Dated 29-06-2020
DAILY REPORT
Overview:
Visited the power plant site and followed the operation and maintenance
activities performed during the day.
Operation Activities:
The complex was running on baseload with a combination of 2+1.
GT-1 is on standby position due to NPCC demand.
GT-2 is operating at baseload.
GT-3 is operating at baseload.
DAILY REPORT
Maintenance Activities:
During the day, visited the plant site area and closely observed the maintenance
activities performed by different departments. The maintenance activities
attended are listed below:
Condensate Motor B:
During the bearing replacement activity of condensate pump motor, after the
removal of old bearing and installation of new bearing on the non-driven end side
of the motor by the electrical maintenance department, the maintenance team
performed the greasing of the newly installed bearing.
DAILY REPORT
DAILY REPORT
DLN Compartments:
In Gas Turbine hall, mechanical maintenance team performed the activity of
replacement of air filters in the DLN compartment of all three gas turbines.
DAILY REPORT