Dated 15-04-2020
DAILY REPORT
Overview:
Visited the power plant site and followed the operation and maintenance
activities performed during the day.
Maintenance Activities:
Throughout the day following maintenance activities are witnessed in the plant
site area:
Cooling Towers:
The cleaning of inside structure of cooling towers which include guardrails was
performed by mechanical maintenance department. The condition of guardrails
of almost all the cooling towers in very bad. During the cleaning process, some
pipes of guardrails were also found broken.
WTP:
The conductivity analyzers of mix bed A and B which is in water treatment plant
were reported faulty. The faulty conductivity analyzers were replaced by new
ones by I&C department.
DAILY REPORT
Thermography:
The Thermography of Mark Vie control system cabinets of all three gas turbines
was performed by I&C maintenance department. In thermography, the
temperature of control cabinets was measured by using an infrared camera. All
the cabinet temperatures were found in normal range.
ST Condenser Cleaning:
The cleaning activity of the condenser water box tubes is in progress in steam
turbine hall by mechanical maintenance department. The pressure of water is
adjusted at 200 bar for cleaning of tubes.
DAILY REPORT
Faulty Lights:
In the power plant area, the issue of faulty lights was solved by electrical
maintenance department. New lights were installed.
DAILY REPORT