You are on page 1of 125

SIGNED

D<-!,11a11
Architects+
Engineers

■•
ISSUED FOR CONSTRUCTION
SUBJECT TO AUTHORITIES APPROVALS

Project Name : TOWNHOUSES AT PHASE 02 OF MASAAR


CLIENT: MASAAR DEVELOPMENTS LLC
ISSUED FOR CONSTRUCTION - PHASE 2AB
Structural Drawings
14th December 2022
NORTH

14 14 14
D21-44 - ARADA MASAAR D21-44 - ARADA MASAAR D21-44 - ARADA MASAAR
(PHASE P2AB) 12 (PHASE P2AB) 12 (PHASE P2AB) 12
KEY PLAN
STRUCTURAL DRAWINGS 22 STRUCTURAL DRAWINGS 22 STRUCTURAL DRAWINGS 22

LIST OF DELIVERABLES LIST OF DELIVERABLES LIST OF DELIVERABLES

CONSTRUCTION

CONSTRUCTION

CONSTRUCTION
ISSUED FOR

ISSUED FOR

ISSUED FOR
M 02 C

SHEET NO. DRAWING TITLE SHEET NO. DRAWING TITLE SHEET NO. DRAWING TITLE

NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
GENERAL NOTES & DETAILS CL2A CL3A ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
COVER SHEET  MAS-P2AB-STR-CL2A-0101 CL2A - FOUNDATION PLAN C00 MAS-P2AB-STR-CL3A-0101 CL3A - FOUNDATION PLAN C00 DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
MAS-P2AB-STR-GEN-0001 GEN - LIST OF DRAWINGS C00 MAS-P2AB-STR-CL2A-0102 CL2A - GROUND FLOOR - FRAMING PLAN C00 MAS-P2AB-STR-CL3A-0102 CL3A - GROUND FLOOR - FRAMING PLAN C00 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

MAS-P2AB-STR-GEN-0002 GEN - GENERAL NOTES 01 C00 MAS-P2AB-STR-CL2A-0103 CL2A - FIRST FLOOR - FRAMING PLAN C00 MAS-P2AB-STR-CL3A-0103 CL3A - FIRST FLOOR - FRAMING PLAN C00
MAS-P2AB-STR-GEN-0003 GEN - GENERAL DETAILS 01 C00 MAS-P2AB-STR-CL2A-0104 CL2A - ROOF - FRAMING PLAN C00 MAS-P2AB-STR-CL3A-0104 CL3A - ROOF & TOP ROOF - FRAMING PLAN C00
MAS-P2AB-STR-GEN-0004 GEN - GENERAL DETAILS 02 C00 MAS-P2AB-STR-CL2A-0201 CL2A - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL3A-0201 CL3A - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00
MAS-P2AB-STR-GEN-0005 GEN - GENERAL DETAILS 03 C00 MAS-P2AB-STR-CL2A-0202 CL2A - FIRST FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL3A-0202 CL3A - FIRST FLOOR - COLUMN LAYOUT C00
MAS-P2AB-STR-GEN-0006 GEN - GENERAL DETAILS 04 C00 MAS-P2AB-STR-CL2A-0301 CL2A - STRUCTURAL DETAILS - 1 C00 MAS-P2AB-STR-CL3A-0301 CL3A - STRUCTURAL DETAILS - 1 C00
MAS-P2AB-STR-GEN-0007 GEN - GENERAL DETAILS 05 C00 MAS-P2AB-STR-CL2A-0401 CL2A - COLUMNS SCHEDULE & DETAILS C00 MAS-P2AB-STR-CL3A-0401 CL3A - COLUMNS SCHEDULE & DETAILS C00
CL1A MAS-P2AB-STR-CL2A-0601 CL2A - STAIR CASE-1 DETAILS C00 MAS-P2AB-STR-CL3A-0601 CL3A - STAIR CASE-1 DETAILS C00
MAS-P2AB-STR-CL1A-0101 CL1A - FOUNDATION PLAN C00 MAS-P2AB-STR-CL2A-0901 CL2A - FIRST FLOOR - LOADING PLAN C00 MAS-P2AB-STR-CL3A-0602 CL3A - STAIR CASE-2 DETAILS C00
MAS-P2AB-STR-CL1A-0102 CL1A - GROUND FLOOR - FRAMING PLAN C00 MAS-P2AB-STR-CL2A-0902 CL2A - ROOF - LOADING PLAN C00 MAS-P2AB-STR-CL3A-0901 CL3A - FIRST FLOOR - LOADING PLAN C00
MAS-P2AB-STR-CL1A-0103 CL1A - FIRST FLOOR - FRAMING PLAN C00 CL2B MAS-P2AB-STR-CL3A-0902 CL3A - ROOF - LOADING PLAN C00
MAS-P2AB-STR-CL1A-0104 CL1A - ROOF - FRAMING PLAN C00 MAS-P2AB-STR-CL2B-0101 CL2B - FOUNDATION PLAN C00 CL3B
MAS-P2AB-STR-CL1A-0201 CL1A - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL2B-0102 CL2B - GROUND FLOOR - FRAMING PLAN C00 MAS-P2AB-STR-CL3B-0101 CL3B - FOUNDATION PLAN C00
MAS-P2AB-STR-CL1A-0202 CL1A - FIRST FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL2B-0103 CL2B - FIRST FLOOR - FRAMING PLAN C00 MAS-P2AB-STR-CL3B-0102 CL3B - GROUND FLOOR - FRAMING PLAN C00
SIGNED
MAS-P2AB-STR-CL1A-0301 CL1A - STRUCTURAL DETAILS - 1 C00 MAS-P2AB-STR-CL2B-0104 CL2B - ROOF - FRAMING PLAN C00 MAS-P2AB-STR-CL3B-0103 CL3B - FIRST FLOOR - FRAMING PLAN C00
D<-!,11a11
MAS-P2AB-STR-CL1A-0401 CL1A - COLUMNS SCHEDULE & DETAILS C00 MAS-P2AB-STR-CL2B-0201 CL2B - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL3B-0104 CL3B - ROOF & TOP ROOF - FRAMING PLAN C00 Architects+
Engineers
MAS-P2AB-STR-CL1A-0601 CL1A - STAIR CASE-1 DETAILS C00 MAS-P2AB-STR-CL2B-0202 CL2B - FIRST FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL3B-0201 CL3B - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00
MAS-P2AB-STR-CL1A-0602 CL1A - STAIR CASE-2 DETAILS C00 MAS-P2AB-STR-CL2B-0301 CL2B - STRUCTURAL DETAILS - 1 C00 MAS-P2AB-STR-CL3B-0202 CL3B - FIRST FLOOR - COLUMN LAYOUT C00
ISSUED FOR CONSTRUCTION
■•
MAS-P2AB-STR-CL1A-0901 CL1A - FIRST FLOOR - LOADING PLAN C00 MAS-P2AB-STR-CL2B-0401 CL2B - COLUMNS SCHEDULE & DETAILS C00 MAS-P2AB-STR-CL3B-0301 CL3B - STRUCTURAL DETAILS - 1 C00 SUBJECT TO AUTHORITIES APPROVALS

MAS-P2AB-STR-CL1A-0902 CL1A - ROOF - LOADING PLAN C00 MAS-P2AB-STR-CL2B-0601 CL2B - STAIR CASE-1 DETAILS C00 MAS-P2AB-STR-CL3B-0401 CL3B - COLUMNS SCHEDULE & DETAILS C00
CL1B MAS-P2AB-STR-CL2B-0901 CL2B - FIRST FLOOR - LOADING PLAN C00 MAS-P2AB-STR-CL3B-0601 CL3B - STAIR CASE-1 DETAILS C00
MAS-P2AB-STR-CL1B-0101 CL1B - FOUNDATION PLAN C00 MAS-P2AB-STR-CL2B-0902 CL2B - ROOF - LOADING PLAN C00 MAS-P2AB-STR-CL3B-0602 CL3B - STAIR CASE-2 DETAILS C00
MAS-P2AB-STR-CL1B-0102 CL1B - GROUND FLOOR - FRAMING PLAN C00 CL2C MAS-P2AB-STR-CL3B-0901 CL3B - FIRST FLOOR - LOADING PLAN C00
MAS-P2AB-STR-CL1B-0103 CL1B - FIRST FLOOR - FRAMING PLAN C00 MAS-P2AB-STR-CL2C-0101 CL2C - FOUNDATION PLAN C00 MAS-P2AB-STR-CL3B-0902 CL3B - ROOF - LOADING PLAN C00
MAS-P2AB-STR-CL1B-0104 CL1B - ROOF - FRAMING PLAN C00 MAS-P2AB-STR-CL2C-0102 CL2C - GROUND FLOOR - FRAMING PLAN C00 CL3C
MAS-P2AB-STR-CL1B-0201 CL1B - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL2C-0103 CL2C - FIRST FLOOR - FRAMING PLAN C00 MAS-P2AB-STR-CL3C-0101 CL3C - FOUNDATION PLAN C00
MAS-P2AB-STR-CL1B-0202 CL1B - FIRST FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL2C-0104 CL2C - ROOF - FRAMING PLAN C00 MAS-P2AB-STR-CL3C-0102 CL3C - GROUND FLOOR - FRAMING PLAN C00
MAS-P2AB-STR-CL1B-0301 CL1B - STRUCTURAL DETAILS - 1 C00 MAS-P2AB-STR-CL2C-0201 CL2C - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL3C-0103 CL3C - FIRST FLOOR - FRAMING PLAN C00
MAS-P2AB-STR-CL1B-0401 CL1B - COLUMNS SCHEDULE & DETAILS C00 MAS-P2AB-STR-CL2C-0202 CL2C - FIRST FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL3C-0104 CL3C - ROOF & TOP ROOF - FRAMING PLAN C00
MAS-P2AB-STR-CL1B-0601 CL1B - STAIR CASE-1 DETAILS C00 MAS-P2AB-STR-CL2C-0301 CL2C - STRUCTURAL DETAILS - 1 C00 MAS-P2AB-STR-CL3C-0201 CL3C - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00
MAS-P2AB-STR-CL1B-0602 CL1B - STAIR CASE-2 DETAILS C00 MAS-P2AB-STR-CL2C-0401 CL2C - COLUMNS SCHEDULE & DETAILS C00 MAS-P2AB-STR-CL3C-0202 CL3C - FIRST FLOOR - COLUMN LAYOUT C00
MAS-P2AB-STR-CL1B-0901 CL1B - FIRST FLOOR - LOADING PLAN C00 MAS-P2AB-STR-CL2C-0601 CL2C - STAIR CASE-1 DETAILS C00 MAS-P2AB-STR-CL3C-0301 CL3C - STRUCTURAL DETAILS - 1 C00
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
MAS-P2AB-STR-CL1B-0902 CL1B - ROOF - LOADING PLAN C00 MAS-P2AB-STR-CL2C-0901 CL2C - FIRST FLOOR - LOADING PLAN C00 MAS-P2AB-STR-CL3C-0401 CL3C - COLUMNS SCHEDULE & DETAILS C00 NO DATE BY REVISION APP

CL1C MAS-P2AB-STR-CL2C-0902 CL2C - ROOF - LOADING PLAN C00 MAS-P2AB-STR-CL3C-0601 CL3C - STAIR CASE-1 DETAILS C00 R E V I S I O N
PROJECT :
MAS-P2AB-STR-CL1C-0101 CL1C - FOUNDATION PLAN C00 MAS-P2AB-STR-CL3C-0602 CL3C - STAIR CASE-2 DETAILS C00
MAS-P2AB-STR-CL1C-0102 CL1C - GROUND FLOOR - FRAMING PLAN C00 MAS-P2AB-STR-CL3C-0901 CL3C - FIRST FLOOR - LOADING PLAN C00 VILLAS AT PHASE 02 OF MASAAR
MAS-P2AB-STR-CL1C-0103 CL1C - FIRST FLOOR - FRAMING PLAN C00 MAS-P2AB-STR-CL3C-0902 CL3C - ROOF - LOADING PLAN C00
CLIENT
MAS-P2AB-STR-CL1C-0104 CL1C - ROOF - FRAMING PLAN C00 CL4
MAS-P2AB-STR-CL1C-0201 CL1C - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL4-0101 CL4 - FOUNDATION PLAN C00
MAS-P2AB-STR-CL1C-0202 CL1C - FIRST FLOOR - COLUMN LAYOUT C00 MAS-P2AB-STR-CL4-0102 CL4 - GROUND FLOOR - FRAMING PLAN C00
MAS-P2AB-STR-CL1C-0301 CL1C - STRUCTURAL DETAILS - 1 C00 MAS-P2AB-STR-CL4-0103 CL4 - FIRST FLOOR - FRAMING PLAN C00 MASAAR DEVELOPMENTS LLC
MAS-P2AB-STR-CL1C-0401 CL1C - COLUMNS SCHEDULE & DETAILS C00 MAS-P2AB-STR-CL4-0104 CL4 - ROOF & TOP ROOF - FRAMING PLAN C00 CONSULTANT

MAS-P2AB-STR-CL1C-0601 CL1C - STAIR CASE-1 DETAILS C00 MAS-P2AB-STR-CL4-0201 CL4 - FOUNDATION & GROUND FLOOR - COLUMN LAYOUT C00
MAS-P2AB-STR-CL1C-0602 CL1C - STAIR CASE-2 DETAILS C00 MAS-P2AB-STR-CL4-0202 CL4 - FIRST FLOOR & ROOF - COLUMN LAYOUT C00
MAS-P2AB-STR-CL1C-0901 CL1C - FIRST FLOOR - LOADING PLAN C00 MAS-P2AB-STR-CL4-0301 CL4 - STRUCTURAL DETAILS - 1 C00
MAS-P2AB-STR-CL1C-0902 CL1C - ROOF - LOADING PLAN C00 MAS-P2AB-STR-CL4-0401 CL4 - COLUMNS SCHEDULE & DETAILS C00
MAS-P2AB-STR-CL4-0601 CL4 - STAIR CASE-1 DETAILS C00
MAS-P2AB-STR-CL4-0901 CL4 - FIRST FLOOR - LOADING PLAN C00 MEP ENGINEER

MAS-P2AB-STR-CL4-0902 CL4 - ROOF & TOP ROOF - LOADING PLAN C00

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

GEN - LIST OF DRAWINGS

DRAWN BY CHECKED BY APPROVED BY DATE


DAE HJ EK 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


D21-44 A1 1:1
N.T.S C00
DRAWING NO.
MAS-P2AB-STR-GEN-0001
NORTH

GENERAL NOTES
1.0. GENERAL
1.1. STRUCTURAL DRAWINGS SHALL BE READ AND VERIFIED IN CONJUNCTION WITH RELEVANT TECHNICAL SPECIFICATION, 4.0. REINFORCEMENT 5.0. EARTHWORK & FOUNDATIONS KEY PLAN
ARCHITECTURAL, ELECTRICAL,MECHANICAL , PLUMBING AND OTHER RELEVANT DRAWINGS.
1.2. FOR MAIN SETTING OUT AND LEVELS REFER TO THE ARCHITECTURAL DRAWINGS. ANY DISCREPANCIES OR CONFLICT IN THE 5.1 THE DESIGN IS BASED ON THE SOIL INVESTIGATION REPORT CARRIED OUT BY ELEMENT ENGINEERING LABORATORY,
SETTING OUT LINES--LEVELS, DETAILS, LOCATIONS, SIZES, REINFORCEMENT ETC. SHALL BE BROUGHT TO THE ATTENTION OF THE 4.1. THE REINFORCEMENT USED IN THE R.C WORKS SHALL BE ROUND, DEFORMED TYPE 2 BARS REFERENCED: RSl2022-0185-SHJ, DATED 27/08/2022.
ENGINEER PRIOR TO -COMMENCEMENT OF THE WORK MARKED AS (Y) OR (T) TO INDICATE HIGH YIELD STRENGTH OF 460N/mm² OR GRADE 520 TO 5.2 THE CONTRACTOR SHALL REFER TO THE SOIL INVESTIGATION REPORT TO ESTABLISH THE NATURE OF THE
ASTM A615M . REINFORCEMENT MARKED (R) DENOTES ROUND PLAIN MILD STEEL HAVING A
SOIL CONDITIONS. SHOULD A DIFFERENT SOIL LIKE LOOSE POCKETS, UNDESIRABLE MATERIALS ARE M 02 C
1.3. DO NOT SCALE THE DRAWINGS. ALL DIMENSIONS SHALL BE READ FROM THE DRAWING OR COMPUTED. ELEVATIONS ARE IN MINIMUM YIELD STRENGTH OF 250 N/mm² OR GRADE 300 TO ASTM A615M
ENCOUNTERED, CONTRACTOR SHOULD LIAISE WITH GEOTECHNICAL AGENCY AND UNDERTAKE THE
METERS, DISTANCES & BAR SPACING ARE IN MILLIMETERS AND REINFORCEMENT BAR SIZES ARE IN MILLIMETERS. 4.2. REINFORCEMENT DETAILS SHOWN ARE INDICATIVE. THE CONTRACTOR SHALL PREPARE NECESSARY MEASURES TO OBTAIN THE ASSUMED BEARING CAPACITY. THE CONSULTANT ENGINEERS
DETAILED SHOP DRAWINGS & FULL BAR BENDING SCHEDULES IN ACCORDANCE WITH THE APPROVAL IS REQUIRED FOR THIS ACTIVITY.
1.4. SLEEVES SHALL BE PROVIDED AT LOCATIONS INDICATED ON DRAWINGS OR AS DIRECTED BY THE ENGINEER. ADDITIONAL DESIGN DRAWINGS AND SPECIFICATIONS FOR THE ENGINEER'S APPROVAL AT LEAST FOUR
REINFORCEMENT SHALL BE PROVIDED AROUND OPENINGS AS REQUIRED BY THE ENGINEER. 5.3 EXCAVATIONS FOR FOUNDATIONS DOWN TO FORMATION LEVEL SHALL BE CARRIED OUT BY MECHANICAL
WEEKS PRIOR TO COMMENCEMENT OF R.C. WORK AND AFTER COORDINATING WITH ALL
MEANS, EXCEPT FOR THE LAST 10 CM OF EXCAVATION WHICH IS TO BE CARRIED OUT BY MANUAL METHODS.
CONCERNED PARTIES.
1.5. WHERE OPEN EXCAVATION IS TO BE CARRIED OUT MAXIMUM SLOPE TO BE LIMITED TO 40 DEGREE SHALL BE MAINTAINED AS 5.4 THE FORMATION LEVEL OF FOUNDATION IS TO BE INSPECTED AND APPROVED BY THE ENGINEER BEFORE NOTES
4.3. LAP ANDDEVELOPMENT LENGTHS OF REINFORCEMENT SHALL BE AS PER THE REQUIREMENT COMMENCEMENT OF THE WORK.
AUTHORITY REQUIREMENT. UNDERPINNING & SHORING OF THE STRUCTURE SHALL BE CARRIED OUT AS NECESSARY AND THE OF ACI - 318M AND ENGINEER'S APPROVAL. THE MINIMUM LAP AND DEVELOPMENT LENGTH OF 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EXISTING STRUCTURE SHALL BE MAINTAINED IN A STABLE AND UNDAMAGED CONDITION 5.5 GENERAL FILL SHALL BE SELECTED WELL GRADED GRANULAR MATERIAL APPROVED BY THE ENGINEER EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
REINFORCEMENT SHALL BE ACCORDING TO TABLES 4.1a AND 4.1b ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
WITH MINIMUM SOAKED CBR OF 15 % COMPACTED IN LAYERS NOT EXCEEDING 200mm TO 95 % MDD IN EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
4.4. SPACER BARS IN BEAMS SHALL BE Y25 @ 1000mm c/c. CHAIRS IN SLABS SHALL BE Y10 @ ACCORDANCE WITH THE SPECIFICATION. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
1.6. FOR SLABS GREATER THAN 50 m; POUR STRIPS SHALL BE PROVIDED AND SUPPORTED WITH NECESSARY PROPS. DIMENSIONS ONLY ARE TO BE CONSIDERED.
1000mm c/c, AND TIES IN WALLS SHALL BE R8 @ 1000mm c/c, H / V. 5.6 WATERPROOFING MEMBRANE FOR UNDER WATER TANK WALLS, FLOOR AND GROUND FLOOR SLAB 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1.7. CONTRACTOR SHOULD PROVIDE ANTI-TERMITE TREATMENT FOR BELOW GROUND STRUCTURES AS PER AUTHORITY REQUIREMENTS & SPECIFICATION. 4.5. UNLESS OTHERWISE NOTED REINFORCE ALL SIDES OF OPENINGS IN CONCRETE WALLS AS WHERE APPLICABLE SHALL BE PROTECTED BY A SUITABLE PROTECTION BOARD SHALL INSURE COMPLETE TO COMMENCEMENT OF ANY WORK.
PER STANDARD DETAILS PROVIDED. TANKING AND WATER TIGHTNESS. ALL APPLICATIONS ARE TO BE CARRIED OUT STRICTLY IN ACCORDANCE
WITH THE MANUFACTURE'S INSTRUCTIONS.
2.0. DESIGN & LOADING 4.6. DEVELOPMENT LENGTH - (REF-ACI-318M-19 - CL-25.4.2.3 & 25.4.2.5) : TABLE 4.1a & 4.1b SHOWS
BASIC DEVELOPMENT LENGTHS FOR DEFORMED BARS WITH MIN. YIELD STRENGTH OF 460N/mm² 5.7 THE CONTRACTOR SHALL VERIFY THE ACTUAL LEVEL OF WATER TABLE AT SITE AND ALLOW FOR ALL CHANGES TO
2.1. DESIGN AND CONSTRUCTION OF REINFORCED CONCRETE MEMBERS SHALL BE IN ACCORDANCE WITH ACI-318M-19 AND OTHER TABLE 4.1a ACI-318M-19-CL-25.4.2.3 BE PLANNED EXCAVATION, SHORING AND DEWATERING AT NO ADDITIONAL COST.
RELEVANT ASCE PUBLICATION. TOP BARS- (BEAMS, RAFT, SLABS THICKER THAN 300 mm AND WALLS HORIZONDAL BARS)
2.2. THE BUILDING HAS BEEN DETAILED IN REFERENCE TO ACI-DETAILING MANUAL (2004)-SP66(04), ACI-315-99 AND ACI-315R-04.
DEVELOPMENT LENGTH (Ld) & LAP SPLICE LENGTH (mm)
6.0 CONCRETE MASONRY BLOCKS
2.3. DESIGN AND CONSTRUCTION OF STRUCTURAL STEEL MEMBERS SHALL BE IN ACCORDANCE WITH AISC 360-10 OR BS-5950-2000. BAR SIZE fcu/fc'
35/28 40/32 45/36 50/40 60/48 70/56 6.1 DESIGN AND CONSTRUCTION OF ALL BLOCKS SHALL COMPLY WITH BS 5628:PARTS 1.2 & 3:1992 AND IN
CLASS
2.4. IMPOSED DESIGN LOADS ON THE FLOORS SHALL BE IN ACCORDANCE WITH ASCE 7-10 -TABLE-4-1 OR ANY AUTHORITY REQUIREMENTS ACCORDANCE WITH THE LOCAL MUNICIPALITY REGULATIONS. THE CONTRACTOR SHALL SUBMIT A
CASE-1 700 650 650 600 550 500
10 B
CASE-2 1050 1000 950 900 800 750
CONSTRUCTION METHOD STATEMENT PRIOR TO COMMENCING THE WORKS.
2.5. BASIC WIND SPEED - 45 m/sec (162 km/hr) ON 3 SEC GUST. ( SURFACE ROUGHNESS CATEGORY & EXPOSURE CATEGORY -C AS PER - ASCE-7-16 ) CASE-1 850 800 750 700 650 600
12 B 6.2 BEARING BLOCK WALLS SHALL BE SOLID BLOCKS HAVING MINIMUM STRENGTH OF 12.5N/mm2.
CASE-2 1300 1200 1150 1050 1000 900
3.0.CONCRETE 16 B CASE-1
CASE-2
1150
1700
1050
1600
1000
1500
950
1400
850
1300
800
1200
6.3 NON LOAD BEARING BLOCK WALLS SHALL BE HOLLOW BLOCKS WITH MINIMUM CHARACTERISTIC
COMPRESSIVE STRENGTH OF 7N/mm2 OR LIGHT WEIGHT BLOCK WITH MIAXIMUM DENSITY 800Kg/m3 (REFER
3.1. CONTRACTOR SHALL SUBMIT DETAIL CONCRETE MIX DESIGN. HRWR (HIGH RANGE WATER REDUCER) B CASE-1 1400 1350 1250 1200 1100 1000
20 DESIGN LOAD TABLE).
ADMIXTURE SHALL BE USED TO REDUCE W/C RATIO. MIX DESIGN SHALL ALSO CONSIDER THE DURABILITY CASE-2 2100 2000 1850 1750 1600 1500
PROVISIONS SUCH AS, WATER PENETRATION, WATER ABSORPTION AND AMBIENT PEAK TEMPERATURE, ETC. 25 B CASE-1 2200 2050 1900 1850 1650 1550 6.4 WALL TIES IN ACCORDANCE WITH BS 1248 FIG.2 CP 121 PART 1.73
CASE-2 3350 3150 2950 2800 2550 2400
6.5 ALL CONCRETE AND BLOCK JOINTS TO HAVE 225mm WIDE EXPANDED METAL SECURED ON BOTH SIDES
3.2. CONTRACTOR TO COMPLY WITH REQUIREMENTS GIVEN IN THE "CIRIA GUIDE TO CONCRETE CONSTRUCTION IN 32 B CASE-1 2800 2600 2450 2350 2150 2000
THE GULF REGION". CIRIA SPECIAL PUBLICATION 31, ALL CONCRETE WORKS SHALL CONFORM TO THIS CASE-2 4300 4000 3800 3600 3300 3050 FOR PLASTERING. ALSO PVC COATED CORNER BEADS AND PLASTER STOPS TO BE PROVIDED AT ALL
PUBLICATION. CORNERS AND PLASTER EDGE AS DIRECTED BY THE ENGINEER.
TABLE 4.1b ACI-318M-19-CL-25.4.2.3
NOTATIONS USED : SCHEDULE OF CONCRETE MIX OTHER BARS (COLUMNS, BEAM, RAFT, SLABS 300 mm THICK AND LESSER. ALSO WALLS VERTICAL BARS) 6.6 BLOCKS WALLS BELOW GROUND FLOOR LEVEL SHALL BE CONSTRUCTED WITH SULPHATE RESISTING BLOCKS.
FOUNDATION SLABS COLUMNS,WALLS RETAINING/ 6.7 THE STRUCTURAL FLOOR PLANS SHOW THE LAYOUT OF THE LOAD BEARING WALLS ONLY. ALL OTHER BLOCK
GGBS : GROUND GRANULATED BLAST FURNACE SLAG & BEAMS
WATER DEVELOPMENT LENGTH (Ld) & LAP SPLICE LENGTH (mm) SIGNED
TANK WALL WORK WALLS ARE TO BE CONSIDERED AS NON-LOAD BEARING PARTITIONS AND SHALL BE CONSTRUCTED
D<-!,11a11
FLOOR
OPC : ORDINARY PORTLAND CEMENT CONCRETE CONCRETE CONCRETE CONCRETE AFTER COMPLETION OF THE STRUCTURE.
MIX TYPE MIX TYPE MIX TYPE MIX TYPE
MSRC : MODERATE SULPHATE RESISTANCE CEMENT
BAR SIZE fcu/fc'
35/28 40/32 45/36 50/40 60/48 70/56 6.8 LOAD BEARING BLOCK WALLS SHALL BE REINFORCED HORIZONTALLY WITH GALVANIZED EXPANDING METAL Architects+
BELOW GROUND F1 F1 F1 F1 CLASS LATHS PLACED AT EVERY 5TH COURSE VERTICALLY. Engineers
SF : SILICA FUME OR MICRO SILICA CASE-1 550 500 500 450 450 400

■•
GROUND TO ROOF - F2 F2 F2 10 B 6.9 FOR WALLS OF HEIGHT OR LENGTH BETWEEN 4.0m TO 6.0m, A CAST IN PLACE BOND LINTEL BEAMS AND
CASE-2 800 750 750 700 650 600
3.3. 25x25mm CHAMFERS TO CONCRETE CORNERS AND EDGES SHALL BE PROVIDED IN CASE-1 650 600 600 550 500 450 COLUMNS (200X200mm. 4Y12, R8-200) TO BE PROVIDED AT MID BLOCK WALL HEIGHT OR WIDTH AND MUST BE
12 B
ACCORDANCE WITH SPECIFICATIONS AND AS DIRECTED BY THE ENGINEER. CASE-2 1000 900 850 850 750 700 ANCHORED IN ADJACENT COLUMNS AND WALLS.
CASE-1 900 800 800 750 700 650 ISSUED FOR CONSTRUCTION
16 B
3.4. CONTRACTOR SHALL SUBMIT ALL ADDITIVES, PLASTICIZERS, MICRO SILICA, CASE-2 1300 1200 1150 1100 1000 950 SUBJECT TO AUTHORITIES APPROVALS
CURING COMPOUNDS ETC. APPLICATION SHOULD FOLLOW STRICTLY THE MANUFACTURER RECOMMENDATION. B CASE-1 1100 1000 950 900 850 800
20
CASE-2 1650 1550 1450 1350 1250 1150
3.5. MAXIMUM PERCENTAGE (BY WEIGHT) OF SALT CONTENTS PERMISSIBLE IN AGGREGATES USED FOR 25 B CASE-1
CASE-2
1650
2600
1550
2400
1500
2300
1400
2150
1300
2000
1200
1850
7.0 STRUCTURAL STEEL WORK
CONCRETE, HOLLOW BLOCKS, & HOURDI BLOCKS, ETC, SHALL BE AS FOLLOWS:
B CASE-1 2150 2000 1900 1800 1650 1500
32
3.5.1. ACID SOLUBLE CHLORIDES IN AGGREGATE - (FINE 0.03 %, COURSE 0.02 %) CASE-2 3300 3100 2900 2750 2550 2350 7.1 ALL STRUCTURAL STEEL SHOWN ARE SCHEMATIC AND FOR TENDER PURPOSE ONLY, CONTRACTOR SHALL BE
3.5.2. ACID SOLUBLE SULPHATE IN AGGREGATE - (FINE 0.3 %, COURSE 0.2 %) NOTES:- RESPONSIBLE TO SUBMIT FULL DESIGN CALCULATION AND DETAILS SHOP DRAWINGS TO THE ENGINEERS FOR
I. TENSION DEVELOPMENT LENGTH AND TENSION LAP SPLICE LENGTH ARE CALCULATED APPROVAL PRIOR TO COMMENCEMENT OF FABRICATION WORKS.
3.6. FOR WATERPROOFING AND DAMP PROOFING REFER TO ARCHITECTURAL/STRUCTURAL DRAWINGS AND AS PER ACI 318M-19, SECTIONS 25.4 AND 25.5 RESPECTIVELY. 7.2 BEFORE CONSTRUCTION OF FOUNDATIONS THE CONTRACTOR HAS TO SUBMIT REACTION (LOADS) OF STEEL
SPECIFICATIONS STRUCTURE WITH DETAIL DESIGN CALCULATION AND DRAWINGS FOR VERIFICATION OF FOUNDATION DESIGN
II. TABULATED VALUES ARE BASED ON MINIMUM YIELD STRENGTH OF 460N/mm², LENGTHS ARE
FOR CONSULTANT APPROVAL.
TABLE 3.1: FOLLOWING TABLE IS GIVEN FOR GUIDANCE ONLY (TO ACHIEVE REQUIRED GREEN CEMENT COMBINATIONS FOR DURABLE AND GREEN RC OR PT ELEMENTS) IN MILLIMETERS (mm). LENGTHS ARE APPROXIMATED TO 50mm INCREMENTS.
7.4 DESIGN AND CONSTRUCTION OF ALL STRUCTURAL STEEL WORKS SHALL BE IN ACCORDANCE WITH THE BS 5950.
SPECIFIED III. IN RARE CASES WHERE THE FOLLOWING CONDITIONS ARE MET, CLASS-A SPLICE MAY BE 7.5 STRUCTURAL STEEL WORK SHALL BE GRADE 43 TO BS 4360, BOLTS SHALL BE GALVANIZED GRADE 8.8 TO BS 3692
APPROXIMATE PROPORTIONS MAXIMUM CHARACTERISTIC
CONCRETE QUANTITY OF USED WHEN: AND ELECTRODES TO BSD 639. (UNO). THE MINIMUM PLATE THICKNESS OF ANY STRUCTURAL MEMBERS IS 6mm.
MAX SIZE FREE CUBE STRENGTH
MIX GRADE TOTAL
TYPE CUBE/
AGG.
CEMENTITIOUS
WATER/ REMARKS a. THE AREA OF STEEL PROVIDED IS AT LEAST TWICE THAT REQUIRED BY ANALYSIS. 7.6 TUBE SECTIONS ARE MILL FORMED STEEL SECTIONS CONFORMING TO JIS-G3466-STKR 490 (OR EQUIVALENT)
(mm) CEMENT (fcu) 28- DAYS
CYLINDER 1 SUB-STRUCTURE 2 SUPER-STRUCTURE MATERIAL b. ONE HALF OR LESS OF THE TOTAL REINFORCEMENT IS SPLICED WITHIN THE REQUIRED LAP WITH A MINIMUM YIELD STRENGTH OF 275 N/mm2
RATIO N/mm²
LENGTH. 7.7 ANGLE BRACING SHALL BE USED TO PROVIDE LONGITUDINAL STABILITY OF THE BUILDING AND SHALL CONFORM
A C15/12 20 A1 100%OPC A2 100%OPC 220 0.55 15 c. AS PER ACI-318-19 CL - 25.4.2.1 TO GRADE 43, WITH MINIMUM YIELD STRENGTH OF 275 N/mm2
B C20/16 20 B1 100%OPC B2 - 250 0.55 20
CLASS 'A' SPLICE = CLASS 'B' SPLICE / 1.3 7.8 UNLESS SHOWN OTHERWISE ON THE DRAWINGS, ALL CONNECTIONS SHALL BE IN ACCORDANCE WITH THE
C C25/20 20 C1 100%OPC C2 - 300 0.45 25 FOLLOWING MINIMUM REQUIREMENTS:
AND IN ALL OTHER CASES SPLICE CLASS B SHALL BE USED (REF-ACI-318M-19-CL-25.4.2.1).
D C30/24 20 D1 64%OPC+36%GGBS D2 25%OPC+75%GGBS 340 0.44 30 i) PRIMARY STRUCTURAL CONNECTIONS ARE MADE WITH HOT DIPPED GALVANIZED, HIGH STRENGTH
E C35/28 20 E1 64%OPC+36%GGBS E2 35%OPC+65%GGBS 380 0.42 35
IV. CASE OF SPLICE: CASE 1 AND 2 DEPEND ON THE TYPE OF STRUCTURAL MEMBER, CONCRETE BOLTS CONFORMING TO ASTM-A-325, TYPE 1.
AND CENTER TO CENTER SPACING OF BARS. ii) ALL WELDS SHALL BE AT LEAST 6mm CONTINUOUS FILLET WELDS ALL AROUND.
F C40/32 20 F1 45%OPC+55%GGBS F2 100%OPC 400 0.35 40 a. FOR UNCOATED BARS, DEFINED AS: iii) ALL STRUCTURAL CONNECTIONS BOLTS SHOULD BE GALVANIZED MINIMUM M20 AND WITH A MINIMUM OF 2
BOLTS PER CONNECTION. PURLIN BOLTS TO BE IN ACCORDANCE WITH THE SUPPLIERS RECOMMENDATIONS. C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
64%OPC+36%GGBS (or) 55%OPC+45%GGBS (or) CASE 1 CONCRETE COVER AT LEAST 1.0 db AND C/C SPACING AT LEAST 2.0 db. iv) ALL GUSSET PLATES SHALL BE AT LEAST 10mm THICK. NO DATE BY REVISION APP
G C45/36 20 G1 G2 410 0.37 45 BEAMS
55%OPC+45% Fly Ash 55%OPC+45% Fly Ash v) ALL CAP PLATES SHALL BE AT LEAST 10mm THICK. R E V I S I O N
COLUMNS
CASE 2 CONCRETE COVER AT LESS THAN 1.0 db OR C/C SPACING LESS THAN 2.0 db. vi) ALL BASE PLATES SHALL BE AT LEAST 10mm THICK.
64%OPC+36%GGBS (or) 60%OPC+40%GGBS (or) PROJECT :
H C50/40 20 H1
50%OPC+50% Fly Ash
H2
50%OPC+50% Fly Ash
420 0.36 50 vii) ANCHOR BOLTS ARE MADE OF HOT DIPPED GALVANIZED RODS CONFORMING TO JSI
ALL CASE 1 CONCRETE COVER AT LEAST 1.0 db AND C/C SPACING AT LEAST 3.0 db. GRADE-3101-SS-400 WITH A MINIMUM YIELD STRENGTH OF 24.5 KN/cm2 AND AN ULTIMATE STRENGTH OF 40.2 KN/cm2
J C55/44 20 J1
69%OPC+26%GGBS+5%SF (or)
60%OPC+40%GGBS (or) J2
70%OPC+25%GGBS+5%SF (or)
74%OPC+26%GGBS (or) 430 0.35 55
OTHERS VILLAS AT PHASE 02 OF MASAAR
CASE 2 CONCRETE COVER AT LESS THAN 1.0 db OR C/C SPACING LESS THAN 3.0 db.
74%OPC+26% Fly Ash 84%OPC+16% Fly Ash
NOTE: d b = BAR DIAMETER
69%OPC+26%GGBS+5%SF (or) 70%OPC+25%GGBS+5%SF (or) CLIENT
K C60/48 20 K1 60%OPC+40%GGBS (or) K2 74%OPC+26%GGBS (or) 440 0.34 60
74%OPC+26% Fly Ash 84%OPC+16% Fly Ash
4.7. ABBREVIATIONS USED ON THE DRAWINGS : | R : MILD STEEL
For Admixtures, Refer Table 3.1
T1 : FIRST TOP LAYER | T,Y : HIGH YIELD STEEL
68%OPC+26%GGBS+6%SF (or) 70%OPC+24%GGBS+6%SF (or) T2 : SECOND TOP LAYER | NF : NEAR FACE
L C65/52 20 L1 55%OPC+45%GGBS (or) L2 71%OPC+29%GGBS (or) 450 0.33 65 B1 : FIRST BOTTOM LAYER | EF : EACH FACE
71%OPC+29% Fly Ash 83%OPC+17% Fly Ash
B2 : SECOND BOTTOM LAYER | FF : FAR FACE
68%OPC+26%GGBS+6%SF (or) 70%OPC+24%GGBS+6%SF (or) EW : EACH WAY | SP : SPACING
M C70/56 20 M1 55%OPC+45%GGBS (or) M2 71%OPC+29%GGBS (or) 460 0.33 70 STGD : STAGGERED MASAAR DEVELOPMENTS LLC
71%OPC+29% Fly Ash 83%OPC+17% Fly Ash
a. REINFORCEMENT SHALL BE NOTED THUS: CONSULTANT
67%OPC+26%GGBS+7%SF (or) 67%OPC+26%GGBS+7%SF (or)
N C75/60 20 N1 50%OPC+50%GGBS (or) N2 68%OPC+32%GGBS (or) 470 0.32 75 T 16 200 T1 5200
68%OPC+32% Fly Ash 82%OPC+18% Fly Ash TYPE SIZE SPACING LOCATION LENGTH SYMBOLS ABBREVIATIONS
b. -- -- -- -- -- BARS IN TOP LAYER
67%OPC+26%GGBS+7%SF (or) 67%OPC+26%GGBS+7%SF (or) AS/ : AS PER
P C80/64 20 P1 50%OPC+50%GGBS (or) P2 68%OPC+32%GGBS (or) 490 0.31 80
c. -------------------- BARS IN BOTTOM LAYER Structural Concrete wall & Columns
ARCH. : ARCHITECT / ARCHITECTURAL
68%OPC+32% Fly Ash 82%OPC+18% Fly Ash
4.8. WHERE DISTRIBUTION REINFORCEMENT IS NOT DETAILED ON FLOOR SLAB DRAWINGS, C/C : CENTER TO CENTER
PLACE T10 @ 200mm SPACING. Column/wall Stop Below Slab Level. CJ : CONTROL JOINT (OR) CONSTRUCTION JOINT
66%OPC+26%GGBS+8%SF (or) 65%OPC+27%GGBS+8%SF (or)
CL : CENTER LINE
Q C85/68 20 Q1 45%OPC+55%GGBS (or) Q2 65%OPC+35%GGBS (or) 500 0.30 85 : CENTIMETER
CM
65%OPC+35% Fly Ash 81%OPC+19% Fly Ash 4.9. 4.9.FOR HOLES IN SLABS UP TO 300x300mm, REINFORCEMENT ON FLOOR IS TO BE CUT Floating Column/wall (FC/FW) DB : BAR DIAMETER
AND REPLACEMENT BARS FIXED ADJACENT TO THE HOLE EXTENDING 45xBAR DIA. D.M.A. : DEPARTMENT OF MUNICIPALITIES & AGRICULTURE
66%OPC + 26%GGBS + 8%SF (or) 65%OPC+27%GGBS+8%SF (or) D.M.D. : DUBAI MUNICIPALITY DATUM
R C90/72 20 R1 45%OPC + 55%GGBS (or) R2 65%OPC+35%GGBS (or) 510 0.29 90 BEYOND THE HOLE. Block Wall. DWG. : DRAWING(S)
65%OPC + 35% Fly Ash 80%OPC+20% Fly Ash 4.10. FORM WORK FOR BEAM AND SLAB SOFFITS IS TO BE FIXED AND LEVELED WITH THE E.J. : EXPANSION JOINT
MEP ENGINEER
FOLLOWING PRECAMBERS. Ground Earth / Compacted Soil.
EQ. : EQUAL
F.F.L : FINISHED FLOOR LEVEL
BEAMS (LESS THAN 10m) - SPAN / 500 AT CENTRE FL. : FOUNDATION LEVEL / FORMATION LEVEL
FOR GRADE OF CONCRETE OF SPECIFIC STRUCTURAL MEMBERS REFER TO FLOOR PLAN. BEAMS (MORE THAN 10m) - SPAN /350 AT CENTRE FLR. : FLOOR
SCHEDULE OF COLUMNS, WALLS & SCHEDULE OF CONCRETE MIX. CANTILEVER BEAMS (2m to 5m) - SPAN /300 AT EDGE - DETAIL NUMBER GR : GROUND FLOOR
SLABS - 15mm AT CENTRE -
................ INV. : INVERTED
MIX A1 : USED FOR PLAIN CONCRETE BLINDING ?
DWG. NO. WHERE DETAIL APPEARS
LVL. : LEVEL
MIX A2 : USED FOR PLAIN CONCRETE 4.11. CLEAR COVER TO REINFORCEMENT INCLUDING LINKS, STIRRUPS, TIES SHALL BE AS FOLLOWS:- MAX. : MAXIMUM STAGE LOCATION
MM : MILLIMETER
MIX B1 : USED FOR UN-REINFORCED SLAB ON GRADE (ACI-318M-19-CL-20.5.1.3) ELEVATION NUMBER M. : METER
ISSUED FOR TILAL, ALSUYOH SUBURB,
1 CONSTRUCTION SHARJAH,UAE
1. PILES -------------------------------------------------------------------------------------------------75mm -
................ N.I.C : NOT IN CONTRACT
MIX C1 : USED FOR REINFORCED SLAB ON GRADE 2. CONCRETE CAST AGAINST & PERMANENTLY EXPOSED TO EARTH -------- 75 mm
DWG. NO. WHERE ELEVATION APPEARS N.T.S : NOT TO SCALE
MIX D1 TO N1: USED FOR REINFORCED CONCRETE WORKS FOR SUB-STRUCTURE(REFER ABOVE TABLE) 3. CONCRETE CAST AGAINST SCREED PROTECTION OR SHUTTER -------------50 mm O.T.S : OPEN TO SKY DRAWING TITLE :
? P.L : PAVEMENT LEVEL
MIX D2 TO N2: USED FOR REINFORCED CONCRETE WORKS FOR SUPER STRUCTURE(REFER ABOVE TABLE). 4. CONCRETE EXPOSED TO EARTH OR WEATHER ? SECTION NUMBER R.L : ROAD LEVEL
FOR d/b 10 mm to 20 mm ---------------------------------------------------------------------- 40 mm ?
................. SCHED. : SCHEDULE
GEN - GENERAL NOTES 01
Table 3.1 FOR d/b 25 mm to 57 mm ---------------------------------------------------------------------- 50 mm
DWG. NO. WHERE SECTION APPEARS
S.S.D. : STRUCTURAL SLAB LEVEL
Use of Concrete Admixtures T.O.B. : TOP OF BEAM
Sub-Structure With Basements Sub-Structure Without Basements
5. CONCRETE FOR INTERNAL STRUCTURAL WORKS
All Super Structural elments T.O.F. : TOP OF FOOTING
External Walls along Internal Rafts, Piles Columns, Footings, Rafts, & Water other than Water ABOVE GROUND LEVEL : (NOT EXPOSED TO WEATHER OR EARTH) FFL. ± 0.00 FINISH FLOOR LEVEL T.O.P. : TOP OF PARAPET
............ LEVEL ON PLANS
with connected Columns &walls Structural Elements Pile Caps Walls, & Tie Beams Pile Caps Containing Structures Containing Structures BEAMS & COLUMNS : 40mm SSL ± 0.00
STRUCTURAL SLAB LEVEL T.O.R. : TOP OF RAFT
Waterproofing Yes No Yes No No No Yes No WALLS : 40mm T.O.W. : TOP OF WALL DRAWN BY CHECKED BY APPROVED BY DATE
Admixture SLABS : 25mm TYP. : TYPICAL
FINISH FLOOR LEVEL U.N.O : UNLESS NOTED OTHERWISE DAE HJ EK 14/12/2022
Corrosion
Yes No Yes Yes No No Yes No 6. CONCRETE COVER SHALL NOT BE LESS THAN WHAT IS REQUIRED TO PROVIDE FIRE FFL ± 0.00 .......... LEVEL ON ELEVATIONS
Inhibitor Admixture SSL ± 0.00 WTL : WATER TABLE LEVEL
RESISTANCE, AS PER THE FIRE RATING FOR THE BUILDING AND AS SPECIFIED IN ACI / IBC STRUCTURAL SLAB LEVEL OR SECTIONS JOB NO. SHEET SIZE SCALE REV. NO.
Plasticizers, etc Yes Yes Yes Yes Yes Yes Yes Yes
FIRE RATING REQUIREMENTS (AS PER UAE FIRE CODE & SM REGULATION) D21-44 A1 1 : 100
N.T.S C00
: 2 HOUR RATING (UNO) DRAWING NO.
MAS-P2AB-STR-GEN-0002
NORTH

TYPICAL DETAIL OF BEAM REINFORCEMENT

KEY PLAN
TOP REINFORCEMENT THROUGH
OUT FOR L1 OR L2 WHICHEVER
CL IS GREATER
CL TOP REINFORCEMENT
CL EXTRA TOP REINF.
EXTRA TOP EXTRA TOP REINFORCEMENT AT OF GREATER TYPICAL CURTAILMENT OF REINFORCEMENT:
MID SUPPORT FOR L1 OR L2 THROUGH OUT FOR L2 OR
REINFORCEMENT
WHICHEVER IS GREATER L3 WHICHEVER IS GREATER
AT END TOP 1. LAPS, CURTAILMENT AND ANCHORAGE OF REINFORCEMENT AND STIRRUP SPACING M 02 C
REINFORCEMENT OF SHALL BE AS PER BS 8110 OR OTHERWISE AS INDICATED ON THE DRAWINGS, WHICH EVER
b a a c
L1 THROUGH OUT IS GREATER, TO THE APPROVAL OF THE ENGINEER.
. . . .
45 BAR DIA.
2. CURTAILMENT OF BOTTOM REINFORCEMENT IS NOT ALLOWED IN THE PRESENCE OF A
PRINCIPAL CONCENTRATED LOAD WITHIN THE BEAM SPAN.
TOP
NOTES
REINFORCEMENT 3. THE ABOVE DETAILS APPLY GENERALLY TO EQUAL SPANS. SHOULD DIFFERENCE IS
AT END SUPPORT ADJACENT SPAN LENGTH BE MORE THAN 20 REINFORCEMENT SHOULD BE REFERRED TO 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
L/3 STIRRUPS L/3 STIRRUPS L/3 STIRRUPS L/3 STIRRUPS STIRRUPS THE STRUCTURAL ENGINEER. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
. . . . .
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
4. BOTTOM BEAM REINFORCEMENT MAY OVERLAP AT COLUMN/SUPPORT LOCATIONS DIMENSIONS ONLY ARE TO BE CONSIDERED.
D/2+12 UNLESS CONGESTED AND ACCORDINGLY THE ENGINEER MAY INSTRUCT AN ALTERNATIVE 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
BAR DIA. b b OVERLAPPING ARRANGEMENT AS INDICATED.
b BOTTOM CURTAILED b TO COMMENCEMENT OF ANY WORK.
. BOTTOM REINFORCEMENT SIDE BARS (FOR . . BOTTOM
REINFORCEMENT .
THROUGH OUT BEAM DEPTH)
THROUGH OUT
SPAN = L1 SPAN = L2 SPAN = L3 a. EQUALS 0.25L1, 0.25L2 OR 45 BAR DIA. WHICHEVER IS GREATER (UNO).
. . .
END SPAN CONTINUOS SPAN BRACKET b. EQUALS 0.17L1 OR 45 BAR DIA. WHICHEVER IS GREATER (UNO).
c. EQUALS 1.5L3 OR 45 BAR DIA. WHICHEVER IS GREATER (UNO).

TYPICAL SECTION OF BEAM

TOP OF COLUMN IS
TOP BARS TOP BARS EQUAL TO TOP OF TOP BARS
BEAM

SIDE BARS SIDE BARS SIDE BARS

DEPTH

DEPTH

DEPTH
.

.
STIRRUPS STIRRUPS STIRRUPS SIGNED

D<-!,11a11
Architects+
Engineers

■•
BOTTOM BARS BOTTOM BARS BOTTOM BARS

WIDTH WIDTH WIDTH


. . ISSUED FOR CONSTRUCTION
SUBJECT TO AUTHORITIES APPROVALS
TYPE -1- TYPE -2- INVERTED BEAM

TYPICAL CROSS SECTION OF BEAM

SLAB THICK BRC A252 MESH SURFACE GROOVE


REFER TO PLAN UNLESS NOTED OTHERWISE 20MM EXPANSION JOINT WITH FILLER 10mm WIDEx25mm DEEP
EXPANDED POLYTHYLENE FILLED WITH POLYESTER SEALANT
BOARD AND MASTIC SEALANT CIRCULAR BACKUP STRIP
T10-200 REFER TYPICAL DETAIL OF

h/2
h
h

SLAB ON GRADE

h
2 T12 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
300 NO DATE BY REVISION APP
ONE LAYER OF 1000 GAUGE R E V I S I O N
h

POLYTHENE SHEET (TYP)


100

SMOOTH DOWEL BARS SMOOTH DOWEL BARS PROJECT :


WELL COMPACTED SOIL (TYP)
T20 @ 300-400 LONG, THIS IS SIDE LUBRCATED OR
(FOR h SMALLER & EQUAL TO 150mm) COATED WITH DEBONDING AGENT.
250 100 T25 @ 300-400 LONG, VILLAS AT PHASE 02 OF MASAAR
(FOR h LARGER THAN 150 & EQUAL
OR SMALLER THAN 200mm)
TYP. DETAIL OF SLAB ON GRADE
COLUMN CLIENT
h=100mm UNLESS OTHERWISE SHOWN THICKNED EDGE DETAIL CONSTRUCTION JOINT
FILL ARROUND COLUMN
AFTER FLOOR IS CAST AND
COLUMNS ARE CARRYING
FULL DEAD LOAD.

MASAAR DEVELOPMENTS LLC


CONSULTANT

DIAMOND SHAPE
ISOLATED JOINT
150/200mm THK. 100mm THK.
NON LOAD BEARING WALL NON LOAD BEARING WALL

T10-200 T10-200 CONTRACTION OR CONSTRUCTION JOINT.


REFER TYPICAL DETAIL OF REFER TYPICAL DETAIL OF
SLAB ON GRADE SLAB ON GRADE
3 T12 2 T12
300 300 EXPANDED POLYTHYLENE SURFACE GROOVE
300 300
CIRCULAR BACKUP STRIP 10mm WIDEx25mm DEEP
FILLED WITH POLYESTER SEALANT
INDUCED CRACK
ISOLATION JOINT (PLAN)
h

MEP ENGINEER
AT BASEMENT FLOOR
100

100

100

100

100 400 100 100 250 100

T10-200 3-T12 T10-200 3-T12


SAW CUT JOINT
STAGE LOCATION
CONSTRACTION JOINT /
ISSUED FOR TILAL, ALSUYOH SUBURB,
250mm THICK WALL 120mm THICK WALL LONGITUDINAL JOINT CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
TYP. FOUNDATION DETAIL FOR NON LOAD BEARING WALL
GEN - GENERAL DETAILS 01

DRAWN BY CHECKED BY APPROVED BY DATE


DAE HJ EK 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


D21-44 A1 As N.T.S
indicated C00
DRAWING NO.
MAS-P2AB-STR-GEN-0003
NORTH

TYPICAL DETAILS FOR COLUMN


A142 MESH

100 AT BEAMS

25
TERMINATE 1
_ 1
_ 1
_

75 AT SLAB
TIES SPACING 2 THE TIES SPACING 2 THE TIES SPACING 2 THE KEY PLAN
COL.VERTICALS IN

100
STANDARD HOOK U/N. SPACIFIED IN SPACIFIED IN SPACIFIED IN SCHEDULE
SCHEDULE OR DETAIL SCHEDULE OR OR DETAIL
DETAIL
200MM THK. BLOCK WALL

45 BARS DIA.

45 BARS DIA.

45 BARS DIA.

*
MIN 800 OR

MIN 800 OR

MIN 800 OR
SPLICE BAR 200 500 200
M 02 C
3 LINKS MINIMUM 3 LINKS 3 LINKS
BOTT STEEL MINIMUM MINIMUM
T10-200 EW, EF

400
SSL (ROOF) SLAB REINF.
CONSTRUCTION
SPACIFIED IN SCHEDULE
TIES SPACING 1/2 THE

JOINT IN COL. (FOR


FLAT SLABS ONLY) NOTES
H/3

1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


OR DETAIL

LAR EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT


1
OR GER
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM

45 BARS DIA.
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1.5 OF 4 6 *OPENINGS TO SUIT SERVICES REQUIREMENTS
BAR 0m 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIA m DIMENSIONS ONLY ARE TO BE CONSIDERED.
M. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
VE
R BEAM/SLAB AS PER
SECTION ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
CO

SCHEDULES. SPECIALLY
REINFORCED AT THIS
AREA.
TYPICAL COVERED ROOF
PENETRATION FOR MEP SERVICES
ROUND COLUMNS
SPACIFIED IN SCHEDULE

WITH TIES (HOOPS) COLUMN REINFORCEMENT


TO REST ON THE BEAM
TIES SPACING AS

UPPER BAR
/SLAB MAIN
REINFORCEMENT
OR DETAIL

TYP. DETAILS FOR OPENING 25 150 25

LOWER BAR
* TO SUIT SERVICES REQUIREMENTS
COVER

150
AS1 AS1
AS2
SECTION X - X CASE 1 CASE 2 CASE 3 (NOT APPLICABLE)
SPACIFIED IN SCHEDULE

450*
T10-150 FLOOR/ROOF SLAB B.S. MESH A 393
T10-150
TIES SPACING 1/2 THE

DOWEL COLUMN JUNCTIONS

150 *
LENGTH 60ø+
OR DETAIL

129+75mm
32ø+129 FOR
Fy=460MPa

X X IF COLUMN OFFSET IS 75mm OR MORE USE


45ø MIN.

DOWEL SPLICE. CARRY ALL VERTICALS INTO SIGNED


UPPER
COLUMN WHERE POSSIBLE.
SEISMIC DESIGN
STD. 90° CLASS "C" LAP
D<-!,11a11
WALL OR SLAB SLAB REINF. T10-200 SLAB REINF.
135° HOOK HOOKS CLASS "C" LAP Architects+
REINFORCEMENT
Engineers
OPENING
PLINTH ON SOLID SLAB
10
DI
A.
(ON GROUND OR SUSPENDED SLAB) ■•

.
ISSUED FOR CONSTRUCTION
75 MAX. AS2 0.5 AS1 NOTE: LENGTH OF BASE TO SUIT EQUIPMENT REQUIREMENT SUBJECT TO AUTHORITIES APPROVALS
6 HOOP TIE LAPPED TIE CIRCULAR TIE
SLOPE OF BARS 1
MAXIMUM HORIZONTAL
135° HOOK
OFFSET 150mm.
BARS NOT CARRIED UP FOR SPLICING ARE
CUT OFF ld FROM U/S OF SLAB.
FOR SEISMIC
DESIGN
PLACE TIES WITH LAPS AND HOOK STAGGERED REINFORCEMENT AROUND TYPICAL PLINTH DETAILS FOR WATER TANK / AHU
CONTINUE TIES OF FROM SIDE TO SIDE OF COLUMN
REDUCED SIZE UNLESS
STD. OPENINGS IN (UNLESS OTHERWISE INDICATED ON DRGS.)
STANDARD HOOKS
SUPPORTED BY BEAMS BEND ALL VERTICALS AT SAME LEVEL
180° HOOK TIE REQUIREMENTS SOLID SLABS & WALLS
ON ALL FOUR SIDES. 1. DRAWINGS SHOW SIZE AND SPACING OF DIA. BEYOND OPENING IN WALLS.
TIE SETS.
PROVIDE FOUR TIES 2. REFER TO O.R.S.I. MANUAL FOR NUMBER
AT 75mm O/C JUST - AS1 & AS2 TO COMPENSATE THE TOTAL AREA OF REINFORCEMENT
OF TIES PER SET AND FOR TIE (EACH FACE) FOR THE OPENING INDICATED LIE (UNO).
BELOW SLOPED CIRCULAR TIE CROSSTIE "J" TIE ARRANGEMENT UNLESS NOTED
PORTION. OTHERWISE. - EXTEND AS1 & AS2 TO NEAREST SUPPORT TO SLABS ONLY AND 50
TYPICAL TIED COLUMN DIA. BEYOND OPENING IN WALLS.
TYPICAL TIE SHAPES

PUNCHING SHEAR DETAILS

SET-6

SET-5
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
T12 (TYP.) T12 (TYP.)
HANGER BARS HANGER BARS R E V I S I O N

T10@100 mm c/c T10@100 mm c/c PROJECT :


d/2

d/2

SET-7 SET-4

CRITICAL SECTION OUTSIDE SLAB CRITICAL SECTION OUTSIDE SLAB


SET-8 SET-3 VILLAS AT PHASE 02 OF MASAAR
SHEAR REINFORCEMENT SHEAR REINFORCEMENT

SET-9 SET-2a
X CLIENT
SET-10 SET-1
SHEAR REINFORCEMENT SHEAR REINFORCEMENT
REINFORCEMENT (FIRST LINE OF SHEAR LEGS) REINFORCEMENT (FIRST LINE OF SHEAR LEGS)
N=NO . OF LINKS / ONE SET

SET-11

SET-12
d/2
L=NO OF SETS PERPENDICULAR TO COLUMN SP=SPACAING BETWEEN LINKS
A LONG DIRECTION
d/2 T12 (TYP.) T12 (TYP.) T12 (TYP.)
- d/2
HANGER BARS
d/2
HANGER BARS
d/2
HANGER BARS
MASAAR DEVELOPMENTS LLC
S=NO OFSETS PERPENDICULAR TO COLUMN SHORT DIRECTION
T10@100 mm c/c T10@100 mm c/c T10@100 mm c/c CONSULTANT

T10@100 mm c/c T10@100 mm c/c T10@100 mm c/c TYPICAL PUNCHING SHEAR DETAILS
A T12 (TYP.) T12 (TYP.) T12 (TYP.)
PUNCHING SHEAR LINKS SCHEDULE
d/2

- HANGER BARS T12 (TYP.) HANGER BARS HANGER BARS


NO. SHEAR LINKS
CONCRETE COLUMN HANGER BARS CONCRETE COLUMN CONCRETE COLUMN SHEAR LINK TYPE N=NO. OF LINKS/ONE SET LINK DIA
SP a X
T10@100 mm c/c
S L TOTAL
CRITICAL SECTION OUTSIDE SLAB
SHEAR REINFORCEMENT PS1 2 3 10 5 T10 100 400 50 MEP ENGINEER
SLAB NORMAL MESH
SHEAR REINFORCEMENT PS2 2 4 12 6 T8 100 500 50
THICKNESS

REINFORCEMENT (FIRST LINE OF SHEAR LEGS)


SLAB

PS3 2 4 12 6 T10 100 500 50

PS4 3 3 12 6 T10 100 500 50


P.S = PUNCHING SHEAR REINFORCEMENT P.S = PUNCHING SHEAR REINFORCEMENT P.S = PUNCHING SHEAR REINFORCEMENT
d/2

d/2

d/2

STAGE LOCATION
PS5 2 3 5 6 T10 100 500 50
ISSUED FOR TILAL, ALSUYOH SUBURB,
PS6 2 - 2 6 T12 100 500 50 CONSTRUCTION SHARJAH,UAE
PUNCHING SHEAR DETAILS FOR INTERIOR COLUMNS PUNCHING SHEAR DETAILS FOR SLAB EDGE COLUMNS PUNCHING SHEAR DETAILS FOR SLAB EDGE COLUMNS 6 500 50 DRAWING TITLE :
PS7 2 3 8 T10 100

NOTE:- ABOVE PUNCHING SHEAR REINFORCEMENT TO BE PROVIDED UNLESS, PS8 2 6 16 7 T10 100 600 50 GEN - GENERAL DETAILS 02
SPECIFICALLY SHOWN IN, PUNCHING SHEAR SCHEDULE 1200 50
PS9 2 8 10 11 T10 100

PS10 2 10 12 6 T10 100 1200 50

1200 50 DRAWN BY CHECKED BY APPROVED BY DATE


PS11 2 4 6 7 T10 100
DAE HJ EK 14/12/2022
PS12 2 2 6 7 T10 100 600 50
JOB NO. SHEET SIZE SCALE REV. NO.
PS13 2 7 16 7 T10 100 800 50
D21-44 A1 As N.T.S
indicated C00
PS14 3 3 12 6 T12 100 500 50 DRAWING NO.
MAS-P2AB-STR-GEN-0004
NORTH

LEGEND:

4 1 50mm PROTECTION SCREED.


KEY PLAN
2 POLYETHYLENE SHEET 1000 GAUGE.
3
9 3 WATER PROOFING MEMBRANE
7 2 LAYERS OF SBS 4mm THICK EACH LAYER
.
20mm 9 M 02 C

4 BITUMINOUS PRIMER

20mm
ALUMINUM

.
STRIP 5 LEAN CONCRETE
NOTES
6 PVC WATER STOP
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
4 . . (EXTERNAL SURFACE MOUNTED) EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
150mm
. 3 STAGGERED LAP STAGGERED LAP
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
200mm
. 6.1 - 250mm WIDE MINIMUM 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
3 3 6.2 - HYDROSTATIC PRESSURE RESISTANCE TO COMMENCEMENT OF ANY WORK.

7 INTERNAL
1
6.3 - 250mm WIDE MINIMUM
2 6.4 - HYDROSTATIC PRESSURE RESISTANCE

3
7 PROTECTION BOARD 6 mm THICK
4
8 REINJECTABLE HOSE
5
SPOT DETAIL-B TERMINATION DETAIL,C ENDING DETAIL OVERLAP DETAIL 9 ELASTOMERIC SEALENT
N.T.S. N.T.S. N.T.S. N.T.S.

10 SMOOTH SURFACE-PLASTER OR GUNITE

11 50 x 50mm CORNER REGLET

12 FREE FLOWING SHRINKAGE


COMPENSATED MICRO CONCRETE

13 HIGH PERFORMANCE FLUID RASIN SYSTEM


SIGNED

14 SWELLABLE HYDROPHILIC WATER STOP D<-!,11a11


Architects+
SEE TERMINATION 9 Engineers
DETAIL-C EXPANSION JOINT: POLYETHYLENE CELLULITE
15
FILLER, NON ABSORBENT, SEMI-RIGID

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS
PUDDLE
7 FLANGE 9 16 EPOXY RESIN MORTAR

100(Minimum)
17 EXPANSION JOINT MEMBRANE

.
.
100mm PUDDLE
FLANGE

100(Minimum)
1 2 3 4 11 9 1
2
7 3
3
4
5

N.T.S.

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP

PIPE PENETRATION DETAIL AT VERTICAL WALL PIPE PENETRATION DETAIL AT FOUNDATION R E V I S I O N


N.T.S. PROJECT :

VILLAS AT PHASE 02 OF MASAAR

4 6.1 CLIENT

3 8 200

7 9
KICKER
150mm

BLOCK WORK (200mm THK)

MASAAR DEVELOPMENTS LLC


.

IN SIDE OUT SIDE

STR.COLUMN (200mm THK) CONSULTANT


BLOCK WORK COLUMN IN ELEVATION
COMPRESSIBLE FILL
INSULATION AS PER SPEC. AS/ARCH.
GROUND FLOOR SSL.
SLAB ON GRADE
RAFT SLAB
GROUND BEAM (200mm WIDE)
GROUND BEAM AS/SCHED. GROUND BEAM AS/SCHED.
GROUND LEVEL AS/ARCH.

1000 GAUGE POLYTHENE SHEET PROTECTIVE COAT WATER 50 PROTECTIVE COAT WATER
50 PROOFING AS/SPECS PROOFING AS/SPECS
(TYP.)
WELL COMPACTED SOIL FILL

50
MEP ENGINEER
.
(TYP.)

150mm SOLID BLOCK WALL BELOW


50

.
200mm PROTECTIVE COAT WATER EXTERNAL GROUND FLOOR BEAMS LEAN CONCRETE
COLUMN BELOW GROUND FLOOR (200 WIDE) PROOFING AS/SPECS 200
1000

1 FOUNDATION AS/SCHED. FOUNDATION AS/SCHED.


COLUMN REINF. AS/ SCHEDULE
11
2
STAGE LOCATION
50 ISSUED FOR TILAL, ALSUYOH SUBURB,
3 (TYP.) 50
SEE SPOT DETAIL-B CONSTRUCTION SHARJAH,UAE
4
DRAWING TITLE :
50
(TYP.)
50

5 LEAN CONCRETE GEN - GENERAL DETAILS 03


FOOTING AS/SCHED.
LEAN CONCRETE FOOTING REINF. AS/SCHEDULE
1000 GAUGE POLYTHENE SHEET
BACK FILL AS/SOIL REPORT
1000 GAUGE POLYTHENE SHEET

TYPICAL EXTERNAL COLUMN FOOTING TYPICAL DETAIL OF EXTERNAL GROUND BEAM TYPICAL DETAIL OF INTERNAL GROUND BEAM DRAWN BY CHECKED BY APPROVED BY DATE

WATER PROOFING APPLIED ON BASEMENT WALL DAE HJ EK 14/12/2022


N.T.S. JOB NO. SHEET SIZE SCALE REV. NO.
NOTE:- BLOCK WORK BELOW EXTERNAL TIE BEAM NOT
D21-44 A1 As N.T.S
indicated C00
SHOWN FOR CLARITY
DRAWING NO.
MAS-P2AB-STR-GEN-0005
NORTH

STIFFNER COLUMN ( SC2) STIFFNER COLUMN ( SC1)

AS PER ARCH. STIFFNER COLUMN ( SC1)


MAX 1500mm
KEY PLAN
GB-B01 GB-B01 GB-B01 GB-B01/02

M 02 C
STIFFNER GROUND BEAM PER BOUNDARY WALL
COLUMN ( SC1) TYPICAL DETAIL GROUND BEAM PER BOUNDARY WALL

1200
TYPICAL DETAIL

NOTES

GB-B01/02
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
BF2 BF2 BF3 EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
FOOTING FOR BOUNDARY WALL TO COMMENCEMENT OF ANY WORK.
AS PER SCHED.
FOOTING FOR BOUNDARY WALL FOOTING FOR BOUNDARY WALL
AS PER SCHED. AS PER SCHED. FOOTING FOR BOUNDARY WALL
AS PER SCHED.

GROUND BEAM PER BOUNDARY WALL


TYPICAL DETAIL

TYPICAL DETAIL PLAN FOR BOUNDARY WALL AT DOORS TYPICAL DETAIL PLAN FOR BOUNDARY WALL AT PLOT CORNER

STIFFNER COLUMN ( SC1) STIFFNER COLUMN ( SC1)

3000 3000 TO 7000 mm

GB-B01

SIGNED

GROUND BEAM PER BOUNDARY WALL GROUND BEAM PER BOUNDARY WALL D<-!,11a11
TYPICAL DETAIL TYPICAL DETAIL
Architects+
Engineers
STIFFNER COLUMN ( SC1) STIFFNER COLUMN ( SC1)
@ SPACING 3.0m @ SPACING 3.0m

ISSUED FOR CONSTRUCTION


■•
FOOTING FOR BOUNDARY WALL FOOTING FOR BOUNDARY WALL
AS PER SCHED. AS PER SCHED. SUBJECT TO AUTHORITIES APPROVALS
BF2 BF2

BF4 BF4

TYPICAL DETAIL PLAN FOR BOUNDARY WALL AT SPACING 3.0 m TYPICAL DETAIL PLAN FOR BOUNDARY WALL AT SPACING 3000 TO 7000mm

3000
NOTES :
1- FOR BOUNDARY WALL LAYOUT , REFEER TO ARCHITECHTURAL DRAWINGS.
TOWNHOUSE COLUMN STIFFNER COLUMN ( SC1) 2- BOUNDARY WALL FOOTINGS SHALL BE PLACED STAGGERED WITH TOWNHOUSE FOOTINGS.
AS PER LAYOUT @ SPACING 3.0m 3- THE FOOTING AND COLUMN STIFFENER TYPS (SC1+BF04) ARE DESIGNED TO WITHSTAND MAXIMUM OF 7.0M TRIBUTARY LENGTH.
4- MOVEMENT JOINT OF 25mm BETWEEN DOUBLE STIFFNER COLUMNS ON FOOTING TYPE BF3 SHALL BE USED TO LIMIT LENGTH
STIFFNER COLUMN ( SC1)
OF BOUNDARY WALL SEGMENTS TO 15m MAXIMUM.

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
GB-B01
150 PROJECT :

150 X 400 COPING BEAM VILLAS AT PHASE 02 OF MASAAR


*FOR SPAN 3.0m USING T&B 2T10
AND STTIRUPS T8-200
*FOR SPAN 3.1m TO 7.0m USING T&B 2T12

400
CLIENT
AND STTIRUPS T10-200
BF1
GROUND BEAM PER BOUNDARY WALL
TYPICAL DETAIL
STIFFNER COLUMN ( SC1 OR 2)
REFER TO STIFFNER COLUMN DETAIL
FOOTING FOR BOUNDARY WALL
MASAAR DEVELOPMENTS LLC
AS PER SCHED. CONSULTANT

UP TO 2.0m (MAX.)
AS PER ARCH
TOWNHOUSE FOOTING 25 mm EXP. JOINT
AS PER LAYOUT COMPRESSIBLE FILL MATERIAL

TYPICAL DETAIL PLAN FOR BOUNDARY WALL ADJACENT TO TOWNHOUSE COLUMN 150mm HOLLOW BLOCK
( NORMAL WEIGHT) MEP ENGINEER

AS PER ARCHITECTURAL
T10@200 2T12 TOP T10@150 2T16 TOP & LANDSCAPE DRWAINGS
STIRRUPS BARS STIRRUPS BARS
FOOTING SCHEDULE FOR BOUNDARY WALL 500 GROUND LEVEL STAGE LOCATION
300
FFL = 0.0 ISSUED FOR TILAL, ALSUYOH SUBURB,
OVER ALL SIZE (mm) REINFORCEMENR DETAILS CONSTRUCTION SHARJAH,UAE
400 mm.

400 mm.

150/200

150/200

FOOTING REMARKS
MARK BOTTOM MESH TOP MESH DRAWING TITLE :
WIDTH LENGTH DEPTH

400
SHORT BAR LONG BAR SHORT BAR LONG BAR 200 X 400 GROUND BEAM
REFER TO GROUND BEAMS DETAIL

600
BF1 1000 1000 300 T12-200 T12-200 - - GEN - GENERAL DETAILS 04
NO. OF BARS: 8 NO. OF BARS: 6

BF2 1000 1200 300 T12-200 T12-150 T12-200 T12-150 200 mm. 2T12 BOTTOM 200 mm. 2T16 BOTTOM V-BARS : 8T10 V-BARS : 6T10 200 X 500 STIFFNER COLUMN (SC1 OR 2)
200
GB-B01 BARS GB-B02 BAS LINKS : T8 - 200 LINKS : T8 - 200 REFER TO STIFFNER COLUMN DETAIL
BF3 1200 1200 300 T12-150 T12-150 T12-150 T12-150
SC1 SC2 DRAWN BY CHECKED BY APPROVED BY DATE

300
FOR SPACING UP TO 3.0m FOR SPACING UP TO 3.0 TO 7.0m BOUNDARY WALL FOOTING
BF4 1000 1500 300 T12-150 T12-150 T12-150 T12-150
REFER TO SCHED. DAE HJ EK 14/12/2022
EXCAVATION LEVEL
GROUND BEAMS DETAILS STIFFNER COLUMN DETAILS EXCV. = -1.05 50 JOB NO. SHEET SIZE SCALE REV. NO.
D21-44 A1 1 : 20 C00
DRAWING NO.
MAS-P2AB-STR-GEN-0006
NORTH

BLOCK WALL TYPICAL LINTEL DETAILS


NOTES:- G.I. metal holdfast 300mm long & 40mm
thick at every alternative course fixed to CL CL
1. Lintels are designed to support 2.0m height of block wall above. flush surface
concrete with two numbers shot fired KEY PLAN
2. For clear span of more than 7.0m consult the engineer.
cramps top reinforcement top reinforcement
3. Reinforcement and lintel width to be increased proportionate to wall thickness wider than 30cm.
R.C.C. Slab R.C.C. Slab 45 bar dia.
4. Width of stiffener column, stiffener beam and lintel to match with of block wall t/w unless t/w is
less than 150mm, then b/1, b/2, b/3 and b/l shall be 150mm minimum.

D2
STIRRUPS
5. Corner stiffener column to be square with dimensions as per wall thickness but not less than 200mm. .
STIRRUPS

D2
6. Contractor to coordinate the stiffeners with other disciplines requirements and submit blockwork . M 02 C
shopdrawing for engineer's review R.C.
Column bottom
or Wall reinforcement 20cm min
bottom 20cm min
Expanded metal . .
reinforcement CLEAR SPAN
2cm compressible filler to Concrete wide beam mesh reinforcement
.
specification (10mm or slab (horizontal) at every NOTES
compressible intumescent seal 5th course Lintel Supported By Columns Lintel Supported By Walls
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
for fire barrier walls) EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
SCHEDULE OF LINTEL REINFORCEMENT 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
Full solid block or hollow LINTEL/WALL WIDTH 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
block filled in with concrete. 5x5x.5cm galvanised MS B =(mm)
BL = 100 BL = 150 BL = 200 BL= 250/300 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
4mm glavanized iron TO COMMENCEMENT OF ANY WORK.
80 80 (typical) angles (30cm long) with 2 Reinforcement For Block Walls metal holdfast ties 300mm
CLEAR L
TOP TOP BOTTOM TOP BOTTOM TOP BOTTOM
nos. drill in anchor bolts BOTTOM STIRRUPS BEARING
long at every alternative SPAN (mm) REINF REINF REINF. REINF REINF. REINF REINF. DL
7.5 7.5 REINF.
Concrete coarse (450mm max.)
column/wall as per fixed to conc. with t wo < 2000 1T10 1T14 2T10 2T12 2T10 2T12 2T10 2T12 200 R8@100 200
225 wide galvanized steel
7

detail nos. shot fired cramps. 2001 - 3000 1T10 1T16 2T10 2T14 2T10 2T14 2T10 2T14 250 R8@150 225
False ceiling expanded strip mesh
3001 - 4000 2T10 2T16 2T10 2T16 2T10 2T16 300 R8@175 250
Cut block to suit wall height
4001 - 5000 2T10 3T16 2T10 3T16 350 R8@200 275
10/20cm thick hollow 5001 - 6000 2T10 3T16 2T10 3T16 400 R8@200 300
A PLAN
blockwall
- 6001 - 7000 2T10 3T16 450 R8@200 325
B SECTION
1cm compressible
Wall Head Junction With Slab Soffit Or - filler as per spec.
SCHEDULE FOR RC STIFFENERS AT WALL OPENINGS.
Wide Beam In Areas With False Ceiling External
1 no. drill in anchor bolt
Connection of R.C.C. Column/Wall and Block Wall (Type-1)
lintel S.No. B3 D REINF. LINKS
Fixing to the concrete (refer typical 3
Concrete column
Compressible filler as expanded strip 4mm glavanized iron lintel details 2 T12
Sliding anchor-head restraint Internal 1 100 200 T8-200
per spec. metal holdfast ties (1+1)
mesh
as per spec. 1 no. drill in anchor bolt 300mm long at every 4 T12
225 wide galvanized 2 150 200 T8-200
or similar approved fixing to the concrete alternative coarse T8-400 (2+2)
steel expanded strip
mesh (450mm max.) fixed to T8-400 4 T12
Compressible filler as per typ. blockwork 3 200 200 T8-200
conc. with t wo nos. shot (2+2)
spec.
fired cramps.
250/300 SIGNED
1 no. full solid block 4 200 4 T12
T8-200
AND ABOVE (2+2) D<-!,11a11
External rc stiffener Architects+
sliding stainless steel masonry ties by 'Harris D3 Engineers
and Edgar' pattern type 35/80/e or similar
approved at 80cm c/c.
■•

D3
Internal 1cm compressible ISSUED FOR CONSTRUCTION
A ELEVATION B SECTION sliding galvanised m.s. masonry ties by 'Harris filler as per spec. SUBJECT TO AUTHORITIES APPROVALS
- and Edgar' pattern type 35/80/e or similar 1cm compressible filler T8-400
-
External And Internal Wall Without approved at 80cm c/c. as per spec.

False Ceiling Wall Head Junction 20 thick blockwork Connection of R.C.C. Column and Block Wall (Type-2) TYP. DETAIL FOR OPENINGS IN BLOCK WORK

SCHEDULE FOR STIFFENERS COLUMNS IN CASE OF SCHEDULE FOR STIFFENERS COLUMNS IN CASE OF
FLOOR-TO-FLOOR BOUNDED WALLS FREE STANDING WALLS (3 2 2 3) AS / SCHEDULE

DL
S.No. B2 D2 REINF. LINKS S.No. H B1 D1 REINF. LINKS

B1
Equal to wall thickness (tw)
4 T12 6 T12
1 150 250 T8-150 150 300
(2+2) 1 (2+2+2) T8-150
D1 B2
200 250 6 T12 8 T12
2 (2+2) T8-200 2 0.0 m TO 1.6m 150 400
(2+2+2+2) T8-150 TYPICAL STIFFENER COLUMN DETAIL TYPICAL STIFFENER BEAM DETAIL
250/300 10 T12 4 T12
3 AND ABOVE
250 (2+2) T8-200 3 200 200
(2+2) T8-200
200 6 T12
4 300 T8-200
(2+2+2)
8 T12
5 1.65 m TO 2.6m 200 400
(2+2+2+2) T8-200

not less than 200mm


250/300 10T16
6 tw T10-150
(3+2+2+3)

w
AND ABOVE

t
X
-

250/300 10T16 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


7 2.65 m TO 3.6m 400
AND ABOVE (3+2+2+3) T10-150 NO DATE BY REVISION APP
tw
not less than 200mm R E V I S I O N
tw D 2 RC STIFFENER MAX.(4000) D2
TYPICAL CORNER STIFFENER COLUMN DETAIL PROJECT :

X
VILLAS AT PHASE 02 OF MASAAR

-
BLOCK WORK BLOCK WORK BLOCK WORK STIFFENER BEAM
BLOCK WORK
RC STIFFENER SPAN D1
STIFFENER BEAM

AS / SCHEDULE

AS / SCHEDULE
CLIENT
STIFFENER BEAM

DL
DL
B2
STIFFENER COLUMN
DL

DL

DL

Y Y
MASAAR DEVELOPMENTS LLC
- -
CONSULTANT
BLOCK WORK BLOCK WORK BLOCK WORK BLOCK WORK
BLOCK WORK Y Y
- - BLOCK WORK STIFFENER COLUMN BLOCK WORK STIFFENER COLUMN

AS PER SCHEDULE
tw
MAX.(4000)

MAX.(4000)

MAX.(4000)

AS PER ARCH.

T8-400
STIFFENER COLUMN STIFFENER COLUMN

H (m)
DOWEL

STIFFENER BEAM BLOCK WORK / LOUVERS


B2
MEP ENGINEER
DL

DL

DL

STAGE LOCATION
S.S.L. RC SLAB AS PER PLAN ISSUED FOR TILAL, ALSUYOH SUBURB,
AS PLAN CONSTRUCTION SHARJAH,UAE
BLOCK WORK
BLOCK WORK BLOCK WORK BLOCK WORK D1 MAX.(4000) D1 DRAWING TITLE :
THK.

X
-
GEN - GENERAL DETAILS 05
tw D2 MAX.(4000) D2 SECTION X-X BLOCK WORK BLOCK WORK BLOCK WORK
X
-

BLOCK WORK BLOCK WORK BLOCK WORK TYPICAL BLOCK WORK OPENING/LOUVERS AS PER MEP/ARCH DRAWINGS.

tw
tw

B1

B1
DRAWN BY CHECKED BY APPROVED BY DATE
tw
tw

B1
B1

D1 MAX.(4000) D1 DAE HJ EK 14/12/2022


D2 MAX.(4000) D2 JOB NO. SHEET SIZE SCALE REV. NO.
SECTION Y-Y
D21-44 A1 1 : 100 C00
SECTION X-X SECTION Y-Y
TYPICAL BLOCK WORK WITH STIFFENER COLUMNS & BEAMS (FREE STANDING WALLS) DRAWING NO.
TYPICAL BLOCK WORK WITH STIFFENER COLUMNS & BEAMS (FLOOR-TO-FLOOR BOUNDED WALLS)
MAS-P2AB-STR-GEN-0007
NORTH

CL1A - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
F01 1000 1000 300 T12 - 200 T12 - 200 - - Denotes Slab Opening
F03 1300 1700 400 T12 - 150 T12 - 150 - -
F04 1500 1900 400 T16 - 200 T16 - 200 - - 200 Denotes Slab / Raft Thickness In mm.
F05 1700 2100 400 T16 - 200 T16 - 200 - -
F06 1900 2300 400 T16 - 200 T16 - 200 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
M 02 C
F08 2300 2700 400 T16 - 200 T16 - 100 - -
S.S.L. +1.000 Slab Surface Level in M
Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For Grade of Concrete of the Foundation and Ground Beams ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
refer to General Notes drawing No. MAS- P2AB-STR-0002. TO COMMENCEMENT OF ANY WORK.
4. The Allowable net bearing capacity at Foundation level is as per
Soil Investigation Report No. RSl2022-0185 SHJ, issued by
M/S ELEMENT ENG'G LABORATORY, dated 27/08/2022.
6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
7. The contractor to conduct the required tests and confirm soil
bearing capacities before foundation construction.
8. For plots with narrow space between asset footprint and
boundary wall, the contractor shall submit shop drawings in light
of the measures below for the engineer’s review, and
implement the advised work without extra cost.
8.1 The water tank shall be moved to avoid the clash
considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

26800

4200 2700 2700 3800 3800 2700 2700 4200


PLOT
PLOT
LIMIT
LIMIT

FOR BOUNDARY WALL DETAILS


REFER TO SHEET
MAS-P2AB-STR-GEN-0006

WORKING LOAD FROM COLUMN


ENVELOPE SERVICE REACTION
480kN 730kN 730kN 480kN

XA6 540kN C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


1300

NO DATE BY REVISION APP

XA5 R E V I S I O N
F03 F03
PROJECT :
F06 F06
F04 VILLAS AT PHASE 02 OF MASAAR
4200

620kN 760kN 950kN 760kN 620kN


CLIENT

XA4
540kN F05
1600

540kN
F05 F06 F06
420kN
F08 420kN MASAAR DEVELOPMENTS LLC
XA3
CONSULTANT
17000

F04 F04
3800

560kN 750kN 550kN


520kN 450kN F03 450kN F03 530kN

XA2
430kN 430kN
F04 F05 F04 F06 F04 F05 F04 MEP ENGINEER

F03 F03
6100

LOWERED LOWERED
BOTTOM OF FOOTING BOTTOM OF FOOTING
STAGE LOCATION
B.O.F. -1.400 B.O.F. -1.400
ISSUED FOR TILAL, ALSUYOH SUBURB,
WATER TANK DETAILS
130kN 120kN 130kN CONSTRUCTION SHARJAH,UAE
REFER TO DWG NO.
MAS-P2AB-STR-CL1C-301
DRAWING TITLE :
F01 F01 F01
XA1 CL1A - FOUNDATION PLAN
PLOT PLOT
LIMIT LIMIT

DRAWN BY CHECKED BY APPROVED BY DATE

FOUNDATION PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1A-0101
NORTH

LEGEND:
CL1A - BEAMS SCHEDULE - GROUND FLOOR Column / Wall Continuous
OVER ALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Column / Wall Stop Below Slab Level
EXTRA AT EXTRA AT SID BARS Floating (Planted) Column / Wall (FC/FW)
BEAM STRAIGHT STRAIGHT FROM
EXTRA AT CONT. END MID SPAN NO. OF EACH REMARKS KEY PLAN
MARK WIDTH DEPTH THROUGH THROUGH SUPPORT Denotes Slab Opening
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS FACE
OUT OUT TO L/3
L/4 OF SPAN L/4 OF SPAN
200 Denotes Slab / Raft Thickness In mm.
G-B01 200 500 2T12 - 2T12 2T12 - T10 - 200 T10 - 200 2 - -
G-B02 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - -
PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B03 200 500 2T16 - 2T16 2T12 2T16 T10 - 200 T10 - 200 2 - - M 02 C
G-B04 200 550 2T12 - 2T12 - 2T12 T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M
G-B05 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - -
G-B06 200 500 2T12 - 2T16 T10 - 200 T10 - 200 2 - Top extra rebars
G-CB01 200 500 2T12 - 2T16 - - T10 - 200 - 2 - - Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
mesh unless otherwise mentioned on the drawings. TO COMMENCEMENT OF ANY WORK.
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

26800

4200 2700 2700 3800 3800 2700 2700 4200


PLOT
PLOT
LIMIT
LIMIT

FOR BOUNDARY WALL DETAILS


REFER TO SHEET
MAS-P2AB-STR-GEN-0006

G-B04 G-B04
XA6
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
1300

G-B02 G-B02 NO DATE BY REVISION APP

XA5 R E V I S I O N
PROJECT :
100 100
G-B02

G-B02

G-B02
G-B05

G-B05
G-B02

100 100 VILLAS AT PHASE 02 OF MASAAR


SLAB ON GRADE SLAB ON GRADE
G-B02
4200

S.S.L.-0.100 SLAB ON GRADE SLAB ON GRADE S.S.L.-0.100


S.S.L.-0.100 S.S.L.-0.100
G-CB01

G-CB01

CLIENT

UP UP
G-B02 G-B02 G-B02 G-B02
UP UP
XA4
1600

STAIRCASE-1 G-01 STAIRCASE-1


0301
STAIRCASE-2 STAIRCASE-2 MASAAR DEVELOPMENTS LLC
XA3 G-B06 G-B06
G-B06 G-B06
G-B02

G-B02

CONSULTANT
G-B02
17000

150MM THK. PLAIN 150MM THK. PLAIN


G-B06

G-B06
3800

G-B06
G-B03

G-B03

CONCRETE CONCRETE
G-B06

200 200
G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01
RC SLAB RC SLAB
XA2 S.S.L.-0.550 S.S.L.-0.550
100 100 100 100

SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE MEP ENGINEER

S.S.L.-0.400 S.S.L.-0.250 S.S.L.-0.250 S.S.L.-0.400


G-B02

G-B02

G-B02

G-B06 G-B06
6100

T.O.B. -0.400 T.O.B. -0.400


200 200 STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
RC SLAB RC SLAB CONSTRUCTION SHARJAH,UAE
S.S.L.-0.670 S.S.L.-0.670
DRAWING TITLE :

XA1 CL1A - GROUND FLOOR - FRAMING PLAN


PLOT WATER TANK DETAILS PLOT
REFER TO DWG NO. LIMIT
LIMIT MAS-P2AB-STR-CL1A-0301

DRAWN BY CHECKED BY APPROVED BY DATE

GROUND FLOOR - FRAMING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1A-0102
NORTH

CL1A BEAMS SCHEDULE – FIRST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVER ALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT SID BARS Column / Wall Stop Below Slab Level
BEAM STRAIGHT STRAIGHT FROM 1 T12-400 C/C A 1500
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH FACE
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS 2 T12-200 C/C B 2000 KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 Denotes Slab Opening
1-B01 200 600 2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
1-B01a 200 900 2T12 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - 4 T16-100 C/C D 3000
1-B02 200 1250 2T12 - 2T16 2T12 - T10 - 200 T10 - 200 2 3T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600 M 02 C
1-B03 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 3T10 -
1-B04 200 900 2T12 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M
1-B04a 200 900 2T16+2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 3T10 - G 4400 Top extra rebars
1-B05 200 1000 2T16 2T12 2T16 2T12 2T16 T10 - 200 T10 - 200 2 3T10 - Bottom extra rebars
H 4800
1-B05a 200 1000 2T16+2T16 - 2T16 - 2T16 T10 - 200 T10 - 200 2 3T10 - * Inverted Beam
1-B06 200 1100
900/1100 2T12 - 2T16+2T16 - - T10 - 200 T10 - 200 2 3T10 - J 5400 NOTES
1-B07 200 1050 2T12 - 2T12 - - T10 - 200 T10 - 200 2 3T10 - K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1-B08 200 1250
900/1250 2T12 - 2T16+2T12 - - T10 - 200 T10 - 200 2 3T10 - NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT

1-B09 200 1250 2T16 2T20 2T16 2T16 2T12 T10 - 200 T10 - 200 2 3T10 -
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
1-B10 200 1100 2T16 - 2T16 2T16 - T10 - 200 T10 - 200 2 2T10 - M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
1-B11 200 1250
900/1250 2T16 2T16 2T16+2T12 - - T10 - 200 T10 - 200 2 3T10 - 2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1-B12 200 600 2T16 2T16 2T16 2T16 2T12 T10 - 125 T10 - 200 2 - - TO COMMENCEMENT OF ANY WORK.

1-B13 200 900 2T16 2T16 2T16 2T16 - T10 - 200 T10 - 200 2 3T10 - P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
1-CB01 200 600 2T12 - 2T20 2T12 - T10 - 150 - 2 - - Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
1-CB02 200 900 2T12 - 2T20 2T12 - T10 - 150 - 2 3T10 - to the typical mesh mentioned above.
R 9000
1-CB03 200 900 2T12 - 2T20 2T16 - T10 - 150 - 2 3T10 - 5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
XA1 U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
BEAM REINF. Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
AS/SCHED.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
F.F.L. 500 4525
3500 X 12,000 elements attached to structural concrete need to allow for joint
1ST FLOOR to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
900

GEN-0004.
1250

BEAM 1-CB02
AS/SCHED. LEGEND:

NOTE: SIMILAR TO BEAM 1-B06 & 1-B08. Stair Opening Boundary SIGNED
Additional Rebars
D<-!,11a11
3T16 TOP & BOT Architects+
BEAM 1-B11 DETAIL Engineers
1-B11
■•
1 : 50 500X200 Hidden Beam
TOP BAR: 5T16
BOTTOM BAR: 5T16 ISSUED FOR CONSTRUCTION
STIRRUPS: 4 LEGS OF T10-150 SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

26800

4200 2700 2700 3800 3800 2700 2700 4200


PLOT
PLOT
LIMIT
LIMIT

100 2600 100 2600 100


1-CB01 *

1-CB01 *
700

700
650

650

1-B05a 1-B05a
XA6
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
1300

11-t3C 1-B05 1-B05 11-t3C NO DATE BY REVISION APP


100 200

XA5 R E V I S I O N
PROJECT :
1-B01 *

1-B01 *
T.O.B. +3.500 T.O.B. +3.500
1-B12

1-B12

200 VILLAS AT PHASE 02 OF MASAAR


27-t2D

27-t2D

200
1-B12
4200

RC SLAB
46-b2F

46-b2F

RC SLAB
S.S.L.+3.400 CLIENT
44-b2G S.S.L.+3.400 44-b2G
0

80
80

0
0
80

80
0
400

500 275
500 275

400

XA4
11-t2C
6-t2C

6-t2C
600

600
1600

1250 500 500 1250


100 1600 600 600 1600 100 MASAAR DEVELOPMENTS LLC
XA3
0

80
80

CONSULTANT
1-B09

1-B09
1-B12

T.O.B.+3.500 T.O.B.+3.500
0
80

9-t3C 9-t3C
80
0
17000

200 1-01 200


9-t1C 9-t1C
1-B01a

1-B01a

0301
1-B10
3800

1-B10
1-B02

RC SLAB
1-B02

T12-200 TOP MESH T12-200 TOP MESH RC SLAB


T.O.B. +3.500 T.O.B. +3.500
S.S.L.+3.400 T12-200 BOT MESH T12-200 BOT MESH S.S.L.+3.400
T12-200 TOP MESH STAIRCASE-1 STAIRCASE-2 STAIRCASE-2 STAIRCASE-1 T12-200 TOP MESH
T12-200 BOT MESH T12-200 BOT MESH
XA2
1-B03 1-B07 1-B07 1-B11 1-B03
1-B06
1-B06

1-B08
1-B08

0103
MEP ENGINEER
T.O.B. +3.500 T.O.B. +3.500
S.S.L. +3.300 S.S.L. +3.300 S.S.L. +3.300 S.S.L. +3.300
1-B13

1-B04a 1-B04 1-B04 1-B04a


6100

1-B11

1-B11
1-CB03

1-CB03

1-02 STAGE LOCATION


0301 ISSUED FOR TILAL, ALSUYOH SUBURB,
DOWNSTAND CONSTRUCTION SHARJAH,UAE
WALL REFER TO
T.O.B.+3.500 TYP. DETAILS T.O.B.+3.500 DRAWING TITLE :
1-CB02

1-CB02

1-CB02

SECTION 1-02

XA1 CL1A - FIRST FLOOR - FRAMING PLAN


1-B03 1-B03 1-B03 1-B03 PLOT
PLOT
LIMIT T.O.B.+3.500 LIMIT
T.O.B.+3.500

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - FRAMING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 As indicated C00
DRAWING NO.
MAS-P2AB-STR-CL1A-0103
NORTH

CL1A BEAMS SCHEDULE - ROOF FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVER ALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT SID BARS Column / Wall Stop Below Slab Level
BEAM STRAIGHT STRAIGHT FROM 1 T12-400 C/C A 1500
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH FACE
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS 2 T12-200 C/C B 2000 KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 Denotes Slab Opening
R-B02 200 700 2T12 - 2T16 2T12 - T10 - 200 T10 - 200 2 2T10 - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B02a 200 700 2T16 - 2T16 - - T10 - 200 T10 - 200 2 2T10 - 4 T16-100 C/C D 3000
R-B03 200 700 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 2T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600 M 02 C
R-B04 200 700 2T16+2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 2T10 -
R-B05 200 800 2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M
R-CB01 200 700 2T12 - 2T20 2T12 - T10 - 150 - 2 2T10 - G 4400 Top extra rebars
R-CB02 200 700 2T12 - 2T20 2T16 - T10 - 150 - 2 2T10 - Bottom extra rebars
H 4800
* Inverted Beam
J 5400 NOTES
K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

26800

4200 2700 2700 3800 3800 2700 2700 4200


PLOT
PLOT
LIMIT
LIMIT
R-CB01

R-CB01
XA6 68-b4K 68-b4K C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
1300

11-t3C 11-C NO DATE BY REVISION APP

XA5 R E V I S I O N
PROJECT :
63-t4K
63-b4K

63-b4K
63-t4K

T.O.B. +7.150 T.O.B. +7.150


R-B03
R-B03

R-B04

R-B04
R-B04

VILLAS AT PHASE 02 OF MASAAR


31-t3D

31-t3D
4200

T.O.B. +7.150
68-t4K 68-t4K
28-t2C

CLIENT

300
XA4 800 800
800 175

800 175

1875 600
800 375

360 800 800 360


550
1600

600 600

600 600
425 800
250 800

800

600 1875 950 1600 1600 950


300 MASAAR DEVELOPMENTS LLC
XA3
11-t2B
11-t2B

CONSULTANT
R-B05

R-B05
R-B04
11-t1B

11-t1B

T.O.B. +7.150
11-t2B 11-t2B
17000

200 200
R-01
R-B02 *

R-B02 *
3800

R-B03
R-B03

RC SLAB 0301 200 200 RC SLAB


R-B02

R-B02

T.O.B. +7.150 T.O.B. +7.150


S.S.L.+6.900 RC SLAB RC SLAB S.S.L.+6.900

T12-200 TOP MESH


S.S.L.+6.900 S.S.L.+6.900 T12-200 TOP MESH
R-CB01

R-CB01

T12-200 BOT MESH T12-200 BOT MESH


XA2 T12-200 TOP MESH T12-200 TOP MESH
R-CB02

R-CB02 *
R-CB02 *

T12-200 BOT MESH T12-200 BOT MESH


R-CB02
R-CB02

MEP ENGINEER
R-B02a * R-B02a *
6100

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

XA1 CL1A - ROOF - FRAMING PLAN


PLOT PLOT
LIMIT LIMIT

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF - FRAMING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1A-0104
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
CW DENOTES CORE WALL

NOTES

NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing
series STR-0401.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

26800

4200 2700 2700 3800 3800 2700 2700 4200

100 100 100 100


XA6
1000

1000
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
1300

1400

1400

100 NO DATE BY REVISION APP


100

XA5 200 C06 200 C06 R E V I S I O N


800

C07 200 C07 PROJECT :


200
200 C03
VILLAS AT PHASE 02 OF MASAAR
4200

100 CLIENT
100 100 100
100
750

750

750

750
900

900

900

900
550

900

XA4
200 C04 200 C04 200 C04 200 C04
1600

200 C04
100 100
MASAAR DEVELOPMENTS LLC
XA3
50

50
700

700

100 100
700

700

CONSULTANT
200 C02 200 C02
700

700
17000

200 C02 200 C02


3800

100 100 100


100 100 100 100
1000

1000

1000
900

900

900
500

500

500

500
600

600

600

600

XA2
200 C01 200 C05 200 C01 200 C05 200 C01 200 C05 200 C01
1375

1375

100 100
MEP ENGINEER
1000

1000

200 C05 200 C05


6100

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
100 100 100 CONSTRUCTION SHARJAH,UAE
500

500

500

DRAWING TITLE :
200 C08 200 C08 200 C08
XA1 CL1A - FOUNDATION & GROUND FLOOR -
COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE

FOUNDATION & GROUND FLOOR - COLUMN LAYOUT DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1A-0201
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
CW DENOTES CORE WALL

NOTES

NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing
series STR-0401.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

26800

4200 2700 2700 3800 3800 2700 2700 4200

100 100 100 100


XA6
1000

1000
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
1300

1400

1400

100 NO DATE BY REVISION APP


300

100

XA5
100

100

200 C06 200 C06 R E V I S I O N


800

200 C07 200 C07 PROJECT :


200 C03
VILLAS AT PHASE 02 OF MASAAR
4200

100 CLIENT
100 100 100 100
750

750

750

750
900

900

900

900
550

900

XA4
200 C04 200 C04 200 C04 200 C04
1600

200 C04
100 100
MASAAR DEVELOPMENTS LLC
XA3
50

50

100 100
700

700
700

700

CONSULTANT
200 C02 200 C02
700

700
17000

200 C02 200 C02


3800

100 100
100 100 100 100
1000

1000

1000
900

900
500

500

500

500
600

600

600

600

XA2
200 C01 200 C05 200 C01 C05 200 C01 200 C05 200 C01
1375

1375

100 100
MEP ENGINEER
1000

1000

200 C05 200 C05


6100

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

XA1 CL1A - FIRST FLOOR - COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE

1ST FLOOR - COLUMN LAYOUT DAE DAE Approver 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1A-0202
NORTH

KEY PLAN

XA2
M 02 C
F.F.L.
COMPRESSIBLE
MATERIAL AS PER
100MM THK. PLAIN
CONCRETE
BEAM
AS/SCHED.
XA2
0 SLAB ON GRADE
TYP. DETAILS
AS/PLAN BEAM 1-B06 BEAM
GROUND FLOOR
F.F.L. AS/SCHED. F.F.L. ELEVATION 200
RC SLAB
3500 3500
AS/PLAN
1ST FLOOR 1ST FLOOR
S.S.L. NOTES

200

200
+3.30 m
GROUND BEAM 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
AS/SCHED. COLUMN EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ELEVATION ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM

200
BEAM EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
AS/SCHED. T12-200 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.

900
T10-200
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
S.S.L. STAIR LANDING TO COMMENCEMENT OF ANY WORK.

500
-1100 AS/DETAIL S.S.L.
FOUNDATION LEVEL +2.64 m

S.S.L.
-1150 BEAM
AS/SCHED.
EXCAVATION LEVEL
FOUNDATION DOWNSTAND
AS/PLAN WALL
200 1100 200 875

SECTION G-01 SECTION 1-01 SECTION 1-02


G-01 1 : 20 1-01 1 : 20 1-02 1 : 20

100 100
200 800 200 SIGNED
T12-150 CLEAR OPENING
S.S.L. -0.320m
T12-150 D<-!,11a11
Architects+
Engineers
200

PARAPET PARAPET

■•
WALL WALL

T12-150
300

ISSUED FOR CONSTRUCTION

Hmax = 1600MM

Hmax = 1600MM
T12-150 T10-200 EF T10-200 EF
T12-150 T12-200 EF SUBJECT TO AUTHORITIES APPROVALS
T12-200 EF T12-200 EF
T12-150
WATER SURFACE LEVEL
GRP LINING
200 200
F.F.L. AS PER F.F.L. AS PER T10-200 EF
1500

ARCH. ARCH. (TYPICAL)


2 LAYERS OF BITUMINOUS
1200

PROTECTIVE COAT AS/SPECS


S.S.L. AS PER S.S.L. AS PER
FRAMING PLAN FRAMING PLAN
PLAN
PVC WATER STOPER PVC WATER STOPER
T12-150
S.S.L. -2.020m
T12-150
150

150

REINJECTABLE HOSE REINJECTABLE HOSE


UP-STAND
200

BEAM AS/PLAN
RC SLAB & SCHED. RC SLAB
AS/PLAN AS/PLAN

200 VARIES 200


CASE 1 (EDGE) CASE 2
LEAN CONCRETE
NOTES:
2 LAYERS OF BITUMINOUS • "H" IS THE PARAPET HEIGHT AS PER ARCHI. C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
PROTECTIVE COAT AS/SPECS NO DATE BY REVISION APP

WELL COMPACTED SOIL UP TO 95% OF R E V I S I O N


TYPICAL WATER TANK DETAILS MAXIMUM DRY DENSITY TYPICAL DETAIL OF PARAPET WALL PROJECT :
WT 1 : 20 PW 1 : 20
VILLAS AT PHASE 02 OF MASAAR

CLIENT

BEAM LINKS
MASAAR DEVELOPMENTS LLC
S

BEAM TOP BARS AS 100MM UP-STAND CONSULTANT


PER BEAM SCEH. WALL
100 S.S.L.
W MIN. 2T12 W +7.15 m
2T16 TOP BARS
Ld
VL BARS AS PER VL BARS AS PER
COLUMNS SCEHD. COLUMNS SCEHD. T12@100 HORIZONTAL
MIN. 600mm

CLOSED STIRRUPS
250
S/2

RC SLAB
LINKS BEAM TOP BARS AS LINKS
L

BEAM BARS TO BE VL BARS AS PER F.F.L. AS/PLAN


PER BEAM SCEH.
EXTENDED IN COLUMNS SCEHD. 6900
MIN. 2T16
CANTILEVER AS Level R1 Roof
SHOWN
SHORT CANTILEVER

SHORT CANTILEVER

BEAM MEP ENGINEER


L=AS PLAN

L=AS PLAN

200

W=600 mm
S

MIN.
S

COL. LINKS
STAGE LOCATION
BEAM BEAM
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE
PLAN PLAN SECTION
DRAWING TITLE :

CASE 1 CASE 2 BEAM


CL1A - STRUCTURAL DETAILS - 1
AS/PLAN
SHORT CANTILEVER WITH EXTENSION SHORT CANTILEVER WITHOUT EXTENSION

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


TYPICAL SHORT CANTILEVER DETAIL SECTION R-01 D21-44 A1 As indicated C00

SCB 1 : 20 R-01 1 : 10
DRAWING NO.
MAS-P2AB-STR-CL1A-0301
NORTH

COLUMNS - SCHEDULE AND TYPICAL DETAILS


KEY PLAN
NOTES:

1.Splice of vertical bars shall be made at mid-height of the column , and shall be
400/500 600 / 700 600 / 700 800 / 900 800 / 900 1000 / 1100 1000 / 1100 staggered at least Ld.
2.Splice of each individual bar within a bundle shall be staggered at least Ld. M 02 C
3.Mechanical splice shall be used where reinforcement ratio exceeds or equals 4%.
200

200

200

200

200

200

200
TYPE 1 TYPE 2 TYPE 2A TYPE 3 TYPE 3A TYPE 4 TYPE 4B
NO. OF BARS: 8 NO. OF BARS: 10 NO. OF BARS: 10 + 4 = 14 NO. OF BARS: 12 NO. OF BARS: 12 + 4 = 16 NO. OF BARS: 14 NO. OF BARS: 14 + 8 = 22 NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
1300/1400/1500 400/500 1000 / 1100
200

200

200
TYPE 1A TYPE 4A
TYPE 5 NO. OF BARS: 8 + 4 = 12 NO. OF BARS: 14 + 4 = 18
NO. OF BARS: 18

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

TOP ROOF FLOOR TOP ROOF FLOOR


S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
C40 C40
PROJECT :
ROOF FLOOR ROOF FLOOR
S.S.L. S.S.L. VILLAS AT PHASE 02 OF MASAAR
-XX.XXX M -XX.XXX M

CLIENT

SECTION : 200 X 1000


TYPE : 4A
C40 V-BARS : 14T16 C40
ADD. V : 4T16 MASAAR DEVELOPMENTS LLC
1ST FLOOR LINKS : T10-200 1ST FLOOR CONSULTANT
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C40 C40
MEP ENGINEER
GROUND FLOOR GROUND FLOOR
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
SECTION : 200 X 600 SECTION : 200 X 700 SECTION : 200 X 800 SECTION : 200 X 900 SECTION : 200 X 1000 SECTION : 200 X 1000 SECTION : 200 X 1400 SECTION : 200 X 500 CONSTRUCTION SHARJAH,UAE
TYPE : 2 TYPE : 2 TYPE : 3 TYPE : 3 TYPE : 4 TYPE : 4 TYPE : 5 TYPE : 1A DRAWING TITLE :
C40 V-BARS : 10T16 V-BARS : 10T16 V-BARS : 12T16 V-BARS : 12T16 V-BARS : 14T16 V-BARS : 14T16 V-BARS : 18T16 V-BARS : 8T12 C40
ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : 4T12 CL1A - COLUMNS SCHEDULE
FOUNDATION LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 FOUNDATION
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

DRAWN BY CHECKED BY APPROVED BY DATE

LEVEL LEVEL DAE DAE DAE 14/12/2022


CONC. CONC.
GRADE
C01 C02 C03 C04 C05 C06 C07 C08 GRADE JOB NO. SHEET SIZE SCALE REV. NO.
COLUMN COLUMN
D21-44 A1 1 : 20 C00
MARK MARK
DRAWING NO.
MAS-P2AB-STR-CL1A-0401
NORTH

KEY PLAN

YAG YAH
T10-200 FLOOR SLAB
(TYP.) AS/PLAN
M 02 C
2700 T8 (TYP.)
3
0601

FLOOR BEAM T12-150


AS/SCHEDULE NOTES
T12-150 T10-200

200
T12-150 T10-200 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
4 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
T12-150
0601 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE

200
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
XA4 TO COMMENCEMENT OF ANY WORK.

T12-150
YAG YAH T12-150

2700

XA3 F.F.L. DETAILS OF STAIRCASE FLIGHT-C


3500
1ST FLOOR
5400

1300 1200

3500
FLIGHT-A

G-CB01

808
F.F.L.
FLOOR BEAM SIGNED
0
XA2 GROUND FLOOR AS/SCHEDULE
D<-!,11a11
Architects+
T12-150 Engineers

1150
120
S.S.L. T12-150 0
-1100
FOUNDATION LEVEL
T12-150
■•

200
S.S.L.
ISSUED FOR CONSTRUCTION
-1150 T10-200 SUBJECT TO AUTHORITIES APPROVALS
EXCAVATION LEVEL
T12-150
T12-150
T10-200
STAIRCASE 1 - FIRST FLOOR PLAN STAIRCASE 1 - SECTION 2 (TYP.)
2 1 : 50 4 1 : 50 T8 (TYP.)

T12-150
T10-200 120
0

200
T12-150
T10-200

T12-150
YAG YAH
T12-150

2700

200
3
0601
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
DETAILS OF STAIRCASE FLIGHT-B T12-150 NO DATE BY REVISION APP
T12-150 R E V I S I O N
PROJECT :
4
0601
1200

VILLAS AT PHASE 02 OF MASAAR


XA2 XA3 XA4
XA4 CLIENT

5400

F.F.L.
3500
1ST FLOOR MASAAR DEVELOPMENTS LLC
XA3 FLIGHT-C
T12-150 CONSULTANT

T12-150 T10-200
(TYP.)
5400

T8 (TYP.)
FLIGHT-B

200
RC BEAM
AS/SCHEDULE T12-150
T12-150 T12-150 T12-150

200
T10-200 T10-200 MEP ENGINEER

SLAB
F.F.L.
FLIGHT-A AS/PLAN
0
GROUND FLOOR

STAGE LOCATION
XA2 ISSUED FOR TILAL, ALSUYOH SUBURB,
S.S.L.
-1100 CONSTRUCTION SHARJAH,UAE
FOUNDATION LEVEL
S.S.L. GRADE BEAM DRAWING TITLE :
-1150 AS/SCHEDULE
EXCAVATION LEVEL CL1A - STAIR CASE-1 DETAILS

DETAILS OF STAIRCASE FLIGHT-A


DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


STAIRCASE 1 - GROUND FLOOR PLAN STAIRCASE 1 - SECTION 1
1 1 : 50 3 1 : 50
D21-44
DRAWING NO.
A1 As indicated C00

MAS-P2AB-STR-CL1A-0601
NORTH

KEY PLAN

YAF YAG

M 02 C
3
0602

NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
XA4 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

XA3

1-B11
SIGNED
XA2 0103
D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
T10-200 FLOOR SLAB SUBJECT TO AUTHORITIES APPROVALS
(TYP.) AS/PLAN

T8 (TYP.)

STAIRCASE 2 - FIRST FLOOR PLAN


2 1 : 50
T12-150
T12-150 T10-200
FLOOR BEAM
T10-200
AS/SCHEDULE

200
T12-150
T12-150

200
YAF YAG
T12-150
T12-150

3
0602 DETAILS OF STAIRCASE FLIGHT-B C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
R E V I S I O N
PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT
XA4
FLOOR BEAM
XA2 XA3 XA4 AS/SCHEDULE

T12-150
5400 T12-150 MASAAR DEVELOPMENTS LLC
F.F.L.
3500
CONSULTANT
XA3 1ST FLOOR

200
100

FLIGHT-B
T12-150
T12-150
T10-200
(TYP.)
3500

T8 (TYP.)
FLIGHT-A

200
MEP ENGINEER

F.F.L. T12-150 T12-150


0
T10-200 T10-200 STAGE LOCATION
GROUND FLOOR
ISSUED FOR TILAL, ALSUYOH SUBURB,
XA2 SLAB CONSTRUCTION SHARJAH,UAE
AS/PLAN
1150

S.S.L. DRAWING TITLE :


-1100
FOUNDATION LEVEL
CL1A - STAIR CASE-2 DETAILS
S.S.L.
-1150
EXCAVATION LEVEL

GRADE BEAM
DRAWN BY CHECKED BY APPROVED BY DATE
AS/SCHEDULE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


STAIRCASE 2 - GROUND FLOOR PLAN STAIRCASE 2 - SECTION 1 DETAILS OF STAIRCASE FLIGHT-A D21-44 A1 As indicated C00
1 1 : 50 3 1 : 50 DRAWING NO.
MAS-P2AB-STR-CL1A-0602
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0 KEY PLAN

2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00 M 02 C

5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00

6 CURTAIN WALL 200mm 1.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
8 ROOF MEP 5.00 5.00 5.00 5.00 DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

26800

4200 2700 2700 3800 3800 2700 2700 4200

XA6
2 2 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
1300

NO DATE BY REVISION APP

XA5 R E V I S I O N
2 PROJECT :

VILLAS AT PHASE 02 OF MASAAR


4200

CLIENT

1 1 1
XA4
1600

MASAAR DEVELOPMENTS LLC


XA3
CONSULTANT
17000

3800

3 3

XA2

MEP ENGINEER

4 4
6100

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

XA1 CL1A - FIRST FLOOR - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

1ST FLOOR - LOADING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1A-0901
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0 KEY PLAN

2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00 M 02 C

5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00

6 CURTAIN WALL 200mm 1.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
8 ROOF MEP 5.00 5.00 5.00 5.00 DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

26800

4200 2700 2700 3800 3800 2700 2700 4200

XA6
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
1300

NO DATE BY REVISION APP

XA5 6 6 R E V I S I O N
7 7 PROJECT :

VILLAS AT PHASE 02 OF MASAAR


4200

CLIENT

XA4
1600

8 8 8 8 MASAAR DEVELOPMENTS LLC


XA3
CONSULTANT
17000

3800

XA2
6 7 7 6
MEP ENGINEER
6100

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

XA1 CL1A - ROOF - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF - LOADING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1A-0902
NORTH

CL1B - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
F01 1000 1000 300 T12 - 200 T12 - 200 - - Denotes Slab Opening
F03 1300 1700 400 T12 - 150 T12 - 150 - -
F04 1500 1900 400 T16 - 200 T16 - 200 - - 200 Denotes Slab / Raft Thickness In mm.
F05 1700 2100 400 T16 - 200 T16 - 200 - -
F06 1900 2300 400 T16 - 200 T16 - 200 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
M 02 C
F08 2300 2700 400 T16 - 200 T16 - 100 - -
S.S.L. +1.000 Slab Surface Level in M
Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For Grade of Concrete of the Foundation and Ground Beams ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
refer to General Notes drawing No. MAS- P2AB-STR-0002. TO COMMENCEMENT OF ANY WORK.
4. The Allowable net bearing capacity at Foundation level is as per
Soil Investigation Report No. RSl2022-0185 SHJ, issued by
M/S ELEMENT ENG'G LABORATORY, dated 27/08/2022.
6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
7. The contractor to conduct the required tests and confirm soil
bearing capacities before foundation construction.
8. For plots with narrow space between asset footprint and
boundary wall, the contractor shall submit shop drawings in light
of the measures below for the engineer’s review, and
implement the advised work without extra cost.
8.1 The water tank shall be moved to avoid the clash
considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBI YBJ YBK
33300
PLOT
LIMIT
4200 2700 2700 3800 2700 3800 3800 2700 2700 4200 PLOT
LIMIT

FOR BOUNDARY WALL DETAILS


REFER TO SHEET
MAS-P2AB-STR-GEN-0006

WORKING LOAD FROM COLUMN


ENVELOPE SERVICE REACTION
490kN 740kN 730kN 490kN

XB6
540kN 530kN
1300

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


XB5 NO DATE BY REVISION APP
F03 F03 R E V I S I O N
F06 F06
PROJECT :
F04 F04
4200

VILLAS AT PHASE 02 OF MASAAR


620kN 760kN 850kN 960kN 760kN 620kN

CLIENT

XB4
1600

540kN 540kN
F05 F06 G-01 F06 F05
0301 430kN F08 400kN
F08 420kN
XB3
MASAAR DEVELOPMENTS LLC
CONSULTANT
17000

F04 F04
3800

560kN 650kN 750kN 550kN


520kN 460kN F03 460kN F04 460kN F03 530kN

XB2
430kN 430kN
F04 F05 F04 F06 F05 F06 F04 F05 F04
MEP ENGINEER

F03 F03
6100

LOWERED LOWERED
BOTTOM OF FOOTING BOTTOM OF FOOTING
PLOT
B.O.F. -1.400 B.O.F. -1.400
LIMIT
STAGE LOCATION
130kN WATER TANK DETAILS 120kN 130kN 130kN
REFER TO DWG NO. ISSUED FOR TILAL, ALSUYOH SUBURB,
MAS-P2AB-STR-CL1C-301 CONSTRUCTION SHARJAH,UAE

F01 F01 F01 F01 DRAWING TITLE :


XB1
PLOT
LIMIT
CL1B - FOUNDATION PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


FOUNDATION PLAN D21-44 A1 1 : 100 C00
1 DRAWING NO.
1 : 100
MAS-P2AB-STR-CL1B-0101
NORTH

CL1B - BEAMS SCHEDULE - GROUND FLOOR LEGEND:


Column / Wall Continuous
OVER ALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
EXTRA AT EXTRA AT SID BARS Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM
Mark
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH FACE
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 Denotes Slab Opening
G-B01 200 500 2T12 - 2T12 2T12 - T10 - 200 T10 - 200 2 - - 200 Denotes Slab / Raft Thickness In mm.
G-B02 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - -
G-B03 200 500 2T16 - 2T16 2T12 2T16 T10 - 200 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B04 200 550 2T12 - 2T12 - 2T12 T10 - 200 T10 - 200 2 - - M 02 C
G-B05 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M
G-B06 200 500 2T12 - 2T16 T10 - 200 T10 - 200 2 - Top extra rebars
G-CB01 200 500 2T12 - 2T16 - - T10 - 200 - 2 - - Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
mesh unless otherwise mentioned on the drawings. TO COMMENCEMENT OF ANY WORK.
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBI YBJ YBK

33300
PLOT
PLOT
LIMIT 4200 2700 2700 3800 2700 3800 3800 2700 2700 4200 LIMIT

G-B04 G-B04
XB6
1300

G-B02 G-B02 G-B02 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


XB5 NO DATE BY REVISION APP
R E V I S I O N
100 100
G-B02

G-B02

G-B02
G-B05

G-B05
G-B02

PROJECT :
SLAB ON GRADE 100 100 100 SLAB ON GRADE
G-B02

G-B02
4200

S.S.L.-0.200 SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE S.S.L.-0.200 VILLAS AT PHASE 02 OF MASAAR
G-CB01

S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100


G-CB01

CLIENT
G-B02 G-B02 G-B02 G-B02 G-B02
XB4
1600

G-01
0301
XB3 G-B06 G-B06
G-B06 G-B06 G-B06 MASAAR DEVELOPMENTS LLC
G-B02

G-B02

G-B02
G-B02

CONSULTANT
17000

150MM THK. PLAIN 150MM THK. PLAIN 150MM THK. PLAIN


G-B06

G-B06
3800

CONCRETE CONCRETE CONCRETE


G-B03

G-B03

200
G-B06
G-B06

G-B06

200 RC SLAB
G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 S.S.L.-0.550
RC SLAB
XB2
S.S.L.-0.550 100 100 100 100 100
G-B02
G-B02

G-B02

SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE
S.S.L.-0.500 S.S.L.-0.250 S.S.L.-0.250 S.S.L.-0.250 S.S.L.-0.500 MEP ENGINEER
G-B02

G-B06 G-B06
6100

T.O.B. -0.400 T.O.B. -0.400


200 200 200 PLOT
LIMIT
RC SLAB RC SLAB RC SLAB STAGE LOCATION
S.S.L.-0.670 S.S.L.-0.670 S.S.L.-0.670 ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XB1
PLOT
LIMIT
WATER TANK DETAILS CL1B - GROUND FLOOR - FRAMING PLAN
REFER TO DWG NO.
MAS-P2AB-STR-CL1C-0301

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


GROUND FLOOR - FRAMING PLAN D21-44 A1 1 : 100 C00
1 DRAWING NO.
1 : 100
MAS-P2AB-STR-CL1B-0102
NORTH

CL1B - BEAMS SCHEDULE - FIRST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVER ALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT SID BARS Column / Wall Stop Below Slab Level
BEAM STRAIGHT STRAIGHT FROM 1 T12-400 C/C A 1500
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH FACE
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS 2 T12-200 C/C B 2000 KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 Denotes Slab Opening
1-B01 200 600 2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
1-B01a 200 900 2T12 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - 4 T16-100 C/C D 3000
1-B02 200 1250 2T12 - 2T16 2T12 - T10 - 200 T10 - 200 2 3T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600 M 02 C
1-B03 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 3T10 -
1-B03a 200 900 2T12 - 2T12 2T12 - T10 - 200 T10 - 200 2 3T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M
1-B04 200 900 2T12 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - G 4400 Top extra rebars
1-B04a 200 900 2T16+2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 3T10 - Bottom extra rebars
H 4800
1-B05 200 1000 2T16 2T12 2T16 2T12 2T16 T10 - 200 T10 - 200 2 3T10 - * Inverted Beam
1-B05a 200 1000 2T16+2T16 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - J 5400 NOTES
1-B06 200 1100
900/1100 2T12 - 2T16+2T16 - - T10 - 200 T10 - 200 2 3T10 - K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1-B07 200 1050 2T12 - 2T12 - - T10 - 200 T10 - 200 2 3T10 - NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT

1-B08 200 1250


900/1250 2T12 - 2T16+2T12 - - T10 - 200 T10 - 200 2 3T10 -
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
1-B09 200 1250 2T16 2T20 2T16 2T16 2T12 T10 - 200 T10 - 200 2 3T10 - M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
1-B10 200 1100 2T16 - 2T16 2T16 - T10 - 200 T10 - 200 2 3T10 - 2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1-B11 200 1250
900/1250 2T16 2T16 2T16+2T12 - - T10 - 200 T10 - 200 2 3T10 - TO COMMENCEMENT OF ANY WORK.

1-B12 200 600 2T16 2T16 2T16 2T16 2T12 T10 - 125 T10 - 200 2 - - P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
1-B13 200 900 2T16 2T16 2T16 2T16 - T10 - 200 T10 - 200 2 3T10 - Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
1-CB01 200 600 2T12 - 2T20 2T12 - T10 - 150 - 2 - - to the typical mesh mentioned above.
R 9000
1-CB02 200 900 2T12 - 2T20 2T12 - T10 - 150 - 2 3T10 - 5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
1-CB03 200 900 2T12 - 2T20 2T16 - T10 - 150 - 2 3T10 -
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
XB1 Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
BEAM REINF. W 11,500 deflection for 6.0m span, curtain walls and any non-structural
AS/SCHED.
X 12,000 elements attached to structural concrete need to allow for joint
F.F.L. 500 4525 to accommodate the slab deflection of L/240 without sustaining
A to X
3500 * damage or non-functionality as a result of slab deflection.
1ST FLOOR 10. For slabs punching shear reinforcement refer to STR-
GEN-0004.
900

LEGEND:
COLUMN
BEAM 1-CB02 AS/SCHED.
AS/SCHED.
Stair Opening Boundary SIGNED
BEAM SUPPORTING
Additional Rebars
D<-!,11a11
STAIR LANDING

NOTE: SIMILAR TO BEAM 1-B06 & 1-B09.


3T16 TOP & BOT Architects+
Engineers

BEAM 1-B11 TYP. DETAIL


500X200 Hidden Beam
■•
1-B11 1 : 50
TOP BAR: 5T16
BOTTOM BAR: 5T16
STIRRUPS: 4 LEGS OF T10-150
ISSUED FOR CONSTRUCTION
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBI YBJ YBK

33300
PLOT
LIMIT 4200 2700 2700 3800 6500 3800 2700 2700 4200 PLOT
LIMIT
1-CB01 *

1-CB01 *
1-B05a 1-B05a
XB6
1300

11-t3C 1-B05 1-B05 1-B05 11-C


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XB5 NO DATE BY REVISION APP
R E V I S I O N
1-B01 *

1-B01 *
PROJECT :
1-B12

1-B12

200 200 200


1-B12

1-B12
27-D

27-D
4200

RC SLAB RC SLAB RC SLAB VILLAS AT PHASE 02 OF MASAAR


46-b2F

46-b2F
S.S.L.+3.400 S.S.L.+3.400 S.S.L.+3.400
44-b2G 44-b2G
0

80
80

0
0
80

80

CLIENT
80
0

500 275
500 275
500 275

XB4
11-t2C

11-t2C
600 400

600 400
6-t2C

6-t2C
1600

1250 500 1250 500 500 1250


100 1600 600 600 1600 100
XB3
80
0
80

MASAAR DEVELOPMENTS LLC


1-B09

1-B09

1-B09
1-B12
80

80

9-t3C 9-t3C
80
0

CONSULTANT
17000

200 1-01 200


9-t1C 9-t1C 9-t1C
1-B01a

1-B01a
1-B10

1-B10
3800

RC SLAB 0301 RC SLAB


1-B02

1-B02

1-B02

S.S.L.+3.400 T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH S.S.L.+3.400
T12-200 BOT MESH T12-200 BOT MESH T12-200 BOT MESH
T12-200 TOP MESH STAIRCASE-1 STAIRCASE-2 STAIRCASE-2 STAIRCASE-2 STAIRCASE-1 T12-200 TOP MESH
T12-200 BOT MESH T12-200 BOT MESH
XB2
1-B08

1-B08

1-B03 1-B07 1-B11 1-B07 1-B07 1-B03


1-B06

1-B08

1-B06

0103

S.S.L. +3.300 S.S.L. +3.300 S.S.L. +3.300 S.S.L. +3.300 S.S.L. +3.300 MEP ENGINEER
1-B11

1-B13

1-B04a 1-B04 1-B04 1-B04 1-B04a


6100

1-B11

1-B11

1-02
1-CB03

1-CB03

0301 PLOT
LIMIT
STAGE LOCATION
DOWNSTAND
WALL REFER TO ISSUED FOR TILAL, ALSUYOH SUBURB,
TYP. DETAILS CONSTRUCTION SHARJAH,UAE
1-CB02

1-CB02

1-CB02

1-CB02

SECTION 1-02
DRAWING TITLE :
XB1
PLOT 1-B03a 1-B03 1-B03 1-B03 1-B03a
LIMIT
CL1B - FIRST FLOOR - FRAMING PLAN
T.O.B.+3.500 T.O.B.+3.500

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


FIRST FLOOR - FRAMING PLAN D21-44 A1 As indicated C00
1 DRAWING NO.
1 : 100
MAS-P2AB-STR-CL1B-0103
NORTH

CL1B - BEAMS SCHEDULE - ROOF FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
OVER ALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
Column / Wall Continuous
Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT SID BARS Column / Wall Stop Below Slab Level
BEAM STRAIGHT STRAIGHT FROM
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH REMARKS 1 T12-400 C/C A 1500 Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH FACE
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 2 T12-200 C/C B 2000 Denotes Slab Opening
R-B02 200 700 2T12 - 2T16 2T12 - T10 - 200 T10 - 200 2 2T10 - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B02a 200 700 2T16 - 2T16 - - T10 - 200 T10 - 200 2 2T10 - 4 T16-100 C/C D 3000
R-B03 200 700 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 2T10 - PS1
E 3600 Denotes Slab / Raft Punching Shear RFT Type.
R-B04 200 700 2T16+2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 2T10 - M 02 C
R-B05 200 800 2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M
R-CB01 200 700 2T12 - 2T20 2T12 - T10 - 150 - 2 2T10 -
G 4400 Top extra rebars
R-CB02 200 700 2T12 - 2T20 2T16 - T10 - 150 - 2 2T10 -
H 4800 Bottom extra rebars
* Inverted Beam
J 5400 NOTES
K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBI YBJ YBK
33300
PLOT 4200 2700 2700 3800 6500 3800 2700 2700 4200
LIMIT PLOT
LIMIT
R-CB01

R-CB01
XB6 68-b4K 68-b4K
1300

11-t3C 11-t3C
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XB5 NO DATE BY REVISION APP
PARAPET WALL TOP OF PARAPET R E V I S I O N
63-t4K

63-t4K
63-b4K

63-b4K
AS/TYP. DET. AS/ARCH. T.O.B.+7.150

R-B03
PROJECT :
R-B03

R-B04

R-B04
31-t3D

31-t3D
4200

VILLAS AT PHASE 02 OF MASAAR


R-B04

T.O.B.+7.150 T.O.B.+7.150
R-B04

68-t4K 68-t4K
28-t2C
28-t2C

T.O.B.+7.150
CLIENT
800 750 950 800 750 950 950 750 800
XB4 600 1875 360 800 800 360 1875 600
800

800

800
1600

600 600

600 600
500 725

500 725

500 725
R-B05
250 800

250 800
R-B05
625

625

625

XB3
11-t2B
11-t2B

T.O.B.+7.150 MASAAR DEVELOPMENTS LLC


R-B04

R-B04
11-t1B

11-t1B

200 11-t2B 11-t2B 200 CONSULTANT


17000

200 200 200


R-B02 *

R-B02 *

T.O.B.+7.150 T.O.B.+7.150
RC SLAB RC SLAB
3800

R-B03
R-B03

T.O.B.+7.150
R-B02

R-B02

R-B02

S.S.L.+6.900 RC SLAB RC SLAB RC SLAB S.S.L.+6.900


R-01
S.S.L.+6.900 S.S.L.+6.900 S.S.L.+6.900 T.O.B.+7.150
0301
T12-200 TOP MESH T12-200 TOP MESH
R-CB01

R-CB01

T12-200 BOT MESH T12-200 BOT MESH


XB2 T12-200 TOP MESH T12-200 TOP MESH
R-CB02

R-CB02 *
R-CB02 *

T12-200 BOT MESH T12-200 BOT MESH


R-CB02

R-CB02

R-CB02
R-CB02

R-B02a * R-B02a * MEP ENGINEER


6100

PLOT
LIMIT
STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XB1
PLOT
LIMIT
CL1B - ROOF - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


ROOF - FRAMING PLAN D21-44 A1 1 : 100 C00
1 DRAWING NO.
1 : 100
MAS-P2AB-STR-CL1B-0104
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
CW DENOTES CORE WALL

NOTES

NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing
series STR-0401.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBI YBJ YBK

33300
4200 2700 2700 3800 6500 3800 2700 2700 4200

100 100 100 100


XB6
1000

1000
1300

1400

1400
100 100 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
300

300
100

100

XB5
100

100
200 C06 200 C06 NO DATE BY REVISION APP
800

800

200 C07 200 C07 R E V I S I O N


200 C03 200 C03
PROJECT :
4200

VILLAS AT PHASE 02 OF MASAAR


100 100 100
100 100 100
CLIENT
750

750

750

750
900

900

900

900
550

550
900

900

XB4
200 C04 200 C04 200 C04 200 C04
1600

200 C04 200 C04


100 100
XB3
50

50

100 100 MASAAR DEVELOPMENTS LLC


700

700
700

700

700

100
200 C02
700

700

700

200 C02 CONSULTANT


17000

200 C02 200 C02


3800

200 C02
100 100 100 100
100 100 100 100 100
1000

1000

1000

1000
900

900

900
500

500

500

500

500
600

600

600

600

600

XB2
100

200 C01 200 C01


200 C05 200 C05 200 C01 200 C05 200 C01 200 C05 200 C01
1375

1375

100 100
1000

1000

MEP ENGINEER

200 C05 200 C05


6100

STAGE LOCATION
100 100 100 100 ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE
500

500

500

500

200 C08 200 C08 200 C08 200 C08 DRAWING TITLE :
XB1
CL1B - FOUNDATION & GROUND FLOOR -
COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


FOUNDATION & GROUND FLOOR - COLUMN LAYOUT D21-44 A1 1 : 100 C00
1 DRAWING NO.
1 : 100
MAS-P2AB-STR-CL1B-0201
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
CW DENOTES CORE WALL

NOTES

NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing
series STR-0401.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBI YBJ YBK

33300
4200 2700 2700 3800 6500 3800 2700 2700 4200

100 100 100 100


XB6
1000

1000
1300

1300
1400

1400
100 100 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
300

100

100

XB5
100

200 C06 200 C06 NO DATE BY REVISION APP


800

800

200 C07 200 C07


R E V I S I O N
200 C03 200 C03
PROJECT :
4200

VILLAS AT PHASE 02 OF MASAAR


100 100 100 100
100 100
CLIENT
750

750

750

750
900

900

900

900
550

550
900

900

XB4
200 C04 200 C04 200 C04 200 C04
1600

200 C04 200 C04


100 100
XB3
50

50

100 100 100 MASAAR DEVELOPMENTS LLC


700

700
700

700

700

200 C02
700

700

700

200 C02 CONSULTANT


17000

200 C02 200 C02


3800

200 C02

100 100 100


100 100 100 100 100
1000

1000

1000

1000
900

900

900

900
500

500

500

500

500
600

600

600

600

600

XB2 200 C01 200 C05 200 C01 C05 200 C01 200 C05 200 C01 200 C05 200 C01
1375

1375

100 100
1000

1000

MEP ENGINEER

200 C05 200 C05


6100

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XB1
CL1B - FIRST FLOOR - COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


1ST FLOOR - COLUMN LAYOUT D21-44 A1 1 : 100 C00
1 DRAWING NO.
1 : 100
MAS-P2AB-STR-CL1B-0202
NORTH

KEY PLAN

XB2 M 02 C
XB2
BEAM 1-B06 BEAM
F.F.L. AS/SCHED. F.F.L. ELEVATION
COMPRESSIBLE 150 MM THK. PLAIN RC SLAB 200
F.F.L. BEAM 3500 3500
MATERIAL AS PER SLAB ON GRADE CONCRETE AS/PLAN
0 AS/SCHED. 1ST FLOOR 1ST FLOOR
TYP. DETAILS AS/PLAN S.S.L.
GROUND FLOOR NOTES

200

200
+3.30 m
S.S.L. COLUMN
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
-0.25 m ELEVATION EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT

200
BEAM ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
AS/SCHED. T12-200 EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
BEAM 2. THIS DRAWING IS NOT TO BE SCALED. STATED

900
T10-200 EF DIMENSIONS ONLY ARE TO BE CONSIDERED.
AS/SCHED. VERIFY S.S.L. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
STAIR LANDING AS/ARCH. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
AS/DETAIL

500
TO COMMENCEMENT OF ANY WORK.
S.S.L.
+2.64 m

S.S.L.
-1100 BEAM
AS/SCHED.
FOUNDATION LEVEL
DOWNSTAND
S.S.L. WALL
-1150 200 1100 200 875
EXCAVATION LEVEL

FOUNDATION
AS/PLAN

SECTION G-01 SECTION 1-01 SECTION 1-02


G-01 1 : 20 1-01 1 : 20 1-02 1 : 20

100 100
200 800 200
T12-150 SIGNED
S.S.L. -0.320m CLEAR OPENING
T12-150 D<-!,11a11
Architects+
Engineers
200

PARAPET PARAPET

■•
WALL WALL

T12-150
300

ISSUED FOR CONSTRUCTION

Hmax = 1600MM

Hmax = 1600MM
T12-150 T12-150 T10-200 EF T10-200 EF
T12-200 EF SUBJECT TO AUTHORITIES APPROVALS
T12-150 T12-200 EF T12-200 EF
WATER SURFACE LEVEL
GRP LINING
200 200
F.F.L. AS PER F.F.L. AS PER T10-200 EF
1500

ARCH. ARCH. (TYPICAL)


2 LAYERS OF BITUMINOUS
1200

PROTECTIVE COAT AS/SPECS


S.S.L. AS PER S.S.L. AS PER
FRAMING PLAN FRAMING PLAN

PVC WATER STOPER PVC WATER STOPER


PLAN
T12-150
S.S.L. -2.020m
T12-150
150

150

REINJECTABLE HOSE REINJECTABLE HOSE


UP-STAND
200

BEAM AS/PLAN
RC SLAB & SCHED. RC SLAB
AS/PLAN AS/PLAN

200 VARIES 200


CASE 1 (EDGE) CASE 2
LEAN CONCRETE
NOTES:
2 LAYERS OF BITUMINOUS • "H" IS THE PARAPET HEIGHT AS PER ARCHI. C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
PROTECTIVE COAT AS/SPECS NO DATE BY REVISION APP
WELL COMPACTED SOIL UP TO 95% OF R E V I S I O N
TYPICAL WATER TANK DETAIL MAXIMUM DRY DENSITY TYPICAL DETAIL OF PARAPET WALL
WT 1 : 20 PW 1 : 20
PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

MASAAR DEVELOPMENTS LLC


BEAM LINKS CONSULTANT
S

BEAM TOP BARS AS 100MM UP-STAND


PER BEAM SCEH. 100 WALL
W MIN. 2T12 W S.S.L.
2T16 TOP BARS +7.15 m
Ld
VL BARS AS PER VL BARS AS PER
COLUMNS SCEHD. COLUMNS SCEHD. T12@100 HORIZONTAL T10-200
MIN. 600mm

CLOSED STIRRUPS
S/2

RC SLAB
250

LINKS BEAM TOP BARS AS LINKS T12-200


L

BEAM BARS TO BE VL BARS AS PER AS/PLAN


PER BEAM SCEH. S.S.L.
EXTENDED IN COLUMNS SCEHD.
MIN. 2T16 6900 MEP ENGINEER
CANTILEVER AS
SHOWN ROOF
SHORT CANTILEVER

SHORT CANTILEVER

BEAM
L=AS PLAN

L=AS PLAN

W=600 mm
S

MIN.
S

STAGE LOCATION
COL. LINKS ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE
BEAM BEAM
DRAWING TITLE :
PLAN PLAN SECTION
CL1B - STRUCTURAL DETAILS - 1

CASE 1 CASE 2 BEAM


ELEVATION
SHORT CANTILEVER WITH EXTENSION SHORT CANTILEVER WITHOUT EXTENSION
DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


TYPICAL SHORT CANTILEVER DETAIL SECTION R-01 D21-44 A1 As indicated C00

SCB 1 : 20 R-01 1 : 10
DRAWING NO.
MAS-P2AB-STR-CL1B-0301
NORTH

COLUMNS - SCHEDULE AND TYPICAL DETAILS


KEY PLAN

NOTES:

1.Splice of vertical bars shall be made at mid-height of the column , and shall be
400/500 600 / 700 600 / 700 800 / 900 800 / 900 1000 / 1100 1000 / 1100 staggered at least Ld.
2.Splice of each individual bar within a bundle shall be staggered at least Ld. M 02 C
3.Mechanical splice shall be used where reinforcement ratio exceeds or equals 4%.
200

200

200

200

200

200

200
TYPE 1 TYPE 2 TYPE 2A TYPE 3 TYPE 3A TYPE 4 TYPE 2A
NOTES
NO. OF BARS: 8 NO. OF BARS: 10 NO. OF BARS: 10 + 4 = 14 NO. OF BARS: 12 NO. OF BARS: 12 + 4 = 16 NO. OF BARS: 14 NO. OF BARS: 14 + 8 = 22
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

1300/1400/1500
400/500 1000 / 1100
200

200

200
TYPE 5
NO. OF BARS: 18 TYPE 1A TYPE 4A
NO. OF BARS: 8 + 4 = 12 NO. OF BARS: 14 + 4 = 18

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

TOP ROOF FLOOR TOP ROOF FLOOR


S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
C40 C40 PROJECT :

ROOF FLOOR ROOF FLOOR VILLAS AT PHASE 02 OF MASAAR


S.S.L. S.S.L.
-XX.XXX M -XX.XXX M
CLIENT

SECTION : 200 X 1000


TYPE : 4A
C40 V-BARS : 14T16 C40 MASAAR DEVELOPMENTS LLC
ADD. V : 4T16
CONSULTANT
1ST FLOOR LINKS : T10-200 1ST FLOOR
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C40 C40
MEP ENGINEER

GROUND FLOOR GROUND FLOOR


S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE
SECTION : 200 X 600 SECTION : 200 X 700 SECTION : 200 X 800 SECTION : 200 X 900 SECTION : 200 X 1000 SECTION : 200 X 1000 SECTION : 200 X 1400 SECTION : 200 X 500
TYPE : 2 TYPE : 2 TYPE : 3 TYPE : 3 TYPE : 4 TYPE : 4 TYPE : 5 TYPE : 1A DRAWING TITLE :
C40 V-BARS : 10T16 V-BARS : 10T16 V-BARS : 12T16 V-BARS : 12T16 V-BARS : 14T16 V-BARS : 14T16 V-BARS : 18T16 V-BARS : 8T12 C40
CL1B - COLUMNS SCHEDULE
ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : 4T12
FOUNDATION LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 FOUNDATION
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M
DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022
LEVEL LEVEL
CONC. CONC. JOB NO. SHEET SIZE SCALE REV. NO.
GRADE
C01 C02 C03 C04 C05 C06 C07 C08 GRADE
COLUMN COLUMN D21-44 A1 1 : 20 C00
MARK MARK
DRAWING NO.
MAS-P2AB-STR-CL1B-0401
NORTH

YBI YBJ
KEY PLAN
2700

T10-200 FLOOR SLAB


3 (TYP.) AS/PLAN
0601 M 02 C
T8 (TYP.)

4 FLOOR BEAM T12-150


0601 AS/SCHEDULE NOTES
T12-150 T10-200

200
T12-150 T10-200 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
T12-150 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
XB4 2.
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE

200
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
1600

T12-150
T12-150
XB3 YBI YBJ
2700 DETAILS OF STAIRCASE FLIGHT-C
F.F.L.
3500
1ST FLOOR

1300 1200
3800

3500
FLIGHT-A

XB2 G-CB01

808
F.F.L.
SIGNED
0 FLOOR BEAM
GROUND FLOOR AS/SCHEDULE D<-!,11a11

200
Architects+
T12-150 Engineers

1150
120

■•
S.S.L. T12-150 0
-1100
FOUNDATION LEVEL
T12-150 ISSUED FOR CONSTRUCTION

200
S.S.L.
-1150 T10-200 SUBJECT TO AUTHORITIES APPROVALS
EXCAVATION LEVEL

T12-150
T12-150
T10-200
STAIRCASE 1 - FIRST FLOOR PLAN STAIRCASE 1 - SECTION 2 (TYP.)

2 1 : 50 4 1 : 50 T8 (TYP.)

T12-150
T10-200 120
0

200
T12-150
T10-200
YBI YBJ
T12-150
2700 T12-150

200
0601

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION

DETAILS OF STAIRCASE FLIGHT-B T12-150 NO DATE BY REVISION APP


T12-150 R E V I S I O N
4
PROJECT :
0601

VILLAS AT PHASE 02 OF MASAAR


XB4
CLIENT
XB2 XB3 XB4
1600

3800 1600
F.F.L.

XB3 3500 MASAAR DEVELOPMENTS LLC


1ST FLOOR

FLIGHT-C T12-150 CONSULTANT


T12-150 T10-200
(TYP.)

T8 (TYP.)

200
FLIGHT-B
3800

3500

T12-150
T12-150 T12-150 T12-150

200
T10-200 T10-200
MEP ENGINEER
RC COLUMN SLAB
AS/SCHEDULE AS/PLAN
F.F.L.
0 FLIGHT-A
GROUND FLOOR
XB2 STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
1150

S.S.L. CONSTRUCTION SHARJAH,UAE


-1100
FOUNDATION LEVEL GRADE BEAM DRAWING TITLE :
S.S.L. AS/SCHEDULE
-1150 CL1B - STAIR CASE-1 DETAILS
EXCAVATION LEVEL

DETAILS OF STAIRCASE FLIGHT-A


DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


STAIRCASE 1 - GROUND FLOOR PLAN STAIRCASE 1 - SECTION 1 D21-44 A1 As indicated C00

1 1 : 50 3 1 : 50
DRAWING NO.
MAS-P2AB-STR-CL1B-0601
NORTH

KEY PLAN

YBH YBI
M 02 C
2700

3
0602
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

XB4
1600

XB3

T10-200 FLOOR SLAB


(TYP.) AS/PLAN
3800

T8 (TYP.)

T12-150 SIGNED

FLOOR BEAM
T12-150 T10-200
D<-!,11a11
T10-200
AS/SCHEDULE Architects+

200
XB2 Engineers
T12-150
T10-200
ISSUED FOR CONSTRUCTION
■•
SUBJECT TO AUTHORITIES APPROVALS

200
T10-200
T12-150

DETAILS OF STAIRCASE FLIGHT-B

STAIRCASE 2 - FIRST FLOOR PLAN


2 1 : 50

YBH YBI
2700

3 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


0602 NO DATE BY REVISION APP
R E V I S I O N
FLOOR BEAM
AS/SCHEDULE PROJECT :

T12-150 VILLAS AT PHASE 02 OF MASAAR


T10-200

XB2 XB3 XB4 CLIENT

200
XB4
F.F.L. 3800 1600
T10-200
3500
T12-150
1600

1ST FLOOR
100

T10-200 MASAAR DEVELOPMENTS LLC


FLIGHT-B (TYP.)
CONSULTANT
925

T8 (TYP.)
XB3

200
3500

FLIGHT-A
T12-150 T12-150
T10-200 T10-200
3800

SLAB MEP ENGINEER


AS/PLAN
F.F.L.
0
GROUND FLOOR
1150

STAGE LOCATION
S.S.L.
-1100 ISSUED FOR TILAL, ALSUYOH SUBURB,
FOUNDATION LEVEL GRADE BEAM CONSTRUCTION SHARJAH,UAE
XB2 S.S.L. AS/SCHEDULE
DRAWING TITLE :
-1150
EXCAVATION LEVEL
CL1B - STAIR CASE-2 DETAILS
DETAILS OF STAIRCASE FLIGHT-A

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


STAIRCASE 2 - GROUND FLOOR PLAN STAIRCASE 2 - SECTION 1 D21-44 A1 As indicated C00
1 1 : 50 3 1 : 50 DRAWING NO.
MAS-P2AB-STR-CL1B-0602
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00

6 CURTAIN WALL 200mm 1.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.

the contractor, and shall be brought to engineer's attention in case it is exceeded.


2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBI YBJ YBK

33300
4200 2700 2700 3800 6500 3800 2700 2700 4200

XB6
2 2
1300

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


XB5 NO DATE BY REVISION APP
2 2 R E V I S I O N
PROJECT :
4200

VILLAS AT PHASE 02 OF MASAAR


1 1
1 CLIENT

XB4
1600

XB3
MASAAR DEVELOPMENTS LLC
CONSULTANT
17000

3 3 3
3800

TVT
TTV

TTV

XB2

4 2 4 MEP ENGINEER
6100

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XB1
CL1B - FIRST FLOOR - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


FIRST FLOOR LOADING PLAN D21-44 A1 1 : 100 C00
1 DRAWING NO.
1 : 100
MAS-P2AB-STR-CL1B-0901
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00

6 CURTAIN WALL 200mm 1.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.

the contractor, and shall be brought to engineer's attention in case it is exceeded.


2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBI YBJ YBK

33300
4200 2700 2700 3800 6500 3800 2700 2700 4200

XB6
1300

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


4000

4000
XB5 6 6 NO DATE BY REVISION APP

7 R E V I S I O N
PROJECT :
4200

VILLAS AT PHASE 02 OF MASAAR

CLIENT

XB4
1600

XB3 8
MASAAR DEVELOPMENTS LLC
CONSULTANT
17000

3800

D
D

D
D

XB2
6 6
D
D

7
MEP ENGINEER
6100

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XB1
CL1B - ROOF - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


ROOF LOADING PLAN D21-44 A1 1 : 100 C00
1 DRAWING NO.
1 : 100
MAS-P2AB-STR-CL1B-0902
NORTH

CL1C - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
F01 1000 1000 300 T12-200 T12-200 - - Denotes Slab Opening
F03 1300 1700 400 T12-150 T12-150 - -
F04 1500 1900 400 T16-200 T16-200 - - 200 Denotes Slab / Raft Thickness In mm.
F05 1700 2100 400 T16-200 T16-200 - -
F06 1900 2300 400 T16-200 T16-200 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
M 02 C
F08 2300 2700 400 T16-200 T16-100 - -
S.S.L. +1.000 Slab Surface Level in M
Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For Grade of Concrete of the Foundation and Ground Beams ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
refer to General Notes drawing No. MAS- P2AB-STR-0002. TO COMMENCEMENT OF ANY WORK.
4. The Allowable net bearing capacity at Foundation level is as per
Soil Investigation Report No. RSl2022-0185 SHJ, issued by
M/S ELEMENT ENG'G LABORATORY, dated 27/08/2022.
6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
7. The contractor to conduct the required tests and confirm soil
bearing capacities before foundation construction.
8. For plots with narrow space between asset footprint and
boundary wall, the contractor shall submit shop drawings in light
of the measures below for the engineer’s review, and
implement the advised work without extra cost.
8.1 The water tank shall be moved to avoid the clash
considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
39800
SUBJECT TO AUTHORITIES APPROVALS
4200 2700 2700 3800 3800 2700 2700 3800 3800 2700 2700 4200

PLOT PLOT
LINE LINE

FOR BOUNDARY WALL DETAILS


REFER TO SHEET
MAS-P2AB-STR-GEN-0006

WORKING LOAD FROM COLUMN


ENVELOPE SERVICE REACTION
480kN 730kN 730kN 480kN

XC6 540kN 530kN 530kN


1300

XC5 F03 F03


F06 F06
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
F04 F04 F04 NO DATE BY REVISION APP
4200

R E V I S I O N
620kN 760kN 960kN 960kN 760kN 620kN
750kN PROJECT :

VILLAS AT PHASE 02 OF MASAAR


XC4
540kN 540kN CLIENT
1600

F05 F06 F06 F05


F06
420kN F08 430kN 420kN F08 420kN
XC3
17000

F04 F04
MASAAR DEVELOPMENTS LLC
3800

560kN 750kN 540kN 750kN 550kN


530kN 450kN
F03 450kN
F03 450kN
F03 460kN
F03 530kN
CONSULTANT

XC2
430kN 430kN
F04 F05 F04 F06 F04 F05 F04 F06 F04 F05 F04
6100

F03 F03
LOWERED LOWERED MEP ENGINEER
BOTTOM OF FOOTING BOTTOM OF FOOTING
B.O.F. -1.400 B.O.F. -1.400

130kN 130kN WATER TANK DETAILS 110kN 130kN 130kN


REFER TO DWG NO.
MAS-P2AB-STR-CL1C-301
STAGE LOCATION
F01 F01 F01 F01 F01
XC1 PLOT PLOT
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE
LINE LINE
DRAWING TITLE :

CL1C - FOUNDATION PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FOUNDATION PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1C-0101
NORTH

CL1C - BEAMS SCHEDULE - GROUND FLOOR LEGEND:


Column / Wall Continuous
BOTTOM
OVER ALL SIZE (mm) REINFORCEMENT TOP REINFORCEMENT STIRRUPS Column / Wall Stop Below Slab Level
BEAM MARK EXTRA AT SID BARS
REMARKS
Floating (Planted) Column / Wall (FC/FW)
STRAIGHT STRAIGHT FROM
EXTRA AT CONT. EXTRA AT END MID SPAN NO. OF EACH FACE Denotes Slab Opening KEY PLAN
WIDTH DEPTH THROUGH THROUGH SUPPORT TO
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS
OUT OUT L/3
L/4 OF SPAN L/4 OF SPAN 200 Denotes Slab / Raft Thickness In mm.
G-B01 200 500 2T12 - 2T12 2T12 - T10 - 200 T10 - 200 2 - -
G-B02 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B03 200 500 2T16 - 2T16 2T12 2T16 T10 - 200 T10 - 200 2 - - M 02 C
G-B04 200 500 2T12 - 2T12 - 2T12 T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M
G-B05 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - -
Top extra rebars
G-B06 200 500 2T12 - 2T16 - - T10 - 200 T10 - 200 2 -
Bottom extra rebars
G-CB01 200 500 2T12 - 2T16 - - T10 - 200 T10 - 200 2 - -
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
mesh unless otherwise mentioned on the drawings. TO COMMENCEMENT OF ANY WORK.
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
39800
SUBJECT TO AUTHORITIES APPROVALS
4200 2700 2700 3800 3800 2700 2700 3800 3800 2700 2700 4200

PLOT PLOT
LINE LINE

FOR BOUNDARY WALL DETAILS


REFER TO SHEET
MAS-P2AB-STR-GEN-0006

G-B04 G-B04
XC6
1300

G-B02 G-B02 G-B02 G-B02


XC5
G-B02

G-B02
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
G-B05

G-B05
G-B02

G-B02
100 100
100 100 100 100 NO DATE BY REVISION APP
G-B02
G-B02

G-B02

SLAB ON GRADE SLAB ON GRADE


4200

R E V I S I O N
SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE
S.S.L.-0.100 S.S.L.-0.100 PROJECT :
G-CB01

G-CB01
S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100

G-B02
UP
G-B02 G-B02 G-B02 G-B02 G-B02 VILLAS AT PHASE 02 OF MASAAR
UP
XC4

50
UP

CLIENT
1600

STAIRCASE-1 G-01 STAIRCASE-1


0301 STAIRCASE-2 STAIRCASE-2
XC3 G-B06 STAIRCASE-2 STAIRCASE-2 G-B06
G-B06 G-B06 G-B06 G-B06
G-B02

G-B02
G-B02

G-B02
17000

G-B02

150MM THK. PLAIN 150MM THK. PLAIN 150MM THK. PLAIN


G-B06

G-B06

G-B06

MASAAR DEVELOPMENTS LLC


G-B06

G-B06
3800

CONCRETE CONCRETE CONCRETE


G-B03

G-B03
G-B06

200 200
CONSULTANT
RC SLAB RC SLAB
S.S.L.-0.550 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 S.S.L.-0.550
XC2
100 100 100 100 100 100
G-B02

G-B02
G-B02

SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE
S.S.L.-0.400 S.S.L.-0.250 S.S.L.-0.250 S.S.L.-0.250 S.S.L.-0.250 S.S.L.-0.400
G-B02

G-B02

G-B06 G-B06
6100

T.O.B. -0.400 T.O.B. -0.400 MEP ENGINEER


200 200 200 200

RC SLAB RC SLAB RC SLAB RC SLAB


S.S.L.-0.670 S.S.L.-0.670 S.S.L.-0.670 S.S.L.-0.670

STAGE LOCATION
XC1 PLOT
ISSUED FOR TILAL, ALSUYOH SUBURB,
PLOT CONSTRUCTION SHARJAH,UAE
LINE WATER TANK DETAILS
REFER TO DWG NO. LINE
MAS-P2AB-STR-CL1C-0301 DRAWING TITLE :

CL1C - GROUND FLOOR - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

GROUND FLOOR - FRAMING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1C-0102
NORTH

CL1C - BEAMS SCHEDULE - FIRST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVER ALL SIZE
BOTTOM
TOP REINFORCEMENT STIRRUPS
Type Dia. & Spacing Type Length & Shape
REINFORCEMENT Column / Wall Stop Below Slab Level
EXTRA AT EXTRA AT SID BARS 1 T12-400 C/C A 1500 Floating (Planted) Column / Wall (FC/FW)
Mark STRAIGHT STRAIGHT FROM REMARKS
EXTRA AT CONT. END MID SPAN NO. OF EACH FACE 2 T12-200 C/C B 2000 KEY PLAN
WIDTH DEPTH THROUGH THROUGH SUPPORT TO Denotes Slab Opening
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS
OUT OUT L/3 3 T16-200 C/C C 2400
L/4 OF SPAN L/4 OF SPAN 200 Denotes Slab / Raft Thickness In mm.
1-B01 200 600 2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
1-B01a 200 900 2T12 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - PS1
E 3600 Denotes Slab / Raft Punching Shear RFT Type.
1-B02 200 1250 2T12 - 2T16 2T12 - T10 - 200 T10 - 200 2 3T10 - M 02 C
1-B03 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 3T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M
1-B03a 200 900 2T12 - 2T12 2T12 - T10 - 200 T10 - 200 2 3T10 - G 4400 Top extra rebars
1-B04 200 900 2T12 - 2T16 - - T10 - 200 T10 - 200 2 3T10 -
H 4800 Bottom extra rebars
1-B04a 200 900 2T16+2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 3T10 -
* Inverted Beam
1-B05 200 1000 2T16 2T12 2T16 2T12 2T16 T10 - 200 T10 - 200 2 3T10 - J 5400 NOTES
1-B05a 200 1000 2T16+2T16 - 2T16 - 2T16 T10 - 200 T10 - 200 2 3T10 - K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1-B06 200 1100
900/1100 2T12 - 2T16+2T16 - - T10 - 200 T10 - 200 2 3T10 - NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT

1-B07 200 1050 2T12 - 2T12 - - T10 - 200 T10 - 200 2 3T10 -
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
1-B08 200 1250
900/1250 2T12 - 2T16+2T12 - - T10 - 200 T10 - 200 2 3T10 - M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
1-B09 200 1250 2T16 2T20 2T16 2T16 2T12 T10 - 200 T10 - 200 2 3T10 - 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
N 7500 2. All RC Slabs to be 200 mm thick. unless otherwise mentioned ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1-B10 200 1100 2T16 - 2T16 2T16 - T10 - 200 T10 - 200 2 3T10 - on the drawings. TO COMMENCEMENT OF ANY WORK.

1-B11 200 1250


900/1250 2T16 2T16 2T16+2T12 - - T10 - 200 T10 - 200 2 3T10 - P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
1-B12 200 600 2T16 2T16 2T16 2T16 2T12 T10 - 125 T10 - 200 2 - - Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
1-B13 200 900 2T16 2T16 2T16 2T16 - T10 - 200 T10 - 200 2 3T10 - to the typical mesh mentioned above.
R 9000
1-CB01 200 600 2T12 - 2T20 2T12 - T10 - 150 - 2 - - 5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
1-CB02 200 900 2T12 - 2T20 2T12 - T10 - 150 - 2 3T10 -
1-CB03 200 900 2T12 - 2T20 2T16 - T10 - 150 - 2 3T10 - 6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape
U 10,500 7. For concrete grade of slabs & beams refer to General Notes
XC1 Type (dia & spacing) drawing no.STR-GEN-0002
BEAM REINF. Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
AS/SCHED. 9. The slabs design adheres to L/240 deflection limit (25mm slab
Nos. of bars W 11,500
deflection for 6.0m span, curtain walls and any non-structural
F.F.L.
3500
500 4525 X 12,000 elements attached to structural concrete need to allow for joint
A to X to accommodate the slab deflection of L/240 without sustaining
1ST FLOOR
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.
900

1250

COLUMN
BEAM 1-CB02 AS/SCHED. LEGEND:
AS/SCHED.
BEAM SUPPORTING
STAIR LANDING Stair Opening Boundary SIGNED
Additional Rebars
NOTE: SIMILAR TO BEAM 1-B06 & 1-B08. D<-!,11a11
BEAM 1-B11 TYP. DETAIL 3T16 TOP & BOT Architects+
1-B11 1 : 50
Engineers

YCA YCB YCC YCD YCE YCF YCG YCH YCI YCJ YCK YCL YCM
500X200 Hidden Beam
TOP BAR: 5T16
BOTTOM BAR: 5T16 ISSUED FOR CONSTRUCTION
■•
39800 STIRRUPS: 4 LEGS OF T10-150 SUBJECT TO AUTHORITIES APPROVALS
4200 2700 2700 3800 3800 2700 2700 3800 3800 2700 2700 4200

PLOT PLOT
LINE LINE
1-CB01 *

1-CB01 *
1-B05a 1-B05a
XC6
1300

11-t3C 1-B05 1-B05 1-B05 1-B05 11-t3C

XC5
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
1-B01 *

1-B01 *
1-B12

NO DATE BY REVISION APP


27-t2D

27-t2D
1-B12

200 200 200 200


1-B12

1-B12

1-B12
4200

R E V I S I O N
46-b2F

RC SLAB RC SLAB RC SLAB RC SLAB

46-b2F
PROJECT :
44-b2G S.S.L.+3.400 S.S.L.+3.400 S.S.L.+3.400 S.S.L.+3.400 44-b2G

80
0
80

0
0

0
80

80
80

80
VILLAS AT PHASE 02 OF MASAAR
0

0
11-t2C

275
275
500 275

500 275

400
XC4
11-t2C

11-t2C
600 400

6-t2C
500

500
6-t2C

CLIENT

600
1600

100 1600 600 500 1950 100 500 1250 1250 500 500 1250 600 1600 100
XC3

80
0
80

0
1-B01a

1-B01a
1-B09

1-B12

1-B09

1-B12

1-B09
80

80
0

9-t3C 9-t3C
80

80
0

0
17000

200 1-01 200


1-B10

1-B10
9-t1C 9-t1C 9-t1C 9-t1C
MASAAR DEVELOPMENTS LLC
3800

0301
1-B02

1-B02

RC SLAB T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH RC SLAB
T12-200 BOT MESH T12-200 BOT MESH T12-200 BOT MESH T12-200 BOT MESH
1-B02
1-B02

CONSULTANT
S.S.L.+3.400 S.S.L.+3.400
T12-200 TOP MESH STAIRCASE-1 STAIRCASE-2 STAIRCASE-2 STAIRCASE-2 STAIRCASE-2 STAIRCASE-1
T12-200 TOP MESH
T12-200 BOT MESH
XC2 T12-200 BOT MESH
1-B03 1-B07 1-B07 1-B11 1-B07 1-B07 1-B03
1-B06

1-B08

1-B08

1-B08

1-B08

1-B06

0103
S.S.L. +3.300 S.S.L. +3.300 S.S.L. +3.300 S.S.L. +3.300 S.S.L. +3.300 S.S.L. +3.300
1-B13

1-B13

1-B04a 1-B04 1-B04 1-B04 1-B04 1-B04a


6100

MEP ENGINEER
1-B11

1-B11

1-B11

1-02

1-CB03
0301
1-CB03

DOWNSTAND
WALL REFER TO
TYP. DETAILS
1-CB02

1-CB02

1-CB02

1-CB02

1-CB02

SECTION 1-02
STAGE LOCATION
XC1 PLOT
ISSUED FOR TILAL, ALSUYOH SUBURB,
1-B03a 1-B03 1-B03 1-B03 1-B03 1-B03a PLOT CONSTRUCTION SHARJAH,UAE
LINE
LINE
DRAWING TITLE :
T.O.B.+3.500 T.O.B.+3.500 T.O.B.+3.500
CL1C - FIRST FLOOR - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - FRAMING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 As indicated C00
DRAWING NO.
MAS-P2AB-STR-CL1C-0103
NORTH

CL1C - BEAMS SCHEDULE - ROOF Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVER ALL SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT SID BARS Column / Wall Stop Below Slab Level
BEAM STRAIGHT STRAIGHT FROM
MARK EXTRA AT CONT. END MID SPAN NO. OF EACH REMARKS 1 T12-400 C/C A 1500 Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH THROUGH THROUGH SUPPORT FACE
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 2 T12-200 C/C B 2000 Denotes Slab Opening
R-B02 200 700 2T12 - 2T16 2T12 - T10 - 200 T10 - 200 2 2T10 - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B02a 200 700 2T16 - 2T16 - - T10 - 200 T10 - 200 2 2T10 - 4 T16-100 C/C D 3000
R-B03 200 700 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 2T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
R-B04 200 700 2T16+2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 2T10 -
E 3600 M 02 C
R-B05 200 800 2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M
R-CB01 200 700 2T12 - 2T20 2T12 - T10 - 150 - 2 2T10 - G 4400 Top extra rebars
R-CB02 200 700 2T12 - 2T20 2T16 - T10 - 150 - 2 2T10 - Bottom extra rebars
H 4800
* Inverted Beam
J 5400 NOTES

K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
L 6600 EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
R 9000 5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500 drawing no.STR-GEN-0002
Type (dia & spacing)
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
9. The slabs design adheres to L/240 deflection limit (25mm slab
Nos. of bars W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X damage or non-functionality as a result of slab deflection.
*
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
SUBJECT TO AUTHORITIES APPROVALS
39800
4200 2700 2700 3800 3800 2700 2700 3800 3800 2700 2700 4200

PLOT PLOT
LINE LINE
R-CB01

R-CB01
XC6 68-b4K 68-b4K
1300

11-t3C 11-t3C

XC5
PARAPET WALL TOP OF PARAPET
R-B04
63-t4K

63-t4K
63-b4K

AS/TYP. DET. AS/ARCH.


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION

R-B03
R-B03

R-B04
NO DATE BY REVISION APP
R-B04

31-t3D
31-t3D
4200

R E V I S I O N
R-B04

R-B04

T.O.B. +7.150 T.O.B. +7.150 T.O.B. +7.150 T.O.B. +7.150


68-t4K 200 200 200 200 T.O.B. +7.150 68-t4K PROJECT :
28-t2C

28-t2C

28-t2C

RC SLAB RC SLAB RC SLAB RC SLAB 63-b4K

S.S.L.+6.900 S.S.L.+6.900 S.S.L.+6.900 S.S.L.+6.900


VILLAS AT PHASE 02 OF MASAAR
800 360
XC4 800
800 175

800 175

800 175

800 175

800 800 800


375

725 375
600 400

600 400
360 800
CLIENT
1600

500 725

725

500 725
250 800

250 800
1725 600 950 1600 1600 950 950 1600 1600 950 600 1725
500

300 300 T.O.B. +7.150 300


XC3
11-t2B

11-t2B
R-B05

R-B05
R-B04
R-B04
11-t1B

11-t1B

11-t1B
11-t1B

11-t2B 11-t2B
17000

200 200
R-B05
R-B02 *

R-B02 *
MASAAR DEVELOPMENTS LLC
3800

R-B03
R-B03

T.O.B. +7.150 T.O.B. +7.150 T.O.B. +7.150


RC SLAB RC SLAB
R-B02

T.O.B. +7.150
R-B02
R-B02

T.O.B. +7.150 T.O.B. +7.150 CONSULTANT


S.S.L.+6.900 S.S.L.+6.900
R-B02

R-01
T12-200 TOP MESH T12-200 TOP MESH
0301
T12-200 BOT MESH
R-CB01

R-CB01

R-CB01

T12-200 BOT MESH


XC2 T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH
R-CB02

R-CB02

T12-200 BOT MESH T12-200 BOT MESH T12-200 BOT MESH T12-200 BOT MESH
R-CB02 *
R-CB02 *

R-CB02

R-CB02

R-CB02

R-CB02

R-B02a * R-B02a *
6100

MEP ENGINEER

STAGE LOCATION
XC1 PLOT
ISSUED FOR TILAL, ALSUYOH SUBURB,
PLOT CONSTRUCTION SHARJAH,UAE
LINE
LINE
DRAWING TITLE :

CL1C - ROOF - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF FLOOR - FRAMING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1C-0104
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
CW DENOTES CORE WALL

NOTES

NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing
series STR-0401.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
SUBJECT TO AUTHORITIES APPROVALS

39800
6900 2700 3800 3800 2700 2700 3800 3800 2700 2700 4200
PLOT PLOT
LINE LINE

100 100 100 100


XC6
1000

1000
1300

1400

1400
100 100 100
100

100

100

XC5 200 C06 200 C06


800

800

800
200 C07 200 C07
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
200 C03 200 C03 200 C03 NO DATE BY REVISION APP
R E V I S I O N
4200

PROJECT :
100 200 100 100
100 100 100 VILLAS AT PHASE 02 OF MASAAR
900

900

900

900
900

900

900

XC4
150

150

150

150
350

350

350

CLIENT
200 C04 100 C04 200 C04 200 C04
1600

200 C04 200 C04 200 C04


100 100
XC3
50

50
700

700
100 100
700

700

700

700

100 100
700

700

700

700

200 C02 200 C02


17000

200 C02 MASAAR DEVELOPMENTS LLC


3800

200 C02 200 C02 200 C02


CONSULTANT
100 100 100 100 100
100 100 100 100 100 100
1000

1000

1000

1000

1000
600

600

600

600

600

600
XC2
100

100

100

100

100

100

100

100

100

100

100

200 C01 200 C05 200 C01 200 C05 200 C01 200 C05 200 C01 200 C05 200 C01 200 C05 200 C01
100 100
1000

1000
200 C05 200 C05
6100

MEP ENGINEER

100 100 100 100 100


500

500

500

500

500

STAGE LOCATION
500

500

500

500

XC1 200 C08 200 C08 200 C08 200 C08 200 C08 ISSUED FOR TILAL, ALSUYOH SUBURB,
PLOT PLOT CONSTRUCTION SHARJAH,UAE
LINE LINE
DRAWING TITLE :

CL1C - FOUNDATION & GROUND FLOOR -


COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022
FOUNDATION & GROUND FLOOR - COLUMN LAYOUT JOB NO. SHEET SIZE SCALE REV. NO.
2 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL1C-0201
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
CW DENOTES CORE WALL

NOTES

NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing
series STR-0401.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
SUBJECT TO AUTHORITIES APPROVALS
39800
6900 2700 3800 3800 2700 2700 3800 3800 2700 2700 4200

PLOT PLOT
LINE LINE

100 100 100 100


XC6
1000

1000
1300

1400

1400
100 100 100
100

100

100
XC5
100

200 C06 200 C06


800

800

200 C07 800 200 C07


200 C03 200 C03 200 C03 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
4200

R E V I S I O N
PROJECT :
100 100 100 100
100 100 100
VILLAS AT PHASE 02 OF MASAAR
900

900

900

900
900

900

900

XC4
150

150

150

150
350

350

350

200 C04 200 C04 200 C04 200 C04 CLIENT


1600

200 C04 200 C04 200 C04


100 100
XC3 100 100 100 100
700

700
650

650
700

700

700

700
700

700

700

700

200 C02 200 C02


17000

MASAAR DEVELOPMENTS LLC


3800

200 C02 200 C02 200 C02 200 C02


100 100 100 100 100 CONSULTANT
100 100 100 100 100 100
1000

1000

1000

1000

1000
600

600

600

600

600

XC2 600
100

100

100

100

100

100

100

100

100

100

100

200 C01 200 C05 200 C01 200 C05 200 C01 200 C05 200 C01 200 C05 200 C01 200 C05 200 C01
100 100
1000

1000
200 C05 200 C05
6100

MEP ENGINEER

STAGE LOCATION
XC1 PLOT PLOT
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE
LINE LINE
DRAWING TITLE :

CL1C - FIRST FLOOR - COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE

1ST FLOOR - COLUMN LAYOUT DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1C-0202
NORTH

KEY PLAN

M 02 C
XC2
BEAM 1-B06
XC2 F.F.L. AS/SCHED. F.F.L.
BEAM
RC SLAB ELEVATION 200
3500 3500
COMPRESSIBLE 150 MM THK. PLAIN AS/PLAN
F.F.L. BEAM 1ST FLOOR 1ST FLOOR NOTES
MATERIAL AS PER SLAB ON GRADE CONCRETE S.S.L.
0 AS/SCHED.
TYP. DETAILS

200

200
AS/PLAN +3.300 m 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
GROUND FLOOR COLUMN EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT

150 100
S.S.L. ELEVATION ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM

200
BEAM EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
-0.250 m 2. THIS DRAWING IS NOT TO BE SCALED. STATED
AS/SCHED. T12-200
DIMENSIONS ONLY ARE TO BE CONSIDERED.

900
T10-200 EF 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
BEAM ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
VERIFY S.S.L. TO COMMENCEMENT OF ANY WORK.
AS/SCHED. STAIR LANDING AS/ARCH.

500
AS/DETAIL

BEAM
S.S.L.
AS/SCHED.
-1100
DOWNSTAND
FOUNDATION LEVEL
WALL
S.S.L.
200 1100 200 875
-1150
EXCAVATION LEVEL
FOUNDATION
AS/PLAN

SECTION G-01 SECTION 1-01 SECTION 1-02


G-01 1 : 20 1-01 1 : 20 1-02 1 : 20

100 100
200 800 200
T12-150 CLEAR OPENING SIGNED
S.S.L. -0.320m
T12-150
D<-!,11a11
Architects+
200

PARAPET PARAPET
Engineers

■•
WALL WALL
T12-150
300

Hmax = 1600MM

Hmax = 1600MM
T12-150 T12-150 T10-200 EF T10-200 EF ISSUED FOR CONSTRUCTION
T12-200 EF SUBJECT TO AUTHORITIES APPROVALS
T12-150 T12-200 EF T12-200 EF
WATER SURFACE LEVEL
GRP LINING
200 200
F.F.L. AS PER F.F.L. AS PER
1500

T10-200 EF
ARCH. ARCH. (TYPICAL)
2 LAYERS OF BITUMINOUS
1200

PROTECTIVE COAT AS/SPECS


S.S.L. AS PER S.S.L. AS PER
FRAMING PLAN FRAMING PLAN
PVC WATER STOPER PVC WATER STOPER
PLAN
T12-150
S.S.L. -2.020m
T12-150
150

150

REINJECTABLE HOSE REINJECTABLE HOSE


UP-STAND
200

BEAM AS/PLAN
RC SLAB & SCHED. RC SLAB
AS/PLAN AS/PLAN

200 VARIES 200


CASE 1 (EDGE) CASE 2
LEAN CONCRETE
NOTES:
2 LAYERS OF BITUMINOUS • "H" IS THE PARAPET HEIGHT AS PER ARCHI.
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
PROTECTIVE COAT AS/SPECS
NO DATE BY REVISION APP
WELL COMPACTED SOIL UP TO 95% OF R E V I S I O N
MAXIMUM DRY DENSITY
TYPICAL WATER TANK DETAILS TYPICAL DETAIL OF PARAPET WALL PROJECT :

WT 1 : 20 PW 1 : 20 VILLAS AT PHASE 02 OF MASAAR

CLIENT

MASAAR DEVELOPMENTS LLC


BEAM LINKS
CONSULTANT
S

BEAM TOP BARS AS 100MM UP-STAND


PER BEAM SCEH. 100 WALL
MIN. 2T12 S.S.L.
W W
+7.150 m
2T16 TOP BARS
Ld
VL BARS AS PER VL BARS AS PER
T10-200
COLUMNS SCEHD. COLUMNS SCEHD. T12@100 HORIZONTAL
MIN. 600mm

CLOSED STIRRUPS
S/2

RC SLAB
250

T12-200
LINKS BEAM TOP BARS AS LINKS AS/PLAN
L

BEAM BARS TO BE VL BARS AS PER S.S.L.


PER BEAM SCEH.
EXTENDED IN COLUMNS SCEHD. 6900
MIN. 2T16
CANTILEVER AS MEP ENGINEER
ROOF PLAN
SHOWN
SHORT CANTILEVER

SHORT CANTILEVER

BEAM
L=AS PLAN

L=AS PLAN

200

W=600 mm
S

MIN.
S

STAGE LOCATION
COL. LINKS ISSUED FOR TILAL, ALSUYOH SUBURB,
BEAM BEAM CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
PLAN PLAN SECTION
CL1C - STRUCTURAL DETAILS - 1
CASE 1 CASE 2 BEAM
ELEVATION
SHORT CANTILEVER WITH EXTENSION SHORT CANTILEVER WITHOUT EXTENSION
DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


D21-44 A1 As indicated C00
TYPICAL SHORT CANTILEVER DETAIL SECTION R-01
SCB 1 : 20 R-01 1 : 10
DRAWING NO.
MAS-P2AB-STR-CL1C-0301
NORTH

COLUMNS - SCHEDULE AND TYPICAL DETAILS


KEY PLAN
NOTES:

1.Splice of vertical bars shall be made at mid-height of the column , and shall be
400/500 600 / 700 600 / 700 800 / 900 800 / 900 1000 / 1100 1000 / 1100 staggered at least Ld.
2.Splice of each individual bar within a bundle shall be staggered at least Ld. M 02 C
3.Mechanical splice shall be used where reinforcement ratio exceeds or equals 4%.
200

200

200

200

200

200

200
TYPE 1 TYPE 2 TYPE 2A TYPE 3 TYPE 3A TYPE 4 TYPE 4B
NO. OF BARS: 8 NO. OF BARS: 10 NO. OF BARS: 10 + 4 = 14 NO. OF BARS: 12 NO. OF BARS: 12 + 4 = 16 NO. OF BARS: 14 NO. OF BARS: 14 + 8 = 22 NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
1300/1400/1500
400/500 1000 / 1100
200

200

200
TYPE 5
NO. OF BARS: 18 TYPE 1A TYPE 4A
NO. OF BARS: 8 + 4 = 12 NO. OF BARS: 14 + 4 = 18

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

TOP ROOF FLOOR TOP ROOF FLOOR


S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
C40 C40
PROJECT :
ROOF FLOOR ROOF FLOOR
S.S.L. S.S.L. VILLAS AT PHASE 02 OF MASAAR
-XX.XXX M -XX.XXX M

CLIENT

SECTION : 200 X 500


TYPE : 4A
C40 V-BARS : 14T16 C40
ADD. V : 4T16 MASAAR DEVELOPMENTS LLC
1ST FLOOR LINKS : T10-200 1ST FLOOR CONSULTANT
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C40 C40
MEP ENGINEER
GROUND FLOOR GROUND FLOOR
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
SECTION : 200 X 600 SECTION : 200 X 700 SECTION : 200 X 800 SECTION : 200 X 900 SECTION : 200 X 1000 SECTION : 200 X 1000 SECTION : 200 X 1400 SECTION : 200 X 500 CONSTRUCTION SHARJAH,UAE
TYPE : 2 TYPE : 2 TYPE : 3 TYPE : 3 TYPE : 4 TYPE : 4 TYPE : 5 TYPE : 1A DRAWING TITLE :
C40 V-BARS : 10T16 V-BARS : 10T16 V-BARS : 12T16 V-BARS : 12T16 V-BARS : 14T16 V-BARS : 14T16 V-BARS : 18T16 V-BARS : 8T12 C40
ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : 4T12 CL1C - COLUMNS SCHEDULE
FOUNDATION LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 FOUNDATION
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

DRAWN BY CHECKED BY APPROVED BY DATE

LEVEL LEVEL DAE DAE DAE 14/12/2022


CONC. CONC.
GRADE
C01 C02 C03 C04 C05 C06 C07 C08 GRADE JOB NO. SHEET SIZE SCALE REV. NO.
COLUMN COLUMN
MARK MARK D21-44 A1 1 : 20 C00
DRAWING NO.
MAS-P2AB-STR-CL1C-0401
NORTH

YCK YCL
KEY PLAN
2700

M 02 C

T10-200 FLOOR SLAB


(TYP.) AS/PLAN
4 T8 (TYP.)
0601 NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
FLOOR BEAM T12-150 EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
XC4 AS/SCHEDULE 2. THIS DRAWING IS NOT TO BE SCALED. STATED
T12-150 T10-200 DIMENSIONS ONLY ARE TO BE CONSIDERED.
30

200
T12-150 T10-200
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
T12-150 TO COMMENCEMENT OF ANY WORK.
1600

200
YCK YCL
XC3
2700
F.F.L. T12-150
3500
1ST FLOOR T12-150

DETAILS OF STAIRCASE FLIGHT-C


1200 1300
3800

3500
XC2 F.F.L.
G-CB01
0 FLOOR BEAM
SIGNED
GROUND FLOOR AS/SCHEDULE
D<-!,11a11

100
T12-150 Architects+

1150
120 Engineers
S.S.L. T12-150 0

■•
-1100
FOUNDATION LEVEL
3 T12-150

200
S.S.L.
0601 -1150 T10-200 ISSUED FOR CONSTRUCTION
EXCAVATION LEVEL SUBJECT TO AUTHORITIES APPROVALS
T12-150
T12-150
T10-200
STAIRCASE 1 - FIRST FLOOR PLAN STAIRCASE 1 - SECTION 2 (TYP.)
2 1 : 50 4 1 : 50 T8 (TYP.)

T12-150
T10-200 120
0

200
T12-150
T10-200

T12-150
T12-150

200
YCK YCL
T12-150 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
2700 DETAILS OF STAIRCASE FLIGHT-B NO DATE BY REVISION APP
T12-150
R E V I S I O N
PROJECT :

VILLAS AT PHASE 02 OF MASAAR

4 XC2 XC3 XC4 CLIENT

0601
3800 1600

XC4
1300
F.F.L. MASAAR DEVELOPMENTS LLC
3500
1ST FLOOR CONSULTANT
T12-150
1600

T12-150 T10-200
S.S.L. -0.100
S.S.L. (TYP.)
+2.617 m
XC3 T8 (TYP.)

200
FLIGHT-C
RC BEAM
AS/SCHEDULE
T12-150
T12-150 T12-150 T12-150

200
T10-200 T10-200 MEP ENGINEER
FLIGHT-B S.S.L.
+0.808 m SLAB
3800

AS/PLAN

F.F.L.
0 FLIGHT-A
GROUND FLOOR STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

S.S.L. DRAWING TITLE :


GRADE BEAM
-1100
AS/SCHEDULE
FOUNDATION LEVEL
XC2 CL1C - STAIRCASE-1 DETAILS
S.S.L.
-1150
EXCAVATION LEVEL
3
0601
DETAILS OF STAIRCASE FLIGHT-A DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


STAIRCASE 1 - SECTION 1 D21-44 A1 As indicated C00

1
STAIRCASE 1 - GROUND FLOOR PLAN
1 : 50
3 1 : 50
DRAWING NO.
MAS-P2AB-STR-CL1C-0601
NORTH

KEY PLAN

YCJ YCK

2700
M 02 C

NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
XC4 TO COMMENCEMENT OF ANY WORK.
1600

XC3
1375
3800

S.S.L. +2.500
T10-200 FLOOR SLAB
1300 1199 (TYP.) AS/PLAN

T8 (TYP.)
2600

2600

SIGNED
T12-150
XC2 FLOOR BEAM
T12-150 T10-200 D<-!,11a11
AS/SCHEDULE
T10-200 Architects+

200
Engineers

■•
T12-150
T12-150
ISSUED FOR CONSTRUCTION
SUBJECT TO AUTHORITIES APPROVALS

200
3
0602

T12-150
T12-150

STAIRCASE 2 - FIRST FLOOR PLAN


2 1 : 50
DETAILS OF STAIRCASE FLIGHT-B

YCJ YCK

2700

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :

VILLAS AT PHASE 02 OF MASAAR


4
0601
CLIENT
XC2 XC3 XC4 FLOOR BEAM
UP
AS/SCHEDULE
3800 1600
XC4
T12-150
F.F.L. T12-150
3500 MASAAR DEVELOPMENTS LLC
1600

1ST FLOOR
100

200
CONSULTANT
950

XC3
T12-150
T12-150
FLIGHT-B T10-200
(TYP.)
3500

T8 (TYP.)

200
2550

MEP ENGINEER
3800

FLIGHT-A

F.F.L.
0 T12-150 T12-150
GROUND FLOOR T10-200 T10-200
STAGE LOCATION
SLAB ISSUED FOR TILAL, ALSUYOH SUBURB,
1150

S.S.L. AS/PLAN CONSTRUCTION SHARJAH,UAE


-1100
XC2 FOUNDATION LEVEL DRAWING TITLE :
S.S.L.
-1150 CL1C - STAIRCASE-2 DETAILS
3 EXCAVATION LEVEL
0602
GRADE BEAM
AS/SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022
STAIRCASE 2 - GROUND FLOOR PLAN STAIRCASE 2 - SECTION 1
1 3
JOB NO. SHEET SIZE SCALE REV. NO.
DETAILS OF STAIRCASE FLIGHT-A
1 : 50 1 : 50 D21-44 A1 As indicated C00
DRAWING NO.
MAS-P2AB-STR-CL1C-0602
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00

6 CURTAIN WALL 200mm 1.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YCA YCB YCC YCD YCE YCF YCG YCH YCI YCJ YCK YCL YCM
39800
6900 2700 3800 3800 2700 2700 3800 3800 2700 2700 4200

XC6
2 2
1300

XC5
2 2
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
4200

R E V I S I O N
1 1 1 1 PROJECT :

VILLAS AT PHASE 02 OF MASAAR


XC4
CLIENT
1600

4 4
XC3
17000

MASAAR DEVELOPMENTS LLC


3800

3
3 3 CONSULTANT

XC2

4 4 4
6100

MEP ENGINEER

STAGE LOCATION
XC1 ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL1C - FIRST FLOOR - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - LOADING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1C-0901
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00

6 CURTAIN WALL 200mm 1.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YCA YCB YCC YCD YCE YCF YCG YCH YCI YCJ YCK YCL YCM
39800
6900 2700 3800 3800 2700 2700 3800 3800 2700 2700 4200

XC6
1300

4100

XC5 6 6
7 7
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
4200

R E V I S I O N
PROJECT :

VILLAS AT PHASE 02 OF MASAAR


XC4
CLIENT
1600

XC3
8 8 8 8
17000

MASAAR DEVELOPMENTS LLC


3800

CONSULTANT

XC2
4000

4000
6 6
7 7
6100

MEP ENGINEER

STAGE LOCATION
XC1 ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL1C - ROOF - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF - LOADING PLAN DAE DAE DAE 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL1C-0902
NORTH

CL2A - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
F01 1000 1000 300 T12-200 T12-200 - - - Denotes Slab Opening
F03 1300 1700 400 T12-150 T12-150 - - - KEY PLAN
F04 1500 1900 400 T16-200 T16-200 - - - 200 Denotes Slab / Raft Thickness In mm.
F05 1700 2100 400 T16-200 T16-200 - - -
F06 1900 2300 400 T16-200 T16-200 - - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
F08 2300 2700 400 T16-200 T16-100 - - -
S.S.L. +1.000 Slab Surface Level in M M 02 C
F09 2500 2900 450 T16-200 T16-100 - - -
F10 2700 3100 450 T16-200 T16-150 - - - Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
3. For Grade of Concrete of the Foundation and Ground Beams DIMENSIONS ONLY ARE TO BE CONSIDERED.
refer to General Notes drawing No. MAS- P2AB-STR-0002. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
4. The Allowable net bearing capacity at Foundation level is as per TO COMMENCEMENT OF ANY WORK.
Soil Investigation Report No. RSl2022-0185 SHJ, issued by
M/S ELEMENT ENG'G LABORATORY, dated 27/08/2022.
6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
7. The contractor to conduct the required tests and confirm soil
bearing capacities before foundation construction.
8. For plots with narrow space between asset footprint and
boundary wall, the contractor shall submit shop drawings in light
of the measures below for the engineer’s review, and
implement the advised work without extra cost.
8.1 The water tank shall be moved to avoid the clash
considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED

D<-!,11a11
Architects+
Engineers

■•
YAB
YAA YAC YAD YAE YAF YAG YAH YAI
30600 ISSUED FOR CONSTRUCTION
5100 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
FOR BOUNDARY WALL DETAILS LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006

WORKING LOAD FROM COLUMN


ENVELOPE SERVICE REACTION

1130kN 960kN 1130kN


645kN 645kN

XA6

F06 F06
F09 F08 F09
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


F08 1160kN F08 NO DATE BY REVISION APP
895kN 895kN
R E V I S I O N
PROJECT :
XA5
VILLAS AT PHASE 02 OF MASAAR
2300

640kN 640kN
685kN 565kN 565kN 685kN

CLIENT
XA4 F10
17150

F06 F05 F05 F06


4000

F06 755kN
F06
275kN 510kN 450kN 450kN 450kN 450kN 510kN 275kN MASAAR DEVELOPMENTS LLC
CONSULTANT
LOWERED LOWERED
BOTTOM OF FOOTING BOTTOM OF FOOTING
XA3 B.O.F. -1.400 B.O.F. -1.400

F03 F04 F04 F04 F06 F04 F04 F04 F03


2275

LOWERED
F03
LOWERED BOTTOM OF FOOTING LOWERED
XA2 BOTTOM OF FOOTING B.O.F. -1.400 BOTTOM OF FOOTING
B.O.F. -1.400 B.O.F. -1.400
F03 F03 355kN F03
300kN 270kN 270kN F03 300kN
MEP ENGINEER
3725

WATER TANK DETAILS WATER TANK DETAILS


REFER TO SHEET 90kN 80kN 90kN REFER TO SHEET
MAS-P2AB-STR-CL2A-0301 MAS-P2AB-STR-CL2A-0301

XA1 STAGE LOCATION


F01 F01 F01
PLOT PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
LINE WATER TANK DETAILS LINE CONSTRUCTION SHARJAH,UAE
REFER TO SHEET
MAS-P2AB-STR-CL2A-0301 DRAWING TITLE :

CL2A - FOUNDATION PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FOUNDATION PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2A-0101
NORTH

CL2A - BEAM SCHEDULE – GROUND FLOOR LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
G-B01 200 500 2T12 + 2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - 200 Denotes Slab / Raft Thickness In mm.
G-B02 200 500 2T16 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B03 200 500 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B04 200 500 2T16 + 2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B05 200 500 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M M 02 C
G-B06 200 500 2T16 2T16 2T12 - - T10 - 200 T10 - 200 2 - - Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 DIMENSIONS ONLY ARE TO BE CONSIDERED.
mesh unless otherwise mentioned on the drawings. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned TO COMMENCEMENT OF ANY WORK.
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers

■•
YAB
YAA YAC YAD YAE YAF YAG YAH YAI
30600 ISSUED FOR CONSTRUCTION
5100 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
FOR BOUNDARY WALL DETAILS LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006

G-B04 G-B04 G-B04 G-B04


XA6

100 100 100 100


G-B03
4850

G-B06

G-B06

G-B06

G-B06
G-B03

G-B03

SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 NO DATE BY REVISION APP
G-B03

G-B03
R E V I S I O N
PROJECT :
XA5 UP UP UP UP
G-B05 G-B04 G-B04 G-B05
UP UP UP UP VILLAS AT PHASE 02 OF MASAAR
2300

CLIENT
XA4 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02
G-B03
G-B03

G-B03
17150

UP UP UP UP
300mm THK 300mm THK
G-B01
G-B01

G-B01

G-B01
G-B01

G-B01
4000

PLAIN CONCRETE PLAIN CONCRETE


MASAAR DEVELOPMENTS LLC
CONSULTANT

XA3
G-B01

G-B01

G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02


G-B01
G-B01

G-B01
2275

G-01 T.O.B.-0.400 T.O.B.-0.400


G-B04 0301 G-B04 G-B04 G-B04

XA2
T.O.B.-0.400 100 T.O.B.-0.400 T.O.B.-0.400 100 T.O.B.-0.400
G-B01
G-B01

G-B01

MEP ENGINEER
SLAB ON GRADE SLAB ON GRADE
3725

S.S.L.-0.400 S.S.L.-0.400
200 200
T.O.B.-0.400 T.O.B.-0.400
RC SLAB T.O.B.-0.400 RC SLAB
XA1 STAGE LOCATION
S.S.L.-0.550 S.S.L.-0.550
PLOT 200 PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
LINE LINE CONSTRUCTION SHARJAH,UAE
WATER TANK DETAILS WATER TANK DETAILS
REFER TO SHEET RC SLAB REFER TO SHEET
MAS-P2AB-STR-CL2A-0301 MAS-P2AB-STR-CL2A-0301 DRAWING TITLE :
S.S.L.-0.700
WATER TANK DETAILS CL2A - GROUND FLOOR - FRAMING PLAN
REFER TO SHEET
MAS-P2AB-STR-CL2A-0301

DRAWN BY CHECKED BY APPROVED BY DATE

GROUND FLOOR - FRAMING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2A-0102
NORTH

CL2A - BEAM SCHEDULE – FIRST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS 1 T12-400 C/C A 1500
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO 2 T12-200 C/C B 2000
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
1-B01 200 600 2T16 2T12 2T16 2T12 2T12 T10 - 125 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
1-B02* 200 600 2T16 2T12 2T16 2T12 - T10 - 150 T10 - 200 2 - INVERTED 4 T16-100 C/C D 3000
1-B03 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 2T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600
1-B04* 200 900 2T16 - 2T16 - - T10 - 200 T10 - 200 2 2T10 INVERTED
1-B05 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M M 02 C
1-B06* 200 900 2T16 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 2T10 INVERTED G 4400 Top extra rebars
1-B07 200 1000 2T16 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - Bottom extra rebars
H 4800
1-B07a 200 900 2T16 + 2T12 - 2T16+2T12 - - T10 - 200 T10 - 200 2 2T10 - * Inverted Beam
1-B08 200 1000 2T20 2T16 2T20 2T16 - T10 - 200 T10 - 200 2 3T10 - J 5400
1-B09 200 800
800/1000 2T16 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - K 6000 NOTES
1-CB01 200 900 2T12 - 2T20 2T16 - T10 - 150 - 2 2T10 - NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
L 6600 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
M 7200 STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings. 3.
DIMENSIONS ONLY ARE TO BE CONSIDERED.
ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom TO COMMENCEMENT OF ANY WORK.
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

LEGEND:

Stair Opening Boundary


Additional Rebars
SIGNED
3T16 TOP & BOT
D<-!,11a11
500X200 Hidden Beam Architects+
Engineers
TOP BAR: 5T16

■•
YAB BOTTOM BAR: 5T16
YAA YAC YAD YAE YAF YAG YAH YAI STIRRUPS: 4 LEGS OF T10-150

30600 ISSUED FOR CONSTRUCTION


5100 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
FOR BOUNDARY WALL DETAILS LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006

1-B08 1-B08 1-B08 1-B08


XA6
4850

1-B01

200 200
1-B01

16-t2D
16-t2D
1-B01

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


RC SLAB RC SLAB

41-b4F
41-b4F

NO DATE BY REVISION APP


1-B01

1-B01
S.S.L.+3.400 S.S.L.+3.400 R E V I S I O N
80

80

44-b4G 44-b4G
0

0
80

80
0

PROJECT :
XA5
VILLAS AT PHASE 02 OF MASAAR
400

1850 250 250 1850


2300

685 685
6-t3C

6-t2C

6-t2C

6-t3C
440 700

440 700
1275

T12-200 TOP MESH


T12-200 BOT MESH CLIENT
XA4 DN
11-b3H
11-b3H

DN DN DN
1-B01
80

80
0

0
80

80

1-B02*
1-B02*

DN
17150

DN DN DN
1-B04*

1-B04*
9-t3C 9-t3C
1-B07

1-B07

1-B07
4000

1-B07

T12-200 TOP MESH


T12-200 BOT MESH
MASAAR DEVELOPMENTS LLC
T.O.B.+3.000 T.O.B.+3.000 T.O.B.+3.500
T.O.B.+3.500 CONSULTANT

XA3 1-B07a 1-B07a 1-B07a 1-B07a


1-B04*

1-B04*
1-B01

1-B09

1-B07
1-B07
1-B09

1-B09
1-B09

T.O.B.+3.400
2275

T.O.B.+3.400
1-B06* 1-B06* 1-B06* 1-B06*
XA2
200 1-03
1-02 200
0301
0301
1-CB01

1-CB01

MEP ENGINEER
1-B03

1-B03

1-B03

RC SLAB RC SLAB
3725

S.S.L.+3.300 S.S.L.+3.300

1-01
0301 1-B05 1-B05 1-B05 1-B05
XA1 STAGE LOCATION
PLOT PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
T.O.B.+3.500 T.O.W.+3.500 T.O.B.+3.500
LINE T.O.W.+3.500 BEAM EXTENSION LINE CONSTRUCTION SHARJAH,UAE
T.O.W.+3.500
DRAWING TITLE :
T.O.B.+3.500 T.O.B.+3.500
BEAM EXTENSION BEAM EXTENSION
CL2A - FIRST FLOOR - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - FRAMING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2A-0103
NORTH

CL2A - BEAM SCHEDULE – ROOF FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS 1 T12-400 C/C A 1500
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO 2 T12-200 C/C B 2000
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
R-B01* 200 450 2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 - INVERTED 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B02 200 600 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
R-B02* 200 600 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - INVERTED PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600
R-B03* 200 600 2T16 2T12 2T16 2T12 2T12 T10 - 100 T10 - 200 2 - INVERTED
R-B04* 200 600 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - INVERTED F 4000 S.S.L. +1.000 Slab Surface Level in M M 02 C
R-CB01 200 600 2T16 - 2T20 2T20 - T10 - 150 - 2 - - G 4400 Top extra rebars
R-CB02* 200 600 2T16 - 2T20 2T16 - T10 - 150 - 2 - INVERTED Bottom extra rebars
H 4800
* Inverted Beam
J 5400
K 6000 NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
L 6600 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
M 7200 STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings. 3.
DIMENSIONS ONLY ARE TO BE CONSIDERED.
ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom TO COMMENCEMENT OF ANY WORK.
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

SIGNED

D<-!,11a11
Architects+
Engineers

■•
YAB
YAA YAC YAD YAE YAF YAG YAH YAI
30600 ISSUED FOR CONSTRUCTION
5100 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
LINE

T.O.B.+7.150 T.O.B.+7.150 T.O.B.+7.150 T.O.B.+7.150

R-B01* R-B01* R-B01* R-B01*


R-CB02*

R-CB02*

R-CB02*
R-CB02*

R-CB02*
76-b4K 76-b4K
XA6
PARAPET WALL TOP OF PARAPET
AS/TYP. DETAILS
65-t4N

65-t4N
AS/ARCH.

T.O.B.+7.350 T.O.B.+7.350
4850

R-B03*
R-B03*

R-B03*

700 350 200 200 350 700


41-t2D

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


500

500
41-t2D

RC SLAB RC SLAB NO DATE BY REVISION APP

R-B04*
R-B04*

76-t4K 76-t4K
41-t2D

R E V I S I O N
1250

1250

S.S.L.+6.900 S.S.L.+6.900
925 800 800 925 PROJECT :
XA5
65-b4N

65-b4N

800 750 750 800


800

800

250 1850 VILLAS AT PHASE 02 OF MASAAR


400

400
2300

800

800

685 685
445 800

445 800
11-t3B

11-t3B

11-t3B

11-t3B
1320

1320
1275

1275
800

800

1850 250 CLIENT


XA4
R-B03*
R-B02*

R-B02*

11-t3B 11-t3B T12-200 TOP MESH 11-t3B 11-t3B


17150

T12-200 TOP MESH


R-B02*

R-B02*
R-B02*

R-B02*

T12-200 BOT MESH T12-200 BOT MESH


R-B02

R-B02
4000

T12-200 TOP MESH


T12-200 BOT MESH
T12-200 TOP MESH
T12-200 BOT MESH
MASAAR DEVELOPMENTS LLC
T.O.B.+7.350 T.O.B.+7.350
CONSULTANT

XA3
R-B02*
R-B02*

R-B02*
R-CB02*
R-CB02*

R-CB01
R-CB01

T.O.B.+7.150
2275

R-B01* R-B01*
XA2
BEAM EXTENSION BEAM EXTENSION
R-01 MEP ENGINEER
3725

0301
T.O.B.+7.150
T.O.B.+7.150

XA1 STAGE LOCATION


PLOT PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
LINE LINE CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2A - ROOF - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF - FRAMING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2A-0104
NORTH
LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)

C1-01 KEY PLAN

COLUMN TYPE
PART NUMBER
C DENOTES COLUMN
W DENOTES WALL M 02 C
CW DENOTES CORE WALL

NOTES
NOTES:
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1. For general notes & general details refer to drawing No. EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. For concrete grade of columns refer to General Notes 2. THIS DRAWING IS NOT TO BE SCALED. STATED
drawings series STR-0401. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For columns reinforcement schedule refer to drawing ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
series STR-0401. TO COMMENCEMENT OF ANY WORK.

SIGNED

D<-!,11a11
Architects+
Engineers

■•
YAB
YAA YAC YAD YAE YAF YAG YAH YAI
30600 ISSUED FOR CONSTRUCTION
5100 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

100 100 100


XA6
1000

1000

1000

1000

1000
200 C05a 200 C05 200 C05 200 C05 200 C05a
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
100 100 100
R E V I S I O N
PROJECT :
XA5
50

50

50
1000

1000

1000

VILLAS AT PHASE 02 OF MASAAR


2300

200 C05 200 C05 200 C05


100 100 100 100 CLIENT
250

250
XA4
50

50

50
1000

1000
700

700

700

700

200 C05 200 C02 200 C02 200 C02 200 C02 200 C05
17150
4000

100 100
100 MASAAR DEVELOPMENTS LLC
100 100 100 100
CONSULTANT
900
800

800
600

600

600

600

600

600

XA3
200 C03 200 C01 200 C01 200 C01 200 C04 200 C01 200 C01 200 C01 200
C03
2275

100 100 100


600
600

600

600

600
100

XA2 200 C01


200 C01 200 C07 200 C07 200 C01

MEP ENGINEER
3725

100 100 100


500

500

500
250

250

250

XA1 200 C06 200 C06 200 C06 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2A - FOUNDATION & GROUND FLOOR -


COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE

FOUNDATION - COLUMN LAYOUT DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2A-0201
NORTH
LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)

C1-01 KEY PLAN

COLUMN TYPE
PART NUMBER
C DENOTES COLUMN
W DENOTES WALL M 02 C
CW DENOTES CORE WALL

NOTES
NOTES:
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1. For general notes & general details refer to drawing No. EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. For concrete grade of columns refer to General Notes 2. THIS DRAWING IS NOT TO BE SCALED. STATED
drawings series STR-0401. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For columns reinforcement schedule refer to drawing ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
series STR-0401. TO COMMENCEMENT OF ANY WORK.

SIGNED

D<-!,11a11
Architects+
Engineers

■•
YAB
YAA YAC YAD YAE YAF YAG YAH YAI
30600 ISSUED FOR CONSTRUCTION
5100 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

100 100 100


XA6
1000

1000

1000

1000

1000
200 C05a 200 C05 200 C05 200 C05 200 C05a
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
100 100 100
R E V I S I O N
PROJECT :
XA5
50

50

50
1000

1000

1000

VILLAS AT PHASE 02 OF MASAAR


2300

200 C05 200 C05 200 C05


100
100 100 100 CLIENT
250

250
XA4
50

50

50
1000

1000
700

700

700

700

200 C05 200 C02 200 C02 200 C02 200 C02 200 C05
17150
4000

100 100
100 100 MASAAR DEVELOPMENTS LLC
100 100 100
CONSULTANT
900
800

800
600

600

600

600

600

600

XA3
200 C03 200 C01 200 C01 200 C01 200 C04 200 C01 200 C01 200 C01 200 C03
2275

100
600
600

600
100

XA2 200 C01


200 C01 200 C01

MEP ENGINEER
3725

XA1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2A - FIRST FLOOR - COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - COLUMN LAYOUT DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2A-0202
NORTH

200 800 200


T12-150 CLEAR OPENING
S.S.L. -0.320m
T12-150

200
KEY PLAN

T12-150 XA3 XA4

300
T12-150 T12-150
T12-150
WATER SURFACE LEVEL M 02 C
GRP LINING 300mm THK SLAB ON GRADE
PLAIN CONRETE AS/PLAN

1500
SLAB ON GRADE
2 LAYERS OF BITUMINOUS FFL +0
S.S.L.
AS/PLAN

1200
PROTECTIVE COAT AS/SPECS -0.10 m NOTES

100
GROUND FLOOR
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
S.S.L.

300
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
PVC WATER STOPER PVC WATER STOPER -0.40 m EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
T12-150
S.S.L. -2.020m DIMENSIONS ONLY ARE TO BE CONSIDERED.
T12-150 GROUND BEAM GROUND BEAM
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
150

150
REINJECTABLE HOSE REINJECTABLE HOSE ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
AS/SCHED. AS/SCHED. TO COMMENCEMENT OF ANY WORK.
200

FFL -1100

FOUNDATION LEVEL
200 VARIES 200
FFL -1150
LEAN CONCRETE
EXCAVATION LEVEL
FOUNDATION FOUNDATION
2 LAYERS OF BITUMINOUS AS/PLAN AS/PLAN
PROTECTIVE COAT AS/SPECS
WELL COMPACTED SOIL UP TO 95% OF
MAXIMUM DRY DENSITY
TYPICAL WATER TANK DETAIL SECTION G-01
WT 1 : 20 G-01 1 : 20

SIGNED

D<-!,11a11
Architects+
BEAM LINKS Engineers
XA2 XA3
■•
TOP OF DOWNSTAND WALL
S

BEAM TOP BARS AS AS/PLAN


PER BEAM SCEH.
MIN. 2T12 STAIR LANDING ISSUED FOR CONSTRUCTION
W W AS/DETAIL SUBJECT TO AUTHORITIES APPROVALS
2T16 TOP BARS FFL +3500
Ld
VL BARS AS PER VL BARS AS PER S.S.L.
FIRST FLOOR

200
COLUMNS SCEHD. COLUMNS SCEHD. T12@100 HORIZONTAL +3.30 m
MIN. 600mm

CLOSED STIRRUPS

S/2
LINKS BEAM TOP BARS AS LINKS
L

BEAM BARS TO BE VL BARS AS PER


PER BEAM SCEH.

900
EXTENDED IN COLUMNS SCEHD. T10-200 E.F.
MIN. 2T16
CANTILEVER AS
SHOWN T10-200 VERIFY S.S.L.
SHORT CANTILEVER

SHORT CANTILEVER

AS/ARCH.
BEAM
DOWNSTAND
L=AS PLAN

L=AS PLAN

900
W=600 mm WALL (TYP.)
BEAM
S

MIN.
AS/SCHED.
S

200
BEAM
COL. LINKS AS/SCHED.
BEAM BEAM

PLAN PLAN SECTION STAIR LANDING


AS/DETAIL

CASE 1 CASE 2
SHORT CANTILEVER WITH EXTENSION SHORT CANTILEVER WITHOUT EXTENSION

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP

TYPICAL SHORT CANTILEVER DETAIL SECTION 1-01 SECTION 1-02 R E V I S I O N

SCB 1 : 20 1-01 1 : 20 1-02 1 : 20


PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

100 100 XA2 XA3


MASAAR DEVELOPMENTS LLC
CONSULTANT
BEAM
PARAPET PARAPET
AS/SCHED.
WALL WALL REINF.
AS/SCHED. 100
FFL +3500
S.S.L. 100MM UPSTAND WALL (TYP.)
Hmax = 1600MM

Hmax = 1600MM

+3.40 m
100

T12-200 EF FIRST FLOOR

T10-200 RC SLAB
AS/PLAN

250
T10-200 EF T10-200 EF
F.F.L. AS PER F.F.L. AS PER 200 200 T12-200 MEP ENGINEER
T12-200 EF T12-200 EF T10-200 EF
800

ARCH. ARCH. (TYPICAL)

S.S.L. AS PER S.S.L. AS PER

200
FRAMING PLAN FRAMING PLAN

UP-STAND
PLAN STAGE LOCATION
BEAM AS/PLAN
& SCHED. ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

1775 500 DRAWING TITLE :


BLOCK WORK
RC SLAB AS/ARCH. RC SLAB CL2A - STRUCTURAL DETAILS - 1
AS/PLAN AS/PLAN COLUMN
AS/SCHED.
CASE 1 (EDGE) CASE 2
NOTES:
DRAWN BY CHECKED BY APPROVED BY DATE
• "H" IS THE PARAPET HEIGHT AS PER ARCHI. DAE HJ EK 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


TYPICAL PARAPET WALL DETAIL BEAM 1-B06 DETAIL SECTION R-01
PW 1-03 R-01
D21-44 A1 As indicated C00
1 : 20 1 : 20 1 : 10 DRAWING NO.
MAS-P2AB-STR-CL2A-0301
NORTH

COLUMNS - SCHEDULE AND TYPICAL DETAILS


NOTES:
KEY PLAN
1. Splice of vertical bars shall be made at mid-height of the column ,
500 600 / 700 800 / 900 1000 / 1100 1000 / 1100 1000 / 1100
and shall be staggered at least Ld.
2. Splice of each individual bar within a bundle shall be staggered at
least Ld.
M 02 C
3. Mechanical splice shall be used where reinforcement ratio exceeds
200

200

200

200

200

200
or equals 4%.

TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 4A TYPE 4B


NO. OF BARS: 8 NO. OF BARS: 10 NO. OF BARS: 12 NO. OF BARS: 14 NO. OF BARS: 14 + 4 = 18 NO. OF BARS: 14 + 8 = 22
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

1300 / 1400 / 1500 500


200

200
TYPE 5 TYPE 1A
NO. OF BARS: 18 NO. OF BARS: 8 + 4 = 12

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
ROOF FLOOR ROOF FLOOR
S.S.L. S.S.L. VILLAS AT PHASE 02 OF MASAAR
-XX.XXX M -XX.XXX M

CLIENT

SECTION : 200 X 1000


TYPE : 4A
C40 V-BARS : 14T16 C40
ADD. V : 4T16 MASAAR DEVELOPMENTS LLC
FIRST FLOOR LINKS : T10-200 FIRST FLOOR CONSULTANT
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C40 C40
MEP ENGINEER
GROUND FLOOR GROUND FLOOR
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
SECTION : 200 X 600 SECTION : 200 X 700 SECTION : 200 X 800 SECTION : 200 X 900 SECTION : 200 X 1000 SECTION : 200 X 1000 SECTION : 200 X 500 SECTION : 200 X 600 CONSTRUCTION SHARJAH,UAE
TYPE : 2 TYPE : 2 TYPE : 3 TYPE : 3 TYPE : 4 TYPE : 4 TYPE : 1A TYPE : 2 DRAWING TITLE :
C40 V-BARS : 10T16 V-BARS : 10T16 V-BARS : 12T16 V-BARS : 12T16 V-BARS : 14T16 V-BARS : 14T16 V-BARS : 8T12 V-BARS : 10T16 C40
ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : 4T12 ADD. V : - CL2A - COLUMN SCHEDULE
FOUNDATION LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 FOUNDATION
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

DRAWN BY CHECKED BY APPROVED BY DATE

LEVEL LEVEL DAE HJ EK 14/12/2022


CONC. CONC.
GRADE
C01 C02 C03 C04 C05 C05a C06 C07 GRADE JOB NO. SHEET SIZE SCALE REV. NO.
COLUMN COLUMN
D21-44 A1 1 : 20 C00
MARK MARK
DRAWING NO.
MAS-P2AB-STR-CL2A-0401
NORTH

KEY PLAN

YAB
YAC T10-200 FLOOR SLAB
(TYP.) AS/PLAN
7
M 02 C
0601 T8 (TYP.)
2700

FLOOR BEAM T12-150


AS/SCHEDULE NOTES
T12-150 T10-200

200
T12-150 T10-200 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
XA5 T12-150
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE

200
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
2300

T12-150
T12-150

XA4 YAB YAC


DN DETAILS OF STAIRCASE FLIGHT-C
2700

VERIFY S.S.L.
DN
AS/ARCH.
1300 S.S.L.
+0.808 m
FLIGHT-A
4000

FFL +0
1-03
0301 GROUND FLOOR

SIGNED
FLOOR BEAM
XA3 AS/SCHEDULE D<-!,11a11
T12-150 Architects+
T12-150 120 Engineers
0

T12-150
■•

200
ISSUED FOR CONSTRUCTION
T10-200 SUBJECT TO AUTHORITIES APPROVALS

T12-150
T12-150
T10-200
1ST TO ROOF - STAIRCASE PLAN STAIRCASE SECTION - 01 (TYP.)
2 1 : 50 6 1 : 50 T8 (TYP.)

T12-150
T10-200 120
0

200
T12-150
T10-200

T12-150
T12-150
YAB
YAC
7

200
0601
2700 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
DETAILS OF STAIRCASE FLIGHT-B T12-150 NO DATE BY REVISION APP
T12-150 R E V I S I O N
PROJECT :

6
XA5 0601 VILLAS AT PHASE 02 OF MASAAR

CLIENT
XA3 XA4 XA5
2300

4000 2300
G-01
0301
VERIFY S.S.L.
VERIFY S.S.L.
AS/ARCH. MASAAR DEVELOPMENTS LLC
T12-150
XA4 FFL +3500
AS/ARCH. S.S.L. CONSULTANT
+3.40 m T12-150 T10-200
1300
100

FIRST FLOOR
2T20 (TYP.)
FLIGHT-C
883

S.S.L. T8 (TYP.)

200
+2.617 m
T10-150

500
CANTILEVER T12-150
2592

FLIGHT-B MID LANDING BEAM T12-150


T12-150 T12-150
4000

200
T10-200 T10-200
VERIFY S.S.L. 200
AS/ARCH. 2T16 MEP ENGINEER
SLAB
2617

S.S.L. AS/PLAN
+0.808 m RC COLUMN
AS/SCHEDULE
808

FFL +0 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
XA3 GROUND FLOOR CONSTRUCTION SHARJAH,UAE
GRADE BEAM
AS/SCHEDULE DRAWING TITLE :

CL2A - STAIR CASE-1 DETAILS

DETAILS OF STAIRCASE FLIGHT-A


DRAWN BY CHECKED BY APPROVED BY DATE
DAE HJ EK 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


GROUND TO 1ST - STAIRCASE PLAN STAIRCASE SECTION - 02 D21-44 A1 As indicated C00
1 1 : 50 7 1 : 50 DRAWING NO.
MAS-P2AB-STR-CL2A-0601
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0

2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.


KEY PLAN
1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00

5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00
M 02 C
6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00

6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00


NOTES
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
8 ROOF MEP 5.00 5.00 5.00 5.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
Notes: 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
the contractor, and shall be considered in the design of slabs (RC). ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

■•
YAB
YAA YAC YAD YAE YAF YAG YAH YAI
30600 ISSUED FOR CONSTRUCTION
5100 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

2 2 2 2
XA6

D
D

D
D
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
XA5 1 1 1
VILLAS AT PHASE 02 OF MASAAR
2300

CLIENT
XA4
17150

3 3
T
T
4000

MASAAR DEVELOPMENTS LLC


CONSULTANT

XA3
2275

7 7
XA2

MEP ENGINEER
3725

XA1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2A - FIRST FLOOR - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - LOADING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2A-0901
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0

2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.


KEY PLAN
1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00

5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00
M 02 C
6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00

6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00


NOTES
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
8 ROOF MEP 5.00 5.00 5.00 5.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
Notes: 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
the contractor, and shall be considered in the design of slabs (RC). ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

■•
YAB
YAA YAC YAD YAE YAF YAG YAH YAI
30600 ISSUED FOR CONSTRUCTION
5100 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

6 6
XA6
7
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
XA5
8 VILLAS AT PHASE 02 OF MASAAR
2300

CLIENT
XA4
17150
4000

MASAAR DEVELOPMENTS LLC


CONSULTANT

XA3
7
2275

6 6

XA2

MEP ENGINEER
3725

XA1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2A - ROOF - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF - LOADING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2A-0902
NORTH

CL2B - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
F01 1000 1000 300 T12-200 T12-200 - - - Denotes Slab Opening
F03 1300 1700 400 T12-150 T12-150 - - - KEY PLAN
F04 1500 1900 400 T16-200 T16-200 - - - 200 Denotes Slab / Raft Thickness In mm.
F05 1700 2100 400 T16-200 T16-200 - - -
F06 1900 2300 400 T16-200 T16-200 - - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
F08 2300 2700 400 T16-200 T16-100 - - -
S.S.L. +1.000 Slab Surface Level in M M 02 C
F09 2500 2900 450 T16-200 T16-100 - - -
F10 2700 3100 450 T16-200 T16-150 - - - Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
3. For Grade of Concrete of the Foundation and Ground Beams DIMENSIONS ONLY ARE TO BE CONSIDERED.
refer to General Notes drawing No. MAS- P2AB-STR-0002. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
4. The Allowable net bearing capacity at Foundation level is as per TO COMMENCEMENT OF ANY WORK.
Soil Investigation Report No. RSl2022-0185 SHJ, issued by
M/S ELEMENT ENG'G LABORATORY, dated 27/08/2022.
6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
7. The contractor to conduct the required tests and confirm soil
bearing capacities before foundation construction.
8. For plots with narrow space between asset footprint and
boundary wall, the contractor shall submit shop drawings in light
of the measures below for the engineer’s review, and
implement the advised work without extra cost.
8.1 The water tank shall be moved to avoid the clash
considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED

D<-!,11a11
Architects+
Engineers

YBA YBB YBC YBD YBE YBF


38100
YBG YBH YBI YBJ YBK
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
FOR BOUNDARY WALL DETAILS LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006 WORKING LOAD FROM COLUMN
ENVELOPE SERVICE REACTION

1110kN 985kN 970kN 1110kN


655kN 655kN

XB6

F06 F06
F08 F08
4850

F09 F09
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
F08 1030kN F10 1165kN
F08 NO DATE BY REVISION APP
890kN 895kN
R E V I S I O N
PROJECT :
XB5
VILLAS AT PHASE 02 OF MASAAR
2300

640kN 640kN
685kN 585kN 530kN 565kN 685kN

CLIENT
XB4 F10
17150

F06 F05 F05 F05 F06


4000

F06 625kN 755kN F06


270kN 510kN 445kN 470kN 430kN 445kN 450kN 510kN 275kN MASAAR DEVELOPMENTS LLC
CONSULTANT
LOWERED LOWERED
BOTTOM OF FOOTING BOTTOM OF FOOTING
XB3 B.O.F. -1.400 B.O.F. -1.400

F03 F06 F03


2275

F04 F04 F04 F06 F04 F04 F04 F04


LOWERED LOWERED F03
LOWERED BOTTOM OF FOOTING BOTTOM OF FOOTING LOWERED
XB2 BOTTOM OF FOOTING B.O.F. -1.400 B.O.F. -1.400 BOTTOM OF FOOTING
B.O.F. -1.400 B.O.F. -1.400
F03 330kN
F03 360kN F03
300kN F03 270kN 270kN F03 300kN
MEP ENGINEER
3725

PLOT
LINE 90kN 80kN 85kN 90kN
WATER TANK DETAILS WATER TANK DETAILS
REFER TO SHEET REFER TO SHEET
MAS-P2AB-STR-CL2B-0301 MAS-P2AB-STR-CL2B-0301
XB1 STAGE LOCATION
PLOT F01 F01 F01 F01
PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
LINE LINE CONSTRUCTION SHARJAH,UAE
WATER TANK DETAILS
REFER TO SHEET DRAWING TITLE :
MAS-P2AB-STR-CL2B-0301

CL2B - FOUNDATION PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FOUNDATION PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2B-0101
NORTH

CL2B - BEAM SCHEDULE - GROUND FLOOR LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
G-B01 200 500 2T12 + 2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - 200 Denotes Slab / Raft Thickness In mm.
G-B02 200 500 2T16 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B03 200 500 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B04 200 500 2T16 + 2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B05 200 500 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M M 02 C
G-B06 200 500 2T16 2T16 2T12 - - T10 - 200 T10 - 200 2 - - Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 DIMENSIONS ONLY ARE TO BE CONSIDERED.
mesh unless otherwise mentioned on the drawings. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned TO COMMENCEMENT OF ANY WORK.
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers

YBA YBB YBC YBD YBE YBF


38100
YBG YBH YBI YBJ YBK
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
FOR BOUNDARY WALL DETAILS LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006

G-B04 G-B04 G-B04 G-B04 G-B04


XB6

100 100 100 100 100


G-B03

SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE
4850

G-B03
G-B06

G-B06
G-B06

G-B06

G-B06
G-B03

G-B03
S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
G-B03

G-B03
R E V I S I O N
PROJECT :
XB5 UP UP UP UP UP
G-B05 G-B04 G-B04 G-B04 G-B05
UP UP UP UP UP VILLAS AT PHASE 02 OF MASAAR
2300

CLIENT
XB4 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02
G-B03

G-B03
G-B03

G-B03
17150

300mm THK
300mm THK PLAIN CONCRETE 300mm THK
G-B01

G-B01

G-B01

G-B01
G-B01

G-B01

G-B01
4000

PLAIN CONCRETE PLAIN CONCRETE


MASAAR DEVELOPMENTS LLC
CONSULTANT

XB3
G-B01

G-B01
G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02
G-B01

G-B01

G-B01
G-B01

WATER TANK DETAILS WATER TANK DETAILS


REFER TO SHEET REFER TO SHEET
2275

MAS-P2AB-STR-CL2B-0301 G-01 T.O.B.-0.400 MAS-P2AB-STR-CL2B-0301


T.O.B.-0.400
0301
G-B04 G-B04 G-B04 G-B04 G-B04

XB2
T.O.B.-0.400 100 T.O.B.-0.400 T.O.B.-0.400
100 T.O.B.-0.400
T.O.B.-0.400
G-B01

G-B01
G-B01

G-B01

SLAB ON GRADE 100 SLAB ON GRADE MEP ENGINEER


3725

PLOT S.S.L.-0.400 S.S.L.-0.400


LINE 200 SLAB ON GRADE 200
T.O.B.-0.400 T.O.B.-0.400 S.S.L.-0.400 T.O.B.-0.400 T.O.B.-0.400
RC SLAB RC SLAB
XB1 STAGE LOCATION
S.S.L.-0.550 S.S.L.-0.550
PLOT PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
LINE LINE CONSTRUCTION SHARJAH,UAE
WATER TANK DETAILS
REFER TO SHEET
MAS-P2AB-STR-CL2B-0301 DRAWING TITLE :

CL2B - GROUND FLOOR - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

GROUND FLOOR - FRAMING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2B-0102
NORTH

CL2B - BEAM SCHEDULE - FIRST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS 1 T12-400 C/C A 1500
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
MID SPAN SUPPORT TO SUPPORT TO 2 T12-200 C/C B 2000
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
WIDTH DEPTH KEY PLAN
1-B01 200 600 2T16 2T12 2T16 2T12 2T12 T10 - 125 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
1-B02* 200 600 2T16 2T12 2T16 2T12 - T10 - 150 T10 - 200 2 - INVERTED 4 T16-100 C/C D 3000
1-B03 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 2T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600
1-B04* 200 900 2T16 - 2T16 - - T10 - 200 T10 - 200 2 2T10 INVERTED
1-B05 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M M 02 C
1-B06* 200 900 2T16 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 2T10 INVERTED G 4400 Top extra rebars
1-B07 200 1000 2T16 - 2T16 - - T10 - 200 T10 - 200 2 3T10 Bottom extra rebars
H 4800
1-B07a 200 900 2T16 + 2T12 - 2T16 + 2T12 - - T10 - 200 T10 - 200 2 2T10 - * Inverted Beam
1-B07b 200 1000 2T16 2T16 2T16 2T16 - T10 - 200 T10 - 200 2 3T10 J 5400
1-B08 200 1000 2T20 2T16 2T20 2T16 - T10 - 200 T10 - 200 2 3T10 - K 6000 NOTES
1-B09 200 800 2T16 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1-CB01 200 900 2T12 - 2T20 2T16 - T10 - 150 - 2 2T10 -
L 6600 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
M 7200 STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings. 3.
DIMENSIONS ONLY ARE TO BE CONSIDERED.
ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom TO COMMENCEMENT OF ANY WORK.
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

LEGEND:

Stair Opening Boundary


Additional Rebars
SIGNED
3T16 TOP & BOT
D<-!,11a11
500X200 Hidden Beam Architects+
Engineers
TOP BAR: 5T16

■•
BOTTOM BAR: 5T16
YBA YBB YBC YBD YBE YBF YBG YBH YBI YBJ YBK STIRRUPS: 4 LEGS OF T10-150

38100 ISSUED FOR CONSTRUCTION


5100 2700 2700 4800 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
FOR BOUNDARY WALL DETAILS LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006

1-B08 1-B08 1-B08 1-B08 1-B08


XB6
4850

1-B01

200 200
1-B01
1-B01

16-t2D

16-t2D

1-B01
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
RC SLAB RC SLAB

41-b4F
41-b4F

NO DATE BY REVISION APP

1-B01
1-B01

S.S.L.+3.400 S.S.L.+3.400 R E V I S I O N
80

80

80
44-b4G 44-b4G
0

0
80

80
0

0
PROJECT :
XB5
VILLAS AT PHASE 02 OF MASAAR
400

400

400

1850 250 250 1850


2300

6-t3C

6-t3C

6-t3C

6-t3C

6-t3C
785 685 685
440 700

440 700
1275

1275

1275

CLIENT
XB4 DN

11-b3H
11-b3H

DN DN DN DN
1-B07b

1-B01
80

80

80
0

0
80

80

1-B02*
1-B02*

0
17150

9-t3C
1-B04*

1-B04*
9-t3C
1-B07

1-B07

1-B07

1-B07

1-B07
4000

T12-200 TOP MESH


T12-200 BOT MESH
T12-200 TOP MESH
T12-200 BOT MESH
T12-200 TOP MESH
T12-200 BOT MESH
MASAAR DEVELOPMENTS LLC
S.S.L.+3.500 T.O.B.+3.000 T.O.B.+3.000 T.O.B.+3.500
CONSULTANT

XB3 1-B07a 1-B07a 1-B07a 1-B07a 1-B07a

1-B04*
1-B04*

1-B07

1-B01
1-B09

1-B09
1-B07

1-B07
1-B09

1-B09
1-B09

T.O.B.+3.400
2275

T.O.B.+3.400
1-B06* 1-B06* 1-B06* 1-B06* 1-B06*
XB2
200 1-03 1-02 200 200
0301 0301
1-CB01

1-CB01
MEP ENGINEER
1-B03

1-B03

1-B03

1-B03

RC SLAB RC SLAB RC SLAB


3725

PLOT S.S.L.+3.300 S.S.L.+3.300 S.S.L.+3.300


LINE 1-01
T.O.B.+3.500 T.O.B.+3.500
0301
1-B05 1-B05 1-B05 1-B05 1-B05
XB1 STAGE LOCATION
PLOT PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
T.O.B.+3.500
LINE T.O.B.+3.500 T.O.B.+3.500 LINE CONSTRUCTION SHARJAH,UAE
T.O.W.+3.500 T.O.B.+3.500
T.O.W.+3.500 DRAWING TITLE :
T.O.W.+3.500
BEAM EXTENSION
BEAM EXTENSION BEAM EXTENSION
CL2B - FIRST FLOOR - FRAMING PLAN

BEAM EXTENSION

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - FRAMING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2B-0103
NORTH

CL2B - BEAM SCHEDULE - ROOF FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS 1 T12-400 C/C A 1500
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO 2 T12-200 C/C B 2000
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
R-B01* 200 450 2T16 - 2T16 2T12 - T10 - 200 T10 -200 2 - INVERTED 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B02 200 600 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
R-B03* 200 600 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - INVERTED PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600
R-B04* 200 600 2T16 2T12 2T16 2T12 2T12 T10 - 100 T10 - 200 2 - INVERTED
R-B05* 200 600 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - INVERTED F 4000 S.S.L. +1.000 Slab Surface Level in M M 02 C
R-CB01 200 600 2T16 - 2T20 2T20 - T10 - 150 - 2 - - G 4400 Top extra rebars
R-CB02* 200 600 2T16 - 2T20 2T16 - T10 - 150 - 2 - INVERTED Bottom extra rebars
H 4800
* Inverted Beam
J 5400
K 6000 NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
L 6600 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
M 7200 STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings. 3.
DIMENSIONS ONLY ARE TO BE CONSIDERED.
ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom TO COMMENCEMENT OF ANY WORK.
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

SIGNED

D<-!,11a11
Architects+
Engineers

YBA YBB YBC YBD YBE YBF


38100
YBG YBH YBI YBJ YBK
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
LINE

T.O.B.+7.150 T.O.B.+7.150 T.O.B.+7.150 T.O.B.+7.150


T.O.B.+7.150

R-B01* R-B01* R-B01* R-B01* R-B01*


100

100
R-CB02*

R-CB02*
R-CB02*

R-CB02*
R-CB02*

R-CB02*
1150

1150
76-b4K 76-b4K
XB6
PARAPET WALL TOP OF PARAPET
AS/TYP. DETAILS AS/ARCH.
65-t4N

65-t4N
T.O.B.+7.350 T.O.B.+7.350
4850

R-B04*

T12-200 TOP MESH


R-B04*

R-B04*

R-B04*
200 200

41-t2D
700 350 T12-200 BOT MESH 350 700
41-t2D

41-t2D

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


500

500
41-t2D

RC SLAB RC SLAB NO DATE BY REVISION APP

R-B05*
R-B05*

76-t4K 76-K
R E V I S I O N
1250

1250
S.S.L.+6.900 S.S.L.+6.900
PROJECT :
XB5 925 800 925 800 800 925
65-b4N

65-b4N
800 750 750 800
800

800

800

250 1850 VILLAS AT PHASE 02 OF MASAAR


400

400

400
2300

800

800
685 685 685
445 800

445 800
11-t3B

11-t3B

11-t3B

11-t3B

11-t3B
1320

1320

1320
1275

1275

1275
800

800
1850 250 CLIENT
XB4
R-B04*

R-B04*
R-B03*

R-B03*
11-t3B 11-t3B 11-t3B 11-t3B 11-t3B
17150

R-B03*

R-B03*
R-B03*

R-B03*
R-B02
R-B02

R-B02
4000

T12-200 TOP MESH


T12-200 BOT MESH
T12-200 TOP MESH
T12-200 BOT MESH
MASAAR DEVELOPMENTS LLC
T.O.B.+7.350 T.O.B.+7.350
CONSULTANT

XB3
R-B03*
500

500

500
R-B03*

R-B03*
R-B03*
R-CB02*

R-CB02*
R-CB01

R-CB01

R-CB01
2275

T.O.B.+7.150 T.O.B.+7.150
R-B01* R-B01*
100

100

XB2

BEAM EXTENSION BEAM EXTENSION


R-01 MEP ENGINEER
T.O.B.+7.150
3725

0301
PLOT
LINE

XB1 STAGE LOCATION


PLOT PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
LINE LINE CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2B - ROOF - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF - FRAMING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2B-0104
NORTH
LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)

C1-01 KEY PLAN

COLUMN TYPE
PART NUMBER
C DENOTES COLUMN
W DENOTES WALL M 02 C
CW DENOTES CORE WALL

NOTES
NOTES:
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1. For general notes & general details refer to drawing No. EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. For concrete grade of columns refer to General Notes 2. THIS DRAWING IS NOT TO BE SCALED. STATED
drawings series STR-0401. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For columns reinforcement schedule refer to drawing ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
series STR-0401. TO COMMENCEMENT OF ANY WORK.

SIGNED

D<-!,11a11
Architects+
Engineers

YBA YBB YBC YBD YBE YBF


38100
YBG YBH YBI YBJ YBK
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

100 100 100 100


XB6
1000

1000

1000

1000

1000

1000
200 C05a 200 C05 200 C05 200 C05 200 C05 200 C05a
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
100 100 100 100
PROJECT :
XB5
50

50

50

50
1000

1000

1000

1000
VILLAS AT PHASE 02 OF MASAAR
2300

200 C05 200 C05 200 C05 200 C05


100 100 100 100 100 CLIENT

250
XB4
50

50

50

50

50
1000

1000
700

700

700

700

700
200 C05 200 C02 200 C02 200 C02 200 C02 200 C02 200 C05
17150
4000

100 100
100 100 MASAAR DEVELOPMENTS LLC
100 100 100 100 100
CONSULTANT
900

900
800

800
600

600

600

600

600

600

600
XB3
200 C03 200 C01 200 C01 200 C01 200 C04 200 C01 200 200 C01 200 C01 200 C01 200 C03
C04
2275

100 100 100 100


600

600
600

600

600

600
100

100

XB2 200 C01 200 C01


200 C01 200 C07 200 C07 200 C01

MEP ENGINEER
3725

100 100 100 100


500

500

500

500
250

250

250

250

XB1 200 C06 200 C06 200 C06 200 C06 STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2B - FOUNDATION & GROUND FLOOR -


COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE

FOUNDATION - COLUMN LAYOUT DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2B-0201
NORTH
LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)

C1-01 KEY PLAN

COLUMN TYPE
PART NUMBER
C DENOTES COLUMN
W DENOTES WALL M 02 C
CW DENOTES CORE WALL

NOTES
NOTES:
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1. For general notes & general details refer to drawing No. EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. For concrete grade of columns refer to General Notes 2. THIS DRAWING IS NOT TO BE SCALED. STATED
drawings series STR-0401. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For columns reinforcement schedule refer to drawing ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
series STR-0401. TO COMMENCEMENT OF ANY WORK.

SIGNED

D<-!,11a11
Architects+
Engineers

YBA YBB YBC YBD YBE YBF


38100
YBG YBH YBI YBJ YBK
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

100 100 100 100


XB6
1000

1000

1000

1000

1000

1000
200 C05a 200 C05 200 C05 200 C05 200 C05 200 C05a
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
100 100 100 100
PROJECT :
XB5
50

50

50

50
1000

1000

1000

1000
VILLAS AT PHASE 02 OF MASAAR
2300

200 C05 200 C05 200 C05 200 C05


100 100 100 100 100 CLIENT

250
XB4
50

50

50

50

50
1000

1000
700

700

700

700

700
200 C05 200 C02 200 C02 200 C02 200 C02 200 C02 200 C05
17150
4000

100 100
100 100 MASAAR DEVELOPMENTS LLC
100 100 100 100 100
CONSULTANT
900

900
800

800
600

600

600

600

600

600

600
XB3
200 C03 200 C01 200 C01 200 C01 200 C04 200 C01 200 C04 200 C01 200 C01 200 C01 200 C03
2275

100 100
600

600
600

600
100

100

XB2 200 C01 200 C01


200 C01 200 C01

MEP ENGINEER
3725

XB1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2B - FIRST FLOOR - COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - COLUMN LAYOUT DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2B-0202
NORTH

200 800 200


T12-150 CLEAR OPENING
S.S.L. -0.320m
T12-150

200
KEY PLAN

T12-150

300
T12-150 T12-150 XB3 XB4
T12-150
WATER SURFACE LEVEL M 02 C
300mm THK SLAB ON GRADE
GRP LINING PLAIN CONRETE AS/PLAN
F.F.L.
0

1500
S.S.L.
GROUND FLOOR
2 LAYERS OF BITUMINOUS -0.10 m

100
SLAB ON GRADE

1200
PROTECTIVE COAT AS/SPECS NOTES
AS/PLAN
S.S.L.

300
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
-0.40 m EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
PVC WATER STOPER PVC WATER STOPER EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
T12-150 GROUND BEAM GROUND BEAM
S.S.L. -2.020m DIMENSIONS ONLY ARE TO BE CONSIDERED.
T12-150 AS/SCHED. AS/SCHED. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
150

150
REINJECTABLE HOSE REINJECTABLE HOSE ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
200

F.F.L.
-1100
FOUNDATION LEVEL

F.F.L.
-1150
200 VARIES 200
EXCAVATION LEVEL

LEAN CONCRETE FOUNDATION FOUNDATION


AS/PLAN AS/PLAN
2 LAYERS OF BITUMINOUS
PROTECTIVE COAT AS/SPECS
WELL COMPACTED SOIL UP TO 95% OF
MAXIMUM DRY DENSITY
TYPICAL WATER TANK DETAIL SECTION G-01
WT 1 : 20 G-01 1 : 20

SIGNED

D<-!,11a11
XB2 XB3 Architects+
BEAM LINKS Engineers

■•
S

BEAM TOP BARS AS TOP OF DOWNSTAND WALL


PER BEAM SCEH. AS/PLAN RC SLAB
W MIN. 2T12 W FFL +3500 AS/PLAN ISSUED FOR CONSTRUCTION
2T16 TOP BARS SUBJECT TO AUTHORITIES APPROVALS
Ld S.S.L.
FIRST FLOOR

200
VL BARS AS PER VL BARS AS PER +3.30 m
COLUMNS SCEHD. COLUMNS SCEHD. T12@100 HORIZONTAL
MIN. 600mm

CLOSED STIRRUPS

S/2
LINKS BEAM TOP BARS AS LINKS
L

BEAM BARS TO BE VL BARS AS PER


PER BEAM SCEH.
EXTENDED IN COLUMNS SCEHD.
MIN. 2T16 VERIFY S.S.L.
CANTILEVER AS

900
T10-200 E.F.
SHOWN AS/ARCH.
SHORT CANTILEVER

SHORT CANTILEVER

T12-200

900
BEAM
BEAM
L=AS PLAN

L=AS PLAN

W=600 mm DOWNSTAND AS/SCHED.


S

MIN. WALL (TYP.)


S

BEAM
AS/SCHED.
COL. LINKS 200
BEAM BEAM

PLAN PLAN SECTION STAIR LANDING


AS/DETAIL

CASE 1 CASE 2
SHORT CANTILEVER WITH EXTENSION SHORT CANTILEVER WITHOUT EXTENSION

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
TYPICAL SHORT CANTILEVER DETAIL SECTION 1-01 SECTION 1-02 R E V I S I O N
SCB 1 : 20 1-01 1 : 20 1-02 1 : 20 PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

100 100 XB2 XB3

MASAAR DEVELOPMENTS LLC


BEAM
AS/SCHED. CONSULTANT

PARAPET PARAPET
REINF.
WALL WALL AS/SCHED.
FFL +3500
S.S.L.
+3.40 m 100
100

FIRST FLOOR 100MM UPSTAND WALL (TYP.)


Hmax = 1600MM

Hmax = 1600MM

T12-200 EF

T10-200 RC SLAB
AS/PLAN

250
800

T10-200 EF T10-200 EF
F.F.L. AS PER F.F.L. AS PER 200 200 T12-200 MEP ENGINEER
T12-200 EF T12-200 EF T10-200 EF
ARCH. ARCH. (TYPICAL)

S.S.L. AS PER S.S.L. AS PER

200
FRAMING PLAN FRAMING PLAN

UP-STAND
PLAN STAGE LOCATION
BEAM AS/PLAN ISSUED FOR TILAL, ALSUYOH SUBURB,
& SCHED.
CONSTRUCTION SHARJAH,UAE
1775 500
DRAWING TITLE :
BLOCK WORK COLUMN
RC SLAB AS/ARCH. RC SLAB CL2B - STRUCTURAL DETAILS - 1
AS/PLAN AS/PLAN AS/SCHED.

CASE 1 (EDGE) CASE 2


DRAWN BY CHECKED BY APPROVED BY DATE
NOTES:
• "H" IS THE PARAPET HEIGHT AS PER ARCHI. DAE HJ EK 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


TYPICAL PARAPET WALL DETAIL BEAM 1-B06 DETAIL SECTION R-01
PW 1 : 20 1-03 1 : 20 R-01 1 : 10
D21-44
DRAWING NO.
A1 As indicated C00

MAS-P2AB-STR-CL2B-0301
NORTH

COLUMNS - SCHEDULE AND TYPICAL DETAILS


NOTES:
KEY PLAN
1. Splice of vertical bars shall be made at mid-height of the column ,
500 600 / 700 800 / 900 1000 / 1100 1000 / 1100 1000 / 1100
and shall be staggered at least Ld.
2. Splice of each individual bar within a bundle shall be staggered at
least Ld.
M 02 C
3. Mechanical splice shall be used where reinforcement ratio exceeds
200

200

200

200

200

200
or equals 4%.

TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 4A TYPE 4B


NO. OF BARS: 8 NO. OF BARS: 10 NO. OF BARS: 12 NO. OF BARS: 14 NO. OF BARS: 14 + 4 = 18 NO. OF BARS: 14 + 8 = 22
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
400/500
1300 / 1400 / 1500

200
200

TYPE 1A
TYPE 5 NO. OF BARS: 8 + 4 = 12
NO. OF BARS: 18

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
ROOF FLOOR ROOF FLOOR
S.S.L. S.S.L. VILLAS AT PHASE 02 OF MASAAR
-XX.XXX M -XX.XXX M

CLIENT

SECTION : 200 X 1000


TYPE : 4A
C40 V-BARS : 14T16 C40
ADD. V : 4T16 MASAAR DEVELOPMENTS LLC
FIRST FLOOR LINKS : T10-200 FIRST FLOOR CONSULTANT
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C40 C40
MEP ENGINEER
GROUND FLOOR GROUND FLOOR
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
SECTION : 200 X 600 SECTION : 200 X 700 SECTION : 200 X 800 SECTION : 200 X 900 SECTION : 200 X 1000 SECTION : 200 X 1000 SECTION : 200 X 500 SECTION : 200 X 600 CONSTRUCTION SHARJAH,UAE
TYPE : 2 TYPE : 2 TYPE : 3 TYPE : 3 TYPE : 4 TYPE : 4 TYPE : 1A TYPE : 2 DRAWING TITLE :
C40 V-BARS : 10T16 V-BARS : 10T16 V-BARS : 12T16 V-BARS : 12T16 V-BARS : 14T16 V-BARS : 14T16 V-BARS : 8T12 V-BARS : 10T16 C40
ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : 4T12 ADD. V : - CL2B - COLUMN SCHEDULE
FOUNDATION LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 FOUNDATION
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

DRAWN BY CHECKED BY APPROVED BY DATE

LEVEL LEVEL DAE HJ EK 14/12/2022


CONC. CONC.
GRADE
C01 C02 C03 C04 C05 C05a C06 C07 GRADE JOB NO. SHEET SIZE SCALE REV. NO.
COLUMN COLUMN
D21-44 A1 1 : 20 C00
MARK MARK
DRAWING NO.
MAS-P2AB-STR-CL2B-0401
NORTH

KEY PLAN
YBB YBC
T10-200 FLOOR SLAB
2700 (TYP.) AS/PLAN
M 02 C
4
T8 (TYP.)
0601

FLOOR BEAM T12-150


AS/SCHEDULE NOTES
T12-150 T10-200
XB5

200
T12-150 T10-200
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
T10-200 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE

200
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
2300

TO COMMENCEMENT OF ANY WORK.

T10-200
T12-150
XB4 DN
DETAILS OF STAIRCASE FLIGHT-C
YBB YBC
2700
1300
VERIFY S.S.L.
4000

4300

AS/ARCH.
S.S.L.
+0.808 m
1-03 FLIGHT-A
0301
F.F.L.
0
GROUND FLOOR

SIGNED
XB3 FLOOR BEAM
AS/SCHEDULE D<-!,11a11
T12-150 Architects+
T10-200 120 Engineers
0

T12-150
■•

200
ISSUED FOR CONSTRUCTION
T10-200 SUBJECT TO AUTHORITIES APPROVALS

T10-200
T12-150
T10-200
1ST TO ROOF - STAIRCASE PLAN STAIRCASE SECTION - 01 (TYP.)

2 1 : 50 3 1 : 50 T8 (TYP.)

T12-150
T10-200 120
0

200
T12-150
T10-200

T12-150
T12-150
YBB YBC

200
2700
4 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
0601 T12-150
DETAILS OF STAIRCASE FLIGHT-B NO DATE BY REVISION APP
T12-150 R E V I S I O N
PROJECT :

3 VILLAS AT PHASE 02 OF MASAAR


XB5 0601

CLIENT
2300

XB3 XB4 XB5


4000 2300
MASAAR DEVELOPMENTS LLC
T12-150
XB4 VERIFY S.S.L. T12-150
CONSULTANT
T10-200
1300 AS/ARCH. 2T20 (TYP.)
VERIFY S.S.L. S.S.L.
FFL +3500 AS/ARCH. +3.400 m T8 (TYP.)

200
100

FIRST FLOOR FLIGHT-C T10-150

500
883

S.S.L.
+2.617 m CANTILEVER T12-150
MID LANDING BEAM T12-150
T12-150 T12-150
4000

200
T10-200 T10-200
200
2T16
2592

MEP ENGINEER
FLIGHT-B SLAB
AS/PLAN
VERIFY S.S.L. RC COLUMN
AS/ARCH. AS/SCHEDULE
2617

S.S.L.
+0.808 m
STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
808

XB3 F.F.L. CONSTRUCTION SHARJAH,UAE


0 GRADE BEAM
GROUND FLOOR AS/SCHEDULE DRAWING TITLE :
G-01
0301
CL2B - STAIR CASE-1 DETAILS

DETAILS OF STAIRCASE FLIGHT-A


DRAWN BY CHECKED BY APPROVED BY DATE
DAE HJ EK 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


GROUND TO 1ST - STAIRCASE PLAN STAIRCASE SECTION - 02 D21-44 A1 As indicated C00

1 1 : 50 4 1 : 50
DRAWING NO.
MAS-P2AB-STR-CL2B-0601
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0

2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.


KEY PLAN
1 RESIDENTIAL UNITS 2.5 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00

5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00
M 02 C
6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00

6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00


NOTES
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
8 ROOF MEP 5.00 5.00 5.00 5.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
Notes: 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
the contractor, and shall be considered in the design of slabs (RC). ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

YBA YBB YBC YBD YBE YBF


38100
YBG YBH YBI YBJ YBK
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

2 2 2 2 2
XB6

D
D

D
D
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N

XB5 1 1 1 1 PROJECT :

VILLAS AT PHASE 02 OF MASAAR


2300

CLIENT
XB4
17150

3 3 3

T
T
4000

MASAAR DEVELOPMENTS LLC


CONSULTANT

XB3
2275

7 7 7
XB2

MEP ENGINEER
3725

XB1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2B - FIRST FLOOR - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR LOADING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2B-0901
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0

2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.


KEY PLAN
1 RESIDENTIAL UNITS 2.5 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00

5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00
M 02 C
6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00

6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00


NOTES
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
8 ROOF MEP 5.00 5.00 5.00 5.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
Notes: 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
the contractor, and shall be considered in the design of slabs (RC). ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

YBA YBB YBC YBD YBE YBF


38100
YBG YBH YBI YBJ YBK
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

6 6
XB6
7
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
XB5
8 VILLAS AT PHASE 02 OF MASAAR
2300

CLIENT
XB4
17150
4000

MASAAR DEVELOPMENTS LLC


CONSULTANT

XB3
6 7 6
2275

XB2

MEP ENGINEER
3725

XB1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2B - ROOF - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF LOADING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2B-0902
NORTH

CL2C - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
F01 1000 1000 300 T12-200 T12-200 - - - Denotes Slab Opening
F03 1300 1700 400 T12-150 T12-150 - - - KEY PLAN
F04 1500 1900 400 T16-200 T16-200 - - - 200 Denotes Slab / Raft Thickness In mm.
F05 1700 2100 400 T16-200 T16-200 - - -
F06 1900 2300 400 T16-200 T16-200 - - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
F08 2300 2700 400 T16-200 T16-100 - - -
S.S.L. +1.000 Slab Surface Level in M M 02 C
F09 2500 2900 450 T16-200 T16-100 - - -
F10 2700 3100 450 T16-200 T16-150 - - - Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
3. For Grade of Concrete of the Foundation and Ground Beams DIMENSIONS ONLY ARE TO BE CONSIDERED.
refer to General Notes drawing No. MAS- P2AB-STR-0002. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
4. The Allowable net bearing capacity at Foundation level is as per TO COMMENCEMENT OF ANY WORK.
Soil Investigation Report No. RSl2022-0185 SHJ, issued by
M/S ELEMENT ENG'G LABORATORY, dated 27/08/2022.
6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
7. The contractor to conduct the required tests and confirm soil
bearing capacities before foundation construction.
8. For plots with narrow space between asset footprint and
boundary wall, the contractor shall submit shop drawings in light
of the measures below for the engineer’s review, and
implement the advised work without extra cost.
8.1 The water tank shall be moved to avoid the clash
considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG


45600
YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 4800 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
FOR BOUNDARY WALL DETAILS LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006

WORKING LOAD FROM COLUMN


ENVELOPE SERVICE REACTION

1110kN 970kN 1015kN 970kN 1110kN


655kN 655kN

XC6

F06 F06
F08 F08 F08
4850

F09 F09
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
1170kN 1170kN NO DATE BY REVISION APP
890kN 875kN 900kN
F08 F08 F08
R E V I S I O N
PROJECT :
XC5
VILLAS AT PHASE 02 OF MASAAR
2300

645kN 645kN
690kN 565kN 565kN 565kN 565kN 690kN

CLIENT
XC4 F10 F10
17150

F06 F05 F05 F05 F05 F06


4000

F06 755kN 755kN F06


275kN 510kN 450kN 450kN 450kN 450kN 450kN 450kN 450kN 510kN 275kN MASAAR DEVELOPMENTS LLC
CONSULTANT
LOWERED
BOTTOM OF FOOTING
XC3 B.O.F. -1.400

F03 F03
2275

F04 F04 F04 F06 F04 F04 F04 F06 F04 F04 F04
LOWERED LOWERED
LOWERED BOTTOM OF FOOTING LOWERED LOWERED LOWERED BOTTOM OF FOOTING
XC2 BOTTOM OF FOOTING B.O.F. -1.400 F03 BOTTOM OF FOOTING BOTTOM OF FOOTING F03 BOTTOM OF FOOTING B.O.F. -1.400
B.O.F. -1.400 B.O.F. -1.400 B.O.F. -1.400 B.O.F. -1.400
295kN F03 275kN
F03 360kN 265kN
F03 360kN 275kN
F03 F03 295kN
MEP ENGINEER
3725

PLOT
LINE 95kN 85kN 85kN 85kN 95kN
WATER TANK DETAILS
REFER TO SHEET
MAS-P2AB-STR-CL2C-0301
XC1 STAGE LOCATION
PLOT
F01 F01 F01 F01 F01
PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
WATER TANK DETAILS WATER TANK DETAILS
LINE LINE CONSTRUCTION SHARJAH,UAE
REFER TO SHEET REFER TO SHEET
MAS-P2AB-STR-CL2C-0301 MAS-P2AB-STR-CL2C-0301
DRAWING TITLE :

CL2C - FOUNDATION PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FOUNDATION PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2C-0101
NORTH

CL2C - BEAM SCHEDULE - GROUND FLOOR LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
G-B01 200 500 2T12 + 2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - 200 Denotes Slab / Raft Thickness In mm.
G-B02 200 500 2T16 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B03 200 500 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B04 200 500 2T16 + 2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B05 200 500 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M M 02 C
G-B06 200 500 2T16 2T16 2T12 - - T10 - 200 T10 - 200 2 - - Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 DIMENSIONS ONLY ARE TO BE CONSIDERED.
mesh unless otherwise mentioned on the drawings. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned TO COMMENCEMENT OF ANY WORK.
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG


45600
YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 4800 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
FOR BOUNDARY WALL DETAILS LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006

G-B04 G-B04 G-B04 G-B04 G-B04 G-B04


XC6

100 100 100 100 100 100


4850

G-B03

G-B03

G-B03
G-B06

G-B06

G-B06

G-B06

G-B06

G-B06
G-B03

SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
G-B03

G-B03
G-B03
S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
XC5 UP UP UP UP UP UP
G-B05 G-B04 G-B04 G-B04 G-B04 G-B05
UP UP UP UP UP UP VILLAS AT PHASE 02 OF MASAAR
2300

CLIENT
XC4 G-B02 G-B02
G-B02 G-B02 G-B02 G-B02 G-B02
G-B03

G-B03
G-B02
G-B03

G-B03

G-B03
17150

300mm THK
G-B01

300mm THK 300mm THK

G-B01

G-B01
G-B01
PLAIN CONCRETE
4000

G-B01

G-B01

G-B01

G-B01

PLAIN CONCRETE PLAIN CONCRETE


MASAAR DEVELOPMENTS LLC
CONSULTANT

XC3
G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02 G-B02
G-B01

G-B01
G-B01

G-B01

G-B01
G-B01

G-01
2275

T.O.B.-0.400 T.O.B.-0.400
0301
G-B04 G-B04 G-B04 G-B04 G-B04 G-B04

XC2
100 T.O.B.-0.400 100 T.O.B.-0.400
T.O.B.-0.400 T.O.B.-0.400 T.O.B.-0.400 T.O.B.-0.400
G-B01

G-B01
G-B01

G-B01

G-B01
SLAB ON GRADE SLAB ON GRADE MEP ENGINEER
3725

100
PLOT S.S.L.-0.400 S.S.L.-0.400
LINE 200 SLAB ON GRADE T.O.B.-0.400 200
T.O.B.-0.400
T.O.B.-0.400 200 S.S.L.-0.400
T.O.B.-0.400 200
RC SLAB RC SLAB
XC1 RC SLAB STAGE LOCATION
S.S.L.-0.550 RC SLAB S.S.L.-0.550
PLOT PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
S.S.L.-0.700 T.O.B.-0.400 S.S.L.-0.700
LINE LINE CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

WATER TANK DETAILS


CL2C - GROUND FLOOR - FRAMING PLAN
REFER TO SHEET
MAS-P2AB-STR-CL2C-0301

DRAWN BY CHECKED BY APPROVED BY DATE

GROUND FLOOR - FRAMING PLAN DAE

JOB NO.
HJ

SHEET SIZE
EK

SCALE
14/12/2022

REV. NO.
1
1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2C-0102
NORTH

CL2C - BEAM SCHEDULE - FIRST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS 1 T12-400 C/C A 1500
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO 2 T12-200 C/C B 2000
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
1-B01 200 600 2T16 2T12 2T16 2T12 2T12 T10 - 125 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
1-B02* 200 600 2T16 2T12 2T16 - 2T12 T10 - 150 T10 - 200 2 - INVERTED 4 T16-100 C/C D 3000
1-B03 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 2T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600
1-B04* 200 900 2T16 - 2T16 - - T10 - 200 T10 - 200 2 2T10 INVERTED
1-B05 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M M 02 C
1-B06* 200 900 2T16 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 2T10 INVERTED G 4400 Top extra rebars
1-B07 200 1000 2T16 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - Bottom extra rebars
H 4800
1-B07a 200 900 2T16 + 2T12 - 2T16 + 2T12 - - T10 - 200 T10 - 200 2 2T10 - * Inverted Beam
1-B08 200 1000 2T20 2T16 2T20 2T16 - T10 - 200 T10 - 200 2 3T10 - J 5400
1-B09 200 800
800/1000 2T16 - 2T16 - - T10 - 200 T10 - 200 2 3T10 - K 6000 NOTES
1-CB01 200 900 2T12 - 2T20 2T16 - T10 - 150 - 2 2T10 - NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
L 6600 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
M 7200 STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings. 3.
DIMENSIONS ONLY ARE TO BE CONSIDERED.
ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom TO COMMENCEMENT OF ANY WORK.
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

LEGEND:

Stair Opening Boundary


Additional Rebars
SIGNED
3T16 TOP & BOT
D<-!,11a11
500X200 Hidden Beam Architects+
Engineers
TOP BAR: 5T16

■•
BOTTOM BAR: 5T16
YCA YCB YCC YCD YCE YCF YCG YCH YCI YCJ YCK YCL YCM STIRRUPS: 4 LEGS OF T10-150

45600 ISSUED FOR CONSTRUCTION


5100 2700 2700 4800 4800 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
FOR BOUNDARY WALL DETAILS LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006
1050

1050
1-B08 1-B08 1-B08 1-B08 1-B08 1-B08
XC6
4850

T12-200 TOP MESH T12-200 TOP MESH

1-B01
1-B01
1-B01

1-B01

200 200
16-t2D

16-t2D
1-B01

T12-200 BOT MESH T12-200 BOT MESH


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
RC SLAB RC SLAB

41-b4F
41-b4F

NO DATE BY REVISION APP

1-B01
1-B01

S.S.L.+3.400 S.S.L.+3.400 R E V I S I O N

0
80
80

44-b4G 44-b4G
0

80
80
80
80

0
0

0
PROJECT :
XC5
VILLAS AT PHASE 02 OF MASAAR
400

400

400

400
1850 250 250 1850
2300

6-t3C

6-t2C

6-t2C

6-t2C

6-t2C

6-t3C
685 685 685 685
440 700

440 700
CLIENT
XC4

11-b3H
11-b3H

DN DN DN DN DN DN
1-B01

1-B01
0

80

80
0
80
0

80

80
80

1-B02*

1-B02*
1-B02*

0
0
17150

9-t3C 9-t3C
1-B04*

1-B04*
1-B07

1-B07

1-B07
1-B07

1-B07

1-B07
4000

T12-200 TOP MESH


T12-200 BOT MESH T.O.B.+3.000
T12-200 TOP MESH
T12-200 BOT MESH T.O.B.+3.500 MASAAR DEVELOPMENTS LLC
T.O.B.+3.000 T.O.B.+3.000
T.O.B.+3.500
CONSULTANT

XC3 1-B07a 1-B07a 1-B07a 1-B07a 1-B07a 1-B07a


1-B04*

1-B04*
1-B01

1-B01
1-B09

1-B09
1-B09
1-B07

1-B07
1-B07
1-B09

1-B09
1-B09
2275

T.O.B.+3.500
T.O.B.+3.500
1-B06* 1-B06* 1-B06* 1-B06* 1-B06* 1-B06*
XC2
1-03 1-02 T.O.B.+3.400 T.O.B.+3.400
200 200 T.O.B.+3.400 200
0301 0301

1-CB01
1-CB01

MEP ENGINEER
1-B03
1-B03

1-B03

1-B03

1-B03
RC SLAB RC SLAB RC SLAB
3725

PLOT S.S.L.+3.300 1-01 S.S.L.+3.300 S.S.L.+3.300


LINE 0301
T.O.B.+3.500 T.O.B.+3.500 T.O.B.+3.500
1-B05 1-B05 1-B05 1-B05 1-B05 1-B05
XC1 STAGE LOCATION
PLOT PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
LINE T.O.B.+3.500 T.O.W.+3.500 T.O.B.+3.500 T.O.W.+3.500 T.O.B.+3.500 LINE CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
BEAM EXTENSION BEAM EXTENSION BEAM EXTENSION
CL2C - FIRST FLOOR - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - FRAMING PLAN DAE

JOB NO.
HJ

SHEET SIZE
EK

SCALE
14/12/2022

REV. NO.
1
1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2C-0103
NORTH

CL2C - BEAM SCHEDULE - ROOF FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS 1 T12-400 C/C A 1500
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO 2 T12-200 C/C B 2000
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
R-B01* 200 450 2T16 - 2T16 2T12 - T10 - 200 T10 - 200 2 - INVERTED 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B02 200 600 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
R-B03* 200 600 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - INVERTED PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600
R-B04* 200 600 2T16 2T12 2T16 2T12 2T12 T10 - 100 T10 - 200 2 - INVERTED
R-B05* 200 600 2T16 2T12 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - INVERTED F 4000 S.S.L. +1.000 Slab Surface Level in M M 02 C
R-CB01 200 600 2T16 - 2T20 2T20 - T10 - 150 - 2 - - G 4400 Top extra rebars
R-CB02* 200 600 2T16 - 2T20 2T16 - T10 - 150 - 2 - INVERTED Bottom extra rebars
H 4800
* Inverted Beam
J 5400
K 6000 NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
L 6600 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
M 7200 STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings. 3.
DIMENSIONS ONLY ARE TO BE CONSIDERED.
ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom TO COMMENCEMENT OF ANY WORK.
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG


45600
YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 4800 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

PLOT
PLOT LINE
LINE

PLOT
LINE

T.O.B.+7.150 T.O.B.+7.150 T.O.B.+7.150 T.O.B.+7.150 T.O.B.+7.150 T.O.B.+7.150

R-B01* R-B01* R-B01* R-B01* R-B01* R-B01*


100

100
R-CB02*

R-CB02*

R-CB02*
R-CB02*

R-CB02*
R-CB02*

R-CB02*
1150

1150
76-b4K 76-t4K
XC6
PARAPET WALL
TOP OF PARAPET
AS/TYP. DETAILS
AS/ARCH.
65-t4N

65-t4N
T.O.B.+7.350
R-B04*

T.O.B.+7.350
4850

R-B04*
T12-200 TOP MESH T12-200 TOP MESH
R-B04*

R-B04*
R-B04*

700 350 200 T12-200 BOT MESH T12-200 BOT MESH 200 350 700

41-t2D
41-t2D
41-t2D

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


500

500
41-t2D

RC SLAB RC SLAB NO DATE BY REVISION APP

R-B05*
R-B05*

76-t4K 76-t4K
41-t2D

R E V I S I O N
1250

1250
S.S.L.+6.900 S.S.L.+6.900
PROJECT :
XC5
800 180

800 180

800 180

800 180
65-b4N

65-t4N
400 625

400 625

400 625

400 625
800 750 750 800
VILLAS AT PHASE 02 OF MASAAR
2300

800

800
800 685 685 800 925 925 800 685 685 800 925
445 800

445 800
11-t3B

11-t2B

11-t2B

11-t2B

11-t2B

11-t3B
800

800
CLIENT
1850 250 250 1850
XC4
R-B04*

R-B04*
R-B03*

R-B03*
R-B03*

11-t3B 11-t2B 11-t2B 11-t2B 11-t2B 11-t3B


17150

R-B03*

R-B03*
R-B03*
R-B02

R-B02
R-B02

R-B02
R-B03*
4000

T12-200 TOP MESH


T12-200 BOT MESH
T12-200 TOP MESH
T12-200 BOT MESH
MASAAR DEVELOPMENTS LLC
T.O.B.+7.350 T.O.B.+7.350
CONSULTANT

XC3
R-B03*

R-B03*
500

500
R-B03*

R-B03*
R-CB02*

R-CB02*
R-CB01

R-CB01

R-CB01

R-CB01
2275

T.O.B.+7.150 T.O.B.+7.150
R-B01* R-B01*
100

100
XC2
BEAM EXTENSION BEAM EXTENSION R-01 BEAM EXTENSION
T.O.B.+7.150 MEP ENGINEER
0301
3725

PLOT
T.O.B.+7.150
LINE

XC1 STAGE LOCATION


PLOT PLOT ISSUED FOR TILAL, ALSUYOH SUBURB,
LINE LINE CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2C - ROOF - FRAMING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF - FRAMING PLAN DAE

JOB NO.
HJ

SHEET SIZE
EK

SCALE
14/12/2022

REV. NO.
1
1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2C-0104
NORTH
LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)

C1-01 KEY PLAN

COLUMN TYPE
PART NUMBER
C DENOTES COLUMN
W DENOTES WALL M 02 C
CW DENOTES CORE WALL

NOTES
NOTES:
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1. For general notes & general details refer to drawing No. EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. For concrete grade of columns refer to General Notes 2. THIS DRAWING IS NOT TO BE SCALED. STATED
drawings series STR-0401. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For columns reinforcement schedule refer to drawing ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
series STR-0401. TO COMMENCEMENT OF ANY WORK.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG


45600
YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 4800 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

100 100 100 100 100


XC6
1000

1000

1000

1000

1000

1000

1000
200 C05a 200 C05 200 C05 200 C05 200 C05 200 C05 200 C05a
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
100 100 100 100 100
PROJECT :
XC5
50

50

50

50

50
1000

1000

1000

1000

1000
VILLAS AT PHASE 02 OF MASAAR
2300

200 C05 200 C05 200 C05 200 C05 200 C05
100 100 100 100 100 100 CLIENT
240

XC4
50

50

50

50

50

50

1000
1000

750
700

700

700

700

700

700
200 C05 200 C02 200 C02 200 C02 200 C02 200 C02 200 C02 200 C05
17150
4000

100 100 MASAAR DEVELOPMENTS LLC


100 100 100 100 100 100 100 100 100
CONSULTANT
900

900
800

800
600

600

600

600

600

600

600

600

600
XC3
200 C03 200 C01 200 C01 200 C01 200 C04 200 C01 200 C01 200 C01 200 C04 200 C01 200 C01 200 C01 200 C03
2275

100 100 100 100


600

600
600

600

600

600
100

100

XC2 200 C01 200 C01


200 C01 200 C07 200 C07 200 C07 200 C01

MEP ENGINEER
3725

100 100 100 100 100


500

500

500

500

500
250

250

250

250

250

XC1 200 C06 200 C06 200 C06 200 C06 200 C06 STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2C - FOUNDATION & GROUND FLOOR -


COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE

FOUNDATION & GROUND FLOOR - COLUMN LAYOUT DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2C-0201
NORTH
LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)

C1-01 KEY PLAN

COLUMN TYPE
PART NUMBER
C DENOTES COLUMN
W DENOTES WALL M 02 C
CW DENOTES CORE WALL

NOTES
NOTES:
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1. For general notes & general details refer to drawing No. EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. For concrete grade of columns refer to General Notes 2. THIS DRAWING IS NOT TO BE SCALED. STATED
drawings series STR-0401. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For columns reinforcement schedule refer to drawing ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
series STR-0401. TO COMMENCEMENT OF ANY WORK.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG


45600
YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 4800 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

100 100 100 100 100


XC6
1000

1000

1000

1000

1000

1000

1000
200C05a 200 C05 200 C05 200 C05 200 C05 200 C05 200 C05a
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
100 100 100 100 100
PROJECT :
XC5
50

50

50

50

50
1000

1000

1000

1000

1000
VILLAS AT PHASE 02 OF MASAAR
2300

200 C05 200 C05 200 C05 200 C05 200 C05
100 100 100 100 100 100 CLIENT
XC4
50

50

50

50

50

50

1000
1000

750
760

700

700

700

700

700

700
200 C05 200 C02 200 C02 200 C02 200 C02 200 C02 200 C02 200 C05
17150
4000

100 100
100 100 100 MASAAR DEVELOPMENTS LLC
100 100 100 100 100 100
CONSULTANT
900

900
800

800
600

600

600

600

600

600

600

600

600
XC3
200 C03 200 C01 200 200 C01 200 C04 200 C01 200 C01 200 C01 200 C04 200 C01 200 C01 200 C01 200 C03
C01
2275

100 100 100 100


600

600
600

600

600

600
100

100

XC2 200 C01 200 C01


200 C01 200 200 200 200 C01

MEP ENGINEER
3725

XC1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2C - FIRST FLOOR - COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - COLUMN LAYOUT DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2C-0202
NORTH

200 800 200


T12-150 CLEAR OPENING
S.S.L. -0.320m
T12-150
XC3 XC4

200
KEY PLAN

T12-150

300
300mm THK SLAB ON GRADE
T12-150 T12-150 PLAIN CONCRETE AS/PLAN
T12-150 M 02 C
FFL +0
WATER SURFACE LEVEL S.S.L.
SLAB ON GRADE -0.100 m
GRP LINING

100
GROUND FLOOR AS/PLAN

1500 S.S.L.

300
2 LAYERS OF BITUMINOUS -0.400 m NOTES

1200
PROTECTIVE COAT AS/SPECS
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
GROUND BEAM GROUND BEAM ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
AS/SCHED. AS/SCHED. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
PVC WATER STOPER PVC WATER STOPER 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
T12-150 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
S.S.L. -2.020m ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
T12-150 FFL -1100
150

150
TO COMMENCEMENT OF ANY WORK.
REINJECTABLE HOSE REINJECTABLE HOSE
FOUNDATION LEVEL
200

FFL -1150

EXCAVATION LEVEL
FOUNDATION FOUNDATION
AS/PLAN AS/PLAN
200 VARIES 200

LEAN CONCRETE

2 LAYERS OF BITUMINOUS
PROTECTIVE COAT AS/SPECS
WELL COMPACTED SOIL UP TO 95% OF
TYPICAL WATER TANK DETAIL MAXIMUM DRY DENSITY SECTION G-01
WT 1 : 20 G-01 1 : 20

SIGNED

D<-!,11a11
Architects+
BEAM LINKS Engineers

■•
XC2 XC3
S

BEAM TOP BARS AS


PER BEAM SCEH.
W MIN. 2T12 W TOP OF DOWNSTAND WALL ISSUED FOR CONSTRUCTION
2T16 TOP BARS T12@100 HORIZONTAL AS/PLAN SUBJECT TO AUTHORITIES APPROVALS
Ld CLOSED STIRRUPS FFL +3500 RC SLAB
VL BARS AS PER VL BARS AS PER AS/PLAN
COLUMNS SCEHD. COLUMNS SCEHD. S.S.L.
MIN. 600mm

FIRST FLOOR

200
+3.300 m

S/2
LINKS BEAM TOP BARS AS LINKS
L

BEAM BARS TO BE VL BARS AS PER


PER BEAM SCEH.
EXTENDED IN COLUMNS SCEHD.
MIN. 2T16
CANTILEVER AS
SHOWN
SHORT CANTILEVER

SHORT CANTILEVER

VERIFY S.S.L.
BEAM

900
T10-200 E.F. AS/ARCH.
L=AS PLAN

L=AS PLAN

W=600 mm

900
T12-200
S

MIN. BEAM
FFL +2667
S

AS/SCHED.
DOWNSTAND
WALL (TYP.) LANDING
COL. LINKS BEAM
BEAM BEAM AS/SCHED.
200

PLAN PLAN SECTION


STAIR LANDING
AS/DETAIL
CASE 1 CASE 2
SHORT CANTILEVER WITH EXTENSION SHORT CANTILEVER WITHOUT EXTENSION

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
TYPICAL SHORT CANTILEVER DETAIL SECTION 1-01 SECTION 1-02 R E V I S I O N
SCB 1 : 20 1-01 1 : 20 1-02 1 : 20 PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

100 100
XC2 XC3
MASAAR DEVELOPMENTS LLC
BEAM CONSULTANT
AS/SCHED.
PARAPET PARAPET
REINF.
WALL WALL
FFL +3500
S.S.L.
AS/SCHED.
100
+3.400 m
100
Hmax = 1600MM

Hmax = 1600MM

FIRST FLOOR 100MM UPSTAND WALL (TYP.)


T12-200 EF

T10-200 RC SLAB
AS/PLAN

250
T10-200 EF T10-200 EF
800

200 200 T12-200 MEP ENGINEER


F.F.L. AS PER F.F.L. AS PER T10-200 EF
T12-200 EF T12-200 EF (TYPICAL)
ARCH. ARCH.

S.S.L. AS PER S.S.L. AS PER

200
FRAMING PLAN FRAMING PLAN
PLAN STAGE LOCATION
UP-STAND
BEAM AS/PLAN ISSUED FOR TILAL, ALSUYOH SUBURB,
& SCHED. CONSTRUCTION SHARJAH,UAE
1775 500
DRAWING TITLE :

BLOCK WORK COLUMN


RC SLAB AS/ARCH. RC SLAB CL2C - STRUCTURAL DETAILS - 1
AS/PLAN AS/PLAN AS/SCHED.

CASE 1 (EDGE) CASE 2


DRAWN BY CHECKED BY APPROVED BY DATE
NOTES:
• "H" IS THE PARAPET HEIGHT AS PER ARCHI. DAE HJ EK 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


TYPICAL PARAPET WALL DETAIL BEAM 1-B06 DETAIL SECTION R-01 D21-44 A1 As indicated C00
PW 1 : 20 1-03 1 : 20 R-01 1 : 10 DRAWING NO.
MAS-P2AB-STR-CL2C-0301
NORTH

COLUMNS - SCHEDULE AND TYPICAL DETAILS


NOTES:
KEY PLAN
1. Splice of vertical bars shall be made at mid-height of the column ,
500 600 / 700 600 / 700 800 / 900 1000 / 1100 1000 / 1100 1000 / 1100
and shall be staggered at least Ld.
2. Splice of each individual bar within a bundle shall be staggered at
least Ld.
M 02 C
3. Mechanical splice shall be used where reinforcement ratio exceeds
200

200

200

200

200

200

200
or equals 4%.

TYPE 1 TYPE 2 TYPE 2A TYPE 3 TYPE 4 TYPE 4A TYPE 4B


NO. OF BARS: 8 NO. OF BARS: 10 NO. OF BARS: 10 + 4 = 14 NO. OF BARS: 12 NO. OF BARS: 14 NO. OF BARS: 14 + 4 = 18 NO. OF BARS: 14 + 8 = 22
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
500
1300 / 1400 / 1500

200
200

TYPE 1A
TYPE 5 NO. OF BARS: 8 + 4 = 12
NO. OF BARS: 18

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
ROOF FLOOR ROOF FLOOR
S.S.L. S.S.L. VILLAS AT PHASE 02 OF MASAAR
-XX.XXX M -XX.XXX M

CLIENT

SECTION : 200 X 1000


TYPE : 4A
C40 V-BARS : 14T16 C40
ADD. V : 4T16 MASAAR DEVELOPMENTS LLC
FIRST FLOOR LINKS : T10-200 FIRST FLOOR CONSULTANT
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C40 C40
MEP ENGINEER
GROUND FLOOR GROUND FLOOR
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
SECTION : 200 X 600 SECTION : 200 X 700 SECTION : 200 X 800 SECTION : 200 X 900 SECTION : 200 X 1000 SECTION : 200 X 1000 SECTION : 200 X 500 SECTION : 200 X 600 CONSTRUCTION SHARJAH,UAE
TYPE : 2 TYPE : 2 TYPE : 3 TYPE : 3 TYPE : 4 TYPE : 4 TYPE : 1A TYPE : 2 DRAWING TITLE :
C40 V-BARS : 10T16 V-BARS : 10T16 V-BARS : 12T16 V-BARS : 12T16 V-BARS : 14T16 V-BARS : 14T16 V-BARS : 8T12 V-BARS : 10T16 C40
ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : 4T12 ADD. V : - CL2C - COLUMN SCHEDULE
FOUNDATION LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 FOUNDATION
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

DRAWN BY CHECKED BY APPROVED BY DATE

LEVEL LEVEL DAE HJ EK 14/12/2022


CONC. CONC.
GRADE
C01 C02 C03 C04 C05 C05a C06 C07 GRADE JOB NO. SHEET SIZE SCALE REV. NO.
COLUMN COLUMN
D21-44 A1 1 : 20 C00
MARK MARK
DRAWING NO.
MAS-P2AB-STR-CL2C-0401
NORTH

KEY PLAN

YCB YCC T10-200 FLOOR SLAB


(TYP.) AS/PLAN
M 02 C
2700 T8 (TYP.)
4
0601
FLOOR BEAM T12-150
AS/SCHEDULE NOTES
T12-150 T10-200

200
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
T10-200 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
T12-150 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
T12-150 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR

200
TO COMMENCEMENT OF ANY WORK.

XC4 DN T12-150
T12-150

1250
1100

DETAILS OF STAIRCASE FLIGHT-C


1300
4000

YCB YCC
1-03 2700
2750

2750

0301
VERIFY S.S.L.
S.S.L.+2.667 AS/ARCH.
S.S.L.
+0.808 m
FLIGHT-A
XC3
FFL +0
SIGNED
GROUND FLOOR
FLOOR BEAM D<-!,11a11
AS/SCHEDULE
Architects+
T12-150 Engineers

■•
T12-150 120
0
ISSUED FOR CONSTRUCTION
T12-150 SUBJECT TO AUTHORITIES APPROVALS

200
T10-200

T12-150
1ST TO ROOF - STAIRCASE PLAN STAIRCASE SECTION - 01
2 1 : 50 3 1 : 50
T12-150
T10-200
(TYP.)

T8 (TYP.)

T12-150
T10-200 120
0

200
T12-150
T10-200
YCB YCC
T12-150
2700 T12-150

4
0601

200
300 2300
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
T12-150
3
DETAILS OF STAIRCASE FLIGHT-B R E V I S I O N
T12-150
XC5 PROJECT :
1200

0601 UP

VILLAS AT PHASE 02 OF MASAAR


UP
2300

CLIENT
1500

XC3 XC4 XC5


XC4 1300 4000 2300 MASAAR DEVELOPMENTS LLC
CONSULTANT

VERIFY S.S.L.
AS/ARCH.
VERIFY S.S.L. T12-150
S.S.L.
FFL +3500 AS/ARCH. T12-150
+3.400 m T10-200
100

FIRST FLOOR
2T20 (TYP.)
4000

FLIGHT-C
883

S.S.L. T8 (TYP.)

200
+2.617 m
T10-150

CANTILEVER 500 T12-150


MEP ENGINEER
2592

MID LANDING BEAM T12-150


FLIGHT-B T12-150 T12-150

200
T10-200 T10-200
VERIFY S.S.L. 200
2T16
AS/ARCH. SLAB
2617

XC3 S.S.L. AS/PLAN STAGE LOCATION


+0.808 m RC COLUMN
AS/SCHEDULE ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE
808

DRAWING TITLE :
FFL +0

GROUND FLOOR CL2C - STAIRCASE-1 DETAILS


GRADE BEAM
G-01 AS/SCHEDULE
0301

DRAWN BY CHECKED BY APPROVED BY DATE


DAE HJ EK 14/12/2022
GROUND TO 1ST - STAIRCASE PLAN STAIRCASE SECTION - 02 DETAILS OF STAIRCASE FLIGHT-A
1 1 : 50 4 1 : 50
JOB NO.
D21-44
SHEET SIZE
A1
SCALE
As indicated
REV. NO.
C00
DRAWING NO.
MAS-P2AB-STR-CL2C-0601
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0

2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.


KEY PLAN
1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00

5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00
M 02 C
6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00

6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00


NOTES
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
8 ROOF MEP 5.00 5.00 5.00 5.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
Notes: 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
the contractor, and shall be considered in the design of slabs (RC). ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG


45600
YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 4800 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

2 2 2 2 2
XC6

D
D

D
D
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N

XC5 1 1 1 1 PROJECT :

VILLAS AT PHASE 02 OF MASAAR


2300

CLIENT
XC4
17150

T
T
4000

3 MASAAR DEVELOPMENTS LLC


3 3
CONSULTANT

XC3
2275

7 7 7
XC2

MEP ENGINEER
3725

XC1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2C - FIRST FLOOR - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

FIRST FLOOR - LOADING PLAN DAE

JOB NO.
HJ

SHEET SIZE
EK

SCALE
14/12/2022

REV. NO.
1
1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2C-0901
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0

2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.


KEY PLAN
1 RESIDENTIAL UNITS 2.50 2.00 2.50 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00

5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 5.00
M 02 C
6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00

6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00


NOTES
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
8 ROOF MEP 5.00 5.00 5.00 5.00 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
Notes: 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
the contractor, and shall be considered in the design of slabs (RC). ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

YCA YCB YCC YCD YCE YCF YCG


45600
YCH YCI YCJ YCK YCL YCM
ISSUED FOR CONSTRUCTION
■•
5100 2700 2700 4800 4800 2700 2700 4800 4800 2700 2700 5100 SUBJECT TO AUTHORITIES APPROVALS

6 6
XC6
7 7
4850

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
XC5
8 8 VILLAS AT PHASE 02 OF MASAAR
2300

CLIENT
XC4
17150
4000

MASAAR DEVELOPMENTS LLC


CONSULTANT
6 6
XC3
7 7
2275

XC2

MEP ENGINEER
3725

XC1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

CL2C - ROOF - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE

ROOF - LOADING PLAN DAE HJ EK 14/12/2022

1 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL2C-0902
NORTH

CL3A - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
F01 1000 1000 300 T12 - 200 T12 - 200 - - Denotes Slab Opening
F02 1100 1300 400 T12 - 125 T12 - 125 - -
F03 1300 1700 400 T12 - 150 T12 - 150 - - 200 Denotes Slab / Raft Thickness In mm.
F04 1500 1900 400 T16 - 200 T16 - 200 - -
F05 1700 2100 400 T16 - 200 T16 - 200 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
M 02 C
F06 1900 2300 400 T16 - 200 T16 - 200 - -
F08 2300 2700 400 T16 - 200 T16 - 100 - -
S.S.L. +1.000 Slab Surface Level in M
Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For Grade of Concrete of the Foundation and Ground Beams ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
refer to General Notes drawing No. MAS- P2AB-STR-0002. TO COMMENCEMENT OF ANY WORK.
4. The Allowable net bearing capacity at Foundation level is as per
Soil Investigation Report No. RSl2022-0185 SHJ, issued by
M/S ELEMENT ENG'G LABORATORY, dated 27/08/2022.
6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
7. The contractor to conduct the required tests and confirm soil
bearing capacities before foundation construction.
8. For plots with narrow space between asset footprint and
boundary wall, the contractor shall submit shop drawings in light
of the measures below for the engineer’s review, and
implement the advised work without extra cost.
8.1 The water tank shall be moved to avoid the clash
considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ


32200
3200 5400 4200 3300 3300 4200 5400 3200

PLOT PLOT
LINE LINE

FOR BOUNDARY WALL DETAILS


REFER TO SHEET
MAS-P2AB-STR-GEN-0006

WORKING LOAD FROM COLUMN


ENVELOPE SERVICE REACTION

570kN 455kN 455kN 570kN

605kN 500kN 605kN


320kN 320kN
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XA6 NO DATE BY REVISION APP

F04 F04 R E V I S I O N
F05 F05
F03 F04 F03 PROJECT :
F05 F05
4100

395kN 390kN VILLAS AT PHASE 02 OF MASAAR


465kN 570kN 570kN 470kN
420kN 375kN 420kN
CLIENT
XA5
F03 F03
F04 F03 F04
F04 F04
2775

F05 F05
690kN 695kN
490kN 455kN 450kN 375kN 455kN 455kN 490kN
MASAAR DEVELOPMENTS LLC
XA4 CONSULTANT
16200

F04 F04
F06 F03 F06
3225

F04 F04 F04 F04


860kN
1045kN 1045kN
270kN 280kN 280kN 270kN

XA3
410kN F02 F02 410kN
F02 F02
2500

175kN 180kN MEP ENGINEER


F08
F08 F08
XA2
F03 F01 F01 F03

PLOT STAGE LOCATION


3600

LINE
ISSUED FOR TILAL, ALSUYOH SUBURB,
160kN WATER TANK DETAILS 140kN 160kN CONSTRUCTION SHARJAH,UAE
REFER TO DRAWING NO.
MAS-P2AB-STR-CL3A-0301 DRAWING TITLE :
XA1 F01 F01 F01 CL3A - FOUNDATION PLAN
PLOT
LINE

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

FOUNDATION PLAN JOB NO. SHEET SIZE SCALE REV. NO.


1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3A-0101
NORTH

CL3A - BEAMS SCHEDULE - GROUND FLOOR LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
SIDE Column / Wall Stop Below Slab Level
BEAM EXTRA AT EXTRA AT BARS
STRAIGHT STRAIGHT FROM
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 FACE Denotes Slab Opening
G-B01 200 500 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - 200 Denotes Slab / Raft Thickness In mm.
G-B02 200 500 2T12 2T12 2T12 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B03 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B04 200 500 2T16 - 2T16 - 2T16 T10 - 200 T10 - 200 2 - - M 02 C
G-B05 200 500 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M
Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
mesh unless otherwise mentioned on the drawings. TO COMMENCEMENT OF ANY WORK.
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ


32200
3200 5400 4200 3300 3300 4200 5400 3200

PLOT PLOT
LINE LINE

FOR BOUNDARY WALL DETAILS


REFER TO SHEET
MAS-P2AB-STR-GEN-0006

G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XA6 NO DATE BY REVISION APP
R E V I S I O N
100 100 100 100 PROJECT :
G-B03
G-B03

G-B03
4100

G-B03

G-B03

SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE


S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 VILLAS AT PHASE 02 OF MASAAR

G-B02 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B02 CLIENT


XA5
G-B01

G-B01

UP UP UP UP
G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03
G-B03

G-B03
G-B01

G-B01
2775

G-B03

G-B03

G-B03
G-B03

G-B03

G-01 MASAAR DEVELOPMENTS LLC


0301 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01
XA4 CONSULTANT
G-B02 G-B02
16200

130MM PLAIN 130MM PLAIN


CONCRETE CONCRETE
G-B01

G-B01
G-B04

G-B04
3225

G-B03

G-B03

G-B03
G-B03

G-B03

G-B05 G-B05 G-B05 G-B05 G-B05 G-B05


XA3
100 100
G-B03

G-B03
2500

SLAB ON GRADE SLAB ON GRADE MEP ENGINEER


G-B01 S.S.L.-0.230 S.S.L.-0.230 G-B01
200 200
XA2
G-B03

G-B03

G-B03

RC SLAB RC SLAB
S.S.L.-0.400 S.S.L.-0.400
200 200 PLOT STAGE LOCATION
3600

LINE
RC SLAB RC SLAB ISSUED FOR TILAL, ALSUYOH SUBURB,
WATER TANK DETAILS CONSTRUCTION SHARJAH,UAE
S.S.L.-0.700 REFER TO DRAWING NO. S.S.L.-0.700
MAS-P2AB-STR-CL3A-0301 DRAWING TITLE :
XA1
CL3A - GROUND FLOOR - FRAMING PLAN
PLOT
LINE

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

GROUND FLOOR - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3A-0102
NORTH

CL3A - BEAMS SCHEDULE - 1ST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
SIDE Column / Wall Stop Below Slab Level
BEAM EXTRA AT EXTRA AT BARS
STRAIGHT STRAIGHT FROM 1 T12-400 C/C A 1500
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS 2 T12-200 C/C B 2000 KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 FACE Denotes Slab Opening
1-B01 200 500 2T12 - 2T16 - - T10 - 200 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
1-B02 200 600 2T16 2T12 2T16 2T12 - T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
1-B03 200 900 2T16+2T12 - 2T16 2T12 - T10 - 200 T10 - 200 2 2T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600 M 02 C
1-B04 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 2T10 -
1-B05 200 900 2T16 - 2T12 2T12 - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M
1-CB01 200 500 2T12 - 2T20 2T16 - T10 - 150 - 2 - - G 4400 Top extra rebars
1-CB02 200 600 2T12 - 2T20 2T12 - T10 - 150 - 2 - - Bottom extra rebars
H 4800
1-CB03 200 600 2T16 - 2T20 2T16 - T10 - 150 - 2 - - * Inverted Beam
1-CB04 200 900 2T12 - 2T20 2T16 - T10 - 150 - 2 2T10 - J 5400 NOTES
K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

LEGEND:

Stair Opening Boundary SIGNED


Additional Rebars
D<-!,11a11
3T16 TOP & BOT Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ


32200
3200 5400 4200 3300 3300 4200 5400 3200

PLOT PLOT
LINE LINE
600

600

600
1-CB03
1-CB03

1-CB03
1900

1900
1-CB02

1-CB02
8-t2A 6-t1A 6-t1A 8-t2A

7-t2B
7-t2B

6-t1A

6-t1A

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


XA6 NO DATE BY REVISION APP
T12-200 TOP MESH T12-200 TOP MESH
R E V I S I O N
T12-200 TOP MESH 200 T12-200 BOT MESH T12-200 BOT MESH 200 T12-200 TOP MESH
200 T12-200 BOT MESH T12-200 BOT MESH 200 PROJECT :
RC SLAB RC SLAB
1-B02
1-B02

1-B02
4100

1-B02

1-B02
RC SLAB RC SLAB
S.S.L.+3.400 S.S.L.+3.400 VILLAS AT PHASE 02 OF MASAAR
S.S.L.+3.400 S.S.L.+3.400
7-t2A

7-t2A
800

800

CLIENT
900

900

1-CB01 1-B01 1-B01 1-B01 1-B01 1-CB01


0

80
80

XA5
0
1-B02

1-B02
1-B02
1-B02

1-B02
2775

80
80

8-t2A DN DN DN DN 8-t2A MASAAR DEVELOPMENTS LLC


8-b2B

8-b2B

7-t2A
7-t2A

11-t2A

11-t2A

XA4 CONSULTANT
1000

1000

1-CB01 1-B01 1-CB01 1-B01 1-B01 1-CB01 1-B01 1-CB01


800

800
16200
3225

1-B02
1-B02

1-B02
1-B02

1-B02

8-t2C 8-C
8-t2A 1-B01 1-B01 8-t2A
7-t2B

7-t2B

XA3
2500

1-02 1-02
7-t2B

7-t2B

0301 0301 MEP ENGINEER


7-t2B

XA2
1-B03

1-B03

1-B03
600

600

600

600

1450 500 500 1450


1-CB04

1-CB04

PLOT STAGE LOCATION


1-01
3600

DOWNSTAND WALL LINE


0301 REFER TO SECTION 1-01 ISSUED FOR TILAL, ALSUYOH SUBURB,
FOR TYP. DETAIL CONSTRUCTION SHARJAH,UAE

1-B05 1-B04 1-B04 1-B05 DRAWING TITLE :


XA1
CL3A - FIRST FLOOR - FRAMING PLAN
PLOT
LINE BEAM BEAM BEAM
EXTENSION T.O.B.+3.500 EXTENSION T.O.B.+3.500 EXTENSION

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

FIRST FLOOR - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3A-0103
NORTH

CL3A - BEAMS SCHEDULE - ROOF FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
SIDE Column / Wall Stop Below Slab Level
BEAM EXTRA AT EXTRA AT BARS
STRAIGHT STRAIGHT FROM 1 T12-400 C/C A 1500
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS 2 T12-200 C/C B 2000 KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 FACE Denotes Slab Opening
R-B01 200 500 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B02 200 600 2T16+2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
R-CB01 200 600 2T12 - 2T20 2T12 - T10 - 200 - 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600 M 02 C
R-CB02 200 600 2T12 - 2T20+2T20 2T12 - T10 - 200 - 2 - -
R-CB03 200 800 2T12 - 2T20+2T20 2T16 - T10 - 200 - 2 1T10 SEE DETAILS F 4000 S.S.L. +1.000 Slab Surface Level in M
G 4400 Top extra rebars
H 4800 Bottom extra rebars
* Inverted Beam
XA2 J 5400 NOTES
K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
PAREPET N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
AS/TYP. DET. TO COMMENCEMENT OF ANY WORK.
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
REINF. AS T 10,000 top and bottom unless otherwise shown on the plan.
PER SCHED.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
S.S.L. Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
250

6900 Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
Level Roof
X 12,000 elements attached to structural concrete need to allow for joint
200

to accommodate the slab deflection of L/240 without sustaining


800

A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
600 GEN-0004.

COLUMN
AS/SCHED.

SIGNED

D<-!,11a11
BEAM R-CB03 DETAIL Architects+
Engineers
CB3
1 : 20

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ


32200
3200 5400 4200 3300 3300 4200 5400 3200

PLOT PLOT
LINE LINE

T12-200 TOP MESH T12-200 TOP MESH


200 T12-200 BOT MESH T12-200 BOT MESH 200

RC SLAB RC SLAB
S.S.L.+6.900 S.S.L.+6.900
R-CB01*
R-CB01*

R-CB01*
R-CB01*

R-CB01*
1900

1900
12-t2A 6-t1A 6-t1A 12-t2A

12-t2A
12-t2A

6-t1A

6-t1A

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


XA6 PS1 PS1
NO DATE BY REVISION APP
R E V I S I O N
200 200 PROJECT :
R-B02*

R-B02*
R-B02*
R-B02*

R-B02*
4100

RC SLAB RC SLAB
VILLAS AT PHASE 02 OF MASAAR
S.S.L.+6.900 S.S.L.+6.900

T12-200 TOP MESH T12-200 TOP MESH


12-t2A T12-200 BOT MESH 6-t1A R-B01* R-B01* 6-t1A T12-200 BOT MESH 12-t2A CLIENT
12-t2B
12-t2B
14-b1E

6-t1A

6-t1A

XA5 PS1 PS1


14-b1E
R-B02*

R-B02*
R-B02*

R-01
R-B02*

R-B02*
2775

0301 13-t4A 13-t4A


6-t1A 6-t1A MASAAR DEVELOPMENTS LLC
7-t2A
50

7-t2A

R-B01* R-B01*
XA4
6-t1A

6-t1A

CONSULTANT
43-b3K 43-Kb3
16200

R-B02*
R-B02*

R-B02*
3225

31-b3Q
31-b3Q
R-B02*

R-B02*

8-t2D 16-t2D 8-t2D

XA3
31-t3Q
31-t3Q
2500

29-t3D
29-t3D

29-t3D

R-CB02*
R-CB03*

R-CB03*

PARAPET WALL DETAIL TOP OF PARAPET MEP ENGINEER


43-t3L REFER TO SHEET NO. AS/ARCH. 43-t3L
R-CB01*

R-CB01*

MAS-P2AB-STR-CL3C-0301
XA2
600

600

T12-200 TOP MESH T12-200 TOP MESH


T12-200 BOT MESH CB3 T12-200 BOT MESH PLOT STAGE LOCATION
3600

250 250 LINE


0104 ISSUED FOR TILAL, ALSUYOH SUBURB,
RC SLAB RC SLAB CONSTRUCTION SHARJAH,UAE
S.S.L.+6.950 S.S.L.+6.950 DRAWING TITLE :
XA1
CL3A - ROOF - FRAMING PLAN
PLOT
LINE

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

ROOF - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 As indicated C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3A-0104
NORTH

LEGEND:
YAA YAB YAC YAD YAE YAF YAG YAH YAJ Column / Wall Continuous
Column / Wall Stop Below Slab Level
32200
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
3200 5400 4200 3300 3300 4200 5400 3200 C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
1100 150 50 1100 W DENOTES WALL
100 100 100 100 100 CW DENOTES CORE WALL

800

800

800

800
100

100

100
XA6

150

150

150

150
1000

1000

1000
1000

1000
250 C03 200 C02 200 C02 250 C03 NOTES

200 C01 200 C01 200 C01 200 C01 200 C01 NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
4100

ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM


1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
100 100 STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
100 100 100 2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
1300 1000 1000 1300 drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
800

800
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing

400

400
200

200
100

100

100

100
200

800

200

800

200

800

200
XA5 series STR-0401.

400
200 C02 200 C02
1000 C01 800 C02 800 C02 1000 C01
200 C02 200 C02 200 C02
2775

100 1800 100 250 100 250 100 1800 100

100

100

100
XA4

200

200

200

200
800

800

800
800

800
1000 C01 600 C04 600 C04 1000 C01
16200

200 C02 200 C02 200 C02 200 C02 200 C02
3225

100 100 200 100 200 100 100


100

100

100

100

100

100

100
200

200
XA3
600

600
1000
1400

1400
600 C05 600 C05
100 200 C05 200 C05 100
2500

100 200 C01 100


C07 C07
200 200
1000

1000
600

600
XA2
200 C01A 200 C05 200 C05 200 C01A

SIGNED

D<-!,11a11
3600

100 100 100 Architects+


Engineers
500

500

500
■•
250

250

250
XA1 200 C06 200 C06 200 C06
ISSUED FOR CONSTRUCTION
SUBJECT TO AUTHORITIES APPROVALS

GROUND FLOOR - COLUMN LAYOUT


2
1 : 100

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

32200
3200 5400 4200 3300 3300 4200 5400 3200

1100 150 50 1100


100 100 100 100 100
800

800

800

800
100

100

100

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


XA6
150

150

150

150
1000

1000

1000

NO DATE BY REVISION APP


1000

1000
250 C03 200 C02 200 C02 250 C03
R E V I S I O N
200 C01 200 C01 200 C01 200 C01 200 C01 PROJECT :
4100

100 100 VILLAS AT PHASE 02 OF MASAAR


100 100 100
1300 1000 1000 1300
800

800
CLIENT
400

400
200

200
100

100

100

100
200

800

200

800

200

800

200

XA5
400

200 C02 200 C02


1000 C01 800 C02 800 C02 1000 C01
200 C02 200 C02 200 C02
2775

100 1800 100 250 100 250 100 1800 100 MASAAR DEVELOPMENTS LLC
100

100

100

XA4
200

200

200

200

CONSULTANT
800

800

800
800

800

1000 C01 600 C04 600 C04 1000 C01


16200

200 C02 200 C02 200 C02 200 C02 200 C02
3225

100 100 200 100 200 100 100


100

100

100

100

100

100

100
200

200

XA3
600

600
1000
1400

1400

600 C05 600 C05


100 200 C05 200 C05 100
2500

100 200 C01 100


MEP ENGINEER
200 C07 200 C07
1000

1000
600

600

XA2
200 C01A 200 C05 200 C05 200 C01A

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


100 100 100 CONSTRUCTION SHARJAH,UAE
500

500

500

DRAWING TITLE :
250

250

250

XA1 200 C06 200 C06 200 C06 CL3A - FOUNDATION & GROUND FLOOR -
COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

FOUNDATION - COLUMN LAYOUT JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3A-0201
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
CW DENOTES CORE WALL

NOTES

NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing
series STR-0401.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

32200
3200 5400 4200 3300 3300 4200 5400 3200

1150 150 50 1150


100 100 100 100 100
800

800

800

800
100

100

100

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


XA6
150

150

150

150
1000

1000

1000

NO DATE BY REVISION APP


1000

1000
200 C03 200 C02 200 C02 200 C03
R E V I S I O N
200 C01 200 C01 200 C01 200 C01 200 C01 PROJECT :
4100

100 100 VILLAS AT PHASE 02 OF MASAAR


100 100 100
1300 1000 1000 1300
800

800
CLIENT
400

400
200

200
100

100

100

100
200

800

200

800

200

800

200

XA5
400

200 C02 200 C02


1000 C01 800 C02 800 C02 1000 C01
200 C02 200 C02 200 C02
2775

100 1800 100 250 100 250 100 1800 100 MASAAR DEVELOPMENTS LLC
100

100

100

XA4
200

200

200

200

CONSULTANT
800

800

800
800

800

1000 C01 600 C04 600 C04 1000 C01


16200

200 C02 200 C02 200 C02 200 C02 200 C02
3225

100 100 100


100

100

100

XA3
1000
1400

1400

100 100
2500

200 C01 MEP ENGINEER


C07 C07
200 200
1000

1000

XA2
200 C01A 200 C01A

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XA1
CL3A - FIRST FLOOR - COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

1ST FLOOR - COLUMN LAYOUT JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3A-0202
NORTH

KEY PLAN

YAC XA2
M 02 C
COMPRESSIBLE
MATERIAL AS PER
DOWNSTAND WALL
ELEVATION
YAB SS
TYP. DETAILS 0301
130MM PLAIN
CONCRETE F.F.L. F.F.L.
F.F.L. GROUND BEAM 400
0 SLAB ON GRADE 3500 4T16 (TYP.) 3500
AS/SCHED. S.S.L.
AS/PLAN 1ST FLOOR 1ST FLOOR
GROUND FLOOR +3.40 m

100
NOTES
130 100
S.S.L.

200
230

100
-0.23 m 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED

900
DOWNSTAND WALL DIMENSIONS ONLY ARE TO BE CONSIDERED.
REFER TO SECTION 1-01 300 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
T10-200 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
T10-200
DOWNSTAND
S.S.L. WALL (TYP.)
-1100
FOUNDATION LEVEL
200
S.S.L.
-1150
EXCAVATION LEVEL
FOUNDATION
AS/PLAN

SECTION G-01 SECTION 1-01 SECTION 1-02


G-01 1 : 20 1-01 1 : 20 1-02 1 : 20

100 100

200 800 200 SIGNED


T12-150 CLEAR OPENING
S.S.L. -0.320m
T12-150 D<-!,11a11
Architects+
PARAPET PARAPET Engineers
200

WALL WALL

T12-150
■•

Hmax = 1600MM

Hmax = 1600MM
300

T10-200 EF T10-200 EF ISSUED FOR CONSTRUCTION


T12-150 T12-150 T12-200 EF T12-200 EF T12-200 EF SUBJECT TO AUTHORITIES APPROVALS
T12-150
WATER SURFACE LEVEL
GRP LINING
200 200
F.F.L. AS PER F.F.L. AS PER T10-200 EF
ARCH. ARCH. (TYPICAL)
1500

2 LAYERS OF BITUMINOUS
1200

PROTECTIVE COAT AS/SPECS S.S.L. AS PER S.S.L. AS PER


FRAMING PLAN FRAMING PLAN
PLAN
UP-STAND
PVC WATER STOPER PVC WATER STOPER BEAM AS/PLAN
& SCHED.
T12-150
S.S.L. -2.020m
T12-150
150

150

REINJECTABLE HOSE REINJECTABLE HOSE


BLOCK WORK
RC SLAB RC SLAB
200

AS/ARCH.
AS/PLAN AS/PLAN

200 VARIES 200 CASE 1 (EDGE) CASE 2


LEAN CONCRETE NOTES:
• "H" IS THE PARAPET HEIGHT AS PER ARCHI.
2 LAYERS OF BITUMINOUS C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
PROTECTIVE COAT AS/SPECS NO DATE BY REVISION APP
R E V I S I O N
TYPICAL WATER TANK DETAILS WELL COMPACTED SOIL UP TO 95% OF TYPICAL DETAIL OF PARAPET WALL
WT 1 : 20
MAXIMUM DRY DENSITY
PW 1 : 20
PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

MASAAR DEVELOPMENTS LLC


CONSULTANT
BEAM LINKS

Ld
S

TOP REINF. AS/PLAN


BEAM TOP BARS AS
PER BEAM SCEH.
W MIN. 2T12 W Ld
2T16 TOP BARS
Ld Ld
VL BARS AS PER VL BARS AS PER
COLUMNS SCEHD. COLUMNS SCEHD. T12@100 HORIZONTAL
MIN. 600mm

CLOSED STIRRUPS XA4


S/2

LINKS BEAM TOP BARS AS LINKS BOT REINF. AS/PLAN


L

BEAM BARS TO BE VL BARS AS PER 100


PER BEAM SCEH. MEP ENGINEER
EXTENDED IN COLUMNS SCEHD.
MIN. 2T16 T10-200
CANTILEVER AS
SHOWN S.S.L. SLAB REINF. AS/PLAN
250
SHORT CANTILEVER

SHORT CANTILEVER

S.S.L. +6.95 m T12-200


BEAM 6900 S.S.L. AS PER
L=AS PLAN

L=AS PLAN

Level Roof FRAMING PLAN


50

W=600 mm

H
S

250

MIN.
200
S

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,

H
COL. LINKS CONSTRUCTION SHARJAH,UAE
BEAM BEAM RC SLAB RC SLAB
AS/PLAN
300 DRAWING TITLE :
AS/PLAN
MINIMUM
PLAN PLAN SECTION 4T16 T&B CL3A - STRUCTURAL DETAILS - 1

CASE 1 CASE 2
NOTES:
SHORT CANTILEVER WITH EXTENSION SHORT CANTILEVER WITHOUT EXTENSION • THIS DETAIL APPLICABLE FOR SLAB STEPPING OF 150 MM OR LESS. DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


TYPICAL SHORT CANTILEVER DETAIL SECTION R-01 TYPICAL DETAIL OF SLAB STEPPING D21-44 A1 1 : 20 C00

SCB 1 : 20 R-01 1 : 20 SS 1 : 20
DRAWING NO.
MAS-P2AB-STR-CL3A-0301
NORTH

COLUMNS - SCHEDULE AND TYPICAL DETAILS


NOTES:
KEY PLAN
1. Splice of vertical bars shall be made at mid-height of the column ,
500 600 / 700 600 / 700 800 / 900 1000 / 1100 1000 / 1100 1000 / 1100
and shall be staggered at least Ld.
2. Splice of each individual bar within a bundle shall be staggered at
least Ld.
M 02 C
3. Mechanical splice shall be used where reinforcement ratio exceeds
200

200

200

200

200

200

200
or equals 4%.

TYPE 1 TYPE 2 TYPE 2 TYPE 3 TYPE 4 TYPE 4A TYPE 4B


NO. OF BARS: 8 NO. OF BARS: 10 NO. OF BARS: 10 + 4 = 14 NO. OF BARS: 12 NO. OF BARS: 14 NO. OF BARS: 14 + 4 = 18 NO. OF BARS: 14 + 8 = 22
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

1400 500
200

200
TYPE 5 TYPE 1A
NO. OF BARS: 18 NO. OF BARS: 8 + 4 = 12

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
ROOF FLOOR ROOF FLOOR
S.S.L. S.S.L. VILLAS AT PHASE 02 OF MASAAR
-XX.XXX M -XX.XXX M

CLIENT

SECTION : 200 X 1000 SECTION : 200 X 800


TYPE : 4B TYPE : 3
C40 V-BARS : 14T16 V-BARS : 12T16 C40
ADD. V : 8T16 ADD. V : 4T16 MASAAR DEVELOPMENTS LLC
1ST FLOOR LINKS : T10-200 LINKS : T10-200 1ST FLOOR CONSULTANT
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C40 C40
MEP ENGINEER
GROUND FLOOR GROUND FLOOR
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
SECTION : 200 X 1000 SECTION : 200 X 1000 SECTION : 200 X 800 SECTION : 250 X 800 SECTION : 200 X 600 SECTION : 200 X 600 SECTION : 200 X 500 SECTION : 200 X 1400 CONSTRUCTION SHARJAH,UAE
TYPE : 4 TYPE : 4 TYPE : 3 TYPE : 3 TYPE : 2 TYPE : 2 TYPE : 1A TYPE : 2 DRAWING TITLE :
C40 V-BARS : 14T16 V-BARS : 14T16 V-BARS : 12T16 V-BARS : 12T16 V-BARS : 10T16 V-BARS : 10T16 V-BARS : 8T12 V-BARS : 18T16 C40
ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : 4T12 ADD. V : - CL3A - COLUMNS SCHEDULE
FOUNDATION LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 FOUNDATION
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

DRAWN BY CHECKED BY APPROVED BY DATE

LEVEL LEVEL DAE DAE DAE 14/12/2022


CONC. CONC.
GRADE
C01 C01A C02 C03 C04 C05 C06 C07 GRADE JOB NO. SHEET SIZE SCALE REV. NO.
COLUMN COLUMN
D21-44 A1 1 : 20 C00
MARK MARK
DRAWING NO.
MAS-P2AB-STR-CL3A-0401
NORTH

YAB YAC
FLOOR SLAB KEY PLAN
AS/PLAN 120
5400 0
T12-150
F.F.L. T10-200
3500 T10-200
1ST FLOOR (TYP.) M 02 C

100

100
T8 (TYP.)
FLIGHT-C

1260
120 NOTES
0
T12-150 T12-150 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
T10-200 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
3500

T10-200

3400
FLIGHT-B ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM

200
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
T12-150 DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE

2140
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
T12-150 2-T16 TO COMMENCEMENT OF ANY WORK.

FLIGTH-A

200

200
F.F.L.
0
GROUND FLOOR
T10-150
100

T12-150 200

400
S.S.L.
1150

-1100 T12-150
FOUNDATION LEVEL

S.S.L.
-1150 DETAILS OF STAIRCASE FLIGHT-C LANDING BEAM
2-T20
EXCAVATION LEVEL AS/SCHEDULE

STAIRCASE 1 - SECTION
3 1 : 50

SIGNED

YAB YAC D<-!,11a11


Architects+
Engineers
5400

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

XA5
1195

1220

T12-150
T12-150 T12-150 T10-200
(TYP.)
2775

T10-200
280

280

T8 (TYP.) T12-150

200
T12-150
1200

1175

3 DN
0601
T12-150

200
XA4 T12-150 T12-150
T10-200

200
T12-150
T12-150

DETAILS OF STAIRCASE FLIGHT-B


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
R E V I S I O N

STAIRCASE 1 - FIRST FLOOR PLAN PROJECT :

2 1 : 50
VILLAS AT PHASE 02 OF MASAAR

CLIENT

LANDING BEAM

T12-150
YAB YAC T10-200
MASAAR DEVELOPMENTS LLC
CONSULTANT

200
5400

T10-200
T12-150
T10-200
XA5 (TYP.)

T8 (TYP.)

200
1200

MEP ENGINEER
2775

T12-150 T12-150
T10-200 T10-200
3 STAGE LOCATION
0601 ISSUED FOR TILAL, ALSUYOH SUBURB,
SLAB
AS/PLAN CONSTRUCTION SHARJAH,UAE
XA4
DRAWING TITLE :

CL3A - STAIR CASE-1 DETAILS

GRADE BEAM
AS/SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


DETAILS OF STAIRCASE FLIGHT-A D21-44 A1 As indicated C00
STAIRCASE 1 - GROUND FLOOR PLAN
1 1 : 50
DRAWING NO.
MAS-P2AB-STR-CL3A-0601
NORTH

YAD YAE FLOOR SLAB KEY PLAN


AS/PLAN 120
0
3300 T12-150
F.F.L.
T10-200
3500
T10-200
1ST FLOOR
(TYP.) M 02 C

100
T8 (TYP.)

FLIGHT-C

1425
120 NOTES
0
T12-150 T12-150 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
T10-200 T10-200
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM

3400

200
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
FLIGHT-A 2. THIS DRAWING IS NOT TO BE SCALED. STATED
T12-150 DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
T12-150 2-T16 TO COMMENCEMENT OF ANY WORK.
FLIGHT-B

200

200
F.F.L.
0
GROUND FLOOR T10-150
100

T12-150 200

400
T12-150

DETAILS OF STAIRCASE FLIGHT-C LANDING BEAM


2-T20
AS/SCHEDULE

STAIRCASE 2 - SECTION
3 1 : 50

SIGNED

YAD YAE D<-!,11a11


Architects+
Engineers
3300

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

XA5
1175
S.S.L.+1.642 T12-150
1220

T12-150 T12-150 T10-200


T10-200 (TYP.)
2775

280

S.S.L.+1.975 T8 (TYP.) T12-150

200
T12-150
3
1175

0602 DN
T12-150

200
T12-150 T12-150
XA4 T10-200

200
T12-150
2200 1225
T12-150

DETAILS OF STAIRCASE FLIGHT-B


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
R E V I S I O N
STAIRCASE 2 - FIRST FLOOR PLAN
2 1 : 50
PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

LANDING BEAM

YAD YAE T12-150


T10-200
MASAAR DEVELOPMENTS LLC
3300
CONSULTANT

200
2475 1175
T10-200
T12-150
T10-200
XA5 (TYP.)

T8 (TYP.)

200
UP
MEP ENGINEER
2775

T12-150 T12-150
3 T10-200 T10-200
0602 STAGE LOCATION
SLAB ISSUED FOR TILAL, ALSUYOH SUBURB,
AS/PLAN CONSTRUCTION SHARJAH,UAE
XA4
DRAWING TITLE :

CL3A - STAIR CASE-2 DETAILS

GRADE BEAM
AS/SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


STAIRCASE 2 - GROUND FLOOR PLAN DETAILS OF STAIRCASE FLIGHT-A
1
D21-44 A1 As indicated C00
1 : 50 DRAWING NO.
MAS-P2AB-STR-CL3A-0602
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.5 2.00 2.5 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 3.00

6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

32200
3200 5400 4200 3300 3300 4200 5400 3200

2 2 2
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XA6 NO DATE BY REVISION APP

TV D
D TV

TVD
DTV

R E V I S I O N
PROJECT :
4100

1 1
VILLAS AT PHASE 02 OF MASAAR

CLIENT
XA5
2775

3 3 3
MASAAR DEVELOPMENTS LLC
XA4 CONSULTANT
16200

3225

D D

XA3
2500

MEP ENGINEER

XA2

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XA1
CL3A - FIRST FLOOR - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

1ST FLOOR - LOADING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3A-0901
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.5 2.00 2.5 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 3.00

6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAG YAH YAJ

32200
3200 5400 4200 3300 3300 4200 5400 3200

7
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
4000

4000
XA6 6 6 NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
4100

VILLAS AT PHASE 02 OF MASAAR

CLIENT
XA5
2775

8
MASAAR DEVELOPMENTS LLC
XA4 CONSULTANT
16200

3225

XA3
4000

4000
2500

6 6 MEP ENGINEER
7
XA2

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XA1
CL3A - ROOF - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

ROOF - LOADING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3A-0902
NORTH

CL3B - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
F01 1000 1000 300 T12 - 200 T12 - 200 - - Denotes Slab Opening
F02 1100 1300 400 T12 - 125 T12 - 125 - -
F03 1300 1700 400 T12 - 150 T12 - 150 - - 200 Denotes Slab / Raft Thickness In mm.
F04 1500 1900 400 T16 - 200 T16 - 200 - -
F05 1700 2100 400 T16 - 200 T16 - 200 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
M 02 C
F06 1900 2300 400 T16 - 200 T16 - 200 - -
F08 2300 2700 400 T16 - 200 T16 - 100 - -
S.S.L. +1.000 Slab Surface Level in M
Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For Grade of Concrete of the Foundation and Ground Beams ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
refer to General Notes drawing No. MAS- P2AB-STR-0002. TO COMMENCEMENT OF ANY WORK.
4. The Allowable net bearing capacity at Foundation level is as per
Soil Investigation Report No. RSl2022-0185 SHJ, issued by
M/S ELEMENT ENG'G LABORATORY, dated 27/08/2022.
6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
7. The contractor to conduct the required tests and confirm soil
bearing capacities before foundation construction.
8. For plots with narrow space between asset footprint and
boundary wall, the contractor shall submit shop drawings in light
of the measures below for the engineer’s review, and
implement the advised work without extra cost.
8.1 The water tank shall be moved to avoid the clash
considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBJ YBK YBL
39700
3200 5400 4200 3300 4200 3300 3300 4200 5400 3200 PLOT
LINE

FOR BOUNDARY WALL DETAILS


REFER TO SHEET
PLOT
MAS-P2AB-STR-GEN-0006
LINE

WORKING LOAD FROM COLUMN


ENVELOPE SERVICE REACTION

570kN 435kN 460kN 455kN 570kN

610kN 580kN 500kN 610kN


325kN 320kN
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XB6 NO DATE BY REVISION APP

F04 F04 F04 R E V I S I O N


F05 F05
PROJECT :
F03 F05 F05 F04 F05 F03
4100

395kN 390kN VILLAS AT PHASE 02 OF MASAAR


465kN 565kN 600kN 570kN 465kN
370kN 410kN 375kN 415kN
CLIENT
XB5
F03 F03
F04 F04 F03 F04
F04 F04
2775

F05 F05 F05


690kN 685kN
490kN 450kN 430kN 490kN 465kN 370kN 450kN 455kN 490kN
MASAAR DEVELOPMENTS LLC
XB4 CONSULTANT
16200

F04 F04 F04


F06 F03 F06
3225

F04 F04 F04 F04 F04


900kN 875kN
1045kN 1045kN
270kN 280kN 285kN 280kN 270kN

XB3
410kN F02 F02 F02 410kN
F02 F02
2500

175kN 180kN MEP ENGINEER


F08 F08
F08 F08
XB2
F03 F01 F01 F03 PLOT
LINE
STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


160kN 145kN WATER TANK DETAILS 145kN 160kN CONSTRUCTION SHARJAH,UAE
REFER TO DRAWING NO.
MAS-P2AB-STR-CL3C-0301 DRAWING TITLE :
XB1 F01 F01 F01 F01 CL3B - FOUNDATION PLAN
PLOT
LINE

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

FOUNDATION PLAN JOB NO. SHEET SIZE SCALE REV. NO.


1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3B-0101
NORTH

CL3B - BEAMS SCHEDULE - GROUND FLOOR LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
SIDE Column / Wall Stop Below Slab Level
BEAM EXTRA AT EXTRA AT BARS
STRAIGHT STRAIGHT FROM
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 FACE Denotes Slab Opening
G-B01 200 500 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - 200 Denotes Slab / Raft Thickness In mm.
G-B02 200 500 2T12 2T12 2T12 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B03 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B04 200 500 2T16 - 2T16 - 2T16 T10 - 200 T10 - 200 2 - - M 02 C
G-B05 200 500 2T12 - 2T16 - - T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M
Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
mesh unless otherwise mentioned on the drawings. TO COMMENCEMENT OF ANY WORK.
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBJ YBK YBL
39700
3200 5400 4200 3300 4200 3300 3300 4200 5400 3200 PLOT
LINE

FOR BOUNDARY WALL DETAILS


REFER TO SHEET
PLOT
MAS-P2AB-STR-GEN-0006
LINE

G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XB6 NO DATE BY REVISION APP
R E V I S I O N
100 100 100 100 100 PROJECT :
G-B03

G-B03
G-B03

G-B03
4100

G-B03

G-B03
SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE
VILLAS AT PHASE 02 OF MASAAR
S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100

G-B02 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B02 CLIENT
XB5
UP UP UP UP UP
G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03
G-B03

G-B03

G-B03
G-B03

G-B03
G-B03

G-B03
2775

G-B03

G-B03

G-B03

G-B03
G-B03

G-B03
G-01
0301 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 MASAAR DEVELOPMENTS LLC
XB4 CONSULTANT
G-B02 G-B02
16200

130MM PLAIN 130MM PLAIN


CONCRETE CONCRETE
G-B01

G-B01

G-B01
G-B04

G-B04
3225

G-B03

G-B03

G-B03

G-B03
G-B03

G-B03
G-B05 G-B05 G-B05 G-B05 G-B05 G-B05 G-B05 G-B05
XB3
100
G-B03

G-B03
2500

SLAB ON GRADE MEP ENGINEER


G-B01 S.S.L.-0.230 G-B01
200 200 200
XB2
G-B03

G-B03

G-B03

G-B03

RC SLAB RC SLAB RC SLAB PLOT


S.S.L.-0.400 S.S.L.-0.400 S.S.L.-0.400 LINE
200 200
STAGE LOCATION
3600

RC SLAB RC SLAB ISSUED FOR TILAL, ALSUYOH SUBURB,


WATER TANK DETAILS CONSTRUCTION SHARJAH,UAE
S.S.L.-0.700 REFER TO DRAWING NO. S.S.L.-0.700
MAS-P2AB-STR-CL3C-0301 DRAWING TITLE :
XB1
CL3B - GROUND FLOOR - FRAMING PLAN
PLOT
LINE

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

GROUND FLOOR - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3B-0102
NORTH

CL3B - BEAMS SCHEDULE - 1ST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
SIDE Column / Wall Stop Below Slab Level
BEAM EXTRA AT EXTRA AT BARS
STRAIGHT STRAIGHT FROM 1 T12-400 C/C A 1500
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS 2 T12-200 C/C B 2000 KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 FACE Denotes Slab Opening
1-B01 200 500 2T12 - 2T16 - - T10 - 200 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
1-B02 200 600 2T16 2T12 2T16 2T12 - T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
1-B03 200 900 2T16+2T12 - 2T16 2T12 - T10 - 200 T10 - 200 2 2T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600 M 02 C
1-B04 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 2T10 -
1-B05 200 900 2T16 - 2T12 2T12 - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M
1-CB01 200 500 2T12 - 2T20 2T16 - T10 - 150 - 2 - - G 4400 Top extra rebars
1-CB02 200 600 2T12 - 2T20 2T12 - T10 - 150 - 2 - - Bottom extra rebars
H 4800
1-CB03 200 600 2T16 - 2T20 2T16 - T10 - 150 - 2 - - * Inverted Beam
1-CB04 200 900 2T12 - 2T20 2T16 - T10 - 150 - 2 2T10 - J 5400 NOTES
K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

LEGEND:

Stair Opening Boundary SIGNED


Additional Rebars
D<-!,11a11
3T16 TOP & BOT Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBJ YBK YBL
39700
3200 5400 4200 3300 4200 3300 3300 4200 5400 3200 PLOT
LINE

PLOT
LINE
600

600

600

600
1-CB02*

1-CB02*
1-CB03*

1-CB03*

1-CB03*

1-CB03*
1900

1900
6-t1A 6-t1A 6-t1A
7-t2B

7-t2B
6-t1A

6-t1A

XB6 6-t1A C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH
R E V I S I O N
T12-200 TOP MESH 200 T12-200 BOT MESH 200 T12-200 BOT MESH T12-200 BOT MESH 200 T12-200 TOP MESH
200 T12-200 BOT MESH T12-200 BOT MESH 200 PROJECT :
1-B02*

1-B02*

RC SLAB RC SLAB RC SLAB


1-B02*

1-B02*

1-B02*
1-B02*
4100

RC SLAB RC SLAB
S.S.L.+3.400 S.S.L.+3.400 S.S.L.+3.400 VILLAS AT PHASE 02 OF MASAAR
S.S.L.+3.400 S.S.L.+3.400
7-t2A

7-t2A
7-t2A
800

800
CLIENT
900

900

900

1-CB01 1-B01 1-B01 1-B01* 1-B01 1-B01 1-CB01


0

80
80

80

XB5
0

1-B02*
1-B02*

1-B02*

1-B02*
1-B02*

1-B02*
2775

80
80

80

8-t2A DN DN DN DN DN8-t2A MASAAR DEVELOPMENTS LLC


8-b2B
7-t2A

8-t2B

7-t2A
11-t2A

11-t2A
XB4 CONSULTANT
1000

1000

1000
800

800

1-CB01 1-B01 1-CB01 1-B01 1-CB01 1-B01 1-B01 1-CB01 1-B01 1-CB01
16200

1-B02*

1-B02*
3225

1-B02*

1-B02*

1-B02*
1-B02*

8-t2C 8-t2C
8-t2A 1-B01 8-t2A 1-B01 1-B01 8-t2A
7-t2B

7-t2B

XB3
1-02
2500

0301
7-t2B

7-t2B

7-t2B

MEP ENGINEER
7-t2B

XB2
1-B03*

1-B03*

1-B03*

1-B03*
600

600

600

600

600

PLOT
1450 LINE
1-CB04
1-CB04

500 500 500 1450


1-01 STAGE LOCATION
3600

DOWNSTAND WALL
0301 REFER TO SECTION 1-01 ISSUED FOR TILAL, ALSUYOH SUBURB,
FOR TYP. DETAIL CONSTRUCTION SHARJAH,UAE

1-B05 1-B04 1-B04 1-B04 1-B05 DRAWING TITLE :


XB1
CL3B - FIRST FLOOR - FRAMING PLAN
PLOT
LINE BEAM BEAM BEAM BEAM
T.O.B.+3.500 EXTENSION T.O.B.+3.500 EXTENSION EXTENSION T.O.B.+3.500 EXTENSION T.O.B.+3.500

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

FIRST FLOOR - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3B-0103
NORTH

CL3B - BEAMS SCHEDULE - ROOF FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
SIDE Column / Wall Stop Below Slab Level
BEAM EXTRA AT EXTRA AT BARS
STRAIGHT STRAIGHT FROM 1 T12-400 C/C A 1500
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS 2 T12-200 C/C B 2000 KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 FACE Denotes Slab Opening
R-B01 200 500 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B02 200 600 2T16+2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
R-CB01 200 600 2T12 - 2T20 2T12 - T10 - 150 - 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600 M 02 C
R-CB02 200 600 2T12 - 2T20+2T20 2T12 - T10 - 150 - 2 - -
R-CB03 200 800 2T12 - 2T20+2T20 2T16 - T10 - 150 - 2 1T10 SEE DETAILS F 4000 S.S.L. +1.000 Slab Surface Level in M
G 4400 Top extra rebars
H 4800 Bottom extra rebars
* Inverted Beam
J 5400 NOTES
XB2 K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
PAREPET 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
AS/TYP. DET. N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
REINF. AS 6. Minimum Reinforcement around slab opening shall be 4T20
PER SCHED. T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
S.S.L. Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
250

6900 9. The slabs design adheres to L/240 deflection limit (25mm slab
ROOF PLAN Nos. of bars W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
200
800

to accommodate the slab deflection of L/240 without sustaining


A to X
* damage or non-functionality as a result of slab deflection.
600 10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

COLUMN
AS/SCHED.

SIGNED

D<-!,11a11
BEAM R-CB03 DETAIL Architects+
CB3 Engineers
1 : 20

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBJ YBK YBL

39700
PLOT
3200 5400 4200 3300 4200 3300 3300 4200 5400 3200 LINE

T12-200 TOP MESH T12-200 TOP MESH


PLOT T12-200 BOT MESH T12-200 BOT MESH
LINE 200 200

RC SLAB RC SLAB
S.S.L.+6.900 S.S.L.+6.900
R-CB01*

R-CB01*
R-CB01*

R-CB01*
R-CB01*

R-CB01*
1900

1900
12-t2A 6-t1A 6-t1A 6-t1A 12-t2A

12-t2A
12-t2A

6-t1A

6-t1A

XB6 PS1 6-t1A PS1


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
R E V I S I O N
200 200 200 PROJECT :
R-B02*

R-B02*
R-B02*

R-B02*
R-B02*

R-B02*
4100

RC SLAB RC SLAB RC SLAB


VILLAS AT PHASE 02 OF MASAAR
S.S.L.+6.900 S.S.L.+6.900 S.S.L.+6.900

T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH


12-t2A T12-200 BOT MESH 6-t1A R-B01* T12-200 BOT MESH 6-t1A R-B01* R-B01* 6-t1A T12-200 BOT MESH 12-t2A CLIENT

12-t2B
12-t2B

14-b1E
14-b1E

6-t1A

6-t1A

6-t1A

XB5 PS1 PS1


R-B02*

R-B02*
R-B02*

R-B02*
R-B02*

R-B02*
R-01
2775

0301 13-t4A
6-t1A 6-t1A 6-t1A MASAAR DEVELOPMENTS LLC
50

7-t2A

50
R-B01* R-B01*
XB4
6-t1A

6-t1A

6-t1A

CONSULTANT
43-b3K 43-b3K
16200

R-B02*

R-B02*
R-B02*

R-B02*
3225

31-b3Q
31-b3Q
R-B02*

R-B02*
8-t2D 16-t2D 16-t2D 8-t2D

XB3
31-t3Q
31-t3Q
2500

29-t3D

29-t3D
29-t3D

29-t3D
R-CB03*

R-CB02*

R-CB02*

R-CB03*

TOP OF PARAPET PARAPET WALL DETAIL MEP ENGINEER


43-t3L AS/ARCH. REFER TO SHEET NO. 43-t3L
R-CB01*

R-CB01*
MAS-P2AB-STR-CL3C-0301
XB2
600

600
PLOT
T12-200 TOP MESH T12-200 TOP MESH LINE
T12-200 BOT MESH CB3 T12-200 BOT MESH
STAGE LOCATION
3600

250 0104 250


ISSUED FOR TILAL, ALSUYOH SUBURB,
RC SLAB RC SLAB CONSTRUCTION SHARJAH,UAE
S.S.L.+6.950 S.S.L.+6.950 DRAWING TITLE :
XB1
CL3B - ROOF - FRAMING PLAN
PLOT
LINE

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

ROOF - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 As indicated C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3B-0104
NORTH

LEGEND:
YBA YBB YBC YBD YBE YBF YBG YBH YBJ YBK YBL
Column / Wall Continuous
39700 Column / Wall Stop Below Slab Level
3200 5400 4200 3300 4200 3300 3300 4200 5400 3200 Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
1100 150 150 50 1100 W DENOTES WALL
100 100 100 100 CW DENOTES CORE WALL
100 100

800

800

800

800

800
100

100

100

100
XB6

150

150

150

150

150
1000

1000

1000

1000
1000

1000
250 C03 200 C02 200 C02 200 C02 250 C03 NOTES

200 C01 200 C01 200 C01 200 C01 200 C01 200 C01 NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
4100

1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
100 100 STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
100 100 100 100
1300 1000 1000 1000 1300 drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
800

800
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing

400
200

200
100

100

100

100

100
series STR-0401.

200

800

200

800

200

800

200

800

200
XB5

400

400

400
200 C02 200 C02
1000 C01 800 C02 800 C02 800 C02 1000 C01
200 C02 200 C02 200 C02 200 C02
2775

100 1800 100 250 100 250 100 250 100 1800 100

100

100

100

100
XB4
200

200

200

200

200
800

800

800

800
800

800
1000 C01 600 C04 600 C04 600 C04 1000 C01
16200

200 C02 200 C02 200 C02 200 C02 200 C02 200 C02
3225

100 100 200 100 200 100 200 100 100


100

100

100

100

100

100

100

100

100
200

200

200
XB3
600

600
1000

1000
1400

1400
600 C05 600 C05 600 C05
100 200 C05 200 C05 100
2500

100 200 C01 200 C01 100


200 C07 200 C07
1000

1000
600

600
XB2
200 C01A 200 C05 200 C05 200 C01A
SIGNED

D<-!,11a11
3600

Architects+
100 100 100 100
Engineers
500

500

500

500
■•
250

250

250

250
XB1 200 C06 200 C06 200 C06 200 C06
ISSUED FOR CONSTRUCTION
SUBJECT TO AUTHORITIES APPROVALS

GROUND FLOOR - COLUMN LAYOUT


2
1 : 100
YBA YBB YBC YBD YBE YBF YBG YBH YBJ YBK YBL
39700
3200 5400 4200 3300 4200 3300 3300 4200 5400 3200

1100 150 150 50 1100


100 100 100 100 100 100
800

800

800

800

800
100

100

100

100
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XB6
150

150

150

150

150
1000

1000

1000

1000
NO DATE BY REVISION APP
1000

1000
250 C03 200 C02 200 C02 200 C02 250 C03
R E V I S I O N
200 C01 200 C01 200 C01 200 C01 200 C01 200 C01 PROJECT :
4100

100 100 VILLAS AT PHASE 02 OF MASAAR


100 100 100 100
1300 1000 1000 1000 1300
800

800
CLIENT
400
200

200
100

100

100

100

100
200

800

200

800

200

800

200

800

200
XB5
400

400

400

200 C02 200 C02


1000 C01 800 C02 800 C02 800 C02 1000 C01
200 C02 200 C02 200 C02 200 C02
2775

100 1800 100 250 100 250 100 250 100 1800 100 MASAAR DEVELOPMENTS LLC
100

100

100

100

XB4
200

200

200

200

200 CONSULTANT
800

800

800

800
800

800
1000 C01 600 C04 600 C04 600 C04 1000 C01
16200

200 C02 200 C02 200 C02 200 C02 200 C02 200 C02
3225

100 100 200 100 200 100 200 100 100


100

100

100

100

100

100

100

100

100
200

200

200

XB3
600

600
1000

1000
1400

1400

600 C05 600 C05 600 C05


100 200 C05 200 C05 100
2500

100 200 C01 200 C01 100


MEP ENGINEER
200 C07 200 C07
1000

1000
600

600

XB2
200 C01A 200 C05 200 C05 200 C01A

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


100 100 100 100 CONSTRUCTION SHARJAH,UAE
500

500

500

500

DRAWING TITLE :
250

250

250

250

XB1 200 C06 200 C06 200 C06 200 C06 CL3B - FOUNDATION & GROUND FLOOR -
COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

FOUNDATION - COLUMN LAYOUT JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3B-0201
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
CW DENOTES CORE WALL

NOTES

NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing
series STR-0401.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBJ YBK YBL

39700
3200 5400 4200 3300 4200 3300 3300 4200 5400 3200

1150 150 150 50 1150


100 100 100 100 100 100
800

800

800

800

800
100

100

100

100
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XB6
150

150

150

150

150
1000

1000

1000

1000
NO DATE BY REVISION APP
1000

1000
200 C03 200 C02 200 C02 200 C02 200 C03
R E V I S I O N
200 C01 200 C01 200 C01 200 C01 200 C01 200 C01 PROJECT :
4100

100 100 VILLAS AT PHASE 02 OF MASAAR


100 100 100 100
1300 1000 1000 1000 1300
800

800
CLIENT
400
200

200
100

100

100

100

100
200

800

200

800

200

800

200

800

200
XB5
400

400

400

200 C02 200 C02


1000 C01 800 C02 800 C02 800 C02 1000 C01
200 C02 200 C02 200 C02 200 C02
2775

100 1800 100 250 100 250 100 250 100 1800 100 MASAAR DEVELOPMENTS LLC
100

100

100

100

XB4
200

200

200

200

200 CONSULTANT
800

800

800

800
800

800
1000 C01 600 C04 600 C04 600 C04 1000 C01
16200

200 C02 200 C02 200 C02 200 C02 200 C02 200 C02
3225

100 100 100 100


100

100

100

100

XB3
1000

1000
1400

1400

100 100
2500

200 C01 200 C01 MEP ENGINEER


200 C07 200 C07
1000

XB2 1000
200 C01A 200 C01A

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XB1
CL3B - FIRST FLOOR - COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

1ST FLOOR - COLUMN LAYOUT JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3B-0202
NORTH

KEY PLAN

COMPRESSIBLE M 02 C
MATERIAL AS PER YBC
130MM PLAIN TYP. DETAILS XB2
CONCRETE DOWNSTAND WALL YBB
F.F.L. GROUND BEAM
SLAB ON GRADE ELEVATION SS
0 AS/SCHED.
AS/PLAN 0301
GROUND FLOOR F.F.L. F.F.L. 400
S.S.L. 3500 4T16 (TYP.) 3500
S.S.L. NOTES

230
-0.23 m FIRST FLOOR FIRST FLOOR +3.40 m

100
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL

200
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT

100
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE

900
DOWNSTAND WALL ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
REFER TO SECTION 1-01 TO COMMENCEMENT OF ANY WORK.
T10-200 300

S.S.L. T10-200
-1100 DOWNSTAND
FOUNDATION LEVEL WALL (TYP.)

S.S.L.
-1150 FOUNDATION 200
EXCAVATION LEVEL AS/PLAN

SECTION G-01 SECTION 1-01 SECTION 1-02


G-01 1 : 20 1-01 1 : 20 1-02 1 : 20

100 100

200 800 200


T12-150 CLEAR OPENING SIGNED
S.S.L. -0.320m
T12-150
D<-!,11a11
Architects+
PARAPET PARAPET
Engineers
200

WALL WALL

T12-150 ■•

Hmax = 1600MM

Hmax = 1600MM
300

T10-200 EF T10-200 EF
T12-150 T12-150 T12-200 EF T12-200 EF T12-200 EF ISSUED FOR CONSTRUCTION
SUBJECT TO AUTHORITIES APPROVALS
T12-150
WATER SURFACE LEVEL
GRP LINING
200 200
F.F.L. AS PER F.F.L. AS PER T10-200 EF
ARCH. ARCH. (TYPICAL)
1500

2 LAYERS OF BITUMINOUS
1200

PROTECTIVE COAT AS/SPECS


S.S.L. AS PER S.S.L. AS PER
FRAMING PLAN FRAMING PLAN
PLAN
UP-STAND
PVC WATER STOPER PVC WATER STOPER BEAM AS/PLAN
& SCHED.
T12-150
S.S.L. -2.020m
T12-150
150

150

REINJECTABLE HOSE REINJECTABLE HOSE


BLOCK WORK
RC SLAB RC SLAB
200

AS/ARCH.
AS/PLAN AS/PLAN

CASE 1 (EDGE) CASE 2


200 VARIES 200

LEAN CONCRETE NOTES:


• "H" IS THE PARAPET HEIGHT AS PER ARCHI.
2 LAYERS OF BITUMINOUS
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
PROTECTIVE COAT AS/SPECS
NO DATE BY REVISION APP
WELL COMPACTED SOIL UP TO 95% OF R E V I S I O N
TYPICAL WATER TANK DETAILS MAXIMUM DRY DENSITY TYPICAL PARAPET WALL DETAIL
WT 1 : 20 PW 1 : 20
PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

BEAM LINKS
MASAAR DEVELOPMENTS LLC
CONSULTANT
S

BEAM TOP BARS AS Ld TOP REINF. AS/PLAN


PER BEAM SCEH.
OR PT DESIGN
W MIN. 2T12 W
2T16 TOP BARS Ld
Ld
VL BARS AS PER VL BARS AS PER
COLUMNS SCEHD. COLUMNS SCEHD. T12@100 HORIZONTAL XB4 Ld
MIN. 600mm

CLOSED STIRRUPS
S/2

LINKS BEAM TOP BARS AS LINKS 100


L

BEAM BARS TO BE VL BARS AS PER


PER BEAM SCEH. BOT REINF. AS/PLAN
EXTENDED IN COLUMNS SCEHD.
MIN. 2T16 T10-200 OR PT DESIGN
CANTILEVER AS
S.S.L.
SHOWN
250

S.S.L. +6.95 m MEP ENGINEER


SHORT CANTILEVER

SHORT CANTILEVER

T12-200 SLAB REINF. AS/PLAN


BEAM 6900 OR PT DESIGN
L=AS PLAN

L=AS PLAN

ROOF PLAN
50

S.S.L. AS PER
W=600 mm FRAMING PLAN
250
S

MIN. 200

H
S

COL. LINKS STAGE LOCATION

H
BEAM BEAM RC SLAB ISSUED FOR TILAL, ALSUYOH SUBURB,
AS/PLAN PT/RC SLAB CONSTRUCTION SHARJAH,UAE
AS/PLAN
300
PLAN PLAN SECTION DRAWING TITLE :
MINIMUM
3T16 T&B
CL3B - STRUCTURAL DETAILS - 1
CASE 1 CASE 2
SHORT CANTILEVER WITH EXTENSION SHORT CANTILEVER WITHOUT EXTENSION NOTES:
• THIS DETAIL APPLICABLE FOR SLAB STEPPING OF H=150 MM OR LESS.
DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.

TYPICAL SHORT CANTILEVER DETAIL SECTION R-01 TYPICAL DETAIL OF SLAB STEPPING D21-44 A1 1 : 20 C00

SCB 1 : 20 R-01 1 : 20 SS 1 : 20
DRAWING NO.
MAS-P2AB-STR-CL3B-0301
NORTH

COLUMNS - SCHEDULE AND TYPICAL DETAILS


NOTES:
KEY PLAN
1. Splice of vertical bars shall be made at mid-height of the column ,
500 600 / 700 600 / 700 800 / 900 1000 / 1100 1000 / 1100 1000 / 1100
and shall be staggered at least Ld.
2. Splice of each individual bar within a bundle shall be staggered at
least Ld.
M 02 C
3. Mechanical splice shall be used where reinforcement ratio exceeds
200

200

200

200

200

200

200
or equals 4%.

TYPE 1 TYPE 2 TYPE 2A TYPE 3 TYPE 4 TYPE 4A TYPE 4B


NO. OF BARS: 8 NO. OF BARS: 10 NO. OF BARS: 10 + 4 = 14 NO. OF BARS: 12 NO. OF BARS: 14 NO. OF BARS: 14 + 4 = 18 NO. OF BARS: 14 + 8 = 22
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

1000 / 1100 500


200

200
TYPE 5 TYPE 1A
NO. OF BARS: 18 NO. OF BARS: 8 + 4 = 12

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
ROOF FLOOR ROOF FLOOR
S.S.L. S.S.L. VILLAS AT PHASE 02 OF MASAAR
-XX.XXX M -XX.XXX M

CLIENT

SECTION : 200 X 1000 SECTION : 200 X 800


TYPE : 4B TYPE : 3
C40 V-BARS : 14T16 V-BARS : 12T16 C40
ADD. V : 8T16 ADD. V : 4T16 MASAAR DEVELOPMENTS LLC
1ST FLOOR LINKS : T10-200 LINKS : T10-200 1ST FLOOR CONSULTANT
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C40 C40
MEP ENGINEER
GROUND FLOOR GROUND FLOOR
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
SECTION : 200 X 1000 SECTION : 200 X 1000 SECTION : 200 X 800 SECTION : 250 X 800 SECTION : 200 X 600 SECTION : 200 X 600 SECTION : 200 X 500 SECTION : 200 X 1400 CONSTRUCTION SHARJAH,UAE
TYPE : 4 TYPE : 4 TYPE : 3 TYPE : 3 TYPE : 2 TYPE : 2 TYPE : 1A TYPE : 5 DRAWING TITLE :
C40 V-BARS : 14T16 V-BARS : 14T16 V-BARS : 12T16 V-BARS : 12T16 V-BARS : 10T16 V-BARS : 10T16 V-BARS : 8T12 V-BARS : 18T16 C40
ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : 4T12 ADD. V : - CL3B - COLUMNS SCHEDULE
FOUNDATION LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 FOUNDATION
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

DRAWN BY CHECKED BY APPROVED BY DATE

LEVEL LEVEL DAE DAE DAE 14/12/2022


CONC. CONC.
GRADE
C01 C01A C02 C03 C04 C05 C06 C07 GRADE JOB NO. SHEET SIZE SCALE REV. NO.
COLUMN COLUMN
D21-44 A1 1 : 20 C00
MARK MARK
DRAWING NO.
MAS-P2AB-STR-CL3B-0401
NORTH

YBB YBC
KEY PLAN
FLOOR SLAB
5400 120
AS/PLAN 0
F.F.L. T12-150
3500 T10-200
FIRST FLOOR T10-200

100

100
M 02 C
(TYP.)

FLIGHT-C T8 (TYP.)

1260
NOTES
120
0 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
3500 T12-150 T12-150 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT

3400
FLIGHT-B
T10-200 T10-200
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.

200
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.

2140
T12-150 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
T12-150 2-T16
F.F.L. FLIGHT-A
0

200

200
GROUND FLOOR
100

T10-150
S.S.L. 200
T12-150
1150

400
-1100
FOUNDATION LEVEL T12-150
S.S.L.
-1150
EXCAVATION LEVEL
DETAILS OF STAIRCASE FLIGHT-C 2-T20
LANDING BEAM
AS/SCHEDULE

SIGNED

YBB YBC D<-!,11a11


Architects+
Engineers

■•
5400

ISSUED FOR CONSTRUCTION


SUBJECT TO AUTHORITIES APPROVALS

T12-150
XB5 T12-150 T12-150 T10-200
T10-200 (TYP.)
1195

1220

T8 (TYP.) T12-150

200
T12-150
2775

280

280

T12-150

200
T12-150 T12-150
3
T10-200
1200

1175

0601

200
T12-150
T12-150
XB4
DETAILS OF STAIRCASE FLIGHT-B

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

LANDING BEAM

T12-150
YBB YBC
T10-200
MASAAR DEVELOPMENTS LLC
5400 CONSULTANT

200
T10-200
T12-150
T10-200
(TYP.)
XB5
T8 (TYP.)

200
1200

MEP ENGINEER
2775

T12-150 T12-150
3 T10-200 T10-200
G-01 STAGE LOCATION
0601
0301 SLAB ISSUED FOR TILAL, ALSUYOH SUBURB,
AS/PLAN CONSTRUCTION SHARJAH,UAE
XB4 DRAWING TITLE :

CL3B - STAIR CASE-1 DETAILS

GRADE BEAM
AS/SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


DETAILS OF STAIRCASE FLIGHT-A D21-44 A1 As indicated C00
DRAWING NO.
MAS-P2AB-STR-CL3B-0601
NORTH

YBD YBE
3300
KEY PLAN
FLOOR SLAB
AS/PLAN 120
0
F.F.L.
3500 T12-150
FIRST FLOOR T10-200
T10-200 M 02 C
(TYP.)
FLIGTH-C T8 (TYP.)

NOTES
120
0 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL

3400
T12-150 T12-150 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
FLIGHT-A T10-200 T10-200
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.

200
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
T12-150 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
FLIGHT-B ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
T12-150 2-T16
F.F.L.
0
GROUND FLOOR

200

200
100

S.S.L.
-1100
T10-150
FOUNDATION LEVEL T12-150 200

400
T12-150
S.S.L.
-1150
EXCAVATION LEVEL
DETAILS OF STAIRCASE FLIGHT-C 2-T20
LANDING BEAM
AS/SCHEDULE

STAIRCASE 2 - SECTION
3 1 : 50

YBD YBE SIGNED

D<-!,11a11
Architects+
3300 Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

XB5 T12-150
1175 T12-150 T12-150 T10-200
T10-200 (TYP.)
1200

1220

S.S.L.+1.642
T8 (TYP.) T12-150

200
T12-150
2775

280

T12-150
S.S.L.+1.975

200
T12-150 T12-150
1200

1175

3 DN
0602 T10-200

200
T12-150
XB4 T12-150

2200 1225
DETAILS OF STAIRCASE FLIGHT-B

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
STAIRCASE 2 - FIRST FLOOR PLAN
2 1 : 50
PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

LANDING BEAM
YBD YBE T12-150
T10-200
MASAAR DEVELOPMENTS LLC
3300
CONSULTANT

200
T10-200
2475 1175 T12-150
T10-200
XB5 (TYP.)

T8 (TYP.)

200
UP
MEP ENGINEER
2775

T12-150 T12-150
T10-200 T10-200
3 STAGE LOCATION
0602 ISSUED FOR TILAL, ALSUYOH SUBURB,
SLAB
AS/PLAN CONSTRUCTION SHARJAH,UAE
XB4
DRAWING TITLE :

CL3B - STAIR CASE-2 DETAILS

GRADE BEAM
AS/SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


STAIRCASE 2 - GROUND FLOOR PLAN DETAILS OF STAIRCASE FLIGHT-A
1 1 : 50
D21-44
DRAWING NO.
A1 As indicated C00

MAS-P2AB-STR-CL3B-0602
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.5 2.00 2.5 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 3.00

6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBJ YBK YBL

39700
3200 5400 4200 3300 4200 3300 3300 4200 5400 3200

2 2 2 2
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XB6 NO DATE BY REVISION APP

TV D
D TV

D
D

TVD
DTV

R E V I S I O N
D
D

PROJECT :
1 1 1
4100

VILLAS AT PHASE 02 OF MASAAR

CLIENT
XB5
2775

3 3 3 3
MASAAR DEVELOPMENTS LLC
XB4 CONSULTANT
16200

3225

TV
D TV
D TV
D

D D
TVD TVD DTV
XB3
2500

MEP ENGINEER

XB2

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XB1
CL3B - FIRST FLOOR LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

1ST FLOOR - LOADING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3B-0901
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.5 2.00 2.5 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 3.00

6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YBA YBB YBC YBD YBE YBF YBG YBH YBJ YBK YBL

39700
3200 5400 4200 3300 4200 3300 3300 4200 5400 3200

7
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
4000

4000
XB6 6 6 NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
4100

VILLAS AT PHASE 02 OF MASAAR

CLIENT
XB5
2775

8
MASAAR DEVELOPMENTS LLC
XB4 CONSULTANT
16200

3225

XB3
4000

4000
6 6
2500

MEP ENGINEER
7
XB2

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XB1
CL3B - ROOF LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

ROOF - LOADING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3B-0902
NORTH

CL3C - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
F01 1000 1000 300 T12 - 200 T12 - 200 - - Denotes Slab Opening
F02 1100 1300 400 T12 - 125 T12 - 125 - -
F03 1300 1700 400 T12 - 150 T12 - 150 - - 200 Denotes Slab / Raft Thickness In mm.
F04 1500 1900 400 T16 - 200 T16 - 200 - -
F05 1700 2100 400 T16 - 200 T16 - 200 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
M 02 C
F06 1900 2300 400 T16 - 200 T16 - 200 - -
F08 2300 2700 400 T16 - 200 T16 - 100 - -
S.S.L. +1.000 Slab Surface Level in M
Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For Grade of Concrete of the Foundation and Ground Beams ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
refer to General Notes drawing No. MAS- P2AB-STR-0002. TO COMMENCEMENT OF ANY WORK.
4. The Allowable net bearing capacity at Foundation level is as per
Soil Investigation Report No. RSl2022-0185 SHJ, issued by
M/S ELEMENT ENG'G LABORATORY, dated 27 /08 / 2022.
6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
7. The contractor to conduct the required tests and confirm soil
bearing capacities before foundation construction.
8. For plots with narrow space between asset footprint and
boundary wall, the contractor shall submit shop drawings in light
of the measures below for the engineer’s review, and
implement the advised work without extra cost.
8.1 The water tank shall be moved to avoid the clash
considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YCA YCB YCC YCD YCE YCF YCG YCH YCJ YCK YCL YCM YCN
47200
3200 5400 4200 3300 3300 4200 4200 3300 3300 4200 5400 3200

PLOT
FOR BOUNDARY WALL DETAILS
LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006
PLOT
LINE

WORKING LOAD FROM COLUMN


ENVELOPE SERVICE REACTION

560kN 450kN 440kN 440kN 450kN 565kN

610kN 500kN 640kN 500kN 610kN


325kN 325kN
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XC6 NO DATE BY REVISION APP

F04 F04 F04 F04 R E V I S I O N


F05 F05
PROJECT :
F03 F05 F04 F05 F04 F05 F03
4100

395kN 395kN VILLAS AT PHASE 02 OF MASAAR


565kN 755kN 565kN
465kN 380kN 380kN 470kN
410kN 395kN 395kN 415kN
CLIENT
XC5
F03 F03
F04 F03 F04 F04 F03 F04
F04 F04
2775

F05 F06 F05


685kN 595kN 690kN
495kN 450kN 450kN 375kN 445kN 445kN 375kN 450kN 450kN 495kN
MASAAR DEVELOPMENTS LLC
XC4 CONSULTANT
16200

F04 F04 F04 F04


F06 F03 F03 F06
3225

F04 F04 F05 F04


870kN 870kN
1050kN 945kN 1050kN
265kN 280kN 280kN 280kN 280kN 265kN

XC3
415kN F02 F02 F02 F02 415kN
F02 F02
2500

170kN 175kN MEP ENGINEER


F08 F08
F08 F08 F08
XC2
F03 F01 F01 F03

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


160kN 145kN WATER TANK DETAILS 150kN 145kN 160kN CONSTRUCTION SHARJAH,UAE
REFER TO DRAWING NO.
MAS-P2AB-STR-CL3C-0301 DRAWING TITLE :
XC1 F01 F01 F01 F01 F01 CL3C - FOUNDATION PLAN
PLOT PLOT
LINE LINE

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

FOUNDATION PLAN JOB NO. SHEET SIZE SCALE REV. NO.


1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3C-0101
NORTH

CL3C - BEAMS SCHEDULE - GROUND FLOOR LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
SIDE Column / Wall Stop Below Slab Level
BEAM EXTRA AT EXTRA AT BARS
STRAIGHT STRAIGHT FROM
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 FACE Denotes Slab Opening
G-B01 200 500 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - 200 Denotes Slab / Raft Thickness In mm.
G-B02 200 500 2T12 2T12 2T12 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B03 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B04 200 500 2T16 - 2T16 - 2T16 T10 - 200 T10 - 200 2 - - M 02 C
G-B05 200 500 2T12 - 2T16 - - T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M
Top extra rebars
Bottom extra rebars
* Inverted Beam
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
mesh unless otherwise mentioned on the drawings. TO COMMENCEMENT OF ANY WORK.
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YCA YCB YCC YCD YCE YCF YCG YCH YCJ YCK YCL YCM YCN
47200
3200 5400 4200 3300 3300 4200 4200 3300 3300 4200 5400 3200

PLOT
FOR BOUNDARY WALL DETAILS
LINE
REFER TO SHEET
MAS-P2AB-STR-GEN-0006
PLOT
LINE

G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XC6 NO DATE BY REVISION APP
R E V I S I O N
100 100 100 100 100 100 PROJECT :
G-B03

G-B03

G-B03
G-B03

G-B03
4100

G-B03

G-B03
SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE SLAB ON GRADE
S.S.L.-0.100
VILLAS AT PHASE 02 OF MASAAR
S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100 S.S.L.-0.100

G-B02 G-B01 G-B01 G-B01 G-B01 G-B03 G-B03 G-B01 G-B01 G-B01 G-B01 G-B02 CLIENT
XC5
G-B03

G-B03
G-B03
G-B03

UP UP UP UP UP UP
G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03 G-B03
G-B03

G-B03
G-B03

G-B03
2775

G-B03

G-B03

G-B03

G-B03

G-B03
G-B03

G-B03
G-01 MASAAR DEVELOPMENTS LLC
0301 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01 G-B01
XC4 CONSULTANT
G-B02 G-B02
16200

130MM PLAIN 130MM PLAIN


G-B01

G-B01

G-B01

G-B01
G-B04

G-B04
3225

CONCRETE CONCRETE
G-B03

G-B03

G-B03

G-B03

G-B03
G-B03

G-B03
G-B05 G-B05 G-B05 G-B05 G-B05 G-B05 G-B05 G-B05 G-B05 G-B05
XC3
100
G-B03

G-B03
2500

SLAB ON GRADE MEP ENGINEER


G-B01 S.S.L.-0.230 G-B01
200 200 200 200
XC2
G-B03

G-B03

G-B03

G-B03

G-B03

RC SLAB RC SLAB RC SLAB RC SLAB


S.S.L.-0.400 S.S.L.-0.400 S.S.L.-0.400 S.S.L.-0.400
200 200
STAGE LOCATION
3600

RC SLAB RC SLAB ISSUED FOR TILAL, ALSUYOH SUBURB,


WATER TANK DETAILS CONSTRUCTION SHARJAH,UAE
S.S.L.-0.700 REFER TO DRAWING NO. S.S.L.-0.700
MAS-P2AB-STR-CL3C-0301 DRAWING TITLE :
XC1
CL3C - GROUND FLOOR - FRAMING PLAN
PLOT PLOT
LINE LINE

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

GROUND FLOOR - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3C-0102
NORTH

CL3C - BEAMS SCHEDULE - 1ST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
SIDE Column / Wall Stop Below Slab Level
BEAM EXTRA AT EXTRA AT BARS
STRAIGHT STRAIGHT FROM 1 T12-400 C/C A 1500
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS 2 T12-200 C/C B 2000 KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 FACE Denotes Slab Opening
1-B01 200 500 2T12 - 2T16 - - T10 - 200 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
1-B02 200 600 2T16 2T12 2T16 2T12 - T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
1-B03 200 900 2T16+2T12 - 2T16 2T12 - T10 - 200 T10 - 200 2 2T10 - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600 M 02 C
1-B04 200 900 2T12 - 2T12 - - T10 - 200 T10 - 200 2 2T10 -
1-B05 200 900 2T16 - 2T12 2T12 - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M
1-CB01 200 500 2T12 - 2T20 2T16 - T10 - 150 - 2 - - G 4400 Top extra rebars
1-CB02 200 600 2T12 - 2T20 2T12 - T10 - 150 - 2 - - Bottom extra rebars
H 4800
1-CB03 200 600 2T16 - 2T20 2T16 - T10 - 150 - 2 - - * Inverted Beam
1-CB04 200 900 2T12 - 2T20 2T16 - T10 - 150 - 2 2T10 - J 5400 NOTES
K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

LEGEND:

Stair Opening Boundary SIGNED


Additional Rebars
D<-!,11a11
3T16 TOP & BOT Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YCA YCB YCC YCD YCE YCF YCG YCH YCJ YCK YCL YCM YCN
47200
3200 5400 4200 3300 3300 4200 4200 3300 3300 4200 5400 3200

PLOT
LINE

PLOT
LINE
600

600

600

600

600
1-CB02*

1-CB02*
1900

1900
8-t2A 8-t2A 8-t2A 8-t2A 8-t2A 8-t2A
1-CB03*

1-CB03*

1-CB03*
1-CB03*

1-CB03*
7-t2B

7-t2B

7-t2B

7-t2B

7-t2B

7-t2B
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XC6 NO DATE BY REVISION APP
T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH
T12-200 TOP MESH R E V I S I O N
T12-200 TOP MESH 200 T12-200 BOT MESH T12-200 BOT MESH 200 200 T12-200 BOT MESH T12-200 BOT MESH 200
200 T12-200 BOT MESH T12-200 BOT MESH 200 PROJECT :

1-B02*
1-B02*

1-B02*
RC SLAB RC SLAB RC SLAB RC SLAB
1-B02*

1-B02*

1-B02*
1-B02*
4100

RC SLAB RC SLAB
S.S.L.+3.400 S.S.L.+3.400 S.S.L.+3.400 S.S.L.+3.400 VILLAS AT PHASE 02 OF MASAAR
S.S.L.+3.400 S.S.L.+3.400
7-t2A

7-t2A

7-t2A

7-t2A
800

800
CLIENT
900

900

900

900
1-CB01 1-B01 1-B01 1-B01 1-B01 1-B01 1-B01 1-CB01
0

80

80
80

80

XC5
0

0
1-B02*

1-B02*
1-B02*

1-B02*
1-B02*

1-B02*

1-B02*
2775

80

80
80

80
0

0
8-t2A DN DN DN DN DN DN 8-t2A MASAAR DEVELOPMENTS LLC
8-b2B

8-b2B
7-t2A

7-t2A
11-t2A
11-t2A

XC4 CONSULTANT
1000

1000

1000

1000
1-CB01 1-B01
800

800
1-CB01 1-B01 1-B01 1-CB01 1-CB01 1-B01 1-B01 1-CB01 1-B01 1-CB01
16200

1-B02*

1-B02*
3225

1-B02*

1-B02*

1-B02*
1-B02*

1-B02*
8-t2C 8-t2C
8-t2A 1-B01 1-B01 8-t2A 8-t2A 1-B01 1-B01 8-t2A
7-t2B

7-t2B
XC3
1-02 1-02
2500

0301 0301
7-t2B

7-t2B

7-t2B MEP ENGINEER


7-t2B

7-t2B
300

XC2
1-B03
600

600

600

600

600

600
1-B03

1-B03

1-B03
1-B03

1450 500 500 500 500 1450


1-CB04

1-CB04
STAGE LOCATION
3600

1-01 DOWNSTAND WALL


REFER TO SECTION 1-01 ISSUED FOR TILAL, ALSUYOH SUBURB,
0301 FOR TYP. DETAIL CONSTRUCTION SHARJAH,UAE

1-B05 1-B04 1-B04 1-B04 1-B04 1-B05 DRAWING TITLE :


XC1
CL3C - FIRST FLOOR - FRAMING PLAN
PLOT PLOT
LINE BEAM BEAM BEAM BEAM BEAM LINE
T.O.B.+3.500 EXTENSION EXTENSION T.O.B.+3.500 EXTENSION T.O.B.+3.500 EXTENSION EXTENSION T.O.B.+3.500

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

FIRST FLOOR - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3C-0103
NORTH

CL3C - BEAMS SCHEDULE - ROOF FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (mm) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
SIDE Column / Wall Stop Below Slab Level
BEAM EXTRA AT EXTRA AT BARS
STRAIGHT STRAIGHT FROM 1 T12-400 C/C A 1500
MARK THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT
MID SPAN NO. OF EACH
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO L/3 LEGS 2 T12-200 C/C B 2000 KEY PLAN
OUT OUT
L/4 OF SPAN L/4 OF SPAN
TO L/3 FACE Denotes Slab Opening
R-B01 200 500 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B02 200 600 2T16+2T12 - 2T16 2T12 2T12 T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
R-CB01 200 600 2T12 - 2T20 2T12 - T10 - 150 - 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600 M 02 C
R-CB02 200 600 2T12 - 2T20+2T20 2T12 - T10 - 150 - 2 - -
R-CB03 200 800 2T12 - 2T20+2T20 2T16 - T10 - 150 - 2 1T10 SEE DETAILS F 4000 S.S.L. +1.000 Slab Surface Level in M
G 4400 Top extra rebars
H 4800 Bottom extra rebars
* Inverted Beam
J 5400 NOTES

XC2 K 6000 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


NOTES: EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
L 6600 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
1. For general notes & general details refer to drawing no. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
M 7200 STR-GEN-0002 to STR-GEN-0007. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
PAREPET N 7500 on the drawings.
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
AS/TYP. DET.
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
REINF. AS T 10,000 top and bottom unless otherwise shown on the plan.
PER SCHED. Length & shape
U 10,500 7. For concrete grade of slabs & beams refer to General Notes
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
S.S.L.
9. The slabs design adheres to L/240 deflection limit (25mm slab
250

6900 Nos. of bars W 11,500 deflection for 6.0m span, curtain walls and any non-structural
ROOF PLAN
X 12,000 elements attached to structural concrete need to allow for joint
200

to accommodate the slab deflection of L/240 without sustaining


A to X
800

* damage or non-functionality as a result of slab deflection.


10. For slabs punching shear reinforcement refer to STR-
600 GEN-0004.

COLUMN
AS/SCHED.

SIGNED

D<-!,11a11
Architects+
Engineers
BEAM R-CB03 DETAIL
CB3
1 : 20
ISSUED FOR CONSTRUCTION
■•
SUBJECT TO AUTHORITIES APPROVALS

YCA YCB YCC YCD YCE YCF YCG YCH YCJ YCK YCL YCM YCN
47200
3200 5400 4200 3300 3300 4200 4200 3300 3300 4200 5400 3200

PLOT
LINE T12-200 TOP MESH T12-200 TOP MESH
200 T12-200 BOT MESH T12-200 BOT MESH 200 PLOT
LINE
RC SLAB RC SLAB
S.S.L.+6.900 S.S.L.+6.900
R-CB01*

R-CB01*
R-CB01*

R-CB01*

R-CB01*

R-CB01*

R-CB01*
1900

1900
12-t2A 6-t1A 6-t1A 6-t1A 6-t1A 12-t2A

12-t2A
12-t2A

6-t1A

6-t1A

6-t1A

6-t1A
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XC6 PS1 PS1
NO DATE BY REVISION APP
R E V I S I O N
200 200 200 200 PROJECT :
R-B02*

R-B02*
R-B02*

R-B02*
R-B02*

R-B02*

R-B02*
4100

200
RC SLAB RC SLAB RC SLAB RC SLAB VILLAS AT PHASE 02 OF MASAAR
S.S.L.+6.900 RC SLAB
S.S.L.+6.900 S.S.L.+6.900 S.S.L.+6.900
T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH T12-200 TOP MESH S.S.L.+6.900
12-t2A T12-200 BOT MESH 6-t1A R-B01* R-B01* 6-t1A T12-200 BOT MESH T12-200 BOT MESH 6-t1A R-B01* R-B01* 6-t1A T12-200 BOT MESH 12-t2A CLIENT

12-t2B
12-t2B

14-b1E
14-b1E

6-t1A

6-t1A

6-t1A

6-t1A
XC5 PS1 PS1
R-B02*

R-B02*
R-B02*

R-B02*

R-B02*
R-B02*

R-B02*

R-01
2775

0301 13-t4A 13-t4A

7-t2A
6-t1A 6-t1A 6-t1A 6-t1A MASAAR DEVELOPMENTS LLC
50

7-t2A

50
R-B01* R-B01*
XC4
6-t1A

6-t1A

6-t1A

6-t1A
CONSULTANT
43-b3K 43-b3K
16200

R-B02*

R-B02*
R-B02*

R-B02*

R-B02*
3225

31-b3Q

31-b3Q
R-B02*

R-B02*
8-t2D 16-t2D 16-t2D 16-t2D 8-t2D

XC3
31-t3Q

31-t3Q
2500

29-t3D

29-t3D

29-t3D

29-t3D

29-t3D
R-CB03*

R-CB02*

R-CB03*

R-CB02*

R-CB03*

TOP OF PARAPET PARAPET WALL DETAIL MEP ENGINEER


43-t3L AS/ARCH. REFER TO SHEET NO. 43-t3L
R-CB01*

R-CB01*
MAS-P2AB-STR-CL3C-0301
XC2
600

600
T12-200 TOP MESH T12-200 TOP MESH
T12-200 BOT MESH CB3 T12-200 BOT MESH
STAGE LOCATION
3600

250 0104 250


ISSUED FOR TILAL, ALSUYOH SUBURB,
RC SLAB RC SLAB CONSTRUCTION SHARJAH,UAE
S.S.L.+6.950 S.S.L.+6.950 DRAWING TITLE :
XC1
CL3C - ROOF - FRAMING PLAN
PLOT PLOT
LINE LINE

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

ROOF - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 As indicated C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3C-0104
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
YCA YCB YCC YCD YCE YCF YCG YCH YCJ YCK YCL YCM YCN KEY PLAN

47200
C1-01
3200 5400 4200 3300 3300 4200 4200 3300 3300 4200 5400 3200 COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
1100 150 50 50 50 1100 100 CW DENOTES CORE WALL
100 100 100 100 100 100

650
800

800

800

800

800

800
100

100

100

100

100
XC6

150

150

150

150

150
1000

1000

1000

1000

1000
1000

1000
NOTES
250 C03 200 C02 200 C02 200 C02 200 C02 250 C03
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
200 C01 200 C01 200 C01 200 C01 200 C01 200 C01 200 C01 ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
100 1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
4100

STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED


100 100 DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
100 100 100 100 drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
1300 1000 1000 1000 1000 1300 3. For columns reinforcement schedule refer to drawing
800

800
series STR-0401.

400

400

400

400
200

200
1000
100

100
200

800

200

800

200

200

800

200

800

200
XC5

100

100

100

100
500
200 C02 200 C01
1000 800 C02 800 800 C02 800 C02 1000 C01
200 C02 200 C02 C02 200 C01 200 C02 200 C02
2775

100 1800 100 250 100 250 100 250 100 250 100 1800 100

100

100

100

100

100
XC4
200

200

200

200

200

200
800

800

800

800

800
800

800
1000 C01 600 C04 600 C04 600 C04 600 C04 1000 C01
16200

200 C02 200 C02 200 C02 200 C02 200 C02 200 C02 200 C01
3225

100 100 200 100 200 100 200 100 200 100 100
100

100

100

100

100

100

100

100

100
200

200

200

200
XC3

100

100
600

600
1000

1000
1400

1400

1400
600 C05 600 C05 600 C05 600 C05
100 200 C05 200 C05 100
2500

100 200 C01 200 C01 100


200 C07 200 C07 200 C07
1000

1000
600

600

600
XC2
200 C01A 200 C05 200 C05 200 C01A
SIGNED

D<-!,11a11
3600

Architects+
100 100 100 100 100 Engineers

■•
500

500

500

500

500
250

250

250

250

250
XC1 200 C06 200 C06 200 C06 200 C06 200 C06
ISSUED FOR CONSTRUCTION
SUBJECT TO AUTHORITIES APPROVALS

GROUND FLOOR - COLUMN LAYOUT


2
1 : 100

YCA YCB YCC YCD YCE YCF YCG YCH YCJ YCK YCL YCM YCN
47200
3200 5400 4200 3300 3300 4200 4200 3300 3300 4200 5400 3200

1100 150 50 50 50 1100


100 100 100 100 100 100 100
650
800

800

800

800

800

800
100

100

100

100

100
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XC6
150

150

150

150

150
1000

1000

1000

1000

1000
NO DATE BY REVISION APP
1000

1000
250 C03 200 C02 200 C02 200 C02 200 C02 250 C03
R E V I S I O N
200 C01 200 C01 200 C01 200 C01 200 C01 200 C01 200 C01 PROJECT :
4100

100 100 VILLAS AT PHASE 02 OF MASAAR


100 100 100 100 100
1300 1000 1000 1000 1000 1300
800

800
CLIENT
400

400

400

400
200

200
1000
100

100
200

800

200

800

200

200

800

200

800

200
XC5
100

100

100

100
500

200 C02 200 C01


1000 800 C02 800 800 C02 800 C02 1000 C01
200 C02 200 C02 C02 200 C01 200 C02 200 C02
2775

100 1800 100 250 100 250 100 250 100 250 100 1800 100 MASAAR DEVELOPMENTS LLC
100

100

100

100

100
XC4
200

200

200

200

200

200
CONSULTANT
800

800

800

800

800
800

800
1000 C01 600 C04 600 C04 600 C04 600 C04 1000 C01
16200

200 C02 200 C02 200 C02 200 C02 200 C02 200 C02 200 C01
3225

100 100 200 100 200 100 200 100 200 100 100
100

100

100

100

100

100

100

100

100
200

200

200

200

XC3
100

100
600

600
1000

1000
1400

1400

1400
600 C05 600 C05 600 C05 600 C05
100 200 C05 200 C05 100
2500

100 200 C01 200 C01 100


MEP ENGINEER
200 C07 200 C07 200 C07
1000

1000
600

600

600
XC2
200 C01A 200 C05 200 C05 200 C01A

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


100 100 100 100 100 CONSTRUCTION SHARJAH,UAE
500

500

500

500

500

DRAWING TITLE :
250

250

250

250

250

XC1 200 C06 200 C06 200 C06 200 C06 200 C06 CL3C - FOUNDATION & GROUND FLOOR -
COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

FOUNDATION - COLUMN LAYOUT JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3C-0201
NORTH

LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)
KEY PLAN
C1-01
COLUMN TYPE
PART NUMBER
M 02 C
C DENOTES COLUMN
W DENOTES WALL
CW DENOTES CORE WALL

NOTES

NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL


EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
1. For general notes & general details refer to drawing No. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
STR-GEN-0002 to STR-GEN-0007. 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
2. For concrete grade of columns refer to General Notes 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
drawings series STR-0401. ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
3. For columns reinforcement schedule refer to drawing
series STR-0401.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YCA YCB YCC YCD YCE YCF YCG YCH YCJ YCK YCL YCM YCN
47200
3200 5400 4200 3300 3300 4200 4200 3300 3300 4200 5400 3200

1150 150 50 100 50 50 1150 100


100 100 100 100
650
800

800

800

800

800

800
100

100

100

100

100
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XC6
150

150

150

150

150
1000

1000

1000

1000

1000
NO DATE BY REVISION APP
1000

1000
200 C03 200 C02 200 C02 200 C02 200 C02 200 C03
R E V I S I O N
200 C01 200 C01 200 C01 200 C01 200 C01 200 C01 200 C01 PROJECT :
100
4100

100 100 100 VILLAS AT PHASE 02 OF MASAAR


100 100 100
1300 1000 1000 1000 1000 1300
800

800
CLIENT
400

400

400

400
200

200
1000
100

100
200

800

200

800

200

200

800

200

800

200
XC5
100

100

100

100
500

200 C02 200 C01


1000 800 C02 800 800 C02 800 C02 1000 C01
200 C02 200 C02 C02 200 C01 200 C02 200 C02
2775

100 1800 100 250 100 250 100 250 100 250 100 1800 100 MASAAR DEVELOPMENTS LLC
100

100

100

100

100
XC4
200

200

200

200

200

200
CONSULTANT
800

800

800

800

800
800

800
1000 C01 600 C04 600 C04 600 C04 600 C04 1000 C01
16200

200 C02 200 C02 200 C02 200 C02 200 C02 200 C02 200 C01
3225

100 100 100 100 100


100

100

100

100

100
XC3
1000

1000
1400

1400

1400
100 100
2500

200 C01 200 C01 MEP ENGINEER


200 C07 200 C07 200 C07
1000

1000
XC2
200 C01A 200 C01A

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XC1
CL3C - FIRST FLOOR - COLUMN LAYOUT

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

1ST FLOOR - COLUMN LAYOUT JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3C-0202
NORTH

KEY PLAN

M 02 C
YCB XC2
YCC
COMPRESSIBLE
SS
130MM PLAIN MATERIAL AS PER
CONCRETE TYP. DETAILS DOWNSTAND WALL 0301
F.F.L. ELEVATION F.F.L.
F.F.L. 400
GROUND BEAM 3500 4T16 (TYP.) 3500
0 SLAB ON GRADE S.S.L.
NOTES
AS/SCHED. 1ST FLOOR 1ST FLOOR
AS/PLAN +3.40 m

100
GROUND FLOOR
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL

200
130 100

S.S.L. EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT

100
230
-0.23 m ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE

900
DOWNSTAND WALL ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
REFER TO SECTION 1-01 300 TO COMMENCEMENT OF ANY WORK.
T10-200
T10-200
DOWNSTAND
S.S.L. WALL (TYP.)
-1100
FOUNDATION LEVEL
200

S.S.L.
-1150
FOUNDATION
EXCAVATION LEVEL
AS/PLAN

SECTION G-01 SECTION 1-01 SECTION 1-02


G-01 1 : 20 1-01 1 : 20 1-02 1 : 20

100 100

200 800 200


T12-150 CLEAR OPENING SIGNED
S.S.L. -0.320m
D<-!,11a11
T12-150

Architects+
200

PARAPET
WALL
PARAPET
WALL
Engineers

T12-150 ■•
300

Hmax = 1600mm

Hmax = 1600MM
T10-200 EF T10-200 EF
T12-150 T12-150 T12-200 EF ISSUED FOR CONSTRUCTION
T12-200 EF T12-200 EF
T12-150 SUBJECT TO AUTHORITIES APPROVALS

WATER SURFACE LEVEL


GRP LINING
200 200
F.F.L. AS PER F.F.L. AS PER T10-200 EF
ARCH. ARCH. (TYPICAL)
1500

2 LAYERS OF BITUMINOUS
1200

PROTECTIVE COAT AS/SPECS


S.S.L. AS PER S.S.L. AS PER
FRAMING PLAN FRAMING PLAN
PLAN
UP-STAND
PVC WATER STOPER PVC WATER STOPER BEAM AS/PLAN
T12-150 & SCHED.
S.S.L. -2.020m
T12-150
150

150

REINJECTABLE HOSE REINJECTABLE HOSE


BLOCK WORK
200

RC SLAB AS/ARCH. RC SLAB


AS/PLAN AS/PLAN

200 VARIES 200 CASE 1 (EDGE) CASE 2


LEAN CONCRETE
NOTES:
2 LAYERS OF BITUMINOUS • "H" IS THE PARAPET HEIGHT AS PER ARCHI.
PROTECTIVE COAT AS/SPECS C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
WELL COMPACTED SOIL UP TO 95% OF R E V I S I O N
MAXIMUM DRY DENSITY
TYPICAL WATER TANK DETAILS TYPICAL DETAIL OF PARAPET WALL PROJECT :

WT 1 : 20 PW 1 : 20
VILLAS AT PHASE 02 OF MASAAR

CLIENT

MASAAR DEVELOPMENTS LLC


BEAM LINKS CONSULTANT
Ld TOP REINF. AS/PLAN
S

BEAM TOP BARS AS


PER BEAM SCEH.
W MIN. 2T12 W Ld
2T16 TOP BARS
Ld Ld
VL BARS AS PER VL BARS AS PER
COLUMNS SCEHD. COLUMNS SCEHD. T12@100 HORIZONTAL XC4
MIN. 600mm

CLOSED STIRRUPS
S/2

LINKS BEAM TOP BARS AS LINKS BOT REINF. AS/PLAN


L

BEAM BARS TO BE VL BARS AS PER


PER BEAM SCEH. 100
EXTENDED IN COLUMNS SCEHD.
MIN. 2T16
CANTILEVER AS T10-200 SLAB REINF. AS/PLAN MEP ENGINEER
SHOWN S.S.L.
SHORT CANTILEVER

SHORT CANTILEVER

250

S.S.L. +6.95 m T12-200


BEAM S.S.L. AS PER
6900
L=AS PLAN

L=AS PLAN

FRAMING PLAN
ROOF PLAN
50

W=600 mm

H
S

MIN.
250

200
S

STAGE LOCATION

H
COL. LINKS ISSUED FOR TILAL, ALSUYOH SUBURB,
BEAM BEAM RC SLAB CONSTRUCTION SHARJAH,UAE
RC SLAB AS/PLAN
300
AS/PLAN DRAWING TITLE :
MINIMUM
PLAN PLAN SECTION 3T16 T&B
CL3C - STRUCTURAL DETAILS - 1
CASE 1 CASE 2
NOTES:
SHORT CANTILEVER WITH EXTENSION SHORT CANTILEVER WITHOUT EXTENSION • THIS DETAIL APPLICABLE FOR SLAB STEPPING OF H=150 MM OR LESS.
DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


D21-44 A1 1 : 20 C00
TYPICAL SHORT CANTILEVER DETAIL SECTION R-01 TYPICAL DETAIL OF SLAB STEPPING
SCB 1 : 20 R-01 1 : 20 SS 1 : 20
DRAWING NO.
MAS-P2AB-STR-CL3C-0301
NORTH

COLUMNS - SCHEDULE AND TYPICAL DETAILS


NOTES:
KEY PLAN
1. Splice of vertical bars shall be made at mid-height of the column ,
500 600 / 700 600 / 700 800 / 900 1000 / 1100 1000 / 1100 1000 / 1100
and shall be staggered at least Ld.
2. Splice of each individual bar within a bundle shall be staggered at
least Ld.
M 02 C
3. Mechanical splice shall be used where reinforcement ratio exceeds
200

200

200

200

200

200

200
or equals 4%.

TYPE 1 TYPE 2 TYPE 2A TYPE 3 TYPE 4 TYPE 4A TYPE 4B


NO. OF BARS: 8 NO. OF BARS: 10 NO. OF BARS: 10 + 4 = 14 NO. OF BARS: 12 NO. OF BARS: 14 NO. OF BARS: 14 + 4 = 18 NO. OF BARS: 14 + 8 = 22
NOTES
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.

1400 500
200

200
TYPE 5 TYPE 1A
NO. OF BARS: 18 NO. OF BARS: 8 + 4 = 12

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
ROOF FLOOR ROOF FLOOR
S.S.L. S.S.L. VILLAS AT PHASE 02 OF MASAAR
-XX.XXX M -XX.XXX M

CLIENT

SECTION : 200 X 1000 SECTION : 200 X 800


TYPE : 4B TYPE : 3
C40 V-BARS : 14T16 V-BARS : 12T16 C40
ADD. V : 8T16 ADD. V : - MASAAR DEVELOPMENTS LLC
1ST FLOOR LINKS : T10-200 LINKS : T10-200 1ST FLOOR CONSULTANT
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

C40 C40
MEP ENGINEER
GROUND FLOOR GROUND FLOOR
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
SECTION : 200 X 1000 SECTION : 200 X 1000 SECTION : 200 X 800 SECTION : 250 X 800 SECTION : 200 X 600 SECTION : 200 X 600 SECTION : 200 X 500 SECTION : 200 X 1400 CONSTRUCTION SHARJAH,UAE
TYPE : 4 TYPE : 4 TYPE : 3 TYPE : 3 TYPE : 2 TYPE : 2 TYPE : 1A TYPE : 5 DRAWING TITLE :
C40 V-BARS : 14T16 V-BARS : 14T16 V-BARS : 12T16 V-BARS : 12T16 V-BARS : 10T16 V-BARS : 10T16 V-BARS : 8T12 V-BARS : 18T16 C40
ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : - ADD. V : 4T12 ADD. V : - CL3C - COLUMNS SCHEDULE
FOUNDATION LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 LINKS : T10-200 FOUNDATION
S.S.L. S.S.L.
-XX.XXX M -XX.XXX M

DRAWN BY CHECKED BY APPROVED BY DATE

LEVEL LEVEL DAE DAE DAE 14/12/2022


CONC. CONC.
GRADE
C01 C01A C02 C03 C04 C05 C06 C07 GRADE JOB NO. SHEET SIZE SCALE REV. NO.
COLUMN COLUMN
D21-44 A1 1 : 20 C00
MARK MARK
DRAWING NO.
MAS-P2AB-STR-CL3C-0401
NORTH

KEY PLAN
YCB YCC
5400

FLOOR SLAB M 02 C
F.F.L.
AS/PLAN 120
3500 0
1ST FLOOR T12-150

100

100
T10-200
T10-200
FLIGHT-C (TYP.)

1258
NOTES
T8 (TYP.)
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
3500

120

3400
FLIGHT-B 0
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
T12-150 T12-150 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
T10-200 T10-200

2142

200
T12-150
FLIGHT-A
F.F.L. T12-150 2-T16
0
GROUND FLOOR
100

200

200
S.S.L.
1150

-1100 T10-150
FOUNDATION LEVEL T12-150 200

400
S.S.L.
-1150
T12-150
EXCAVATION LEVEL

DETAILS OF STAIRCASE FLIGHT-C LANDING BEAM


2-T20

STAIRCASE 1 - SECTION AS/SCHEDULE

3 1 : 50

SIGNED

D<-!,11a11
Architects+
Engineers
YCB YCC
5400
ISSUED FOR CONSTRUCTION
■•
SUBJECT TO AUTHORITIES APPROVALS
1175
S.S.L.+1.808
XC5
1200

1225

T12-150
T12-150 T12-150
2775

T10-200
280

280

T10-200 (TYP.)

T8 (TYP.) T12-150

200
1200

1175

3 DN T12-150
0601
T12-150
XC4

200
T12-150 T12-150
1925 1225
S.S.L.+2.142 T10-200

200
T12-150
T12-150

FIRST FLOOR - FRAMING PLAN DETAILS OF STAIRCASE FLIGHT-B


2 1 : 50
C00 14/12/2022
NO DATE
EK
BY
ISSUED FOR CONSTRUCTION
REVISION APP
R E V I S I O N
PROJECT :

VILLAS AT PHASE 02 OF MASAAR

CLIENT

LANDING BEAM

T12-150

0 T12-150
120 MASAAR DEVELOPMENTS LLC
CONSULTANT

200
YCB YCC T12-150
5400 T10-200
T12-150
1375 T10-200
(TYP.) T12-150

T8 (TYP.)

200
XC5
0 MEP ENGINEER
120
T12-150
1200

UP
T10-200
T12-150
2775

T10-200
STAGE LOCATION
SLAB ISSUED FOR TILAL, ALSUYOH SUBURB,
AS/PLAN CONSTRUCTION SHARJAH,UAE
3
DRAWING TITLE :
0601

XC4 CL3C - STAIRCASE-1 DETAILS

GRADE BEAM
AS/SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

GROUND FLOOR - FRAMING PLAN DETAILS OF STAIRCASE FLIGHT-A JOB NO. SHEET SIZE SCALE REV. NO.

1 1 : 50
D21-44
DRAWING NO.
A1 As indicated C00

MAS-P2AB-STR-CL3C-0601
NORTH

KEY PLAN
YCD YCE

3300
F.F.L.
FLOOR SLAB M 02 C
AS/PLAN 120
3500 0
1ST FLOOR T12-150

100
T10-200
T10-200
FLIGHT-C
(TYP.)

1450
NOTES
T8 (TYP.)
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
3500
3400
120 DIMENSIONS ONLY ARE TO BE CONSIDERED.
0 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
FLIGHT-A T12-150 T12-150 ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
TO COMMENCEMENT OF ANY WORK.
T10-200 T10-200

200
FLIGHT-B

T12-150
F.F.L.
0
T12-150 2-T16
GROUND FLOOR
100

200

200
S.S.L.
1150

-1100 T10-150
FOUNDATION LEVEL
T12-150 200

400
S.S.L.
-1150 T12-150
EXCAVATION LEVEL

DETAILS OF STAIRCASE FLIGHT-C LANDING BEAM


2-T20
STAIRCASE 2 - SECTION
3 1 : 50
AS/SCHEDULE

SIGNED

D<-!,11a11
Architects+
Engineers

YCD YCE ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS
3300

XC5
1175
T12-150
1200

1220

S.S.L.+1.617 T12-150 T12-150 T10-200


T10-200 (TYP.)
2775

T8 (TYP.)
280

T12-150

200
S.S.L.+1.950 T12-150
3
1200

1175

0602 T12-150

200
T12-150 T12-150
XC4 T10-200

200
T12-150
2200 1225
T12-150

DETAILS OF STAIRCASE FLIGHT-B


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
FIRST FLOOR - FRAMING PLAN
2 1 : 50
PROJECT :
R E V I S I O N

VILLAS AT PHASE 02 OF MASAAR

CLIENT

LANDING BEAM

T12-150

0 T12-150
120 MASAAR DEVELOPMENTS LLC
CONSULTANT

200
YCD YCE T12-150
T10-200
3300 T12-150
T10-200
(TYP.) T12-150

T8 (TYP.)

200
XC5
0 MEP ENGINEER
120
T12-150
T10-200
T12-150
T10-200
2775

STAGE LOCATION
SLAB ISSUED FOR TILAL, ALSUYOH SUBURB,
AS/PLAN CONSTRUCTION SHARJAH,UAE
3
0602 DRAWING TITLE :

CL3C - STAIRCASE-2 DETAILS


XC4

GRADE BEAM
AS/SCHEDULE DRAWN BY CHECKED BY APPROVED BY DATE
DAE DAE DAE 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


GROUND FLOOR - FRAMING PLAN DETAILS OF STAIRCASE FLIGHT-A
1 1 : 50
D21-44
DRAWING NO.
A1 As indicated C00

MAS-P2AB-STR-CL3C-0602
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.5 2.00 2.5 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 3.00

6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YCA YCB YCC YCD YCE YCF YCG YCH YCJ YCK YCL YCM YCN

47200
3200 5400 4200 3300 3300 4200 4200 3300 3300 4200 5400 3200

2 2 2 2
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
XC6 NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
1 1 1 1
4100

VILLAS AT PHASE 02 OF MASAAR

CLIENT
XC5
2775

3 3 3 3
MASAAR DEVELOPMENTS LLC
XC4 CONSULTANT
16200
3225

XC3
2500

MEP ENGINEER

XC2

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XC1
CL3C - FIRST FLOOR - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

1ST FLOOR - LOADING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3C-0901
NORTH

LINE LOAD CASES: DESIGN LOAD SCHEDULE


S.D.L.
NO. NAME
(KN/m) BUILDING DESIGN SLAB DESIGN
NO. AREAS (KN/m2) (KN/m2) REMARKS
1 ARCH WALL 100mm 5.0
KEY PLAN
2 ARCH WALL 150mm 6.0 S.D.L. L.L. S.D.L. L.L.

1 RESIDENTIAL UNITS 2.5 2.00 2.5 2.00 For partition load, see point 2 below
3 ARCH WALL 200mm 7.5

4 SHAFT, SOLID BLOCK 150mm 11.0 2 BALCONIES 2.50 5.00 2.50 5.00
M 02 C
5 SHAFT, SOLID BLOCK 200mm 17.0 3 STAIRCASES 2.50 5.00 2.50 3.00

6 CURTAIN WALL 200mm 2.0 4 CAR PARKING 2.50 1.00 2.50 1.00

7 GLASS HANDRAIL 1.0 5 PUMP ROOM 2.00 1.00 2.00 1.00


NOTES
6 ROOF ACCESSIBLE 3.50 2.00 3.50 2.00
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
7 ROOF INACCESSIBLE 3.00 2.00 3.00 2.00 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
8 ROOF MEP 5.00 5.00 5.00 5.00 2. THIS DRAWING IS NOT TO BE SCALED. STATED
DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
Notes: ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
1. The actual weight and size of all MEP equipments, and actual load for landscape elements shall be verified by TO COMMENCEMENT OF ANY WORK.
the contractor, and shall be brought to engineer's attention in case it is exceeded.
2. Refer to linear load values herein. AAC block work walls as per architectural layout are applied as linear load.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YCA YCB YCC YCD YCE YCF YCG YCH YCJ YCK YCL YCM YCN

47200
3200 5400 4200 3300 3300 4200 4200 3300 3300 4200 5400 3200

7
C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
4000

4000
XC6 6 6 NO DATE BY REVISION APP
R E V I S I O N
PROJECT :
4100

VILLAS AT PHASE 02 OF MASAAR

CLIENT
XC5
2775

8
MASAAR DEVELOPMENTS LLC
XC4 CONSULTANT
16200
3225

XC3
4000

4000
6 6
2500

MEP ENGINEER
7
XC2

STAGE LOCATION
3600

ISSUED FOR TILAL, ALSUYOH SUBURB,


CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :
XC1
CL3C - ROOF - LOADING PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


DAE DAE DAE 14/12/2022

ROOF - LOADING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100
DRAWING NO.
MAS-P2AB-STR-CL3C-0902
NORTH

CL4 - FOUNDATION SCHEDULE LEGEND:


Column / Wall Continuous
OVERALL SIZE (mm) REINFORCEMENT DETAILS
FOOTING
BOTTOM MESH TOP MESH REMARKS
Column / Wall Stop Below Slab Level
MARK WIDTH LENGTH DEPTH
SHORT BAR LONG BAR SHORT BAR LONG BAR Floating (Planted) Column / Wall (FC/FW)
F01 1000 1000 300 T12-200 T12-200 - - Denotes Slab Opening
F02 1100 1300 400 T12-125 T12-125 - - KEY PLAN
F03 1300 1700 400 T12-150 T12-150 - - 200 Denotes Slab / Raft Thickness In mm.
F04 1500 1900 400 T16-200 T16-200 - -
F05 1700 2100 400 T16-200 T16-200 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
F06 1900 2300 400 T16-200 T16-150 - -
S.S.L. +1.000 Slab Surface Level in M M 02 C
F07 2100 2500 400 T16-200 T16-200
F10 1100 1300 300 T12-200 T12-200 T12-200 T12-200 Top extra rebars
F11 1500 1700 350 T12-150 T12-150 T12-150 T12-150 Bottom extra rebars
F16 1100 1900 400 T12-125 T12-125 - - * Inverted Beam
NOTES
CL4 - BEAMS SCHEDULE - GROUND FLOOR NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For list of drawings refer to drawing No. MAS- P2AB-STR-0001. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
OVERALL SIZE (MM) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
2. For General notes refer to drawing No. MAS- P2AB-STR-0002. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
EXTRA AT EXTRA AT SIDE BARS 3. For Grade of Concrete of the Foundation and Ground Beams
2. THIS DRAWING IS NOT TO BE SCALED. STATED
BEAM MARK STRAIGHT STRAIGHT FROM REMARKS
DIMENSIONS ONLY ARE TO BE CONSIDERED.
EXTRA AT CONT. END refer to General Notes drawing No. MAS- P2AB-STR-0002. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
WIDTH DEPTH THROUGH THROUGH SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
MID SPAN SUPPORT TO SUPPORT TO 4. The Allowable net bearing capacity at Foundation level is as per ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
OUT OUT L/3 TO COMMENCEMENT OF ANY WORK.
L/4 OF SPAN L/4 OF SPAN Soil Investigation Report No. RSl2022-0185 SHJ, issued by
G-B01 200 500 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - M/S ELEMENT ENG'G LABORATORY, dated 27/08/2022.
G-B02 200 500 2T12 - 2T12 2T12 2T12 T10 - 200 T10 - 200 2 - - 6. All the recommendations mentioned in the soil investigation
report to be strictly followed.
G-B03 200 600 2T16 - 2T16 1T16 - T10 - 200 T10 - 200 2 - -
7. The contractor to conduct the required tests and confirm soil
G-B04 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - bearing capacities before foundation construction.
G-B05 300 500 3T12 - 2T16 1T12 1T12 T10 - 200 T10 - 200 2 - - 8. For plots with narrow space between asset footprint and
G-CB01 200 500 2T12 - 2T16 - - T10 - 200 T10 - 200 2 - - boundary wall, the contractor shall submit shop drawings in light
G-STB1 200 700 2T12 - 2T12 - - T10 - 200 T10 - 200 2 1T10 - of the measures below for the engineer’s review, and
implement the advised work without extra cost.
GB-B01 200 400 2T12 - 2T12 1T12 - T10 - 200 T10 - 200 2 - - 8.1 The water tank shall be moved to avoid the clash
GB-B02 200 400 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - considering the foundation layout, or
8.2 The water tank shall be repositioned to support the
boundary wall and its pad footings to be omitted.
8.3 For any other condition arise from plot shape, the
contractor shall propose the necessary measures in
line with design intent.
9. Foundations projecting outside plot limit is in line with ARADA
instruction and undertaking letter number "1103-MAS-
SHJMUN-001" dated "10-OCT-2022".

SIGNED
YAA YAB YAC YAD YAE YAF CL4 - FOUNDATION SCHEDULE FOR BOUNDARY WALL
D<-!,11a11
OVERALL SIZE (mm) REINFORCEMENT DETAILS Architects+
FOOTING
MARK
BOTTOM MESH TOP MESH REMARKS Engineers
WIDTH LENGTH DEPTH

■•
21000 STIFFENER COLUMN (SC) TYP. SHORT BAR LONG BAR SHORT BAR LONG BAR
REFER TO TYPICAL DETAILS BF1 1000 1000 300 T12-150 T12-200 - -
3550 5350 3200 5350 3550 BF2 1000 1200 300 T12-150 T12-150 - -
PLOT LINE PLOT LINE ISSUED FOR CONSTRUCTION
525 525 BF3 1000 1200 300 T12-150 T12-150 T12-150 T12-150 SUBJECT TO AUTHORITIES APPROVALS
GB-B01 GB-B01 25 GB-B01 GB-B01
GB-B01 GB-B01 GB-B01 GB-B01 GB-B01 25 GB-B01 GB-B01 BF4 1200 1200 300 T12-150 T12-150 T12-150 T12-150
EXP. JOINT EXP. JOINT

150
BF4 BF3 BF3 BF3 BF3 BF4
BF3 BF4 BF3
GB-B01

BF3 BF3 BF4

GB-B02
GB-B02

150 X 400 COPING BEAM


*FOR SPAN 3.0m USING T&B 2T10
AND STTIRUPS T8-200
*FOR SPAN 3.1m TO 7.0m USING T&B 2T12
BF1 AND STTIRUPS T10-200
XA8 BF2 F07 700kN F07 700kN BF2
2025

F03 350kN F03 320kN 320kN F03 F03 350kN


GB-B01

150 X 500 STIFFNER COLUMN ( SC) @ 3M

GB-B01
GB-B01

XA7 V-BARS : 8T10


LINKS : T8 - 200

BF1 500
BF2 BF2

UP TO 2.0m (MAX.)
WORKING LOAD FROM COLUMN

AS PER ARCH

150/200
ENVELOPE SERVICE REACTION
4400

GB-B01

510kN 510kN
F05 F05

GB-B01
GB-B01

690kN F07 690kN


F07
250kN 250kN
F03 F03 SC
NO. OF BARS: 8
BF4 BF1 BF4
EXP. JOINT

EXP. JOINT

XA6 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION


525

525
25

25

NO DATE BY REVISION APP


150mm HOLLOW BLOCK
1800

( NORMAL WEIGHT) R E V I S I O N
GB-B01

475kN 475kN
F05 F16 F16 F05
GB-B01
GB-B01

F06 F06 PROJECT :


XA5 AS PER ARCHITECTURAL
675

& LANDSCAPE DRWAINGS


VILLAS AT PHASE 02 OF MASAAR
1575

BF2 BF1 BF2


18925

XA4
275kN 275kN CLIENT
580kN 580kN GROUND LEVEL
GB-B01

GB-B01
GB-B01

FFL = 0.00
3025

F03 280kN F07 730kN F04 385kN


F04 385kN F07 730kN
F03 280kN

400
BF2 50kN BF2 200 X 400 GROUND BEAM
REFER TO SCHED.

700
XA3 MASAAR DEVELOPMENTS LLC
200
CONSULTANT
GB-B01

GB-B01

F01
GB-B01

200 X 500 STIFFNER COLUMN (SC) @ 3M


3000

V-BARS : 8T10
F02 210kN F02 LINKS : T8 - 200
F03 300kN F02 F03 300kN
BF2 BF2
300

BOUNDARY WALL FOOTING


REFER TO SCHED.
XA2
50

EXCAVATION LEVEL
G-STB1
G-STB1

G-STB1

155kN 155kN EXCV. = -1.15


GB-B01
GB-B01

F11
3100

F10 F10
BF4 BF4
MEP ENGINEER

XA1
150kN 245kN 150kN
PLOT LINE PLOT LINE
TYPICAL SECTION FOR BOUNDARY WALL
FOR WATER TANK DETAILS REFER TO DWG NO. FOR WATER TANK DETAILS REFER TO DWG NO. 2 STAGE LOCATION
MAS-P2AB-STR-CL4-0301 MAS-P2AB-STR-CL4-0301 1 : 20
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE

DRAWING TITLE :

FOUNDATION PLAN CL4 - FOUNDATION PLAN


1
1 : 100

DRAWN BY CHECKED BY APPROVED BY DATE


DAE HJ EK 14/12/2022

JOB NO. SHEET SIZE SCALE REV. NO.


D21-44 A1 As indicated C00
DRAWING NO.
MAS-P2AB-STR-CL4-0101
NORTH

CL4 - BEAMS SCHEDULE - GROUND FLOOR LEGEND:


Column / Wall Continuous
OVERALL SIZE (MM) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS
BEAM MARK
THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH
MID SPAN SUPPORT TO SUPPORT TO
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
G-B01 200 500 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - 200 Denotes Slab / Raft Thickness In mm.
G-B02 200 500 2T12 - 2T12 2T12 2T12 T10 - 200 T10 - 200 2 - -
G-B03 200 600 2T16 - 2T16 1T16 - T10 - 200 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
G-B04 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - -
G-B05 300 500 3T12 - 2T16 1T12 1T12 T10 - 200 T10 - 200 2 - - S.S.L. +1.000 Slab Surface Level in M M 02 C
G-CB01 200 500 2T12 - 2T16 - - T10 - 200 T10 - 200 2 - - Top extra rebars
G-STB1 200 700 2T12 - 2T12 - - T10 - 200 T10 - 200 2 1T10 - Bottom extra rebars
GB-B01 200 400 2T12 - 2T12 1T12 - T10 - 200 T10 - 200 2 - - * Inverted Beam
GB-B02 200 400 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - -
NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. Slab on Grade to be 100 mm thick. with reinforcement of A252 DIMENSIONS ONLY ARE TO BE CONSIDERED.
mesh unless otherwise mentioned on the drawings. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
3. All RC Slabs to be 200 mm thick. unless otherwise mentioned TO COMMENCEMENT OF ANY WORK.
on the drawings.
4. Reinforcement of all RC Slabs to be T12-200 Top & Bottom
mesh unless otherwise noted on the drawings.
5. Reinforcement shown on the plan is an additional reinforcement
to the typical mesh mentioned above.
6. Reinforcement shown in the slabs is an additional
reinforcement only.
7. Minimum Reinforcement around slab opening shall be 4T20
top and bottom unless otherwise shown on the plan.
8. For concrete grade of slabs & beams refer to General Notes
drawing no.STR-GEN-0002
9. For staircase details refer to drawing no. STR-600 series.
10. All partitions not provided with ground beam to support
blockwork shall be supported by slab on grade thickening
typical detail in drawing GEN-0003.

SIGNED

D<-!,11a11
Architects+
Engineers
YAA YAB YAC YAD YAE YAF

ISSUED FOR CONSTRUCTION


■•
21000 SUBJECT TO AUTHORITIES APPROVALS

3550 5350 3200 5350 3550

PLOT LINE PLOT LINE

XA8
2025

G-CB01 G-CB01 G-CB01 G-CB01


G-B02 G-B02 G-B02 G-B02
XA7

100 100
G-B03

G-B03
G-B02

G-B02
G-B02

G-B02
4400

SLAB ON GRADE SLAB ON GRADE


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
S.S.L.-0.100 S.S.L.-0.100 NO DATE BY REVISION APP
R E V I S I O N
G-B03 G-B02 G-B02 G-B03
PROJECT :
XA6
UP
VILLAS AT PHASE 02 OF MASAAR
G-B02

G-B02

G-B01 G-B01
1800

G-B04

G-B02

G-B02

G-B04
1
G-B0

G-B0

XA5
1

CLIENT
G-B03 G-B02 G-B02 G-B03
1575

300mm THK
18925

PLAIN CONCRETE
XA4 100 100
G-B02
G-B02

G-B02
G-B02
G-B02

G-B02
G-B01

G-B01

SLAB ON GRADE 100 SLAB ON GRADE


MASAAR DEVELOPMENTS LLC
3025

S.S.L.-0.100 SLAB ON GRADE S.S.L.-0.100


CONSULTANT
G-B02 S.S.L.-0.400 G-B02
XA3 G-B03 G-B01 G-B01 G-B03
G-B02

G-B02
GB-B01
G-B02

G-B02
3000

S.S.L.+0.000 S.S.L.+0.000
100MM PLAIN CONCRETE 100MM PLAIN CONCRETE
G-B02 G-B02 G-B02 G-B02
XA2
MEP ENGINEER
G-STB1

G-STB1

G-STB1

5
3100

0301
G-B05 G-B05

XA1 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
PLOT LINE BEAM EXTENSION BEAM EXTENSION BEAM EXTENSION CONSTRUCTION SHARJAH,UAE
PLOT LINE
6
DRAWING TITLE :
0301

FOR WATER TANK DETAILS REFER TO DWG NO.


FOR WATER TANK DETAILS REFER TO DWG NO. CL4 - GROUND FLOOR - FRAMING PLAN
MAS-P2AB-STR-CL4-301
MAS-P2AB-STR-CL4-301

DRAWN BY CHECKED BY APPROVED BY DATE

GROUND FLOOR - FRAMING PLAN DAE HJ EK 14/12/2022


1 JOB NO. SHEET SIZE SCALE REV. NO.
1 : 100
D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL4-0102
NORTH

CL4 - BEAMS SCHEDULE - FIRST FLOOR Schedule Of Slab / Raft Extra Reinforcement LEGEND:
Column / Wall Continuous
OVERALL SIZE (MM) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
EXTRA AT EXTRA AT
Column / Wall Stop Below Slab Level
STRAIGHT STRAIGHT FROM SIDE BARS 1 T12-400 C/C A 1500
BEAM MARK
WIDTH DEPTH THROUGH
EXTRA AT
THROUGH
CONT. END
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE
REMARKS Floating (Planted) Column / Wall (FC/FW)
MID SPAN SUPPORT TO SUPPORT TO 2 T12-200 C/C B 2000
OUT OUT
L/4 OF SPAN L/4 OF SPAN
L/3 Denotes Slab Opening
KEY PLAN
1-B01 200 400 2T12 - 2T12 1T12 - T10 - 200 T10 - 200 2 - - 3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
1-B02 200 600 2T16 - 2T12 2T12 2T12 T10 - 200 T10 - 200 2 - 4 T16-100 C/C D 3000
1-B03 200 600 2T16 - 2T16 - - T10 - 150 T10 - 200 2 - - PS1 Denotes Slab / Raft Punching Shear RFT Type.
E 3600
1-B04 200 700 2T16 - 2T16 - - T10 - 200 T10 - 200 2 1T10 -
1-B05 200 800 2T16 - 2T16 - - T10 - 200 T10 - 200 2 2T10 - F 4000 S.S.L. +1.000 Slab Surface Level in M M 02 C
1-B06 200 800
400/800 2T16 - 2T16 1T16 - T10 - 200 T10 - 200 2 2T10 - G 4400 Top extra rebars
1-B07 200 800 2T16 2T16 2T16 - T10 - 200 T10 - 200 2 2T10 - Bottom extra rebars
H 4800
1-CB01 200 600 2T12 - 2T20 2T20 - T10 - 150 - 2 - - * Inverted Beam
1-CB02 200 800 2T12 - 2T16 - - T10 - 150 - 2 2T10 - J 5400
K 6000 NOTES
NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
L 6600 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
1. For general notes & general details refer to drawing no. ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
M 7200 STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
N 7500 on the drawings. 3.
DIMENSIONS ONLY ARE TO BE CONSIDERED.
ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom TO COMMENCEMENT OF ANY WORK.
mesh unless otherwise noted on the drawings.
Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

LEGEND:

Stair Opening Boundary


Additional Rebars
SIGNED
3T16 TOP & BOT
D<-!,11a11
500X200 Hidden Beam Architects+
Engineers
TOP BAR: 5T16

■•
BOTTOM BAR: 5T16
STIRRUPS: 4 LEGS OF T10-150

ISSUED FOR CONSTRUCTION


SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF


21000

3550 5350 3200 5350 3550

PLOT LINE PLOT LINE

PRECAMBER-10mm PRECAMBER-10mm

XA8
1-CB01 *

1-CB01 *

1-CB01 *

1-CB01

21-t2D 21-t2D
200
2025

PS2
200 PS2
9-t1D

9-t1D

RC SLAB RC SLAB
XA7 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
S.S.L.+3.400 S.S.L.+3.400 NO DATE BY REVISION APP
R E V I S I O N
T12-200 TOP MESH T12-200 TOP MESH PROJECT :
1-B02 *

1-B02 *

T12-200 BOT MESH T12-200 BOT MESH


1-B02 *

1-B02 *

16-t2C
4400

16-t2C
VILLAS AT PHASE 02 OF MASAAR
11-t3D

11-t3D

CLIENT
800

800

1-B02 T.O.B.+2.180 1-B02


XA6
39-b2F
WITH STAIR

WITH STAIR
26-t2C

26-t2C

UP
1-B02 *

1-B02 *
1800

1-B02

1-B02
39-b2F

XA5 DN MASAAR DEVELOPMENTS LLC


1070

1070

1-B03 1-B03
1575

CONSULTANT
18925

16-t2C T.O.B.+2.180 16-t2C


430

430
800

800
11-t3F

11-t3F

XA4
300

300

250 650 650 250


700 700
1-B02

1-B02
1-B02

1-B02
3025

2700

2700

16-t2D 16-t2D
1-B02 1-B02
6-t1D

6-t1D

XA3
MEP ENGINEER
1-B02
1-B02

1-B01 *

1-B04
1-B04
3000

1-B04 1-B04
1-B06
1-B06

XA2
STAGE LOCATION
200 200
ISSUED FOR TILAL, ALSUYOH SUBURB,
1-B01 *

1-CB02
1-CB02

1-B05
1-B05

5 RC SLAB RC SLAB CONSTRUCTION SHARJAH,UAE


3100

0301 DRAWING TITLE :


S.S.L.+2.900 S.S.L.+2.900
1-B05 1-B05
CL4 - FIRST FLOOR - FRAMING PLAN
XA1 1-B07 1-B07
PLOT LINE BEAM EXTENSION PLOT LINE
BEAM EXTENSION T.O.B.+3.500 T.O.B.+3.500
6
BEAM EXTENSION DRAWN BY CHECKED BY APPROVED BY DATE
0301
DAE HJ EK 14/12/2022

1ST FLOOR - FRAMING PLAN JOB NO. SHEET SIZE SCALE REV. NO.
1 D21-44 A1 1 : 100 C00
1 : 100 DRAWING NO.
MAS-P2AB-STR-CL4-0103
NORTH
Schedule Of Slab / Raft Extra Reinforcement LEGEND:
CL4 - BEAMS SCHEDULE - ROOF FLOOR
Column / Wall Continuous
OVERALL SIZE (MM) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS Type Dia. & Spacing Type Length & Shape
Column / Wall Stop Below Slab Level
EXTRA AT EXTRA AT SIDE BARS 1 T12-400 C/C A 1500
BEAM MARK STRAIGHT
EXTRA AT
STRAIGHT
CONT. END
FROM REMARKS Floating (Planted) Column / Wall (FC/FW)
WIDTH DEPTH THROUGH THROUGH SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE 2 T12-200 C/C B 2000
OUT
MID SPAN
OUT
SUPPORT TO SUPPORT TO
L/3
Denotes Slab Opening
L/4 OF SPAN L/4 OF SPAN KEY PLAN
3 T16-200 C/C C 2400 200 Denotes Slab / Raft Thickness In mm.
R-B01 200 500 2T12 - 2T12 1T12 - T10 - 200 T10 - 200 2 - -
R-B02 200 500 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - 4 T16-100 C/C D 3000
R-B03 200 600 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - E 3600 PS1 Denotes Slab / Raft Punching Shear RFT Type.
R-B04 200 400 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - -
F 4000 S.S.L. +1.000 Slab Surface Level in M M 02 C
R-CB01 200 500 2T12 - 2T20 2T12 - T10 - 150 - 2 - -
R-CB02 200 500 2T12 - 2T20 2T20 - T10 - 150 - 2 - - G 4400 Top extra rebars
H 4800 Bottom extra rebars
* Inverted Beam
CL4 - BEAMS SCHEDULE - TOP ROOF J 5400
K 6000 NOTES
OVERALL SIZE (MM) BOTTOM REINFORCEMENT TOP REINFORCEMENT STIRRUPS NOTES: 1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
EXTRA AT EXTRA AT SIDE BARS
L 6600 EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
BEAM MARK STRAIGHT STRAIGHT FROM REMARKS 1. For general notes & general details refer to drawing no.
EXTRA AT CONT. END ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
WIDTH DEPTH THROUGH
MID SPAN
THROUGH
SUPPORT TO SUPPORT TO
SUPPORT TO MID SPAN L/3 NO. OF LEGS EACH FACE M 7200 STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATED
OUT OUT L/3 2. All RC Slabs to be 200 mm thick. unless otherwise mentioned
L/4 OF SPAN L/4 OF SPAN N 7500 DIMENSIONS ONLY ARE TO BE CONSIDERED.
on the drawings. 3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
TR-B01 200 400 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
P 8000 3. Reinforcement of all RC Slabs to be T12-200 Top & Bottom TO COMMENCEMENT OF ANY WORK.
TR-B02 200 600 2T12 - 2T12 - - T10 - 200 T10 - 200 2 - - mesh unless otherwise noted on the drawings.
TR-B03 200 600 2T16 - 2T16 - - T10 - 200 T10 - 200 2 - - Q 8400 4. Reinforcement shown on the plan is an additional reinforcement
TR-CB01 200 600 2T12 - 2T20 2T12 - T10 - 150 - 2 - R 9000 to the typical mesh mentioned above.
5. Reinforcement shown in the slabs is an additional
21-t 6 G S 9600 reinforcement only.
6. Minimum Reinforcement around slab opening shall be 4T20
T 10,000 top and bottom unless otherwise shown on the plan.
Length & shape 7. For concrete grade of slabs & beams refer to General Notes
U 10,500
Type (dia & spacing) drawing no.STR-GEN-0002
Location (t-top) (b-bottom) V 11,000 8. For staircase details refer to drawing no. STR-600 series.
Nos. of bars 9. The slabs design adheres to L/240 deflection limit (25mm slab
W 11,500 deflection for 6.0m span, curtain walls and any non-structural
X 12,000 elements attached to structural concrete need to allow for joint
to accommodate the slab deflection of L/240 without sustaining
A to X
* damage or non-functionality as a result of slab deflection.
10. For slabs punching shear reinforcement refer to STR-
GEN-0004.

LEGEND:

Stair Opening Boundary


Additional Rebars
SIGNED
3T16 TOP & BOT

D<-!,11a11
500X200 Hidden Beam Architects+
TOP BAR: 5T16
Engineers

■•
BOTTOM BAR: 5T16
STIRRUPS: 4 LEGS OF T10-150

ISSUED FOR CONSTRUCTION


SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAA YAB YAC YAD YAE YAF

21000 21000

3550 5350 3200 5350 3550 3550 5350 3200 5350 3550

200 200
R-B04 * R-B04 * TR-B01 * TR-B01 *
RC SLAB RC SLAB
XA8 XA8

TR-CB01 *

TR-CB01 *

TR-CB01 *
TR-CB01 *
S.S.L.+10.150 S.S.L.+10.150
R-CB02 *

R-CB02 *

R-CB02 *

R-CB02 *

26-t3D 26-t3D
2025

2025
T12-200 TOP MESH
16-t2F

T12-200 TOP MESH


16-t2F

PS3 PS3
200 200 T12-200 BOT MESH T12-200 BOT MESH
XA7 XA7
RC SLAB RC SLAB
S.S.L.+6.900 S.S.L.+6.900
T12-200 TOP MESH T12-200 TOP MESH TR-B02 * TR-B02 * C00 14/12/2022 EK ISSUED FOR CONSTRUCTION

TR-B02 *
R-B01 *

R-B01 *

TR-B02 *
T12-200 BOT MESH T12-200 BOT MESH NO DATE BY REVISION APP

TR-B02 *
TR-B02 *
R-B01 *

R-B01 *

16-t3C 16-t3C
4400

4400
200 200 R E V I S I O N
PROJECT :
21-t4F

21-t4F

RC SLAB RC SLAB
800

800

R-B02 R-B02 S.S.L.+9.750 TR-CB01 * TR-CB01 * S.S.L.+9.750 VILLAS AT PHASE 02 OF MASAAR


XA6 XA6 TR-B03 * TR-B03 *
WITH STAIR

26-t3C

TR-B02 *
WITH STAIR
26-t3C
R-B01 *

R-B01 *

CLIENT

TR-B02 *

TR-B02 *
TR-B02 *
1800

1800
R-B03

R-B03

46-b2F

XA5 XA5
46-b2F

DN
TR-B03 * TR-CB01 * TR-CB01 * TR-B03 *
1070

1070

R-B02 R-B02
1575

1575
250
18925

18925
16-t2C
430

430

16-t2C
800

800

700
MASAAR DEVELOPMENTS LLC
11-t3F

XA4 XA4
11-t3F

T12-200 TOP MESH


300

300

650 250 T12-200 TOP MESH


T12-200 BOT MESH
R-B01 *

R-B01 *
R-B01 *

R-B01 *

700 T12-200 BOT MESH


4 CONSULTANT
0301
3025

3025
2700

2700

9-t1D 9-t1D
11-t3D

11-t3D

XA3 XA3
R-CB01 *

R-CB01 *
R-B02 *

R-B02 *
R-B01 *

R-B01 *

200 200
3000

3000

R-B01 * R-B01 *
RC SLAB RC SLAB
MEP ENGINEER
S.S.L.+9.750 S.S.L.+9.750
XA2 XA2
R-B01 * R-CB01 * R-CB01 * R-B01 *

5
3100

3100

0301 STAGE LOCATION


ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE
XA1 XA1 DRAWING TITLE :

CL4 - ROOF & TOP ROOF - FRAMING PLAN


6
0301

ROOF FLOOR - FRAMING PLAN DRAWN BY CHECKED BY APPROVED BY DATE


1
1 : 100 TOP ROOF - FRAMING PLAN DAE HJ EK 14/12/2022

2 JOB NO. SHEET SIZE SCALE REV. NO.


1 : 100 D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL4-0104
NORTH
LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)

C1-01 KEY PLAN

COLUMN TYPE
PART NUMBER
C DENOTES COLUMN
W DENOTES WALL M 02 C
CW DENOTES CORE WALL

NOTES
NOTES:
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1. For general notes & general details refer to drawing No. EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. For concrete grade of columns refer to General Notes 2. THIS DRAWING IS NOT TO BE SCALED. STATED
drawings series STR-0401. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For columns reinforcement schedule refer to drawing ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
series STR-0401. TO COMMENCEMENT OF ANY WORK.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF

21000

3550 5350 3200 5350 3550

XA8
2025

250 650
100 100 100 100
200

200
625

625

C06
XA7
50

50

50

50

900 900 C06


600

600

600

600

200 C01 200 C03 200 C03 200 C01


C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
4400

R E V I S I O N

100 100
PROJECT :
2600 100 100 2000
VILLAS AT PHASE 02 OF MASAAR
600

600
700

700
200

200
300

300

300

300

XA6
600

600

200 C01 600 600 200 C01


C01 C01
200 C01 200 C01 CLIENT
1800

100 100 100 100


XA5
375

375

375

375

1900 1300
600

600

600

600
1575

200

200
18925

800

800

200 C02 600 200 C01 200 C01 600 200 C02
XA4 C01 C01 MASAAR DEVELOPMENTS LLC
CONSULTANT
3025

100 100 100 100


550 1700 1250
500

500

500

500
600

600

600

600
100

100

100

XA3
200

200
500

200 C03 700 200 C03 200 C03 700 200 C03
C04 C07 C04
200
3000

100 1700 100


50 750 MEP ENGINEER
600

600
500

XA2
200

200
100

100

100

100

100

200 C03 800 200 C07 800 200 C03


C05 C05
3100

STAGE LOCATION
50 1700 150
ISSUED FOR TILAL, ALSUYOH SUBURB,
500

500

500

CONSTRUCTION SHARJAH,UAE
700

700

700

XA1 200 C07 200 C07 200 C07 DRAWING TITLE :

CL4 - FOUNDATION & GROUND FLOOR -


COLUMN LAYOUT

FOUNDATION & GROUND FLOOR - COLUMN LAYOUT DRAWN BY CHECKED BY APPROVED BY DATE
1 DAE HJ EK 14/12/2022
1 : 100
JOB NO. SHEET SIZE SCALE REV. NO.
D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL4-0201
NORTH
LEGEND:
Column / Wall Continuous
Column / Wall Stop Below Slab Level
Floating (Planted) Column / Wall (FC/FW)

C1-01 KEY PLAN

COLUMN TYPE
PART NUMBER
C DENOTES COLUMN
W DENOTES WALL M 02 C
CW DENOTES CORE WALL

NOTES
NOTES:
1. THIS DRAWING IS THE PROPRETY OF : DEWAN AL
1. For general notes & general details refer to drawing No. EMARA - P.O. BOX 60990, DUBAI, UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENTS IN ANY FORM
STR-GEN-0002 to STR-GEN-0007. EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. For concrete grade of columns refer to General Notes 2. THIS DRAWING IS NOT TO BE SCALED. STATED
drawings series STR-0401. DIMENSIONS ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE
3. For columns reinforcement schedule refer to drawing ATTENTION OF THE ENGINEER AND RESOLVED PRIOR
series STR-0401. TO COMMENCEMENT OF ANY WORK.

SIGNED

D<-!,11a11
Architects+
Engineers

ISSUED FOR CONSTRUCTION


■•
SUBJECT TO AUTHORITIES APPROVALS

YAA YAB YAC YAD YAE YAF YAA YAB YAC YAD YAE YAF

21000 21000

3550 5350 3200 5350 3550 3550 5350 3200 5350 3550

XA8 XA8
2025

2025
100 250 100 100 650 100 100 100
200

200
625

625

XA7 XA7
50

50

50

50

50

50

50

50
900 C06 900 C06
600

600

600

600

600

600

600

600
200 C01 200 C03 200 C03 200 C01 200 C01 200 FC01 200FC01 200 C01
1050 1050 C00 14/12/2022 EK ISSUED FOR CONSTRUCTION
NO DATE BY REVISION APP
4400

4400
R E V I S I O N

100 100 100 100


PROJECT :
2600 100 100 2000 2600 100 100 2000
VILLAS AT PHASE 02 OF MASAAR
600

600

600

600
700

700

700

700
200

200

200

200
300

300

300

300

300

300

300

300
XA6 XA6
600

600

600

600
200 C01 600 C01 600 C01 200 C01 200 C01 600 C01 600 C01 200 C01
200 C01 200 C01 200 C01 200 C01 CLIENT
1800

1800
100 100 100 100 100 100 100 100
XA5 XA5
375

375

375

375

375

375

375

375
1900 1300 1900 1300
600

600

600

600

600

600

600

600
1575

1575
200

200

200

200
18925

18925
800

800

800

800
200 C02 600 200 C01 200 C01 600 200 C02 200 C02 600 C01 200 C01 200 C01 600 C01 200 C02
XA4 C01 C01 XA4 MASAAR DEVELOPMENTS LLC
CONSULTANT
3025

100 100 100 100 3025


550 1250
500

500

500

500
600

600

600

600
100

100

XA3 XA3
200

200

200 C03 700 200 C03 200 C03 700 200 C03
C04 C04
3000

3000

100 100
50 750 MEP ENGINEER
600

600

XA2 XA2
200

200
100

100

100

100

200 C03 800 800 200 C03


C05 C05
3100

3100

STAGE LOCATION
ISSUED FOR TILAL, ALSUYOH SUBURB,
CONSTRUCTION SHARJAH,UAE
XA1 XA1 DRAWING TITLE :

CL4 - FIRST FLOOR & ROOF - COLUMN


LAYOUT

1ST FLOOR - COLUMN LAYOUT ROOF FLOOR - COLUMN LAYOUT DRAWN BY CHECKED BY APPROVED BY DATE
1 2 DAE HJ EK 14/12/2022
1 : 100 1 : 100
JOB NO. SHEET SIZE SCALE REV. NO.
D21-44 A1 1 : 100 C00
DRAWING NO.
MAS-P2AB-STR-CL4-0202
NORTH