You are on page 1of 1

LEMBAR - 61

As Menara Intake I = 27.00°


As Bendungan
R = 25.00
CL = 11.59 12.00
As Saluran Penghubung HOIST
HOIST

TL = 5.90
690.00 MAB. EL.688.75 EL.690.00
Aliran
680.00 A
6.00 6.00
.x. EL.663.00 1:3.2 EL.674.00

..
C
.X.
( As Pipa ) B

. .
670.00 B
.X..
3.00 3.00

.
1:3.2
EL.666.50
5.00 Aliran EL.665.50

1:0.3
EL.667.00 EL.667.00

EL.661.50
ELEVASI ( m ) 660.00 95. 1:2. 1:2.

EL.661.50
EL.662.00
EL.655.00 70 4 4
650.00 6.0
1:2. 06 As Saluran Pengelak
.00
640.00 EL.640.00 Aliran
47.75 17.95 7.22 6.55 28.82 B 0
0.30
As Saluran Pengambilan
C D
( CL ) 6.20 Diletisi Steenlis

1:1
EL.635.00 EL.635.00 Pipa Pesat EL.620.20 Contr. Joint

.0

3,18
Galery
630.00 D.2000 ( As Pipa ) Keliling

EL.635.00
Trolly Monorail Hoist

0,7
1:2.5
5 Ton Capacity

1,4
Katup Angin Ø200
Butterfly Valve Ø 800 mm
Alat Penggerak Elektrik
Katup Pancar Hollow Cone
Handrail Ø 3"

EL.623.00 EL.623.00
620.00 30.00 Pipa Maintenance i=0.0017 i=0.0017
EL center Pipa .619.82
Hollow Cone Valve
Ø 800 mm

Steel Cap/ Hood Aliran


1:2.
0
EL.620.00
1:2.

D.400 mm 0
EL.615.00
5.88

EL.618.60

EL.618.00

EL.618.00
610.00 ( Sal. Penghubung )

EL.618.16

1,82
I = 26.00°

( Dasar Tunnel )
Pengelak Tunnel Main Plugng 4.20 Pipa Pesat Beton Tak Bertulang Beton Tak Bertulang

EL.618.40
12.00 13.04 Ø 4.20 R = 25.00 D.1400 10.00
Pipa Pesat ( Transisi )
600.00 ( Intake Pengelak ) CL = 11.55 D.2000
26.09 40.00 29.70 85.60 TL = 5.88 C 136.70 D 43.52 37.65 15.00 28.48 17.88 10.10 61.14
( CL ) ( Rumah Katup ) ( Outlet Pengelak )
222.30 96.17
115.30 136.70 ( Conduit )
252.00
( Tunnel )
As Saluran

POTONGAN A - A
S,A
A
Pipa D.2000
0,75

.62
0.0
0 Pipa Irigasi
EL

ran
Ali
.00
23

.00
.6
EL

T
ILE
TO
1 2

R=
IT
UN

H
PL
TM
UN
IT
1

Rumah Katup
2,00

MA
RU

0 mm
60
D=

I = 43.00° D=
80
0 mm
RU
MA
H
KA
TU
P

R = 50.00 .00
0 mm

D=800 mm
80
D=

30
R=15.00
CL = 37.64
mm
00
14
D=

Pipa Pesat EL.620.00


0,75

D=800 mm

TL = 19.76 .00
D.1400
.00

1:1.0
15 Aliran
EL.618.00
10

1:0.5
EL.653.00
5
EL.648.00 15.00 50.00 6.20 81.78 43.52 37.6L ) EL.6
23.0
0

Outlet Pengelak

Aliran
Beton Bertulang K.225 (C
0

EL.638.00
18.0

Galery
EL.6

(Primary Pluging) (Main Pluging) ( Transisi )

EL.618.16

EL
Lantai akaerja t=10 cm EL.643.00 EL.633.00
2.00 EL.618.00

( As Pipa )

.6
EL.620.20
Contr. Joint Pengelak Tunnel

23
EL.628.00

.0
0

EL. 628.00
EL.638.00 Ø 4.20

0
EL.623.00
EL. 635.0

0,75 2,00 0,75 EL.618.00


EL. 623.00
I = 46.00°
Inlet Pengelak Aliran 1:2.5 i=0.0017
3,72
EL. 635.00
EL.618.00
R = 25.00
Contr. Joint Pipa Pesat EL. 623.00 CL = 20.19
EL.623.00
Diletisi Steenlis As Pipa Pesat
POTONGAN B - B EL.628.00

EL.633.00 R
I = 85.00°
= 6.41 Keliling D.1400
As Bangunan Pengelak
TL = 10.68
S,B EL.638.00 CL = 9.52
EL. 648.00 0,60
TL = 5.88
Pipa Pengambilan
0
EL. 643.0

D.2000

85.60
( Slope )

0,70
0
EL. 638.0

Pipa Pesat D.1400

1:2.0
As Pipa Pesat D.1400
EL.66
5.50
DENAH t =10 mm
As Pipa Pesat D.2000 S,A
Contr. Joint
As Bangunan Pengelak
0,30 0
0,30 0,30 2.1

11.63
EL.663.00 R=
( As Pipa ) 0,80
Pipa Pesat D.2000 I = 25.00° Baut Angker D.19
Main Pluging .70

4,20

5,60
t =10 mm R = 15.00 +680.00
0
R=

0,30
28.82
0,70

CL = 6.55 +675.00
2,00
Pipa Pesat D.1400 TL = 3.33
+670.00

t =10 mm
+665.00
1,41

1,23
+670.00
Grating 0,30

5.00

1,80

0,53
Menara Intake

+66
1%

0.00
Pipa Drainase Ø200

1.25
+67

+66

5.00

( CL 5
)
+66

6.5

0,57
0 EL.

0
90.0
2.1 l )
EL.6

ing
Grat
663
R= unne I = 28.00° .00
Drainase
0,80 (T

0,70
R = 50.00 +66

5
1.2
5
As Jembatan

0,70
8.9
0 CL = 24.23 Pipa Keluaran Ø400 (0.20x0.30)
0.7
4,20

Pelayanan
R=
0,30

5,90

0.00

TL = 12.36
+67

5.00
1:2.0

R
+67

( Pi =1.00 Beton Tak Bertulang Beton Bertulang K.225


pa
0
65.5
EL.6

Pes Lantai Kerja t =10 cm


at )
1,00
1,80

X. .

. .
0

0,70 4,20 0,70


65.5
EL.6

Pipa Drainase Ø200


0

0
65.5

62.0
EL.6

EL.6
.50

5,60
1

0
0,80

.66an

65.5
EL.6
EL Alir

Intake Pengambilan
A EL.662.00
POTONGAN D - D
1,00

1,00

Pipa Keluaran Ø400


S,B

KEMENTERIAN PEKERJAAN UMUMDAN PERUMAHAN RAKYAT Provinsi :


Beton Bertulang K.225 DIREKTORAT JENDERAL SUMBER DAYA AIR
Lantai Kerja t =10 cm SATKER BALAI BESAR WILAYAH SUNGAI BENGAWAN SOLO
JAWA TENGAH
PEJABAT PEMBUAT KOMITMEN PERENCANAAN DAN PROGRAM
0,70 4,20 0,70 Jl. Solo-Kartosuro Km. 7 PO Box 267, Pabelan, Kartasuro, Sukoharjo 57162, Telp./Fax. (0271) 716248 Kabupaten : KARANGANYAR
JUDUL GAMBAR : INTAKE PENGAMBILAN Pekerjaan :
5,60 0 1.0 2.0 3.0 4.0 5.0 m
STUDI INVESTIGASI TAMBAHAN
UNTUK DD BENDUNGAN JLANTAH
S,B JALUR PIPA PENGAMBILAN No. Register : JLT.1-01-06-01
61
POTONGAN C - C
No. Lembar :
0 20 40 60 80 100 m BBWS BENGAWAN SOLO
PT.
ADITYA engineering
consultant No. Kontrak :
Jalan Batu Permata No. 2A Margacinta Bandung 40287 Tanggal
S,A PPK PERENCANAAN DAN PROGRAM Telp: 62+22-7562994.fAXCIMILE:62+22-7562994
Email: aditya engineering consultant @ yahoo.com
31
Direksi Pekerjaan Disetujui Direncana Diperiksa
HK0203-An.
Januari 02/2017-05
Dr.Yunitta Chandra Sari, SE., ST., MT
2017
Ery Suryo Kusumo, S.Pd., MT. Ir. Suwahno Ir. Hadi Santoso, MT.

You might also like