PRE MONSOON

CHECKLIST S
I N G
E D B UILD
G I N EER
RE-E N
P

Pre-Engineered Building Elements and Need for Pre-Monsoon Checks

www.epack.in
THINK PREFAB THINK EPACK

Pre-Engineered Building Elements and Need for Pre-Monsoon Checks

Roong
Assemblies
ELEMENTS
Other Various Critical
METAL Elements
BUILDINGS / Parts Factors : Pollution

WHY TIMELY Environmental


factors
MAINTENANCE
Pollution

To Achieve
Productivity
Damages : Rust

Factors : Environmental Damages : Elemental

www.epack.in
Pre-Monsoon Maintenance - Critical Areas

Pre-Monsoon Checks to Avoid


Potential Leakage

Critical Areas

Roof Sheets /
Eaves & Valley Flashings Miscellaneous
Down Spout Pipes
Gutters & Other Roof Areas
Components

Critical Areas & Checks

Eaves & Valley Roof Sheets / Miscellaneous


Down Spout Pipes
Flashings Areas

Ÿ Check for blockages in Ÿ Includes Other Roof Ÿ Check areas which are
Ÿ Check for debris,
garbage, dry leaves. pipes. Components modied/ repaired after
Ÿ Ensure clear free ow of Ÿ Check for Damages due execution.
Ÿ Items which may cause
choke. water from roof. to wind, storm, live Ÿ Check for weak points.
Ÿ Defects which may cost Ÿ Opening of down spout movements. Ÿ Check for leakages.
must be atleast 1 feet Ÿ Check for gaps, improper
direct leakage.
above ground. overlaps.

Flashing to be change Water Settling and entering below Regular Cleaning Required in
louver Flashing Gutters
Maintenance of Pre-Engineered Building

Maintenance in PEB Buildings

Periodic Standard Maintenance Maintenance Safety Measure


Schedule Maintenance of Records- during
Procedure Accessories Importance Maintenance
work
Standard Maintenance Procedure
Maintenance in PEB Buildings

Standard Maintenance
Procedure

Ÿ Remove Sand & Dust Ÿ Cleaning of encrusted Panels


Ÿ Remove waste & small items using mild detergent solutions.
like screws, rivets, drill bits. Ÿ Cleaning of Oil, Grease, Wax
Ÿ Adopt Pro-Active approach.
Ÿ Removal using Nylon Brush. etc, using mineral spirits.
Ÿ Remove large items using Ÿ Use of caustic or abrasive
hands like cut off metal sheets cleaners to be avoided.
Maintenance of Accessories in PEB

Maintenance in PEB Buildings

Maintenance of
Accessories

SKYLIGHT DOORS SLIDING DOORS ROLL UP DOORS POWER VENTS CRANES

Ÿ Regular Ÿ Dirt, Grit Ÿ Bottom guide Ÿ Periodic Ÿ Cleaning of Ÿ Checks for


Cleaning of removal rail to be Cleaning dirts from fan bracings.
dirt will Ÿ Hinges & cleaned. Ÿ Lubrication of blades Ÿ Checking
improve Locksets Ÿ For dirt, sand drive gears & bolts tighten
lighting Lubrication. & stones. chains or not.
Ÿ Avoid
Striking of
door on wall.

www.epack.in
Periodic Schedule and Records

Maintenance in PEB Buildings

Maintenance Periodic Schedule


Records Importance For Buildings

Regular Entries by Ÿ Low Polluted Ÿ Medium Within 5 kms of


Maintenance maintenance Ÿ Low Humid Polluted Ÿ High Polluted
Log book to be supervisor / staff Area Ÿ High Humid
Ÿ High Humid
kept with signature Area
Area

Effective Records
working maintenance Every 6 months Every 4 months Every 3 months
standard safety dates, actions,
measure remarks

www.epack.in
Safety Measures while doing Maintenance
of Pre Engineered Buildings.

Maintenance in PEB Buildings

Safety Measures

Ÿ Competent & Supervised / Ÿ No Stepping on Skylights.


Ÿ Use of PPE (Personal Protective Experienced workers. Ÿ Walking carefully & as far as
Equipments) Ÿ Access Ladder Should be 1 Possible on Walkways.
Ÿ Demobilization of Cranes before Meter Above Step off Point & Ÿ Walking can be also on Valley
its maintenance. Must Have Firm Base. Purlin, or screw line.

PPE’s Required

www.epack.in
THINK PREFAB
THINK EPACK

EPACK POLYMERS PVT. LTD.


Unit-1 : 61-B&C, Udyog Vihar, Surajpur
Kasna Road Greater Noida,
Uttar Pradesh, India: 201306 Unit2 : B-13, Ecotech-1st Extension Greater
Noida, Uttar Pradesh, India: 201306
Phone : +91-8130444466
+91-8130444477

Email : enquiry@epack.in , sales@epack.in

www.epack.in

You might also like