Quality Control Plan Acknowledgement
Project Name: XXXXXXXXXX
The undersigned (digital) have read and concur with this Contractor Quality Control Plan:
Page 2 of 12
Table of Contents
Page 3 of 12
Project Organizational Chart
Page 4 of 12
Experience, Certifications & Training Requirements (As Applicable)
2) Project Manager
4) Supervisor
5) Technicians/Operators
Confirm at least 2 years of related experience working under the direction of a Project Manager
or Superintendent. Provide copy of current license and/or certification to drive/operate the
type of vehicle/equipment which they drive/operate either on‐site or off‐site.
6) Manufacturers
Provide documentation from any independent testing agencies performing the specified
independent testing required by the Contract Documents for review and approval by the Prime
contractor.
Page 5 of 12
Quality Control Manager Responsibility Form
The Quality Control (QC) Manager, (Details Provided Below), is responsible for overseeing the overall
implementation of the Quality Control Plan and coordinates all project testing, inspections and reporting
matters directly with the Project Manager. The QC Manager has the authority to intercede directly and
stop unsatisfactory work and control further processing, delivery or installation of non‐conforming
material.
Page 6 of 12
QC Manager Details:
(Location): (Name) Phone# (XXXXXXXX)
PROCEDURES
To ensure that parts and supplies used are per the manufacture’s recommendation or
substituted with acceptable alternate aftermarket parts as standard industry practices and/or
company internal processes and procedures. This procedure establishes the methods to be
used to verify and track material / parts and to ensure the items are stored properly.
Verification
Storage
Page 9 of 12
PURPOSE
To ensure that TMDE items are adequately identified, maintained and calibrated as per the
manufacture’s recommendation and company internal procedures. This procedure establishes the
methods to be used to identify and track TMDE items and to ensure the equipment is calibrated when
required. Calibration documents are filed with other equipment documentation.
Identifying / Tracking
Calibrating / Testing
Page 11 of 12
Project Processes (Documentation)
PURPOSE
Establishment of project standards, procedures, and processes that meet the intent of the Statement of
Work and Performance Work Statement requirements.
Page 12 of 12