Professional Documents
Culture Documents
Type MBCH
Biased Differential Relay
Service Manual
Type MBCH
Biased Differential Relay
SAFETY SECTION 7
1 DESCRIPTION 11
2 INSTALLATION 11
2.1 General 11
2.2 Unpacking 12
2.3 Storage 12
2.4 Site 12
3 COMMISSIONING 12
3.1 Commissioning preliminaries 12
3.2 Commissioning tests 13
4 APPLICATION NOTES 17
4.1 General 17
4.2 Matched line current transformers 17
4.3 Ratio and phase matching interposing transformers 18
4.4 Application of matching transformer 19
5 SETTINGS 23
DIAGRAMS
Flowchart 1 24
Flowchart 2 25
Flowchart 3 26
Flowchart 4 27
Flowchart 5 28
Flowchart 6 29
Figure 1 Connections for checking relay settings 30
Figure 2 Connections for checking relay operating time 30
Figure 3 Connections for checking the bias curve 31
Figure 4 MBCH 12/13/16 bias curve 32
Figure 5 Connections to the relay to simulate magnetizing inrush current
waveform 33
Figure 6 Mesh busbar arrangement requiring three bias inputs to the
differential relay 34
Figure 7 Three winding transformer – one power source 35
Figure 8 Switchgear arrangement where six bias inputs may be required 36
Figure 9 Example of a 30 MVA transformer with current flow indicated 37
Figure 10 Disposition of windings on matching transformer 38
Figure 11 Two winding transformer with unmatched line current transformers 39
4
Figure 12 Three winding transformer showing interposing CTs 40
Figure 13 Block diagram: biased differential protection relay Type MBCH12
with two biased inputs 41
Figure 14 Block diagram: biased differential protection relay Type MBCH13
with three biased inputs 42
Figure 15 Block diagram: biased differential protection relay Type MBCH16
with six biased inputs 43
Figure 16 Connection for six change-over tripping contacts for three phase
tripping of up to six circuit breakers 44
6 COMMISSIONING TEST RECORD 45
REPAIR FORM 47
5
6
SAFETY SECTION
*Note: The term earth used throughout the product documentation is the direct
equivalent of the North American term ground.
7
Before energising the equipment it must be earthed using the protective earth
terminal, or the appropriate termination of the supply plug in the case of plug
connected equipment. Omitting or disconnecting the equipment earth may cause a
safety hazard.
The recommended minimum earth wire size is 2.5 mm2, unless otherwise stated in
the technical data section of the product documentation.
Before energising the equipment, the following should be checked:
Voltage rating and polarity;
CT circuit rating and integrity of connections;
Protective fuse rating;
Integrity of earth connection (where applicable)
8
Older Products
Electrical adjustments
Equipments which require direct physical adjustments to their operating mechanism to
change current or voltage settings, should have the electrical power removed before
making the change, to avoid any risk of electric shock.
Mechanical adjustments
The electrical power to the relay contacts should be removed before checking any
mechanical settings, to avoid any risk of electric shock.
Draw out case relays
Removal of the cover on equipment incorporating electromechanical operating
elements, may expose hazardous live parts such as relay contacts.
Insertion and withdrawal of extender cards
When using an extender card, this should not be inserted or withdrawn from the
equipment whilst it is energised. This is to avoid possible shock or damage hazards.
Hazardous live voltages may be accessible on the extender card.
Insertion and withdrawal of heavy current test plugs
When using a heavy current test plug, CT shorting links must be in place before
insertion or removal, to avoid potentially lethal voltages.
Decommissioning: The auxiliary supply circuit in the relay may include capacitors
across the supply or to earth. To avoid electric shock or energy
hazards, after completely isolating the supplies to the relay
(both poles of any dc supply), the capacitors should be safely
discharged via the external terminals prior to decommissioning.
Disposal: It is recommended that incineration and disposal to water
courses is avoided. The product should be disposed of in a safe
manner. Any products containing batteries should have them
removed before disposal, taking precautions to avoid short
circuits. Particular regulations within the country of operation,
may apply to the disposal of lithium batteries.
9
Technical Specifications
Protective fuse rating
The recommended maximum rating of the external protective fuse for this equipment
is 16A, Red Spot type or equivalent, unless otherwise stated in the technical data
section of the product documentation.
10
Section 1. DESCRIPTION
The MBCH is a range of high-speed biased differential relays suitable for protection
of two or three winding power transformers, auto-transformers or generator
transformer units.
The MBCH may also be regarded as an alternative to the high impedance relays for
the protection of reactors, motors and generators.
The relay is extremely stable during through faults and provides high speed operation
on internal faults, even when energized via line current transformers of only moderate
output. Immunity to false tripping due to large inrush currents on energization of the
power transformer, and during overfluxing conditions, is guaranteed without the use
of harmonic filter circuits, therefore eliminating their associated delay.
A tapped interposing transformer for ratio matching of the line current transformers is
available where required. The transformer taps are spaced at intervals of 4% and
better, allowing matching to well within 2% in most cases.
The relay models available are as follows:
Section 2. INSTALLATION
2.1 General
Protective relays, although generally of robust construction, require careful treatment
prior to installation and a wise selection of site. By observing a few simple rules the
possibility of premature failure is eliminated and a high degree of performance can
be expected.
The relays are either despatched individually or as part of a panel/rack mounted
assembly in cartons specifically designed to protect them from damage.
Relays should be examined immediately they are received to ensure that no
damage has been sustained in transit. If damage due to rough handling is evident,
a claim should be made to the transport company concerned immediately, and
ALSTOM T&D Protection & Control Ltd should be promptly notified.
Relays which are supplied unmounted and not intended for immediate installation
should be returned to their protective polythene bags.
11
2.2 Unpacking
Care must be taken when unpacking and installing the relays so that none of the
parts are damaged or their settings altered, and relays must only be handled by
skilled persons.
Relays should be examined for any wedges, clamps, or rubber bands necessary to
secure moving parts to prevent damage during transit and these should be removed
after installation and before commissioning.
Relays which have been removed from their cases should not be left in situations
where they are exposed to dust or damp. This particularly applies to installations
which are being carried out at the same time as constructional work.
2.3 Storage
If relays are not installed immediately upon receipt they should be stored in a place
free from dust and moisture in their original cartons and where de-humidifier bags
have been included in the packing they should be retained. The action of the de-
humidifier crystals will be impaired if the bag has been exposed to ambient
conditions and may be restored by gently heating the bag for about an hour, prior to
replacing it in the carton.
Dust which collects on a carton may, on subsequent unpacking, find its way into the
relay; in damp conditions the carton and packing may become impregnated with
moisture and the de-humidifying agent will lose its efficiency.
The storage temperature range is –25°C to +70°C.
2.4 Site
The installation should be clean, dry and reasonably free from dust and excessive
vibration. The site should preferably be well illuminated to facilitate inspection.
An outline diagram is normally supplied showing panel cut-outs and hole centres.
For individually mounted relays these dimensions will also be found in Publication
R6017.
Publication R7012, Parts Catalogue and Assembly Instructions, will be useful when
individual relays are to be assembled as a composite rack or panel mounted
assembly.
Publication R6001 is a leaflet on the modular integrated drawout system of protective
relay.
Publication R6014 is a list of recommended suppliers for the pre-insulated
connectors.
Section 3. COMMISSIONING
12
3.1.2 Inspection
Remove the polycarbonate front cover by undoing the two knurled plastic nuts with a
small screwdriver. The module can now be withdrawn by the handles provided.
Carefully examine the module and case to see that no damage has occurred during
transit. Check that the relay serial number on the module, case and cover are
identical and that the model number and rating information are correct.
3.1.3 Wiring
Check that the external wiring is correct to the relevant relay diagram and scheme
diagram. The relay diagram number appears inside the case. Note the shorting
switches shown on the relay diagram are fitted internally across the relevant case
terminals and close when the module is withdrawn. It is essential that such switches
are fitted across all CT circuits.
If a test block type MMLG is provided, the connections should be checked to the
scheme diagram, particularly that the supply connections are to the ‘live’ side of the
test block (coloured orange) and with terminals allocated with odd numbers (1, 3, 5,
7 etc). The auxiliary supply voltage to the scheme should be routed via test block
terminals 13 and 15.
3.1.4 Earthing
Ensure that the case earthing connection above the rear terminal block, is used to
connect the relay to a local earth bar.
3.1.5 Insulation
The relay and its associated wiring, may be insulation tested between:
– all electrically isolated circuits
– all circuits and earth
An electronic or brushless insulation tester should be used, having a dc voltage not
exceeding 1000V. Accessible terminals of the same circuit should first be strapped
together. Deliberate circuit earthing links, removed for the tests, subsequently must be
replaced.
3.1.6 WARNING
DO NOT OPEN THE SECONDARY CIRCUIT OF A CURRENT
TRANSFORMER SINCE THE HIGH VOLTAGE PRODUCED
MAY BE LETHAL AND COULD DAMAGE INSULATION.
When the type MMLG test block facilities are installed, it is important that the sockets
in the type MMLB01 test plug, which correspond to the CT secondary windings, are
LINKED BEFORE THE TEST PLUG IS INSERTED INTO THE TEST BLOCK. Similarly, a
MMLB02 single finger test plug must be terminated with an ammeter BEFORE IT IS
INSERTED to monitor CT secondary currents.
3.2 Commissioning tests
3.2.1 Test equipment
For relays with a rated current In = 1A, the variable auto-transformer and resistor
listed below can be used as an alternative to the overcurrent test set.
Overcurrent test set (with timing facilities or separate timer).
DC power supply (to suit relay auxiliary voltage Vx).
13
2 multimeters
Double pole switch
Single pole switch
MMLB01 test plug
MMLB02 single finger test plug } If MMLG Test Block
is supplied
8A variable auto-transformer
2 Variable resistors 0 – 100 Ohms, suitably rated
Diode rated 7A for magnetising inrush test, if required.
Note: The following test instructions are based on injecting current directly into the
relay terminals, however if a MMLG test block is incorporated in the scheme,
then it is more convenient to inject current into the MMLG test block. Refer to
the relevant scheme diagram for connections.
3.2.2 DC auxiliary supply
Check the rated auxiliary voltage Vx on the front plate and connect a suitable
smoothed dc supply or station battery supply to relay terminals 13(+ve) and 14(–ve).
3.2.3 Relay settings
Connect the overcurrent test set to the relay as shown in Figure 1. Adjust the relay
front panel switches to give a relay setting Is = 0.1 x In (10% setting, In = relay
rated current).
Slowly increase the current until the relay operates, indicated by a light emitting
diode (led) on the front plate. Note the operate (differential) current and check that
this is within ±10% of the expected current (ie. 0.09 to 0.11A for a 1A relay, or
0.45 to 0.55A for a 5A relay, with a 10% relay setting).
Check that the relay trip contacts (terminals 1,3 and 2,4 ) are closed with the current
above the setting, and that these contacts open as the current is removed.
Check also that the relay alarm contacts (terminal 9,11) are closed with the current
above the setting and remain closed as the current is removed.
Press the reset button on the relay front plate and check that the LED indicator resets
and that the alarm contacts open.
Repeat the test with the relay adjusted to settings of 0.2 x In, 0.3 x In, 0.4 x In and
0.5 x In in turn. Check that the settings are within ±10% of the nominal value.
Notes: 1. The setting may also be checked using a variable auto-transformer,
0 – 100 Ohm resistor and ammeter, as an alternative to using an
overcurrent test set.
2. During commissioning do not disconnect the dc auxiliary supply
without first removing the ac operating current, otherwise the trip
contacts on terminals 1,3 and 2,4 may remain operated.
If this does occur the contacts may be reset by removing the ac
operating current, and then switching on the dc auxiliary supply at rated
voltage.
3. It is prudent to switch off the dc supply before inserting or removing
modules.
14
3.2.4 Operating time
Connect the test circuit as shown in Figure 2. Set the relay to Is = 0.2 x In (20%
setting).
Inject 3.5 x In and record the relay operating time. For 50Hz, this should be within
the range 24ms ±5ms (60Hz relays, within the range 20ms ±4ms). To check
operation of the instantaneous circuit (high set), inject 4.5 x In and record the mean
relay operating time. For 50Hz relays, this should be less than 20ms (60Hz relays,
less than 17ms).
Note: For relays with a rated current (In) of 1A the operating time may be checked
using a variable auto-transformer and 0 – 100 Ohm (non inductive) resistor
(suitably rated), as an alternative to using the overcurrent test set.
3.2.5 Bias check
3.2.5.1 Connect the test circuit as shown in Figure 3. Ensure that both variable resistors are
non-inductive.
With the relay set to Is = 0.2 x In (20% setting), adjust resistor R1 to about 40 Ohms
(8 Ohms if In = 5A) and resistor R2 to about 100 Ohms (20 Ohms if In = 5A).
Switch on the supply and increase the applied voltage until ammeter A1 indicates
0.6 x In for MBCH 12, 13, 16. Slowly increase the differential current by decreasing
resistor R2 until the relay operates as indicated by the front plate LED. Record the
values of current A1 and A2.
Calculate the mean bias using the formula:
A2
Mean bias = A1 + amps
2
Use the bias curve Figure 4 for MBCH 12, 13, 16 to determine the theoretical
differential current and check that the measured current A2 is within ±20% of this
theoretical value. Note that for a 5 amp relay (In = 5A) the values of the calculated
mean bias have to be divided by 5 before applying the bias curve and the
theoretical differential current multiplied by 5 before comparing with the measured
current A2.
3.2.5.2 MBCH 13 only
Repeat the above test with the third bias coil (terminal 21).
3.2.5.3 MBCH 16 only
Repeat the above test with the third to sixth bias coils (terminals 21, 19, 17 and 15
respectively).
3.2.5.4 Reconnect the 2nd bias coil as shown in Figure 3 and adjust the current shown on
ammeter A1 to be 1.7 x In for MBCH 12, 13, 16. (Note that for a 5A relay this
current may exceed the continuous rating of the variable auto transformer and should
therefore be switched on for short durations only).
Increase the differential current until the relay operates and check that this value is
within ±20% of the theoretical value by calculating the mean bias as described in
3.2.5.1 above.
3.2.5.5 Repeat tests 3.2.2, 3.2.3, 3.2.4, and 3.2.5 for the two relays associated with the
other phases.
15
3.2.6 Bias interconnection
Check that the terminals no 12 on all three phase relays are interconnected using
screened leads, the screen connection being made to the dc negative supply
(terminal no 14).
A suitable screened lead should be provided with each relay. Only two will be
required for the interconnection.
3.2.7 Circuit breaker tripping
By interconnecting terminal no 10 of all three phase relays, up to six self-resetting
changeover contacts can be provided for the three phase tripping of up to six circuit
breakers.
If this is required, check terminals no 10 are connected together, and check that the
relay trip contacts (terminals 1,3 and 2,4) on all three phase relays close as the
current injected into a single phase relay (as shown in Figure 1) exceeds the relay
setting.
3.2.8 On load tests
The object of the on-load tests is to check that the relay is connected correctly to the
system.
If the relay is protecting a transformer with no tap changer then the differential
current could be less than 1% of the load current. However, if the transformer has a
tap changer and the CTs are not matched to the transformer, then the normal
differential current ,with the tap changer away from the nominal position, could be as
much as 20% of the load current.
Check that the load current in each bias coil is close to the value which is expected
for the particular application. For the MBCH 16 relay particularly, it may be
preferable to energize the transformer in different ways to ensure that all connections
are satisfactory. Check that the differential current under any of these conditions is
within 1–20% of the load current. The actual figure of differential current depends
upon the particular application as stated above.
Since the magnetizing current may exceed 5% of rated current for small transformers,
and bearing in mind the comments of the above paragraph, it is recommended that
the standard setting of the relay should be Is = 0.2 x In.
Check that the currents measured in the same bias or differential coils of each phase
relay are similar.
3.2.9 Magnetizing inrush test
The relay may be tested with a simulated waveform representing magnetizing inrush,
by connecting a diode in series with the relay to produce a half wave rectified
waveform.
With reference to Figure 5, close switches S1 and S2 and set the current to 1 x In
(rated current). Check that the relay operates.
Open switch S2, close switch S1 and check that the relay does not operate.
If it is preferred to test the relay with the magnetizing inrush current of the
transformer, it is suggested that the transformer is energized ten times at full rated
voltage on no load and checked that the relay does not maloperate.
16
Section 4 APPLICATION NOTES
4.1 General
The type MBCH relay is a high speed biased differential relay suitable for the
protection of two or three winding power transformers, autotransformers, or
generator transformer units.
Three versions of the relay are available as follows:
17
4.3 Ratio and phase matching interposing transformers
Matching transformers are available for use in cases where the current transformers
on one side of the protected transformer do not match, in current ratio or phase
angle, with the current transformers on the other side of the protected transformer.
The following versions of matching transformer are available:
Description Reference No
Single phase transformer 1/1A GJ0104 010
Single phase transformer 5/5A GJ0104 020
Single phase transformer 5/1 GJ0104 030
Three phase transformer 1/1A GJ0104 050
Three phase transformer 5/5A GJ0104 060
Three phase transformer 5/1A GJ0104 070
Number of turns
Transformer rating
Primary
tap terminals 1/1A 5/1A 5/5A
1–2 5 1 1
2–3 5 1 1
3–4 5 1 1
4–5 5 1 1
5–6 125 25 25
X 7 25 5 5
7–8 25 5 5
8–9 25 5 5
S1 – S2 125 125 25
S3 – S4 90 90 18
Table 1.
Notes on combinations of windings.
For star-output windings:
It is permissible to use either S1-S2 or S1-S4 (with S2-S3 linked). Where S1-S2 alone
is used, the secondary winding S3-S4 is available for formation of an isolated delta
connection to prevent zero sequence currents due to external earth faults being seen
by the relay. This is for applications where phase correction is not required, but
where a zero sequence trap is needed.
For delta output windings:
S1-S4 (with S1-S3 linked) must be used to obtain optimum protection performance.
18
4.4 Application of matching transformer
Where the line current transformer ratios on the two sides of the protected
transformer are mutually incompatible, the matching transformer may be used as in
the following examples:
4.4.1 Single phase transformer
200/5 A 1000/5 A
195 A 780 A
S1 4
4.875 A 3.9 A
S2 7
19
The output current, per phase pilot, of the 300/1A current transformers is given by:
262.43 x 1
Is = = 0.875A
300
This should be adjusted by the interposing transformer so that 0.984A flows into the
relay.
The windings S1–S2, and S3–S4 must be used in series as output windings giving
(125 + 90) = 215 turns.
Primary turns (Tp) required, therefore are given by:
Is/√ 3
Tp = x Ts
Ip
0.984 x 215
∴ Primary turns (Tp) = = 139.6
√3 x 0.875
say Tp = 140 turns
ie. connect each phase pilot from the 300/1A current transformers to primary
terminal nos. 2 and 6 (see Figure 11 and Table 1). Complete connections to the
interposing transformer as given below:
S2 S3 S4 6 2
S1 P2 P1
A A
S2 S3 6 2 To 66kV
To S1 P2 P1 line
Relay B S4 B current
S2 S3 6 2 transformer
S1 P2 P1
C S4 C
N
20
interposing CT. Output windings S1–S2 and S3–S4 must be connected in series to
give 43 turns, thus:
Is/√ 3
Tp = x Ts
Ip
5 x 43
Primary turns (Tp) = = 26.86 say 27 turns.
√3 x 4.62
Table 1 indicates that primary taps nos. 3–6 will give 27 turns.
S2 S3 S4 6 3
S1 P1 P2
A A
S2 S3 6 3 To 500kV
To S1 P1 P2
Relay B line
S4 B current
S2 S3 6 3 transformer
S1 P1 P2
C S4 C
N
138kV winding:
Based on 400MVA the corresponding current would be:
400 x 106
In = = 1674A
√3 x 138 x 103
Secondary current from 138kV current transformers:
1674 x 5
Is = = 6.975A say 7A
1200
The 1200/5 star connected line CTs are associated with the 138kV star winding and
thus the necessary transition to delta connection must be made by means of an
interposing CT.
The output windings S1–S2 and S3–S4 of the interposing transformer must be
connected in series to give a total of 43 turns (see Table 1).
Table 1 indicates that primary tap nos. 2—9 should be used, with link 6—X removed
and terminal 5 connected to terminal X.
21
S2 S3 S4 9 x 5 2
S1 P2 P1
A A
S2 S3 9 x 5 2 To 138kV
S1 P2 P1
B line
S4 B current
S2 S3 9 x 5 2 transformer
S1 P2 P1
C S4 C
N
13.45kV winding:
Based on 400 MVA the corresponding current would be:
400 x 106 17170.2 x 5
In = = 17170.2A Is = = 17.17A
√3 x 13.45 x 103 5000
NB In this case the transformer winding (13.45kV) is delta connected, and the
associated line current transformers are star connected. There is thus no
phase angle compensation required, the associated interposing CT may be
star connected and taps selected to reduce the 17.17A output to 5A.
Using S1–S2, and S3–S4 in series as output winding, the primary tap becomes:
Is 43 x 5
Primary turns (Tp) = x Ts Tp = = 12.52 say 13T
Ip 17.17
Table 1 indicates that primary taps nos. 2–8 will give 13 turns, with link X–5 instead
of X–6.
S2 S3 S4 8 x 5 2
S1 P2 P1
A A
S2 S3 S4 8 x 5 2 To 13.45kV
To S1 P2 P1
Relay B B
line
current
S2 S3 S4 8 x 5 2 transformer
S1 P2 P1
C C
N
N
22
Section 5 SETTINGS
When protecting a power transformer, the differential setting should not be less than
20% of the relay rated current, to give stability for moderate transient overfluxing.
The maximum spill current with through load current should generally be kept below
20% of relay rated current, allowing for CT mismatch and possible tap changer
operation. This may be achieved either by appropriate choice of main line current
transformers, or by the use of interposing transformers, as descibed in Section 4.
Where higher levels of spill current exist, the relay setting may need to be increased.
23
Suspected faulty
module
YES
YES
NO Apply correct
Correct
? dc voltage
YES
Check auxiliary dc
current drain
YES
NO Conclusion:
Correct Internal wiring faulty
? and/or pcb 1, 2 or 3 faulty.
YES
YES
Conclusion: NO Correct
Faulty pcb1 ?
YES
Conclusion:
Auxiliary dc circuit appears
to be working correctly.
YES
Is
relay
operation on
NO
magnetising Follow Flowchart 2
inrush current
incorrect.
YES
Follow Flowchart 6
Flowchart 1
24
Set Is = 0.5 In
on relay frontplate.
Monitor TP4
YES
Inject In into
terminals 27 and
28.
YES
YES YES
R2
Monitor tripping contacts voltage NO Conclusion:
correct faulty pcb 1, pcb 2 or
? transformers T1 or T2
YES
YES
Do
NO tripping
Conclusion:
faulty pcb1 contacts Conclusion:
close faulty pcb1
?
YES
Is
the relay NO Follow
an MBCH 12
Flowchart 4
version
?
YES
Follow
Flowchart 3
Flowchart 2
25
Link terminals 26 and 27.
Inject In into terminals 25
and 28. Monitor TP4.
YES
YES
YES
YES YES
NO R1 Conclusion:
Conclusion: voltage relay appears to be
Faulty pcb1 correct functioning correctly.
?
YES
Conclusion:
Faulty pcb1, pcb2
or transformer T3.
Flowchart 3
26
Link terminals 26 and 27.
Inject In into terminals
25 and 28.
Monitor TP4 (Note 3)
YES
R1
NO Conclusion:
Link terminals voltage
Faulty pcb1, pcb2 or
24 and 27. correct
transformer T3
Inject In into terminals ?
23 and 28
YES
YES
TP4 Conclusion:
Monitor R1 (Note 6) NO voltage Faulty pcb1
Inject In into terminals correct ?
23 and 28. (note 3)
YES
YES
Conclusion: NO R1
voltage Link terminals
Faulty pcb1, pcb2
correct 22 and 27.
or transformer T4
? Inject In into terminals
21 and 28
YES YES
TP4
Conclusion: NO Monitor R1 (Note 6)
voltage
Faulty pcb1 Inject In into terminals
correct ?
21 and 28.
(note 3)
YES
YES
R1
Is NO Conclusion:
voltage
Conclusion: NO the relay Faulty pcb1, pcb2 or
correct
Relay appears to be an MBCH transformer T5
?
functioning correctly 06
version
? YES
YES
Conclusion:
Faulty pcb1
Follow Flowchart 5
Flowchart 4
27
Link terminals
2 and 27.
Inject In into terminals
19 and 28.
YES
Monitor R1 TP4
Inject In into NO voltage
terminals 19 and correct ?
28 (note 3)
YES
YES
R1
Conclusion: NO voltage
Faulty pcb1, Link terminals
correct ?
pcb2 or 18 and 27.
(note 3)
transformer T6 Inject In into terminals
17 and 28
YES YES
YES
R1
Link terminals voltage NO Conclusion:
16 and 27. correct ? Faulty pcb1, pcb2
Inject In into (note 6) or transformer T7
terminals 15 and 28
YES
YES
Monitor R1
inject In into TP4 Conclusion:
NO voltage
terminals 1 Faulty pcb1
and 28 correct ?
(note 3)
YES
YES
Conclusion: R1
Faulty pcb1, NO voltage Conclusion:
pcb2 or correct ? Relay appears to
transformer T8 (note 6) be functioning
correctly
YES
Conclusion:
Faulty pcb1
Flowchart 5
28
Relay trips when
magnetizing inrush
current flows into the
power transformer
YES
YES
R2 Conclusion:
NO
Voltage Faulty pcb1, pcb2, or
correct
transformers T1 or T2
?
YES
YES
TP2 NO Conclusion:
Voltage
Faulty pcb1 pcb2 or
correct
? transformer T1
YES
Conclusion:
Faulty pcb1
Flowchart 6
29
MBCH
RELAY
bias
25 26
Overcurrent
differential
test set
27 28
MBCH
RELAY
bias
25 26
Overcurrent start
timer differential
test set
27 28
1
stop
3 timer
30
6th bias
16 5th bias 15
MBCH 16
18 4th bias 17 ONLY
20 3rd bias 19
MBCH 13, 16
1st bias 22 2nd bias 21 ONLY
A1
25 26 24 23
0–100Ω
28
ac Differential
supply Variable coil
Auto transformer
27
A2
0–100Ω
31
3.0
Is = 0.5 In
2.5 0.4 In
0.3 In
0.2 In
0.1 In
Differential current (Amps x In)
2.0
1.5
32
1.0
0.5
S2
S1
bias
25 26
variable
auto transformer differential
27 28
A
ac 0–100Ω
supply
33
Bias inputs
87
Operating
Circuit
Relay Type
MBCH13
Figure 6 Mesh busbar arrangement requiring three bias inputs to the differential relay
34
Sole infeed
Relay
type
MBCH
12
Bias winding
87
Operating
Circuit
Loads
35
Bias Windings Relay Type
MBCH 16
87
Operating
circuit
36
30 MVA
66kV/11kV
300/5 A 1574.6 A 1800/2.89 A
262.4 A
4.374 A
N.E.R.
4.374 A
37
23 25 27
24 26 28
23 25 27
24 26 28
23 25 27
Relay Type Operating
MBCH12 circuit
Bias Windings 24 28
26
1 2 3 4 5 6 X 7 8 9
38
S1 S2 S3 S4 P1 P2
Output to Relay
1574.6 A 262.43 A
0.984 0.875
Differential Relay
MBCH12
39
Ratio
0.984 A 0.875 A
21 22
23 MBCH 24
25 26
27 13 28
40
21 22
23 MBCH 24
25 26
27
13 28
5000/5 A
21 22
23 MBCH 24
25 26
27
13 28
41
11 12 (see Note 2)
13 14 Reset
15 16 T2 9
27
17 18 RL2–1 11 Alarm
RL2
See following sheets T1 1
DIFF
19 20
28
21 22 Input circuits
23 24
25 26
27 28
Notes:
1. (a) CT shorting links make 2. Terminal 12 on each phase assembly should
before (b) and (c) disconnect. be interconnected by a screened lead GJ0153 001
with the screen connected to terminal 14.
Module terminal (b) Short terminals break before (c).
block viewed
from rear (c) Long terminals.
Figure 13 Block diagram: biased differential protection relay Type MBCH12 with two biased inputs
1
21 RL1–1 3
T5 5
3 Trip
2
22 output
23 RL1 RL1–2 4
2
See following sheets T4 6
2
Output
24 circuits
25 Trip
Case earth 10
other
1 2 T3
1 phases
3 4 26 13
5 6 Vx
14
7 8 Input circuits
12
9 10 Bias
42
11 12 (see Note 2)
13 14 Reset
15 16 T2 9
27
17 18 RL2–1 11 Alarm
RL2
See following sheets T1 1
DIFF
19 20
28
21 22 Input circuits
23 24
25 26
27 28
Notes:
1. (a) CT shorting links make 2. Terminal 12 on each phase assembly should
before (b) and (c) disconnect. be interconnected by a screened lead GJ0153 001
with the screen connected to terminal 14.
Module terminal (b) Short terminals break before (c).
block viewed
from rear (c) Long terminals.
Figure 14 Block diagram: biased differential protection relay Type MBCH13 with three biased inputs
15
T8
6
16
17
1
T7
5 RL1–1 3
18 5
19
2 Trip
T6 output
4 RL1 RL1–2 4
20 2
See following sheets 21 6
Output
T5 circuits
3 Trip
Case earth 10
22 other
1 2 23 phases
3 4 T4 13
2
5 6 Vx
24 14
7 8 25
12
9 10 T3 Bias
1
43
11 12 (see Note 2)
26
13 14 Reset
Input circuits
15 16
9
17 18 T2 RL2–1 11 Alarm
RL2
27 1
19 20
See following sheets T1
DIFF
21 22
28
23 24 Input circuits
25 26
27 28
Notes:
1. (a) CT shorting links make 2. Terminal 12 on each phase assembly should
before (b) and (c) disconnect. be interconnected by a screened lead GJ0153 001
with the screen connected to terminal 14.
Module terminal (b) Short terminals break before (c).
block viewed
from rear (c) Long terminals.
Figure 15 Block diagram: biased differential protection relay Type MBCH16 with six biased inputs
1
13
3
Vx
14
5
Phase ‘A’
2
10 4
1
13
3 All output contacts shown
are instantaneously
14 initiated for any internal
5 fault condition when
Phase ‘B’ terminals No. 10 on each
2 phase unit are connected
together as shown.
1
13
3
14
5
Phase ‘C’
2
10 4
Figure 16 Connection for six change-over tripping contacts for three phase
tripping of up to six circuit breakers
44
Section 6 COMMISSIONING TEST RECORD
45
3.2.6 Check bias interconnection _____________________________________________
Load conditions
_________________________________ __________________________________
Commissioning Engineer Customer Witness
_________________________________ __________________________________
Date Date
46
REPAIR FORM
Please complete this form and return it to ALSTOM T&D Protection & Control Ltd with the
equipment to be repaired. This form may also be used in the case of application queries.
continued overleaf
47
✁
6. What did happen?
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
______________________________________ _______________________________________
Signature Title
______________________________________ _______________________________________
Name (in capitals) Company name
48
✁
49
50
51
A L S T O M T & D P r o t e c t i o n & C o n t r o l L t d St Leonards Works, Stafford, ST17 4LX England
Tel: 44 (0) 1785 223251 Fax: 44 (0) 1785 212232 Email: pcs.enquiries@tde.alstom.com Internet: www.alstom.com