You are on page 1of 11

CLIENT: ENG

Mr.Abd El-Rahman
PROJECT:

Work Drawings 11 District Villa


For MR: Abd El Rahman

CONSULT BY

Sayed Wael
H= 1.15
FH= 1.13 DESIGN BY

Yasmin Madkour

0.44
1.46 1.39 1.36 0.20

0.21
DRAWING TITLE:

H= .75
FH= 1.55
As Built
DRAWN BY: CHECKED BY: DATE: SCALE:
0.40 0.85 0.57 Yasmin Madkour Sayed Wael 6/12/2020
8/12/2020 Fit to Scale
3.00

0.32
PROJ. NO. DRAWING NO. Site Engineers

0.18
1.24

1.06
1 Eng / Ahmed Farag

0.22
1.20 BEAM
0.98
A Eng / ElShazly Farag

0.46
1.24 0.51

6.20
0.32 0.79 0.19

0.56

1.65
0.59 0.64 1.15 1.80
0.67

0.30

H= 1.13

3.00
FH= 1.1
1.73

1.50
H= 1.18
FH= 1.16
1.34

1.67
ELEVATION
0.95

0.65 3.01 0.85


0.20
0.30

0.30

0.30
0.76 0.64

0.75
H= 1.2
1.76

FH= 1.03
1.85

1.23
0.31
0.20

3.35 0.82 0.13 4.41

1.57
2.80
3.70

2.68

1.67
4.25
1.79

0.54
2.00

0.15
1.05 2.62
0.21

0.30

1.28 0.79 1.38

H= .8
H= .76 FH= 1.41
0.86

FH= 1.54 0.57

3.85
CLIENT: ENG

PROJECT:

Work Drawings 11 District Villa


For MR: Abd El Rahman

CONSULT BY
H= 1.15
FH= 1.13 Sayed Wael
D:\Sandy\BT\Sites\Hyde Park Rana NEGM\Logo.jpg

DESIGN BY

Yasmin Madkour

DRAWING TITLE:
H= .75
FH= 1.55
General Demolishing Plan
DRAWN BY: CHECKED BY: DATE: SCALE:
Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale

PROJ. NO. DRAWING NO. Site Engineers


BEAM
2 Eng / Ahmed Farag
0.64 1.15 1.80 0.25 0.79
A Eng / ElShazly Farag

H= 1.13
FH= 1.1

0.30
H= 1.18
FH= 1.16

ELEVATION
1.04

0.40 0.82 0.13

0.93 0.36 0.79 1.38

H= .8
H= .76 FH= 1.41
FH= 1.54
CLIENT: ENG

PROJECT:

Work Drawings 11 District Villa


For MR: Abd El Rahman

H= 1.15 CONSULT BY
FH= 1.13
Sayed Wael

FIRST FLOOR PLAN


Heights With out finish floor level
DESIGN BY

Yasmin Madkour
FFL = (-20)
H= .75
FH= 1.55 DRAWING TITLE:

General Adding Plan


DRAWN BY: CHECKED BY: DATE: SCALE:
Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale
BEAM
PROJ. NO. DRAWING NO. Site Engineers

1.15 2.44
3 Eng / Ahmed Farag
B Eng / ElShazly Farag

2.70
H= 1.13
FH= 1.1
1.34

0.95
0.39

2.50 1.00 0.92

1.23
2.95 0.85 0.53

3.02

0.35 1.38

H= .8
FH= 1.41
CLIENT: ENG

PROJECT:

Work Drawings 11 District Villa


For MR: Abd El Rahman

CONSULT BY
H= 1.15
FH= 1.13
Sayed Wael
D:\Sandy\BT\Sites\Hyde
D:\bta3 Park Rana NEGM\Logo.jpg
tashtebat\61760958_389696451633975_3408255414951739392_n.png

DESIGN BY

0.44
1.43 1.39 1.33 0.20

Yasmin Madkour
H= .75 DRAWING TITLE:
FH= 1.55

Architecture Plan
2.94

0.370.00 0.54
0.32
DRAWN BY: CHECKED BY: DATE: SCALE:
TOILET

1.18

1.00
Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale

1.14 0.92
BEAM PROJ. NO. DRAWING NO. Site Engineers

0.46
1.01 1.03
0.57

5.87
1.12 2.41 1.30
4 Eng / Ahmed Farag

1.41
0.56

0.56
MASTER
0.59
B Eng / ElShazly Farag
0.73

BEDROOM 0.36

2.67
H= 1.13

1.46
FH= 1.1

4.19
LIVING AREA
2.60

8.41
0.95

0.95

1.90
0.36

2.46 1.00 0.92


2.18

0.76 2.95 0.64

0.81
DRESSING
2.00

3.20
2.92 0.82 0.50

1.60
2.37 1.32
KITCHEN
3.70

4.40

0.51
1.73

MASTER
1.94

BATHROOM 1.05 2.59

0.30
0.21

0.90 0.79

H= .8
H= .76 FH= 1.41
0.86

FH= 1.54
0.57

3.78
CLIENT: ENG
Mr.Abd El-Rahman
PROJECT:

Work Drawings 11 District Villa


For MR: Abd El Rahman

CONSULT BY

H= 1.15
FH= 1.13
Sayed Wael
D:\Sandy\BT\Sites\Hyde Park Rana NEGM\Logo.jpg

DESIGN BY

Yasmin Madkour
DRAWING TITLE:

1.98
FURNITURES
H= .75
FH= 1.55

DRAWN BY: CHECKED BY: DATE: SCALE:


Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale

PROJ. NO. DRAWING NO. Site Engineers


BEAM
Eng / Ahmed Farag
5.84

5
A Eng / ElShazly Farag
MASTER
BEDROOM

LIB S CU
LO

RO RIO
PA
RA
SO
S
H= 1.13
FH= 1.1

LIVING AREA
ELEVATION
0.50

0.50

1.96 1.00 0.39

DRESSING
1.00

1.50

0.50 1.96 1.39 0.50 KITCHEN


0.50

MASTER
shower
cabinet BATHROOM

H= .8
H= .76 FH= 1.41
FH= 1.54
CLIENT: ENG

PROJECT:

Work Drawings 11 District Villa


For MR: Abd El Rahman

CONSULT BY

Sayed Wael
H= 1.15
FH= 1.13 DESIGN BY

Yasmin Madkour
DRAWING TITLE:

H= .75
FH= 1.55
Plumbing Plan
DRAWN BY: CHECKED BY: DATE: SCALE:
Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale

0.59
PROJ. NO. DRAWING NO. Site Engineers

0.50
6 Eng / Ahmed Farag

0.59

0.51
BEAM
A Eng / ElShazly Farag

Sympol Meaning Specs

Drain pump 15 *15 cm

H= 1.13
FH= 1.1

ELEVATION

2.35
0.38 2.00

Washing m.+Dryer
(Above each other)

shower Washing machine


0.67

cabinet

1.31 1.47 0.62


Dish washer
1.39

H= .8
H= .76 FH= 1.41
FH= 1.54

1.43 0.75 1.61


CLIENT: ENG
Mr.Abd
AshrafEl-Rahman
Elsayed
PROJECT:
Work Drawings in LAYAN
Work Drawings Compound
11 District VillaFor MR:
Ashraf
For MR: Elsayed
Abd El Rahman

CONSULT BY

H= 1.15 Sayed Wael


FH= 1.13
DESIGN BY

0.73 0.73

N.Socket N.Socket
0.68 0.68
Yasmin Madkour
.75+F.F.L .75+F.F.L

0.60
DRAWING TITLE:

Electrical plan
2.49
N.Socket .45+F.F.L H= .75
FH= 1.55

DRAWN BY: CHECKED BY: DATE: SCALE:


N. socket +.75+F.F.L W.P.socket 1.60 Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale
usb .75+ F.F.L +F.F.L (Heater)

2.84
PROJ. NO. DRAWING NO. Site Engineers
Mirror Light
outlet 1.3+FFl 7 Eng / Ahmed Farag
N.Socket .45+F.F.L B001
0.20
N.Socket 1.2+F.F.L W.P socket 1.3+F.F.L A Eng / ElShazly Farag

0.60
1.35

N.Socket .45+F.F.L
N.Socket .45+F.F.L 0.40 1.61 0.40
Key

0.10
N.Socket .1.3+F.F.L N.Socket .45+F.F.L N.Socket .45+F.F.L N.Socket .45+F.F.L
TV. outlet 1.3+ F.F.L N.Socket 1.2+F.F.L usb .45+ F.F.L usb .45+ F.F.L
Internet C.1.3+F.F.L usb 1.2+ F.F.L Main Board
N.Socket .45+F.F.L
TV Cable outlet

1.83
TV
1.35

LO
S
LIB
RO
CU PA
RIO RA
SO
N.Socket .45+F.F.L
N.Socket .1.3+F.F.L
S

H= 1.13 Waterproof normal socket


TV. outlet 1.3+ F.F.L FH= 1.1

2.19
Internet C.1.3+F.F.L N.Socket .45+F.F.L
Internet point .45+F.F.L Waterproof power socket
Normal socket
0.71

N. socket +.75+F.F.L
Telephone .75+F.F.L N.Socket .45+F.F.L Intercom 1.2 F.F.L
usb .75+ F.F.L N.Socket 1.2+F.F.L Power socket

0.30
0.20

1.84
usb 1.2+ F.F.L
Internet Cable
N.Socket .45+F.F.L
N.Socket N.Socket .45+F.F.L N.Socket 1.2+F.F.L
.45+F.F.L P.Socket 1.2+F.F.L usb 1.2+ F.F.L
Telephone Cable
0.35 1.60 0.35 Internet C.1.2+F.F.L
USB CABLE

0.60
machines Switch
1.00

0.60
N.Socket .45+F.F.L
Led Light
Led light

0.80
(electricity outlet)
1.00

Led light
(electricity outlet) P.Socket .45+F.F.L Shutter Switch
1.00
0.90

0.15
Intercom

0.76
N.Socket .45+F.F.L N.Socket 1.2+F.F.L
N.Socket 1.2+F.F.L usb 1.2+ F.F.L P.Socket .45+F.F.L
1.43

N.Socket Inventory

0.78
1.3+F.F.L 0.15
N.Socket .45+F.F.L
P.Socket 1.6+F.F.L
P.Socket .45+F.F.L
P.Socket .95+F.F.L
Main Board
central Board
Content N .S P .S USB NET TV Telephone Machines
outlet Total
N.Socket

0.67
.45+F.F.L
reception

0.30
W.P socket 1.3+F.F.L 0.15
Wall Ledlight P.Socket .45+F.F.L
N.Socket 1.2+F.F.L
1.55

Mirror Light N.Socket .45+F.F.L kitchen


outlet 1.3+FFl N.Socket
0.85

0.54 0.54 1.08 0.61


.45+F.F.L P.Socket .45+F.F.L
Guest Bathroom
N.Socket N.Socket
N.Socket .45+F.F.L 1.2+F.F.L
H= .8
0.20

H= .76 1.2+F.F.L
storage room
0.40

0.40

0.77 1.55 0.60


FH= 1.41 0.20 1.21
FH= 1.54
stairs

TOTAL
CLIENT:
Mr.Abd
AshrafEl-Rahman
Elsayed
PROJECT:
Work Drawings in LAYAN
Work Drawings Compound
11 District VillaFor MR:
Ashraf
For MR: AbdElsayed
El Rahman

CONSULT BY

Sayed Wael
D:\Sandy\BT\Sites\Hyde Park Rana NEGM\Logo.jpg

DESIGN BY

Yasmin Madkour
DRAWING TITLE:

AC plan & Heaters

1.00
1.50
5 TON SPLIT AC DRAWN BY: CHECKED BY: DATE: SCALE:
Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale
0.10

Water heater
0.27 0.27
PROJ. NO. DRAWING NO. Site Engineers
AC OUTLET key

8 Eng / Ahmed Farag


A001
Eng / ElShazly Farag
A

Key

Sympol Description
Air condition
Heater
Heater Outlet
AC Outlet

Inventory

Content AC Outlet AC Heater

reception 0 0
Living 0 0
master bedroom 0 0
gas heater
Kids Room 0 0
0.60

Master
Bathroom 0 1
Main Bathroom 0 1
Kitchen 0 0
Balcony 0 0
corridor 0 0
Total 0 0
CLIENT:
Mr.Abd
AshrafEl-Rahman
Elsayed
PROJECT:

Work Drawings 11 District Villa


For MR: Abd El Rahman

CONSULT BY

wood wall & celling


Sayed Wael
D:\Sandy\BT\Sites\Hyde Park Rana NEGM\Logo.jpg

DESIGN BY

0.25
Yasmin Madkour

1.50
DRAWING TITLE:

Ceiling Key Plan


DRAWN BY: CHECKED BY: DATE: SCALE:
Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale

PROJ. NO. DRAWING NO. Site Engineers

9 Eng / Ahmed Farag


B001
Eng / ElShazly Farag
A

0.15

0.50
0.50
0.50 0.50 0.85

Key

Hatch Level
+- ZERO

-0.20
-0.5
-0.35

0.34
0.80
0.80
-0.10
0.85 1.00 0.84

Futec
Curtain Gap

2.00
Inventory

white (M) White(M2) Futic 12cm Futic 3cm

reception
0.80

Living

master bedroom

Kids Room

Master
Bathroom

Main Bathroom

Kitchen

Balcony

corridor

Total
CLIENT:
Ashraf Elsayed
PROJECT:
Work Drawings in LAYAN
Work Drawings Compound
11 District VillaFor MR:
Ashraf
For MR: AbdElsayed
El Rahman

CONSULT BY

wood wall & celling


Sayed Wael
D:\Sandy\BT\Sites\Hyde Park Rana NEGM\Logo.jpg

DESIGN BY
0.25

Yasmin Madkour
DRAWING TITLE:

Ceiling Plan

0.50
0.50 1.71 1.71 0.50
DRAWN BY: CHECKED BY: DATE: SCALE:

0.26
0.54 1.00 0.54 Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale

0.60
1.14

2.20
PROJ. NO. DRAWING NO. Site Engineers

10

0.26
Eng / Ahmed Farag
B001
Eng / ElShazly Farag
A
0.55 0.90 0.90 1.14 0.93 0.90 1.29

1.64
0.90

0.20

0.20
3.43
1.14

2.21 2.21
All Reception Wall Light on 1.8 F.F.L

0.87
0.20
All Stairs Wall Light on 2.00 F.F.L
0.20 0.20 0.20

2.20
1.14

0.90
0.90
Key
3.43
Aluminium Profile Led

0.90
0.90
Indirect Light
1.73 0.50
1.12

0.30

0.50
2.20 1.73
Chandelier
0.60

Spotlight

1.20
1.14 0.90 0.90 1.34 1.13 0.90 0.90 1.29
Lighting unit
0.80 0.80
wall light
0.98

0.32
1.22 1.00 1.00 1.22
0.70
Emergency Lights
Stair light

0.50
0.98

0.70

0.50
0.50
Inventory
0.70

0.50 0.50
0.50

.A.P.L IN.L CH Spot L.U W.L E.M


Content
0.70

reception
0.20

kitchen
0.20
1.12

0.70 0.70 0.70

1.09
Guest Bathroom

storage room

stairs

TOTAL
CLIENT:
Ashraf Elsayed
PROJECT:
Work Drawings in LAYAN
Work Drawings Compound
11 District VillaFor MR:
Ashraf
For MR: AbdElsayed
El Rahman

CONSULT BY

wood wall & celling


Led Light Sayed Wael
D:\Sandy\BT\Sites\Hyde Park Rana NEGM\Logo.jpg

DESIGN BY
0.25

Yasmin Madkour
DRAWING TITLE:

Lighting plan
Strech celling

DRAWN BY: CHECKED BY: DATE: SCALE:


Yasmin Madkour Sayed Wael 8/12/2020 Fit to Scale

PROJ. NO. DRAWING NO. Site Engineers

11 Eng / Ahmed Farag


B001
Eng / ElShazly Farag
A
NOTE:
All wall lights are at a level of 1.8m F.F.L

Key
One way Switch

Two way Switch

Three way Switch

S Smoke detector

Ventilation switch

Stairs Switch

Indirect Light

Chandelier

Spotlight

Lighting unit

Led light
(electricity outlet) wall light
Deviater Switch

Inventory
.A.P.L IN.L CH Spot L.U W.L E.M
Content
Master bedroom

master bathroom

living

balacony

middle room

balacony

bathroom

Girl room

corridor

stairs

TOTAL

You might also like