TL = 5.90
690.00 MAB. EL.688.75 EL.690.00
Aliran
680.00 A
6.00 6.00
.x. EL.663.00 1:3.2 EL.674.00
..
C
.X.
( As Pipa ) B
. .
670.00 B
.X..
3.00 3.00
.
1:3.2
EL.666.50
5.00 Aliran EL.665.50
1:0.3
EL.667.00 EL.667.00
EL.661.50
ELEVASI ( m ) 660.00 95. 1:2. 1:2.
EL.661.50
EL.662.00
EL.655.00 70 4 4
650.00 6.0
1:2. 06 As Saluran Pengelak
.00
640.00 EL.640.00 Aliran
47.75 17.95 7.22 6.55 28.82 B 0
0.30
As Saluran Pengambilan
C D
( CL ) 6.20 Diletisi Steenlis
1:1
EL.635.00 EL.635.00 Pipa Pesat EL.620.20 Contr. Joint
.0
3,18
Galery
630.00 D.2000 ( As Pipa ) Keliling
EL.635.00
Trolly Monorail Hoist
0,7
1:2.5
5 Ton Capacity
1,4
Katup Angin Ø200
Butterfly Valve Ø 800 mm
Alat Penggerak Elektrik
Katup Pancar Hollow Cone
Handrail Ø 3"
EL.623.00 EL.623.00
620.00 30.00 Pipa Maintenance i=0.0017 i=0.0017
EL center Pipa .619.82
Hollow Cone Valve
Ø 800 mm
D.400 mm 0
EL.615.00
5.88
EL.618.60
EL.618.00
EL.618.00
610.00 ( Sal. Penghubung )
EL.618.16
1,82
I = 26.00°
( Dasar Tunnel )
Pengelak Tunnel Main Plugng 4.20 Pipa Pesat Beton Tak Bertulang Beton Tak Bertulang
EL.618.40
12.00 13.04 Ø 4.20 R = 25.00 D.1400 10.00
Pipa Pesat ( Transisi )
600.00 ( Intake Pengelak ) CL = 11.55 D.2000
26.09 40.00 29.70 85.60 TL = 5.88 C 136.70 D 43.52 37.65 15.00 28.48 17.88 10.10 61.14
( CL ) ( Rumah Katup ) ( Outlet Pengelak )
222.30 96.17
115.30 136.70 ( Conduit )
252.00
( Tunnel )
As Saluran
POTONGAN A - A
S,A
A
Pipa D.2000
0,75
.62
0.0
0 Pipa Irigasi
EL
ran
Ali
.00
23
.00
.6
EL
T
ILE
TO
1 2
R=
IT
UN
H
PL
TM
UN
IT
1
Rumah Katup
2,00
MA
RU
0 mm
60
D=
I = 43.00° D=
80
0 mm
RU
MA
H
KA
TU
P
R = 50.00 .00
0 mm
D=800 mm
80
D=
30
R=15.00
CL = 37.64
mm
00
14
D=
D=800 mm
TL = 19.76 .00
D.1400
.00
1:1.0
15 Aliran
EL.618.00
10
1:0.5
EL.653.00
5
EL.648.00 15.00 50.00 6.20 81.78 43.52 37.6L ) EL.6
23.0
0
Outlet Pengelak
Aliran
Beton Bertulang K.225 (C
0
EL.638.00
18.0
Galery
EL.6
EL.618.16
EL
Lantai akaerja t=10 cm EL.643.00 EL.633.00
2.00 EL.618.00
( As Pipa )
.6
EL.620.20
Contr. Joint Pengelak Tunnel
23
EL.628.00
.0
0
EL. 628.00
EL.638.00 Ø 4.20
0
EL.623.00
EL. 635.0
EL.633.00 R
I = 85.00°
= 6.41 Keliling D.1400
As Bangunan Pengelak
TL = 10.68
S,B EL.638.00 CL = 9.52
EL. 648.00 0,60
TL = 5.88
Pipa Pengambilan
0
EL. 643.0
D.2000
85.60
( Slope )
0,70
0
EL. 638.0
1:2.0
As Pipa Pesat D.1400
EL.66
5.50
DENAH t =10 mm
As Pipa Pesat D.2000 S,A
Contr. Joint
As Bangunan Pengelak
0,30 0
0,30 0,30 2.1
11.63
EL.663.00 R=
( As Pipa ) 0,80
Pipa Pesat D.2000 I = 25.00° Baut Angker D.19
Main Pluging .70
4,20
5,60
t =10 mm R = 15.00 +680.00
0
R=
0,30
28.82
0,70
CL = 6.55 +675.00
2,00
Pipa Pesat D.1400 TL = 3.33
+670.00
t =10 mm
+665.00
1,41
1,23
+670.00
Grating 0,30
5.00
1,80
0,53
Menara Intake
+66
1%
0.00
Pipa Drainase Ø200
1.25
+67
+66
5.00
( CL 5
)
+66
6.5
0,57
0 EL.
0
90.0
2.1 l )
EL.6
ing
Grat
663
R= unne I = 28.00° .00
Drainase
0,80 (T
0,70
R = 50.00 +66
5
1.2
5
As Jembatan
0,70
8.9
0 CL = 24.23 Pipa Keluaran Ø400 (0.20x0.30)
0.7
4,20
Pelayanan
R=
0,30
5,90
0.00
TL = 12.36
+67
5.00
1:2.0
R
+67
X. .
. .
0
0
65.5
62.0
EL.6
EL.6
.50
5,60
1
0
0,80
.66an
65.5
EL.6
EL Alir
Intake Pengambilan
A EL.662.00
POTONGAN D - D
1,00
1,00