1.0 Purpose
The purpose of this procedure is to establish the Saudi Electricity Company is to maintain a system
for issuing, receiving, transferring and clearance work permits for specific hazardous activities
performed in the SEC . Departments may develop additional practices or procedures to cover their
own specific requirements.
3.0 Definitions
Restricted Locations - The location or activities which have been designated by division managers
requiring the work permit procedure. These include all areas where energized substation, nearby
energized transmission line& road crossing, power plant and construction of Extra High Voltage and
High Voltage etc.,
Work permit Issuers - The Contractor's Site Manager / Construction Manager or his designate
(Project Engineer) who are certified & appointed by SEC Project Manager or Engineer / SEC Site
Manager to issue work permits for restricted location under their supervision. They must be
experienced, competent and familiar with the requirements of SEC 5 Star Safety & Health
management system Element 5.21 work permit and be able to perform the duties associated with
issuing work permits.
Work permit Receivers - Contractor engineer/supervisor who have been certified and appointed by
their department heads to sign and receive work permits.
Page 3 of 8
PROJECTS SECTOR Page 4 of 8
Verification - The SEC Consultant designated by SEC at restricted location to ensure that work
permit system are being implemented properly and verified that all the precaution measures has been
provided for the job and as mentioned in the permit.
Work permit issuers and receivers shall have a valid third party issuer or receiver certificate,
respectively.
The issuer/receiver’s in the case of a contractor, the SEC project engineer responsible for the work
location, shall sign the issuer/receiver certificate.
The work permit system authorizes specific construction of Substation, Transmission line,
Underground cable, and maintenance to be conducted in the within the Saudi Electricity Company's
restricted locations..
Page 4 of 8
PROJECTS SECTOR Page 5 of 8
If any excavation more than 4 feet (1.2m), protective measures should be taken such as
Shoring/Shielding or Stepping/ Benching or Slopping. Documents related to the excavation
activity such as soil test report, excavation design, competency of the professional engineer
who designed the excavation in case of 20 feet depth shall be verified.
A confined space work permit shall be issued for working in areas where location is unsuitable for
continued worker occupancy, having poor ventilation, containing hazardous atmosphere, containing
flammable gases or lack of oxygen.
Page 5 of 8
PROJECTS SECTOR Page 6 of 8
Activities involving using of scaffolds, ladders, MEWP and working on roofs shall be classified as
height work
Page 6 of 8
PROJECTS SECTOR Page 7 of 8
6.3Displaying Permit
1. The receiver of a work permit must keep a copy in his possession or in view at the job site for
the duration of the job so that it is available for inspection and cancellation if necessary.
2. The receiver is expected to remain at the job site to adequately supervise the work, however, if
he must leave the job site for any reason, for example to obtain additional tools or equipment,
etc., he must, if the issuer agree.
Page 7 of 8
PROJECTS SECTOR Page 8 of 8
permit, write on the permit the reasons for the work cancellation, the time, and other relevant
information.
2. All work permits are cancelled in the event of an emergency, such as a fire or medical. Permits
may be re-issued once the “all clear” has been declared and the work sites have been returned
to their pre-emergency conditions.
3. All unnecessary personnel whose presence adversely affects the safety of the job must be kept
away from the job site or work shall be stopped.