You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

B
---

A N 600 600
A
4800 150 16 DOWELS AT 15 SPACINGS OF 300 = 4500 150 #8 - 300 SIDE #8 - 300 (B2&T2)
TOC. 258.314

#8 @ 300 SIDE BARS


THIS DRAWING
150 150
TOC. 258.314

=
#8 - 300 SIDE #8 - 300 SIDE

= = =

800

800
#8 - 300 (B1&T1)

=
800
EXISTING PUMP BASE

=
EXTENDED PUMP BASE

1300

1300
TOC. LVL. 258.314

15 DOWELS AT 14 SPACINGS OF 300 = 4200 #11 RIBBED STEEL DOWEL BARS DOWELS STAGGERED
GROUTED INTO EXISTING BASE
C C #8 @300 T&B EW WITH 'EPIDERMIX 396' OR SIMILAR

1622
--- P1 ---
APPROVED
5900

EXISTING PUMP BASE A KEY PLAN


B TOC. LVL. 258.314 SECTION C B
SECTION THROUGH EXTENDED PLAN ON EXTENDED
4600

1500
SCALE 1:50 --- NOTE.
P3
P4 PUMP BASE PUMP BASE
SCALE: 1:25 650 SCALE: 1:50 1. CONCRETE CUBE CRUSHING STRENGTH TO 30MPa AT 28 DAYS.
2. FOUNDATION DESIGNED FOR A SAKE BEARING PRESSURE OF 150kPa
B

295
325 325 3. SITE GEOTECHNICAL ENGINEER TO CONFIRM THAT SAFE BEARING

600

3900
4 No. 1 INCH P1 ASTM PRESSURE CAN BE ACHIEVED.
F1544 ANCHOR BOLTS

295
4. CONCRETE COVER TO REINFORCEMENT = 50mm

450
320
2400

2400

160
NOTES:

325
300 - EXISTING CONCRETE TO BE SCABBLED TO EXPOSED AGGREGATE FINISH
P3

650

320
- SURFACE TO BE CLEANED AND ALL LOOSE MATERIAL REMOVED

160
B1 P1 160 4 No. 1 INCH P2 - -DOWEL BARS/ TIE BARS TO BE INSTALLED AS PER PLINTH 'P1' SPEC. OR

325

147
CHEMICAL ANCHORS
C SIMILAR APPROVED.

1375
- AN APPROVED WET-TO-DRY EPOXY (ABE EPIDERMIX 345), MUST BE APPLIED
A A TOC. 258.314

295
P2 PRIOR TO CASTING OF FRESH CONCRETE AS PER SUPPLIERS MANUAL

590
--- ---

320

725

295
160

800 EXIST.
C C
4100 900 EXISTING PUMP BASE D D 2x 34 INCH P3 CHEMICAL
--- --- ANCHORS
135
5000 #4 - 200 (B2&T2)
300 #4 - 200 (LINKS)
#4 - 50 (LINK)
2x #4 - 200 (CLIPS)
1 B 2 3
--- SECTION D PLAN ON PLINTH P4 #4 - 200 U BARS
SCALE 1:25 --- PLAN ON PLINTH P3
SCALE: 1:25
SCALE: 1:25
1 No. OFF
1 No. OFF
PLAN
8 - #8 - DOWEL BARS
SCALE: 1:50

500
D D
#4 - 200 (LINKS) #8 DOWEL BARS

50
#4 - 50 (LINK) HILTI INJECTION MORTAR SYSTEM
2x #4 - 200 (CLIPS) OR EQUIVALENT TO BE USED.
650 EXISTING SUPPORT BASE Hilti HIT-RE 500-SD
330ml FOIL PACK (500ml OR 1400ml
325 325 8 - #8 - DOWEL BARS
4 No. 1 INCH P1 ASTM AVAILABLE)
F1544 ANCHOR BOLTS
250 250
P2 P1 P4
276

SECTION THROUGH PLINTH P4

160
TOC. 258.590 TOC. 258.590
TOC. 258.314

325
SCALE: 1:25
450

250 250
#4 - 200 LINKS
650

320
1 No. OFF
1000

1341
1400

325
EXISTING PUMP BASE 2x #4 - 200 CLIPS
300

160

500
8 - #8 - DOWEL BARS #8 DOWEL BARS
400

HILTI INJECTION MORTAR SYSTEM


B1 50mm BLINDING EXISTING SUPPORT BASE 160 160 OR EQUIVALENT TO BE USED.
EXISTING SUPPORT BASE Hilti HIT-RE 500-SD
E 320
330ml FOIL PACK (500ml OR 1400ml
E
AVAILABLE)

ANCHOR BOLT SCHEDULE


PLAN ON PLINTHS P1 & P2 PLAN ON PLINTH P1 SECTION THROUGH PLINTH P1 DESCRIPTION Ø (In) QTY L1 (mm) L2 (mm) L (mm) E (mm) F (mm) G (mm) H C.F.W. (mm)
SECTION A SCALE: 1:25 REINFORCEMENT SCALE: 1:25
P1 1 16 610 120 730 85 16 12 6#

GROUT
SCALE 1:50 --- 3 No. OFF SCALE: 1:25 2 No. OFF
3 No. OFF
P2 4 x 1'' CHEMICAL ANCHORS
P3 2 x 3/4 '' CHEMICAL ANCHORS

1400
NOTE.
700 700 1. ALL BOLTS SHALL CONFORM TO ASTM F 1554 Gr.36
2. ALL NUTS SHALL CONFORM TO A563, HEAVY HEX
3. ALL WASHERS TO BE IN ACCORDANCE WITH ASTM F844.
4. BOLTS TO BE SUPPLIED COMPLETE WITH NUTS & WASHERS.
#4 - 200 (LINKS)
F #4 - 50 (LINK) F

50
Ø
2x #4 - 200 (CLIPS)
#6 - 200 (B1&T1)

'L2' - PROJ.
GROUT
P2 #8 #8 #8
8 - #8

'H'
F F
700

P1 P1 P1 #6 - 200 (B2&T2)
276

TOC. 258.590 TOC. 258.590 #4 LINKS


--- ---
TOC. 258.314 #8 #8
1400
450

#4 CLIPS
1340
800

#8 #8 #8
700

'L'
257.250 REF.
E E

'L1'
264 REF.

50mm BLINDING --- ---


EXISTING SUPPORT BASE
#6 T&B EW
EXISTING PUMP BASE
C.F.W.

'F'
G G

'G'
SECTION B PLAN ON BASE B1 PLAN ON PLINTH P2 SECTION E SECTION F
SCALE 1:50 --- SCALE: 1:25 REINFORCEMENT SCALE 1:25 --- SCALE 1:25 ---
'E' SQ
1 No. OFF SCALE: 1:25
1 No. OFF
ANCHOR BOLT - TYPE P
Pr REG No. 201670260
Date: 2021.07.27
PROF. PERSON T.D 16:52:00 +02'00' .
Pr REG No.
All content included on this document is the property of DRA/SENET (Pty) Ltd and protected by South African
PROF. PERSON and international copyright laws. Any unauthorized copying, reproduction, distribution, publication,
display, performance, modification or any exploitation of copyrighted material is prohibited by law.
CLIENT This document shall not be released to third parties without DRA/SENET’s written consent.
Digitally signed by Raymond Building 12
PROJECT MANAGER Raymond Munsami Munsami Greenstone Hill Office Park
Date: 2021.07.28 09:47:14 +02'00' Emerald Boulevard
Greenstone, 1609.
PROCESS ENGINEER (Modderfontein)
Republic Of South Africa
Tel: (Int.) 27 11 409 1300

PUEBLO VIEJO DOMINICANA CORPORATION DISCIPLINE ENGINEER Fax: (Int.) 27 11 409 1301

H Email: Drawingoffice@senet.co.za
H
KM 14, CARRETERA MAIM ON-COTUI DISCIPLINE MANAGER Grant Wilson Digitally signed by Grant Wilson
Date: 2021.07.28 08:36:10 +02'00' DRA / SENET PROJECT AREA DISC CODE DRG No. SHT
PROVINCIA SANCHEZ RAMIREZ
DRAWING NUMBER SP0793 6186 C LAYT 00025 001
Jaco Smit
Digitally signed by Jaco Smit
REPUBLICA DOMINICANA PROJECT ENGINEER Date: 2021.07.28 08:24:09
+02'00'
PVDC EXPANSION PROJECT
SECTION LEADER 27.07.2021
LIME STONE MILLING
Jaco Digitally signed

27.07.2021
by Jaco Smit
0000-15-0001 STANDARD DETAILS - GENERAL NOTES 00 26.07.21 APPROVED FOR CONSTRUCTION D.K.T. Smit
Date:
2021.07.28
08:23:40 +02'00'
CHECKED VALVE ACCESS PLATFORM AND PUMP PLINTHS
DRG No. DRAWING TITLE REV DATE REVISION DESCRIPTION BY CHK DISC PROJ DO NOT SCALE DRAWN D.K.T. 15.07.21 CONCRETE AND REINFORCEMENT LAYOUT AND DETAILS
ENG ENG
IF IN DOUBT, ASK A0
SCALE PVDC DRAWING NUMBER REV
REFERENCE DRAWINGS REVISIONS APPROVAL SIGNATURE DATE
1:50 SP0793-6186-15-0025 00

1 2 3 4 5 6 7 8 9 10 11 12