Key Plan: Jaco Smit
Key Plan: Jaco Smit
B
---
A N 600 600
A
4800 150 16 DOWELS AT 15 SPACINGS OF 300 = 4500 150 #8 - 300 SIDE #8 - 300 (B2&T2)
TOC. 258.314
=
#8 - 300 SIDE #8 - 300 SIDE
= = =
800
800
#8 - 300 (B1&T1)
=
800
EXISTING PUMP BASE
=
EXTENDED PUMP BASE
1300
1300
TOC. LVL. 258.314
15 DOWELS AT 14 SPACINGS OF 300 = 4200 #11 RIBBED STEEL DOWEL BARS DOWELS STAGGERED
GROUTED INTO EXISTING BASE
C C #8 @300 T&B EW WITH 'EPIDERMIX 396' OR SIMILAR
1622
--- P1 ---
APPROVED
5900
1500
SCALE 1:50 --- NOTE.
P3
P4 PUMP BASE PUMP BASE
SCALE: 1:25 650 SCALE: 1:50 1. CONCRETE CUBE CRUSHING STRENGTH TO 30MPa AT 28 DAYS.
2. FOUNDATION DESIGNED FOR A SAKE BEARING PRESSURE OF 150kPa
B
295
325 325 3. SITE GEOTECHNICAL ENGINEER TO CONFIRM THAT SAFE BEARING
600
3900
4 No. 1 INCH P1 ASTM PRESSURE CAN BE ACHIEVED.
F1544 ANCHOR BOLTS
295
4. CONCRETE COVER TO REINFORCEMENT = 50mm
450
320
2400
2400
160
NOTES:
325
300 - EXISTING CONCRETE TO BE SCABBLED TO EXPOSED AGGREGATE FINISH
P3
650
320
- SURFACE TO BE CLEANED AND ALL LOOSE MATERIAL REMOVED
160
B1 P1 160 4 No. 1 INCH P2 - -DOWEL BARS/ TIE BARS TO BE INSTALLED AS PER PLINTH 'P1' SPEC. OR
325
147
CHEMICAL ANCHORS
C SIMILAR APPROVED.
1375
- AN APPROVED WET-TO-DRY EPOXY (ABE EPIDERMIX 345), MUST BE APPLIED
A A TOC. 258.314
295
P2 PRIOR TO CASTING OF FRESH CONCRETE AS PER SUPPLIERS MANUAL
590
--- ---
320
725
295
160
800 EXIST.
C C
4100 900 EXISTING PUMP BASE D D 2x 34 INCH P3 CHEMICAL
--- --- ANCHORS
135
5000 #4 - 200 (B2&T2)
300 #4 - 200 (LINKS)
#4 - 50 (LINK)
2x #4 - 200 (CLIPS)
1 B 2 3
--- SECTION D PLAN ON PLINTH P4 #4 - 200 U BARS
SCALE 1:25 --- PLAN ON PLINTH P3
SCALE: 1:25
SCALE: 1:25
1 No. OFF
1 No. OFF
PLAN
8 - #8 - DOWEL BARS
SCALE: 1:50
500
D D
#4 - 200 (LINKS) #8 DOWEL BARS
50
#4 - 50 (LINK) HILTI INJECTION MORTAR SYSTEM
2x #4 - 200 (CLIPS) OR EQUIVALENT TO BE USED.
650 EXISTING SUPPORT BASE Hilti HIT-RE 500-SD
330ml FOIL PACK (500ml OR 1400ml
325 325 8 - #8 - DOWEL BARS
4 No. 1 INCH P1 ASTM AVAILABLE)
F1544 ANCHOR BOLTS
250 250
P2 P1 P4
276
160
TOC. 258.590 TOC. 258.590
TOC. 258.314
325
SCALE: 1:25
450
250 250
#4 - 200 LINKS
650
320
1 No. OFF
1000
1341
1400
325
EXISTING PUMP BASE 2x #4 - 200 CLIPS
300
160
500
8 - #8 - DOWEL BARS #8 DOWEL BARS
400
GROUT
SCALE 1:50 --- 3 No. OFF SCALE: 1:25 2 No. OFF
3 No. OFF
P2 4 x 1'' CHEMICAL ANCHORS
P3 2 x 3/4 '' CHEMICAL ANCHORS
1400
NOTE.
700 700 1. ALL BOLTS SHALL CONFORM TO ASTM F 1554 Gr.36
2. ALL NUTS SHALL CONFORM TO A563, HEAVY HEX
3. ALL WASHERS TO BE IN ACCORDANCE WITH ASTM F844.
4. BOLTS TO BE SUPPLIED COMPLETE WITH NUTS & WASHERS.
#4 - 200 (LINKS)
F #4 - 50 (LINK) F
50
Ø
2x #4 - 200 (CLIPS)
#6 - 200 (B1&T1)
'L2' - PROJ.
GROUT
P2 #8 #8 #8
8 - #8
'H'
F F
700
P1 P1 P1 #6 - 200 (B2&T2)
276
#4 CLIPS
1340
800
#8 #8 #8
700
'L'
257.250 REF.
E E
'L1'
264 REF.
'F'
G G
'G'
SECTION B PLAN ON BASE B1 PLAN ON PLINTH P2 SECTION E SECTION F
SCALE 1:50 --- SCALE: 1:25 REINFORCEMENT SCALE 1:25 --- SCALE 1:25 ---
'E' SQ
1 No. OFF SCALE: 1:25
1 No. OFF
ANCHOR BOLT - TYPE P
Pr REG No. 201670260
Date: 2021.07.27
PROF. PERSON T.D 16:52:00 +02'00' .
Pr REG No.
All content included on this document is the property of DRA/SENET (Pty) Ltd and protected by South African
PROF. PERSON and international copyright laws. Any unauthorized copying, reproduction, distribution, publication,
display, performance, modification or any exploitation of copyrighted material is prohibited by law.
CLIENT This document shall not be released to third parties without DRA/SENET’s written consent.
Digitally signed by Raymond Building 12
PROJECT MANAGER Raymond Munsami Munsami Greenstone Hill Office Park
Date: 2021.07.28 09:47:14 +02'00' Emerald Boulevard
Greenstone, 1609.
PROCESS ENGINEER (Modderfontein)
Republic Of South Africa
Tel: (Int.) 27 11 409 1300
PUEBLO VIEJO DOMINICANA CORPORATION DISCIPLINE ENGINEER Fax: (Int.) 27 11 409 1301
H Email: Drawingoffice@senet.co.za
H
KM 14, CARRETERA MAIM ON-COTUI DISCIPLINE MANAGER Grant Wilson Digitally signed by Grant Wilson
Date: 2021.07.28 08:36:10 +02'00' DRA / SENET PROJECT AREA DISC CODE DRG No. SHT
PROVINCIA SANCHEZ RAMIREZ
DRAWING NUMBER SP0793 6186 C LAYT 00025 001
Jaco Smit
Digitally signed by Jaco Smit
REPUBLICA DOMINICANA PROJECT ENGINEER Date: 2021.07.28 08:24:09
+02'00'
PVDC EXPANSION PROJECT
SECTION LEADER 27.07.2021
LIME STONE MILLING
Jaco Digitally signed
27.07.2021
by Jaco Smit
0000-15-0001 STANDARD DETAILS - GENERAL NOTES 00 26.07.21 APPROVED FOR CONSTRUCTION D.K.T. Smit
Date:
2021.07.28
08:23:40 +02'00'
CHECKED VALVE ACCESS PLATFORM AND PUMP PLINTHS
DRG No. DRAWING TITLE REV DATE REVISION DESCRIPTION BY CHK DISC PROJ DO NOT SCALE DRAWN D.K.T. 15.07.21 CONCRETE AND REINFORCEMENT LAYOUT AND DETAILS
ENG ENG
IF IN DOUBT, ASK A0
SCALE PVDC DRAWING NUMBER REV
REFERENCE DRAWINGS REVISIONS APPROVAL SIGNATURE DATE
1:50 SP0793-6186-15-0025 00
1 2 3 4 5 6 7 8 9 10 11 12