BUILDING DRAWING BOQ RECEIVED

1 ACADEMIC BLOCK QTY QTY QTY


stage 1
sub structure
excavation for footings
pcc
footing reinfforement
footing shuttering
footing concrete
column reinforcment upto slab
column shuttering below plinth
concrete for columns
excavation for ssm
pcc for ssm
ssm layer 1 foundation
ssm layer 2
bac filling
stage 2
super structure
ssm basement
internal pcc for pb
plinth beam renforcement
plinth beam shuttering
concrete for pb
filling for plinth
column shuttering below lintel
column concrete below lintel
brick work upto sill level
sill conrete
brick work upto lintel bottom
lintel reinforement
lintel shuttering
chajja shuttering
chajja reinforment
lintel and chajja conreting
brick work till roof beam bottom
roof and beam shuttering
roof slab and beam reinforement
electrical condites for roof
roof slab and beam concreting
ms grill fittings
wood doors fittings
electrical condites for wall
stage 3 finishing works
plastering for ceiling
plastering for wall (internal)
lime rendering
plastering for wall (external)
ROOF CONCELED WALL CONCELED SWITCH BORADS
SI.NO DETAILS CONDUTE CONDUTE

19/20MM 25MM 19/20MM 25MM 1-3 WAY 4WAY

1 Canteen 1 5 12 12 8 2 5
WITCH BORADS SWITCHES SOCKETS FAN'S
EXUST FAN
FAN REGULATORS
6WAY 6A 32A 6A 16A CEILING WALL

5
DB MCB

SINGLE DOUBLE
8 WAY 12 WAY
POLE POLE
1720 1520 2020 1820 24240 26260
10.13333 11.46667 14956.08 42560.78
12 13 149.5608 425.6078
0.149561 0.425608
0.575169
12 2.02 24.24 18.2
0.617 0.617
14.95608 11.2294
0.014956 0.011229 0.026185 0.157113
0.617284