You are on page 1of 22
‘Fe wasn effuramalon ania G CONSTRUCTION CO., LTO. sae wrpsenal rumvaiin es 1400 Ln, £74962 (5 wn, 27612007, 2782558 ar (2) 21-920 1: § a, 28 nt ews rn, 1408 0 Pa, Soageng Tore, 119 Pie Mi, Eargkok S00. Tel 271-9824 (% Les, 27-1967, 27012059 Fax (66) 271-3409 Doak /aeees: PO, Bow 9,5 spo Pos Cie, Barge 10408, Tans LOOR A.) WATER TREATHENT TANK -- STAGE 1: 4,1 Site Clearing and Installation of Sheet piles & king posts 4.2 Installation of Platform System (Cangway) 41.3 Excevation dowa to level -1.60m. and Install F: layer Bracing system. (wale & strut) STAGE 2: 2.1 Excavation down to- 4.00 m. nd 2,2 Installation 2 layer Bracing system. / i a “3 i LA sen eSuasmslen ana BEING CO! STION Cv., LID. wav ema, 19400 fn, 271-3084 ( wr, 27012967, 2704250 wh; (62) 271-2628 fsb 29 vet ss nv, 10408 . 2h Pht, Sonpang Tot, 199 Frabaotn A, Gangek 100. Te 271-3626 (5 Ure) 2794967, 27042559 Fae (652) 2713, os Ades : P.O. Box 22, Sorarpse Pos Oe, Banat 1OGE, Tatars v Bracing systea 2S “Th a re a vain eSunsmalusn dia a Ug ENGI @ CONSTRUCTION CO., LID. te everygan asusTatu ussorwulic amnion 10:00 In. 27-964 6 ana, 27842967, 27042559 wn (ta 27-309 ow 29 as a, 1808 ' ‘nF, Goopang Tene, £163 Frahlthin Ft Sayin YOK, Tek 27-268 (Une), 27012967, 27842564 Fas: 62) 2719829 Peis Atess ; P.O. Ba 22, Senampae Post Ofc, Barylok 14U8, Ted ou down to Approximate level ~ 8.00 m. STAGE 4: 4.1 Excave (Foundation) and - 9,50 m. (at lift pit) 6.2 Pour Lean Coneret snd Foundation 4.3 Back€iil Sand (A) so Level - 5.35 m, with Compaction 4.4 Pour Lean Gonerete Between Foundation First layer Bracing ad 2 layer Bracing layer Bracing - 5.35 m = 7.75 me win eiuasmalemn tia TA EN ING CONSTRUCTION CO., LTD. ti oormygins avevtafu anversum samy ms, $0400 Tn, 274-9826 aru}. 27842962, 2712659 wn 66) 271-2809 ‘unvd G doe 29 vat ty re 1050s {am Fo, Bxngong Tevet, 110 Phatetia RA Bamjok 1400. TAL 271-3EB4 (6 Une), 27812067, 278.155-8 Fae (2) 27-9808 Pes daess:F.0. Boe 29, Saran Past Ofc, Sanghok 146%, Thad 5.4 Pour Concrete Tronfer beam (Basement Slab) rd 3 laver Bracing 5.2 Dismantl 5.3 Pour Coneret Besement Wall Approximate level-1.20m.to-0.00 m. 5.4 Apply Naterproofing to Retaining Wall 5.5 Backfill Sand (B) around Retaining Wall up to level = 3.80m.wit Compaction (Wall No. 1,2 & 3) 5.6 Pour Water Treatment Slab nd 5.7 Dismantle 2 layer Bracing _ Back£ill Sand No, 1,2 & 3 u8tn eSuasmstasr dyin re DELTA ENGINEERING CONSTRUCTION CO., LTD. asian eavonledn xyrnnatata voy on, 100 Lv, 274-826 6 ae), 278-1206-7, 27042559 ung = (2) 27-388 lunwd Fe, 29 a, ny ma 0006 i 4) Fos, Boonng Tans, £199 Phaaljhin fe, Banghck 1010, Tel. 27-3824 (S Ung), 27812367, 278-1256: Fav 880) 271-302, Peal Adiets : P.O, Do 19, Sanonpan Pos! Ose, Bongick 1006, stand STAGE 6 : 6.1 Continue Backfi11 Sand around Wall up to Level -1.40 m. ( Wall No. 1,2 & 3) 6.2 Pour Concrete Treatment Wall up to level -2.00 m. 6.3. Backfill Sand around Treatment ‘Wall upto Level = 1.80 m 6.4 Dismantle First layer Bracing 6.5 Cut and Remove King Post 6.6 Renove Sheet piles ( Wall No. 1,2 & 3) REHOVE ap REKOVE MM . 7. a 1 acy, ott 7 soy 22. ustn esuasmslen din DELTA ENGINEERING CONSTRUCTION CO., LTD. avoaleBu anenstsamegan sin 040 bn, 271-982 6 wna, 27812907, 27012869 oold:fr2 271-3028 vv: Gm. 29 aot. ews) om, 1005 1h Foor, Beanpong Tove, 1193 Prabchotia A, Bargice 16400, Tel 27-3624 (5 Los, 2762967, 270.4256: Fo: 52 271-329 Pos Adtess ° PO. Use 28, Sananpan Pes lic, Barc 10408, Tard STAGE 7 + 7.1 Continue Pour Concrete Treatment Wall up to Level = 0.15 m. and Beck£ill sand 7.2 Remove Sheet (at Wall No. 4) 7.3 Dismantle Platform REMOVE t AOITISTITISITISITTY £0.00 m. — . + 2.00 + CRY, wien sSuasmalan shin : ore 45 & CONSTAUGTION 72. aes aren Sagas aasnuasashel 18 eornygein asi id ue. 28 dn. eves nn 10808 4 oe, Beongng Tone 1189 Paolini, Bergh 1040, Te. 27.982 (5 Uns), 27642067, 27042560 Fax a) 27-600 esse P.O, Dos 2, Sanam Post Ole, Dargie HOH, Tntind - 2 KSC. = ksc. - 0.60 = 1,500 KSC. gS ° : eee Ke = tan (5-9/2) = 1 wpe tka wed $s = Brake = 2c fka + gka -=- ép =Uzp.kp + 2c fea -- St = Sa + 6p ( Combine Eart Pressure)- osetia ee ae ee Oe — CIVIL ENGINEERS contractors . | MADE ey_____________ ATE ‘CHECKED BY. are - BANGKOK, THAILAND. rei 2 or 19, 33,20 12,00 Tei STRUCTURE DEStE:t Sheet Pile + 1600 1.00 0.60 2.00 Hor, DELTA ENGINEERING CONSTRUCTION CO., LTD. SS $$ << Toupint PARK VIEW Mae BYTE | 3 oF CONTRACTORS Wa re ais Gves SSL wv. Op = m/l ege- © td! mL OBR 2 bd cae BS Cau eee eR pase) (nee ao PN 9 NS Ore ITSO NT TS eee LH sP IAL [eee eo 3 Be) 35 delice OBS | Over EER | 9SE [| grav | CFF gp we wor Bars pes SEO] aS 8 we sass [om g aiid CEP 7 7 g SiO eee aia avi = Tm [RD evga | nd a . dz | "69 | a2 | 2 Pawte VIEW LOMPINt DELTA ENGINEERING CONSTRUCTION Ct 4 DATE = ore —__— cxecxeD ox 4___oF ‘SHEET NO, MAE BY CIVIL ENGINEERS OTF] Orel EE ao oc | ove, WE) ee 1 Salalah aeh | woL Ses] 7 vasa 7 WE Sat sae oS are oS oem ozo To oFE— | FE IP 735 +9 ~~ BOVIS AT —Si53HOF Hid sens TSSlg Gsavee OME DELTA ENGINEERING CONSTRUCTION CO., LTD. op. LOM pint Pave View ivi ENGINEERS contracras | wabeey____— owe CHECKED By bare BANGKOK, ~~ THAILAND. ean wos lewglls ot Shed pi d= Fu So Hinivauin | Sheet pl lennfla «415 G00) + eda! | AG-oul aw Moment Mane be. & lems Vce__nivinu Gheet p wal i = tbo = tur em Pequive Ska, Dust #10? * eo Use shed pile yep ¢ Sx Rowe > Se RECHECK Iv STAGE 5 2p +(8.4% 11.20) 4 C.0b-20% 13-30) = (32.G A 4.30) FCAGIDEFT)HCENGS) oe « u 30.23 Boat Yen > 14s coy a aol ly eee) Sneed 6S MICROFEARP—PL DATE: 05-18-1992 LOAD FACTOR : 1 ELEM MA HINGE SECTION AXIAL Fy SHEAR ~ MOMENT Ge Tm Te) Te 0.00 0,0000D+00 -2.29480-06 -8.7917D-07 1120 0,0000D#00 -6.8580D-01 ~4,1227D-01 0.00000+00 S.2993D+00 -4. 1328D-01 0.65 0.0000D+00 4,3503D+00 2.72290+00 . a1 0.00 0,00000+00 4,3503D+00 2.72290+00 0.65 0.0000D+00 2.9980D+00 5. 1112D+00 ao. 0.00 0,0000D+00 299830400 5.1112D+00 0.65 0-0000D+00 1.2401D+00 6. 4887D+00 Seal 0.00 0.000100 1.2401D#00 6. 4887D+00 | e MICROFEAP-P1 DATE: 05-18-1992 P.2 PROJECT : RS.COMPLEX 3 (Sheet Pile Design) FILENAME: sheetl 4 45 AUTHORITY: SURIN SESTASITTIKUL + ENGINEER: Mr.Chay Sangsewai STRESS CONBINATION ¢20-FRANE SYSTEM? ' |) LOAD FACTOR + 1 ELEM MA HINGE SECTION AXIAL F. SHEAR MOMENT { (a) ) Tm) crema" Seite 0.65 0.0000D+00 -9.2247D-01 6, §919D+00 61 0.00 0.0000D+00 134060401 659190400 0.60 0,0000D400 ~1.S76'Dt01 ~2. 15810+00 \ ot 0.00 0.00000100 -1.5751D401 ~2.1581D+00 0,50 0,00000+00- ~1.84:1D+01 -1.2425D+04 0.00000100 -1.8461D401 -1.24250+01 8 i t 0,00000+00 -2:1503D¢01 ~2.4414D101 . 9 i 0.00 0,00000#00 -2, 1509D#01. ~2.4414n+01 o i 0.60 0,00000+00 -2.48930+01 ~3.83330+01 : to 4 0.00 - 0.0000D+00 3,02400+01 ~3.82330+01 0.50 0.0000D+00 2.G516D+01 ~2.13040+01 ' fee 0.00 0,0000000 2.6516D+01 -2.13040+01 | 0.60 0,00000400 2.2436D+01 ~6.6181D+00 i 21 0.00 0,00000+00 2.2436D+01 -6.6181D+00 0.60 0,00000+00 180140401 §.5168D+00 a4 0.00 0,00000+00 1,801404015,5168D+00 2.00 0,00000400 2.69430+00 2,6225D+01 1404 0.00 0.0000n+00 2.694400 262250401 * 4.00 0,00000400 -7.1457D400 1.7322D+01 151 0.00 0,0000D400 ~2.8650D+01 1.73220401 7 1.30 0,0000D#00 -1-04900-05 2. 9564D-05 - SUPPORT REACTIONS ¢2D-FRANE SYSTEM? LOAD FACTOR + 1 NODE 1-REACTION 2-REACTION — 3-REACTION Te Te) Cem.) 2 0,0000D+00 7.8081D+00 0,0000D+00 i & 0.0000D+00 -7.6783D+0. 0. 0000400 i 10 0,0000D+00 40.0141D+01 0, 00000+00 i 15 0,0000D#00 -1,9504D+01 — 0.00000+00 VOLUME OF MATERIALS <20-FRANE SYSTEM? SETS VOLUME, 73) Ee Ee fone) ‘meal Ae SHEAR PORCE(,1,= 41.@7E+G1) Coe= 4,36E+81> MOMENT : 1 hee hens — bees — hen — bee — bames — bares Lym — best — bess — leer — la — bes — hast — lowest twee csr — br tues DELTA ENGINEERING CONSTRUCTION CO., LTD. | sos. =e ee pare CHECKED av. ee sheet no____ 12 _oF. BANKOK, Design Woley : L 4 1. Lower Waler C2 “a 3” layer Fy=_-4o.00t/7 \ \ i Diagonal Bracing Wear 125 ; | we Clear Spow of Wavley = 2.50 ; : j Homent way = 2. 640 112-50) ie 25 Tem | J 0 | . : sl ; Require Modulus of Section ; &a = = Wee. ce | 4 | i 1 Sy = 2300 co > Sun yous Cm) C Old xe | 4 ‘i 4 “Upper alee CFir lager) i - Feo wtoT 7 i i h Mo = a tego 250)" = i io i Reguive Hodolus of Srelion = - Pe Use ve 300% 300 10 wm yl. Ay eg for | ie Sx = Tro Om > Sep © 326.97 OM COMED 2 chee, Wan. elrol Spacing ,e = [rere Sn h ierrrattid Sear : | : - 2500x2300 [10 s800% 2300 : ao™ af ict L vlna iic es DELTA ENGINEERING CONSTRUCTION CO, LTD. yoe___LYMPINI PARIC VIEW cece or one, BANGKOK, THALAND, Seater 15 strut _¢ Brocing ) é x, lower slut —; ror Fy = Aoeoo ¥ 500 © > 200,000. a i | Assume Fa = 202 Ke ce Reopive A = 209900 = 1b. con® . ALO i choose u= 350%250X 12 wa, VE ashe, fo t A = 193.80 cu> a = BBE Con | = 2300 ew? , K+ | Ku = 56.56 * | * | eee GQ + 2 paceaptczr) = — 0D i = CKL)™ 7, a Fa aE }iFy P= 260,000 = 1150,087 kse < Fa _..-- Gk a 193.90 4 a, Upper steul => Fy + 2900 x 5.00 = 39900 bg Require A = 39p00 = 32.9 on™ 4 1200 Choose wE_0Ox300% 10 ke = 1 500) ZFIA - es ksc Fo. wt 94 bgp ¢ ~ 1240.88 Ksc — (3b5b B83? = bese << C > 39000 = gab 110. 80 = A 2 179,80 61) DELTA ENGINEERING CONSTRUCTION CO., LTD. [a MADE ay. - BANGKOK, THAILAND. eae Wor a : Desien PLATFORM lad 2 | it : | ~ ota CRE (49 TY lol 29 cr (my | i | eae | | Sov = oa = Za Tt i I _ | ae 7 i | RowrS = 0.9 2 29.67 i = } i = i i { = TNL, crows Beowa 2-1 200. 190 *F won BO 38 \ | i = ye : Rawaur mune AOUAL - iil | | 4 : H z 4 | Beam i | - Try 2-2 200% 100 x 55mm, wt ans legen CA = 2716 owt) J i = Dead lone {| i Moment = 2 571 5 : Eee onest = coonmcast | | | SECeooe = 0s pee a : + Bo Rb i ‘ Ra ~ Rh = 0-0572 (6.00) 10.57 Hi 078 450 07 i ere ee Peceee cere = 07 } 4 Oe 5%) @ 0.25 7 length ago, | | DELTA ENGINEERING CONSTRUCTION CO., LTD. civic ENGINEERS & contRAcroRs eAicKox, —THALAND | vouble look Case 1 a ; | 07s 4.50 al 1 4 : | : iq | oe tag (2aS) = sales) THRE TOM | | | { | 7 it | Rar Ro ® nas 7 ool | i : | i 4 i - | i | Coe Eh } | | oe | 039, i] 3. i i| Moz 69 ¢4S-20) = 1686 To i | i Bn | Ry 5 MaNIO = ot | m+ OT \ | Cave TM | | Me ata (292) 12099 TO | } Be = 1B MSH OTS 05 D4 nt BF) BaD | Ay * | eo 4977 ! j | 1 Mane * aus tots = 17905 To | 7 Section vodvls = wpa0snivop™teg «og 194 Cm 1500 aa jl ae Tey CIVIL ENGINEERS ‘BANGKOK, THAILAND. a4 ax ways + Mooimun Sheow- Allowalale Shen | Check Deflection A (waxy = Kalo. 7 Use 2-3 Q_ cormoos ss ——— ~ | meh ADE by¥_________— SHEET N¢ Aor. > a? y oq cor” 1340 = (0.972 + 24.82)(2000) 2% 5X ARAN OSS 247 se = Om Fy = 04 (2300) = bd WP € cose x) ey > 23% 148 (1900) 4-3) erie Gag | 2an™ BRAVO) Son = 3S MOD 360 checKeo sy_______ 200% 100 ¥ 5.5 mm wt. ans ley 7m @ 0.35 'm. Coy yo0O ) 247 2087 1.081 cone @ 035, zoo v 109.9 wm, tt 21.9 begin oxte______— 45. cm Lt ba “a i a ee eee er eee ee eee ee ee cv eNGaNeeRS ®@ eomeectoms 1 | gare eee ae ‘CHECKED bY. ATE. BANGKOK, THARAND. tect nal 7S or 375 DESIGN KING POST : depth | ez | | Xe, [o-ga]tona | tb. | 6%. a, | | coy lets i cory | rp et) Evetea = ef wrr7 | 096 | = - | - | 280} ser] FX 200 =a|l | 2.20 | 0.944 | ~ 2 = | 400 | 5275 [es 1997 aa aaay | 0x60 | ~ = = [soo | avsa freee | [tars vro | obas | 0.70 23.794) 0.441 | 300 ma [CEM UL [2839 Design Frict lew s00xt0gxI0Km, wh ay. Leg/n (Lp = 138m Qa = a BS Qp = Lp [meatety + Ks By tytons | er ek aiid. Logon (RBt tags £2809) FE =e 805 OT Qt bp ete roen 98 = 14. 2 we Oy = O+ £0.05 = 2 1.023 Temporary Steudive FS 14 i 120 = yD ovs Joie, > 24.837 7 Contes Penav le 5 RaW aQseM = 20.83 T EP GenStur-w So) -w 21-2 : wou prepueAs st pue S3ild H (eusiay-w eo) w a8 wide vepueIS SSdqWHS SONW1d 36m 8 vontuguienunmercls dm wunugamenunnstes

You might also like