Reduced Construction Schedule:
Because construction of modular buildings can occur simultaneously with the site
and foundation work, projects can be completed 30% to 50% sooner than
traditional construction.
https://vanguardmodular.com/blog/permanent-modular-construction-
solutions-long-term/
2. Relocatable Buildings