network, PA, CCTV & PAC)
SYS-002 To Tag No: 73-JB-TSPI-
0402
EICS Signal Cable; Underground,
Fire resistant, 1Pair; Non IS Signals
92PAC0011002E Tel.Cables (4mm2) - From Tag No: 73-JB-TSPI 812 Cable Installation Yes 29-Jul-20 K013
-0401 To Tag No: 92-EICS-SYS-
002
EICS Signal Cable; Underground,
Fire resistant, 1Pair; Non IS Signals
Inspec. Test Report for Telecom Cable
92PAC0011002E Tel.Cables (4mm2) - From Tag No: 73-JB-TSPI 829 Yes 29-Jul-20 K013
(Tel_Data Network, PA, CCTV & PAC)
-0401 To Tag No: 92-EICS-SYS-
002
EICS Signal Cable; Underground,
Fire resistant, 1Pair; Non IS Signals
92PAC0012002E Tel.Cables 812 Cable Installation Yes 07-Sep-20 K013
(4 mm2); From Tag: 92-EICS-SYS-
002 To Tag: 73-JB-TSPI-0502
EICS Signal Cable; Underground,
Fire resistant, 1Pair; Non IS Signals Inspec. Test Report for Telecom Cable
92PAC0012002E Tel.Cables 829 Yes 12-Sep-20 K013
(4 mm2); From Tag: 92-EICS-SYS- (Tel_Data Network, PA, CCTV & PAC)
002 To Tag: 73-JB-TSPI-0502
EICS Signal Cable; Underground,
Fire resistant, 1Pair; Non IS Signals
92PAC0013002E Tel.Cables 812 Cable Installation Yes 07-Sep-20 K013
(4 mm2); From Tag: 73-JB-TSPI-
0501 To Tag: 92-EICS-SYS-002
EICS Signal Cable; Underground,
Fire resistant, 1Pair; Non IS Signals Inspec. Test Report for Telecom Cable
92PAC0013002E Tel.Cables 829 Yes 12-Sep-20 K013
(4 mm2); From Tag: 73-JB-TSPI- (Tel_Data Network, PA, CCTV & PAC)
0501 To Tag: 92-EICS-SYS-002
EICS Signal Cable;UG,Fire
92PAC0101002E Tel.Cables 812 Cable Installation Yes 07-Sep-20 K013
resistant,1 PR;NIS (4.0mm²)

Wednesday, September 23, 2020 4:06 PM Page 1 / 4


Tag Discipline Tag Description QVD QVD Description Completed Date Contr.
EICS Signal Cable;UG,Fire Inspec. Test Report for Telecom Cable
92PAC0101002E Tel.Cables 829 Yes 12-Sep-20 K013
resistant,1 PR;NIS (4.0mm²) (Tel_Data Network, PA, CCTV & PAC)
EICS Signal Cable;UG,Fire
92PAC0102002E Tel.Cables 812 Cable Installation Yes 07-Sep-20 K013
resistant,1 PR;NIS (4.0mm²)
EICS Signal Cable;UG,Fire Inspec. Test Report for Telecom Cable
92PAC0102002E Tel.Cables 829 Yes 12-Sep-20 K013
resistant,1 PR;NIS (4.0mm²) (Tel_Data Network, PA, CCTV & PAC)
EICS Signal Cable;UG,Fire
92PAC0103002E Tel.Cables 812 Cable Installation Yes 07-Sep-20 K013
resistant,2 PR;NIS (0.5mm²)
EICS Signal Cable;UG,Fire Inspec. Test Report for Telecom Cable
92PAC0103002E Tel.Cables 829 Yes 12-Sep-20 K013
resistant,2 PR;NIS (0.5mm²) (Tel_Data Network, PA, CCTV & PAC)
LV_UG_Fire Resistant_2C+1E x
92PAP0104002E Tel.Cables 701 Insul.Resist.& Continuity Test LV Cable Yes 15-Sep-20 K013
4.0 mm²
LV_UG_Fire Resistant_2C+1E x Splicing Termination of Electrical Cable (LV
92PAP0104002E Tel.Cables 727 Yes 07-Sep-20 K013
4.0 mm² Control Cable)
LV_UG_Fire Resistant_2C+1E x
92PAP0104002E Tel.Cables 812 Cable Installation Yes 07-Sep-20 K013
4.0 mm²
EICS Signal Cable;UG,Flame
retardant,2 PR;NIS (0.5mm²); From
96001COMC0038099E Tel.Cables 812 Cable Installation Yes 30-Aug-20 K013
Tag: 96-EICS-SYS-001 To Tag: 78-
EICS-NP-099
EICS Signal Cable;UG,Flame
retardant,2 PR;NIS (0.5mm²); From Inspec. Test Report for Telecom Cable
96001COMC0038099E Tel.Cables 829 Yes 05-Sep-20 K013
Tag: 96-EICS-SYS-001 To Tag: 78- (Tel_Data Network, PA, CCTV & PAC)
EICS-NP-099
EICS Signal Cable;UG,Flame
retardant,2 PR;NIS (0.5mm²); From
96001COMC0039099E Tel.Cables 812 Cable Installation Yes 30-Aug-20 K013
Tag: 96-EICS-SYS-001 To Tag: 78-
EICS-NP-099
EICS Signal Cable;UG,Flame
retardant,2 PR;NIS (0.5mm²); From Inspec. Test Report for Telecom Cable
96001COMC0039099E Tel.Cables 829 Yes 05-Sep-20 K013
Tag: 96-EICS-SYS-001 To Tag: 78- (Tel_Data Network, PA, CCTV & PAC)
EICS-NP-099
EICS Signal Cable;UG,Fire
96002PAC0038031E Tel.Cables 812 Cable Installation Yes 19-Sep-20 K013
resistant,2 PR;NIS (0.5mm²)
EICS Signal Cable;UG,Fire Inspec. Test Report for Telecom Cable
96002PAC0038031E Tel.Cables 829 Yes 21-Sep-20 K013
resistant,2 PR;NIS (0.5mm²) (Tel_Data Network, PA, CCTV & PAC)
96COMC0037TTEE920 EICS Signal Cable;UG,Flame
Tel.Cables 812 Cable Installation Yes 19-Sep-20 K013
1E retardant,2 PR;NIS (0.5mm²)
96COMC0037TTEE920 EICS Signal Cable;UG,Flame Inspec. Test Report for Telecom Cable
Tel.Cables 829 Yes 21-Sep-20 K013
1E retardant,2 PR;NIS (0.5mm²) (Tel_Data Network, PA, CCTV & PAC)
EICS Signal Cable;UG,Flame
retardant,2 PR;NIS (0.5mm²); From
96COMC0038001E Tel.Cables 812 Cable Installation Yes 23-Sep-20 K013
Tag: 96-EICS-SYS-001(96-FAR-01)
To Tag: 78-JB-TTTEL-2131
EICS Signal Cable;UG,Flame
retardant,2 PR;NIS (0.5mm²); From Inspec. Test Report for Telecom Cable
96COMC0038001E Tel.Cables 829 Yes 05-Sep-20 K013
Tag: 96-EICS-SYS-001(96-FAR-01) (Tel_Data Network, PA, CCTV & PAC)
To Tag: 78-JB-TTTEL-2131
LV_UG_Flame Retardant_2C+1E x
4.0 mm²; From Tag: 96-DB-02G04
96COMP0039004E Tel.Cables 701 Insul.Resist.& Continuity Test LV Cable Yes 21-Sep-20 K013
(96-FAR-01) To Tag: 78-JB-TTTEL-
2131
LV_UG_Flame Retardant_2C+1E x
4.0 mm²; From Tag: 96-DB-02G04 Splicing Termination of Electrical Cable (LV
96COMP0039004E Tel.Cables 727 Yes 21-Sep-20 K013
(96-FAR-01) To Tag: 78-JB-TTTEL- Control Cable)
2131
LV_UG_Flame Retardant_2C+1E x
4.0 mm²; From Tag: 96-DB-02G04
96COMP0039004E Tel.Cables 812 Cable Installation Yes 21-Sep-20 K013
(96-FAR-01) To Tag: 78-JB-TTTEL-
2131
EICS Signal Cable;UG,Fire
resistant,1 PR;NIS (4.0mm²); From
96PAC0028501E Tel.Cables 812 Cable Installation Yes 22-Jun-20 K013
Tag: 96-EICS-SYS-002 To Tag: 78-
JB-TSPI-7501
EICS Signal Cable;UG,Fire
resistant,1 PR;NIS (4.0mm²); From Inspec. Test Report for Insulation
96PAC0028501E Tel.Cables 824 Yes 15-Jun-20 K013
Tag: 96-EICS-SYS-002 To Tag: 78- Resistance & Continuity
JB-TSPI-7501
EICS Signal Cable;UG,Fire
resistant,1 PR;NIS (4.0mm²); From
96PAC0030002E Tel.Cables Tag: 96-EICS-SYS-002(96-FAR-01) 812 Cable Installation Yes 30-Aug-20 K013
To Tag: 78-JB-TSPO-8520(78-SH-
02)

Wednesday, September 23, 2020 4:06 PM Page 2 / 4


Tag Discipline Tag Description QVD QVD Description Completed Date Contr.
EICS Signal Cable;UG,Fire
resistant,1 PR;NIS (4.0mm²); From
Inspec. Test Report for Telecom Cable
96PAC0030002E Tel.Cables Tag: 96-EICS-SYS-002(96-FAR-01) 829 Yes 05-Sep-20 K013
(Tel_Data Network, PA, CCTV & PAC)
To Tag: 78-JB-TSPO-8520(78-SH-
02)
EICS Signal Cable;UG,Fire
resistant,1 PR;NIS (4.0mm²); From
96PAC0031002E Tel.Cables Tag: 78-JB-TSPO-8523(78-SH-02) 812 Cable Installation Yes 30-Aug-20 K013
To Tag: 96-EICS-SYS-002(96-FAR-
01)
EICS Signal Cable;UG,Fire
resistant,1 PR;NIS (4.0mm²); From
Inspec. Test Report for Telecom Cable
96PAC0031002E Tel.Cables Tag: 78-JB-TSPO-8523(78-SH-02) 829 Yes 05-Sep-20 K013
(Tel_Data Network, PA, CCTV & PAC)
To Tag: 96-EICS-SYS-002(96-FAR-
01)
EICS Signal Cable;UG,Fire
resistant,1 PR;NIS (4.0mm²); From
96PAC0033002E Tel.Cables 812 Cable Installation Yes 22-Jun-20 K013
Tag: 78-JB-TSPI-2132(78-B-74) To
Tag: 96-EICS-SYS-002(96-FAR-01)
EICS Signal Cable;UG,Fire
resistant,1 PR;NIS (4.0mm²); From Inspec. Test Report for Insulation
96PAC0033002E Tel.Cables 824 Yes 15-Jun-20 K013
Tag: 78-JB-TSPI-2132(78-B-74) To Resistance & Continuity
Tag: 96-EICS-SYS-002(96-FAR-01)
EICS Signal Cable;UG,Fire
96PAC0034002E Tel.Cables 812 Cable Installation Yes 19-Sep-20 K013
resistant,1 PR;NIS (4.0mm²)
EICS Signal Cable;UG,Fire Inspec. Test Report for Telecom Cable
96PAC0034002E Tel.Cables 829 Yes 21-Sep-20 K013
resistant,1 PR;NIS (4.0mm²) (Tel_Data Network, PA, CCTV & PAC)
EICS Signal Cable;UG,Fire
96PAC0035002E Tel.Cables 812 Cable Installation Yes 19-Sep-20 K013
resistant,1 PR;NIS (4.0mm²)
EICS Signal Cable;UG,Fire Inspec. Test Report for Telecom Cable
96PAC0035002E Tel.Cables 829 Yes 21-Sep-20 K013
resistant,1 PR;NIS (4.0mm²) (Tel_Data Network, PA, CCTV & PAC)
EICS Signal Cable;UG,Fire
resistant,2 PR;NIS (0.5mm²); From
96PAC0036002E Tel.Cables Tag: 96-EICS-SYS-002(96-FAR-01) 812 Cable Installation Yes 30-Aug-20 K013
To Tag: 78-JB-TPAA-8520(78-SH-
02)
EICS Signal Cable;UG,Fire
resistant,2 PR;NIS (0.5mm²); From
Inspec. Test Report for Telecom Cable
96PAC0036002E Tel.Cables Tag: 96-EICS-SYS-002(96-FAR-01) 829 Yes 05-Sep-20 K013
(Tel_Data Network, PA, CCTV & PAC)
To Tag: 78-JB-TPAA-8520(78-SH-
02)
EICS Signal Cable;UG,Fire
96PAC0039002E Tel.Cables 812 Cable Installation No --- K013
resistant,2 PR;NIS (0.5mm²)
EICS Signal Cable;UG,Fire Inspec. Test Report for Telecom Cable
96PAC0039002E Tel.Cables 829 No --- K013
resistant,2 PR;NIS (0.5mm²) (Tel_Data Network, PA, CCTV & PAC)
LV_UG_Fire Resistant_2C+1E x
4.0 mm²; From Tag: 96-EICS-SYS-
96PAP0037002E Tel.Cables 701 Insul.Resist.& Continuity Test LV Cable Yes 05-Sep-20 K013
002(96-FAR-01) To Tag: 78-JB-
TPAA-8520(78-SH-02)
LV_UG_Fire Resistant_2C+1E x
4.0 mm²; From Tag: 96-EICS-SYS- Splicing Termination of Electrical Cable (LV
96PAP0037002E Tel.Cables 727 Yes 06-Sep-20 K013
002(96-FAR-01) To Tag: 78-JB- Control Cable)
TPAA-8520(78-SH-02)
LV_UG_Fire Resistant_2C+1E x
4.0 mm²; From Tag: 96-EICS-SYS-
96PAP0037002E Tel.Cables 812 Cable Installation Yes 30-Aug-20 K013
002(96-FAR-01) To Tag: 78-JB-
TPAA-8520(78-SH-02)
LV_UG_Fire Resistant_2C+1E x
96PAP0040002E Tel.Cables 812 Cable Installation No --- K013
4.0 mm²
LV_UG_Fire Resistant_2C+1E x Inspec. Test Report for Telecom Cable
96PAP0040002E Tel.Cables 829 No --- K013
4.0 mm² (Tel_Data Network, PA, CCTV & PAC)
Power Cable Underground, flame
retardant, Cu/XLPE/PVC/SWA/PVC
LU-01-G-73-DB-04G01 Tel.Cables - From Tag No: 21-FAR01-COMP- 701 Insul.Resist.& Continuity Test LV Cable Yes 29-Jul-20 K013
01, Feeder-A To Tag No: 73-DB-
04G01
Power Cable Underground, flame
retardant, Cu/XLPE/PVC/SWA/PVC
Splicing Termination of Electrical Cable (LV
LU-01-G-73-DB-04G01 Tel.Cables - From Tag No: 21-FAR01-COMP- 727 Yes 29-Jul-20 K013
Control Cable)
01, Feeder-A To Tag No: 73-DB-
04G01
Power Cable Underground, flame
retardant, Cu/XLPE/PVC/SWA/PVC
LU-01-G-73-DB-04G01 Tel.Cables - From Tag No: 21-FAR01-COMP- 812 Cable Installation Yes 29-Jul-20 K013
01, Feeder-A To Tag No: 73-DB-
04G01

Wednesday, September 23, 2020 4:06 PM Page 3 / 4


Tag Discipline Tag Description QVD QVD Description Completed Date Contr.
Power Cable Underground, flame
retardant, Cu/XLPE/PVC/SWA/PVC
LU-01-G-73-DB-04G02 Tel.Cables - From Tag No: 21-FAR01-COMP- 701 Insul.Resist.& Continuity Test LV Cable Yes 29-Jul-20 K013
01, Feeder-B To Tag No: 73-DB-
04G01
Power Cable Underground, flame
retardant, Cu/XLPE/PVC/SWA/PVC
Splicing Termination of Electrical Cable (LV
LU-01-G-73-DB-04G02 Tel.Cables - From Tag No: 21-FAR01-COMP- 727 Yes 29-Jul-20 K013
Control Cable)
01, Feeder-B To Tag No: 73-DB-
04G01
Power Cable Underground, flame
retardant, Cu/XLPE/PVC/SWA/PVC
LU-01-G-73-DB-04G02 Tel.Cables - From Tag No: 21-FAR01-COMP- 812 Cable Installation Yes 29-Jul-20 K013
01, Feeder-B To Tag No: 73-DB-
04G01
73-MDS-05 EICS CABLE FROM:
LU-05-G-73-DB-05G01 In.Cables 701 Insul.Resist.& Continuity Test LV Cable Yes 15-Sep-20 K013
39-DB-01G03 TO: 73-DB-05G01
73-MDS-05 EICS CABLE FROM: Splicing Termination of Electrical Cable (LV
LU-05-G-73-DB-05G01 In.Cables 727 Yes 15-Sep-20 K013
39-DB-01G03 TO: 73-DB-05G01 Control Cable)
73-MDS-05 EICS CABLE FROM:
LU-05-G-73-DB-05G01 In.Cables 812 Cable Installation Yes 15-Sep-20 K013
39-DB-01G03 TO: 73-DB-05G01
73-MDS-05 EICS CABLE FROM:
LU-05-G-73-DB-05G02 In.Cables 701 Insul.Resist.& Continuity Test LV Cable Yes 15-Sep-20 K013
39-DB-01G03 TO: 73-DB-05G01
73-MDS-05 EICS CABLE FROM: Splicing Termination of Electrical Cable (LV
LU-05-G-73-DB-05G02 In.Cables 727 Yes 15-Sep-20 K013
39-DB-01G03 TO: 73-DB-05G01 Control Cable)
73-MDS-05 EICS CABLE FROM:
LU-05-G-73-DB-05G02 In.Cables 812 Cable Installation Yes 15-Sep-20 K013
39-DB-01G03 TO: 73-DB-05G01

Printed by: ahm21421


Report: QVD Status Index Summary "A" Sheets < QVD Status Index A1.repx >
Restrictions: Contractor (equals): K013 - IMCO - And - Table Title2 (equals): Instrument Cables, Telecom Cables
Restrictions: Subsystem (equals): 70-70-00-C002-043

Wednesday, September 23, 2020 4:06 PM Page 4 / 4


Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

SECTION 4.0
PRESERVATION
HISTORY REPORTS

Not Applicable
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

SECTION 5.0
FIRST FILLS, OILS AND
LUBRICANTS

NOT APPLICABLE
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

SECTION 6.0
HAZARD / SAFETY

NOT APPLICABLE
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

SECTION 7.0
PHASED TRANSFER OF
SUBSTANTIALLY
COMPLETE SYSTEM

NOT APPLICABLE
Al-Zour Refinery Project
Contract No.: ZOR/EPC-0055-B

SECTION 8.0

ENGINEERING
REFERENCE
DOCUMENTATION

NOT APPLICABLE