Chittagong City Corporation

Procurement, Installation And Commissioning Of


Modern Municipal Solid Waste Collection Vehicles
And Equipment With Underground Waste Disposal
Container Under Chittagong City Corporation
Total Investment Cost : 27279.28Lakh
Objectives
 To modernize waste collection system in
increased manner by introducing under
ground waste container.

 To enhance and modernize transport capacity


of CCC solid waste in environment friendly
manner.

 To enhance efficient vehicles and waste


disposal operation and meet the demand of
fast increasing of solid waste in CCC areas.
Advantages
 Reduce air pollution.

 Environment friendly system.

 Reduce waste collection time and labor.

Improved health protection of


associated operator/ labors’.
Project Components

Sl no Components Quantity Cost in lakh

a) Revenue Component

01 L.C Opening (1.20% of Cost) 1 Lot 154.75

02 Port Dues 1 Lot 20.00

03 Insurance , Landing & Port charges, 1 Lot 322.39


Transportation, Clearance, Fuel &
Lubricant

04 Foreign Training of Engineers 1 Lot 227.50

05 Office Stationery 1 Lot 20.00

07 Advertisement LS 5.00

Total (Revenue Component)= 781.64


Project Components
Sl no Components Quantity Cost in lakh
b) Capital Component
08 Procurement , supply , installation and commissioning of 10 Nos 537.34
Solar Compactor with spare parts with associated
engineering services.
09 Procurement , supply , installation and commissioning of 4 Nos 664.40
Hook lifter with chassis with spare parts tools and machinery
10 Procurement , supply , installation and commissioning of 13 Nos 4398.03
Rotopress Crane with chassis with spare parts tools and
machinery
11 Procurement , supply , installation and commissioning of 500 Nos 6275.00
Under ground Container with spare parts tools and
machinery
12 Procurement , supply , installation and commissioning of 4 Nos 967.44
sweepers with chassis with spare parts tools and machinery
13 Procurement , supply , installation and commissioning of 4 Nos 53.40
hose pipe washer with spare parts tools and machinery
14 Construction cost for foundation of under ground container 500 Nos 6500.00
15 Import Duty & VAT (45%) 1 lot 5803.02
Sub Total = 25198.63
Sub Total (a+b)=

c) Physical contingency(2.5%) 649.50


d) Price contingency(2.5%) 649.50
Grand Total (a+b+c+d)= 27279.28
Project Summary - Financial
Estimated cost : 27279.28 Lac Tk
GOB : 27279.28 Lac Tk
CCC : 0.00 Lac Tk

Year wise allocation


GOB (Lac Tk) CCC (Lac Tk)

27279.28

16596.42
6911.97

631.25 0 0 0 0

FY 2016-17 FY 2017-18 FY 2018-19 Total


PROPOSED WASTE
COLLECTION AND
DISPOSAL SYSTEM AT A
GLANCE